HomeMy WebLinkAboutContract 59244-FP4FORT WORTHa
-FP4
City Secretary
Contract No. 59244
Date Received 04/18/2023
AT
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Palladium Oak Grove
City Project No.: 104281
Improvement Type(s): Water x❑ Sewer x❑
Original Contract Price:
$243,296.00
Amount of Approved Change Order(s): $2,050.00
Revised Contract Amount: $245,346.00
Total Cost of Work Complete: $245,346.00
Corul1,.1CDT) Jul 17, 2025
Contractor Date
Project Manager
Title
Wildstone Construction
Company Name
��—
J 117, 2025
Carlos Gafcia (Jul 17, 202518:18 CDT)
u
Project Inspector
Date
MotadageMohaw wdem,,TU.
Jut 21, 2025
Project Manager
Date
-',ou"
J 121, 2025
Rebecca Owen (Jul 21. 202510:19 CDT)
u
CFA Manager
Date
-.?"�
J l 2112025
Lauren P ri e u r (Jul 21, 202510:30 CDT)
u
TPW Director
Date
Cvl v
Jul 22, 2025
Asst. City Manager
Date
OFFICIAL RECORD Page 1 of 2
CITY SECRETARY
FT. WORTH, TX
Notice of Project Completion
Project Name: Palladium Oak Grove
City Project No.: 104281
City's Attachments
Final Pay Estimate x❑
Change Order(s): ❑x Yes ❑ N/A
Pipe Report: x❑ Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety'
Statement of Contract Time
Contract Time: 240 WD
Work Start Date: 8/16/2023
Completed number of Soil Lab Test: 96
Completed number of Water Test: 18
Days Charged: 233 WD
Work Complete Date: 9/25/2024
Page 2of2
FoRTWoRTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name PALLADIUM OAK GROVE
Contract Limits
Project Type WATER AND SEWER
City Project Numbers 104281
DOE Number 4281
Estimate Number 1 Payment Number 1 For Period Ending 9/25/2024
WD
City Secretary Contract Number Contract Time 24WD
Contract Date Days Charged to Date 233
Project Manager NA Contract is 100.00 Complete
Contractor WILDSTONE CONSTRUCTION
P O BOX 164429
FORT WORTH, TX 76161
Inspectors G. DEYON / C. GARCIA
Friday, November 22, 2024 Page 1 of 5
City Project Numbers 104281 DOE Number 4281
Contract Name PALLADIUM OAK GROVE Estimate Number I
Contract Limits Payment Number 1
Project Type WATER AND SEWER For Period Ending 9/25/2024
Project Funding
UNIT I: WATER IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
8" PVC WATER PIPE
114 LF
$54.00
$6,156.00
114
$6,156.00
2
4" PVC WATER PIPE
28 LF
$40.00
$1,120.00
28
$1,120.00
3
DUCTILE IRON WATER FITTINGS/RESTRAINT
I TN
$8,000.00
$8,000.00
1
$8,000.00
4
3" WATER METER AND VAULT
1 EA
$30,000.00
$30,000.00
1
$30,000.00
5
2" WATER SERVICE
3 EA
$4,000.00
$12,000.00
3
$12,000.00
6
WATER SAMPLING STATION
I EA
$2,500.00
$2,500.00
1
$2,500.00
7
ASPHALT PVMT REPAIR BEYOND DEFINED
303 SY
$90.00
$27,270.00
303
$27,270.00
WIDTH
8
TRENCH SAFETY
185 LF
$5.00
$925.00
185
$925.00
9
6" PVC WATER PIPE
43 If
$58.00
$2,494.00
43
$2,494.00
10
2" WATER SERVICE, METER RECONNECTION
1 EA
$10,000.00
$10,000.00
1
$10,000.00
11
24"X8" TAPPING SLEEVE & VALVE
2 EA
$25,000.00
$50,000.00
2
$50,000.00
12
24"X6" TAPPING SLEEVE & VALVE
1 EA
$25,000.00
$25,000.00
1
$25,000.00
13
UTILITY SERVICE SURFACE RESTORATION
90 SY
$5.00
$450.00
90
$450.00
SOODING
Sub -Total of Previous Unit $175,915.00 $175,915.00
-------------------
UNIT Ik SANrrARY IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
8" SEWER PIPE
68 LF
$57.00
$3,876.00
68
$3,876.00
2
4' MANHOLE
3 EA
$8,000.00
$24,000.00
3
$24,000.00
3
POST- CCTV INSPECTION
68 LF
$20.00
$1,360.00
68
$1,360.00
4
TRENCH SAFTEY
68 LF
$20.00
$1,360.00
68
$1,360.00
5
EPDXY MANHOLE LINER
22.1 VF
$500.00
$11,050.00
22.1
$11,050.00
6
MANHOLE VACUUM TESTING
3 EA
$250.00
$750.00
3
$750.00
7
REMOVE 4" SEWER MANHOLE
1 EA
$3,000.00
$3,000.00
1
$3,000.00
8
4' MANHOLE W/ BOLT DOWN LID &
1 EA
$9,000.00
$9,000.00
1
$9,000.00
WATERTIGHT GASKET
9
20"CASING BY OPEN OUT
20 LF
$350.00
$7,000.00
20
$7,000.00
10
UTILITY SERVICE SURFACE RESTORATION
30 SY
$5.00
$150.00
30
$150.00
SODDINF
11
4' EXTRA DEPTH MANHOLE
11.8 VF
$325.00
$3,835.00
11.8
$3,835.00
Friday,
November 22, 2024
Page 2
of 5
City Project Numbers 104281
Contract Name PALLADIUM OAK GROVE
Contract Limits
Project Type SANITARY
Project Funding
12 CONCRETE 2 EA
13 ASPHALT PVMT REPAIR BEYOND DEFINED 15 SY
WIDTH (COI)
14 4" SEWER ABANDONMENT PLUG (COI) 1 EA
Sub -Total of Previous Unit
DOE Number 4281
Estimate Number 1
Payment Number 1
For Period Ending 9/25/2024
$1,000.00 $2,000.00
$90.00 $1,350.00
$700.00 $700.00
$69,431.00
2 $2,000.00
15 $1,350.00
1 $700.00
$69,431.00
Friday, November 22, 2024 Page 3 of 5
City Project Numbers 104281
Contract Name PALLADIUM OAK GROVE
Contract Limits
Project Type SANITARY
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 1
Total Contract Price
DOE Number 4281
Estimate Number 1
Payment Number 1
For Period Ending 9/25/2024
$243,296.00
$2,050.00
$245,346.00
Total Cost of Work Completed $245,346.00
Less % Retained $0.00
Net Earned $245,346.00
Earned This Period $245,346.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$245,346.00
Friday, November 22, 2024 Page 4 of 5
City Project Numbers 104281
Contract Name PALLADIUM OAK GROVE
Contract Limits
Project Type SANITARY
Project Funding
Project Manager NA
Inspectors G. DEYON / C. GARCIA
Contractor WILDSTONE CONSTRUCTION
P O BOX 164429
FORT WORTH, TX 76161
DOE Number 4281
Estimate Number 1
Payment Number 1
For Period Ending 9/25/2024
City Secretary Contract Number
Contract Date
Contract Time 240 WD
Days Charged to Date 233 WD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $245,346.00
Less % Retained $0.00
Net Earned $245,346.00
Earned This Period $245,346.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$245,346.00
Friday, November 22, 2024 Page 5 of 5
DocuSign Envelope ID: D743BB06-A39C-478D-80C7-7F6D07E27A3C REVIEWED `
By Mosadage Mohammdeen at 10:19 am, Sep 12, 2023
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PPROJECT NAME:
PALLADIUM OAK GROVE
I CHANGE
CONTRACT:
Water, Pavinq, Drainaqe and Street Liqhts
ORDER No:
ICFA #
CFA22-0086 CITY PARTICIPATION:(
N/A
CITY PROJECT #
104281
IPRC #
IPRC22-0146
IFID #
30114-0200431-104281-EO7685
IX -Number
X-27464
IFILE #
W-2862
INSPECTOR:
Eric Yarger Phone No:
PROJECT MANAGER:
VICTOR TORNERO, JR. P.E. Phone No:
817-392-7830
CONTRACT UNIT
WATER SEWER
PAVING
DRAINAGE
STREET LIGHTS
CONTRACT DAYS
Developer Developer
Developer
Developer
Cost City Cost Cost City Cost
Cost Citv Cost
Cost
City Cost
Developer Cost
City Cost
ORIGINAL CONTRACT
$175,915.00 $0.00 $67,381.00 $0.00
$227,625.00 $0.00
$293,195.00
$0.00
$157,266.00
$0.00
120
(EXTRAS TO DATE
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00
$0.00
$0.00
$ -
$0.00
CREDITS TO DATE
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
I
CONTRACT TO DATE
$175,915.00 $0.00 $67,381.00 $0.00
$227,625.00 $0.00
$293,195.00
$0.00
$157,266.00
$0.00 I
120
(AMOUNT OF PROP. CHANGE ORDER
$ - $ 2,050.00
1 $0.00
$0.00
$ -
REVISEDCONTRACTAMOUNT
$175,915.00 $0.00 $69,431.00 $0.00
$227,625.00 $0.00
$293,195.00
$0.00
$157,266.00
$0.00
120
TOTAL REVISED CONTRACT AMOUNT PER UNIT
$175,915.00 $69,431.00
$227,625.00
$293,195.00
5157,266.00
REVISED COST SHARE
Dev. Cost: $923,432.00
City Cost:
$0.00
TOTAL REVISED CONTRACT
$923,432.00
Revised: 10-12-2011 Page 1
DocuSign Envelope ID: D743BB06-A39C-478D-8OC7-7F6D07E27A3C
You are directed to make the following changes in the contract documents:
CITY BID ITEM
PAY ITEM #
# QUANTITY UNIT
ITEM DESCRIPTION
UNIT 1: Water Improvements
I
UNIT II: Sanitary Sewer Improvements Total
3201.0202
1 13* 15 SY
Asphalt Pvmt Repair Beyond Defined Width
0241.2101
14* 1 EA
I
4" Sewer Abandonment iuq
I I
UNIT II: Sanitary Sewer Improvements Total
UNIT III: Drainaqe Improvements
1
UNIT III: Drainage Improvements Total
UNIT V: Street Lightinq Improvements
UNIT V: Street Lightinq Improvements Total
I
TOTAL
Asterisk (*) indicates New Pay Item
REASONS FOR CHANGE ORDER
Added existing sewer service abandonment
REVIEWED
By Mosadage Mohammdeen at 10:19 am, Sep 12, 2023
UNIT PRICE
$ 90.00 $
$ 700.00 $
1$
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED: APPROVED: APPROVED:
[i°&Hsi Ofi� ) Yigineer) Eel7ERWigned by: on�jVV igned by:
y.y: fb i atn �t.E9542BC98F6C440._ A39FBBBCCA854EE... 853E47886AD2410...
Name: Jonathan Hake - Cross Enqineerinq Name: Scott Johnson - Palladium East Berry, Ltd. Name: John Kolb - Wildstone Construction
Title: Vice President Title: Senior Vice President Title: President
TOTAL
1,350.OD
700.00
2.050.00
Revised: 10-12-2011 Page 2
i
"Fa . .. nacpilu�
I
/ l /llr II
. /PeNA1C SCAN
r-
r
�., - � f '� gerA•.x
Fes. ;. � T ' ..• .
�l
640 EX. 12" SS LINE s4,
H: 1•=40'
635 f3p_ 65
CAUTIONII wf •���
E,I,ting UUIU,, In Are,. Contractor
,hall det,ml,, Ioeatl,n end plow I n--$-odep�yi. --yf ;I - -------
of all utllltT,, prior to c notructlon
Contractor Mall Inform Engineer of
ony conflicts prior to --trucflon.
Net•
E.ivtlnq OtIIIUea STa.n Per Ae D-In"If
L--Lein Dept ctof to FlaIO eee Pd
Lacatlan and Depth en of All Dllliden Pdor
to CwuWCUon ontl Notl/y Englnevr of
any DhcreDancle.
Ngtc
All Improwmente em of Meters
Are Priwte and By
Sep
Seperote Contract
Temporaroy Service, May Be Rv Tnod to
Insure th t No Ca.tomer Hoe S—
Intenupted.
1630 630
L
625 -._ - / I I 625
. -�' - -- - - -- 620
�Nbly
a iru
615 1615
610 610
0
i
660
PUBLIC SS NORTH 660
H: 1'nap'
655
5£E �
-r€ p_
655
-
at„ a
a„
650
650
/
645
/
645
640
II
n.
640
Iv umJ
635
635
630
z er
rr
630
l: 0+00 1+00
REVIEWED
6rAf...wg.ww.,lmm..n.rrr:sD.n, LprygDZf J
® 0 "010C
GRAPHIC
�
1" 40'
WATER & SANITARY SEWER NOTES
1. All natodal, a.d naUuction Mall be In ....dance Ith the Clty of
Fort Wv M Standard speclfcatlon. and Con—tlon Stondord� and
Standard sp-Ifl-tlan. far Public Works C...tru U- prepvr by N—
Central Tana. C,—Il of Gowmmente (Let..t R.N.lon) end to the
raga atone of The T.—Comml.elon onEnNronmental Ouvllty.
z E.l.Ung utllltl., are Mew oh—t ally end are for the contmct—
guld ce only The location and/o olew0on of -Lang unntlec a Mown
mene" plan. a e based an v rde of Nv mr' a ulllldn c P. III. end.
ere I ... lbie, m . —ntertoken In Me flold.eJmI a t,otor mu t call
— appropriate tlllty company at least 72 houn prior to any ...—Uen
to request ...ct field l...tl.n of uV111A...
3. The contractor .hall be r pon.IEle for protecting all e.letlnq
kn no—ont. In the co U,etlon of to , P,oL The centrvcior la
no,p=ble for opal.. f d.mago to nyoezl.11nq Imprewment. dudnq
o ,traction. Hepvim shall be equal to r better on condition prior to
mn,tru.U_
4. All sewer (In,. shall be PVC SDR-26
5. All manhoe Hm g vdee must math gnt—d grvd. In paved are...
Marshal» netructed in lend ... pe vreea must haw a final rlm grade .1.
Inches (6-) above 8na1 grade.
6. All water of,. Mall be DR-14, Cl.. 200 PVC water pip., conforming
to AWWA Cg00 standard.. ..,not MI. Line.
1. Contmator on be ...pe-W. for mamt.imng trenm eatery
requlr.m.nty In a w d...I elth the latest vt,.d,,d. of O.S.H.A, I, any
elver agency hating lurhdletlon for e.eawU n nd lmnchinq crocedurev
Contractor shall proWtla and Implement a trench .ofety plan omDlNng Ith
O.S M_
8. Flra eprinkle1 Ilne hall be .1. and In.tvlled by a state Il -oaf
eontrvctor. Flra Llne shaven for reference only.
9. Flra prptectlpn -Inn. shall have n oaf occaea,—Pelnla, lectrical
panels, et...go. Bre Protection room, are for Flra Alarm and Cenirol
system. uses
FIRE LINE NOTE
1. All underground gre Ilne and remote MC piping .hall be v mt—,
of Gaev 200/DR 14 or better. Embedment .hall be No. 4 crushed
atone. Dept, of Bury'- minimum If 46 inch,. from grade to the
top of the pipe. All ,d.rgr.u,d flra Ilnee begin at the point of
action to the circulating public/privetl
water main and
terminate at the top of tie eplgot place 1 ft.obe- N. onlehed
floor and no moro then 5 ft melds - W(ding.
I rnFNo
- - - - Prepa,ea 4 arse
A
t.y-d STOP!
— ®X.;1 wln CALL BEFORE YOU DIG
WSS STUDY NO. WSL-2022-1895 Qj Added Abandonment of E. Ss S.—
cc I Lme a,re.: Rrnaanc n.re: ..
0+75 0+00
1 bx/n, >/1s/2.vz nnz, R CC ENGINE&SING
CITY BENCHMARK: SITE BENCHMARK: I3 1u/11/2tg1 2 �1\OVV CONSULTANTS F.4
.cape _ al.eee,e alder v � one. a . Mt��oo verso. see
sea enap�wu oi�.•r. a�i•nn'• b t I5 12/n1 /'ll_ 'P=�eum'0'e+ Tm.P£Pom Na FSWS 9l]e : ��
D aw eSpDe n en,N ]oo ��aew�u and poleoe 14 nl/1-/2u2, n CheeNnl 65: salc , LL't.�4
w. - .oulnwrt mmw u. wepn pne•M•t e[Ma.-6g0.]I I T n2/n2 r"02M1 C.LL('..L I C_LC1. IH, 1"�4,' V:1".a' ,e••••@/Ol/t�
,veanbu+,N
(® leeet 72 houn pd., to dgghg)
SANITARY SEWER I I'll
PLAN 8c PROFILE CIS,
PALLADIUM OAK GROVE
PALLADIUM OAK GROVE, LTD.
CITY OF FORT WORTH, TEXAS
U
REVIEWED
By Mosadage Mohammdeen at 11:12 am, Dec 11, 2023
DEVELOPER-AINARDED-PROJECT CHANGE ORDER /
PROJECT NAME:
PALLADIUM OAK GROVE
CHANGE
CONTRACT:
Water, Paving, Drainage and Street Lights
ORDER No:
CFA #
CFA22-0086
CITY PARTICIPATION:
N/A
CITY PROJECT #
104281
IPRC #
IPRC22-0146
2
FID #
30114-0200431-104281-E07685
X-Number
X-27464
FILE #
W-2862
INSPECTOR:
Eric Yarger
Phone No:
PROJECT MANAGER:
VICTOR TORNERO,
JR. P.E. Phone No: 817-392-7830
CONTRACT UNIT
WATER
SEWER PAVING
DRAINAGE STREET LIGHTS
CONTRACT DAYS
Developer
Developer Developer
Developer
Cost City Cost
Cost
City Cost Cost City Cost
Cost
City Cost_
Developer Cost city Cost
ORIGINAL CONTRACT
$175,915.00 $0.00
$67,S81.00
$0.00 $227,625.00 $0.011
$293,195.00
$0.00
E157,266.00 $0.00
120
EXTRAS TO DATE
$0.00 $0.00
$2,050.00
$0.00 $0.00 $0.00
$0.00
$0.00
$ - $0.00_
CREDITS TO DATE
$0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00
$0.00
$0.00 $0
CONTRACT TO DATE
$175,915.00 $0.00
$69,431.00 $0.00 $227,625.00 $0.00
$293,195.00
$0.00
$157,266.00 $0 _
120
AMOUNT OF PROP. CHANGE ORDER
REVISED CONTRACT AMOUNT
$
$175,915.00 $0.00
$ $0.00
$69,431.00 $0.06 . - $227,625.00 $0.01)
$ 3,386.00
$296,581.00
$0.00
$
$157,266.00 $0.00 _
120
TOTAL REVISED CONTRACT AMOUNT PER UNIT
$175,915.00
$69,431.00 E227,625.00
;296,581.00
$157,266.00
REVISED COST SHARE
Dev. Cost:
$926,818.00 City Cost:
$0.00
TOTAL REVISED CONTRACT
$926,818.00
Revised: 10-12-2011 Page 1
You are directed to make the followinq chances in the contract documents:
CITY BID ITEM
PAY ITEM ti # QUANTITY U VIT
`UNIT I: Water Improvements
(UNIT II: Sanitary Sewer Improvements Total
UNIT II: Sanitary Sewer Improvements Total
UNIT III: Drainage impis-FRents
313T0103 11" 25 SY Large Stone Riprap, Groutec
UNIT III: Draina q+ prQvements Total
CLIN1T V: Stree4 Lighrttinq Improvements
(
UNIT V: Street Liahtina Improvements Total
( TOTAL
Asterisk (') indicates New Pay Item
REASONS FOR CHANGE ORDER Added grouted rip rap
NO CITY FUNDS INVOLVED IN THIS CONT " CT. DEVELOPER IS I
REIMBURSEMENT FROM THE CITY WILL SOUGHT BY THE DE'
:.Jathan
ENDE APPROVED:
ng gineer) (Developer)
me Hake -Cros En Bering Nam Scott J sident I/ Title: Seniglr Vice
REVIEWED
By Mosadage Mohammdeen at 11:13 am, Dec 11, 2023
ITEM DESCRIPTION UNIT PRICE TOTAL
S 135.44 $
BLE FOR 100% OF THE CHANGE ORDER COST AND NO
APPROVED:
(conbsc"
By,
t
East Berry, Ltd. Name; ,ahtt W�%dsttone Construction
Title: Rrasld!6/
3,386.00
3,386.00
Revised: 10-12-2011 Page 2
PROJECT NAME:
CONTRACT:
CFA #
CITY PROJECT #
IPRC #
FID #
X-Number
FILE #
INSPECTOR:
PROJECT MANAGER:
ORIGINAL CONTRACT
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
AMOUNT OF PROP. CHANGE ORDER
REVISED CONTRACT AMOUNT
TOTAL REVISED CONTRACT AMOUNT PER UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PALLADIUM OAK GROVE
Water, Paving, Drainage and Street Lights
CFA22-0086 CITY PARTICIPATION: N/A
104281
IPRC22-0146
30114-0200431-104281-EO7685
X-27464
W-2862
Carlos Garcia Phone No: 817-925-4381
Mosadage Mohammdeen Phone No: 817-392-2443
REVIEWED
By Mosadage Mohammdeen at 10:07 am, Mar 11, 2024
10
CHANGE
ORDER No:
3
CONTRACT UNIT
WATER SEWER PAVING DRAINAGE
Developer Developer Developer Developer
Cost City Cost Cost City Cost Cost City Cost Cost City Cost
$175,915.00 $0.00 $67,381.00 $0.00 $227,625.00 E0.00 $293,195.00 $0.00
$0.00 $0.00 $2,050.00 $0.00 t $0.00 ' $0.00 $3,386.00 $0.00'
$0.00 $0.00 $0.00 $0.00 $0.00 $o.0o $0.00 $0.00'
$175,915.00 $69,431.00 $227,625.00 $296,581.00
$ $ $ 4,689.44
$175,915.00 $0.00 $69,431.00 $0.00 $232,314.44 $0.00 $296,581.00 $0.00
$175,915.00 $69,431.00 $232,314.44 $296,581.00
Dev. Cost: $931,507.44 City Cost:
$931,507.44
STREET
LIGHTS
CONTRACT DAYS
Developer Cost
City Cost
$157,266.00
' $0.00
120
$
$0.00
$0.00
$0.00
$157,266.00
120
$157,266.00
120
$157,266.00
Revised: 10-12-2011 Page 1
REVIEWED
By Mosadage Mohammdeen at 10:07 am, Mar 11, 2024
You are directed to make the tollowing changes in the contract documents:
CITY BID ITEM
PAY ITEM #
# QUANTITY
UNIT
ITEM DESCRIPTION
UNIT PRICE
UNIT IV: Paving Improvements
10* 2
SF
0241.0100 Remove Sidewalk
$
465.00 $
2 2
SF
3213.0301 4" Conc Sidewalk
$
79,72 $
11* 60
LF
0241.1300 Remove Conc CurbBGutter
$
24.00 $
6 60
LF
3216.0101 6" Conc Curb and Gutter
$
36.00 $
UNIT IV: Paving Improvements Total
I I I
I
$
TOTAL
$
Asterisk (*) indicates New Pay Item
REASONS FOR CHANGE ORDER
Added curb and sidewalk removal
and replacement
NO CITY FUNDS INVOLVED IN THIS CONT CT. DEVELOPER I RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL E SOUGHT BY THE VELOPER.
RE MEN APPROVED: I APPROVED:
( nsultin ngineer) (Develo (Contractor)
s �
By: By: By: // ta-Z 104,a J�
nathan Hake - Cro F _ ineering Name: ott Jo on - dlalladium East Berry, Ltd. Name: Brandi Prather - FB Potter Concrete, LLC
tie: Vice President Title: Senior Vice spent Title: CFO
TOTAL
930.00
159.44
1,440.00
2,160.00
4,689.44
4,689.44
Revised: 10-12-2011 Page 2
PROJECT NAME:
I CONTRACT:
ICFA #
CITY PROJECT #
IIPRC #
IFID #
IX -Number
FILE #
INSPECTOR:
PROJECT MANAGER:
(ORIGINAL CONTRACT
EXTRAS TO DATE
(CREDITS TO DATE
ICONTRACT TO DATE
(AMOUNT OF PROP. CHANGE ORDER
(REVISED CONTRACT AMOUNT
TOTAL REVISED CONTRACT AMOUNT PER UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
REVIEWED
By Mosadage Mohammdeen at 11:34 am, Jul 09, 2024
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PALLADIUM OAK GROVE I CHANGE
Water, Pavinq, Drainaqe and Street Liqhts ORDER No:
CFA22-0086 CITY PARTICIPATION: N/A
104281
IPRC22-0146 4
30114-0200431-104281-EO7685
X-27464
W-2862
Carlos Garcia Phone No: 817-925-4381
Mosadage Mohammdeen Phone No: 817-392-2443
WATER I SEWER
Developer beveloper
Cost I City Cost Cost City Cost
$175,915.00 I $0.00 I $67,381.00 $0.00
$0.00 I $0.00 I $2,050.00 $0.00
$0.00 $0.00 I $0.00 $0.00
$175,915.00 $0.00 I $69,431.00 $0.00
$ I I $
$175,915.00 I $0.00 I $69,431.00
$175,915.00 I $69,431.00
Dev. Cost: $946,315.44
CONTRACT UNIT
PAVING
I DRAINAGE
STREET LIGHTS
beveloper
eveloper
(Cost I
(Developer
Cost
City Cost
City Cost
Cost
City Cost
$227,625.00
$0.00
$293,195.00 I
$0.00
$157,266.00
$0.00
$4,689.44
$0.00
I $3,386.00 I
$0.00
$
$0.00
$0.00
$0.00
I $0.00 I
$0.00
$0.00
$0.00
$232,314.44
$0.00
I $296,581.00 I
$0.00
$157,266.00
$0.00
$ 14,808.00
I I
$
$247,122.44
$0.00
$296,581.00 I
$0.00
$157,266.00
$247,122.44
$296,581.00
$157,266.00
City Cost:
$0.00
$946,315.44
CONTRACT DAYS
120
120
120
Revised: 10-12-2011 Page 1
You are directed to make the following changes in the contract documents:
CITY BID ITEM
PAY ITEM # #
QUANTITY
UNIT
UNIT IV: Paving Improvements
7
688
SF
12*
77
SY
13*
1
LS
UNIT IV: Paving Improvements Total
Asterisk (*) indicates New Pay Item
REASONS FOR CHANGE ORDER
Added asphalt removal and replacement
REVIEWED
By Mosadage Mohammdeen at 11:34 am, Jul 09, 2024
ITEM DESCRIPTION
0241.0402 Remove Asphalt Drive
3201.0202 Asphalt Pvmt Repair Beyond Defined Width
Mobilization
TOTAL
UNIT PRICE
$ 3.00 $
$ 72.00 $
$ 7,200.00 $
$
TOTAL
NO CITY FUNDS INVOLVED IN THIS CONTRCT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL E SOUGHT BY THE DEVELOPER.
REC MMEND APPROVED: APPROVED:
(C suiting ngin(Developer) (Contractor)
By: By: �'� 7.9.20246y 07/09/2024
nathan Hake - Cros/ EEr meerinq Name: Scott Jo nson - Palladium East Berry, Ltd. Name: Jordan Lannuier - Treymore Construction
Vice President // Title: Senior Vice President Title: SPM
2,064.00
5,544.00
7,200.00
14.808.00
14,808.00
Revised: 10-12-2011 Page 2
FORT WORTH,
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Palladium Oak Grove
CITY PROJECT NUMBER: 104281
WATER
PIPE LAID SIZE TYPE OF PIPE LF
C-900 8 pvc 114
C-900 4 pvc 28
C-900 6 pvc 43
FIRE HYDRANTS: N/A VALVES (16" OR LARGER) N/A
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes uploaded to Accela
NEW SERVICES: 2" Copper 3EA
I SEWER
PIPE LAID SIZE TYPE OF PIPE LF
SDR26 8 PVC 68
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes uploaded to Accela
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 7941 • Fax: (817) 392 - 7845
FORTWORTH.
M,
TRANSPORTATION AND PUBLIC WORKS
November 18, 2024
Wildstone Construction
12850 Highway 287
Fort Worth, Texas 76052
RE: Acceptance Letter
Project Name: Palladuim Oak Grove
Project Type: Water, Sewer, Drainage
City Project No.: 104281
To Whom It May Concern:
On October 1, 2024 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on November 18, 2024. The final
inspection and the corrected punch list items indicate that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on November 18,
2024, which is the date of the punch list completion and will extend of two (2) years in accordance with
the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
925-4381.
Sincerely,
MosadageMohara im,,TE
Mohammdeen Mosadage, Project Manager
Cc: Carlos Garcia, Inspector
Gary Deyon, Inspection Supervisor
Lorrie Pitts, Senior Inspector
Mohammdeen, Mosadage , Program Manager
Cross Engineeing Consultants, Consultant
Wildstone Contruction, Contractor
Palladium Oak Grove, LTD., Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
ALL BILLS PAID AFFIDAVIT
State of Texas
County of Dallas
BEFORE ME, the undersigned authority, on this day personally appeared John Kolb, known to me to be a
credible person and officer of Wildstone Construction LLC and who, being duly sworn, upon his oath
declares and acknowledges as follows:
1. I am a duly authorized agent of Wildstone Construction LLC, which has authorized me to make
this affidavit, and all of the recitations herein are true and correct.
2. Pursuant to Private Development Contract No. 828.106 between Treymore Construction LLC and
Wildstone Construction LLC for Palladium Oak Grove, Wildstone Construction LLC has
supplied materials and performed labor in connection with the construction of improvements on
real property contracted by Treymore Construction LLC in the Fort Worth,
3. Wildstone Construction LLC has actual knowledge that all bills owed by Treymore Construction
LLC to Wildstone Construction LLC for materials supplied or labor perfonned in connection
with the improvements have been fully paid and satisfied.
4. Wildstone Construction LLC has actual knowledge that all bills owed by Wildstone Construction
LLC to others for materials supplied or labor performed in connection with the improvements
have been fully paid and satisfied.
5. Wildstone Construction LLC has actual knowledge that there are no claims or liens for materials
supplied or labor performed in connection with the Private Development Contract.
6. Wildstone Construction LLC further warrants that should any claim or lien be filed for material
supplied or labor performed in connection with the Private Development Contract, Wildstone
Construction LLC will immediately furnish a bond pursuant to Texas Property Code Sections
53.236 through 53.238 for release of each the claim or lien, obtain settlement of any claim or lien,
and furnish the City of Dallas written full release. Wildstone Construction LLC agrees to fully
indemnify and hold harmless the City of Dallas from any and all costs that may occur by reason
of such claims or liens.
EXECUTED this _3rd_ day of _December—, 2024`
By
NAME:_Jo
TITLE: Presi
STATE OF TEXAS
COUNTY OF TARRANT
LLC
This instrument was acknowledged before me on
December 3.2024 by
John Kolb President of
Wildstone Construction a
LLC corporation, on behalf of
raiid1corporation.,
ANIA-NDA LEIGH PATREDIS
U'
`a.' `• _Notary Public. State of Texas
Expires 05 Q8 2027
ARY PUBL
lam,•. : Cornrn_
Notary ID 134346448
No Consent of Surety on our maintenance bond.
-Wildstone Construction LLC, Cody Lange PM