Loading...
HomeMy WebLinkAboutContract 63287-PM1CSC No. 63287-PM1 2RTWORT PROJECT MANUAL FOR THE CONSTRUCTION OF PA VING & PEDESTRIAN LIGHT TO SER VE PAR WA Y IMPRO VEMENTS FOR JPS PARKING GARAGE IPRC Record No. IPRC 25-0015 City Project No. CPN 106001 FID No. 30114-0200431-106100-EO7685 X File No. N/A File No. K-3334 Mattie Parker Jesus "Jay" Chapa Mayor City Manager Lauren Prieur, P.E. Director, Transportation and Public Works Department Christopher P. Harder, P.E. Director, Water Department Prepared for City of Fort Worth and Tarrant County Hospital District 5C4TT A. GIB50N r 89290 t C Ns 1,4XX 10NAl- March 2025 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX A ^.6, tnp teague nail & perkins 5237 N. Riverside Drive, Suite 100 Fort Worth, TX 76137 817.336.5773 ph 817.336.2813 fx TBPE Registration No. F-230 www.tnpinc.com BKA 22446 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 4 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions Last Revised i20/2020 001113 nno�3 invitation to Bidders + Bidders I$�YtIf.R°1.�'�i1JM�v-axc�cccr� 03 03,90/2mn va-avravzv in 004100 00 42 43 00 4313 Bid FE)fm Proposal Form Unit Price Bid Boni 04 T 05/22/2019 04,102Q014 00 45 11 Bidders Prequal fication's Prequalification Statement Bidde- U-o,,u l;fiea4io A..plie., v�v�r�v�� 04/02/2014 09/01/2015 v�r✓-rr 0045 12 0045 13 00 45 26 00 45 40 ie Contractor Compliance with Workers' Compensation Law Minerity Business Enterprise Goal 03/09/2020 04/02/2014 09,91Q019 00 52 43 Agreement 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 Maintenance Bond 01/31/2012 00 72 00 General Conditions (EJCDC) 11/15/2017 00 73 00 Supplementary Conditions (EJCDC) 07/01/2011 0073 10 Standard City Conditions of the Construction Contract for Developer 01/10/2013 Awarded Projects Division 01 - General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 i 20 Preconstruction Meeting + 08/30/2013 i 0i 3 vrTrry 01 3233 Pr-aje Meeting Preconstruction Video 07,10 2 mTVT-rviT 08/30/2013 01 3300 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 0157 13 Storm Water Pollution Prevention Plan 07/01/2011 01 6000 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 0177 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 4 Technical Specifications which were modified by the Engineer specifically for this Project: NONE MODIFIED. Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httn:Hfortworthtexas.Lyov/tpw/contractors/ or httus:Hauus.fortworthtexas.Lov/Proi ectResources/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 12/20/2012 02 � 1 1 � T 441 ty D om.,v.,1 / A 1..,,-,.1.,a.,-,en 1 7 /7zzi-20/2012 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 12/20/2012 03 211 13 Qm4felled row St fora, >, a.,tor;.,l (Cr SM4 17/7 z 03 34- 6 ('onerete Base Material for Tf:enel, Re '1 * 1/'l z 03 go 00 Modificatio 0 Ex.-iod g Gonerote Strad res 1 �/�ii Division 26 - Electrical 26 05 00 Common Work Results for Electrical 11/22/2013 16 0!5 r0 -DL-Q, .,A1;t;A0 - r>r1eetr;e-1 S„steFAS 1�/�12- 26 05 33 Raceways and Boxes for Electrical Systems 12/20/2012 26 05--43• T Tnde -gr-o ,,-,.1 Duets .,,-,.1 Raee,, ays for- RlorvtP��� E-j"stems n7/nmT01/2 i Division 31 - Earthwork 31 WOO nn Site rleafi g 000001 3123 16 T T,-,elassifie.l 1~.,.,.,y do n1 /28/2013 �v v-r� L-vrz-o,� 31�2 Berro nPIo11T-28/20i3. 21 U nn 1 n198/20 3 �rz�-� Fil`�, u�i$ � vn-zvrav�� 31 25 00 Erosion and Sediment Control 12/20/2012 31�0 Gabiens 171 /7 z 3 i 37 00 Ripr-ap 12/20/2012 Division 32 - Exterior Improvements 3201 1'T 7 Dor,v,a- e % ��t 1700 �'1z~...t Itvrllzr� A 3201 18 Temporary Asphalt Paving Repair 12/20/2012 3-2-0-129 Q-avravzz I 1 1 72 F40-*i-ble B-Ase /'oiffSOS 17/7n/7n17 �� rz�-avraviz 32 1129 T ifne Treated Base !''.,,,r17/20/7017 32 1133 GefnefA Treated Base CE) 12/20/2012 32 1137 Liquid Treated Soil 04/2T1 20is 27� Asphalt It DaA lillp; Q/20% 32 �3 ,z 32 13 13 Coner-ete Paving 110010012 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 06/05/2018 CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN 106001 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 4 273 n12 Gonar0to )Zl.ii}g 13frit Eaalant8 12 /2n/2 32 14-16 €'3i'lJ1 T ftitt Pavii3g 17/7 i 32 16 13 Concrete Curb and Gutters and Valley Gutters 10/05/2016 2'l�3 Pavement T afki,- gs 1 1 /7Trr22/20i31 27�3 r a Gate-s 12/2n/2n12 .�i'�'Y. rV14 � �r�vr=v�z 2'72 32 113 Cast i Dlae (`.,� Walls 06/nc�a4 3291 19 Topsoil Placement and Finishing of Parkways 12/20/2012 3292 13 Hydro -Mulching, Seeding, and Sodding 12/20/2012 32 93 43 Trees and Shrubs 12/20/2012 Division 33 - Utilities 22�0 Bypass Dumirlix • of Existing Sewer Systo12/7zzi-20/2012 22� Toro. T2..,,.l;r.,. a -ad Qeet-f oa ``Dime$ Q/ z 22� !'',,f fesio Control Test Stations 1 2 /rz� 20/20Q 3304 12 Magnesium Anode r,.t1.,,,1ie Pr-ateeti,,,., Syste,.... 12/20/2012 22 nn 2n To,....,.efar-y Water- Serviee /01 ,-/2n1 1 --�-�o Q,n7�ten 33 04-50 of Sewer- Mains 1 � /��2 22�o Utility Trench Excavation, 1—tri dment, anBackfi11 17/12/ 016 3305 i2 Water !,,.,i:� La in 1�2/'1rz�20/20ia 3305 1 2 Fr- ,1 Gr-a e Rings n1 /22/2016 �--v�-T� r r-ai��C6vEli-inm -vi-c�c�xr�.�C�st�Tvix ors-�crz o xv 3305 n G 13.10 F-r- ,1 (`_ ade Dings n 1 /22 /201 6 T✓-v�-rrz-c'iii3�E6��' " C�irr�6��c mr�o�v 33 A54 n,a;usti g Manholes, inlets, Valve Boxes a -ad c,.uet es to r_r.,ae 1�/��2 22�6 Gonerete Water Vaults 12/2rz�avr2viz 22 nc 2n Auger- Ber-i g 12/20/2012 a�--v�-zv rrag�rvvnrig � 22 nG Tu.l���r1�7z 1 1 T ' l }� 12/20 204- ���� 33 05 22 Steel crac/.11-g, pipe 1 /�Q 33 05 23 end Timno!ing 1 /�Q 22 nC 24 installation of Gaf.-;or Pipe i,,, Casing E)r- T,,finel Liner- r Plate i2/09/7027 330526 U4 ity Ti afkers/T .,e ter- 12/20/2n1'l 330530 T.e do of Existing Utir/anranzz 22 11 nC Bolts Nttom ,a Gaskets 12120/7n12 TJ-Z r-v� , , rz�-avraviz 33 iii io Huoti'.QIraPipe Q112rz�0/2viz 22 1 1 1 T 1 Ductile Tr on Pitt✓ngs 12/2n/2n17 ���� 12 11 12 D 1yyif yl !'h ride (PVC) Press ro Pipe 1 11 1 /1 a8 22 1 1 1 2 Goner-eteD--rressu-Fe Pipe Bar- Tx7r wed, Steel Cy'lindercrType i2/20/20i2 .P- 11 11 feel Nj�c Gmd Fittings 12/�12 22 Q 1 n Water- Seryi„es 1 ine to 2 inel- m/1 n /2n1 � Iry V�T1"Zp1T Tszzzv Q-avravzz 22 12 21, 1, Axx WA Rubber Seated Butterfly Valy 1'l/'1zzr�mzviz 22�5 rto EGidD n xx/.�� 02,106/2013 22 1230 C Air- Valve Assemblies for- Water Systems 17/2n/2n12 �v oYPi .1:�11Jn � �- CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN 106001 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 4 331250 � 22�o 3,2 21 12 22 21 12 'P- 21 If 333120 32 21 �i7,, QY E:�rY' lJ Ft-atiAiiS C`+.,„,1.,,.,1 Bow efFValve Cufe,l in Dl.,ee Pipe (CIDD\ Fiberglass Rei fo-ee.l Pipe High Density Polyethylene Polyvinyl Chloride (nnIr4 L Uyr4 , 2/2n/2n, 2 rLrzvrLv�z nssemb 06/1 4 ,7/'lrt,-20/20Q forl-"_fa-yity Sanitary Sewer ,2/20/20Q (I-IDP,E) Pira. for- Sanitafy cewe-f 17/7m-20/1012 r_,-.,yity Sa-nit.,,-y ca,,,a,- —. 06/1 o/2n1 2 Close D-efle r, San. Sewer- U:„a 12/2 z, 2, yity c ,„; �� c�,P�r Flip Trnisg Q/�Q '2\2 21 '1'2 Sanitary Sewer- Pipe Eala,,, gea„+ ,'1/7 z 22�o Sanit. y Sewer- cery ee Gennec6onc-and ce,,,;ee Linee nn Q6/2013. 22�0 rozmbim;:e„ n;, Lalye fo 1,2/l z 3339 10 �o 22� 30 r In _ , n „ ,.e re„ee+e ��1 n,-eeast Co ere+e Manho Manholes , � /'1�Q Q/20/20Q ,2/7 33 ✓9 22�0 22�o 22 1 n Fiber -glass Manholes Wastewa4e.. n eeess Chamber- F„e,,,, I: e S f r Saflit,,-„ ne:„fo -ee,l re„e,.e+e c+e,-,.., z (Aa(n r) , � /�� Se„\�3—,S4Z 0VdYaS 12/2re�-20/2012 cewef n�/n1 /'1n1 1 41 Ts-rrry 22 1 1 1 .,., � _ _ High Density P4yethyle„e Pipe/r„lyei4s O']TOT/ZP1T 7 Di' D' i2/20/20i �D� � _ Ipe C, D15�r. �� 22�i Deinf ,.ee.l Del„e+b,le„e (V PE) Pica 443/20is t �3-4H-00 .c7d � ��be 1 �/2n/2nl � �� 22�1T Slet4ed S ozvn, Dpwn.; n7/no 1�T 22� 2 2�no 22 nn 40 � T-r2i39. D1*N.:tS Cast in 121.,ee Manholes r,,,a. and D -e„ inlets c+e,-.-„ Drainage Headwalls n�/n, /201 1 �T „.1 I„„e+;e„ Beres , 1/'fez 1 2 /2 z a„.l �a 7:„..,,,.,lls 07/01/201 1 �n Division 34 - Transportation 3441 10 Traffic Signals 10/12/2015 34 41 10.01 Attaehment A Eentreller- Gabinet , '1 /, /, 5 24 41 10.02 A p rrtta riieiit� f�ntre11nerSe icati9ii i 2n n�e3 Attuh. m. -&t weft ium Fpoeif4eation 0bQ0i2 M 11 11 T2rsp o:a-;—Tf9fic , , /'gin 24 41 12 Removing Tr- ff;e Signals 12/20/20,2 34 41 15 PceE ular R,,-V.d rlaJ-`irzg Beaeon , , /2 24 41 16 De.lestfi „ 14ybfid Signal , , /22/7n, 2 34 41 20 Roadway Illumination Assemblies 12/20/2012 24 41 '1n nl n,+e ; l I FIB ne,,dw ,, r r nti/, 5/',n, e �vr �.ldl�ilYA.1.3S ovrr�rsvi� 24 n 1 nn 02 Freeway LED ne.,dw ,, I nu1 5/2n, e �-�rzvvz �ldffill�i'Y'73S vrn-r�rsvi� 2n n�n02 Resi +' r I7dL�11rm1YLS 06/15/2015 LZ'1J � �� n ' ��� 24 4130 n '1n, 2 �i� Ul�l'SLIC�S � � „ 2/ �� �-rr50 vz-rz-vrz-v iv 3471 13 Traffic Control 11/22/2013 Appendix GC-4.02 Subsurface and Physical Conditions GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN 106001 Revised March 20, 2020 00 42 43 DAP - BID PROPOSAL Page 1 of 4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Unit of Bid Unit Price Bid Value Item No. Section No. Measure Quantity UNIT I: WATER IMPROVEMENTS 1 3312.2101 1 1/2" Water Service, Meter Reconnection 33 12 10 EA 1 $3,500.00 $3,500.001 12 I 13 I 14 I 15 I 16 I I 7 I I 8 I 19 I I 10 I I 11 I I 12 I I 13 I I 14 I I 15 I I 16 I I 17 I I 18 I I 19 I I 20 I I 21 I I 22 I I 23 I I 24 I I 25 I I 26 I I 27 I I 28 I I 29 I I 30 I I 31 I I 32 I I 33 I I 34 I I 35 I I 36 I I 37 I I 38 I I 39 I I 40 I I 41 I I 42 I TOTAL UNIT I: WATER IMPROVEMENTS $3,500.001 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Faun Version May 22, 2019 UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information 00 42 43 DAP - BID PROPOSAL Page 2 of 4 Bidder's Application Bidlist Specification Unit of Bid Item No. Description Section No. Measure Quantity UNIT IV: PAVING IMPROVEMENTS 1 0241.0100 Remove Sidewalk 0241 13 SF 4225 2 0241.0401 Remove Concrete Drive 0241 13 SF 1030 3 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 110 4 3201.0400 Temporary Asphalt Paving Repair 3201 18 LF 255 5 3213.0301 4" Conc Sidewalk 32 13 20 SF 6755 6 3213.0401 6" Concrete Driveway 32 13 20 SF 1929 7 3213.0502 Barrier Free Ramp, Type U-1 32 13 20 EA 1 9 3216.0101 6" Conc Curb and Gutter 3216 13 LF 55 10 3217.0504 Preformed Thermoplastic Contrast 32 17 23 LF Markings - 24" Stop Bars 12 11 3292.0100 Block Sod Placement 3292 13 SY 500 12 3293.0105 Plant 5" Tree 32 93 43 EA 25 13 3471.0001 Traffic Control 3471 13 MO 2 14 999.0002 5' Conc Flume with Bolted Plate Cover 00 00 00 LF 17 15 16 17 18 19 20 21 22 23 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 TOTAL UNIT IV: PAVING IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Fonn Version May 22, 2019 Bidder's Proposal Unit Price I Bid Value $1.00 $4,225.001 $7.40 $7,622.001 $4.00 $440.00 1 $45.00 $11,475.00 1 $20.00 $135,100.00 1 $20.00 $38,580.001 $675.00 $675.00 1 $20.00 $1,100.00 1 $100.00 $1,200.00 $5.84 $2,920.001 $1,100.00 $27,500.001 $4,333.33 $8,666.661 $650.00 $11, 050.00 1 $250,553.66 1 UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information 00 42 43 DAP - BID PROPOSAL Page 3 of 4 Bidder's Application Bidlist Description Specification Unit of Bid Item No. Section No. Measure Quantity UNIT V: STREET LIGHTING IMPROV =MENTS 1 2605.3015 2" CONDT PVC SCH 80 (T) 26 05 33 LF 835 2 2605.3016 2" CONDT PVC SCH 80 (B) 26 05 33 LF 165 3 3441.1403 NO 6 Triplex OH insulated Elec Condr 3441 10 LF 280 4 3441.1409 NO 8 Insulated Elec Condr 3441 10 LF 1240 5 3441.1414 NO 8 Bare Elec Condr 3441 10 LF 1005 6 3441.1502 Furnish/Install Ground Box Type B, 3441 10 EA 7 w/Apron 7 3441.3003 Rdwy Illum Assmbly TY 18,18A,19, and D- 3441 20 EA 1 40 8 3441.3037 Furnish/Install 10' - 14' Washington 3441 20 EA 12 Standard Liqht Pole & Fixture LED 9 3441.3302 Rdwy Illum Foundation TY 3,5,6, and 8 3441 20 EA 1 10 3441.3303 Rdwy Illum Foundation TY 7 3441 20 EA 6 11 12 13 14 15 16 17 18 19 20 21 22 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Fenn Version May 22, 2019 Bidder's Proposal Unit Price I Bid Value $45.17 $37,716.951 $64.05 $10,568.251 $8.40 $2,352.001 $4.78 $5,927.201 $4.78 $4,803.901 $2,302.65 $16,118.55 $10,500.00 $10,500.00 $10,323.60 $123,883.201 $3,598.35 $3,598.351 $2,802.45 $16,814.701 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $232,283.10 1 UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information 00 42 43 DAP - BID PROPOSAL Page 4 of 4 Bidder's Application Bidlist Specification Unit of Bid Item No. Description Section No. Measure Quantity Bid Summary UNIT I: WATER IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT V: STREET LIGHTING IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: Beck - Potere Joint Venture 464 Bailey Ave Suite 210 Fort Worth, TX 76107 Total Construction Bid BY: Scot 'tnett TIT DAV gional Director Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Vcnion May 22, 2019 Bidder's Proposal Unit Price I Bid Value $3,500.00 $250,553.66 $232,283.10 $486,336.76 180 working days after the date when the 0045 12 DAP PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 4512 DAP PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Maior Work Tv -De" box Drovide the complete maior work tvDe and actual descrin_ tion as provided by the Water Department for water and sewer and TPW for paving. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Water New Development, Maverick Utility Construction, Inc. 04/30/2026 Rehabilitation, and Redevelopment Open Cut (18" and under) Street Lights and Pedestrian Bean Electrical, Inc 03/24/2027 Lights The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Beck Potere Joint Venture 464 Bailey Ave Suite 210 Fort Worth, TX 76107 BY: lot Bennett (Signature) �TLE: Regional Director DATE: 05/20/2026 END OF SECTION CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN 106001 Revised September 01, 2015 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 106001. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Beck Potere Joint Venture Company 464 Bailev Ave, Suite 210 Address Fort Worth, TX 76107 City/State/Zip THE STATE OF TEXAS § COUNTY OF TARRANT § By: Scot Bennett (Please Print) Signature: ,.,� . U Title: _Ree_ ional Director (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared S C f , 44— , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of Beck Potere Joint Venture ! . for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of , 202i ,A T Notary Public in and for the State of Texas • �2.o6murs t 211t0 1418 END OF SECTION CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 02, 2014 00 52 43 - 1 Developer Awarded Project Agreement Page 1 of 4 1 SECTION 00 52 43 2 AGREEMENT 3 4 THIS AGREEMENT, authorized on June 18, 2025 is made by and between the Developer, 5 (TARRANT COUNTY HOSPITAL DISTRICT (DBA JPS HEALTH NETWORK)), authorized 6 to do business in Texas ("Developer") , and Beck Potere Joint Venture, authorized to do 7 business in Texas, acting by and through its duly authorized representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1. WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2. PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 PAVING AND PEDESTRIAN LIGHT TO SERVE PARKWA YIMPRO VEMENTS FOR JPS 17 PARKING GARAGE 18 City Proiect No. 106001 19 20 Article 3. CONTRACT TIME 21 3.1 Time is of the essence. 22 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 23 Documents are of the essence to this Contract. 24 3.2 Final Acceptance. 25 The Work will be complete for Final Acceptance within 180 working days after the date 26 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard 27 City Conditions of the Construction Contract for Developer Awarded Projects. 28 3.3 Liquidated damages 29 Contractor recognizes that time is of the essence of this Agreement and that Developer 30 will suffer financial loss if the Work is not completed within the times specified in 31 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 32 the Standard City Conditions of the Construction Contract for Developer Awarded 33 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 34 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 35 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees 36 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 37 Developer Zero Dollars ($0) for each day that expires after the time specified in 38 Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECT CPN 106001 Revised June 16, 2016 005243-2 Developer Awarded Project Agreement Page 2 of 4 39 Article 4. CONTRACT PRICE 40 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 41 Documents an amount in current funds of Four Hundred Eighty -Six Thousand, Three Hundred 42 Thirty -Six Dollars and Seventy -Six Cents ($ 486,336.76 ). 43 Article 5. CONTRACT DOCUMENTS 44 5.1 CONTENTS: 45 A. The Contract Documents which comprise the entire agreement between Developer and 46 Contractor concerning the Work consist of the following: 47 1. This Agreement. 48 2. Attachments to this Agreement: 49 a. Bid Form (As provided by Developer) 50 1) Proposal Form (DAP Version) 51 2) Prequalification Statement 52 3) State and Federal documents (project specific) 53 b. Insurance ACORD Form(s) 54 c. Payment Bond (DAP Version) 55 d. Performance Bond (DAP Version) 56 e. Maintenance Bond (DAP Version) 57 f. Power of Attorney for the Bonds 58 g. Worker's Compensation Affidavit 59 h. MBE and/or SBE Commitment Form (If required) 60 3. Standard City General Conditions of the Construction Contract for Developer 61 Awarded Projects. 62 4. Supplementary Conditions. 63 5. Specifications specifically made a part of the Contract Documents by attachment 64 or, if not attached, as incorporated by reference and described in the Table of 65 Contents of the Project's Contract Documents. 66 6. Drawings. 67 7. Addenda. 68 8. Documentation submitted by Contractor prior to Notice of Award. 69 9. The following which may be delivered or issued after the Effective Date of the 70 Agreement and, if issued, become an incorporated part of the Contract Documents: 71 a. Notice to Proceed. 72 b. Field Orders. 73 c. Change Orders. 74 d. Letter of Final Acceptance. 75 CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECT CPN 106001 Reviscd Junc 16, 2016 00 52 43 - 3 Developer Awarded Project Agreement Page 3 of 4 77 Article 6. INDEMNIFICATION 78 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 79 expense, the city, its officers, servants and employees, from and against any and all 80 claims arising out of, or alleged to arise out of, the work and services to be performed 81 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 82 under this contract. This indemnification provision is suecifically intended to operate 83 and be effective even if it is alleged or proven that all or some of the damages being 84 sought were caused. in whole or in part. by anv act, omission or negligence of the citv. 85 This indemnity provision is intended to include, without limitation, indemnity for 86 costs, expenses and legal fees incurred by the city in defending against such claims and 87 causes of actions. 88 89 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 90 the city, its officers, servants and employees, from and against any and all loss, damage 91 or destruction of property of the city, arising out of, or alleged to arise out of, the work 92 and services to be performed by the contractor, its officers, agents, employees, 93 subcontractors, licensees or invitees under this contract. This indemnification 94 provision is specificallv intended to operate and be effective even if it is alleged or 95 proven that all or some of the damages being sought were caused. in whole or in part, 96 by anv act. omission or negligence of the citv. 97 98 Article 7. MISCELLANEOUS 99 7.1 Terms. 100 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 101 the Construction Contract for Developer Awarded Projects. 102 7.2 Assignment of Contract. 103 This Agreement, including all of the Contract Documents may not be assigned by the 104 Contractor without the advanced express written consent of the Developer. 105 7.3 Successors and Assigns. 106 Developer and Contractor each binds itself, its partners, successors, assigns and legal 107 representatives to the other party hereto, in respect to all covenants, agreements and 108 obligations contained in the Contract Documents. 109 7.4 Severability. 110 Any provision or part of the Contract Documents held to be unconstitutional, void or 111 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 112 remaining provisions shall continue to be valid and binding upon DEVELOPER and 113 CONTRACTOR. 114 7.5 Governing Law and Venue. 115 This Agreement, including all of the Contract Documents is performable in the State of 116 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 117 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECT CPN 106001 Rcviscd Junc 16, 2016 005243-4 Developer Awarded Project Agreement Page 4 of 4 118 119 7.6 Authority to Sign. 120 Contractor shall attach evidence of authority to sign Agreement, if other than duly 121 authorized signatory of the Contractor. 122 123 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 124 counterparts. 125 126 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 127 128 Contractor: BECK — POTERE JOINT VENTURE Scot Bennett 1((Signature) (Printed Name) Title: Regional Director Company Name: Beck — Potere Joint Venture Address: 464 Bailey Ave, Suite 210 City/State/Zip: Fort Worth, TX 76107 Date Developer: Tarrant County Hospital District (dba JPS Health Network) •� � � tft(�ignature) � J' 1 Fa ell (Printed Name) Title: Sr. Executive Vice President, Chief Operating Officer Company name: Address: 1500 S. Main Street City/State/Zip: Fort Worth, TX 76104 Date CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECT CPN 106001 Revised June 16, 2016 00 6125 CERTIFICATE OF INSURANCE THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER, SANITARY SEWER, AND DRAINAGE IMPROVEMENTS FOR JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 105038 Revised July 1, 2011 ENDORSEMENT #034 This endorsement, effective 12:01 a.m., July 1, 2025, forms a part of Policy No. CGC740986606 issued to BECK GROUP HOLDINGS, LLC. by Greenwich Insurance Company. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED — OWNERS, LESSEES OR CONTRACTORS — SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) ANY PERSON OR ORGANIZATION FOR WHOM YOU ARE PERFORMING OPERATIONS WHEN YOU AND SUCH PERSON OR ORGANIZATION HAVE AGREED IN WRITING IN A CONTRACT OR AGREEMENT THAT SUCH PERSON OR ORGANIZATION BE ADDED AS AN ADDITIONAL INSURED ON YOUR POLICY, PROVIDED THE "BODILY INJURY" OR "PROPERTY DAMAGE" OCCURS SUBSEQUENT TO THE EXECUTION OF THE WRITTEN CONTRACT OR WRITTEN AGREEMENT BUT ONLY WHEN THE CONTRACT DEMAND SPECIFIES ISO 2013 EDITION FORMS OR EQUIVALENT. Location(s) Of Covered Operations VARIOUS AS REQUIRED PER WRITTEN CONTRACT. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. MANUS © 2021, XL America, Inc. Page 1 of 2 All rights reserved. May not be copied without permission. Includes copyrighted material of Insurance Services Office, Inc., with its permission B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. C.With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. MANUS © 2021, XL America, Inc. Page 2 of 2 All rights reserved. May not be copied without permission. Includes copyrighted material of Insurance Services Office, Inc., with its permission COMMERCIAL GENERAL LIABILITY CG20401219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - AUTOMATIC STATUS FOR OTHER PARTIES WHEN REQUIRED IN WRITTEN CONSTRUCTION AGREEMENT (COMPLETED OPERATIONS) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART A. Section II — Who Is An Insured is amended to B. With respect to the insurance afforded to these include as an additional insured: additional insureds, the following additional 1. Any person or organization for whom you have exclusion applies: performed operations when you and such This insurance does not apply to: person or organization have agreed in writing "Bodily injury" or "property damage" arising out of in a contract or agreement that such person or the rendering of, or the failure to render, any organization be added as an additional insured professional architectural, engineering or on your policy; and surveying services, including: 2. Any other person or organization you are required to add as an additional insured under the contract or agreement described in Paragraph 1. above. Such person(s) or organization(s) is an additional insured only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" performed for the additional insured described in Paragraph 1. or 2. above and included in the "products -completed operations hazard". However, the insurance afforded to such additional insured described above: a. Only applies to the extent permitted by law; and b. Will not be broader than that which you are required by the contract or agreement to provide for such additional insured. 1. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or 2. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury" or "property damage" involved the rendering of, or the failure to render, any professional architectural, engineering or surveying services. CG 20 40 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 2 C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: The most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement described in Paragraph A.1.; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. CG 20 40 12 19 © Insurance Services Office, Inc., 2018 Page 2 of 2 ENDORSEMENT #012 This endorsement, effective 12:01 a.m., July 1, ❑❑❑5, forms a part of Policy No. C❑C❑❑❑❑❑❑❑❑6 issuedto BECK GROUP HOLDINGS, LLC. by Greenwich Insurance Company. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY INSURANCE CLAUSE ENDORSEMENT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS COVERAGE PART It is agreed that to the extent that insurance is afforded to any Additional Insured under this policy, this insurance shall apply as primary and not contributing with any insurance carried by such Additional Insured, as required by written contract. All other terms and conditions of this policy remain unchanged. XIL 424 0605 ©, 2005, XL America, Inc. POLICY NUMBER: CGC740986606 COMMERCIAL GENERAL LIABILITY CG24041219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITED COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS SCHEDULE Name Of Person(s) Or Organization(s): WHERE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT EXECUTED PRIOR TO LOSS (EXCEPT WHERE NOT PERMITTED BY LAW). Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV — Conditions: We waive any right of recovery against the person(s) or organization(s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization(s) prior to loss. This endorsement applies only to the person(s) or organization(s) shown in the Schedule above. CG 24 04 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 ENDORSEMENT #003 This endorsement, effective 12:01 a.m., July 1, 202 , forms a part of Policy No. CGC74098660 issued to BECK GROUP HOLDINGS, LLC. by Greenwich Insurance Company. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CANCELLATION NOTIFICATION TO OTHERS ENDORSEMENT In the event coverage is cancelled for any statutorily permitted reason, other than nonpayment of premium, advanced written notice will be mailed or delivered to person(s) or entity(ies) according to the notification schedule shown below: Name of Person(s) or Entity(ies) AS PER SCHEDULE ON FILE WITH THE COMPANY. All other terms and conditions of the Policy remain unchanged. Number of Days Mailing Address: Advanced Notice of Cancellation: 30 IXI 405 0910 © 2010 X.L. America, Inc. All Rights Reserved. May not be copied without permission. POLICY NUMBER: CGC740986606 COMMERCIAL GENERAL LIABILITY CG 25 03 05 09 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED CONSTRUCTION PROJECT(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Construction Project(s): EACH "PROJECT" FOR WHICH YOU HAVE AGREED, IN A WRITTEN CONTRACT WHICH IS IN EFFECT DURING THIS POLICY PERIOD, TO PROVIDE A SEPARATE GENERAL AGGREGATE LIMIT; PROVIDED THAT, THE CONTRACT IS SIGNED AND EXECUTED PRIOR TO ANY LOSS FOR WHICH COVERAGE IS SOUGHT. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. For all sums which the insured becomes legally 3. Any payments made under Coverage A for obligated to pay as damages caused by damages or under Coverage C for medical "occurrences" under Section I — Coverage A, and expenses shall reduce the Designated for all medical expenses caused by accidents Construction Project General Aggregate Limit under Section I — Coverage C, which can be for that designated construction project. Such attributed only to ongoing operations at a single payments shall not reduce the General designated construction project shown in the Aggregate Limit shown in the Declarations nor Schedule above: shall they reduce any other Designated 1. A separate Designated Construction Project Construction Project General Aggregate Limit General Aggregate Limit applies to each for any other designated construction project designated construction project, and that limit shown in the Schedule above. is equal to the amount of the General 4. The limits shown in the Declarations for Each Aggregate Limit shown in the Declarations. Occurrence, Damage To Premises Rented To 2. The Designated Construction Project General You and Medical Expense continue to apply. Aggregate Limit is the most we will pay for the However, instead of being subject to the sum of all damages under Coverage A, except General Aggregate Limit shown in the damages because of "bodily injury" or Declarations, such limits will be subject to the "property damage" included in the "products- applicable Designated Construction Project completed operations hazard", and for medical General Aggregate Limit. expenses under Coverage C regardless of the number of: a. Insureds; b. Claims made or "suits" brought; or c. Persons or organizations making claims or bringing "suits". CG 25 03 05 09 © Insurance Services Office, Inc., 2008 Page 1 of 2 B. For all sums which the insured becomes legally C. obligated to pay as damages caused by "occurrences" under Section I — Coverage A, and for all medical expenses caused by accidents under Section I — Coverage C, which cannot be attributed only to ongoing operations at a single designated construction project shown in the Schedule above: 1. Any payments made under Coverage A for damages or under Coverage C for medical D. expenses shall reduce the amount available under the General Aggregate Limit or the Products -completed Operations Aggregate Limit, whichever is applicable; and 2. Such payments shall not reduce any Designated Construction Project General E. Aggregate Limit. When coverage for liability arising out of the "products -completed operations hazard" is provided, any payments for damages because of "bodily injury" or "property damage" included in the "products -completed operations hazard" will reduce the Products -completed Operations Aggregate Limit, and not reduce the General Aggregate Limit nor the Designated Construction Project General Aggregate Limit. If the applicable designated construction project has been abandoned, delayed, or abandoned and then restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables, the project will still be deemed to be the same construction project. The provisions of Section III — Limits Of Insurance not otherwise modified by this endorsement shall continue to apply as stipulated. CG 25 03 05 09 © Insurance Services Office, Inc., 2008 Page 2 of 2 POLICY NUMBER: THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. AUTOMATIC ADDITIONAL INSURED This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM AUTO DEALERS COVERAGE FORM XIC 411 1013 A.0 OVERED AUTOS LIABILITY COVERAGE, Who Is An Insured, is amended to include as an "insured" any person or organization you are required in a written contract to name as an additional insured, but only for "bodily injury' or "property damage" otherwise covered under this policy caused, in whole or in part, by the negligent acts or omissions of: You, while using a covered "auto"; or 2. Any other person, except the additional insured or any employee or agent of the additional insured, operating a covered "auto" with your permission; Provided that: a. The written contract is in effect during the policy period of this policy; b.T he written contract was signed by you and executed prior to the "accident' causing "bodily injury' or "property damage" for which liability coverage is sought; and C. Such person or organization is an "insured" solely to the extent required by the contract, but in no event if such person or organization is solely negligent. B.T he Limits of Insurance provided for the Additional Insured shall not be greater than those required by contract and, in no event shall the Limits of Insurance set forth in this policy be increased by the contract. C. General Conditions, Other Insurance is amended as follows: Any coverage provided hereunder shall be excess over any other valid and collectible insurance available to the additional insured whether such insurance is primary, excess, contingent or on any other basis unless the contract specifically requires that this policy be primary. All terms, conditions, exclusions and limitations of this policy shall apply to the liability coverage provided to any additional insured, and in no event shall such coverage be enlarged or expanded by reason of the contract. All other terms and conditions of this policy remain unchanged. XIC 411 1013 © 2013 X.L. America, Inc. All Rights Reserved. Page 1 of 1 May not be copied without permission. Includes copyrighted material of Insurance Services Office, Inc., with its permission. COMMERCIAL AUTO CA 04 49 11 16 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. A. The following is added to the Other Insurance Condition in the Business Auto Coverage Form and the Other Insurance — Primary And Excess Insurance Provisions in the Motor Carrier Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage is primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". B. The following is added to the Other Insurance Condition in the Auto Dealers Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage and General Liability Coverages are primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". CA 04 49 11 16 © Insurance Services Office, Inc., 2016 Page 1 of 1 111111 ■■■■■ ■ ■■■111111■• III ■■■ ■ ■■■ 111 111■■111■ LLI❑ ❑❑®❑ It LILILLIL]r LDd❑ELL] ❑d ❑m❑❑❑d[[Dd❑a- ❑❑❑d❑d Hr ❑ ❑m❑ ❑❑❑[MEE❑❑❑® ❑- T❑❑ ❑❑❑ auto mm ❑d ❑❑ LLI]❑ scheduled underlying insurance❑ LILI❑ ® ®❑ mLrm ❑❑T❑❑®❑❑ Lr ❑❑ ❑❑❑❑®❑❑❑❑ insured. LILI❑ ❑ ❑®❑ =-❑d Ld FFIFI❑md ❑®❑❑®d LLr ❑-❑mid ®❑- ❑❑❑❑ ❑❑ auto mm ❑d ❑❑ IITIE] ❑❑TFF Fir scheduled underlying insurance❑ ® [1❑FT❑ 711 pollutants, Or ❑❑❑ ET11111YET] IEI ❑❑FTF ®❑ pollutants FT❑ m❑®IID❑d❑ET❑ ❑ ❑md ®❑❑ 7111 ❑®m ❑❑FT❑ ®❑❑ IT[] 77FF7TIl ❑❑ ®❑ insured TT ❑ ❑m❑ ❑❑❑®FE] ❑❑® ❑❑auto mm❑d ❑❑scheduled underlying insurance❑li ® LIMIr LID pollutants or ❑❑❑ ❑ ❑❑a ®ILI ❑❑FFTI LEE pollutants ❑-❑ —F---❑d Lir❑ ❑ ❑md T❑❑ ❑❑auto mm❑d LEIIIIIELILIffuLir ®❑scheduled underlying insurance ® IIII❑ ❑®m ❑ ❑a ❑ ®❑❑ ❑ ❑ ®❑® d ❑ELL❑d ❑ d FFFFI❑md LILIL]r ❑❑❑❑d ❑❑❑d ❑❑ ®❑ insured❑ "M ■ ■■■■■111. ■■ ■■• I]ErdEr Or ■111111111 ■ ■ ■■■111111 ■ ■■■ri■■ 1]■■111■■■■■ ■ ■111■ ■ 111■■111 ■■ ■■1111 ■■M1111 ■■■ ■■ 11■■■■■■111111■f■■111• ■111■1111 Er 111111THMEDEr 111 111111111111 rEEIIIIEd 111 Er ■■■■■■ 111■ ■11111■111 ■EE • ■ 11111 ■ claim ■ ■■ ■ ■■ ■■■■111■■■ ■■■■ ■■ ■■11I■■■■1■ 1111111 . ■■ ■■■■ ■■■■■■■ ■■ 111■1111■ LMr ■ ■ LILIEEIr 111■■ ■111■■111■ ■■■ r ■■ ■■111■■ ■■■LELI111■■ fi■■1111■■ • ■111■IIIIIII■ Or LILILITLEFFIMLILEr 111 ■■■ ■ ■■ ■■■■■• 111■ 111 Lr ■■■■■■111■ 11111 ■11111■111 ■■.. ■ ❑❑❑ ®®❑ ®❑ ❑-i 1 !❑❑❑ ❑❑❑IM ®❑®FIM❑ LL®®❑❑❑❑❑[E] ®❑❑ ❑®a-❑ FFFF1 L_ILLr ❑d claim ❑- suit ❑FFFFI mm ❑d ❑❑ ®❑ scheduled underlying insurance❑ ®❑ ❑a -❑a-❑❑❑❑ E[OFMFM Ell ❑❑❑❑ uuu--Lud❑ ❑❑❑❑❑❑- = bodily injury ❑- property damage -End❑d ❑FM® [ID❑ products -completed operations hazard -your product Er your work 1111111111111111111111 FFM ❑ ❑❑❑❑ d IEEErd ❑d ❑d ❑❑ ❑❑d ❑❑❑❑❑d ❑❑❑d 1111[r ❑] 111111 ❑mIP❑❑[l]d ❑- ❑❑❑d ❑d 111111 ❑FFM ❑❑ ❑❑m❑❑❑ ®❑ ❑a -❑a-❑❑❑❑ ®®®❑❑d uuu--u ud❑ ❑❑❑❑❑❑- ❑® r❑m❑mom bodily injury [Ir property damage ❑-®❑ ❑❑❑❑❑❑❑❑®m ❑m ❑- ®❑ ❑❑ THE ❑ hostile fire❑ m■ ■ ■ ■■ ■■■ mm■mlin. ■■■ ■■■■■■m m■ ®❑ Bodily injury m®®❑d ❑I]ITI ❑ ❑❑Qd ®❑ ❑❑d m❑md ❑❑ m ❑m❑ ®❑ ❑m m❑a- ❑- m❑❑ Er rid ❑md ❑❑ o- E-❑ ---F-i ir ❑❑ mono ❑❑❑ iiii❑❑ - ❑md - ❑❑❑iiii ❑❑❑❑ o- d ❑❑❑❑ Id in iiii❑ ❑❑Qd ®❑ ❑- ❑❑❑-❑ 1111❑z7LLIM ❑md - ❑❑❑m 111HIr I[I] ❑a-m❑❑mmm❑ ®❑ ❑❑Qd ®❑- ❑FM❑❑❑IEI E1011 Bodily injury [Ir property damage [[or ❑ ❑FFIF ❑❑ insured ❑ ❑❑ ❑❑ ❑❑Cd ®❑- ®[[[]❑ insured - ❑ m❑Ir❑EL[Ir ❑❑d EL❑ ❑❑ ❑❑r Or ®=❑ ❑❑❑ Er II] ❑❑FUFM a- ®m®❑ ❑❑❑ ❑❑❑❑ Ed ❑d - [ILL] ❑❑TM ❑❑ ❑❑ ❑dd ®❑❑FFm ❑d ❑ ® r❑m❑mom 5TI❑ insured's ❑❑❑❑®❑ ❑❑a ❑®❑❑ 1111El-❑ ❑d ❑r ®❑❑ ❑dd ®❑❑❑®m ❑d ❑❑ mm []rill] FTFm ® lir ®m=❑❑ ❑❑d mm ❑-❑❑ Mm ® Or [EIm®❑ IF] [][][][]rid ❑❑m ❑❑❑ ❑❑❑❑d ❑ [IF-M❑old ❑ma r[I❑EDd a ®❑❑❑d ET]❑❑❑❑ insured EIUE]r ®❑❑ ®❑❑❑ddLmuuuluuLr❑d❑ ❑C ❑ 11111111111111 ❑ ❑❑❑❑ ❑ -❑❑ ❑ o-FFFFI❑gym ❑ 11IR ®❑® R IIE[ir and ❑ ❑ ❑❑❑ ❑❑ ❑❑❑❑ M ❑❑ ❑❑❑❑❑ m❑®d ❑ ®❑❑❑❑a-❑ ®❑❑ ®®d m moor®mod o oEMr®FM® oom ❑ Er o ®o FFM ® oo-❑ ®oo ❑other insurance ❑❑❑_❑ ® d❑❑ ❑❑❑❑ =m ❑d ❑❑ 7171❑❑_7171 [1❑_ ❑ ®❑❑D] ❑__ ❑❑ == other i ns u rance ❑ ❑ ❑❑ ❑m ❑®® Lr❑❑ ❑ ®❑❑❑❑❑ M LILI❑ LLILLI❑ other insurance ILI ❑r®❑ EL [ILI ❑gym ❑❑ILLIM ❑❑_ LILI❑ ❑ = r❑=❑m HE LLL1LEr ®❑ ❑ Lr❑❑❑ ❑❑❑ ❑ ❑❑_ ILI m❑ ❑❑_ ❑Ll-❑❑d ®❑ ❑ r®❑ _❑1❑_ ❑ ® ❑❑❑®a ❑a-m❑ Llr Llr ❑❑❑__❑ ®❑❑®® ❑❑® _❑®❑ ❑ [U] Llr ❑ ❑❑d ❑❑❑®1111®11[]-❑ ❑ ® __ 111II[Ir L1L1r =❑ or entity's coverage, but only with respect to damages arising out of insured operations or work on _E]r ❑❑❑❑®❑11r❑Iir❑ ❑d llldlir mm ❑r®❑ _❑T❑®❑ ❑❑❑ FF®❑EKa ❑❑❑ ®❑❑❑❑__EM❑ =m ❑❑❑ available to the other person or organization will be the lesser of the policy's Limits of Insurance or 1111111 ®® ❑❑ _ ®r❑❑❑©❑d ❑❑ __ ❑r®❑ _❑®❑D7M ® ®❑❑==L-other insurance ❑❑71❑❑❑FT_❑ [Ir [I ❑❑❑®®❑ ❑ ®❑❑® ❑❑ ❑__ ❑❑d ❑❑❑m❑®®❑T11 ❑ ❑P 57 IT[T] ®m ❑❑_ ❑md ❑d ❑❑ TIM ❑❑® ®❑ ❑ ❑M®❑ ILI LED] C ❑❑d ®❑ 1AA ❑_❑_ ❑_ ®®❑❑= _❑®_M] LD❑ EY❑ ==❑d ®❑❑ ❑❑d = ®_❑❑ ❑❑ Ella] other insurance❑ ®❑ Premium LILI❑ u o i first named insured i 11❑M-10 r❑=❑❑®ID ar ❑❑LD ❑❑❑❑❑❑1ILD ❑❑ ®❑ ❑ ❑ ❑❑❑ d❑❑❑ [ID❑ ❑❑❑ ❑-❑❑ IM❑ Hl- 11111M ❑❑_ =❑[ID❑❑ _❑ ❑❑Dd -❑ iiii❑ ❑❑_ =❑[m [ID ® D❑niflr❑=❑❑ _❑ ❑❑ ❑❑EU❑ ❑❑❑[ID❑®❑ 1111111111 policy period ❑ [ID❑ first named insured ❑ ❑_ ❑❑❑ ❑❑ [ID❑ ❑r❑❑ ®❑ _❑❑ ❑ IM D❑ETT❑=❑❑ _❑ ❑❑ 111E ■ ■■■ 11111E ■■LULL■ ■■■ri■■ Llr ILI ■■■■■1111• ■■ ■ D111■■■ ■■ED 111E ■■ ■■• ■ ■■ III■ 111 111E IIII ■ 11111E ■■IIII■ ■ ■■ 111 111 ■■■ 11111111E ■■LULL■ 111 ■■■111■■111 ■■• IMA 11I= ■■111111■ ■■111■■■■■■■■ ■ ■■■■ ■ IIII■■ ■■■• Lill ■■■ ■■LD 111E ■■ ■■d ■ ■■ 111E ■ 111111E ■■ ■■• ■ ■■ 111E Ell LrLLIL[Er 111■■ 111E ■ 111111■■■ ■■ 111E 001 ■■■■ ■ 1111E ■■ ■IIII ■■■ ■■ 111E • 11111E ■■■■■ 111111E ■■ ■■• ■ ■■ 111E ILI MILL 111■■ 111E ■ 111111E■■ ■■ 111E ■■Ci ■■ ■ IIII ■111 ■ 111E • 11111E ■■■■ 111 ■■■■ ■ ■■M] ■■■ ■■■■111■ ■ ■■■111 ■111111 111E M [Ella] ■■ ■ ■■ III■ ■■ ■■■■ ■ ■ III■■ 11111E ■ ar ■■■■ 111 ■111■ IIII■■ LULU■ LIL11111F policy periodu Separation of Insureds ❑=❑_ = rC=❑=EM F 11111 ❑1M _ ❑❑gym ❑❑_ ❑❑1111® ❑❑_ ❑❑d r[ID❑® ❑- d ❑_❑ HE ❑=❑❑d [ID =❑❑ 11111M [IDm ❑ = ❑❑❑_❑ _ [❑❑= insured ❑a-❑ [ID❑ ❑❑® insured❑❑❑d m❑a-❑[1M [ID ❑❑= insured ❑❑❑1M_ 11111111 claim IM ❑ ❑d ❑ ❑- suit ®❑-❑❑❑❑1111 ®❑ Transfer of Rights of Recovery =❑❑❑ insured ❑E. -111❑ r®❑❑® r❑=EE ❑®EI❑a-❑❑❑❑❑❑ ❑❑m ❑❑❑❑❑ ❑❑_ ❑ ❑d❑ ODdE]r ®® ❑❑® ®❑= r[EI❑® ❑-❑ ®❑❑EEMIr❑d ®❑a ❑❑❑ ❑ ❑md❑ ❑❑®®❑ ❑M- loss ED ®❑❑© ®❑= r®❑® ❑❑d ❑ ❑_ ❑❑EM ❑❑ ❑❑Eff1_ EM❑❑ ❑ =a-llflr 1111 1111❑ _ ❑ ❑❑❑❑ occurrence❑=❑ ❑❑d 1111❑ ®m a- [][]scheduled underlying insurance ❑ ❑_ ❑❑❑r®❑=Q-❑=m ❑ ❑❑❑®_ _❑_ ❑a-=❑ Or ❑-❑❑❑__❑ 111r 11❑1 ❑ Eir d ❑❑ 1111111111 r❑❑❑©❑d ❑❑d ❑- ❑❑ insured contractor ❑ HIM ❑ _ ❑® ❑❑❑ r®❑[ID ®❑ ❑❑ ❑❑_ ❑❑❑®_ IEEE ■■ ■■■ ■ ■ ■■■111■IIII■■ m■ ■ ■■ IEEE■ m■ ■■■n1■■ ■■■nin. ■■ mnn■ ■■ III■ ■ ■■ ■■ ■■■ ■ ■ ■■■111■IIII■■ ll1■111. 111E NONE 111■■ ■■■ ■■Ci on on soon ON ■■■■■■ ■■ 111E ■■■11111■■III ■111 IIII ■■111■■ IEEE ■■111111 ■■IIII■ ■ IIII■■ ■III ■■ ■■. —[IIII ❑C ❑ 11111111111111 ❑ ❑❑❑❑ ❑ [ID❑❑ ❑ o-=❑11L= ❑ ❑R ®❑® R IIE[ir =d ❑ ❑ ❑❑❑ ❑❑ ❑❑❑❑ M ❑❑ ❑❑❑❑❑ =❑®d ❑ ®❑❑❑❑a-❑ ®❑❑ ®®d m moor®=d o oEMr®=® oom ❑ Er o ®o FFM ® oo-❑ ®oo POLICY NUMBER: COMMERCIAL AUTO CA04441013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: Beck Group Holdings, LLC Endorsement Effective Date: July 1, 202 SCHEDULE Name(s) Of Person(s) Or Organization(s): WHERE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT EXECUTED PRIOR TO LOSS (EXCEPT WHERE NOT PERMITTED BY LAW). Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The Transfer Of Rights Of Recovery Against Others To Us condition does not apply to the person(s) or organization(s) shown in the Schedule, but only to the extent that subrogation is waived prior to the "accident' or the 'loss" under a contract with that person or organization. CA 04 44 10 13 © Insurance Services Office, Inc., 2011 Page 1 of 1 POLICY NUMBER: CAH74098670 IXI 405 0910 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CANCELLATION NOTIFICATION TO OTHERS ENDORSEMENT In the event coverage is cancelled for any statutorily permitted reason, other than nonpayment of premium, advanced written notice will be mailed or delivered to person(s) or entity(ies) according to the notification schedule shown below: Name of Person(s) or Entity(ies) AS PER SCHEDULE ON FILE WITH THE COMPANY. Mailing Address: All other terms and conditions of the Policy remain unchanged. IXI 405 0910 © 2010 X.L. America, Inc. All Rights Reserved. May not be copied without permission. Number of Days Advanced Notice of Cancellation: 30 ❑other insurance ❑❑❑_❑ ® d❑❑ ❑❑❑❑ =m ❑d ❑❑ 7171❑❑_7171 [1❑_ ❑ ®❑❑D] ❑__ ❑❑ == other i ns u rance ❑ ❑ ❑❑ ❑m ❑®® Lr❑❑ ❑ ®❑❑❑❑❑ M LILI❑ LLILLI❑ other insurance ILI ❑r®❑ EL [ILI ❑gym ❑❑ILLIM ❑❑_ LILI❑ ❑ = r❑=❑m HE LLL1LEr ®❑ ❑ Lr❑❑❑ ❑❑❑ ❑ ❑❑_ ILI m❑ ❑❑_ ❑Ll-❑❑d ®❑ ❑ r®❑ _❑1❑_ ❑ ® ❑❑❑®a ❑a-m❑ Llr Llr ❑❑❑__❑ ®❑❑®® ❑❑® _❑®❑ ❑ [U] Llr ❑ ❑❑d ❑❑❑®1111®11[]-❑ ❑ ® __ 111II[Ir L1L1r =❑ or entity's coverage, but only with respect to damages arising out of insured operations or work on _E]r ❑❑❑❑®❑11r7ir❑ ❑d llldlir mm ❑r®❑ _❑T❑®❑ ❑❑❑ FF®❑EKa ❑❑❑ ®❑❑❑❑__EM❑ =m ❑❑❑ available to the other person or organization will be the lesser of the policy's Limits of Insurance or 1111111 ®® ❑❑ _ ®r❑❑❑©❑d ❑❑ __ ❑r®❑ _❑®❑D7M ® ®❑❑==L-other insurance ❑❑71❑❑❑FT_❑ [Ir [I ❑❑❑®®❑ ❑ ®❑❑® ❑❑ ❑__ ❑❑d ❑❑❑m❑®®❑T11 ❑ ❑P 57 IT[T] ®m ❑❑_ ❑md ❑d ❑❑ TIM ❑❑® ®❑ ❑ _®❑ 01 F7FFfl ❑ ❑❑d ®❑ M ❑_❑_ ❑_ ®®❑❑= _❑®_M] LD❑ EY❑ ==❑d ®❑❑ ❑❑d = ®_❑❑ ❑❑ Ella] other insurance❑ ®❑ Premium LILI❑ u o i first named insured i 11❑M-10 r❑=❑❑®ID ar ❑❑LD ❑❑❑❑❑❑1ILD ❑❑ ®❑ ❑ ❑ ❑❑❑ d❑❑❑ [ID❑ ❑❑❑ ❑-❑❑ IM❑ Hl- 11111M ❑❑_ =❑[ID❑❑ _❑ ❑aDd -❑ iiii❑ ❑❑_ =❑❑I] -[ID ® D❑niflr❑=❑❑ _❑ ❑❑ ❑❑EU❑ ❑❑❑[ID❑®❑ 1111111111 policy period ❑ [ID❑ first named insured ❑ ❑_ ❑❑❑ ❑❑ [ID❑ ❑r❑❑ ®❑ _❑❑ ❑ IM D❑ETT❑=❑❑ _❑ ❑❑ 111E ■ ■■■ 11111E ■■LULL■ ■■■ri■■ Llr ILI ■■■■■1111• ■■ ■ D111■■■ ■■ED 111E ■■ ■■• ■ ■■ III■ 111 111E IIII ■ 11111E ■■IIII■ ■ ■■ 111 111 ■■■ 11111111E ■■LULL■ 111 ■■■111■■111 ■■• IMA 11I= ■■111111■ ■■111■■■■■■■■ ■ ■■■■ ■ IIII■■ ■■■• Lill ■■■ ■■LD 111E ■■ ■■d ■ ■■ 111E ■ 111111E ■■ ■■• ■ ■■ 111E Ell LrLLIL[Er 111■■ 111E ■ 111111■■■ ■■ 111E 001 ■■■■ ■ 1111E ■■ ■IIII ■■■ ■■ 111E • 11111E ■■■■■ 111111E ■■ ■■• ■ ■■ 111E ILI MILL 111■■ 111E ■ 111111E■■ ■■ 111E ■■Ci ■■ ■ IIII ■111 ■ 111E • 11111E ■■■■ 111 ■■■■ ■ ■■M] ■■■ ■■■■111■ ■ ■■■111 ■111111 111E M [Ella] ■■ ■ ■■ III■ ■■ ■■■■ ■ ■ III■■ 11111E ■ ar ■■■■ 111 ■111■ IIII■■ LULU■ LIL11111F policy periodu ❑ Separation of Insureds ❑=❑_ = r❑=❑=EM F 11111 ❑1M _ ❑❑gym ❑❑_ ❑❑1111® ❑❑_ ❑❑d r[ID❑® ❑- d ❑_❑ HE ❑=❑❑d [ID =❑❑ 11111M [IDm ❑ = ❑❑❑_❑ _ [❑❑= insured ❑a-❑ [ID❑ ❑❑® insured❑❑❑d m❑a-❑[1M [ID ❑❑= insured ❑❑❑1M_ 11111111 claim IM ❑ ❑d ❑ ❑- suit ®❑-❑❑❑❑1111 ®❑ Transfer of Rights of Recovery =❑❑❑ insured ❑E. -111❑ r®❑❑® r❑=EE ❑®EI❑a-❑❑❑❑❑❑ ❑❑m ❑❑❑❑❑ ❑❑_ ❑ ❑d❑ ODdE]r ®® ❑❑® ®❑= r[EI❑® ❑-❑ ®❑❑EEMIr❑d ®❑a ❑❑❑ ❑ ❑md❑ ❑❑®®❑ ❑M- loss ED ®❑❑© ®❑= r®❑® ❑❑d ❑ ❑_ ❑❑EM ❑❑ ❑❑Eff1_ EM❑❑ ❑ =a-llflr 1111 1111❑ _ ❑ ❑❑❑❑ occurrence❑=❑ ❑❑d 1111❑ ®m a- [][]scheduled underlying insurance ❑ ❑_ ❑❑❑r®❑=Q-❑=m ❑ ❑❑❑®_ _❑_ ❑a-=❑ Or ❑-❑❑❑__❑ ❑r 11❑1 ❑ Eir d ❑❑ 1111111111 r❑❑❑©❑d ❑❑d ❑- ❑❑ insured contractor ❑ ❑❑❑ ❑ _ ❑® ❑❑❑ r®❑[ID ®❑ ❑❑ ❑❑_ ❑❑❑®_ IEEE ■■ ■■■ ■ ■ ■■■111■IIII■■ m■ ■ ■■ IEEE■ m■ ■■■n1■■ ■■■nin. ■■ mnn■ ■■ III■ ■ ■■ ■■ ■■■ ■ ■ ■■■111■IIII■■ ll1■111. 111E NONE 111■■ ■■■ ■■Ci on on soon ON ■■■■■■ ■■ 111E ■■■11111■■III ■111 IIII ■■111■■ IEEE ■■111111 ■■IIII■ ■ IIII■■ ■III ■■ ■■. —[IIII 111111 ❑5 1111111111 ❑ ❑❑❑❑ ❑ [ID❑❑ ❑ o-=❑11L= ❑ ❑R ®❑® R IIE[ir EEd ❑ 11111111115 ❑❑❑❑ M ❑❑ ❑❑❑❑❑ =❑®d ❑ ®❑❑❑❑a-❑ ®❑❑ ®®d m moor®=d o oEMr®=® oom ❑ Er o ®o FFM ® oo-❑ ®oo ❑other insurance ❑❑❑_❑ ® d❑❑ ❑❑❑❑ =m ❑d ❑❑ 7171❑❑_7171 [1❑_ ❑ ®❑❑D] ❑__ ❑❑ == other i ns u rance ❑ ❑ ❑❑ ❑m ❑®® Lr❑❑ ❑ ®❑❑❑❑❑ M LILI❑ LLILLI❑ other insurance ILI ❑r®❑ EL [ILI ❑gym ❑❑ILLIM ❑❑_ LILI❑ ❑ = r❑=❑m HE LLL1LEr ®❑ ❑ Lr❑❑❑ ❑❑❑ ❑ ❑❑_ ILI m❑ ❑❑_ ❑Ll-❑❑d ®❑ ❑ r®❑ _❑1❑_ ❑ ® ❑❑❑®a ❑a-m❑ Llr Llr ❑❑❑__❑ ®❑❑®® ❑❑® _❑®❑ ❑ [U] Llr ❑ ❑❑d ❑❑❑®1111®11[]-❑ ❑ ® __ 111II[Ir L1L1r =❑ or entity's coverage, but only with respect to damages arising out of insured operations or work on _E]r ❑❑❑❑®❑11r7ir❑ ❑d llldlir mm ❑r®❑ _❑T❑®❑ ❑❑❑ FF®❑EKa ❑❑❑ ®❑❑❑❑__EM❑ =m ❑❑❑ available to the other person or organization will be the lesser of the policy's Limits of Insurance or 1111111 ®® ❑❑ _ ®r❑❑❑©❑d ❑❑ __ ❑r®❑ _❑®❑D7M ® ®❑❑==L-other insurance ❑❑71❑❑❑FT_❑ [Ir [I ❑❑❑®®❑ ❑ ®❑❑® ❑❑ ❑__ ❑❑d ❑❑❑m❑®®❑T11 ❑ ❑P 57 IT[T] ®m ❑❑_ ❑md ❑d ❑❑ TIM ❑❑® ®❑ ❑ _®❑ 01 F7FFfl ❑ ❑❑d ®❑ M ❑_❑_ ❑_ ®®❑❑= _❑®_M] LD❑ EY❑ ==❑d ®❑❑ ❑❑d = ®_❑❑ ❑❑ Ella] other insurance❑ ®❑ Premium LILI❑ u o i first named insured i 11❑M-10 r❑=❑❑®ID ar ❑❑LD ❑❑❑❑❑❑1ILD ❑❑ ®❑ ❑ ❑ ❑❑❑ d❑❑❑ [ID❑ ❑❑❑ ❑-❑❑ IM❑ Hl- 11111M ❑❑_ =❑[ID❑❑ _❑ ❑aDd -❑ iiii❑ ❑❑_ =❑❑I] -[ID ® D❑niflr❑=❑❑ _❑ ❑❑ ❑❑EU❑ ❑❑❑[ID❑®❑ 1111111111 policy period ❑ [ID❑ first named insured ❑ ❑_ ❑❑❑ ❑❑ [ID❑ ❑r❑❑ ®❑ _❑❑ ❑ IM D❑ETT❑=❑❑ _❑ ❑❑ 111E ■ ■■■ 11111E ■■LULL■ ■■■ri■■ Llr ILI ■■■■■1111• ■■ ■ D111■■■ ■■ED 111E ■■ ■■• ■ ■■ III■ 111 111E IIII ■ 11111E ■■IIII■ ■ ■■ 111 111 ■■■ 11111111E ■■LULL■ 111 ■■■111■■111 ■■• IMA 11I= ■■111111■ ■■111■■■■■■■■ ■ ■■■■ ■ IIII■■ ■■■• Lill ■■■ ■■LD 111E ■■ ■■d ■ ■■ 111E ■ 111111E ■■ ■■• ■ ■■ 111E Ell LrLLIL[Er 111■■ 111E ■ 111111■■■ ■■ 111E 001 ■■■■ ■ 1111E ■■ ■IIII ■■■ ■■ 111E • 11111E ■■■■■ 111111E ■■ ■■• ■ ■■ 111E ILI MILL 111■■ 111E ■ 111111E■■ ■■ 111E ■■Ci ■■ ■ IIII ■111 ■ 111E • 11111E ■■■■ 111 ■■■■ ■ ■■M] ■■■ ■■■■111■ ■ ■■■111 ■111111 111E M [Ella] ■■ ■ ■■ III■ ■■ ■■■■ ■ ■ III■■ 11111E ■ ar ■■■■ 111 ■111■ IIII■■ LULU■ LIL11111F policy periodu ❑ Separation of Insureds ❑=❑_ = r❑=❑=EM F 11111 ❑1M _ ❑❑gym ❑❑_ ❑❑1111® ❑❑_ ❑❑d r[ID❑® ❑- d ❑_❑ HE ❑=❑❑d [ID =❑❑ 11111M [IDm ❑ = ❑❑❑_❑ _ [❑❑= insured ❑a-❑ [ID❑ ❑❑® insured❑❑❑d m❑a-❑[1M [ID ❑❑= insured ❑❑❑1M_ 11111111 claim IM ❑ ❑d ❑ ❑- suit ®❑-❑❑❑❑1111 ®❑ Transfer of Rights of Recovery =❑❑❑ insured ❑E. -111❑ r®❑❑® r❑=EE ❑®EI❑a-❑❑❑❑❑❑ ❑❑m ❑❑❑❑❑ ❑❑_ ❑ ❑d❑ ODdE]r ®® ❑❑® ®❑= r[EI❑® ❑-❑ ®❑❑EEMIr❑d ®❑a ❑❑❑ ❑ ❑md❑ ❑❑®®❑ ❑M- loss ED ®❑❑© ®❑= r®❑® ❑❑d ❑ ❑_ ❑❑EM ❑❑ ❑❑Eff1_ EM❑❑ ❑ =a-llflr 1111 1111❑ _ ❑ ❑❑❑❑ occurrence❑=❑ ❑❑d 1111❑ ®m a- [][]scheduled underlying insurance ❑ ❑_ ❑❑❑r®❑=Q-❑=m ❑ ❑❑❑®_ _❑_ ❑a-=❑ Or ❑-❑❑❑__❑ ❑r 11❑1 ❑ Eir d ❑❑ 1111111111 r❑❑❑©❑d ❑❑d ❑- ❑❑ insured contractor ❑ ❑❑❑ ❑ _ ❑® ❑❑❑ r®❑[ID ®❑ ❑❑ ❑❑_ ❑❑❑®_ IEEE ■■ ■■■ ■ ■ ■■■111■IIII■■ m■ ■ ■■ IEEE■ m■ ■■■n1■■ ■■■nin. ■■ mnn■ ■■ III■ ■ ■■ ■■ ■■■ ■ ■ ■■■111■IIII■■ ll1■111. 111E NONE 111■■ ■■■ ■■Ci on on soon ON ■■■■■■ ■■ 111E ■■■11111■■III ■111 IIII ■■111■■ IEEE ■■111111 ■■IIII■ ■ IIII■■ ■III ■■ ■■. —[IIII 111111 ❑5 1111111111 ❑ ❑❑❑❑ ❑ [ID❑❑ ❑ o-=❑11L= ❑ ❑R ®❑® R IIE[ir EEd ❑ 11111111115 ❑❑❑❑ M ❑❑ ❑❑❑❑❑ =❑®d ❑ ®❑❑❑❑a-❑ ®❑❑ ®®d m moor®=d o oEMr®=® oom ❑ Er o ®o FFM ® oo-❑ ®oo WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 00 03 13 (Ed. 4-84) WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule Where required by written agreement signed prior to loss. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective July 1, 202 Policy No. CWC74098650 Endorsement No. Insured BECK GROUP HOLDINGS, LLC Insurance Company Countersigned by XL Specialty Insurance Company WC 00 03 13 (Ed. 4-84) © 1983 National Council on Compensation Insurance. WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 99 06 90 (Ed. 0616) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CANCELLATION NOTIFICATION (INCLUDING NONPAYMENT OF PREMIUM) TO OTHERS ENDORSEMENT This endorsement modifies insurance provided under the following: WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY INSURANCE POLICY In the event coverage is cancelled for any statutorily permitted reason, advanced written notice will be mailed or delivered to person(s) or entity(ies) according to the notification schedule shown below: Number of Days Name of Person(s) or Entity(ies) Mailing Address: Advanced Notice of Cancellation: AS PER SCHEDULE ON FILE WITH AS PER SCHEDULE ON FILE WITH COMPANY. 30 COMPANY. All other terms and conditions remain the same. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective: July 1, 2025 Policy No.: CWC740986506 Endorsement No.: Insured: BECK GROUP HOLDINGS, LLC. Insurance Company: XL Specialty Insurance Company Countersigned by: WC 99 06 90 (Ed. 0616) © 2016 X.L. America, Inc. All Rights Reserved. Page 1 of 1 May not be copied without permission 0062 13- 1 PLRFOR'NANCI_ BOND Page i of 3 SECTION 44 62 13 2 PERFORMANCE BOND Bond No. 674225452 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, Beek -- Potere Joint Venture, known as "Principal" herein and 9 Liberty Mutual Insurance Company , a corporate surety (sureties, if more than 10 one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one I I or more), are held and firmly bound unto the Developer, Tarrant County Hospital District (dlbla 12 JPS health Network), authorized to do business in Texas ("Developer") and the City of Fort 13 Worth, a Texas municipal corporation ("City"), in the penal sum of, ]~our Hundred Eighty -Six 14 Thousand, Three hundred Thirty -Six Dollars and Seventy -Six Cents ($486,336,76 ), lawful 15 money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of 16 which surn well and truly to be made jointly unto the Developer and the City as dual obligees, we 17 bind ourselves, our heirs, executors, adnunistrators, successors and assigns, jointly and severally, 19 firmly by these presents. 19 WHEREAS, Developer and City liave entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities 21 Agreement, CFA Number CFA 25-044, and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded 23 the 18th day of June , 20 25 , which Contract is hereby referred to and shade a 24 part hereof for all purposes as if fully set forth 'herein, to furnish all materials, cquipincnt labor 25 and other accessories defined by law, in the prosecution of the Work, including any Change 26 Orders, as provided for in said Contract designated as 27 PAVING & PEDESTRIAN LIGHT 28 TO SERVE 29 PARKWAY IMPROVEMENTS FOR JPS PARKING GARAGE CITY OF FORT WORTH 14RK;FA Y & PEDESTRIRNLI(;I1T lii?PRGYEd1EN7S TO SERVE JPS PARKING GARAGE STAti'DARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised January 31. 2012 0062 13 - 2 PERFORMANCE BOND Pagc 2 of3 1 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 2 shall faithfully perform it obligations under the Contract and shall in all respects duly and 3 faithfully perform the Work, including Change Orders, tinder the Contract, according to the plans, 4 specifications, and contract documents therein referred to, and as well during any period of 5 extension of the Contract that may be granted on the part of the Developer and/or City, then this 6 obligation shall be and become null and void, otherwise to remain in full force and effect. 7 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 8 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 9 Worth Division, 10 This bond is made and executed in compliance with the provisions of Chapter 2253 of the I I Texas Government Code, as amended, and all IiabiIities on this bond shall be determined in 12 accordance with (lie provisions of said statue. 13 IN WITNESS WHEREOF, the Principal and the Surety have SIGNET] and SEALED 14 this instrument by duly authorized agents and officers on this the 18th day of 15 June , 20 25 . 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 ATTEST: (Principal) Secretary an ss as to Principal PRINCIPAL: Bcck — ^re Joint Venture BY.rennett. Sconal Director Name and Title Address: 464 Bailey Ave. Suite 21 a Fort Worth, TX. 76107 SURETY: Liberty Mutual Insurance Company BY: 5ignalurc : .. Veronica Lawver, Attorney -in -fact ` Name and Title Address: Liberty Mutual Insurance Company 175 Berkeley Street Boston, MA 02116 CITY OF FORT WORTH PARKWAY& PEDESTRIAN LIGUT IMPROVEMEN T TO SERYC.IPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS (TiV 106001 Revised Jaimary 31. 2012 I%- 006213-3 PERFORMANCE BOND ? ! Page 3 o1`3 I `�}�` � 1711 Cf: P4� 2 Witness as to Surety Telephone Number. (617) 357-9500 3 4 5 6 *Note: If signed by an officer of the Surety Company, them must be on tide a certified extract 7 from the by-laws showing that this person has authority to sign such obligation. If 8 Surety's physical address is different from its mailing address, both must be provided. 9 10 The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH PARKWA Y & PEDESTRIA N LIGHTIMPROMIENJS TO SER VE.IPS PARKING GA RA GE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS- DEVELOPER AWARDED PROJECTS CPN 106WI Revi ed Jnia q 31. 2012 0062 14 - 1 PAYMhNI'130IND Page 1 of 3 SECTION 00 62 14 2 PAYMENT BOND Bond No. 67422545E 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, Beck — Potere Joint Venture, known as "Principal" herein, and 9 Liberty Mutual Insurance Company , a corporate surety ( or 10 sureties if more than one), duly authorized to do business in the State of Texas, known as "Surety" I I herein (whether one or more), are held and firmly bound unto the Developer, Tarrant County Hospital 12 District (dlbla JPS Health Network), authorized to do business in Texas "(Developer"), and the City I3 of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of Four Hundred Eighty -Six 14 Thousand, Three Hundred Thirty -Six Dollars and Seventy -Six Cents ($486.336.76 ), lawful money of 15 the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sutra 16 well and truly be made jointly unto the Developer and the City as dual obligees, we bind ourselves, 17 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these 18 presents: 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth, by and through a Community Facilities Agreement, 2I CFA Number CFA 25-044;and 22 WHEREAS, Principal has entered into a certain written Contract with Developer, awarded 23 the 18th day of June , 2025, which Contract is hereby referred to and 24 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, 25 labor and other accessories as defined by law, in the prosecution of the Work as provided for in said 26 Contract and designated as PAVING AND PEDESTRIAN LIGHT TO SERVE: PARKWAY 27 IMPROVEMENTS FOR JPS PARKING GARAGE 28 CITY OF FORT WORTH P.4RKfvR 1'& PEDESTRIAN L1G11T IMPROVEMENTS TO SERVEJPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -- DEVELOPER AWARDED PROJECT CPY 106001 Revised January 31, 2012 0062I4-2 PAYMENT BOND Pagc 2 of I NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal 2 shall pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of 3 the Texas Government Code, as amended) in the prosecution of the Work under the Contract, then 4 this obligation shall be and become null and void; otherwise to remain in full force and effect. 5 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 6 Texas Govemment Code, as amended, and all liabilities on this bond shall be detennined in 7 accordance with the provisions of said statute, 8 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this 9 instrument by duly authorized agents and officers on this the 18th day of 10 June 20 25. Il PRINCIPAL: Bcck -- Potere Joint Venture ATTEST: BY: ]g ature cot Bennett, Reeional Director (Principal) Secretary Natnc and Title Address: 464 Bailey Ave. Suite 210 "~" Fort Worth, TX 76107 Wi e as to Principal SURETY: Liberty Mutual Insurance Company ATTEST: BY: Signature w Veronica Lawver, Attorney -in -Fact (Su ty ee a�- V4llitness Name and Title 12 Address: Liberty Mutual Insurance Company C� Il 175 Berkeley Street Boston, MA 02116 Wrtlress as to Surety Telephone Number: (617) 357-9500 CITY OF FORT WORTH PRRlCR:I} & PEDESMIAN LIGHT IMPROVEMENT. TO SF.RI1E,IPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECT CPN 106001 R"dsed January 31, 2012 0002 1J-3 PAYMENTnOND Page 3 of3 I NoteIf signed by an officer of the Surety, them must be on file a certified extract from the bylaws 2 showing that this person has authority to sign such Obligation. If Surety's physical address is 3 different from its mailing address, both must be provided. 4 5 The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH PARK WA Y & PEDESTRIAN LIGHT IMPROFEME:WS TO SER PE ✓PS PARKING GA RAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS- DEVELOPER AWARDED PROJECT CPN 10601 Revned January 31, 2012 UO62I9- 1 MAIN'TFNANCE BOND Page I of.I 1 SECTION 00 62 19 2 MAINTENANCE BOND Bond No, 674225452 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we Beck — Potere Joint Venture , known as "Principal" herein and g Liberty Mutual Insurance Company , a corporate surety (sureties, if more than 9 one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one 10 or more), are held and firmly bound unto the Developer, Tarrant County Hospital District (dlbla I I JPS Health Network), authorized to do business in Texas ("Developer") and the City of Fort 12 Worth, a Tcxas municipal corporation ("City"), in the sum of Four Hundred Eight -Six Thousand, 13 Three Hundred Thirty -Six Dollars and Seventy -Six Cents ($486,336.76 ), lawful money of the 14 United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well 15 and truly be made jointly unto the Developer and the City as dual obligees and their successors, 16 we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and 17 severally, firmly by these presents. 18 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities 21 Agreement, CFA Number CFA 25-044; and 22 23 WHEREAS, the Principal has entered into a certain written contract with the Developer 24 awarded the 18th day of June , 20 25, which Contract is hereby referred to and 25 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment 26 labor and other accessories defined by law, in the prosecution of the Work, including ally Change 27 Orders, as provided for in said Contract designated as PAVING & PEDESTRIAN LIGHT TO 28 SERVE: PARKWAY IMPROVEMENTS FOR JPS PARKING GARAGE; and 29 30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 31 accordance with the plans, specifications and Contract Documents that the Work is and will 32 remain free from defects in materials or workmanship for and during the period of two (2) years 33 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 34 CITY OF FORT WORTH 1'4RKWA Y& PEDESTR1.4NLIGIIT IAIPROFE3fE.VTE TO SERVE.IPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN11 00J Rcviscd January 31, 2012 2 3 4 5 6 7 8 9 10 I1 12 13 14 15 16 17 18 19 20 21 22 006_219-2 MAINTENANCE nOND Page 2 of3 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the Developer and/or City of the need thereof at any time within the Maintenance Period. NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by Developer or City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full farce and effect. PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the Developer or City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being home by the Principal and the Surety under this Maintenance Bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITYOFFORTWORTH PARKWAY&PED£STRIAN LIGUTIMPROVEMENTS TO SER VE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS- DEVELOPER AWARDED PROJECTS CPN 106MI Revised January 31, 2012 0062 19 - 3 MAINTENANCF 13OND Page 3 oF3 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNET] and SEALED this 2 instrument by duly authorized agents and officers on this the 18th day of 3 June . 24 25 . 4 5 6 7 8 9 10 11 12 I3 14 15 16 17 18 I9 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 ATTEST:: (Princi al} Se/"' Greta P rY a"7, to Principal ATTEST: F (Su ty}� e} t-y-- itness Q (D�� itness as to urety PRINCIPAL: Bcck -- Patere Joint Venture BY: 4S gnaLurc Scot Bennett. Rceional Director Name and Title Address: 464 Bailey Ave. Suite 210 Fort Worth, TX. 76107 SURETY: Liberty Mutual Insurance Company BY: Signature Veronica Lawyer, Attorney -in -Fact Name and Title Address; Liberty Mutual Insurance Company 175 Berkeley Street Boston, MA 02116 Telephone Number: (617) 357-9500 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH A-IRKRAY& PEDESTRUN LIGIITIMPROPrEMENTS TO SERYR.IPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPYV 116001 Rtviwd January 31, 2012 Liberty POWER OF ATTORNEY Mutual. Liberty Mutual Insurance Company Certificates No 8213385-874009 SURETY The Ohio Casualty Insurance Company West American Insurance Company KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a contact duly organized under Me laws of the Slate of New Hampshire, that hbeNy Mutual Insurance Company is a commotion duly organized under the laws of the Slake of Maresch eartls, and West American Insurance Company a a recreation duly organized under the hersofthe Slate of Indiana therein collectively called the-Comoames'), comment b and by summary herein set form. does hereby name, denchtute and appoint, C,Smphcns Gigs, Charles R Tdeq III; Christy M Rrarlc Demdle R Coma: Dcbru 1 Scireenconi Fron C -e... F.van D Sivemore lillary D Shcovrd: )eFL'ev C' Carer. Kdlie A yen, Kristin DThunder, Lauren Scott, Marione Walker: Ma//yv T FlomyPn. Paall T Pribyl. Rebecca S Leal; Tahina hl Fry: Veronica I-mi Anne M (liedq Roxanne Avila; Tamar Bowace Meredith MclA lore Harm, Smelaon: Ruben Elliott all of the dry of Kansas Ch. slate of MO each individually if there be mare Nan one named, its true and lawful alomey-in-fad to make, execute, seal somewhat, and deliveantl an it behalf as sully and as its act and door, any and all undedekings,bonds, rem9nizances and other surety obligations, in pursuance of these presenN and shall be as binding upon the Companies as S they have been duty signed by me president and attested by the secrelary of the Companies in their own proper Pa.. IN WITNESS WHEREOF, this Paver of Attorney has been subsnibed by an authorized officer or broad of the Companies and the commate seals of the Companies have been attired IhereW the I6th day of Mach . 2025 Lldeny Mutual he nod, Company rest;SHao� \WNSUgq� The Ohio Casualty Insurance Company West Amencen Insurance Carrier, ad 1912 0 1919 m i 1991 m /�^ a >m�ya -a %, eIs, .+ea 1`ed 9n .vh� wqM w^Prat By: J. Zangede, AssislanlSeaearyG '- 1B Sfateaf PENNSYLVANIA d & County of MONTGOMERY o E Ls so Crites Itch day of March 2025 before me personally appearetl Nathan J. Zangerie, who acknowledged HimselfN beth Assistanl5ecrelary of Liberty Mutual Insurance r`ga m Company, The Oh'w Caaaally Company, and West Armenian Insurance Company, and Nat he, as such, being aummhetl so to tlo, exewle the Ioegong instrument for the purposes "_ mtherein conramad by signing an behalf of Me corporations by himself as a duly authorized officer. as cD IN WITNESS WHEREOF, I have hereunto subscribed my rem. and affixed my notarial seal at Plymouth Meaung, Penpsylvenia, on Me day and year fuel above written. O� m ad 0�0on—vaniffillfronw.n.-bro,ON 0 T—Pmt.N, No°ry Pud¢ ,/-� /� y-Par ystek.. N/�Puubli'Ac f Q ofarY C This Power of ANamey a made and executed pureuanl to and by authority of he following By-laws and Aulipnzatim, of Th. Ohio Casualty Insurance Company, Libedy Mutual a'd Inwrance Company, and West Amencan Insurance Company which resdWons are new in lull force and effect rPadtcg as followsd n m ARTICLE IV- OFFICERS: Section 12 P., of Mooney. My officer or other official of the Corooraticn summand for that purpose in writing by She Chairman or the President, and subject to such tandem as the Chairman or Me a President may prescribe, ahall appoint such aterneyer-in-fact, as may he necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surelyda— any and all undermil , bonds, centimeters and other surety obligations Steh anorneys,n-fact, wLyecl N the limitations set mtlh in their resportd powers of athemey, shall rat have MI power to and the Corporation by IM1ctr signature and execution of any such instruments and to attach thereto the seal of to Corporation. When so exanuted such g ed Zu instruments shell be as binding as 9 sgned by the President and atleded al by the Secretary. Any power orauthonly granted to any representative or atamey-m-fact under the or provisions of this adds may be Invoked at any time by he Board th Chairman, the Percent or by the officer or officers granting such power or authority. LLa ARTICLE )UH- Execution of Contracts: Section 5. Surety Bonds and UndeHakiage My officer of the Company authorized fair that comoee in writing by the chairman or he president, and subject to such initiation as the chairman or me preadenl may prescribe, Ask appokh such atomeys-in-feel, as may be necessary to act in behalf of Me Company to make, execute sea4 acknowledge and delver as surety any and all undertakings, — bonds, recagnizanres and other surely obigacre s Such atomeys-iMam smoked to the limdations eat forth in their respective powers of attorney. shall have full power to bind Me Company by her signature and execution of any such iinamerhnls and to attach thereto the seal of the Company. When so executed such instruments shall bat as finding as d signed by the president and attested by Me secretary Ce"Mcate of Designation - The President of the Company, acting Pursuant to Me Bylaws of the Company, authorises Nathan J Zangede, Assistant Secretary to sooner such dormers in -fad as may be necessary 0 act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recogmsanws and other surety obigincons. AuthorNaBon- By unanimous consent of the Company's Board of Dlyddors, the Company consents Nat facsimile or mechanically reproduced sgnatum of any assistant sanitary of the Company, wherever appearing upon a cenifiM copy of any power of momey Issued by he Company in cmnechon with surety bonds, shall be "fit and binding upon the Company win Me same force and pled as though manually spied. I, Renee C. Uawellyn, Me undersigned Awtsant Secretary, The Ohio Casualty Insurance Company, library Mutual Insurance Company, and West Amraddre Insurance Company do hereby certify that Me original power of attorney of when the foregoing Is a lull, We and correct copy of the Power of Attorney pxpcuhd by said Companies, is In NII force and effect antl has not been revoked IN TESTIMONY WHEREOF, I here hereunto set no, hand and allied the seals d sad Companies this day of Crt- saUqpN}Y IN@Uqaly: °y+.'trimro�3uw °W 6ym2 ;<°x y797 ,A`�°4- Gat- �shayn o�Nt *Hxeaa Radio L elyn. AssistantSweaty LMVl2V3 LMR OGC WPIC MWa Co OM4 Liberty Mutual Important Notice TO OBTAIN INFORMATION OR TO MAKE A COMPLAINT: You may write to Liberty Mutual Surety at: Liberty Mutual Surety Interchange Corporate Center 450 Plymouth Road, Suite 400 Plymouth Meeting, PA 19462-8284 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: hitp://www.tdi.state.tx.us E-mail: ConsumerProtection(@tdi.state.tx.us Premium or Claim Disputes Should you have a dispute concerning a premium, you should contact the agent first. If you have a dispute concerning a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. Attach This Notice To Your Policy: This notice is for information only and does not become a part or condition of the attached document. LMIC-3500 Page t of 2 Re, 7.1 07 Liberty Mutual. NOTIFICACION IMPORTANTE PARA OBTENER INFORMACION O REALIZAR UNA QUEJA: Usted puede escribir la notificaci6n y dirigirla a Liberty Mutual Surety an la siguiente direcci6n: Liberty Mutual Surety Interchange Corporate Center 450 Plymouth Road, Suite 400 Plymouth Meeting, PA 19462-8284 Usted puede conlactar al Departamento de Seguros de Texas para obtener informacion acerca de las companias, coberturas, derechos o quejas: 1-800-252-3439 Usted puede escribir al Departamento de Seguros de Texas a la siguiente direcci6n: P. O. Box 149104 Austin, TX 78714-9104 Fax:(512) 475-1771 Web: httD://www.tdi.state.tx.us E-mail: ConsumerProtectionOtdi.state.tx.us Disputas acerca de primas o reclamos En caso de qua usted quiera elevar una disputa concerniente al tema de primes, por favor contacte an primer lugar a su agente. Si el tema de la disputa as relativo a un reclamo, por favor contacte a la companfa de seguros an primer t6rmino. Si usted considera que la disputa no as apropiadamente resuelta en estas instancias, entonces usted puede contactar al Departamento de Seguros de Texas.. Adjunte esta notificacion a su p6liza: Este notificaci6n as a los solos fines de su informaci6n y la misma no forma parte o condiciona de manera alguna el documento adjunto. LMIC-3500 Page 2 of 2 Rev. 7.1.07 -� Liberty POWER OF ATTORNEY Certificate No: 8213385.674009 mute . Liberty Mutual Insurance Company SURETY The Ohio Casualty Insurance Company West American Insurance Company KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana {herein collectively called the 'Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, C. Stephens Griggs; Charles R Teter, Ill; Christy M Braile: Danielle R Capps; Debra J Scarborough; Erin C Lavin, Evan D Sizemore; Hillary D Shepard; Jeffrey C Carey; Kellic A Meycr; Kristin D Thurber; Lauren Scott; Mariana Walker; Mary T Flanigan; Patrick T Pribyl; Rebecca S Leal; Tahitia M Fry; Veronica Lawvcr; Anne M Gliedt; Roxanne Avila; Tamara Bowser: Meredith McMillen; Nancy Singleton; Robert Elliott all of the city of Kansas City state of MO each individually if there be more than one named, its true -and lawful attomey-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as If they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 18th day of March 2025 Liberty Mutual Insurance Company PXI %Nstr �1v INS& �Nst►,� The Ohio Casualty Insurance Company O'� p yJ �caPO�A `v? oo.P°�r yp West American Insurance Company Q 1912 c 0 1919 C., 1991 / N 4c�tss$ da hA1t? a �� ' da •L t7 c e�) * t+� °'H1 * 1►t� �,t1 lta By: •� — co Nathan J. Zangede, Assistant Secretary Cr State of PENNSYLVANIA ss County of MONTGOMERY o = On this 18th day of March 2025 before me personally appeared Nathan J. Zangerle, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance 8 ao 0'@ Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes `L 4 therein contained by signing on behalf of the corporations by himself as a duly authorized officer. > of c.o IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written. 0 �c'PoNv SrFI CommonwealUiefPartnsytvania-NotarySeal � p �4iQuo�y y Te feria. Public p OP montY ri B: L 4) C � Airy commission expires MBrtb 26.2029 y �/.�it,c,�� O �vD�� t ,� , nufftv1 of Teresa Pastella, Notary Public Q o Cm 0 °rgRy`' � 5 4 3 This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual 3 ONo ES Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: a M L a? ARTICLE N - OFFICERS: Section 12. Power of Attorney. 1- 0O 06 Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the :a President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety Cu _— any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact, subject to the limitations set forth in their respective powers of attomey, shall -oc8 -6- t have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such o a) Z0 instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the Z.- M provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ti a ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose In writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys•in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes Nathan J. Zangede, Assistant Secretary to appoint such adomeys-in-fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shag be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, tare and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked. , % , I I I 1 ► , r IN TESTIMONY WHEREOF, I have hereunto set my hand �rtcl"�ffj�edkhe�6 s Qj>�'pl=cmpanies this 17th day of July 2025 . -1991 c By. .a;:q _ dvl B,CINa. .�a` �• � HA101 i , .Y jNO10 d3 Renee C. Llewellyn, Assistant Secretar y LMS-12873 LMIC OCIC WAIC Muld Co 02124 ��, • . U �. . '�`� �.' �,' �V `` GENERAL PURPOSE RIDER To be attached to and form part of Bond Number 674225452 effective January 13. 2025 issued by the Libertv Mutual Insurance Comoanv in the amount of 48$6,336.76, on behalf of Beck - Potere Joint Venture as Principal, and in favor of Citv of Fort Worth as Obligee: NOW Therefore, it is agreed that: The CFA number is hereby amended from CFA 25-044 to CFA 25-0044. It is further understood and agreed that all other terms and conditions of this bond shall remain unchanged. This change is effective the 17th day of July. 2025 Signed, sealed and dated this 17th day of JuIL 2025 . Liberty Mutual Insurance Company Surety____, Veronica Lawver, Attorney-m- c STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS C®0 ❑ 0 m ❑ ❑ ❑ ❑ ❑OH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE D11AODAOOC®OCOE]❑®®ODDLlDDOOODODA[]ALI00❑ m0®000 CPN106001 ❑®iOCDEEO m ❑❑A❑❑A❑❑ CLIE ❑ C❑❑❑LULE❑❑ ❑❑ ❑H❑ C❑❑ LIE] ❑❑C❑Ell ❑ C❑❑❑❑AC❑ ❑❑❑ ❑ LIE LIED ❑❑❑ A❑ A❑❑❑❑ ❑❑❑❑❑CLIE TABLE OF CONTENTS Page ArM❑❑❑i iiiiiiiiiiiii I I❑C- LJLIIII Ill I iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiu I ®11 71MMl uLtul III 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111u I ®❑ uLtuiiii iiii I uiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiu I ArM❑❑❑rMM3❑MLILLt1 i11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111l6 ®❑ Ek 1 III1 1 1111111 u l I III f 1 I 1 11 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 16 ®❑ ❑[Mmill JL1111 1 1111111111111111111111 l l 1 l l 1 l l 1 l l 1 l l 1 l l 1 l l 11 l l 1 l l 1 l l 1 l l 1 l l 1 l l 1 l l 1 l l 1 l l 1 l l 1 l 1 l l 1 l l 1 l l 1 l l 1 l l 1 l l 1 l l 1 l l 11 l l 1 l l 1 l l 1 l l 1 l l 1 l l 1 l l 11 l 1 l 1fj ®❑ A❑❑W[M❑I-d 1 11 1 1 I I I i ICFFT�= ITFMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11111111111111111 Ar®4 ❑❑M [1F" L11i1iiiiii lllllllllllllllllllll111111111111111111111111111111111111111111111111111111111111111111111111II111111111111111111111111fr 41011 ❑FTFIFFM ❑IT1F1MrTd MLtl V1llllllllllllllllllllllllllllllllllll1ll11ll1ll1ll1ll11ll1ll1ll1ll1ll1ll1ll11ll1ll1ll1ll1ll1ll111111fr 4 m❑ M QIt ❑ rT FFMIFF FIFIFFFITA M 1 1111 1 1111 111 III I u ufl ul l l l l l l l l l l l l l l l l l l l l I I I I I I I I I I I I I I I I I I I I I I I I I 11111111111111111111111111 f r 4®171 uLtllllulllu lulu 11 1 11111 IIYI Ill 11 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIY 4D4 C®FTTrT®[ITrtl u l u illlllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllg 4®❑ AI 11111 1111 1 11 I7EI❑Td❑7d MI 11�1LIIIII ILWI 11 II Hill 111111111111111111111111111111111111111111111111111111111111111Il l ArM11❑CM®MLJJJLLI � 11 1 1 1 11111111111111111 I1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1 ®71 ❑FFT-f 7W ❑FTI-f ITTITIM 111 1 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1 1 ®❑ ❑M-iM Lti i LLutiuLr1 1I1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111I1 I I ®❑ ❑E TUrTUMM$llillill 111 UI I ill 1 11 1 11Ill1ll1ll1ll1ll1ll1l1111l1ll1ll1ll1ll1ll1l1111l1ll1ll1ll1ll1ll1l1111IllIlIllIllIllIllIll1l111I I ®4 D' 1 1 1111 11 111 II I di 1 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111114 ®71 1 11 1 1 1111111111111 11 II ti Mr1 II II I 1 111111 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111114 ®6 Dr=, I ulu11u1, 1111111 1m11[ddl:tE][ }'M❑C®M❑Md 1 11 1 1 1 1 1111I l�tl II III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIill h ®7 C = ❑M ❑ 77TT❑ f11f FFFTd LJ LLLLt 1 11111111111111111111111111111111111111111111111111111111111111111111111 h ®8 ❑ LL1Ju1 II1111 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111'll ej ®9 1 11 111111 1 1 ll-M F-d 1 11 1 1 1111111111 11111 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1 y ® ❑M❑❑" 11 11 1 IIIIIIIIII 1 Illllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll l y M❑ M M❑M ❑Sl ❑ ®3 Ar l II II a 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 I N M ❑1=117d 11 1 11 1 11 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 M ❑® Md Ci' 1 1 1111 iiiiiii I EE14 uLLWWJ a LLL-t 1 11 11 11 1 11 II 1111 1 111111111111111111111111111111111111111111 11111111111111111111111111111111111111111111111111111111111111111111111111I I I M H®'d CM ❑ l 1 11111 II11111 1 DrMfLu 1 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 I I M6 uLLLIIIIIUlullllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll1111111111111111111111111111111111111111111111111111I I = CFFT� M M❑ M1 M] C%r MM ❑Cd LJ LLLt 1 11 11111 I I I I I I I I I I I I I I I I I I I I I 1 l l 1 l l 1 l l 1 l l 1 l l l l l l l l 11 l l 1 l l 1 l l 1 l l 1 l l 1 l l 1 l l 111111111111 I I I C®0 ❑ 0 m ❑ ❑ ❑ ❑ ❑LH PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADIAOOC®000110®®ODD11DD000DODAll A171171O❑ m0®000 CPN106001 ❑®iElCDEEO m FTFF9 L -Ld L111 II II I I II I I III 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111114 [=9 ❑ 1 II1111 I I I II1 1 mLI'1 I II II II III I I III I WUJ uLj'I 1 1111 11 II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 11114 ® 11 AWI111111111IIIIIIIIIIII11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 I ❑ ElEdLitta 1111 II I1111 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1 I Ar®6 ❑❑=f ❑ LkuIUWLuiuiilllllllllllllllliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiilllllllllliiiiiiiiiiiiiiiiiiiiiiiilih Ar®7 uI;LWWJui' II I 11111111111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111h 7®❑ III I11111InII III III 11111111I idA--Tt'I I I iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII h 7D❑ uLWIIuluIuII I LWI;WWuI 11 u I I I ii1ii1u11u11ii1 iiiiiiiiiiii11111111111111111111111111111111iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiilih 7 m❑ C m❑®❑® LT FTT LLI I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1111 11/ Ar®8 ❑C®❑®❑®❑ETLLLL ,I IWri 1 u�lIIIIIIIIIIIIIIIIIIIiiiiilllllllllllllllllllllllllllllllllllllllllllllllliiIIII I/ 8m171 C=LrWWWI LLti II 1111 1111111111 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1 8D❑ A=l El Et ®❑ Lkulllllllllllllllllllllllliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii I / 8®171 ❑1 lulu 1111111 11711 111111 111111 I❑ IFTI IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I / 8m4 ❑1111KIIIII uiiiii I IM ❑ L17❑❑llt[auLdiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiillllllllllllllllllllllllllllliil n Ar7FM9 ❑CTIFTIT❑ [171 ulllllllllllllllllllllllllllllllllllllllllllllllllllllllliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiuix 9D❑ A=1C==❑ ITLIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiilliIN 9®171 ❑i iiiiuillii i11i11i 1®17]LTi uliiiiiiilllllllllllllllllllllllllllliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiilix Ar®m ❑CEX FFI-f EEC®=®❑iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiIIII x mm❑c EECmF-F❑FFT]i1ii1 i1111111111111111111111111111111111111111111111iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiilix [RoDulIII JWC;IW1n 1111 1 WLI ulillllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllliiiiiiiiiiiiilix mm❑ 11i IIIII I i11111111111111111111111111111111111111111111111111iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiuix Ar®m❑❑=mil I ii I u I u illuii I ii ul-t i s uiuii I I iED Ai i u u iiiil I ii Im❑i iiiu 1111111 i❑ a illIIIIIIIIIIIIIIIIIIIIiuIN ®❑ 111 IIIIIII II 111 II 111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIH ®❑A ®❑ a LI1111111111111111111IIIIIIIIIIIIIIIIIIIIIiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiuiy ®❑ ❑IFUIT❑Cd i it i u I it milli I iIIIIIIIIIIIIiiiiiiiillllllllllllllllllllllllllliiiiiiiiiiiilllllllllllliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiuiv ®❑CF7Mm❑=FTR❑ FTI 1111i11111111111111111111111iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiliu FFT06 CATLk ❑W ❑1 11111 1111111 I❑[J'uI1111111111111111111illillillillillillilliillillilillillillillIIIIIIIIIIIIIIIIIIl11t► ®7 CCtr❑LfTA Illlllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiuu FFF08 CWMWCATW1 uliu milli I❑ LtLI1111111111111111111liiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiilii I ArWWWUI;W1 i11ui11ii liiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiilii I FFFO❑ CFF1i1FFFF1fLf1❑ ArW WUWWIIIIIIIIIIIIIIIIIIIIIiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii I I ®❑ uLj'1111111 111111111111 III1111 111ill IIIIIIIIIIIIIIIIII1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 I I [TTO❑ 1 11111 11 1 III 11 III 1111111 11111111Ill 111I I I I I I I I I I I I11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 I I ®4 ❑TTIEAi i1 a ii iliii I u iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiili i I Ar®W ❑ FII 1 11 1 11 1 11111 I W❑ Ltu11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 I I ®❑C®Mm❑EEFTA ❑ III i11111111111111111111111111iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiuii I ArW❑4 ❑Mi111111 II11111 III 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111114 L4®❑ I iiiiiiii i1 1i iiiliu uiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiill111111111111111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111111114 C®0 ❑ 0 m ❑ ❑ ❑ ❑ ❑OH PARKWAY & PEDES TRIA N LIGHTIMPROVEMENTS TO SERVE JPS PARKING GARAGE DDAODAOOC®OCOE❑®®ODDLIDDLED DODAll AL11710❑ mLI®000 CPN106001 ❑®iLl LIDEEO m 141D❑ C H 11 I I I II I II I I I L1LLlLW ❑LLI I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II14 1-410❑ Cm Fir -El EdI IIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII4 C4m4 ❑Cki iiii u i I i❑i iiiiii iiiiiii I iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii I 1-4101111LLdl it l III I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I III I I C®0 D 0 m ❑ ❑ ❑ D ❑OH PARKWAY & PED E S TR [A N L IGHT IMPROVEMENTS TO SERVE JP PARKING GARAGE DDAODAOOC®000E0®®ODDLIDDLED DODAll AL11710❑ m0®000 CPN106001 ❑®iOCDEEO m 00 7 ❑ CD 110 ❑®Odad ❑®❑11Od®001111111111 11110®❑®DDDD1POm1][ID11m®0o-0E]o-dEld Oro®® milloinionim ARTICLE 1— DEFINITIONS AND TERMINOLOGY LD ❑ Defined Terms - ■ ■ ■[ ■1■[ ■■M ■1 n1■1■■ ■ ■■[ 111" n1111■■ 117 m ■n1iCIFFIT=11 ■■■■ ■1■nl■= ■r ■ ■ ■ulna ■■1■1■ ■■1■■ m■ 711 ■n m1■1■n ■ ■m1■ [1[11 1 1 111111 11 1111 m ■■m m■ ■In1■■ni ■1[d ■■i ■1■ n1i = ■1n ■ 117d ■ d■1■■n11■ ■" [ ■■■1m ■1■ IT ■ = Eli iiiiii iiiiii I I= mn1■ ■" ■■1■ni ■ ■■1r Of ■ ■ [ ■ ■■I■i TFI 11 11 1111111111111d It ■ 11111111■ 111 ■I■■I■■ ■71■ ■■[i [IT171111 111111 11 111 111111111111 11 ITM =dI IIIIHHUH I ■■ ■ ■ulna [ ■11■1[d a ■ ■= ■i ■ ■I■■m■■■■ ■ ■ ■■1■nl■ ■1■ d ■=L ■■1n1■ ■ ■■1n1i ■ i ■111[ ■ IIIIII■111 [i d 1111111■ ■1 Ili ■ ■IIIIII[i ETTI ■ ■ ■ IIIII 11111111111■ ■ 111 =C ■■ir ■ E1 ■■■■ ■1■111111■Illh Or ■Ila ■I■■I■I■ HE Id ■I■1111111[d Et FT-fl M ■li ■■■■■ ■'[e111■ 1111111111■ ■■ ■Illi 4■■I■■ ■I■111 i Ili ■ ■I■ mAgreement- ❑m❑r®®m=❑=®78=I==EU= El u 1 IIII it m Asbestos —Am ❑ EMt®=I I I I I11I I11 1 ❑ 117❑ ® = ®=I II II I I IIIII I ❑[fl ® [f® 11' rIIIIIIIIIIIIII II II III II IIIII I®171FUT77® ❑EiTTI II I II IIIIIIIII IIIIIIIIIIIIIIIII1di IT] [TIT]❑� El I II II I I II I II I I 1 II I II I I I I I I I ❑[8 H ®Ad ❑ ®� ■■ : I ■I■ 111 ■IIIIII[i ■1■ ■ 0 ■'■ 111■I■ 111■ IIIII ■I■i� ■■IIII ■i ■ ■■I■i ■IIIIII ■[� ■I■ Ili ■■■■ i NIS [ ■■i ■IIIIIIII ■■Ili ■I■■ ■■■IP ■[i ■■ 111■ IIIII■ ■ :. , . ■ 11111111 ■■111 � ■■I■■ ■I■■■ ■■■I■■I■ ■I■■■I[� ■I■IIIIII■i ■IIIIII■ ■I■■IIIII■ ■ 6 ❑ City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7 ❑ Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8 ❑ Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9 ❑ Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: C®0 ❑ 0 m ❑ ❑ ❑ ❑ ❑OH PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE 7171AODAO171C1711171COE❑®®ODDLIDD171171171711]A[]A1711711111 m0®000 CPN106001 ❑OCDEEO m 00 70 CD 00 ❑®ddad 0®d11dd®001111111111 000®0®OOOd1Pdmd❑ D111Td70E' 0001'dOd Oro®® ■u00010 m A®®®=ACT== [IT] ❑ Id ❑117❑ ® ❑❑ dITC❑®❑®❑m ❑=ECddEf ® ❑FTT FFF] ® CEIT 1 II 1 111111111 I❑ =❑=❑=E®Cd EEC® d ❑ FFFTi-=A EUTd ❑117❑ ® ❑= FT-fl ® ❑C-tEflT❑ T❑❑Ei EE MI 111111111 1 11 1 11 Ell ® ❑ EkE:k❑Cm I I 1111 1111111 IAEE[d� [IT] M❑ ❑❑Cm❑T117❑❑❑D Ed TCMM EE ❑ ❑❑3f EEC FT-fl [IT] ❑TT❑❑ 7FTTFf❑CEW El ❑m❑T"EidC®CFT-fl® T M❑Cd❑EFt❑TTFFCFFTFFF❑FFFMTT® u1VJWWJL1 d ❑E El:k 7M-d m ram= FT-fl d E111 =d ® HE ❑= EEC EE FTE CrEETFE[T[IC FT T T EE ❑rm= T ❑ 7F7Tm77= EMd m 117a EF1 ❑ TA❑ Cad❑ EE ❑EE = ❑= ❑EE EEdEd Ck FFFFFFd FM = i uiiilil I'll''' Id® ®= ACfF-M ❑TTd771111111 1 d ❑T TFFFJ'E1-i[Md FIfFFT-1TCFF1-fT T ® ❑®®❑rFT" T ❑Td ❑rdC-k❑ ® C❑rdJF1 FFrT-1 ❑FM❑m❑FEEFIA Ia i1 i1 1 i1 i1 1 r❑ AL[-tFFT-d ❑= FTTMFFnFI- CFFTi1FrFFf = MMFMFM =r❑FT-®❑Cfi drm = m ED Xontractor—The individual or entity with whom Developer has entered into the Agreement. Day or day —A day, unless otherwise defined, shall mean a Calendar Day. EEEIDeveloper — An individual or entity that desires to make certain improvements within the City of Fort Worth EEEDrawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. C4 ❑Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. C®0 0 0 0] 00 0 0 OOH PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE 00AO0A00 C®0 C0000 II100 0000000000 All A0000 mO00000 CPN106001 ❑ 0 [DEEO m 00 70 CD 110 ❑®Odad ❑®OOOd®001111111111 0000E0®OOOOKmO❑ D111T070E' 00E'dOd Oro®® ■u0000 E6 ❑Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. Q7 ❑General Requirements —A part of the Contract Documents between the Developer and a Contractor. L8 ❑Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. ®❑Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. EOEMilestone A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. EEEYVon-Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. EETIParticipating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. EEUPIans — See definition of Drawings. L4LProject Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. Project --The Work to be performed under the Contract Documents. Chi ❑Project Representative —The authorized representative of the City who will be assigned to the Site. E17 ❑Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. E8ERegular Working Hours — Hours beginning at 7:00 a. in. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). ®aSamples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. C ®0 0 0 D] 0 0 0 0 ❑ OH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE O11AOOA00C®11C0000707000000000000All A0000 m0®000 CPN106001 ❑OCDEEO m 007omD4 ❑®Odad OEM ❑Md®001111111111 11110®❑®DDDDKmE❑ DOm®0o-[IE]o-dDd ❑ 11= 0EE04mm mOSchedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. LLLSite—Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. LLLSpecifications—That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. LLLStandard City Conditions — That part of the Contract Documents setting forth requirements of the City. C40Subcontractor--An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of apart of the Work at the Site. LLLSubmittals—All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. E6 E Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. QIOSupplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. E8 OSupplier A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. ®❑Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40❑Weekend Working Hours — Hours beginning at 9: 00 a.m. and ending at 5: 00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. C®0 ❑ 0 m ❑ ❑ ❑ ❑ ❑OH PARKWAY & PEDES TRIA N L IGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDAODAOOC®000E0®®ODDLIDDOOODODAll ALILIO❑ m0®000 CPN106001 ❑OCDEEO m 00 7 D CD oD ❑®Ddad 711771117]11Dd®11D11111111111111117TIMD®111111111PDm1]❑ DDm®Do-DDo-dDd Oro®® ■u0000 4 IT -Work --The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 4 working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p. m. L10 ❑ Terminology ■ ■ ■■ ■ ■ ■ ■i� IIP ■ ■ 111 ■i IN ■I■■ ■U ■■I Il■■■i■ ■■I■ ■■Iri 111 n1■ ■ r; � n1■ ■ ■I■■i; ■■ ■I■m i ■■i; ■■■■ ■■■■ n1■ nn n11■Inm ■ ❑ ❑ Defective: m ❑m ❑ [fd [i1 7777777 ❑ FF17 ❑Chi ❑ Cfd EF1 [T7M ram❑ H ❑ Cf❑ FTM E71 I I 1 II I I II I II I I II II I i I I I I II I II I I t di ILHILL 1 I, I I IJ__I11 I_IW arl IMMI■ ■ 111 111■ ■■ii■I■I■■ ■■I■■ ■■IIIIIi ■■ ■■I■ ■■■■ ■I■I■111■ ■I■■ii■■ ■■111 ■■■I■■ ■IIII ■I■■I■ ■Illli� i ■IIIIIIIIIi ■I■i ■■■li ■Ili [i 111111 111■ ■■ii■I■I■■ ■■I■■ ■I■IIII■i ■I■ ■■I■ ■■I■I■ � ■I■ ■I■[i i Ili 111 11111111 ■ C []Furnish, Install, Perform, Provide: m ❑ m ❑ Ckd =[T a = ❑ Ckd I it l i i u l i it l li i i IT = ❑ Ckd 1=d M 1111 [k ®❑ 1Td [Tk FFFH ® 117 IM ❑ 117d I 11 II 1 1 I I I I I I I [-' FFFI F-M I Ef ® [M d 1f Ef Trt = ❑ FM M FA rTFf-t LL-t [E]FM❑ Ck❑[T[T]I IIIII 1 II II Il1111t❑[T[TT 41m®IIIIIIII I II 1 IIII I= FA ® I l ll ll ll llllt❑ ® [ li[la❑ FI-7 ❑ [TD IMIMIU❑III l u 1l1u1l1u uIIIII ®Md ET] = 1 II 1 I I I II 1 IT 1[-di❑ I I III II 1 I I I II II 1 Lk I 11 1 1 Ilril I 1111111 1 LLLd®❑ [-' ®Ld❑ ❑ JL1 FFVd ® = CFFIfFEU ❑ FrM LLL EEF1Td=❑ MT=rl II II I I III 11 a ❑ I III IIII I I C ®0 ❑ D D] ❑ ❑ ❑ ❑ ❑ DH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDDDD7DDDDDDLED DDDAll ADDDD mDDDCDD CPN106001 ❑OCDEEO m 00 7 D CD D6 ❑®Ddad 711771117]11Dd®11D111111111111111ID1111®11111111KDm1]❑ DDm®Do-DDo-dDd Oro®® DD F16 mm ARTICLE 2 - PRELIMINARY MATTERS LD ❑ Before Starting Construction Baseline Schedules: ❑= =C ® ® EEEEid=❑ ® =C®= 117[[It ® Mi FFF171117m11FEI 7TF-d FTP❑®m=mod [IT]C®❑777❑C11'IIIIIIIIIIIIIIIIIIC❑rdC$❑11' ❑� [IdIIIIIIIIII illuli ICE❑rddll F1 LID ❑ Preconstruction Conference ❑=k❑=❑ Ck❑=]=❑®®EMf0d❑®C®7FFT F-MTd ❑❑ruu❑wuIII III ❑Cm I II 1 II II I IIII Id [111 FTFC ­71-f= ®❑ Public Meeting ■■F i7T­Ff ■ ■I■ ■■■ ■ ■■11111111■ ■I■■ ■I■■111■ ■I■111 ■ ErIft 11TM 117 r■IIIi ■M [ 11 111■ ■T7 Ef li 111 ■Im■Iid ■1■ ■1■ ■■■nln ■I■In11■ ■I■ ■■■rd ■n ■■ =C ■11■ ARTICLE 3 - CONTRACT DOCUMENTS AND AMENDING -D - Reference Standards ■ ■ n11i� i , ii ■I■■■ ■I■ ■■■Ii� m❑ ®= ® 7"11WE III II II I I I I I I II II I II I I I I I I❑ [' ❑QA gy m= I I I II II I I I I II II I I 11 I II I I II I I I 1 al 1 II IN IIIIIII 1 1 t I I IIII I IIIIIIIIIII I I r TI❑TIE]a ❑I II 1 IIIIIIIIII 1 II I I=ram=ml II III IIIIIIIIICJ' m=I IIIIIII 1111111 I I II I IIIII❑==F"I-'dl 1 II I I VIIIIIIII IIIIIII I I II II I I IIIII II ilk ❑EE❑117 ❑I II I IIIIIIIIII I I [111FFTflM7II-17FTI®❑mi I 1 II 1111 I71171d❑❑f mTIFFInIIIiiIi Iiiiiii i❑FTTTImTFFIAE'FMFM®®❑ 110'❑m❑1dI IIIII I I II I I I II❑®mom❑®I II III IIIIIIIIII IIIIIIIlmd =®C®=�® m❑❑117 11' IIIIIrl1IIIIIII1m1IIIIIIIIIIIIIII1[IT]C117 =mTM FTI d1flFFTFT®❑m®®m=10]I I I I I I II II II III I II IIIIIII II I IIIIIIIIII IIIII11t 11 I It1L111r[E=d=Ek �® ®VFW 117 dlflF-M FFJ� ❑-t❑IF❑= m= ❑ 117171117 FM d7T 11 7T [IT] "a=rI II II I I I III I I I II II II I I I I I I II I I III IIII I II I I I® =117I 1 I I IIII I I 1 Im®C ®= �® ®❑ Amending and Supplementing Contract Documents A❑❑mC®=❑=❑LLmLLI"Ld 21C-F"Lll' Ldd1IIIIIIIIIII IIIILWrI II IIIIIIII 1 I® FFFn ❑ 11' 71117 771 ❑ Ed F7 FTF1 ❑ t 71 ❑ ❑Cd ❑❑-dam ®F17 m ❑ ❑111'I I II I I I I I II I II I I I C ❑rd ll Ef ❑ ❑FT-MLkIIIIIIIII IIIIIIi iC❑rdC-t❑ ❑❑❑mrmFFFMm=Cn-T�F-M❑FTTTT1❑ETI7E]IIIIIIIII[TMd❑1Td❑FTt EEFd di II I IIIIIIII I 1 1 ® FM ❑ LkL1 LLLI III 1 I II I II I I ❑ LJ1 CFF41F-M❑r= Lk CFF[t1FM❑L11 LLI❑ m m ■■ ■IIIICi ■ � i ■ C®D D D D] ❑ ❑ ❑ D ❑DH PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDDDDLED DDDAll ADDDD mDDDCDD CPN106001 ❑®i11 ED EEO m 007oCDo7 ❑®Odad 711771117]E]Od®001111111111 11111IFT111171-1-11 111111KIT11][Ir D111T®0o-0Elo-dEld Oro®® ■uWE-E0 ■■ IIIIIIIIi ■■■111■i Ills ■I■IIII■ ■■■■■■■ 111■i ■■■i ■i ■I■■ ■11[� [I Ills ■■ 11111111 ■ IIIIIII■ 11111[ i ■IIIIIIIIII■ i ■III[ ARTICLE 4 — BONDS AND INSURANCE 4 ®❑ Licensed Sureties and Insurers EE FFT-fl ■ ■Ill 111■i ■I■■I■ r■I■■ir [i ■■ 111■ C ■Fir ■I■■ ■ ■■I■■ ■I■111 111 ■■ ■i ■I■■IRi " 0I IIIIIIIIIIII d■■ ■Fir■I■Ills fi■■ Ali ■111 i T-Fi ■I■■I■ ■M ■ ■111 111111i1■■[i i ■I■Ills 1111[i HE 111■ ■IIIIIII ■■ ■ ■I■■I■ 111 IIIIII■■ ■■■fl ■ [T FTFTFt ■I■■■ I I I 1111111111 1 Ili 111■ 11111 IIIII ■Iifl ■I■■i ■I■■ ■ ] ■I■■ir [i ■ ■■■I■ ETEf ■IIII ■lip 111■li ■I■■I■ ■I■■FFFFTF 1 11 1 11111 111111 1111[i IIIIII■■li ■■Fir■I■ ■I■111 ■lip ■I■■ ■I■ ■■ i ■■Ci [i ElD4 ■ 4 m [l Performance, Payment, and Maintenance Bonds A ❑ C ®VFIFFIt ®❑ FM EIt E] = EBI =F. ❑ ® = = ❑ m ❑ 1 II 1 II I I I I t EEd C ®= mod= El ITT ❑= ❑ gy m ❑mC Chi ❑C C17 111 I u it it u u t I IIIIIIIIIIIII iI--TTT [ID [TI[T] �® =C7-Ff®❑r®1111 ® ❑Ik iiiiiiiiiiiiI I[ItME= ❑❑d C®7FFFf[T[1i I iiiiii uiiiii I iFEd[-t FFFFCFFI-f=�� ❑❑C®771­k I=Ell IIIIIllu1u11lIFTTfl❑®==❑m❑l1I1u111itFTflC®®=Ell om I II I III IIII=C❑ FfFFTi'=FFFM [111C17I IIIII II IIII IC®I II 1 IIIII II1 II 1 IdUFM[1-1 FFFFmTFF] ❑ E'❑d®Tl Ell =C®=❑EEDIEMI IIIIIIIII I I I II IFFT-fl❑m111 Ell] El FM®❑® =d=m❑F[=AI II II II IIIII 1 II ImTIFFICFFM ■ A 111 ■■iH ■III■IIII ■■ III] 111■ Elk ■ Ek ■Ili 111[i ■■ 111■ C ■■ir■I■I■ ■ ■■■■ ■I■111 ■■■■■■ ■I■ Et ■■Ci ri ■FFF ■IIII■ ■■ ■ ■I■ ■ i ■■ i■■I■ Elf ■IIIIIII■ ■I■ i ■ ■■I■ ri 111 111■ ■Ill■ ■■ iC ■■ ■■I■n1I■H"=Cdiiiiiiiiiii iiiiii iEIA■nli nIn ■■ - ■i ■Mull■ ■■ ■rd [It ■I■■ ■ifl ■ ■Iid FT]Ai ■ ■In1■li m■ C ■■ ■■I■nll■i ■I■ d m C f; ■I■■i ■ 1 ml■ " Ed 7171 m■ ■■■■■■ =Eld Eli ■IIII ■ ■ifl ■ ■■■■■■ IIII■■ ■I■it III] ■I■■■■ IIII■ ■i ■IIIIII EIA 111■■ifl ■ ■III■[d ■■ ■ l ■■■■■ i ■I■ui ■il■ ■■ ■■■■■ ■■I■nd ■■ ■ ■III■I■n ■lit d ■■rd ■■■ 11 ■■ Frl-Ff ■■I■ 11=1 11 1 11111 11 1 1 1 1111 11 11111111 11111111 1111111 ILL=d=FITF] ■I■■I■■i ■■Ili ■fill■ ■■F ■ ■ ■ III III■ Tt ■IIII ■■ ■■■ ■■W M ■Illli[d ■■ C F­Tf 7FflTt 1111d ■■Ili 1-d =Et ■I■ ■u1r n1■■m ■ m la ■ n1■Inn ■1= ■= ■■ ■ ■■■I■ ■ m ■ ■I■F= ■■Fir ■I■ ■I■m ■■ Fll-t Tt 7­7 4 [I EC 7C FFT 71­flTt i ■■ ■IIIII ■■IIIIIIIC IIIIII ■lip il■■IIIIII■ 11111111 131 d ■MFIF 11[i IIII■ ■I■■I■■ ■IIIIII■ IIII■ IIII Ili■I■ I I I 111 IN 111 1111111 1 LtFud ■ ■I■■Illi ■■A ■lip Ili ■■ ■ ■IIII■ Ili■IIII ■I■■ ■IIII ■ IIIIII IIII■ ■I■Fir■■ FFFM MFI[t EEt EFEE4 [I ■ We, [I EIC ■ 4 D ❑ Certificates of Insurance C®71FFlf ❑❑f❑N❑f❑T$ [111❑I II I iiIII It ❑[dCFFM 11=EddIIIIII,I I II IIIII 11K-d ❑[d IIII II II I II I 11 I A Ell ❑TiC-td C= CLLd I-fiiillluiil IIIIII 1 m FT7FJ-FFM FFA mod= m FTFFt= ri I I I I uiim m CFU Cf FM 7� Eddy FTFFi-EdEl ❑= CF7Tf 71FFFI� 771 rEd 771 Ll-e ❑Cd ❑1 IIIIIIIIIII I C®0 D 0 m ❑ ❑ ❑ D ❑OH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDAODAOOC®OCOE]❑®®OD[ILI[]LED71 ]A[]AL11711111 m0®000 CPN106001 ❑OCDEEO m 00 70 CD C8 ❑®Odad OEM 000d®001111111111 0111IFTEET711 111111KIT11][Ir DO1TI070E' 0001'dOd Oro®® OO F18 mm m ❑m ❑ll mFTFTFt dam C®❑AdderTTTFtEd11 m TTR ■■ ■■■ ■■R■11111i 111 ■■I■i ■■ IIIIII ■■■I■ 111■IIII111■Ilh ■ ■I■■I■i■ ■111111111 ■ ■I■i ■li• ■IIII■ ■mill■ ■IIII■ re ■■Illlllllh 111 111■ ■li ■I■■I■ ■ ■■[i ri 111 111■ 11111■ ■■ ■ ■■ ■F lllllllll111111 1I1■IIII on ■IIII■[i on ■I■ ■1■■■■ ISBN[ 111[i ■I oil ■I■■i ■I■■ ■■ ■■I■■IIII ■■ 111■ IIIIII [i ■■■ ■■■ ■1111111 111 nil ■I■lii■IIII■■li• III■■ ■I■■ ■illil IIIIII ■1■■I■ ■li Ili ■■I■ ■I■ ■I■ Illlllllh 111 111■ ■i ■I■■� 192 on ■IIIi ■■i 111 ■ ■111■■IIIIII ■ ■- ■ ■ ■■■ 111■li if ■ Ili ■IIII ■ ■I1■■■ IIIIII■■II[i 7d Ili i■i ■■[i 111 d ■ 111 111■ ■11 FT ■■ ■ ■I■■III■ ■ ■■I11■■ Ili ■ i ■i ■II ■■■ I I I 1 111111111 1 1III IIIIII it ■ ■ ■■I■ ■■I■■ ■ ■ IIIIII ■■ r■IIIIII■ ■■ = ■ 111 111 111■ MT F-MA ■ ■ ■ ■IIII ■ i■ ■ ■IIIIII■ ■ FTd ■ i ■■I■■ t 11 11 ■i• 11111111111 ED=11111111111111111111 I=E=M■I■■I■■■ ■I■111 III III■ ■11111■ 111 ■■IIII■ 111■■ ■I■■P [ ■■ 11111■ i■i ■■i■■■ IIII Ills ■I■■P A■ ■■ A111 ii i iiiiiii ii mi i iiiiiiiiii11■■IIII HEEd ■ ■ ■ illlit ■■ ■■i ■■■IIIIII■ III III■111 ■■ ■ ■I11■■i ■■ 111 111■i ■■ 111■ C 11111■111 [i • 1111111■■111■C ■■ii■I■IIi E117 ■III■ 111 ■ ■IIII■ ■IIII 111■111 ■■ IIIi ■■■IIIIII■777771 Lill 111111 =1111 1111111111111111LEEd = [i • 1111111■■I■ IIIIII [i ld7FM7Ud ED 111■IIII ■IllE i • 11111 ■■• 1111111■III ■■IIIIII ■ ■■ 7T-1 IIII 111 • ■■ ■i• IIIi■ Ili i ■IIIi ■I■ri ■I■i■ ■■ IIIIII ■I■■ ■IIIIII■■I■ ■ 11111 111■ 111■li ■I■■I■ ■I■■ii ■I■ i■111 i Illllllli ■ ■■ 111■ IIII 111 I ■I■1111111 ■ • 1 ■■ ■I■ri i■i■ 111■I■111 It ■■ri [i III■IIII■■■■■ FT-d ■■ ■ ■ illlif ■■ ■■i 7 IIIi 111 ■ ■IIIIIIIIIII 111■I■ 11111■I■ ■■IIIIII ■I■■I■ ■I■■i ■I■■I■ 117FT Cf❑ FMIM❑EdE'❑ramEll ❑®FM❑d[lI 1 IIIIIIII IIII Iruti 1 II IIIIIII Idyl II1 I'll, I IFFF 117 lia Ldl=d=m=l ulliiil 1111111 idFFflm=LLk= U®mFFMrtFFFP� FFM-�=TFF FM[IT] 77WEE l Sri It i ii iiiiiii idmFrFF9-=F� m ❑I II IIIIIIIId L111 =di-i m=CFF]f=❑Cd LL± M'LL] ffML❑ ❑= AI 1 II ILtFFTdId EEd117 =CFFTFM❑ =FT ETf =❑Ift=m'FF[dmI IIIII I I I t ET] �❑ A❑ ❑ t m FM71t FFFF1 FUM LLLEd ® = C® LLLdFFM FTFFf=�� ■ i ii iiiiiiiiiii iIII■IIII ■■I■■ ■■ 1 11111 1 1 ■■ ii• i IIII■ ■I■IIIII ■ ■IIII■■ ■■Illllli ■■111111111 Lk ■I■ Ili• ■ 111■ ■I■■iiE ■I■■I■■i d FFf i■11■ mil 11111 11111 ■■IIIri ■I■■i ■I■■ ■■IIIIIII IIIi■ EW117FM ■I■111 i ■ ■I■i ■■[i 111 ■ ■III■■ ■■ 111■ LIC ■■-iIFMF■■ ■■III■ Lid s Ili• 111■ i ■ • TI ■ MT- 111 ■■ i i i i ii ii ii in im i 111■ CTM • ■ TET1 [d• 1111111■■I■ 111■li i■i■ ■I■■i 111■ 11111 • ■FhIi■ 111■ Lai ■■1111111 II■■I■ ■I■■i 117 IIII■ 1 11 1 11111 1 1 A FFUM ■■ 111■ ■■III■■111■ [17 i■ 1111 7t IIIi■ [d• i i ii ii i i i ii i i i i t ■I■■ ■111■ ■I ■ ■ • ■ ■■ [i 111111111 111 ■I■■IIIIII on ■■Ill 1 [I I ■ �Fff i IIIIII ■I■■■ ■I■■i ■I■■ III■III■■ ■I■i ■■[i ■■ 111■ 11111 111 ■I■i • ■ 111 ■1111111■0111■■ Ili• C®0 00LIE 000 OOOH PA RK WA Y & PEDES TRIA N LIGHT IMPR 0 VEMENTS TO SER VE JPS PA RKING GA RA GE OOAOOA00 C®0 C000070700 0000000000 All A0000 m000000 CPN106001 ❑ ®i11 [DEEO m 0070CDE9 ❑®Ddad 0®DODd®ODDDOD000D0110®OOODKDmO❑ DDm®Do-DDl-rdDd Oro®® OD F19 mm null■ ■■ir[i 1111111■■I■11111i ■■IIIIII■ ■I■■i■I■■ ■ � Ili ■■■■ 11111i ■■■I■ ■■■111 ■ 11111 ■ ■■■■I■■ ■■11■I■II■ ■■ ■I■i ■■r� ■■ nln■ [I EA ■■ d E ■■11111111 ■l ■■■I■111■ ■■ ■■U 1 II 1 ■ Ili ■I■■ ■■11111■ 111■I■ • ■■I■ ■■■ Ek ■■Ci ■ ■I■■i ■I■■ ■■ ■ FIFUd■nIr ■■111111■■ ■■I■■■1 11 11 11 1 11111 1111 111 1Tfl FM ■■rd ■■ TIFFIC nl■■ = 11111■ ■I■ ■I■ 111111 d EEI ■IIIIII■■i ■Illi ■■I■ 111■ r= EEI r■I■111■ 111■ FTFT ■■■I■ r■I■■ir ■■ ■■111 ■■II■IIIIII 11■1i ■■ ■ ■■■ Ed /■■11i ■■i11■; 111 111 ■ ■■ •■M II 11 ■ ■6 i■■■■ 11 ■IR11111 ■■■•■■IFTF1 i ■■■ ■■1■ b■■T■ ■■ ■ ■IT■■■■1■■■11■ 1■ ■■■ 1111 ■F11 i ■■C■ i li • •■■■• ■ TTF ■ [■1■■FFFFf 77k ■IIIh 111111 111■ ■ 117 ■ ■■ C■■I■■■ EA147171 ® 7T T Fn FFFMTFd ❑r ® r ❑❑❑❑❑J❑Ld ❑ I❑1LL❑ 11 1 1 u 1 11 u 1 1 1 I r m I 1 I 1111 1 1 11I 1 ❑Ed ❑Cd Ef = FFFT ® FTM ❑C d ❑ m ❑ FFF1 FM r l II II II III r QT d Cf r 117 ❑ ❑dI IIIIIIII II I III I I 1 [Ti ®®'❑ ®FFA I I IIIII IIII I III IIJ III I IIIIIIIIII I 11 I II I II II IIt❑ ® ❑ = ❑❑d 7❑d117 = [IT] FFFF1 rim = m = C 7T1l[TlM ❑ I II I I I I II I I I II I rI I I I IIII I I I II Lt' ❑ Edi I IIII 111 II I II I I I I mr®Ed ❑ El:tE JI I I I IIII I I I I JE1 1 II III I II I I II III 1 d m FIT 117rI I I IIIIIIIIII I IFTM FF7 71-1771[T =77dJOr®' mFMFIFFIFI I IIIIIIIIII II I EE11C® = m rI II II III [IT = d®= m T71F�= [kEll = ® Ea CFFF�71FFFFTIFTFF�� 4104 Contractor's Insurance A❑ Workers Compensation and Employers' Liability. CFFF�7TTf I II 11II II I r❑❑d ❑ FTM= =[]=®®I II I I IIIIIIIIII I I❑= [11 I II I IIIIIIIII177TIM-d ®=❑=❑ [km® CmI I II iuuiiiii I AETI FTI= ❑❑M C❑dmCm406❑m FEIEWI E111" ❑gym FFT® [Rf ❑❑ =1 LJWJLl1LIUW = ®❑FFh=k® M = ❑ [k❑ El:i=k[] Cal ❑A m ❑ ® [TFFA❑ IT Illu IIIuII I [TIT] ❑ FMQETF ❑= ❑Ell J TFF1 FFFmlIt rFfm CF­T77FT® U�t Llk❑ gy m= ❑ [17❑ FFi C®FFFFTL11I I I IUI I uIUI I I I LLdJ FMCS=Ll ❑ FTFM® m m ETkEl [d mC ®IFFIFFIT I II I I II I t17MT� [17 F-17-FTFFiET17 m dT [f Ei®®Lm=mom LEILJM❑ FIMm1=❑ [71F� mLLLI7 ❑�� FMmMT-F ❑ETIm� m ®❑LLd[t ❑ C-'m [LIFM I I ii I II II I II I I I di I III II I I II II II I I I I II III III II III II❑Cl ® ® LLI m ®❑a'dal FrMI IIIIIIIIIIImmdF[M Fmftm III III IIIIIIII IVIIIIIIIIIIIIIII[-'dWIiiiiiiIJ❑Lt'd®m C®I-FTIFT ®m I I I I I III II II I ■■ ■ ■■ 11111 11111 ■■ Ili 111■ IIIIIi ■I■■I■ ■I■■IIII i ■■[i ■ 111■ 11111111■ 111■ ■I■■i■I■■■ Ili ■■■ 1111111 111■I■ 111■ 11111111■ 111■ ■I■ ■■■111 i MEIN ■ ■i ■ ■I■■ii [� ■■ ■ ■■ ■ ■It• ■I■ ■Illlllllli ■ 11111 11111 ■■■■1■1■111■iil■II■URM C®0 ❑ 0 D] ❑ ❑ ❑ ❑ ❑OH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDAODAOOC®0000D®®ODDODDLED DODAll A00DD m0®000 CPN106001 ❑®iDCDEEO m 0070[DDD ❑®Odad 0®1111Dd®011 110000111100E0OIO1111OOIfOm0[ID11m070E' 11001'dOd Oro®® OOS] CD mm ■■ ■[I I [I 11 ■I■111■ ■IIIIICi ■I■■■ ■■ ■[I I [I 11 ■ 11111/111/ ■■11111■ ■■ ■111■■I■ ■■ ■[I I [I 11 ■ 11111■IIII ■■■null■ 11111 111 FIE] Cm❑[-t=F1E[1-tEF1❑I111I111I111I11 CFFFt=11FFF1FMm®Md U F[TTI 111 llull111 Fl®TMIT❑117 11'FFFf®dEll =Et ❑[T=IINIINI ItAEEEEd= ® a[f11 1 III IIIIII 1 l [71-11I II I II I I 1 II 1 I tl II 1 1 II I I I I I lt[ITA I I II I II III II III Ed[i ETI [TFF� Fd I I I Iri II I III III II t= ❑[$❑ FMTFF] ®❑ ❑ ❑ITT FTFFf= ❑❑❑ITfII TTTT[ FEI [}® JE1 TTT�= ❑ ® ri 1111JJJJIJJJ FTTF-f FFTFi*=[T I1111111111111ur=11711:kEI1❑=dEd ®=C®❑mCm❑Ct®❑=EE � IIIIII IIII IIIIII m I 11 IIIIII II I I I I I m ITH 1 1 FM =❑1-7-TH ® m EKIIIIII11111111 it aDdI 1 III IIIIII 1 I E=d FFT-f M TTFT= t [dm [TFFFf m❑ = Ef ❑ ET-17 ❑ ®I I II hl ❑ FFM TT-1 7❑TMF71❑❑7F❑F] [T❑ C TM FFFi' = 1 I 1 II I I I I I I I I I I ®❑r® on ■i I Ii ■■i ■IIIIII■ ■I■■■Ili ■I■ 111■ 11111 ■ ■I■ ■I■■ii ■ 111■ ■I■■ii ■I■lli ill ■ ■Illllllllll ■I■■ ■IIIIIIr, ■■if ■IIIIII■■ ■I■■if ■I■■ Ili ■ ■IIIIII ■■ ■■ ■■ Ili ■I■ 111■ ■■i■ 11111111■ 111■ 111■ ■■■ ■11111111■ ■■ 111■ i ■IIIIII■ ■■ ■■ii■IIIIII III IIIIII ■■■I■ ■i� iIIIIII ■■I■IIIIII■ ■ ■IIII■ ■11■IIII ■■ ■■ ■ ■i i ■111■I■ ■■11111 ■I■■i 111■ 111■ ■■ii ■■IIII ■ 11111 ■IIIIII ■■ 11111 11111 ■111 ■I■ ■■[I 11 [I 11 ■I■I■I■ ■■I■li ■I■■I■ ■■ ■■[I I 1 [I I 1 ■I■i ■I■■IIII 11111 111 ■■ ■■■ ■■11111■ ■ ■111 ■■I■■ ■I■ ■lip i IIII■ ■I■■ I ■ ■i� ■ ■I■■ ■ ■i ■I■■IIII ■111 11111 ■■ 111■li ■I■■I■I■ ■ BOOM IIII ■ ■■i ■I■• ■i ■I■■III IIII IIII■i ■1111111 Ill ■I■1■1■ 11111111111111 4❑ ❑mCm❑Ct®❑❑❑3tm❑= I 1 iluiiliil I ®117FTM❑ ELm[CEEEEd ED❑ ❑11711IIIll II IIIIIII 1 mFM ❑[gym =El [IT] TFF1 ❑mJEEIArMM m[FFF1 C J LLI � C❑Automobile Liability. A IM ❑ []['I1 71 1 1 IIII 1 iI iI I❑❑❑ [}FFTH❑ FFF1 m = � dLIE m FFd❑®Cd ❑M LLd ❑C [-tFFId❑ nlLE = L[Lk ❑ LILt dLE FFM ii iI i I u I ❑ dTT =i❑ [f dFM mFM I-Et7T] EW Cf [fFF-FK® dEE1 F-M Et FMmTFn ❑ [fm ❑I IIIIIIIII I I 1 II ICE' FMm1M❑LLL[t mFM1CFrTfFr1PT ❑C-' ❑LIA7 m fft ❑FFHHIMnMmrV]Fl ❑FIF]m� m A= -IIIIII IIIIII IIII (,'1--T7ff--TTTTET1❑FFFTf=❑ dEt [TFM[I E = FFTMFT7FT LLI LE I I I I I I I I I I u u I PTFF] = = M� Automobilea. ■ ■ ■I■■ ■ It FTMI I 1 11111 11 11 1 117 ■■ii ■IIII ■I■■ ■■ ■■ IIII L ■■Ilri ■I■ ■IIIIII ■■ ■[i ■■ir [i ■L ■■IIII■ ■L ■ C ®0 0 0 D] 0 0 0 0 00H PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE 110AO11A00 C1710 C01111070700 000000D000 All A00110 m000000 CPN106001 ❑ O [DEEO m 00 7 D ED Dm ❑®Ddad D®DDDd®DDDEll] Ell] DDDD11D®DDDDIfDmD❑ DDmD]Do-DDo-dDd DrD®® 1) $1, 000, 000 = 7TFd = m ❑ = 77T-d ® ®❑= ® = [t ❑ 1 II II II II IIIII IIII[TnFFFFM[t[li II IIIII II IIII ■■■1 U 11 ■ MoIIIII Illlli ■ ■i ■i ml■■ ■■11 n 11 ■ ■� nln ■Ini ■ ■i■Iml■Ir ■I■■■ ■[I I U 11 i ■■i111 ■ ■I■ ■I■■ ■ ■ ' i i - 111 ■I■■ on Ills ■ i ■ i ■■■ ■ i ■I■111 ■ i ■ 111 ■ 11111111 Ills IIIII IIIII ■■ ■'li i ■[� ■I■■111■ ■sir ■I■Ills mill ■ IIIII Ills 11111111■ Ills ■I■■ir ■I■ ■I■IIII■ m ❑m C 7i1F F1-t[-T] 77-FTrfTIT(TIC III II I II I I I II II I II I ❑ F[F[Ir [I FTM [T] I I I I I 1 11 II II IF-TTTTTIF]1 II I I I I rllei = ❑W ❑ EEIt= dM ® Et= r®FA [k7Ti*® ❑ A I= m 75H ❑M FFq nUd I m I I I I I rNonel I I I I I I I I I I I I I I I I I I I l I I I I I I I I I I I I I I I l I I I I I I I I I I I I I I ❑ r®=FTF D mDI]r®oEt FM oDZD ®Dr®DSIID m ❑mC7WFFFf IFM7T-tiF-MTT7T-f mr®Fi [TFIFTf®®IFIFT ❑❑ ETI=EF1 ® ®'❑ ❑ MMFFM Ltd-k I❑1W❑WJJr®FFd FIFT-1 EL FFP ❑ ❑ I I III III 1 11 1 # L11 FM FFfl 117 F7T-f mmMMmfl 1f=11 [T7T-iT7 ❑FM EET-t mr®mil 117FFF-f®❑ ETI r®❑=FFTFI� LILL1 II 1 1111 1111❑L1E=m❑®❑A[tFM=❑=FMIL® r®FFd FM Ef FM FFFMIF]I I I I I I I I I diced [IT] FFFFM❑-d FFF7 C FTTWT-ffff Ell EF1 = rLLI FFMmFrMT®F ❑A m LkL] Ld [Ell 11 1 111 IIII=rl I I I I I IIII IIIII Ir1❑ ®� rEd m ❑ r®EEd F ❑m T[T1 = 111 1 11 11111111d [Tf® TFF1 rT] = C®F1�L[JF-FHL-1Lk FAL LLdLLt Eldr®FA Ct7T-fFTTF] ■■ ■ ■■ ■sir ■mull■I■ ■IIII■111111111 ■■■i ■■■ ■I■■ir ri ■■ ■i ■ - ■■■ ■[I 4 ■ ■■ Ills ■ ■■it ■I■ ■L 1111111■■ 111■IIII Et ■sir ■ ■I■■i ■I■■ Tf ■■■ IIIII■ Ills■ 111■ 11111111■ 111■ ■■ ■■■IIIII IIIII■[d ■■ ■I■■ ■■I■IIII■ 11 ■ 111 ITITICITIT ■iH 111 Ills ■ ■ TFF ■■ ■■I■■ L]]7 ■ 11it ■ Jill 1 11 1 1 111111 1 1 ILLLt ■■ Ills■ ■I■ FTFIC ■sir FIT- 71[1 ■■ J ■IIII■■■ ■lip 11117 ■ i I 1 1111 1 1 11 11 1 1 1 1 tIlls■I■ ■Ilir ■ l i ■■i Ills LEI ❑❑ L LLALLk 1 II I iiiiii ( I I I I None I I I I I I I I I I I I I I I I I I I I I I I I I I I DDT ®®a•DzdEd mD®oTlCm®DDT r®oD1 11 m ❑FM ❑ MITI II 1 II II 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DDm ®®D•DzdEd mD®DE1 CE11 DDr®oDm - ■ ■ nln n1■ ■I■■■■ ■■n111r� n1IlI ■I■■I■ ■■sir■■ ■Inln■ n1■ ■■ LLI ❑ Ll-t❑❑fir®mil FFT-1 LLDW❑1LLl IFFMC®FFIFT CtFF1d❑=FMIT F� �®FTF1 FIFT❑mar®FT-d F7E]❑❑3fFM❑Ct❑TTF1FMItEdF1 � Lt FTHTtLdLJ Ell mFM-1Ur LLI®FM FFMIII1 II 1111111 1 Im=1TI m FTn ®❑ r®A F FIM F-M ❑ FEI m r7dF1= IF FTn FFII I I 1111nu11d on ■ OF ■ ■ i ■ 111■I■ ■■■ mill of, miIin ■■I■■ IN ■■F ■(IIIII■ ■■ 111■ mill■ ■ ■■ i ■ ■i ■ IIII■F ■I■ I■■ ■■I■IIII■ i ■ ■lie ■■i ■IIIII ■■ 1111lir ■■ ■ 111■i ■IIII CME D D CD D D D D DDH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDDDDLED DDDAll ADDDD mDDDCDD CPN106001 ❑ FFFTFd 11 [DEEO m 00 7 D ED Dm ❑®Ddad D®DDDd®DDDEll] Ell] DDDD111D®DDDDIfDmD❑•DDmD]Do-DDo-dDd DrD®® milloinnin m=r®mil F ■I■ 11111 ill ri IIII■■ 111 ■ ■ ri ■ ■III■i ■IIII■■ ■ ■I■ ■■Ili ri ■ i MEN ■ ■ ■ ■ ■lull■■ul Ill ■ ■■■11[i ■■ ■ ■IIII ■ri ■I■■ on ■I■ ■ ■I■li i mini ■I11■r mill■ 15,111111 111■ i r1 ■ ■111■i ■■■■ ■ ■IIIII r� ■ i ■■■■ ■I■■r ■■■ Ili IIIIII ■ ■ ■ ■ ■■■■■ 111■l1111 IS 111 111■ ■■IIIIII■ ■I■■r 111■ 111■ i ri ■ IIII■r ■IIII■■■ f ■ III on IF IF ■ ■III■r ■IIIIII■ mil 111■■lllr1 ■■■■Ills ■ i ■ mil i ■■■11[� ■■ ■ ■lii■ri ■I■■ ■■I■■111 ■Ills ■ i ■ ■ ■■ on ■I■■i IF mil ■ IIIII■111 ■■IIIIII■ Ili ■l■i ■liii■ri ■■I■■■ 111■■■■ 111■ ■ i ■ ■ ■I■ ■■ ■■111 ■ i ■ i ■ ■111■i ■IIII ■■ 111111 i ■ i ■■ ■ ■Ili i ■ri ■I■■ ■■I■■111 ET ■■i 111 111 ■■ EI17 ETf ■ ri ■■ 111■ C ■■ii ■I■IIIi 111■IIII ■■ ■I■■ ■ FFTTd 111■ C ■■ii 7TFFk ■■I■ Ili 7111■ri 111■ C IIIII ■ IIIII ■I■ i 1111111 11 1 1 1111111 i ■■ 111■ TFFT ■I■■I■ 7f ■IIII ■ri ■I■■ ■■■■ ■■I■ ri ■ ■I■ Fd ` 111 ■11■I■ FTFFt ■I■■■ ■ ■■I1 ■■ 7T-T ■■ri ■■ 111■C IIIII ■16 ■I■I■I■ ■IIIIIIIIIri ■ ■Ilii ■ri C■■ ■■I■■ IT Ellk 111 111■ ■■ii 7FT 111 777TT7T ■ Ef ■■ • ■ ■■■ 111■li ■■■I■ i ii i i ii i iiii id ■■■■■ ■ ■■I■■■ ■li Iri I I I 111111 11111 1 i ■ 111 ■■ ■i III ■ ri ■■ 111■ ■I■i■r� ■■ ■■■ ■■I■I■ ■I■■ ■Illllri ■I5 111■ i ri ■ r ■1111111■■ 111 ■I■■■ 111 ■■ 111■■r ■Iri ■■ 111■ ■■i ■I■Illi ■ III r� ■I■■I■ ■ ■1 = ■Ir Iri d 1 111■ ■IIII■ ■Ire Ili ■I■1R ■ i ■ ■r Ili ■ ri 111 111■ ■ -fEEi ■I■■■■■I■ 111■li ■I■■I■ ■ ■■I■■■I■ ■ 111■ ■Ili FT- ■I■■ ■■■■ ■I■ 111■ 11111i rd■ IIIII ■I■■ IIII■■■ 1111111111■ ■■ 111■ ■Ilii ■ri ■I■■ ■■I■■ ■■i ■IIIIII■ ■■i ii ■I■I■■ III III■ ■ ■IIII■IIII ■ ■ • • • • ' • • • • ■■ii ■■IIII ■11■IIII ill ■ r11111NIM ■■1111111 IIIII ■■■■ i ■IIII IIIIII ■■ IIIIIi ■I■■I■ ■I■■r ■I■■I■ ■■ii ■I■IIII ■ i ■ ■■IIIII ■I■IIII1111■ ■I■■I■ ■■I■ ■■I■I■ i om a dre Immimm ■ ■■ IIIII ■ i ri IIIIIi ■I■■ ■■■■ i ■ri ■i IIIIII 4 ®❑ Acceptance of Bonds and Insurance; Option to Replace L11C IIIII ■■I■ ■I■■ I I I I 111 1111111 1 ■I 111■ ■I■■r ■I■■ FFMTtd ri ■■ Lt ■Illr 111 1 11111111 1 1 ■■ 111■ ■■rd ■ i 111■li ■I■■I■ Ed Ti ■■ ■i ■I■■Ire ■lip ■ i ii i i i d ■■ 1117■■iG■Illlli FM ■EEF d■I■■I■ ■ TTArMFffT 1171 111■ ■■IIIIII ■■ I I I 11111 1 ilitL]= ■ IIIII 111■ ■■ii■III■ ■ ■■I■■ ■I■11111111■ Lii ii i iiii i it ■id CFfffl 111■IIII 111 ■■1111111 111■ ■■T■I■IIIi 111 ■ 1111111■ ■ IIIIIIII 1-0 ■ ■IIIII■IIII ■ ■I■■ ■IIIII r■I11■IIII■ ■■ 111■ 1-117111111 Ill 11 111111 1 Ili FTTT-f ■I■ii ■■■I■ LUC Mil FFIFt I ■■Ci ■ 111 111■ C IIIII 11■■I■ ri ■ ■IIIIII■ 111 ■■■I■ 117 ■■ii ri ■I■ 111■ 111 11 1 11111 1 It C IIIII ■ ■I■ r 1 11 111 r 1 11 1 1 111111 111 C ■■T7 Ili d ■■I■ ■■■ IT-■I■■IIII i ■ ■IIIIIIIIIII ■IIII ■■ 111■ ■■rd ■ ■Ire 111■li ■I■■I■ ■I■■ii ri ■■ 111■ C ■■ii ■III■ ■ ■■I■■FIFTIURn ■ 1 11 1 11111 1 t i C IIIII 111■ ■■ii ■FIli 111 EIr IIMT-1 ■■ 11■■'■ Illllllli ■ Efft 111 TTI ■Ills ■■■ 111■ ■ ITFFT--f ■■ 111■I■ Illllllli ■ 111 ■ ■IIIIIIIIIII d LL[t 111 ■■■ ■I■■I■■■ 111 111■ ■I■■iiri ■I■■r ■I■■I■ ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES ®❑ Supervision and Superintendent I "11111�0111,r Ron ■I■■IIIII■ Mil s 111■I■ 111■III ■Ire ■I■■r 1111111mmummm■Elinorli ■ ■i■ C ®D D D CD D D D D D DH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDDDDDDDDDDAll ADDDD m0®000 CPN106001 ❑ FFFTFd D CDEEO m 00 7 D ED Dm ❑®Clod D®DDDdMIT] DEll] Ell] DDDD11D®DDDDIfDmD[IDDmD]Do-DDo-dDd DrD®® 0111010010 1019101111111 ■I■■i ■■■I■ ■ 11111 111■ ■■ir■111■■ ■■I■■ ■I■1111[ ■■ir■I■Ills ■11111111 Ili 111■ ■ ■I■I■■I■■ ■Illis i ■■I[i i 11❑A❑®®0]dEk= = 117=t®m= ❑ IT=C®FFF­Ft ❑ = 11 1 11 1 iiin 711-77-f FTFTFdFM❑m FTFmr❑❑r®® CITFFFI❑m ❑ELLi =d=❑®mC®71RTi®T❑:'I II II V IIIIIIIII I==E1=F d ®®gym mil= mC®FFI]Tk❑ ■ ■■ii ■Illlli ■11■IIII ■■1111111 111■ 11111 !� ■■i ■ i Ili 111 ■ ■■111■ i ■I■I■ � i 111■ 111■ ■■ LID ❑ Labor; Working Hours A❑C®FIFIFFT E'FFFti❑ = I II IIIIII IIII I I I IIIIIIIIIIt] ❑t EEI mom❑ 1 1 1 11rJI 11111111 r®Ed 7E]TT-1 C ®I-11711 =TFIC 77iFFIFFIT FFFIMFP TTTF ETI❑17Tfl d I I I IIIIi I I i III I i I ❑W C17d Et ❑® ❑❑ ❑FEI FUTf❑®rEd T' TFF1 1-f 1]1 11111 1111111 1 IMI a = a 11-1717 a iIU M = ❑® E' LJU=[Tfl I II I 11 II I II II 1®❑ ® 17TTd ® =CFIT =E II I I III III I❑ aE FTIFFFF ❑F m ❑ITt❑Cal dCtTT-1 ❑❑ C17=H77t FTIC71-f 7TTJ- ❑ EI17❑ 771TF ❑:t Elk ❑=m❑ Ck❑mil ❑❑ C17=HEIT❑C17 M ❑ Fl� ❑ Ck=HEIJ❑❑� CTFTF1❑ram III I l 1111 l 117111 FFM ❑TTFTFIm 1Tfl II Il Il l 1 1 1111 ❑ITIF❑ rFFFMrl 11 l III II II III 1 ® 1-f ®�= ❑ 1 1 I I I I II I II I I 1 In I 'mo ❑ a= m QIt F7F7T-d ❑❑ 117=H71-J7❑ram❑gym❑Cd11771 ETI ET❑77❑� ❑=C1711 ■■ ■i ■ ■■I■■Ii� ■ ■ ■nl■ ■■ ■� ■■■■■ ■ r� ■ ■■ ■■■■ ■■nl■ ■ ■■Ire nl■ ■■■ �� ■■ m E F"=ram❑gym ❑Ed Elm I] El ❑ ❑=Eta EFT[d F-M ®❑ Services, Materials, and Equipment A❑❑FTTFT-f❑®I II11IIIIIIIId U=C®1M❑7= FFI-fITT117FFTIJ717-d ❑FIFIFT rl III I I I II I I I I II II II I I ❑ t IFF ®❑ ®IRP = FFT-FT ❑ T LJLW r 1 1 111111 1 FMEFd ❑ mlTr❑❑I❑1 II I I I II 1 II III II II I❑-❑f T TTl —F1 I I I u 111I 1 1 I 1 11 1❑ ®❑❑ II II II II II II 1111 1 ® LLk J❑ II II II II II II II ❑[ ® Frrrr f I II II II I II II II II I II I ❑Cd und ❑ L ❑-177 ❑ FF1f 7FFFT r®Ed I I III III II l ltl 1111 l I tj F m=❑ [}m ■ ■ A 111■ ■IIIt 1111111 ■lip ■I■■111■ ■I■■111■li LLk ■Illh 111111 111■ ■ Lt ■ MILDI 11 1 11 11111111d i ■111 ■ FFFMM ■■ ■■■fl ■■■IIIIIIII ■lip ■■I■ ■I■ ■ FFF ■ FTFI i ■■ ii [d 111 111■ ■■rr ■■I■ ■ ■■I■■ ■FETIA Ell i ■I■111111■ ■lip ■■i [i LLIFFUDI 1 11 1111111111 1111111 1 11 11 1 11111 11 1 t■11111111 ■■ 111 111■ ■■I■■11111 EEIC 11111■ 111r■■■i; [d ■■ C = ■■i; ■I■Illi 71111 1 11 111111111111 1111 r ■ ■I■ri ■I■■I■ 11111■Illh TFF1 r ■I■i 111 ■■ ■I■■ir ri 11111111111 ■■ 1111111 LLL ■I■I■■Ilh ■■lip ■■■1111111 ■■ ■ ■ L 1III M ■A ■I■■111■ ■I■111 C®D ❑ D CD ❑ ❑ ❑ ❑ ❑DH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDDDDLED DDDADADDDD mDDDCDD CPN106001 ❑ D [DEEO m 00 70 [D11A ❑®Odad 0®O1111d®011 11000011111711 11-TIFT11 11 [T]If DITT] [Ir D11m070E' 11ElErdOd Oro®® 00M A m07 ■ Ills ■IIIP 1111111 ■Ire ■I■■111■ ■I■■111 on 111■Ii on i■ri IIIIII Ills ■ IF ■I■■IIII■■ ■IIli ri ■ Ili ■I■Illh Ili ■IIII■Illri ■■■Iri ■■IIIII■I■ri ■■li1111111■ri lllinIlIllgro ■I■■I■ ■ IIIII 111■hi■■IIIIII■■ ■■ Ills ■■■■IIIIP■Ills ■ IIII■ ■ ■I■ ■■ i ■■Ci ri 111 Ills ■■R■I■I■■ ■■■■ ■I■IIII■ LID4 Project Schedule ■ ■sir ■I■IIli ■I■■IIII ri ■r ■ 111 Ills ■ ■IIII■I■ ■■I■ri ■111niiiiiiniiiiiilviiiii ■■I■li ■I■■I■ ■ IIIII ■r ■li ■I■■ ■ll ■ ■lip nl■ ■ ■IIli ■■■ ■I■■i; ■■ ■Ism ■■ mil ■■ ■■ r� nl■Inn fi ■■ nll ■ m nll ■ ■■ i ■■r: r� ■■Inl■ ■ on ■■ii■I■IIli ■I■■111■I■■■ IIIIII IIIII Ili IIIII Ills ■I■111■■IlhORION mill OF IN ■I■■ ■U ■ ■'i� nl■ ■ ■I■r ■I■■ ■■Ili; ■I■ ■■nl■i ■■■■In r� nl■Im ■Ism m nl■ ■ ■mil ■■ ■ ■■■■Iri ri ■i■I■1 ■IIIII ill Ills ■ ■IIII■■ ■■I■rmill 111■I■ ■ IIIII ■I■■I■■■ ills ■sir, ■■I■ ■ 111 ■ ■I■■IIII ■■ ■I■■■ llllllri mill ■I■IIli ■I■■I■ ■IIIII Ills ■I■■i; ■I■ ■Ism on • 111111111 ■ • I NIMBI ■I■111 Ill ■■ii ■I■I■ ■ 111 ■ Ill ■ ■IIII■IIII ■ IIIII IIIII ■r ■ ri ■ ■■ ■r ■I■■I■■■ ■ � r ■I■ L10 ❑ Substitutes and "Or -Equals" ■ ■ ■■I■■I■r ■I■ Illlr■ ■■■ ■IIli iiimff ■I■■111■ ■■■111 n i ■Ili lllri 1111110 ■■ii■■I■■ ■■I■■ ■Ism on ■■IIII■ Ills ■■■ ■ ■■■ i Ili Illllli ■IIIIII■ i Ills ■■■ ■ ■■■Ili IIIII■lli momiiirmlilmmimmiimiili ■Ills 111MINI III lllllllriri 111 Ills Ill■■■ ■■■Ili ■I■■■I ■■■IIIIIIII ■I■■ii r� ■ ■ ■IIIII■ i � ■I■Pnmin■ i m Il�nln■ r� ■■ ■ i � ■� Ilr� nl■ nl■I■■■ i ■Ii IIII■■■IIII IIIIII■ i ■■ 111 ■r ■ Illlllri ■■Illr IIIIII■ ■ ■■ ■ ■IIli III i ■I■■111■ ■I■■ ■■ ■Ills ■ ■ ■I■ ■■ ■I■■■ Illlllh 111 IIIII Ili ■■IIII■ ■i� i Ills ■Ili ■I■■ ■Ili Illri ■■IIII■ ■ ■■ • i IIIIII 11111111 ■■111 d0IE ■IIIIII■ ■I■ IIIIII■ ■■■ ■IIli IIII■i ■I■■111■ =[17 ■■■■rd ■■ FFii7TTf 7777TTT77Tr7 777777 TTFIF7P ri ■lip 777777777 ■IIII IIli ■I■ 111■I■ ■■ ■I■■I■■■ 111 ■Illllllri ■ i ■ ■ IIIII■■ Ed ■Ills ■■ ■■ ■■■■I: Ef ri ■■ C IIIII ■I■ ■I■ IliIIII■■■IIII IIIII■ 11111 ■ ■IIII■ ■I■111■ ■I■IIII■ ■lip ■Ili ■■■I■ ■■ Ills 117■■■■Iri IIIIII■ ■ ■I■■ 111 C 111 FU ■I■111 d IIIIP ■IIIIII■■ ■■ ■I■I■I■■ F7TTd ■IIIII■■■ ■■■ ■IIIII■■I■ ■ IIIII ■I■■ ■ Ek ■IIII ■■ Ills ■I■■ii■I■ ■■111 Ili ■Ili ■■■I■ ■■ i ■■■■rd 1 11 1 IIIII■ ETID117 Ills Ili■■■Ills ■■ IIIIII Ili Ili 7MFT0F[A=[1117=T1d IIIIII■ ■■ ■ ■IIII 111■i ■I■■111■ ■I■■■ IIIII■■ FFFPdLtFVIIII IIIIIIII IIIIIIIII III I1IIIIILErW ■I■ ■■I■ ri IIIII ■I■ IIIII lIlirlOWNHIMEN m 111® L L11 ❑®IFIM m FIFT-F[IfFFTIFFMI 11 IIIIIIII Idd��� FIR III IIII I II d d ❑❑3' ® � ■■ 111 ■IIIII ■IIIIIII■111 Ili 111 ■ ■I■ IIII■1ls ■I■■■IIIIII ■ ■IIII Ills ■Ire 111■ ■iliIIIII 111 ■■■Iri ■■ Ills ■IIIIII■ 11■ ■I■■ ■Illllrl i ■ ■ ■■ Ills■I■ ■ i ■■■I■ ■IIli ■■■r Ili ■ ■I■■I■ ■lipMMIMMMIMMME-111 ■■ ■■ii ■I■IIII Ili 1111111111■ 111■IIIIIII ■IIli ■■r� ■lip 111■li Ili ■Illr� IIIIII Ills ■ i ■■ ■■ IIli ■ ■IIIII■■ ■■ Ills ■I■111■ 111 ■■■I■111 Ills IIIII i IIli ■I■111■ 111 ■■ii■■■■111 ■I■■li�l C ®0 0 0 D] 0 0 0 0 OOH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE 110AO11A00 C1710 C01111070700 00111100D11011 All A00110 m000000 CPN106001 ❑ O [DEEO m 00 7 D ED Dm ❑®Clod DD➢DDDd®DDDEll] Ell] DDDDIMD®DDDDIfDmD❑ DDmD]Do-DDo-dDd DrD®® 0111010010 m ®❑®❑ ® =dui r11E Ed ® � C®T�� T Substitute Items: T E111UC❑T77TdEF1Ef T FITT T❑ [Fa E=d mCmi�TFf dFFF I I I ❑❑❑iiu❑ ®EE M ® EEd Ci ❑d Ea= ® EA = III] ❑ =d = ❑ 117 1 II I I IIIIIIIIIIIImT❑❑ m C®VIFFIFT ®=®I II IIIIIIIIIIIII I IFFFFF­k❑® E'7Ed ® C® EEI d®❑ FFFF 11T1T FFM T❑ ®=17 FEET F11 III II I I I II I II I II I I III I Ill IIIII I IIT T = Ed ❑Td = I II II II II IIIII IIIII II I I III II II I I I I I ®=E]EI =k r® mQ'[Tj� I II I I IIIII IIIII I ®❑T❑®TFPC1' F-IM❑TTT III II III Id TCT [YT 775' T C®=❑ T C®FrFFt FM❑rTI II I IIIIIII IIIIIII I®CFUITTrT❑CT� II III II IIIIII II IIIIII m ❑ =i=Ek ==C ®FIFFIFT ED =k= 117 =❑m 1 IIIIII IIIIII I FMT❑T❑01]T00 Td❑ ■■ 1111111111■I■111■ ■ ■■■■I[i ■ IIIIIII [IT] [Tt7'❑ [dI II I I uIIUIII=I II I IIIIIIII I I[Tfl III II IIIII I ITFF1rI II II IIIIIII II IIIIIId ITIT 7E]TFF1 T d� 1111110011111111111 111 111 ■ nlln ■■ ■■nlr� m nl■ ■■■ ■ ■■■ ■■ = ■■Ir1 ■■■■® ® = ❑TIT-F Tll ❑ ED El = = = m= ETFFFTM I II I I II I u II I I I I I IJ I❑I ❑ =Ek C FTF�71FFTM II I I I III I I I ❑T❑F]I III I I II i II I I mFFM EF1 ® ❑® ===117EE=d I II 11111II1IIIII= ®=❑ 11'❑❑=k El ® FMTTIFFICIFFTF-M❑Fr]Tn7f 1111 FFFFCTI I IIIIIIII I Im7MFl� dKM FM III I IIIIIIIIIIIII TIF❑ ®❑ FFFFT-f Ek Lk FFF1 LLI = Lt I III IIIIII IIIIIII = [Ell 1 I I I II IIIIII I ❑ FM FFFn❑ CF]ETII II I IIIII II IIIIFFTMI-t rI I I IIIIII I In 000011111 ■I■IIIIIII■ 111 ■IIII■i 111111111■■ ■■111■ i ■■■■I[� ii ■■ ■ ® III I IIIIII IIIII II I IIII 1 f I I I I I II IIIIII II I 11 IIIIIIII I II III II ti II I I❑Ld rl 1 I I l 1 II II IIIII II II d C®D D D LIE D D D D DDH PARKWAY & PEDESTRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDDDDLED DDDAll ADDDD mDDDCDD CPN106001 ❑ D [DEEO m 00 7 ❑ [D 11]6 ❑®Ddad D [FE1 11 11Dd TrT1111 1171] 71] 11 11117TIM 11-TrUl 11 [T]If DITT] [Ir DDmDIDo-DDo-dDd Oro®® [IFMC6 mm ■NNN11111111NN1null■ 1111[i ■11111111 ■IIII ■■ ■IIII ■■IIIII ■ i r1 IIIII IIIII■ ■ Illlli ■III■111I it■I■IIIIII i IIb i; ■I■IIIIII si ■■ ■ill ■■Ili■I■ null■ Ellin .... 111■ ■I■IIIII ■■� [i ■IIIIII■ ■lip ■ ■I■ ■I■■ IBM ■ ■■ ■llli I ■ ■IIIIIII■IIIF� ■■ ■I■■ FIE]Substitute Construction• i or • - FIE ■ I ill 11 111111111 ■ ■Iil■ili ■ ■IllliU1 i i ■■I[i i ■ ■■ 111 ■I■i ■11111111 ■IIIII [d ■■ IIII C IIII IIII■ ■ ■■I■■ ■I■IIIII ■ ■1■ M IIII i ■1111111111■ 711 111 1 111111111111171 ■IIIII■■ FFTd I III Ill 11 1 1111 1 11 1 1111 1 1 11 1 11 11 11 t i ■■[i i ■ ■■■■■llii■■IIIIII■ FTT__f ■■A ■■ C Illlli ■­FTJi1FFTFFk 1 11 1 1111 11 1 1 11111 11 1 111111111111 1 111111 r ■ ■IIIIII■ 111 ■IIIIII■ IIIII■111 IIIIIn1 IIIIII d 771 7TFFT FM d FM ■IIII FTFT_1 FTF1 1 11 1 1 111111111111117■■■il[i 111 [711111 11 1 1 1 r■11111111 ■I■IIIIRd Ili ■■ IIII C ■■ii■I■I■ ■ ■■I■■ ■■IIIIIC ■■ii■I■Illi ■I■■IIII ■ ■■■ ■ 11111111■ IC IIIII Ili ■■IIII■ 111 111■ FIM ■ ■ ■IIII 71■ [IIIIII i ■■[i Ed 111 Flit 71-t ■1■■ ■[I ETA IIII ■City's Evaluation: CIIIII ■ IIIII ■■ ■IIIIII■ [i EIrl 11 111 1 1 11 1111 IIIII ■ ■ IIIIIIII ■ ■IIII■ 111 1 11 1 11111 11111 ■■III■ 117■■■IIII■ 117 IIII■ 11111111■ ■ A■ ■i IIII■■ 111 ■i Ili ■I■■■ ■[I ■L ■lip ■[I IIII ■ C ITT ■ 71■ r■IIIII ■ 7TVITTt Ili ■IIIII [i d 1111111■■I■d ■IIII i ■■■IA IIIII ■ IIIII■■ IIII ■■III 116 ■■ ■■ EliIIII■■■IIII 1]7 1 11 1 1 11111 ill 111111 IIIII■■ EtdaFd I I I I I ill I i I ii dj i ■111111111[i ■■IIII[ 11111111� ■I■IIII■ nl ■I■■ ■nllnll■ ■ ■nll■ ■ nln ■■ ■A ■nnrd ■■ ■ C■■I■■■ Eirda nl = ■IIIIII ■■ ■ I ■IF ■I■ ■■■■ nllnll■Ili ■1■ Mi ii ii I I Ill I iCTM ■ ■I■ri ■IIIII ■■ii■I■Ills 111 ■ 1111111■ ■■11111d■IIII ■ ❑ ❑ Special Guarantee: C ®❑ m r®❑ C ®7FFFT = ❑Ik= IIDC ®VFTT= 1 ii 1 1 ii 1 II 1 ❑ 71-151T71 = [TTJ'I 11 11111 1 1 I Ctrs ® M= ❑ [ITrI 11 11 IIII 11111 IM I II I Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. ■ ■ City's Cost Reimbursement[] IIIII ■ MFF117d CMTTM ■I■IIIII 111 1 11 1 11111 1111111 1 ■ I I I I IFT■■■IRi i III■■ 111111[i ■■ C IIII■I■IIII El:II■■I■■ 111 E111 Ili ■I■■■ ■[I EA 111 ■lip ■[I IIII ■ ■ ■■IIIII 117 ■■■ CIIIII ■1■i ■■■I■ 1-11 11 1 ni a ■■■■[i i IIII■ IIIIIRi ■■ C ■■i ITT ■ ■ ■1■ ■■ r■I■■R Ed 11 IIII LEJ7LLIC IIIII 11111 1111111 1 ■IIIII■ IIIII■ Lk ■■■il[i ■ ■1■ ■IIII■ ■■ ■■■irL 111 IIII ITT EFIC IIIII Tt 111■ 7111 ■■II 7f ■ ■IIII■1 111 IIII ■■i FFF1 ■■I■■ ■I■IIII■ ❑❑ Contractor's Expense❑CFF1 f FFFFT CkFFTd❑F"FM®❑mFFT-1Ck� II Iliuuiiiil� ❑-T ❑❑C ®FFF]t I I I I I II I III I II II I 11LISubstitute Reimbursement LIC ■IIIII 11111 11 Ill I Lk LLIt=FTIiIIIII 11111 IIIIL11 1 11 11 1 11 11111 1 1 ILLLII ■i ■IIIGi 111 IIII ■■T Ill■■■ Ell-fiIIIIIIII 1111111 Ic■■I■■■ ■ i ■ ®6 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) All ❑m CIFF-TIFFIFT FT-fl IM I u i irI a alit❑ JE1 rC-I ® m C171u 1 I uii111111 i [157 FTF1 7111711 rLkl IIII 1 IIIIIIIIIIII Fill I ®7 Concerning Subcontractors, Suppliers, and Others A❑Minority and Women Owned Business Enterprise Compliance: C®0 ❑ D D] ❑ ❑ ❑ ❑ 0 DH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDDDDLED DDDAll ADDDD mDDDCDD CPN106001 ❑®iOCDEEO m 00 70 [DO[77 ❑®Odad [I IFFE] [I E]Dd Truri [I [I[] [1[] 11 111IFT11 11-TIFITO 11 FTTf DITT] [Ir DOmO]OE' OOE'dOd Oro®® FEFE 1-0 IN FA 0-0 FE-01 ■ ■ ■1■■ii Illim Ili IIIIII ■■ii ■IIIIII [I Ellin IIIIII MEN III IIIF ■ 111 NINE IIIII ■i nnnnnnnm 1 ■ ■■■ ■Ionia ii Ili IIIIII ■■ii ■■IIII FTIETIC IIIII ■■IIIIII■ 111 ■I■Ili ■ 111■ IIIIII■lip III I iiiiiii IIIIETTIIIIIIIIIIIIIIII■■ Ills IIIII ■lid ■ ■■ ■■ ■ ■Ili i IIIII■ li ■ ■ ■ ■ 111 111■ i ■■I - ■I■ ■I■■ ■■ ■■id ■ LLd ■i ■IIIIII■ ■■ ■ ■Ionia ■IIIIII■I■ ■■IIIIIIII 111 111■ ■■T■III■■ ■■I■■ ■1■111 i ■■ri ■ Ili ■ ■ ■ ■ ■■■III[ ■■T77i 116 ■Iona;[d 111 ■I■■ ■111 ■ IIIII 111■ 1111111■■ ■■ 111■ 11111111 ■ ■ ■ Lird111■I■■I■ IIII■ ■1■ ■A Ld ■ ■■ 111■ IIIIII■■ 111■■ ■■ C ■■ii■■IIIi IIIII■i ■■ri ■ ■I■■ ■1111111 ■Iid ■IIIII ■IIII FFFFFFt ■ ■IIIIII■ ■I■i d111■ Lt ■ 1-1-t 1111 ■ [i ■■ LIM ■ ■ ■ ■■ FIMC ■■ii■III■■lip ■■I■■ ■■■IIII LL[Lk ■ M CAM ❑TT=Fl= Eddiiiiiiii 1M1 1111111111 1 11 I[} 1 II 1 111111111111111 1 IMI II II II II Ilid M❑ ❑❑ ❑� ❑r® 1 11 1 1 1111 1 ILL] ITMCLLLLLAM I I I I I 1 111111111111 Lf dM ❑❑ M$=CJ'M m C ®FIM Mi ❑ M rIff] d M3 ❑ = [ID Mid MM ❑ M FTF1 Ft 7Td F17M Mai T] M ❑rd111111IuI1 ■■ C ■■T77i 1 11 1 11111111 1 1 1 1 r■I■■■IIII ■■ C IIIII■ ■IIIII■ ■1■ FFd 111 Td Ili ■I■■■ 111■IIIII■ ■■ ■■■ ■■■■III rLLLtd III Lk 1111111■ 111 111■ I I I I I I ■■ 111■ C FFIfFFF[Ft 11M ■IIIII I ii I I ii I I ii I I ii I ii I I I 111■ ■IIIIII■I■ ■ Lk ■ Fl-i 7f ■ [i ■■ ■ I M ■ ■ ■ ■ M ■I E IIII■ ■ Ilia Tf 1 111111 1111111111 1 ■■ ■M MFFT ■ [I MT ■■ It FFT-d ■ Ili Ili ■ 111■IIIIII■ ■■ 111■ ■■ii ■■IIII ` ■■ ■I■1■ ■ Ili i ■li ■ ■1■ ■■ i ■■id ■ Ili MIC FFT7TTt 111 ■ri ■■ 7FFf ■ ■Ionia ■IIIIII ■ IIIII 1117IIIII Ili ■ FTf Ilh EDI I I I I 111 11 1 111■1■ a ■■ FEJ ■■ ❑❑CAM MMr1 11111 1 111111111®CM ❑Ii MMIII" mom=I 11 1 1 11 1 ti I III ll® ❑FFFF lFf®EEd FFFFFf TO 7Tii = Et ETI❑Ti❑ M 117 ❑III FFF1 M M ❑ 117❑ M M CAM LLD r111111 1 1 11111111 L[Li CF[TfMIT LIE] M❑ M❑Cd MII11111111 1111❑® =CFFTFm ❑ MM MM M dMII] ❑Lk FU M= HFFF1 ❑rFnmfMnnmMFt❑Ct M EiMd=Lt MM] M] 1 II 1 1T11 II IIIII II It 11111111111 1 II IIII MM[M CM ❑Cd 77 II 1 1 11 1 Irll II 1111 t F1 Lil I I I 1111$ 1-1 M [dLLd1 II 11II1111 1 It M [MJ MID M] I I M [TIT] ❑ t ❑MC M ® [M 11' ® FTF1 11 ❑ Fn FFF ❑ dM FFU Frm ❑❑❑❑ k M LLdMdM❑CJ7 M ❑ M M ❑ M MrEd M❑M❑❑Cd 1 11 11 1 1111111111 1 ill C❑CAM M r1 II111 1 111111111 11k FIFFFd Frd ❑L d❑ LiL1 M 1 11 1 1 11 1 It1 11 III It❑❑77-TF❑t1T1[Td M-f UdMdM [} ET-i Ell F] M Ef ❑It M] M[M ❑ [}❑ LLdd ❑d®LL[d®1 11 11 1 11 1 ItM MCF-F1tM ❑ ■ ■ 111 ■ ■■■Iona; ■llllli III III ■lip III■I■ ■Illinh 111[i ■■IIII i ■I■1111111111■ ■i Ili ■ 111■ i Ili ■IIIIIIII■ ■I■■ ■■111■ ■ i ■ ■ ■■111■IIII ■IIIII IIIII Ili noon ■■ii■■Ili ■ ■■ 111 ■ i ■ ■i Ili ■ [i Ili ■■i;■■IIII ■■ ■ i ■IIIII ■■ ■i II■■■■ 111 ■■ ■I■i ■i 1111111 ■li ■I■'■ ■I■■■■IIII ■I■■ ■■fi■I■IIII ■lip 111■ ■■■■Ionia■I■IIII i ■ ■IIII■ ■Ilh ■ 111■ i 1111110 or ■ ■ miw!Mmimi■■ 111■III ■■fi■III■ C®O O O D] OO O O ❑OH PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE ODAODAOOC®OCODOO7070OOOODOOODODAll ADODO 7171000000 CPN106001 O®iOCDEEO m 00 7 ❑ [D 11E8 ❑®Clod D®DDDdMIT] DDDDDDDDD111D®DDDDIfDmD[IDDmD7Do-DDo-dDd Oro®® ODz] CB mm ❑C®771� CTFT7d❑ C® I 11 1 1 11JLJ=EI❑ ❑" ram= =[I]-❑ ❑❑Cfl[it ❑EF1 ®8 Wage Rates ►' ■ ■■■ ■I■■ii i� ■i mm ■ Duty to pay , . Rates. ■ ■■ C ■■ir 77i ■I■■Im ■1■■ ■m ■ ■n ■Im ■1■■ii ■■ ■1■m ■■ ■■I■nr ■■■: ■■ ■I■■■ ■ F7T-f 1771 = id ■ m1■ ■I■ ■W id 111 1111 1111 IFIFIFF nl■ ■■I■■ ■■■■■FFTflTM n1■I■ nl■ ■1n11■d ■nrt ■ n1id ■■ n1■ = n1■ nut ■■ ■1 ■■ ETEE1===ETi ii i iiiiiiiii IEI=rFMEE FEH17d ■I■■I■ ■ ITT C■■I■na ■■■; IFIE= 117777MTF7 ■ ■I■■ r ■In11■ Ef ■ n1■Inn id IFIE nl■1i1 ■■ii■M ■ ■■1■■ ■1■n111 ■ ■ Penalty f.r Violation. A C ■■YFII■Ini [17 ■I■■ 7FFTFFTf 7FFFFf ■ ■■ d ■■■ ■■■■■I■ nl■ ■ ■ ■I■■ ■11■Iil ■ rd ■ ■■ n1■ nn■■■■ n1 n1■ ■n E:60 at ■■111■ Elal=i ■1■ 7n1■id at ■1■1■1■ ■I■Illlli i d ■I■ Ef 7f ■ ■■ TTI d ■I■ 111■I■ 111■ ■ It ■� FM ■■ICE IFTM IFIFFM IFIFFF Ef7771717717 ■ ■I■■ r ■I IT lilliel n1 n1■11i11 11 1 1 1 1 11 d■■1■■ ■1■nll■ ■ ■m ■■1■■Inln1 11 1 1111 LL]rE[H=d ■■ =CIFU m IMIT id ■ ■ ■I■■I■ ■ ■■i ■■ ■I■i id ■ ■■■: [O■■■ ■ Complaints of ViolationsDetermination of Good Cause. ■ ■ r■1■1■u■■ ■■ n11i ■ ■nu1■■ 111■IIQi 111■ ■ ■I■■ ■1111111■ ■■ ■ ■ Ef ETJ7 ■ ■I■■■li ■111■ ■I■ ■IIIIIII■ii777777r7 1771 ■■■: [I ■■■ ■ ■I■■I■ ■ 7T-f ■■ ■1■■C 1 1 ■1■ ■■ ■ C ■■ii■■ni 117 11 1 1 11 1 1 1 11 1111 ■ n1■ C = m■Im ■ ■1■■ ■1■ mnlllnl■ ■IIII ■ ■ = ■■A ■I■ ■Illlli 111■d■1111111■ 11111 ■I■■uII■I■ 111■ IIIIII ■ ■ ■■IIII ■■■fl ■1■1■■I■ ■1■nllm m ■■InIn1■■ n1■1■ n1■ I 1111111111111 1 ■■IIII id ■ ■ ■■ nIn 1 11 1 1111 1 1 1111111 m ■ nlnl■ n1■ ■■-VIFIIlls It 1 11 1 1 1 1 It 11 111 it ■lip ■I■■ ■IIIIII■IIGi ■ EfFT-fi ■■ IFU 11111111111■d ■Illi 1177171717171 ■ ■■■ 111■ nlnnl d ■Ini ■ n1■Im■■ = EIt ■ m ■■ifl ■III■III m ■■nlnl■■ n1■ ■■ii■1■ni [17 Lill Ili 1 1111111 ■■1■ ■111111111d C■■I■li ■■■: ■ 111■ C ITT 111■IIII ■IIIIIIII 111■ 1FM ■I■ ■■■111 ■IIIIIIII id ■■ 111■ ■IIIIIIII ■I■■ 117 ■IIIIIIII ■I■111 ILILI 111■ d EEIJ7 ■I■■I■ ■■IIII ■I■I■ ■ IFFM ■■ICI ■lip ■ ■I■■I■d■■ ■id i 111■ Lil 11 1 111111111 1 ■ ■I■■ ■IIIIIII■ 111■I■ ■I■ ■■■111 ■■IIII■ ■ F-T■■FF [TEE] 1 11 t[-TkF-MFFM■I■111 ■■lip 1111 ■ 11111■Iid ■IT ■ 111■IIIIII■ FIE]Arbitration Required if Violation. . , AE1 1111111■ ■IIIIIIIIII■ 111 ■I■ [11A I iiiiiiiiiiiii 1 ■■ Ll IFIFIF9 [■■■■■I■■I■ ■ ■■it ■■ LE-1C id■I■111■Illh 111■ ■ ■■I■■ullll ■■ ii ■I ITTI c ITT Lt ILILI ■IIIIIII■III[i ■ Ef EFf 171 1771 =MTd 111 7116 111■ i 111 EFEI]7d= IFITM 111■ ■■I■■■ ■ ■I■i ■I■ Ari iiiii iiiiiii ALLLArFFFMLL4 [-j 1 11 1 1 11 1 lei 11 lilt ■lil ■I■■ ■IIIIIII■IIRd ■ i ■il d ■■I■ ■■■i ■'IIIIII■ 111■ 17171 ■Ii ■M ■I■■ ■ills ■ 111■ ■■111 d ■I■ ■IIIIR 111■ d ■IIII 111■ Ills ■ ■I■■■ 11111LLJ ■ 111■IIIIII■ LI-ii 11 1 11 1 11111 ■dI■li ■I■■ C■I■■■■I■ IIIIII■ ■J■I■■■ ■I■■ii[i ILIJI JIFTTFIFFEdIt 111111111■IIIIII■ ■ ■■■ ■Ii ■I■ 1771 ■I■ it ■lii ■Ills ■■IIII ■ 111■ ■■111 d ■I■ 717-T 111■ d ■IIII 111■I■ dIFF11 ■IIIIII■ 111 ■I■■ii Ld ■ ■ d Illlli IIII■ ■FIF ■ ■11■IIII1 11 1 1 1111 ILL] LtIFIFTILL[k ILL 111■ I 1 11111111111 ■■ ■I■■ ■■ 111■ ■rt■I■■■11 ■ ■■ 11111 FM ■■■ ■ ■iI 111 111 111■ i ■ ■■ ■I■IIIIIIII■ ■lip ■I■ i d ■■ 1111 Et ■li i ■IIII 111 ■Ilh = ■■ ■IIII■i 111111■■Iii ■ ■■ ■■ ■■Ili ■ii 111 ■I■■ FFFt ■■■■I■■ I I I I 111 1 11 It IICi 111111111■■ ■ ■ ' � . , .. � , , � , ■ ■■ ■■iii ■I■IIII ■lip ■I■I■I■ ■■■■I■■iii ■I■IIII ■ ■iIlh ■■Ili ■I■ 111■ ■■lip ■IIIIIIII■ 111■ 111■ � ■IIII ■■ ■■111■ ■ i ■■■ ■1111111111 ■I■li � ■ 111■I■111■■ 11111111■ ■■I■ ■ ■i� C®0 ❑ D D] ❑ ❑ ❑ ❑ ❑DH PARKWAY & PEDESTRL4 N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDDDDLED DDDAll ADDDD mDDDCDD CPN106001 ❑FFUM Ll ED EEO m 00 7 ❑ [D o[D ❑®Ddad [I FFEI 11 11Dd TrIM1111 1171] 71] 11 111IFT11 11-TrIM11 11 071f JTT] [Ir DDmD7Do-DDo-dDd Oro®® [IDz] E9 mm 1 II II 1 1 IIIIIII Im=ElaEt ®I-TTFFd m=C®l-TIFITt ==®gym®❑ EEEt7A Ed 711f EF1 TTMC FFT=7FH F77TT-1 ❑❑IT MF-Fi- dMF1 ❑ =FFTH 1111 = ❑ [j❑T'❑ ❑mr='dUI 11 1 11111 1 1 ®EMI II IIII I 1 11 1Im I I ❑❑j}' IIII II I II IIIIIII Im=C=11=IJI 1 (IIIIIII 1 I=[Idm=6�� I❑IA[}iII11II11I uIIi Irl--T-� ET] TTMiIII111111111111 n ■■ Progress Payments ■ ■ (IIII Il■III■ i Ili■111 ■■I■■ ■I■■ i ■Ili ■111 ■iK16 ■ ■ I I I I ii I ii I 111 11111111■ Ills ■■ii■Illlli II■■IIII III■■ 111 ■I■ ■1111d ■I■111 IIIIIIIIIII■ 111■I■ 111■ C ■■ii■I■Ills ■■I■ ■■■ ■11116i [ITT 1111 ■■■ii ■I■ ■■111 ■■ ■■I■Ili ■■■. ■■ ■I■■I■ ■ ■Ili ■■ = Di ■I■ ❑❑Posting of Wage Rates mmCFTTf FFFFt 1 11 ❑FFF]rFTTPFff]❑1 II 1111111111 1 1 17E] ■ i i i - ■ ■ ■■ III■IIII 111■Illh ■ 111 11111 ■lii Ili III■IIII ■Illi■IIII■ ■■■ii■ ■IIII■■11111 ■■■■I■sir■■Ili ■ 111 ■I■■ ■111 ■ 11111 ■i■li ■I■■■ � Ili ■■■■ ■ ■I■■■■I■ L109 Patent Fees and Royalties A❑ To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. L1110 Laws and Regulations A❑C®7FTFtI�IIJiii -Lill 1 1111111 11 Ir®Ed m ❑T == ❑® ®❑EE❑❑Ffl LJI 11 1 1111111111 1 1 1 II 1 111111111 1111 ® = ITi❑ E]= m= ❑ 111T]❑❑❑t[I FTFFf❑FM FFFT rC-1 m I II 1 1111111 11 IIII❑m❑❑[d ❑I II 11111111111 1111I=C®mr111111 1 1111111IIIIEt ❑C®7FIFT� F❑FU=❑m❑[} 1 11 II 1 1111111111 1111 [} ❑I II 11111111I I I u C®I-PUt ❑WL❑L1 A$ TfTII 1TTIM [IT] T 1 dETI = EUEF[d FTn I I II FUMd ®®®❑Cd LL[-tFFFIm1 II 1 1111 11tLLIJI II 1111111111111 11 M11i1 III III III d FFFFFf [-'1 11111111111 11111111 FFF❑1T FiFTTi❑❑1Tl Ef 77J dr1 1111 111111111 1 Et FFFIm[t r115 = ❑ [fm Hm LLI-t ❑M] mCIFFIfFIFFIFiffIr1 1111 1 1 1 11111 11111111 111 ❑ FM ❑IK M =rF[n ❑I 1 11 II 11111111 II1111 1 1 1 ❑[d 11rM=137171EF1 EEE[Td=❑®❑m❑❑Cd ❑I II 1111111111 11111-MFTFT CFTIT FFFT m C®1-TFFKI[1I IIIIIII IIIIIII I Imo[$ ❑L3❑❑��m Use of Site and Other Areas A❑Limitation on Use of Site and Other Areas: on nor, Milli MEMIGNMENUM mimmilim ■■111111■ ■Ills ■I■■ ■■■ ■IIII IIIIIII■lis" ■I■■111■ ■I■111■(Ile Ills ■■if Million ■■ ■ i Ili ■ 111 Ills milli ■■IllF i ■III■ ■i■ Illlllh ■■ ■ ■I■ ■ ■lip III■IIII ■■■ Ili ■I■■I■■ Ili 111■ ■11111 ■i� ■IIII i ■III■ ■ 11111 ■I■■111■ ■I■■ i CME D D D] ❑ ❑ ❑ D ❑DH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDDDDLED DDDADADDDD mDDDCDD CPN106001 ❑®iOCDEEO m 00 7 D [D D[D ❑®Ddad 0 [FE1 11 11Dd TrIT1111 1171] 71] 11 11117TIM 1171-TO 11 071f JTT] [Ir DDm®Do-DDo-dDd DrD®® DFFF] ED mm MTi ❑MiFM[T =®FFIFFFt ®11171TrI uui 1 iiIlliluiluilIt =dED=® FM = 7" F' O'FMQ' 771 Un m m ET I 1 II II 1 1 II 1 I❑T❑t=[1' mFM L9 FTM 117 57F-M ri iuiiuiili Ism [Tm m A❑=®❑❑®=EF[imFFMmTFFIC=TFF]CM-T�M7Tf ®mil Ef [i U ❑Or= m M-T� ®❑ =k® m❑ ®=rliil (IIII I III11=C1 =1177-71 = 11E iI iI i uut❑❑17 a FT-Tf 1 u i iI iI iiuii imp❑ a CTT❑ET]r❑TIFFICIFFIT 7TTt [IT]�� [gym mFIFFF ❑FFM ■■ ■■■■� ■■■ ■ ■■ ■■■ 1111111 ■■ ■ [i ■ ■■ ■■■ ■■■■ ■■ ■i i Emilio ■i Ili ■ ■I■■I■ ■■111■ ■ i ■[ ■I■■Illli ■■ ■11111 ■IIIIIII■ ■■111 ■111■111■ 111■ ■ ■I■ ■I■■ 1111111 ■ 411 Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. FIE]Removal of Debris During Performance of i ■ i 111■ 111■ 1 ■i ■1■ ■■ 111■ ■ i ■ ■■T7FI1i 11■■IIII ■■I■■ 111■ ■11111 ■lip ■IIII it ■I■I■ It■I■ It■■ ■■I■I■■I I I ■■ ■ ■IIIIII ■ ■Ili IIIIIIII■ ■lip FMT-f d ■i IIII■ ■ ■■ ■■■I■ ■lip d11111■IIII■ ■■ ■■■I■ ■ ■ IT ■ ■IIIKTIFFI1■ ■Ill1 d ■li ■ 111 ■ ■I■ ■ ■lip C ❑ Site Maintenance Cleaning: 74 F7FK1 FT75f ❑ram [IT] [IT] = C FFI�IITT� = = 1 IIIIII II IIII I=====aEEHd=®❑❑® I I I IIIIIIIIIIII1 uIIi'❑®=C®Q' ❑I II I IIIII It❑®= C71-�77T 71-MITEF] 7JTi i i iLLLLii I I iI llliiluii li liiitri CkETTiCTETITT-1C®❑ m ==dTFM Ell =C=d=❑❑T-K1:k=®❑[iT==IIIIIIIIIIIII IdIIIIIIIIIIIIIIHill I=d ®=C®= ®= ❑r®FM® ET FT-F❑I I IN IIIIIII IIII Ild m[IT]rFFP=[IT] dam= ❑=C®❑EEI❑TFTTTd ❑=AIu1I11111111III I IIIIII1111111111I11JE F d =IE'❑ rEd11 ❑ ❑Final Site Cleaning: ❑ram E ❑CAI a III III i i I IIi III i M= ❑ [t❑ C�� = ❑FFM FM FFF1❑ Ef11I i 717� FIT EW❑❑I1' I IIIIIIIIIII IIIIIII I7E]C®[17 EdIII1 II II 111'FFTJ'[IT]7E]IT17EA=FM m=❑ [J'❑CFF1fFFFFT LLI FIFT-1[fm =❑FFM IFTIT II II 1 IIIIIII 1 II 1111 II-11-1-1 -ITrf��� ❑Cd ❑ =d ❑ f = ❑ EM TTT ❑❑d FIFTFFt ❑ [111 [1' 1 I I 1 I I 1 II II II 1 (1 FTIM Et ® =[f FTT dATFf FFd mom❑ [tm ■ ■ Loading Structures: C ■■T ■I■Ili 1 11 1 111111 1 1 11111 et EEf EFt ■ TOFM EFt ■ ■■ ■I■■ 16 i FFFT ■ 111 ■■ FTI-d [i 111 ■I■■ i ■I■■i 111■I■■ 11111■IF ■I■■i 111■ 1hi■■Ili ■I■■i =LLUCIFIFTIFFIFIT FFFFMMFFF] LIJ ■■■= ■ i ■ 117 A I I 111 11 1 1 1 t FT-Tf IT IT ■T■1111111■ [17 FT FPFFt ■I■ 111■I■■ 1111TE ITT Record Documents ■ C IFFIFiVITTt■I■■IIII■ ■IIIIIIIIIII 111 ■ 7-F7 ■111■I■ ■I■111■ ■TT 117 111 ■ ■IIII■■d I I III I I 1 111 let ■■ 111■ C ■■i;■I■I FI ■lip ■I■i ■" ■■ 111■ FFFJI ■I■■■ ■■■IIII■ ■F- ■I[ ■■I■■■ ■ i ■I■■1111[i [1rdJFI1EFd ■ 11111111■ I IFFF i ■lip ElEh 11111111 1111111 1 1 FT ■■id Fid 11 ■lip 1 11 1 1 111111 n 111 ■■■■ I ii I ii I I ii I ■ Li ■ i 111■ I 1 1111111 1 Lil 1 11 11 rLLLjd d■■■■ ■I■111111■■Illli ■ 11111 FFMFFFT ■■[i C®D D O CD D D D D ODH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDD®®DDDDDDLED DDDADADDDD mD®CDD CPN106001 ❑ D CDEEO m 00 7 D ED Dm ❑®DdadD®DDDdMIT] DEll] Ell] DDDDED®DDDDIfDmD❑•DDmD]Do-DDo-dDd DrD®® ❑EE=❑A ❑gy[It ❑m®IIII1III1IIdi0=®❑®mIII1III1IIII1I1I1]C®Mr®� ❑ [ID [- gy m= ❑ [1' 1 1 IIII II II IY 1-Md d mz7 I I Will 11 1 I mFi ❑Cd ❑ I I I I I I I II III I II ❑� ❑A ❑= ❑®md®Ed ®C® Eta Ell ❑=III1III 11IIIIIII I ICmt1FFFFk ==d❑ �I-TT I I I I iI iI I ii i I I❑a I❑ [A IU® Iid[A ® IT Safety and Protection A❑ C mTFFIFFIf m r I II II 1 1 1 II I I I I I I [III' I I I I I II II I II I II I I 1 IEll II I I I I I II I I I I I I IEld FM [� JIuiIiI11iI111I❑Cd Cam®❑®iuiiiiIiIIiiIiI❑®=❑Cam❑=riuuiIiiIiIiiiIiiiIiid==r� 1 II I III I I111 I IllIt❑m®rI IIII I I I IIIIIIIIIIIIII[TT 7E]I1-i=11 11m3Ell [IT]=❑-17Ea❑=m ® ❑ [T mm' M = ❑ ® 1 II II II ®❑= ❑ ❑A ❑ I II I I I I II I II I I 1 II I C 71-117711- [J� = ❑ MI III II II II IIt❑ aI II II II I IIII I I I [It TIFFI ® FTT❑❑d Efm­fl❑ FIT-] I 1 II II II II IIt❑ 1171 11111 1111111 1 [IT] 117DIIIAI1EI II 1 II IIIIIIt❑Ek == ■■ ■1■■i ■■■■ ■■ n1■ ■nln ■ ■ ■■ ■ ■I■ ■■ ■I1n■■Inr� ■■ n1■ ■ ■ ■■ m ®= ❑ Ck❑ ❑Cfl ❑ MY®❑C-fl =® m mTmtIFFid EHIlt®❑ HE EET= m ■■ milli EkFFIF-f Ell ■■ 111■ ■11111 Ek E IlIt= 111■Illfe 111■ ii■IIIII■ Ili ■mill IIII■ ■■I■ ■ ■IIIIII ■■■■■ ■■(IIIIrEEdl]=FTFFFFIFMIIIIIIIIIIIIIIIIIIIEW ■ iU i i ■TA I 111111111111111i IFTFdIi Ili ■■ ■■milli11111 11 1111111 1 1 rri 11 11111 11 11■I■■111 111■ 7TI III ■■■I■■■lip■■IIIIII■■ FIE] C ❑❑❑i ❑l❑FT F-M FTM ❑ TT Lai II I I I II I II II IIII ❑ ETI ❑ ❑❑d ❑ I II I I I I II I II I I 1 I r ® IFFIFF] m ❑:' = Ek Ek 7-Ft== Ell I I I II II I II I I I m[It= IT EKTTKIII1� m d m I II 1 II I I I I I l t m-t ❑E �J FM❑[-fl ❑ ❑❑II 1 II II II 1111 t ❑ ❑ FFT-F-T-id ❑ 1711t = ❑ fl 1171 1 1 I I1 II 1 II 1 1 1 CI ❑ I rll_I_II_I_I m� m m ❑ = Ed It m3 ®❑❑d = El EU E ' It mFfl ❑II II II I II II II II I II I ❑Ffl ® ® m ❑ f E1 E1= 1171 IIIIIVIllllllIT] ❑11❑❑m❑❑❑d ❑ ITT = [IT]=EJI IIIIIIIIIII I I rm 1 II I I I II II II I I d rEkI77 = ■ ■lim ■ 11111 111■ ■I■■ii ■I■ ■I■111 ■■ IIIIIIII IIIIIIIIII i ■i ■I■ S■■ii ■Illlli IN 11111 Emilio ■'■■ii ■■ ■I■111 ■■ ■■ii ■I■Ills 111 IIIIIIIIIII i ■i on mill ■■■■ ■ 11111 ■ mill■ 11111111 ■I■ ■li ■III■I■■ mill ■ ■11111 ■I■111■ ■IIIIII■ ■■ � I■� in Ii ■I■1i Ilfe ii ■IIIIIIII■ 111 ■ ■milli 111 ■i 111 ■■ ■■ii ■I■Ills ■ ■I■■ ■ ■ MEIN[ ■ i ■I■■ milli life IIICi ■■I■ i ■I■1111111 it ■Illlllll i Ilfe ii ■Illlllll on ■111■[i on ■lion ■■ llliII 111 ■i Ili ■ ■I■■ ■■ 111■ ■ i ■■i ■I■■■■■ Ili ■ ■mill ■IIIIII ■I■■ ■■ 111■I■ ■ ■I■ on ■I■ I11 ■■ ■■ii ■lllli ■ ❑❑ C®[FIFIft IIDd ❑Qd rI II II I I I IIII I I II II II II1II 1111 ❑[d ❑H' LtI I IIII II I II I I I mrM❑ C-'❑ IJ_I IIII iI I i I u I I I I I I Mill II 1 II 17M❑1❑ [17❑ET] FM77M ❑M CTIM­FP I II II II 1 III$ ­17-171 Efm m=4 Safety Representative ■■REIlllli ■ 11111 111 ■ 1111111■ ■■ ■■R■I■IIII 111q IIIIIIIIIII ■li ■■111■ ■IIIIII■ C®D D D CD D D D D ❑DH PARKWAY & PEDESTRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDDDDLED DDDAll ADDDD mDDDCDD CPN106001 ❑ FFFTFd D [DEEO m 00 7 D ED Dm ❑®Ddad D®❑ODd®DDDEll] Ell] OODD111O®ODDDIfDmD❑ DDm®Do-DDo-dDd ❑r❑®® 0111010010 Hazard Communication Programs C®71F-Ff I II I IIIIII I IrIII III I I IIIIIIIILJLt ❑[-1-fdFT711 III III III I Im❑®IIIII II II IIIIIII1IdFTM 11' �3 =d =❑I I IIIII IIIIIII I Imo❑ r®❑d ®m ❑Ed❑ I II I IIIIIII IIII ® IT III IIIIII Id1 =® E' mFMFEI ❑EF1l7EH-td=❑TT❑EF1❑Ct I iI a iiiillun I u I EIU6 Submittals A❑C77�7MTt 77TM77-7F[FrA ❑=®IIDCIFFM❑Tr❑ H i u u iI iI iiIu i iI iI i ❑7M=ITIFTT El Id EEIMd ❑❑r®Ed mC ■■■■I■■■IIII■■■1■i1111111EI■1■I■ii■I■■I■I■■iil■■1■I■IIIIMI ■■ ■ ■IIII III■■ ■ ■■ 111E ■■■■ 11111111111 ■IIIII ■■ ■I■■ ■1111111 ■IIIII r■IIII■III■ Ell I I 1 11 11 IdEE ITf Ili ■ ■I■■I■ ■■fl d■IIIIII■ Et FlIf IIII■ ■ ■IIIt 11111111E ■lip ■IIII IIIIP d ■111 111 MIME■ C IIIII 111E Ili ■IIIIIIIII ■ E111 IIIIIIIII ■A ■I■■111■ ■I■■ ■■ii■I■Illi i ■■■IIII■ EE ET ■■Ci ■ ■Ed 111 ■I■■I■111 IIIII EE ■■IIII■ 111E IIIIII ■ ■IIIIII■ 711t 111E IIII Eld ■i Ed ■■ ElEt ■i ■I■■ ■IR. IC ■ m ❑= ® = =d = El:t® IIT7TH Cal m C ®7IFFIFT ❑Cfl rCal m C ® M ❑=❑®FTndIYI IIIII IsmI 11 III IIIIId 7171 ❑FU❑®CIFFITFM ❑ 77IF-k❑=r®❑d =C= ■ ■ ■■I■ ■■■■ 11111111111 i ■ EIE■■ nllllh Ili 111E ■i ■■EIE on MINES 1 1■111111111 111■lii ■I■IIII■ III■IIII ■■■ ■I■■■III ■■ii■Illlli ii ■■ ■I■■ir■■ ■I■111 NINE■ ■ ■■ 111E ■ ■■ NINE■ ■lip ■■ ■i IIIIIIIi ■ ■IIIIII■111 MINI III■■ 11111111111 ■■■■ ■ ■IIII■ 111E IIIII 111 ■■■ � 111 ■I■i� ■■I■ ■I■IIII■ i IIII■■ ■IEIIIII■ ■ ■I■ ■■ EIE r ■I■111111116i 111 111E ■■ii■IEI■■ ■■I■■ ■■IIII■ • ■ ■■■■ Ili ■■■G[i ■■■ ■i ■■■■I■ ■IIII■ � III III■ ■ C Illli 111 I ■I■1111111 ■■■■ ■■■ ■111 E■ 111 ■ ■IIIi ■■i IIIII■I■■i ■IIII ITEM ■I■ ■IEIIIIIIII■ ■■■ [TiFT] 111E ■III Elk ■ ■IIII■ IlllEE [i ■M ■IIIi d■IIII ■I■ IIIII ■ ■I■ ■■■ii■ 111 ■■■I■111 IIIII 111 r■I■IIII■ 111E EIE■■ 11111111■Ili 111E ITT [Ed ■i Ed ■■ F11-t FIT ■I■■ 17176 IC ■ rEM ❑ Ck❑ FTfM❑Cal FT ITT 1111 C TMTr❑Cfl 1iI i u u ii u 1 mFTF] E Ef❑ FFMF❑I-F TTF❑ TREE = I II I I II I II I ad r1 II II I I I II I I I I II II II 11[--LIC F[ IfFFFFf ❑ C ❑ City's Review: ILL C ®❑ IT]CkFFO❑ = IFFIT rILL]rA ❑= ® LIJI dFFFF1 ❑ IFFF] = ❑Fi= m ❑FTF❑❑❑TI II V II II IIIII I I I I Fff] C = TIFTr ❑❑d I 11IIIII IIIII I I I❑®m=®d7ITt❑=1111= ®❑ A m== Ll I I I I IIIIIIIIIIIIIIII ICE' [T[T1tL[.-k ®=❑ Ltl I 1 II 1 1IItL ❑�� C®D D O CD D D D D ODH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDO❑®®DDDDDDLED DDDAll ADDD❑ mD®CDD CPN106001 ❑ D CDEEO m 00 7 D ED Dm ❑®Ddad D [711111 11Dd T-M1111 1171] 71] 11 11117TIM 11-TrM11 11 [T]If DITT] [Ir DDmDIDo-DDo-dDd DrD®® milloinnin m C ®rI ❑ ®=17TMF-d = ❑ ❑ CFTfl L—I 1111 II 1 1 11 1 1 II II II II II 1 1 11 1 II 1 II III 1177AEfmm11II I IF] EFt❑❑EEfCIS ❑❑[-T[Td1 11111II 1 1111 1 11 11 1111 1 111 II II [17 Ek F-T-M ET ❑ m 1L II 1 11 1 1 1�1 ® 1 11 1 1111111111111111111 ❑Tfl TT-f CJ(d ❑Ik m = C MY ❑ Ef [ID ® a II II II I I II I 1 1 1 a a1-1-T [TI ❑ FTFMFM FFTf = ❑m r 1 II II111111111111 1m❑®®® Ell El===d®FFFt ®®❑== m C ®r -Tfl I u 1I II I I I 111 III I [ILA = r C ®7TIT [�= r 1 11 11 1 1 1 1111 1 11111111 1 Elk ❑-k ITm =r®m=mFFFF1CMYFMEI C71-�7FFT AIMS ❑==r®mom❑®0❑m00 ❑CHI C®❑r®IIIiu1I111111II== FFTF 11-t ml IIIII1111111❑r®1111111111111®F1M[IIi'EET7M T]Ef I III IIIIITFF1 ❑= ®C ®r ❑[d 1 11 11 11 11 11111 CF1-TffTTTTi It m r 1 11 11 1 1 1 1111 1 11111111 1 ❑ i �7 Contractor's General Warranty and Guarantee A[1C❑❑❑r❑❑r❑T ❑[fr7F-FMEEd FMB❑fTTICFFP TTTI—Fi T7 [}❑❑ITm1111 FFP-td=❑®CIIDCFF]fFM ❑® ❑A ❑®=m d1 IIIIII II11111 II IC® ❑❑d ®®=d®IFFUTIE❑[❑Im®m'®'® LHI IIII I I 111 u 11 1 1 11111 11 1 1 1 11 1111111 11111 11 11 d 1 11 1 1 11 1 1t11 a 11111'❑mEITIEU Uri FEr❑Q1 u m C ®77T®❑ AT= ❑N CT� ■ ■ ■■i; ■I■Ini ■� ■ i ■I■m ■Ii� ■■i ■I■■rl■ ■iI ■I■■• i ■I■■I■r� ■■, ■I■ ■I■■ ■I■I■■In ■■■ ■■ it 111 i ■■i ■ i ■■F ORION ■■ ■i ■I■■■ ■111F 111■I■ 0111 ■■Ills ■ ■I■ ■■■■Illli ■I■ i ■■■ ■Illi Ilh Biro ■■I■ i ■I■1111111 Ili ■ ■■■ 111 r1 1 11 1 I 1111111111 it ■■ ■i ■ ■■■ ■li ■i• Illli ■■• i ■i ■ C❑C®CFT­Fi® I I I11111 111111 1 ® EI ❑It❑ ❑A == ❑ Ek❑ HE ='d= ❑® =C®® ❑=1111 1111 1 11 II 1 11 11111111 1 1[ FF[Tl=[JIB=❑IIIIII 11 1 1111111111111E]EI1 II11111 11111 1 1 Im❑ CJ❑[III FFF1 [ID LLLLAd FFFH ❑ MIT FIT-1 C FFFfFM ❑ = Lk ❑ r m C FFIfFURK11 I I [ID ■■ ■■■li ■■IIIIII■■ ■■ ■III■ ■■ ■I■I■■ ■ ■lir ■IIIIII■ i ■■I■■ ■I■■■■ 11111 i ■ ■■ ■I■■ i ■i ■111■ i ■I■111 mFIT] I I III I I 1 � 1 II 1 m❑❑ t m ❑F[MA I II III I I III I ii I m C® Lt II ❑FFIr ®Ffffl m C CIS ■ ■■I■ i ■■ 111■ ■ i ■ i ■I■■ ■i 11111iff ■I■■ ■■ 11111■ ■■ ■I■■ ■I■1111■ ■lir ■■■ ■■■■ 11111111■■■ 11111■ • ■ ■I■i ■■■I■■■ ■Ills ■I■ir C ®D D D CD D D D D D DH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDD T]LEDDDDADADDDD mDDDCDD CPN106001 ❑FFIRIM DCDEEO m 00 70 [Do[4 ❑®Odad 0®1111Dd®011 1100001111117TIM071-TO11OOIfOmO❑ D11m070E' 11ElErdOd Oro®® [I0FF] C# mm ■ ■I■■ ■i ■I■IIIIII■ ■■� ■ i ■ ■■ 11111■ ■ ■ ■ ■■ ■I■■IIII ■I■ Ed ■ ■I■■ d■IIIII■IIII i d ■I■ ■I■■I■ 111 111■ ■ Ef ■ ■ld ■■■ Fit ■■■ d ■I■ ■I■■ 111 ■ FT ■ i ■ i ET7T-f[Elri 111 11111111 1 Illit■11i ■■ ■ ■IIII■ III I III I III I I ii ■ 11111111 ■ ■i Ild ■■ 111 ■ = ■ni ■ ii ■■ 1117 d ■IIII ■■ E=A 1 11 1 11 11111 1 11 1 ■■ 17M ■ FT ■ ■■111111■ ■ 111■■i [74 7d Ti I ii I ii ii I ii ii id ■lip ■I■■IIII li ■IIII■ ■ ■■■fl ■" III ■ 1 111111111 111 1 ■■■d ■ ■I■■ ■111111■ ■ 11111 111■ r■I■■ir ■I■ ■1■111 =Ar= 4 11 ■111 ■■ ■■ 11111 ■ 111■■111■ ■■null■ ■■ ■■■li ■f ■IIIII■IIII ■ TMr 1 11 1111 1 1 11 111 LtEEI ■111■11111■ ■nl; Im ■1■ ■ ■■il■I■IIII ■li ■I■I■ 111 116 ■■ 1 111111 1 1 Ict ■iI ■ 1 TT1 ■id d ■IIIIIid ■■I■1111 ■■ ■ ■n■= ■n■n1` EIIE1 ■■1■m ■Iil 111■ I 1111 1 11 11 11 III= ■Iid ■1■■Inl■I■ ■1■■ EEd ■Im ■In11m ■ a nllnl■ ■■■ ■■1 i ■1111111■ri 111 117 IIII■ ■■■ ■111111■ ■ It ■ ■lip ■i ■IIII■I■ 111 ■■ ETt 111■ [i ■■ 111■ C ■■il ■I■Illu ■ 11111 ■Illllllli ■■ ■1■■1■nll■ MI IIII I IIIIIII IIII I III In 111111 ■■ 11111111 11111 1 i IIII IIIIIIIII I ■ifl a = C 17-411-m THIS INDEMNIFICATION1 1 TO OPERATE 1 BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, ANY ACT, OMISSION OR NEGLIGENCE OF THE ■ ■ ■m EMIT] ■nIn i ■■nllnl■ m Illllllid l- 111 111■Illh ■I■■ 7d ■I■ 71111 111 111■■I■IIII■I■ EuTfT [i ■■ =C==d7"=I 11 1 11111 11 1 11 1 11 1■anon ■ ■Iid ❑❑CFTFrFTTFT 111 I 1 II 1 11 1111FTd F11IMIITITdET17T7d ­T-A ETt❑II11111111 II IIIIIIm❑1 11 1 1 11 11111 1111 ICE ® EE❑ t ❑ fl ® I I I III II II II IIII= ❑[d I ii I II I I I u ❑❑❑ ❑ d ®®d= = [:' d®� m ❑:i❑T❑ Chi m =C­F7f775,= i I I I I I II II II III 1 II 1 I111[--TT7i'I II I 111111 II I II III 1Lt I II I I IIIII II I ❑E1[-t = C77V17M THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY ❑ ® Delegation of Professional Design Services A[1C❑-:HFFf1Ft ❑®FTFmrEd Fff] CT[TTH❑[171 111111111111 1 II dFIFFM ❑Ct = EU 11771 I II I II II IIIII I II II I II I 1 rLd m rM C®FM ❑ FFFT ❑It ❑ LLJ'[RP m FM-1 ❑ Lt❑ Lt ❑[f EVIrEd [ID ❑ iTF] =®FIFITTITn 111 i i i ail i iuiiuiilu ii iit rTl-fTFFFT 71 11 F 1Erl 1 1111 11 1 IIII 1 11 11 1 1111 1 I 11 1 II 11 1 ❑Ld [-' ITTd [--' FFIFI ❑❑ IT CAI 1 II II 1111111 1 II Ids ❑ t a 1-TT'11111111111 1111111 1 I m ❑ dEh 1 II II 1111111 1 11 Irl 1-7FA ET FTI ❑®®[k =JLJI1111II11111111IIIIIIIr[d mCFF1fFF11Ff m=C®[rF❑LLLMC[FUI ❑TITIMITIMFMITfM❑=EFddC1'®®TTF=[It [I❑TiiliiIiiluIII r;FFTFFTF� [� = ❑Lt [j ❑ k 1 111 1111111 II 1111 1 I I [ID m [J" Id m ❑ [-' [T-T[ID [J' 1 1 11 II II II 11 1 1 1111 C [� ❑ ❑Cd =m =drM FFTTF]1 II 111111 1 11111111 1 1 11 II 11 1 11 1111111111 II I II I I I II 1-11'I I II IIII I II II I II I I 1 II I M ❑= ® [-k❑❑3I A m FFFF Lf I I I III a u 11 i 111110= ®r LEI = ❑ [-k❑ d [J7 ❑ tLL" m=[}1 111111111111 1 1111111 iLt EFTI Ed m®I II1111 111111 1 11t [TI-71-11 III II1111111 1 111111❑r®1-1 1 t ❑Fm FFM LIM LLL C TM C®0 0 0 D] 00 0 0 00H PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE 110AO11A00C®0C0111107070000111100D11011AOA00110 m000000 CPN106001 ❑ O [DEEO m 00 70 EDom ❑®Odad 0®1111Dd®011 11 000011110®0®1111OOIfOm0[ID11m070E' 11001'dOd Oro®® milloinnin ■ nln ■II■Im ■■ EEEI]Ed ■l r ■ M ■■■■ =Edi III I III I I■I■■li ■I■I■ ■rd =1 111111111 1 111 I== ■i ■m■III■ FTJ7777MT77T 117 ■I■i ■■■IIII ETtIMP [i ■■ ■11■I■ d■11111■ 1171 111111111111 1 111111 1 f ■■ri Ed C 11111 ■■17 EEC IFFTiVIFFIFT El:i Elk ■ ■■■I■ F-Ffl d■111111■ iK Illli 111 I I I 1 11 1 11 1 11 1 [I ■111■I■ ■ ■ ■ Elf111■I■■111 111111 711 1117 ■I■■ ■1■9 7C 11111111 ■I■111■ ■W 7M77M77 ■■d ■111111■1 11 111111 1111111111 1 11TH d■111111■ ■I■ 111■■ ■ 11111 ■■ ■■111 It 111■ 11111 1111 O:k==I 11 1 11 11 1111 1 Elk ■ ■I■■I■ ■ 11111 [It Elk ■ ■I■■'■ nrd d■111111■ i IIII 111 ■111■I■ F 111■ d■111111■I 111 111111 11111f[■IIIIRi 111 111■ ■■. ■M ■ ■■I■■ 7■11111 1111111 ■I■IIII■ ■Ire I I I I I I III I I I=[]= 11111111111 ■111111■1 11 111,, 1111111111 1 ■Ire d■IIInI■dr11E 111■■II ■ 11111 ■■ ■■111 Ili 1111 7717 ■■■11 ■IIIIIIIGi 111 Flit Ti■I■■ ■111. IC ■ FMO Right to Audit: • ■ ■ ■■ n1n ■111i1 ■■1■ nl■ nl■■m ■r� m■lnli ■n11■lm nul ■Ire ■ 11E1[1=CFF1-fMFFFt ■i ■III■ 111■I■ 111■ 11111 III■IIIIII ■■11111 111■ 1 11 1 1 1 1111111 ■■ Ili ■I■ III■ ■■li ■ ■Illlli 11111■I■ ■■I■■ ■I■■■ii if EEFTIC F7T77177777T■I■I■■1111111 ■■fl TFF1r 111■■111 n■■■ 111■ ■rd 777777777 ■I■■ d ii■I■IIIIII ■i I I I I I I fl ■n■■ I I I I I I I I I I I II■■Ird r ■I■li d ■ ■■ ■l■ C ■■rr ■IIInI 1111 1 1111111 1 rr 1 11 1 1111 1111111 1 t■11n1n1n■ [1 ] 111111 ■■ii ■I■Ills ■■ii ■I■I F[T ■M =TT -IC TIT EO IIIId It 111■ ■ ■I■■Ili ■ i ■111■ ■i ■ 111 77111 1 11 1 111111 ■ C ■■ t1 ■I■Ills ■Ire II■■IIII ■■ Ek ■■Ci [i E ■I■■■IIII ■iA ■I■i D:k 1111111 ■ Ek ■ II■■I■I■ 111 lid it 111 ■" ■■I■ ■Ire ITT111 ■'■■ ■111111■■■ ■ 11111 111■ Ek777777T ■■ 111111 ElEt ■i ■I■■■ ■ ■■ IIII 11■■IIII =CFF1-fFFfTTk rl 11 111 1 1 11 111 lEd■■I■■■ ■■null■ ■■Illlllrd [i ■rfl IIIIIII ■ ■■i; ■■Ili Ili 1■i1 ■li ■■■ 111 111■Illh []IT[] FFTITI 11 1 1 1 1 It=ETJ7FTIUd ■ i ■■1111111■ 111 111■11 1111 M ■I■I■ 111■I■ 111■ C 11111 =1 III ITIIIIIIIII■■ Ili ■I■ 111■ ■■li ■ ■Illlli 11111■I■ ■■I■■ ■I■■■i� it =CFFIT77777777T■I■I■■1111111 FT-fl 111■ 111■■T] n■■■ TFI ■rd ■I■■ d fi■I■IIIIII ■iI 1 11 fl ■■■■ I I I I 111 1 1 11 1 t F1 ­FFd r ■I■i d ■■■■I■■■ ■■■■I■■ii■I■IIIIIIII I IIIIIII ITI11 111■ Ili Ills ■ 111■I■ 11111 ■I■■I■111■ di 111■ ■ ■I■■Ili ■ [17 ■111■ H ■i ■ 111 ■IIII ■II■IIII■■ ET ■■Ci [d [-jd ■rfl FFF-f M 1111111 ■ [17 ■ ■I■■I■I■ I] EkdEt 111 F ■■■ ■Ire TIT 111 ■I■■ ■111111■■I■ ■ IIII 111■ i I I I I I ii I I I I I ■■ 111111 E]Ff ni ■I■■■ ■■■ CTM ■11■IIII ■111■ [i ■■■■I■ ■■null■ ■■IIIIIIri [i U 11IM ■ ■ ■■i, 11111i ■Ire II i ■■ 111 ■■■■ ■■■■ ■I■111 ■■ ■ ■■ ■■ ■■ 111■ 11111■ ■ ■■ 11111 ■li 11110 111 ■IIII ■i ■I■ ■■ir ■I■IIII Ili 111■ ■I■111 ■■ 111■ ■I■■IIII■ ■I■ 11111111■ ■ ■I■ 111■ ■III 111 111■ ■ ■■■I■ • � ■ i� ■ 111 ■■111■ 11111 ■ 111 ■i Ili ■ [� ■ Nondiscrimination A❑❑MCFUUP IIII1 1 1IIIIIIiiM -TTf ❑❑r❑rEFf EF171❑ d ®FMP ®� rCJ'(TMFI = JL1 ❑"Id gy LIKE ®❑LELLI III I 1 II 1 II I I I II II II II I I II I I II 1 II 1 LEI L IL11 m = ❑ ®❑ ❑ =f [IT] F-M m ❑rEEd = ❑ldEtETI ❑ram Ad❑ 77rnrfFITFFn 711117A1111 ❑ d®®I [ Lt HIM II] [TIT]❑FFITA ❑gym lam] Mr ll ll ll ll ll 1111'❑1.1I I IIIIIII III I 117 ❑❑ Title VI, Civil Rights Act of 1964 as amended: C®FIFIFFif FF-Tf FM FM ❑ FFUI =rLEI =m rl II II II I I I I I I I ❑LdLt1 II 1 II II IIII II II II I C®0 0 0 LE 00 0 0 OOH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE 110AO11A00 C®0 C000070700 0000000000 AO A0000 71710110000 CPN 106001 ❑ ®iO [DEEO m 00 7 ❑ [D 11]6 ❑®Ddad [I IFFE] 11 11Dd T-M1111 1171] 71] 11 11117TIM 1171-MI] 11 FT]If DITT] [Ir DDmD7Do-DDo-dDd Oro®® [IDz] E6 mm ARTICLE 6 — OTHER WORK AT THE SITE 6 m ❑ Related Work at Site ■ C IIIII ■ ■I■ [It M ■ ■Illi 11117 ■ r ■IIIIIIRi 111 111■ i ■IIII■I■ ■I■ 111■ ■ IIIII ■ IIIII C IIIIIIII ■I■ I I I I I I 11 11 11 1[17■IIII IIIII I ii I iTii ii iiitET][17Ili ■■■■ ■IIII dii ■FF ■I■■ii ■I■IIII EFFI ■Ili ■ i ■■I■■ ■IIII ■ i ■ ■i E ■ Ed ■■ ■11111111111 ■■ EIt 111111111■I■ ■IIII ■ 117 ■ 111 ■■■ ■■IRi 111 111■ ■■ir ■I■I■ ■ ■■I■■ ■■IIII■ 111■I■ ■ 11111111■ ■■IIIIII■ Eli -ME] IIIII■■ ■111■I■ 111 C 7WIFIFFft Ft Ili 111 ■IllI IIIII■ ■I■■ ■I■■I■ ■IIII ■ i ■■■lip ❑❑C®VIFFt [❑ii❑[L-urd =FTTFi I_❑ I I ii I I 1r ❑m®❑[It ®®=❑d1fl=i 1I u111 u u 1I I® EEI m❑❑ld CFF7 [IT]C17 [IT] mM❑FM7 MFFJ' ❑[1771 ❑FU CTUT FEII I I I I III II I [17 FFF­Fi CTIT I ll l 1 1 1111M a -7 Tf 78 = ® ® = ❑®[T7T8❑ ❑ ri II IIII1 1 II 1111 E' ®Cd❑-1 FET=m❑®'M7 =[]Ed F-7I I I II II IIIIII Im=FFFT-f 1111771171i 117 7T-f ®❑7'd = ❑ Ek ❑ ❑ = ®EEC ®V� �" ❑ ❑TTII II I I II II I I I I I II II II IIII I III d I I Y I III IIII l m FFFT-1 ❑ [f❑ =❑ 7E] m rFd 7171 [tom® I u 1 1 1 u iI ITS' 771-:�❑ FM ❑ = ®EEI 714FIE = ❑ FTFFF�❑ m I I IIIIIIII I II I I IIIIIII I I [17 7T-�❑® ®TFF1 ❑aEEI 117FTAEd11 =❑m❑ � C®FIFFIT❑EEI =[TFIFTF-f=[T❑❑®=❑r®Iiliiuuii=C®❑A ®7TFFi,❑❑� ❑[f❑❑EUTErFd❑ ■ 111 111■ Ek ■■i 1 11 1 11 11 111111 1 IT r■111■IIIII ■■ ■I■■ ■iK ■ ■■ ■■ii■I1111i 111 ■ i ■ ■I■■id ■ ■■■■ ■ IT ■ ■it 711T ■ [i ■■ ■Illi ■ ■id i F=Ar 111111111 7 7C ■■ii 771­t 777TIl I I I I I I 1 11 11 11 1 11 1 ■Illii ■ 117 ■ ■Iid 117 ■■ ■IIIII ■I■i ■ EEI C IIIII 111 EIr IIIIIII■ ■I■■ d ■IIIII■■I■ ■IIIII■111111 i 111 ■11■I■ ■Ills ■ i ■ 111■I■ ■I6 i 111 1171 i ■■i ■lip r■111111111 MC ■■i; ■I■Illi 111 ■ 117 ■[ FFTf 7177t 111 Illllllli ■ ED EEI ■I■i ■ ■IIIII 1 11 1 1 111111111111 ■I■ 1 11 11 11 11 11111 1 11 1 ■■ ■11■I■ ■IIII ■ 117 ■ ■I■ IIIII ■Iil Ek ■■ii Ii Illlllli ■IIIIII■ ■IIIII C ■■Y FFFff 111 ■ 117 ■ 111 111■ ■ 117 ■ i ■■ii Ed ■■ ■IIII ■D ARTICLE 7 — CITY'S RESPONSIBILITIES 710171 Inspections, Tests, and Approvals CAI III I I I IIIIIIIIIIIIII❑ITIMrl II II I 11 II IIIII®ITUIIII II 1 II IIIIIII 1 II IIIII IIIIII I lilt FFFJ- ®®QLkELUI❑[$❑LtFM ®m 7D❑ Limitations on City's Responsibilities A❑ ❑mCTM EFFTE1dT=Ef MIT FFFF 71-117171mrl III I I I IIIIIIII Q1}❑ CMiFFIFTELI❑ F"I II IIIII I I IIII I II IIIII IIII IIII II I t [k[-[Td[j'LEm®I 1 IIIIII I It [T[-p� [-'I II II II IIIIII 1 I❑TN a❑17IT] ❑F"71-FITTi Tk 7❑mC­­Tf 77-Ft 7171 FFF7M❑MM❑7E]❑ Md ❑I III IIIIIIIII 1IIII IIIIIuuIIII11=1 I-QL'❑gym=11[-'mC®❑[-U=mrl1I1II 1111II1II1Llt C[T[iHTInrTt[Tl ❑EFIED71711❑ =❑ Cf❑11T1FFFFJ7d=❑TMT7CFF-T=�� ■ ■ IIIII ■ 111■ ■■ii ■I■IIII ■ ■1111111111 ■IIII■■ ■i ■i ■li MIMI■111■■ C®D ❑ D D] ❑ ❑ ❑ ❑ ❑DH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDDDDLED DDDAll ADDDD mDDDCDD CPN106001 ❑ El ED EEO EEI 007❑[D1177 ❑®Ddad [I FFE1 [I E]Dd Trm[][] [I [I[] [1[] 11 111IFT11 [IFTF11 11 FT]If JTT] [Ir DDm®Do-DDo-dDd Oro®® FINE 1-0 111 FA 0-0 FE-01 7 D ❑ Compliance with Safety Program ❑ 77ET1FM7❑=TFFMET1I IIII I III I"rMi IIIIII IIIIIIIIII II IFMFTM❑TT=IIII IIIIIIIIIII II1 IIIIIIIII IIII r®= = m C®FFFFT®® CtEl:tEll ❑ m ❑ ® C® FIE = FTFF­k❑ FAd El:k ❑CtM71777 ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 81011 City s Project Representative CFU❑®CT7TH❑=Ck ❑CT❑❑ram❑❑h uuu iliiiiuii I'll"IdI:k== mEEd❑❑md� ❑Td rI Il II I I l IIII l lllllll1111 1­Tfl FMFFT m® mCFTFMr[It 1 II Id[tTT-1 I II I I h11 1 IIIIII I I J71 III] ®=C®=�® A❑CFTFMOr 71[ TI IIIIII IIIIIIIIII I❑[M❑F-M [71 TFF1❑gym®'=❑FFi"1711®[IT] TFF 71-t= ®mmom®mC®d=❑llulIlIuut❑=Ckdd ®gym=C17m®®m❑= ❑ Ed❑ ❑Cd FFFF1 m FM-1 EI17 m C❑7TIFI 11 171 I 11 1 1 II 11ld ❑ 117m ❑md m FIFFIFFIFt❑momIIInd da'®=®❑d®I1IIIIIII1IIIC®Ek®❑mIIIIIIIIIIIIIIIIII❑® d[D❑=1 ®71177 ❑ Ct❑ Ell C17FTTdFFF1 [IT] mid=❑® T7C®M❑mmmom] C=EIr E ❑ ki II II II IIIIIIIIII I❑®=mrEd ®❑=I II I III I IIIIIII la I II I Milli I I I Mill II I II IIIIIII I I mT-F] ❑MT 771 FTF a I I I III II I I mTFFI❑ a FDC ITFFM Dr FI LI I II II II I I I II I II I I III 11 Il l l l l t[111 ❑=md®m=d =Eid CkFTTd=C®❑CkmID dElimm7TTTci =l ❑ CT❑ ❑IIIIII II 1 111rE m❑3­W [IT] FFFFIC®=mmm� m�MEWri u u I I I uilliouoll[1T1=CF-F1-f=mmm�] 810171 Authorized Variations in Work 111HEI ■ mill■I■ ■Eli ■ ■I■ ■I■Ills 1111E ■ Illi mi 111111111■■ 111 111E ■ i ■ ii ■■ 111E ■I■■ii ■I■ ■I■111 ■■ 111E ■■r, ■I■I■ ■ ■■I■■ ■I■111 ■ Milli■ 4 ■ ■■■ 111■■111■ on IF 111■1111 ■I■■ 111 111E Mori ■I■I■ i 1111E i 111E ■■ri ■■■ ■ 111 ■ ■lip i ■ ■I■■ ■■IIIIIIIII ■ 11111 111E ■111111■ 111E ■I■■ ■IIIIIIG■ 01111MEN■ ■mill ■I■ Ilh 1111■1116i ■■ 111E ■■ii ■I■I■ ■ ■■I■■ ■I■1111■ ■ ■mill■ ■ ■I■ on ■I■RON ■1111111[i on ■ ■111'Ci ■ i ■lip ■ 11111 ■■ mill 111E on 11111 ■ 1 ■■lip ■IIIII■ ■■ ■■ii ■I■Ills ■■ ■■ 11 Ili ■ 111E ■ i ■ i ■■ ■11111■ 8100 Rejecting Defective Work C ®❑ MM FTF 1111 r ❑ FT F1 F1 C7TM CIr ❑ E[k III II II I I I II I II I I 11 1 III 1111 1 II I® m d I I I 111 II I II I I 1 1 [}Md77=®m=dI l llllll lmTFFIFM[ITTId CIr m❑II IIIIIIII IIII❑gym 11[d m" m = C ®FM Ll C FFM ❑ HU ® ® F" FIFF l l III II l l 11 l l I [} ® mFFFF ❑ CT❑ mCkFFTdCd EllAr® =❑mom 117 FFTI=❑ CF❑ Ell EM®i❑ ti❑117 FM F1 C®0 D D D] ❑ ❑ ❑ D ❑DH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDDDDLED DDDADADDDD mDDDCDD CPN106001 ❑®i11 ED EEO m 00 70 [DoE8 ❑®Odad 0®OOOdMIT] 000000000E0®1111OOIfOmO❑ DOm070E' 00E'dOd Oro®® [I0FF] E8 mm 8104 Determinations for Work Performed FFIT 7FFFFf ■ ■Ilh ED ■ III■ ■1■ 1 11 11111 1 11 1 1 11 1111111111 1 1■Ii] I IF I ii Iiiiiiii ii III 1 7777 i ■ ■i Ili ■ [i 1 ■IIIIII ■ ■■III■ ■ ■li ■ IIIIII ■■111■ El ITT C ■■i 7 Ili 111■ i ■IIIIII Ills ■ d ■Ilia ■ I I I 1 1111111 1 1 ■■ IIII■ ■ ■IIFF ■ ■■Ills ■ ■idi ■1■ ■ ■ ■IIIIII■ rFFT7 ■ ■lip ■IIII■■■ ■TTI ■ 111I111■ d■III1111111■ ■ ITT ■■ ■III■I■ ■■ ■ Ed ■IIIIDi 111 n 11111 11111 11 1 11 1 111111111■■ Ek ■ i ■ ■IIIIII ■IIII ■IIIIIIII ARTICLE 9 - CHANGES IN THE WORK 910171 Authorized Changes in the Work A ❑ ❑ TTmT TrrnTd TT-1 C FTT F-M ❑ fl ❑ TITmT FMM 771 FM ❑[f =C ITT ❑ FIFF Erl FM ®❑ CT = TM [Ell ITT Ell Ckdd ❑®❑ ❑ ET= ❑ = m = ❑®❑ ❑ Ek=C ®F1­F­Ff Etm 7U 117E=d ❑ ® T7 ❑ ET [I r 777rad ❑ FMIF] ❑ ® m ET17 EflT❑ Cal ❑ d1-f TT-1 777777 F" ==C®=E1 =IIIII 1 II II 1 I= E1=I 111 II1111111111IIIIIIICk1TTdCd®❑®❑❑ C:'❑ �7E]71FEI117E]7117]C1 7C❑rdJ ❑=❑ACT ❑Ell FFI-1117F1Td71mCtd117 m❑®❑❑C17m 7171 FlEf ■ Illi ■■ ■ Ef ■ ■■■ 111 C ■■T ■III■ 1177111 Ef C ■■ii ■III■ FT IIII■ ■■ ■ 117■IIIIII■■ IIIII IIIII ■ihI1II1IIII 111111 1 1 IE[]Hd ElrdEf EIIII=EEIA ■■ 111■ IIIII■ 9 m ❑ Notification to Surety 111 111■ 1171 1 11111111 1 1 ■■ ■I■■ ­TT-d r■I■■ir■ ■■IIIII■ 11 ■■ ■111■I■ III] ■ Ili ■IIII ■■ ■I■■ ■I■■■■■1 1111111 1111111 1 111■ ■■I■iMFFFM ■■ ■1■ ■ 117171 i III■ Ft7777777EE1=CFFWME1 ■■■■ ■I■11111111■Illh ■1■■ ■■■ ■■■ ■IIII ■IIDi IIII■C ■■ii ■III■ EIr IIII■ Ek C ■■T ■III■ ■ IIII ■IIII IIII■ ■IIIIII■ ■■ ■I■■ III■I■ ■■IIIIII■ ■ IIIII ■■ C ■■T FFFT IIII ■■ ■I■ ■■id ■ ■IIII ■■ F nl■nh ■■ IIII■ C ■■i; ■FII■i IIII ■■ III■I■ ARTICLE 10 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME m ®❑ Change of Contract Price A❑❑mCFFI-fF-M❑rFM❑FTI=mom m❑❑111111111111 IIIIIII ICE❑rdl3' ❑a FT EIMTCTR U.-iIIIIIIIIII IIIIIII 1 I m m ❑ Change of Contract Time A❑❑mCFF41FIM❑L11❑❑LLFFFMmMLILI 'III111IIII 1111111 ICE❑rdC-t LL± Li LI=C= ®'IIIIIIIIII 1111111 1 I m m ❑ Delays A❑ ®CF­-FfFF1­FFk ®d777d= I-Mm [1T1C7­Tn7­­T 7117 n7n FTI Ef dEj nFF1-1 = I I I I I III 11111 LA ®❑Cd ❑ I IFlml 11 1 IIII 11 t®I II I I II I II II I I11 1 II I II1f1 I I I II I II d 717-t 1-171 111111111111 1 111I1❑[d ITM❑TTt❑[} J ITlilT71TTl [} 177-1 d r1 111 11111111 1 F177MI 111 111111111 d m C®FTTIT LLLt 1[11 II I 111I IIIIII I❑®FFT-1 Lt I 11 1111111111 1II1d j C®0 D 0 D] 00 0 D ❑OH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE OOAOOA00C®000000707000000000000All A0000 m0®000 CPN106001 0®iOCDEEO m 00 7 ❑ [D o[D ❑®Ddad D®DODd®DDDDODOOODD111O®ODDDIfDmO❑ DDm®Do-DDo-dDd Oro®® [IDz] E9 mm ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK ®❑ Notice of Defects ■ ■111111■ on 1111 ■ ■ ■onsiolmillIng Hill ■■I■ ■I■I■1■I■ ■■■■ 11n ■■ ■ 1111 ■■ mill■I■ 111 ■■ii■I■Ills ■ ■ ■ ■ ■ ■ ■I■ ■■ ■IIII■Inn ■■Ii ■I■Ills Ing , ■I■ ■ ■lira ri 111 111111 111111111 ■■■ FF10 ❑ Access to Work lull■ life ■I■■E lnimmillillillillool111■i ■Ills IIIIII■ ■Ire ■■■i ■■ ■I■1111■ ■ 11111 Ili IICi ■mr ■111111 ■ 11111 ■■I■■ ■I■I■I■■I■ 111 111 ■11111 i ■ on 11111 ■I■ Ili 111■lii ■■■IF N llilloomil■Ire limit ■I■Illi ■I■■Illli ■■� ■ 111■■ i ■■r ■Iffs ■IIIIII ■I■r1111111■■ Ili ■I■■I■ ■1■I■I■III■ ■Ire If ■IIII■ 111■I■ ■■ ■■i; ■I■Illi ■� ■11111111 i ■■Iri i ■I■ ■r� i ■i ■I■ ■ ■1■ ■ 111 ■I■■ ■111 Ills ■I■ 11111 Elm ®❑ Tests and Inspections A❑ C C-FWFr-rf I ii C ❑T FFF FFT mr ❑ d m CHID ❑ 117171 T t ®r®C-i i i i i 11 1 ii i i ii i i 1 11 ❑M 1 11 1 11 I I I II I I I t ®❑ ® I I I I 11 11 II 1 II 1 1 1 Ew ®❑I' T1TTl-MT I I I III 111111111111 Ir Ed I111 11 1 111111111 1 11 t ❑ ❑ [IDC ®=❑ ❑ EE ❑ T7' Ill I 1 IIIIIIIIII 1 I TZ7 T❑I7 FA ❑ a ®1 [IIffi7 r ®❑ = m= ❑ T17171 T f [I- ❑[IT'=[ID m 1 111 11 1 11 11 Ids❑THUd❑[1' TTTTTTITTT ❑ F7T r 1 11 11 1 1 1 1111 1 11111111 1❑ k Tyr 7-fl 1 1 1 111111 1 11 1 1 ® nj i=U T7CI7 1 11 1 11 1 II 1111111 1 11 1® r® IT T-T-1 t 1 1 1 111111 11 1 11 1 [ F[ID 1 11 1 1 1 II 1111111 1 ® IT] [TFF]❑Cd ❑1717-71 C® TIID rA ❑Tt1 I11111I I II I I I m 1 11 1 111 II 1111111 1 Ek [T [ f 1 II 1 11 11 will 1 I = ❑m ❑ = 1 11 I 11 1111111111 1111111 A FF1711" ® = nFFFFTF] 7­FTFf ❑ C Ei Et = ❑ = ❑ Tom' TII] T-M m 1 11 1111 II 1 11 t ❑ ❑-fl 111 II 1 1 11111111 1 1 T ❑ 7117171 1 11 1 11 1 II 1111111 1 11 1 I =1 11 1 11111 1 I TI ❑❑d ®� TID TITI7 ❑77TT ❑ C C❑ C FFF�[7' 1 11 1 1111 1LLIr1 Ill 1 1 1 11111 111 M Eft [Td I I I I III I I I I I I I " TTTTTiF-m 7m [Tr] 1 11 1 1 1 11 Hill I I ❑® = 1I11 11 1 11 1111111 1 11 II IJ_ILl111u t1 II111111 111111 ❑t ❑C--F-fTAT®Cd TIIT CTIMID1 II V', I'llI 1 11 I =❑ ®'®C:' m TFFT-f [1-T Ted TID = ❑ T17 FFTT 1 11 11 11 11 11 Ill 111 I mn ®7171 d l II 1111 1 I u 1 t ❑Q] FUM Cl[d ❑Ik ❑FFT [J7LL[k ® CFF41U�L[] LLk LLLJ FIM L11 LI-e L11 Fln ❑ Tim ❑[--TT 1 11 1 11 1 111111111 1 11 1I 11 1111111 t I II 111111 11 I I l l lit m❑ f T t❑ [d m Ef I I I I H i 11 II 1111 1 1 1 ❑L❑r [TTd m CFTU ❑ ❑ C TT] ❑ FEI [IT TIIk [Tn ❑[$ m 7E] A EEE[d Tom[ [III [UF� ❑ I I 1 111 11 111 II 11 1 ❑= 71 ❑I'❑±❑ = ill 1 11 1 11 II 1 11 1 1 1117 ITFIFTM ITTI 11 1111111 1 11 I[[Lt = m ❑m= ❑ [-'mlEd®❑ m CFTFF ■■ 11111 ■ 11111■I■i 111■IIII ■I■■I■ ■ ■11111111■ 111 111■ 11111 Nor, ■I■Ili ■ m ❑FFFTii = ❑FEdTt = ❑®❑ ❑ r[a] ❑ BEd Id TT MFM TT FTFT-f ®® 1 1 II 1 111111 I r rFTT1T [M CFF1tFF1T1t 1 11 1 1111J W r 1 1111 1 1 1 1111 1 11 1[ k ❑I}' FM ❑[d [LLLk C[FI-f7-F-Tt[IDI II II 111II11111111111 1171 MCTIlFTFTMd ❑mdFMEd ❑1 III 1111111 I r1 1111 1111 II et ❑❑ram C®O ❑ O D] OO O O ODH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE ODAODAOOC®DCDOD®®DDDODDLED DDDAll ADDDD mDMCDD CPN106001 ❑®iDCDEEO m 00 7 D [D DD ❑®Ddad [I IFFE] 11 11Dd T-T1111 1171] 71] 11 11117TIM 11-TrT11 11 071f DITT] [Ir DDmD]Do-DDo-dDd DrD®® [IFFF] ED mm mAmEll mCal❑a=r 7-flJ=❑®❑❑®mid®®®= ❑❑m m C77�771­fi-❑ CITIM ❑® ❑ tEl1-fd ® I II I I Mill I I F' r[IT] Ell 11111III ItE®F7­Tk7 4❑FIFICm,N❑❑❑t®FIT] FIFT 7­1❑❑=MM❑MMFIFT ❑gym❑CAIuuitliiiliu1 ❑❑ JF1 FIM ❑ FT T' IFIFFn 71FTF1 77171­­­Ff FTI=FMB m I I I 1 II 1 II Il11d❑FTFFFd❑IFT FFFT7A EM Ed m C®7IFFT ❑ ❑r®fir=mCHEDC®1111111 1 11 1 1 11111 id mC�� ®4 Uncovering Work A❑®7M❑ EfF1FM 1-d ®[j'❑ET1 TIFFIC77�==[f 1 II 1 II II111111I®mIFTFIC� ❑ ®®ri II I 1 11 Ilildi m C®m ❑d M C ❑A rEE=d =C®7rFT= iuiluiuii ®❑ City May Stop the Work ITIFITIFF]❑ [}❑Ild1 111111 V11111 II 1 t•CmFf FFTff 7MEIII IllluluIII I II❑❑❑Tdi ❑lI11 111 111111 II11❑®ITTIT Ek = [kd d = = ® mil ❑= ❑❑J El=r =mC MIT 11 117 E =ram FEI FM d= m = ETI❑mCIFFM [IT] EEJ= FTFMr=❑[t' I ❑mr❑T1mCm��❑� 111 I 1 II 1 1 t1 u❑ult ❑= ❑❑❑❑T -4 ❑= ® Ed ETTd =Ek I II II II II r = =' ®❑ k ❑Ek E 117 mFFT m= ❑ ®6 Correction or Removal of Defective Work A❑ O'm FM ® rim❑r® 1 111111 u 7WFTTTi- ❑L❑LLI I_II_irFM=d I II II I II I II I 1 I ❑ Ef F1 ET-h II III I II I I I ®III II111111II IIIIFF"=❑® Ek =EEEkE=d E117777M❑Et =IFF"❑[k❑®®❑ ETEI =ram 7E]CIFTI-1rFE1FM11TIEdm =❑r❑❑Tl❑❑Fdr771❑ ITT ❑ CT❑T­TTT1FEA1 II111111 u C ®F 1 11 II II 1 II I I II II ddul III i I i II II i II i i I II I I i ii ii i ii ii i d dLLI-F-FF RE FMFM IFTFAFMFTM®EEd®FFFmlII11111It®'IIII111111IIIIll u❑❑❑1I1II1II1IId­FT­J-[TI1111111111111111 TdFTT ❑FFT ❑Lk LETT Lk FflTIf drl II 11 111111111 I J IFFT-ILLIt r® HFIFFI ❑DTT� 117 rm m❑❑❑❑❑❑A= m7717­1 ITT E[Ud FM ❑M771 fly mr® 117 rm ❑ C17❑ m 77 fFM ❑E'❑LEI r❑=rmmFmd❑ruiiI1111 I❑ [}❑ FM1 II 1 11111111111111 II II I111111111 II Imp ❑ [f m ❑❑❑ FM❑UTTd1 IIIIII1111111 I❑ [±❑[Ad =[jo❑m=❑[j ±=LL[06 Lk ❑JI1.1FIM F1-T07❑ FIFT41 I I1111 II 1111ILIL[d ❑ [km ®7 Correction Period ■ 111 ■ 11111111 ■1 ■ 1110 ■■F ■ ■I■II ■1■ a Fill ■■ 01111I1 ■111■■i OF llh ■■ IIIII ■ ■I■ ■ ■I■ ■■ ■ ■ ill Hill ■■ 111■ ■r ■ ■ ■■ ■I■■ 1I1■I■IIIII■ ■■i ■1■1111■ ■■ 111■ ■■� ■I■I■ CME D D CD D D D D DDH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDDDDLED DDDAll ADDDD mDDDCDD CPN106001 ❑ D [DEEO m 00 70 EDom ❑®Odad 0®1111Dd®011 11 00001111110Ill0OIOOOOOfOm0❑ D11m0I0E' 11001'dOd Oro®® milloinnin ■ ■■1■■ ■1■nnm■1■■ ■ i ■ EE17FT-fl m ■■ m m■ ■1■■1li ■■ ■1■■ d ■1■ ■1■■1■ ■1= EDE ■ J ■M ■ [i ■ 777M777 li C FFIT FFFFT 111 ■M ■■ C IIIII 117 71 ■ IIIIIRi ■■ ■■■ ■ ■lip ■I■ ■I■■1111■ ■IIIIIIGi El Ed ■11■■■ ■IIU L EEI =1--d 11 ■■ ■■Ii■■Ili 111■Illli ■■ ■IIIII■■ IIIII■■■ ■I■11■111C IIIII ■lii 111 ■EEF d ■I■■I■ ■ IIIII C 11111111 Elr 1111111■ ■■ ■I■■Ili 111■I■ � Illli� ■ i ■■■■■ ■■ ■li � ■ i ■■i m ® = d nrnTmrrn ❑ Ck ❑ = = r E=d m C ®r Ell CID ®It m ❑r ❑" rEE ' ■ IIIII ■li ■I11■i ■■■Ili i ■I■ ■■■ ■lip ■I■IIIIII■ ■I■■ I on ■I■■ III NOW ■ i ■IIIII 111■ ■ i ■ ■■IIIIII ■ IF ■Ills I1111 i i ■I■1■ Ills ■rli ■■ ■ ■ ■ 11ECFF1-fl7TFFk d==Ek== ■I■■ IIIII ■IIIII IIIII Ill ■ ■ ■■C 11111111 ■ 1111111■ IIII leiED ■I■ ■■ J ■ ■iFA■IIIII■ ■ ■■[i ■I■I■■I■ ■IIt111■■i IIIII ■■FTrT Ef d ■I■ ■I■■I[ IIIII ■ ■I■ ■■I■■ IIIII ■ Ek ■ ■Ii ■■IIRi Ek r ■1■■1-f [d Ek ■ ■I■ IIIIII■ IIIIIr 7FMFFd ■ ET ■ r ■I■ FFT-d ■A r ■1■1111■[i EIA 111 ■IIIIIIII 1E ■I■1111111111■1111111■ ■A d ■■ ■IIIIII■ 11111■Illh 111■ ■■■ ■■■ IIIII [Ed 11] IIIIII 1111■I■ ■lip ■I■i ■■I■ ■■ 7777777 ■I■ al I ■IIIIII ■■IIIIII ■Iil ■Ills i [Id IIIIII 7T--f ■ Ek IIIIII dIIIII■111 ■I■1111111 J ■■■IIIII r■IIIIIIIIII■ FM ■IIIII■ Tir■I■IIIII■ 117 r ■FFM i 11■■I■ r ■I■ ■I■1111111■ Illld 111 I I I I 1 11 1 1111 IEI]rl--T--FlFf Et ri I I I 111 11 11■I■■■■■ i ■ ■■■Illif ■I■■IIIII■■ ■■Ci ■■ C FTT FFFFT ■ ■ ■ ETt ■ d777777 ■ 11 ■ Illlil d ■I■ ■IIIII 111 FU7-f ■ 117 ■ r7MT77 FTJ ■Ili ■■ ■ ■■I■ ■■I■I■ El- ■I■116i i ■I■ ■■[i F-Ffl r ■1■1111■[i " i IIIIII ■it El:■I■■ 7T07 ■IIIII EEkr■11111111■ El:t Ild ■it ■" i ■ IIIII r■1111■111■ FT IIIIII■ ■ i ■ ■ ■I■ ■■ ■I■■ii [i ET ■■ Ed Ellt ■I■ [i 1111111■■I■ FIJ7 IRS ■■ ■■■ ■■lip ■IIIIII IIIII ■lip ■■ IIIII 11111111111■ ■■ ■11111111■ ■it116 ■ IIIII 111■IIII 117 ■■r ■ [I d IIIII■ Elr 11111111■ ■■IIIII■ 111 C ■■Ii■■Illi ■id ■ IIIIII■■ IIIIII■ F d nlll■■■■ 1-tr ■ TM ■IIIII ■I■■ ■■ ■■■IiM ■ ■1 I I I I ii I I ii I ii I I I I ■id i ■m1 ■it ■1i IIIII■ FTT07 it ■ ■1 rd d IIIIII■ m IIIII■ 77i Et ■ E ■1■n1■ El=[:kl I IIIIIIII I I== ■i ■li ■I■■ ■■u ■11■m■■■■■ ■rd ETIEII 11 1 1 111111111111 ME117 EFIM-T-f FMFffTEh I I IIIIII I I IEEIFF7 111n1mm ■■= nlilil■■ Lk r■I■■■111■ ®8 City May Correct Defective Work A❑ 1111CFF-If FrFlt [ILM ❑MHTM ❑r1 11 111 1 1 1 1111 ®❑ ® ❑rMTU [tID CTIM El LLirFMd1 11111 1111111 1 ❑ CT7T-i- arm FFF ❑F-d rrEFTEU ❑ Et 11 TlrEd mCFFF CID mod=❑ ®❑CJ7EEkFM FF106ALLT ECFFWJ� FFMImLL-tIItLl =❑ Ct❑Imd=❑==CFFI-f FFFI❑�� 117 EMC FFIT MTFFt FFM IID = = ❑ FFP IM FTFF-f ET m CIID C FFTFM❑ IBC ®❑ FFF ® L7Ld=LlrrTM ECFF1 f[F[Tt ❑Cd =❑1 11 1 11111 1 LLUT rLE C$❑ FM B d1u1u11111111u11 ■ ■ 111 ■LL ■IIIIIIII■ IIIII r111■111 ■lip ■I■ [i IIIIII ■■i i IIIIII ■i ■li ■I■■ ■■U • ■ IIIII ■I■■IIII i ■■■I[i IIIIII[I 1111111 1 11111 1 111 1 11 1 1 1 11 1111111 1 ■ IIIII ■IIIII■ ■Ii ■I■IIII■■ 117 r ■I■ [d IIIIII ■I■IIIII■■C IIIII ■ ■I■ ■I■■FT ■ CIFFliFFIFIFt ■ ■■ FMLk ■d ■ ■■ IIIII LLI=Lt ■d■ ■■ IIIII ■ i ■ ■lip 1111111 11 IIIIII ■■I■I ■1 Elf■n1111■rEFFEd ■Ii ■Im■ ■id TTF-f ■i ■ T ■1 ■1■ ■ i ■ ■I M ■ ■Ina TTM ■lip ■I■■nl■ ■I■■ FFFFf Ld ■III[i ■I 111■ ■ i ■■IIIII ri ■IIIII■ ■■II] LJ7 Llt ■ IIIIII■ C IIIII ■■I■ ■■ICE C FF41FIFFIt IIIIII■ ■1111■ iI ■ CME 0 0 D] 00 0 0 00H PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE 110AO11A00 C1710 C01111070700 001111 LED 11011 All A00110 m000000 CPN106001 ❑O FTFd I0[DEEO m 00 7 D ED Dm ❑®Ddad D®DDDd®DDDEll] Ell] DDDDED®DDDDIfDmD[IDDm®Do-DDo-dDd DrD®® 0111010010 MkDd El:iW C®77T C®C® r=kl IIIIIIIIIIIII III1 III 111 IIII111 IIIII W I IIII 111 111 IF-fN CWFTFI-T-i III 1 It11 II IIIItWT] W ❑W ITT] CW FT =t= WrWW ❑ fl rW CalWE:EdCt WE]dM ■ A 111 ■IIIIIIII ■I■ ■lip d ■I■ ■I■■I■ 71■IIIh 111■ ■■■ ■■■ IIIII IIIIGi 111 ■IIII FFM ■lip ■I■it ■■I■ ■■ ■I■ i IIII ■IIII i ■lip ■IIII ■I■i ■ i ■IIII [i i ■■ IIIII 111 ■I■i ■IIIIIIII■ 111■ 111■111 ■­Ffl r ■I■ Ed IIII■ EW 11 IIIIII ■i 71-k ■I■■ ■■U • ■ IIIII ■■ ■■i ■[i ■I■■I[=■■li ■■Ili ■ ■id ■ ■■I■■■ ElrdEt El==7FFFd 111■Ii ■i ■IIIIII■ 111■ ■ T] 111■ ■■ii ■I■I■ ■ ■■I■■ ■I■111 ■ IIIII r■111■■ICI■ 111 111■ ■ FT ■■ Frfl C IIIII ■It■IIII ■■ ■I■IIIIIIIRi 111 ■I■ ■­1­1--f EIJ 1111111d El:■I■I■■ 111 =C ■■ir■■I■i IIII■I■ ❑❑Cn-T-VmTt ❑FFMI MIT-1 Ed WI II IIIII1II111 I7E1WCFT1-fFM[1E71❑I 1IIIIII111IWFFF]d=®W M Elk El W W W ❑ E'❑ LJLLt11I 1 I I III IIII ® W ®'W WC WWrWW Wd rW E W E:Ed Et Wt❑CtF1­­1®9❑ ARTICLE 12 — COMPLETION FF10 ❑ Contractor's Warranty of Title C®VFFTk ❑CiTW❑Cfi FFT-f WIDW Ell W❑ ITW❑Elt=7-d Ed W= Al 1 IIIIIIIIIIIIII Ila ❑AIM❑WWIMCWMI ' W�WW❑W❑WAI IIIIII IIIII III I ❑[d IIII 111111 1 I [� W FA ® LJJI 11111 J1 111 1 1 11 1 FF10 ❑ Partial Utilization A❑Eir EE[k ®❑WTI IIIIII IIIII I II IWWW❑ Et EDC W❑Ek =111I IIIIII IIIIIIII11I1=[ TmTd ❑Tt❑WW ❑ 117171 ❑W ­7FI 11 1 1 uluulu 1111111 W Cd® WCFFI-fFM❑[17 ❑W CWd®'❑WI 11111111111111111 ❑III11111III1 IN IE ®❑WW❑ 11'01111II I1111= Uld W CW EflT W W 1-d ITTW ❑ I IIIII 111111111 II 1 1 WifQ11W ❑W C❑7I❑F1Tt® ❑LiEEt❑===rW7T­flCt ==E] CkEECW W=W❑❑WIC®FFTFft ®❑rW® ❑1771®CW771FMCf FM=❑17❑WW❑ Cf❑❑WCWdElUt❑WUWrFrd❑Tt W �Ld IIII I III IIIII II IIIIrF[T] =F" W C®FFF­Ff W7MW❑❑WCWH❑rWDWIDC77�77T� It❑7­7W❑D7❑W FM❑ L-k❑r❑Cd❑LILk WLd W W❑ WZI] ❑r1 11 111 1 11 I I I I W❑® 1 1 11111111111 I11II 11 I W []J'(Wd [IT] ❑[]J7TkFFFI C4107AW W EW C®FHT-t ❑= LL I I I 1 II 1 II 1111111 I m=LI❑m= ❑ LKI 111 d®❑= W m FMI II1111111 1 111CWdMI 1 1 1 11 1 1 Id W7Ft❑7E1W71 Cf❑®WI III IIIIIII IIIIIIIIIIIFFFI W ❑IIII11 1 1111111 ICl I IfITHIT ®❑rWD=rLLLLk LLIt❑ ■■ ■iIIIIII■■ ■ ■■ IIIII■ ®❑ Final Inspection A❑ ❑FM ❑rWID TW CFFI-f FFFFf Tf❑❑TFR ®❑ ❑ 11771 H F [IT] mod= ❑ W W C®W�� C®D LID D] D D D D DOH PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDD®®DDDDDDDDDDDDAll ADDDD mDODCDD CPN106001 ❑ D CDEEO m 00 7 D ED Dm ❑®Clod D®DDDdMIT] DEll] Ell] DDDDIMD®DDDDIfDmD❑ DDmD]Do-DDo-dDd DrD®® ■■ ■ 1111111E [I . ■I■■I[ IIIII ■ IIIIIi111■[� ■111 ■ ■ IIIII ■■ir■■Illi ■ ■■ C IIIII ■ IIIII ■■IIIIIII ■Mir ■illli 111 ■ IIIIIII■ ■■ ■111 ■[ IIIIII■III ■ 111 ■ ■IIII■ ■■■I■IIII 111■I■ 111E ■ i ■ IIIIII■I■■ ■IIIIIII i . ■Mir FT-FFTf 111111 [i 1111111111E 111■■ Eli■I■ ■ ■I■IIII ■I■ ■I■ [ ■ ■■I■I■Illli ■ T] ■I■■ ■IIIIIII ■li■I■ ■ FT ■ It r ■■ [-d ■ it■■I■ ®4 Final Acceptance All ❑7MF7E]CmF�77-� [111CTIFTIIIIIIIIIIIIIIIIIIIIII I IT] FMEddT7U7-= F'❑Cd[TT=d ®� oflFMIIII II 1 II 1111111 l 1;®❑®®C®77T ❑®' m❑®AI III �� II II m� l II II II II �� mFFFF]�� ■■ • m. ■■I■■ ■inlr� NIi m nl■ ■■� ■I■■ ■ ■■I■■ ■I■nII■ nl■nn nl■ ■■■ ■■■ nll nlr� m nl■ ■I■r; ■■■■ ■■ nl■li ■■■■ ■■■� [� ■■ ■ i Eli ■■■ ■[I ■■ ■■ ■Inl■m■■■■m ■nl■■• LwLYiluld­TFd w1111lic-41111111III ■■ ■■I■■ ■I■111 ■I■. ■I■■ ■IIIIIII ■Ir. IIII■■IIIIII ■IIIII■11111■ i ■ ■IIII[ ■ 111 ■■■■IIII■ IIII■ 111■111 i IIIIIII■ ■■■■■i ■IIII■■ Illllln 111 ■IIIII 111E ■ i on ■■ ■IIIIII ■IIII■ ■I■ ■I■■ IIIIIII ■ ■■I■■ ■■I■I■ ■111■111[i ■ ■I■ . it ■I■IIIIII ■■ 111E Moir ■I■IIII i ■ m C®F7Tf C17miiEEFFTd=ITmn77❑EEIFMCFTFF ��r❑��l �Cm��� FTFTFt= EJFFA [it ❑iri II II IIIIIIIII 1 1 . ■ IIIIII■111■ ■111■I■ • ■■ 111E IIIII ■IIIIIII■■ 111E ■■ir■I■Illi ■■ ■I■■ ■■i ■I■IIII■I■ i ■111[ ■I■■ir ■I■ ■I■111 ■■111■ Moir ■I■I■■ ■■■■ ■I■111 ■ ■IIII■ 111[ ■I■IIIIII ■ ARTICLE 13 — SUSPENSION OF WORK ®❑ City May Suspend Work A❑A❑FM ITT ❑❑d ❑=IFIC ITT ❑EEI P7TFFd 7711 Cf❑Cf Fl� 771 MIT-1 =t FlMm❑r® mI�7Lai CFFrf IFFIFFIt LLi ❑FM❑LEI om=dim❑mID❑ C-k❑❑®mrFFMCd❑CFFFfLLLL[i =❑IFFIFF]❑ 11'1717E]=d®SF"11❑CT=FTP EFTI-C]1II1II1 II I 11111 17EIFFIFF11 Fill Ed m Cm-fFM ❑LLL� FM r= C® ❑®FFM III I IrlI u u l FIT❑ m C= ❑T'IIIIIIIIII iliuii 1[-t ■ ■ ■Moore 111E ■Mir■I■Ili ■■■■■ ■I■OWN- �mmmmmm II■ ■Ellin ■ ■IIII■■. on Ill Ills Moore NONE ■Ir. ■IIIII■■■ 111E IIII■111■Mir ■■IIII ■■Ir. ■I■■■rr 111 ■■ . ■IIII ■ 111[i on ■ ■Err■I■IIII NE 111 ■IIIIII■ '" 111 i ■■ire 111■■■ C®D D D CD D D D D DDH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDADDADDC®DCDDDD7D7DDDDDDLED DDDAll ADDDD mDDDCDD CPN106001 ❑ D [DEEO m 00 7 ❑ [D 11[4 ❑®Odad D [711111 11Dd T-T1111 1171] 71] 11 111IFTE 11-TrT11 11 [T]If DITT] [Ir DOm®0o-0Elo-dEld Oro®® [IFFF] Cal mm iIIiIIIIIIIIIIiIII❑®❑riuuuiIII iiii=illm®❑❑C®-TF­Tk11EE1r❑11J1111J❑❑I111I11I1IIIIIi®C®= ❑IT]❑C-fl®®IIII IIIII IIII[Tr][ FF=I II I II 1 II 1 IIIII I I C❑L1❑LWLII l l A ❑I III II II IIIIt❑®mil =❑ C3DIa MIA 11:Ed11=C®77­k EFTf ❑ =❑ ® FTIFM [111 = ❑ ❑ TTTTTTTT ❑ I I II I I I I I I I It ® IFTl ❑ IFFIFF I I I III II II I I I I t [TM 0 ❑dmFl = = ❑=F" m = ❑m'❑ [:'I II II IIIIII 1 = C%dEll = IT d [D Mt ED= ❑ [f ❑ 71-t ❑ f 71 Ed ­FF `TTd ❑ I I I I III I II I I I idr FFT7FTFF1 F1 ET I-f FM ®[1:C]'❑®7TTkm❑®❑I I 11 II II IIIItm ARTICLE 14 — MISCELLANEOUS F4 m ❑ Giving Notice A❑❑ FM Ft mFF7CFF-FfFM❑=r7m❑rITMi iluiil a ilil❑IT and=Ed ®7713®�� M = Ea ❑ = LLLLllJ I I I I I LILd [ E]:k m d A E71 ET = m r Ed 117 ❑T' TMA ❑ ❑FF T FT 7f T7 [t IFFIFTH ❑ [IT] = IF TII-fIT I I I II I I I 111 1 Eddr=❑®=7TFFJ- m=� ■■■ r� ■■I■■ on m■ ■il m■ 74 m ❑ Computation of Times ❑ F-M7MEFFE1 mIM1111TIrEffIlrCd Fff] 711 ITIFFIC®17171 FFFMmd­1=11❑IFFRmFMEETHd 1111 E=1d❑=®E1E7fl TTFA❑=®d====tD ❑==®dmm==EEtEId ®m❑ ❑MkdET] [k ❑miles [T m ❑dam ❑ M❑ ❑ m1F-MF Mm = ❑ [-t= ❑ m 7TTTmr7Tm ❑ = FFFM d=m®El:tIl❑ 74 m ❑ Cumulative Remedies ❑m d[Td I I I I II I I II I II I I I ILL] m ❑ ❑❑J M C mi ❑C4l = r am ❑Cfl rLLI Ld FM 1 II 1 IIIIIIII IIII TtF"J ®17­1 [Tt 17M[TfFFTJ❑IF] CddTTFF ITITT Fd C$❑I-MIT11mFEd [IT]FM❑ETIM ❑ TM r ❑� r M Ld = I II I II I II III I I I I E FM Lj ❑L❑❑JI I I I III ❑ = J Ll FFFFF-f ❑ TH LEI FFTTd a I II I 11111111 IIIIm❑FT]❑Ef F-1I II I IIIIIIIIII I II I I I❑[$rFFFTIt ET-1-fI II IIIII 1 1 t mC7I I IIIIII II I IIT] = C®=1 LL[--'I I IIIIIIII 1 Imp❑1-f1..11FM❑TTmLLII IIIIIIII IIIIIII IMLLJr 1II1 II IIIIIIIII IIIIIII [IT]=CFIT FM❑ =T]I II I II IIIIIII I❑FFMFm di II I II I IIIIII IIIIIII I tMTTI7FFlrmCal❑EJ1 ❑==� C®0 D 0 m ❑ ❑ ❑ D ❑OH PARKWAY & PEDES TRIA N LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE DDAODAOOC®OCO11❑®®ODDL1DDOOODODAll A17100❑ m0®000 CPN106001 ❑OCDEEO m 00 70 EDom ❑®Odad 0®O11Dd®011 11 000011110®0®1111OOfOmO❑ D11m070E' 11ElErdOd Oro®® 0111010010 74104 Survival of Obligations n1r ■I■ nn ■I■ I I I IIII 111 1111111 1 11 IF] i ■■ - ■I■mI■I■ ■ Ed ■ ■1■ ■I■■ir1- ■771 ■n1■I■ 711 ■I■Ili d ■I■■I■ El ITT 111■ C ■■li■■I■ ■ [I:][]==LLLI 111 111111 1111 1 1 1 1111111111111 1 IEId7FFFd 111 111■ ■■-VM ■ ■■I■■ ■I■1111■ ■ MIT ■i ■111■ 11111■I■ ■■■■ ■I■111 ■I■■ I I I ■■fl 717T77777 ■■ 111■ ■ Ef ■ i E ■ 111■IIIIII■ Ek ■■111■ ■■li■■■i E ■ 111■IIIIII■ ■■111■ [it EDIC IFFIT■■li ■ C4 m ❑ Headings Ar®❑Cif ❑I'❑ =FFM=C3'❑TFFRMd Ek III I I I II IIIII III = Td d❑I I I III I I IIIIIIIIIIII®®m® ❑ =f❑CC 77d C®0 LID 0] 00 0 0 00H PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE 110AO11A00 C®0 C01111070700 11711111711711711117111 All A00110 m0110000 CPN 106001 ❑ ®iO [DEEO m 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 01 11 00 SUMMARY OF WORK 011100-1 DAP SUMMARY OF WORK Paget of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised December 20, 2012 011100-2 DAP SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission ftom the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission, neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised December 20, 2012 011100-3 DAP SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised December 20, 2012 012500-1 DAP SUBSTITUTION PROCEDURES SECTION 0125 00 SUBSTITUTION PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 4 The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 4. Substitution will be rejected if. a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer's opinion, acceptance will require substantial revision of the original design d. In the City's or Developer's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 012500-4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Firm Address Date Telephone For Use by City: Approved City Recommended Recommended Not recommended Received late By Date Remarks Date Rej ected CITY OF FORT WORTH PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 013119-1 DAP PRECONSTRUCTION MEETING SECTION 01 31 19 PRECONSTRUCTION MEETING PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 01 31 19 - 2 DAP PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 013119-3 DAP PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 013233-1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infill developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 SECTION 0133 00 DAP SUBMITTALS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 DAP SUBMITTALS Page 1 of 8 General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 013300-2 DAP SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/2 inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 013300-3 DAP SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 013300-4 DAP SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 013300-5 DAP SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 013300-6 DAP SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CRY 106001 Revised August 30, 2013 013300-7 DAP SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 013300-8 DAP SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 1040IZI]wlX40Y1.130 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised August 30, 2013 0135 13- 1 DAP SPECIAL PROJECT PROCEDURES Page 1 of 7 1 SECTION 01 3513 2 SPECIAL PROJECT PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 £ Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1 — General Requirements 23 3. Section 33 12 25 — Connection to Existing Water Mains 24 25 1.2 REFERENCES 26 A. Reference Standards 27 1. Reference standards cited in this Specification refer to the current reference 28 standard published at the time of the latest revision date logged at the end of this 29 Specification, unless a date is specifically cited. 30 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 31 High Voltage Overhead Lines. 32 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 33 Specification 34 1.3 ADMINISTRATIVE REQUIREMENTS 35 A. Coordination with the Texas Department of Transportation 36 1. When work in the right-of-way which is under the jurisdiction of the Texas 37 Department of Transportation (TxDOT): 38 a. Notify the Texas Department of Transportation prior to commencing any work 39 therein in accordance with the provisions of the permit CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECT CPN 106001 Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 013513-2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 b. All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation B. Work near High Voltage Lines 1. Regulatory Requirements a. All Work near High Voltage Lines (more than 600 volts measured between conductors or between a conductor and the ground) shall be in accordance with Health and Safety Code, Title 9, Subtitle A, Chapter 752. 2. Warning sign a. Provide sign of sufficient size meeting all OSHA requirements. 3. Equipment operating within 10 feet of high voltage lines will require the following safety features a. Insulating cage -type of guard about the boom or arm b. Insulator links on the lift hook connections for back hoes or dippers c. Equipment must meet the safety requirements as set forth by OSHA and the safety requirements of the owner of the high voltage lines 4. Work within 6 feet of high voltage electric lines a. Notification shall be given to: 1) The power company (example: ONCOR) a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section 01 31 13 E. Water Department Coordination 1. During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECT CPN 106001 Revised August 30, 2013 013513-3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 1 2. Coordinate any event that will require connecting to or the operation of an existing 2 City water line system with the City's representative. 3 a. Coordination shall be in accordance with Section 33 12 25. 4 b. If needed, obtain a hydrant water meter from the Water Department for use 5 during the life of named project. 6 c. In the event that a water valve on an existing live system be turned off and on 7 to accommodate the construction of the project is required, coordinate this 8 activity through the appropriate City representative. 9 1) Do not operate water line valves of existing water system. 10 a) Failure to comply will render the Contractor in violation of Texas Penal ] ] Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 12 will be prosecuted to the full extent of the law. 13 b) In addition, the Contractor will assume all liabilities and 14 responsibilities as a result of these actions. 15 F. Public Notification Prior to Beginning Construction 16 1. Prior to beginning construction on any block in the project, on a block by block 17 basis, prepare and deliver a notice or flyer of the pending construction to the front 18 door of each residence or business that will be impacted by construction. The notice 19 shall be prepared as follows: 20 a. Post notice or flyer 7 days prior to beginning any construction activity on each 21 block in the project area. 22 1) Prepare flyer on the Contractor's letterhead and include the following 23 information: 24 a) Name of Project 25 b) City Project No (CPN) 26 c) Scope of Project (i.e. type of construction activity) 27 d) Actual construction duration within the block 28 e) Name of the contractor's foreman and phone number 29 f) Name of the City's inspector and phone number 30 g) City's after-hours phone number 31 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 32 A. 33 3) Submit schedule showing the construction start and finish time for each 34 block of the project to the inspector. 35 4) Deliver flyer to the City Inspector for review prior to distribution. 36 b. No construction will be allowed to begin on any block until the flyer is 37 delivered to all residents of the block. 38 G. Public Notification of Temporary Water Service Interruption during Construction 39 1. In the event it becomes necessary to temporarily shut down water service to 40 residents or businesses during construction, prepare and deliver a notice or flyer of 41 the pending interruption to the front door of each affected resident. 42 2. Prepared notice as follows: 43 a. The notification or flyer shall be posted 24 hours prior to the temporary 44 interruption. 45 b. Prepare flyer on the contractor's letterhead and include the following 46 information: 47 1) Name of the project 48 2) City Project Number 49 3) Date of the interruption of service CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECT CPN 106001 Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 01 35 13 - 4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. H. Coordination with United States Army Corps of Engineers (USACE) 1. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. I. Coordination within Railroad Permit Areas 1. At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed to comply with the railroad's requirements. J. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. K. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECT CPN 106001 Revised August 30, 2013 013513-5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 1 1.4 SUBMITTALS [NOT USED] 2 1.5 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.6 CLOSEOUT SUBMITTALS [NOT USED] 4 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.8 QUALITY ASSURANCE [NOT USED] 6 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.10 FIELD [SITE] CONDITIONS [NOT USED] 8 1.11 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.3.13— Added requirement of compliance with Health and Safety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECT CPN 106001 Revised August 30, 2013 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 01 35 13 - 6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH PARKWAY& PEDESTRIAN LIGHT IMPROVEMENTS TO SERVEJPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECT CPN 106001 Revised August 30, 2013 2 3 4 Date: EXHIBIT B FORT WORTH DOE NO. xxxx Project Name: 013513-7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) C630 MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, CONTRACTOR CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECT CPN 106001 Revised August 30, 2013 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another form of distribution approved by the City. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised March 20, 2020 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 03/20/2020 D.V. Magana Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised March 20, 2020 015000-1 DAP TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised JULY 1, 2011 01 50 00 - 2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised JULY 1, 2011 01 50 00 - 3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised JULY 1, 2011 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised JULY 1, 2011 015526-1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 SECTION 0155 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised July 1, 2011 015526-2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised July 1, 2011 015526-3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised July 1, 2011 015713-1 DAP STORM WATER POLLUTION PREVENTION Page 1 of 3 SECTION 0157 13 STORM WATER POLLUTION PREVENTION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 3125 00 — Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised July 1, 2011 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP Submit in accordance with Section 0133 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised July 1, 2011 0157 13 -3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised July 1, 2011 SECTION 0160 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 60 00 DAP PRODUCT REQUIREMENTS Page 1 of 2 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City's website at: httDs://apps.fortworthtexas.2ov/ProiectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. C. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. D. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised March 20, 2020 01 60 00 DAP PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/2020 D.V. Magafia Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised March 20, 2020 016600-1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 01 66 00 - 2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 016600-3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 017000-1 DAP MOBILIZATION AND REMOBILIZATION Page 1 of 4 SECTION 0170 00 MOBILIZATION AND REMOBILIZATION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 01 70 00 - 2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site for the issued Work Order. b) Establishment of necessary general facilities for the Contractor's operation at the Site for the issued Work Order 2) Demobilization shall consist of the activities and cost necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b) Site Clean-up for each issued Work Order c) Removal of all buildings or other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract. 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects a. A Mobilization for Miscellaneous Projects when directed by the City and the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements IRM97[yW.307Z%140IDleh89,11101111114`1V A. Measurement and Payment 1. Mobilization and Demobilization a. Measure 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Remobilization for suspension of Work as specifically required in the Contract Documents a. Measurement 1) Measurement for this Item shall be per each remobilization performed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Specified Remobilization" in accordance with Contract Documents. c. The price shall include: 1) Demobilization as described in Section 1.1.A.2.a.1) 2) Remobilization as described in Section 1.1.A.2.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 01 70 00 - 3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 Remobilization for suspension of Work as required by City a. Measurement and Payment 1) This shall be submitted as a Contract Claim in accordance with Article 10 of Section 00 72 00. 2) No payments will be made for standby, idle time, or lost profits associated with this Item. 4. Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include: 1) Mobilization as described in Section 1.1.A.3.a.1) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. Emergency Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement' will be paid for at the unit price per each "Work Order Emergency Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1) Mobilization as described in Section 1.1.A.4.a) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 01 70 00 - 4 DAP MOBILIZATION AND REMOBILIZATION Page 4 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 1 2 3 PART1- GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 11 12 1.2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 017123-1 CONSTRUCTION STAKING AND SURVEY Pagel of 8 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. See Changes (Highlighted in Yellow). C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Staking a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 07, 2014 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 1.3 REFERENCES A. Definitions 1. Construction Survev - The survey measurements made prior to or while construction is in progress to control elevation, horizontal position, dimensions and configuration of structures/improvements included in the Project Drawings. 2. As -built Survev —The measurements made after the construction of the improvement features are complete to provide position coordinates for the features of a project. 3. Construction Stakins — The placement of stakes and markings to provide offsets and elevations to cut and fill in order to locate on the ground the designed structures/improvements included in the Project Drawings. Construction staking shall include staking easements and/or right of way if indicated on the plans. 4. Survev "Field Checks" — Measurements made after construction staking is completed and before construction work begins to ensure that structures marked on the ground are accurately located per Project Drawings. B. Technical References 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) — 01 71 23.16.01— Attachment A Survey Staking Standards 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available on City's Buzzsaw website). 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land Surveying in the State of Texas, Category 5 25 1.4 ADMINISTRATIVE REQUIREMENTS 26 A. The Contractor's selection of a surveyor must comply with Texas Government 27 Code 2254 (qualifications based selection) for this project. 28 1.5 SUBMITTALS 29 A. Submittals, if required, shall be in accordance with Section 0133 00. 30 B. All submittals shall be received and reviewed by the City prior to delivery of work. 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 32 A. Field Quality Control Submittals 33 1. Documentation verifying accuracy of field engineering work, including coordinate 34 conversions if plans do not indicate grid or ground coordinates. 35 2. Submit "Cut -Sheets" conforming to the standard template provided by the City 36 (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 37 38 1.7 CLOSEOUT SUBMITTALS 39 B. As -built Redline Drawing Submittal CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 07, 2014 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of 2 constructed improvements signed and sealed by Registered Professional Land 3 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A 4 — Survey Staking Standards) . 5 2. Contractor shall submit the proposed as -built and completed redline drawing 6 submittal one (1) week prior to scheduling the project final inspection for City 7 review and comment. Revisions, if necessary, shall be made to the as -built redline 8 drawings and resubmitted to the City prior to scheduling the construction final 9 inspection. 10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11 1.9 QUALITY ASSURANCE 12 A. Construction Staking 13 1. Construction staking will be performed by the Contractor. 14 2. Coordination 15 a. Contact City and Developer's Project Representative at least one week in 16 advance notifying the City of when Construction Staking is scheduled. 17 b. It is the Contractor's responsibility to coordinate staking such that 18 construction activities are not delayed or negatively impacted. 19 3. General 20 a. Contractor is responsible for preserving and maintaining stakes. If City 21 surveyors or Developer's Project Representative are required to re -stake for 22 any reason, the Contractor will be responsible for costs to perform staking. If 23 in the opinion of the City, a sufficient number of stakes or markings have been 24 lost, destroyed disturbed or omitted that the contracted Work cannot take place 25 then the Contractor will be required to stake or re -stake the deficient areas. 26 B. Construction Survey 27 1. Construction Survey will be performed by the Contractor. 28 2. Coordination 29 a. Contractor to verify that horizontal and vertical control data established in the 30 design survey and required for construction survey is available and in place. 31 3. General 32 a. Construction survey will be performed in order to construct the work shown 33 on the Construction Drawings and specified in the Contract Documents. 34 b. For construction methods other than open cut, the Contractor shall perform 35 construction survey and verify control data including, but not limited to, the 36 following: 37 1) Verification that established benchmarks and control are accurate. 38 2) Use of Benchmarks to furnish and maintain all reference lines and grades 39 for tunneling. 40 3) Use of line and grades to establish the location of the pipe. 41 4) Submit to the City copies of field notes used to establish all lines and 42 grades, if requested, and allow the City to check guidance system setup prior 43 to beginning each tunneling drive. 44 5) Provide access for the City, if requested, to verify the guidance system and 45 the line and grade of the carrier pipe. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 07, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 250 linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 07, 2014 017123-5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 I d) Fire hydrants 2 e) Valves (gate, butterfly, etc.) 3 f) Air Release valves (Manhole rim and vent pipe) 4 g) Blow off valves (Manhole rim and valve lid) 5 h) Pressure plane valves 6 i) Underground Vaults 7 (1) Rim and flowline elevations and coordinates for each 8 Underground Vault. 9 3) Sanitary Sewer 10 a) Cleanouts 11 (1) Rim and flowline elevations and coordinates for each 12 b) Manholes and Junction Structures 13 (1) Rim and flowline elevations and coordinates for each 14 manhole and junction structure. 15 4) Stormwater — Not Applicable 16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 17 1.11 FIELD [SITE] CONDITIONS [NOT USED] 18 1.12 WARRANTY 19 PART 2 - PRODUCTS 20 A. A construction survey will produce, but will not be limited to: 21 1. Recovery of relevant control points, points of curvature and points of intersection. 22 2. Establish temporary horizontal and vertical control elevations (benchmarks) 23 sufficiently permanent and located in a manner to be used throughout construction. 24 3. The location of planned facilities, easements and improvements. 25 a. Establishing final line and grade stakes for piers, floors, grade beams, parking 26 areas, utilities, streets, highways, tunnels, and other construction. 27 b. A record of revisions or corrections noted in an orderly manner for reference. 28 c. A drawing, when required by the client, indicating the horizontal and vertical 29 location of facilities, easements and improvements, as built. 30 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all 31 construction staking projects. These cut sheets shall be on the standard city template 32 which can be obtained from the Survey Superintendent (817-392-7925). 33 5. Digital survey files in the following formats shall be acceptable: 34 a. AutoCAD (.dwg) 35 b. ESRI Shapefile (.shp) 36 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use 37 standard templates, if available) 38 6. Survey files shall include vertical and horizontal data tied to original project 39 control and benchmarks, and shall include feature descriptions 40 PART 3 - EXECUTION 41 3.1 INSTALLERS CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 07, 2014 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 I A. Tolerances: 2 1. The staked location of any improvement or facility should be as accurate as 3 practical and necessary. The degree of precision required is dependent on many 4 factors all of which must remain judgmental. The tolerances listed hereafter are 5 based on generalities and, under certain circumstances, shall yield to specific 6 requirements. The surveyor shall assess any situation by review of the overall plans 7 and through consultation with responsible parties as to the need for specific 8 tolerances. 9 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical 10 tolerance. Horizontal alignment for earthwork and rough cut should not exceed 11 1.0 ft. tolerance. 12 b. Horizontal alignment on a structure shall be within .0.1 ft tolerance. 13 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and 14 walkways shall be located within the confines of the site boundaries and, 15 occasionally, along a boundary or any other restrictive line. Away from any 16 restrictive line, these facilities should be staked with an accuracy producing no 17 more than 0.05ft. tolerance from their specified locations. 18 d. Underground and overhead utilities, such as sewers, gas, water, telephone and 19 electric lines, shall be located horizontally within their prescribed areas or 20 easements. Within assigned areas, these utilities should be staked with an 21 accuracy producing no more than 0.1 ft tolerance from a specified location. 22 e. The accuracy required for the vertical location of utilities varies widely. Many 23 underground utilities require only a minimum cover and a tolerance of 0.1 ft. 24 should be maintained. Underground and overhead utilities on planned profile, 25 but not depending on gravity flow for performance, should not exceed 0.1 ft. 26 tolerance. 27 B. Surveying instruments shall be kept in close adjustment according to manufacturer's 28 specifications or in compliance to standards. The City reserves the right to request a 29 calibration report at any time and recommends regular maintenance schedule be 30 performed by a certified technician every 6 months. 31 1. Field measurements of angles and distances shall be done in such fashion as to 32 satisfy the closures and tolerances expressed in Part 3.1.A. 33 2. Vertical locations shall be established from a pre -established benchmark and 34 checked by closing to a different bench mark on the same datum. 35 3. Construction survey field work shall correspond to the client's plans. Irregularities 36 or conflicts found shall be reported promptly to the City. 37 4. Revisions, corrections and other pertinent data shall be logged for future reference. 38 39 3.2 EXAMINATION [NOT USED] 40 3.3 PREPARATION [NOT USED] 41 3.4 APPLICATION 42 3.5 REPAIR / RESTORATION 43 A. If the Contractor's work damages or destroys one or more of the control 44 monuments/points set by the City or Developer's Project Representative, the monuments 45 shall be adequately referenced for expedient restoration. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 07, 2014 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 1 1. Notify City or Developer's Project Representative if any control data needs to be 2 restored or replaced due to damage caused during construction operations. 3 a. Contractor shall perform replacements and/or restorations. 4 b. The City or Developer's Project Representative may require at anytime a 5 survey "Field Check" of any monument or benchmarks that are set be verified 6 by the City surveyors or Developer's Project Representative before further 7 associated work can move forward. 8 3.6 RE -INSTALLATION [NOT USED] 9 3.7 FIELD [OR] SITE QUALITY CONTROL 10 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 11 City or Developer's Project Representative in accordance with this Specification. This 12 includes easements and right of way, if noted on the plans. 13 B. Do not change or relocate stakes or control data without approval from the City. 14 3.8 SYSTEM STARTUP 15 A. Survey Checks 16 1. The City reserves the right to perform a Survey Check at any time deemed 17 necessary. 18 2. Checks by City personnel or 31 party contracted surveyor are not intended to 19 relieve the contractor of his/her responsibility for accuracy. 20 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text"; revised measurement and payment sections for Construction 2/14/2018 M Owen Staking and As -Built Survey; added reference to selection compliance with TGC 2254; revised action and Closeout submittal requirements; added acceptable depth CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 07, 2014 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 07, 2014 SECTION 0174 23 CLEANING PART1- GENERAL 1.1 SUMMARY 017423-1 DAP CLEANING Page 1 of 4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 01 74 23 - 2 DAP CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 01 74 23 - 3 DAP CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 01 74 23 - 4 DAP CLEANING Page 4 of 4 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 SECTION 0177 19 CLOSEOUT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY 017719-1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CRY 106001 Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) £ Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH PARKWAY & PEDESTRIANLIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 017823-1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 0133 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 1/2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CRY 106001 Revised April 7, 2014 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31 /2012 D. Johnson 1.5.A.1 — title of section removed 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 017839-1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 01 78 39 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106001 Revised April 7, 2014 APPENDIX GC-4.02 Subsurface and Physical Conditions GR-01 60 00 Product Requirements CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 106001 Revised July 1, 2011 GC-4.02 Subsurface and Physical Conditions THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 106001 Revised July 1, 2011 ELECTRIC E1 ELECTRIC - - El (C) - ELECTRIC - - - El (D) - - ELECTRIC- E2 ELECTRIC - - - E2 (C) - ELECTRIC - - - E2 (D) - - ELECTRIC E3 ELECTRIC - - E3(C) - - ELECTRIC - - - E3 (D) - - CABLE TV CATV1 CABLE TV - -CATV1 (C)- - CABLE TV -CATV 1 (D )- FIBER OPTIC F01 FIBER OPTIC - F01 (C)- - FIBER OPTIC - - F01 (D) - - - LINESTYLE LEGEND J ONCOR ONCOR ONCOR CITY OF FORT WORTH CITY OF FORT WORTH CITY OF FORT WORTH PRIVATE PRIVATE PRIVATE SPECTRUM SPECTRUM SPECTRUM AT&T AT&T AT&T FIBER OPTIC F02 ZAYO FIBER OPTIC - - - F02 (C) - ZAYO FIBER OPTIC - - F02 (D ) - ZAYO TELEPHONE - T1 AT&T TELEPHONE - - - T1(C) - - AT&T TELEPHONE - T1(D) - - AT&T QUALITY LEVEL LEGEND OVERHEAD ELECTRIC - - OHE1(C) - - ONCOR OVERHEAD CABLE TV - OHCATV1(C)- SPECTRUM OVERHEAD TELEPHONE - - OHT1(C)- - AT&T OVERHEAD FIBER OPTIC - - OHF01(C)- - AT&T GAS G1 ATMOS GAS --- G1 (C) -- ATMOS GAS — G1 (D) — - ATMOS WATER W1 - CITY OF FORT WORTH WATER — — — W1(C) — — — CITY OF FORT WORTH WATER — — — WI (D) — — — CITY OF FORT WORTH WATER W2 - PRIVATE WATER — — — W2(C) — — — PRIVATE WATER — — — W2(D) — — — PRIVATE WASTEWATER WWI CITY OF FORT WORTH WASTEWATER - — — WWI (C)— — CITY OF FORT WORTH WASTEWATER — — WWI (D) — - CITY OF FORT WORTH WASTEWATER WW2 PRIVATE WASTEWATER - — — WW2 (C) — - PRIVATE WASTEWATER — — WW2 (D) — — - PRIVATE STORMWATER STM1 CITY OF FORT WORTH STORMWATER- — — STM1(C) — — — CITY OF FORT WORTH STORMWATER - — — STM1(D) — — — CITY OF FORT WORTH STORMWATER STM2 PRIVATE STORMWATER - — — STM2 (C) — — — PRIVATE STOR — — — .WW1 — — MWATER - — — 5TM2(D) — — — PRIVATE - QUALITY LEVEL B ---WW1 (C)----WW1 (C)----WW1 (C)--- QUALITY LEVEL C — — WW1 (D)---- WWI (D)---- WW1 (D)-- QUALITY LEVEL D UTILITY QUALITY LEVEL B: INFORMATION OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF SUBSURFACE UTILITIES° QUALITY LEVEL B DATA SHOULD BE REPRODUCIBL ANY POINT OF THEIR DEPICTION° THIS INFORMATION IS SURVEYED TO APPLICABLE TOLERANCES DEFINED BY THEE SURFACE GEOPHYSICS AT PLAN DOCUMENTS. PRROO JECT AND REDUCED ONTO UTILITY QUALITY LEVEL C: INFORMATION OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE -GROUND UTILITY FEATURES AND BY USING P CORRELATING THIS INFORMATION TO PROFESSIONAL JUDGEMENT IN QUALITY LEVEL D INFORMATION UTILITY QUALITY LEVEL D: INFORMATION DERIVED FROM EXISTING RECORDS OR ORAL RECOLLECTIONS. COMPANY Atmos Midtx AT&T Centurylink City of Fort Worth ExteNet Systems Oncor Spectrum UTILITY COORDINATOR Daniel Goette James (Jesse) Johnson Daniel Ellison Brienna Fields Mary Pimentel ' � r I � t League nall and perkins, inc 5237 N. Riverside Drive, Suite 100 IFort Worth, Texas 76137 817.336.5773 ph 817.336.2813 fx Ii I www.tnpinc.com no. I revision j by I date TBPE: F-230; TBPLS: 10011600, 10011601, 10194381 PHONE 469-662-4601 817-392-8054 866-892-5327 888519-9188 CONTACT LIST E-mail Map.Requests@atmosenergyocom g11289c@ctt.com Dciniel.Goette@lumen.com Jcmes.K.Johnsonc@fortworthtexcis.gov noc@extenetsystemsocom DistributionGIScjoncor. com forcerelosc@kineticengocom scale when bar is 1 inch long horiz N/A vert N/A AUGUST 2022 SYMBOL LEGEND ( GENERIC WATER FEATURE O AIR RELEASE VALVE O WATER VENT PIPE ® WATER MANHOLE FIRE HYDRANT WATER METER wve WATER VALVE BOX WATER VALVE wrs CATHODIC PROTECTIONFR W FIRE ALARM SPRINKLER O PHOTO TAKEN HERE J Fo Do Ce CONNECTIONS 0 O WASTEWATER MANHOLE SEWER CLEAN FI-0] ELECTRIC PEDESTAL OUT Q ELECTRIC MANHOLE s� STORM MANHOLE ELECTRIC METER FOISTORM SEWER INLET E O ELECTRIC JUNCTION BOX O STORM CLEAN OUT O MOUNTED JUNCTION BOX OJ ROOF DRAIN Pex ELECTRIC PULLBOX O GAS MANHOLE O HIGH MAST LIGHTING TOWER GAS METER T ELECTRIC TRANSFORMER GAS VALVE crs GAS TEST STATION TRAFFIC CAMERA CATV PEDESTAL 7 E LUMINAIRE STANDARD FVICATV SERVICE BOX SIGNAL CONTROL PANEL OO TELEPHONE MANHOLE POWER POLE 0 TELEPHONE PEDESTAL o POWER POLE WITH RISER TELEPHONE POLE F11TELEPHONE HAND HOLE o ILLUMINATION POLE GUY ANCHOR OJ JUNCTION BOX 0 GUY POLE DEADMAN TELEPHONE REPEATER o SOLAR PANEL Fo" FIBER OPTIC HAND HOLE TRAFF IC FIC SIGNAL BOX FIBER OPTIC JUNCTION BOX o STREET SIGN O FIBER OPTIC MANHOLE o TRAFFIC SIGNAL POLE COMMUNICATION BOX UTILITY MARKER POST O O GENERIC MANHOLE RAILROAD SIGNAL LEVEL 'A' TEST HOLE 0 CONTROL POINT 0 TOWER TRAFFIC SIGNAL PEDESTAL FAUCET D LINES ON BUILDING EXTERIOR ADDRESS 2513 W E Roberts Dr, Grand Prairie, TX 75051 200 Texas Street Fort Worth, TX 76102 3030 Worrenville Rd, Lisle, I 60532 777 Ma i n Street, # 707, Fort Worth, TX 761 02 1585 Jameson Road Van Alstyne, TX 75495 i!# tnp ANDREW R. LUCE 1 10084 10/21/2022 JPS HOSPITAL UTILITY LEGEND JPS MOB Parking Garage top project JPS 22351 sheet 1 M IV N O Ld Ln w 0 Ld + n C� �s 0 3 i a Ln Ln PM N N .e N 00 Ln Lo .e -F- N 0 cV N O •-n N 0\ k CL N / IN, .. O Ld Ld J F— �-qa LL o ono. E2 ( PHOTO 1 8" W1 (D) 10"WW1 (B) INVESTIGATION LIMITS I 6"WW1 (B) 6"G1 (D) INVESTIGATION LIMITS /— 42" STM1 (B) 46x60" STM1 (B) ARCH -6"G1 (B) -42'' STM1 (B) 10"WW1 ( -10"WW1 (B) 42"RCP STM 1 (D) z" W1 (D) MATC - I revision by 12" W1 (I E2 ( INVESTIGATIO LIMITS N - A N 0 20 40 80 SCALE: 1" = 40" HOR. ------------------------------------------------------------------------------------1 \`' E2 (B) �I 8"WW1 (B) 8"WW1 (B) o 0 8"WW1 (D) �' r0o > 8" W1 (D) I 8" W1 (D) I— STM1 (D) 6"G1 (B) I C) ---- F r I Lu I I t/! I (B) UNABLE TO I I# I Z OPEN COVERED BY ASPHALT I �_ 12" W1 (C)_ E1 (B) teague nail and perkins, inc 5237 N. Riverside Drive, Suite 100 Fort Worth, Texas 76137 817.336.5773 ph 817.336.2813 fx www.tnpinc.com date TBPE: F-230; TBPLS: 10011600, 10011601, 10194381 (C) G1 'PXEl (C) — — — 1 (C — — — W1 (C) -- — — — W1 (C— — W1 1�4A�mKin L��V� T I 1 (C) — — � W1 ( ) ''�'— 4IV1 (D) — — — —�11 (D) — — — — W1 (D) I (D) -� v> /�-�:]L W� (q) ---- l� - - U \ � G 1 y ........ ARCH G1 (B) `~ I � T1 (B)o 11 (B) 'g •� �' —� E3 (B) I Q 2-1701 (13 I 1 (D B) I CATV1 (D) U Imo\ 12"W1 (D) I wJ ABANDONED _ (D) 1 - 1 - - 16 W1 (C) I y F1 I E1 (B) J 1 (D)w- 3I 1 (Di W1 (D) E3(B) 6'WW1 (D) y T I v I OHE1 (C) I UNABLE TO OPEN OUT OF SERVICE E1 I PER HOSPITALLJJ I I M P UNABLE TO I I TSB—STM1 (D) --w STM1 (D)----STM1 (D)-- k\ OPEN DUE TO 1 _ / TR AFFI C" I -3(B) c.� French E3 (B) L� I I� Drains E3 ABANDONED_ G1 (D) FRENCH DRAIN \ I J . . . scale ®®oF�aAo when bar is �P�E. rFk 0 p pP 1 inch long ® ANDREW R. LUCE O ® o ®� 110084 ® 10/21/2022 �o ICENS�'����s horiz 1 "=40' vert N/A ,AUGUST 2022 tnp JPS HOSPITAL EXISITING UTILITY PLAN JPS MOB Parking Garage 8" tnp project JPS 22351 sheet 2 I ♦ / C O w D V) / V) w o w+ n CC' / L 0 3 / /Q M M ("d .. (\J 00 V) Lo 0-) 4- N U CV N O •-n N 0\ L N .. O ww J F- I--qa LL- r) VATC 8" W1 (D) W. M ORF 42"RCP STM1 (C) 211 "RCP STM1 (D) I 1 2" W1 (C) I I I_ LA C I �— IX �_ I l i I 4 lip VC STM2 (D) I I I ZE I ��I I� I I� 811WW1 (C) I c� 54"RCP %-18" G1 (BY -1-21"RCP - E3 STM1 (Dr)-i E1 (B) /G1 (B) 8"WW2 (B) .WW2 m \ OE- E2 (B) C3 � \ — ABANDONED 0 4"WW2 (D) p� FRENCH DRAIN ------ i PROFESSIONAL BLDG. II 6 " FIRE LINE BACKFLOW PREVENTER FRENCH DRAIN —Qr 0 s 3 " METER' Serviced by 2-T1 (B) So I ar P I s CATV 1 (B ) cc o 74 "WW2 (D) r t r I 8"WW2 (B) UNABLE TO I STM2 (D) OPEN RRABANDONED I UNABLE TO OPEN F --- cTnrn�Q� 4" METER —x—X X x -N X- X- X- X X- X- X- X- X- X- ,. .. - X- X X J 8" STM1 (D) S T M 1 ( B) I I �I 18 " G 1 (B) TARRANT COUNTY MEDICAL EXAMINER I— FRENCH DRAIN GRATE INLET- 8 W1 (C) UNABLE TO I OHE1 (C) ROD OE r `&v' n --OHE1 (C) y', i 10 WW1 (C) UNABLE TO u 8 WW1 (D)�3TMI (D OPEN DUE TOs STM1 (D) TRAFFIC 51 13 N I I � ---1 (D) — --- — — — — — (- --- — _� 1'r -� i X X X X I, u X x �- T W�1� �- � FELIKS GWOZDZ PL.�� _ _ _ _ �_ _ W1) — — W1 (C) — — — (C) — — W1 (C) W1 (C) —z _CATV 1 o = — I1— ------ —------- — —--r-------- — 21 RCP I 10"WW1 (C) 8 STM1 (D) STM1 (D) 0 12 W1 (C) 6"WW1 (D) 36"RCP CATV1 (B) 24"RCP STM1 (D) INVESTIGATION 10"WW1 (D) 6" G1 (B) LIMITS STM1 (D) 8"WW1 (D) teague nail and perkins, inc 5237 N. Riverside Drive, Suite 100 Fort Worth, Texas 76137 817.336.5773 ph 817.336.2813 fx www.tnpinc.com ono. revision by date TBPE: F-230; TBPLS: 10011600, 10011601, 10194381 scale " when bar is 1 inch long horiz 1 "=40' N/A AUGUST 2022 N 0 20 40 80 SCALE: 1 " = 40" HOR. 1- VV I lUJ {7-1r--:J— —`VV I IUJ�`i — oH� F 0 2 (B)'1 2"W1 (D) SST 1 l� F02(B) w, ral) Fn2 \ 16"W1 (D) I \ CV \ LEI i OHE2 (C) iIle i /" / 16"W1 (C) / 12"W1 (D) I- - ABANDONED INVESTIGATION � LIMITS I UNABLE TO OPEN DUE TO TRAFFIC 16" W1 (C) E2 (B) \ � F02 (B) �I NO LINES I CONNECTING TO MH PER T--' CITY MAPS 16"W1 (D) I'L ® ANDREW R. LUCE ®e 110084 �® 10/21/2022 �40IFSSICENSE�' G a ��eIQNA PHOTO 1 JPS HOSPITAL EXISITING UTILITY PLAN JPS MOB Parking Garage top project JPS 22351 sheet 3 / IJ C 0 0 U .0 E U O Ld N Ln w 0 Ld + n C� �s 0O � 3 0_ �Q Lnco rM M N .. N 00 c/) LC) .e -F- N U cV N O •-n N 0� k CL N / IN, .. O H Ld Ld J F— �-qa LL o MATC - I revision by INVESTIGATION LIMITS INVESTIGATION - LIMITS N - A N 0 20 40 80 SCALE: 1" = 40" HOR. r--------------------------------------------------------------------------------------� LU > I W < Q H = > Z W o I > i _ 0 �. 1�— 2 I N N I F02 (B) W I 00 > o �I Z Q 1 Q 0 R I I o0(6 �� i it N LL- i U�' I� ° o ° W. MAGNOLIA AVE. T, 7_ � I T1 (B) J- a j 0 �'I I I CATV 1 (D) ---CATV1—C t o I I I W tN t N a 0 OO N ID O ' I teague nail and perkins, inc 5237 N. Riverside Drive, Suite 100 Fort Worth, Texas 76137 817.336.5773 ph 817.336.2813 fx www.tnpinc.com date TBPE: F-230; TBPLS: 10011600, 10011601, 10194381 scale ®®oF�aAo when bar is �P�E. rFk 0 p pP 1 inch long*`� r*Pd 0 '—40horiz 1 ® ANDREW R. LUCE ;'01 e c vert ®� 110084 �o 10/21/2022 N/A 4 "CENSV c,��s AUGUST 2022 ���os'soe®X JPS HOSPITAL EXIST. COMMUNICATION UTILITY PLAN (1 OF 2) JPS MOB Parking Garage tnp project JPS 22351 sheet 4 J C T� V N L) O Ld / I-- C LLI O Ld + =0) Ln C / L 00 � 3 0_ / Q In M N .. N CD (n Lo .e v/ + N U N N O •� N O \ k N .. O Ld Ld J F- I--qa LL o MATC-_IN- A �° revision O W. MORPHY ST, by date I \\p �X X PROFESSIONAL BLDG II �� ✓ X—X—X—X---y'- j %p O vc- W ° > O Q 000 CATV1 (B)O OAK « �> c� �» a I I El � I hit PROFESSIONAL BLDG. I I I p �X X� X X -X-X I — X — X X I X U O X — X 0 -7"-X-X-X-X-X-X-X-X-X-X-X-X-X-X X-X-X-XJ X X� X [] CI X F- X 0 X X f TARRANT COUNTY X E MEDICAL EXAMINER t X Fct X I u�� X I I � X x X X I FELIKS GWOZDZ PL T _ - - - O �- — - - - _ _ ��--------- ——7--------------------�— � fi CATV 1 (B) teague nail and perkins, inc 5237 N. Riverside Drive, Suite 100 Fort Worth, Texas 76137 817.336.5773 ph 817.336.2813 fx www.tnpinc.com TBPE: F-230; TBPLS: 10011600, 10011601, 10194381 INVESTIGATION LIMITS I I I I I I I > I \ I I I I I I I �F02 (B) I I I I � I scale ®® ®®®® when bar is �P�� OF 1 inch long �horiz ® ANDREW R. LUCE 1 =40 °o .... �m N/A 90� 0� 1 1 0084 � �1 0121 12022 11 F < ICENSEO G�- AUGUST 2022 �®®e 80 SCALE: 1 " = 40" HOR. I F02 (B)'�I F02 (B) FCC �. I I I �I SAT I ON JPS HOSPITAL EXIST. COMMUNICATION UTILITY PLAN (2 OF 2) JPS MOB Parking Garage top project JPS 22351 sheet 5 N 0 20 40 80 SCALE: 1 " = 40" HOR. -------------------------------------------------------------------------------------- I E 2 (B) ccm � of 8 W1 (D) > I 8 W1 (D) I 6"G1 (B) t� = I 0 INVESTIGATION Z o UP — — — LIMITS � � � O� � I I W I >J Nei IAA I Z I I Q ! Q —E1 (B) I L 12 W1 (C>_ I O — 1 o E1 (B) I �12" W1 (D) W1(C)❑ � /-12' � I I G1 PX I L - — E1 E1 W1 - --- W1 (D) ---- --1— �vi1 cy -- W1 (C) — — — — W1 (4 --- W1 (C) ----- W1 (C— -- W1 - I I W1 ( — — — — W1 (C) — — — T W1 (C) —MAGNO A—A-VE IV1 (D) — — — —�11 (D) — — — W1 (D) — — �N (D� - —I— W1 (D) i i e I �� 6 G1 (D) I o UJ Iw .� I � �.I � I 8 —__ - —, ldL G1 (D) - (� — — I' G1 (B) OO U � E 3 (B) o 11 _- �� I ,� _r I - V1 (D G1 (B) ni I c - - C ��' 12"W1 (D) I w -� ABANDONED LiJ I N C' r -C w I Q I I G1 (B) E1 (B> o J i E2 E 3 (B) W — j I E3 (B) I11 (D ) �, I❑ A E3(B) w 12" W1 (D) OHE1 (C) UNABLE TO OPEN i Q OUT OF SERVICE PER HOSPITAL N �E1 I.-M P I I o OHE1 (C) w I I w < II L � o (ED J r x n C 3 (B) - — 0 o I I � — _ I� � .3 E2 (B) I I E3 (B) o * I - � 0 � INVESTIGATION r' E3 ABANDONED- I I NI LIMITS I� P X �G1 (D) � i a I - — X . 0 N 00 MATC -IN A ee N U cV N O ' scale ®®®®00 tnp project O \ teague nail and perkins, inc when bar is �P�� of TF 900a JPS HOSPITAL L JPS 22351 1-1 IN,5237 N. Riverside Drive, Suite 100 1 inch long ®,rG' s*PP sheet Fort Worth, Texas 76137 horiz ®* ANDREW R. LUCE 1 •-40• ........ EXIST. WATER, GAS, & ELECTRIC UTILITY PLAN (1 of 2) 817.336.5773 ph 817.336.2813 fx vert®� 1 1008 4�® 1012112022 J www.tnpinc.com p <vP � p TBPE: F-230; TBPLS: 10011600, 10011601, 10194381 N/A 0I�A�SIONNS E®' � JPS MOB Parking Garage ono. revision by date AUGUST 2022®®®®®® J }C}-� V• N L a� 0 w 0 r- 0 LIJ V) / V) I--C w 0 w+ = 0) cn C / L oU) 0 3 / /Q � M M U-) N .. N CD N 0 0_ + N U CV N O •� N 0\ L � N .. O Lv W J �a LL \, no. revision 1 4_U 8 W 1 (D) PROFESSIONAL BLDG. 11611 FIRE LINE -I; BACKFLOW PREVENTER G1 (B) r W. MORPHY ST. — — — - I E OE �1 3" METERS'--- P 1 c� H - 18 G1 (B) Serviced by Solar Panels t �IEl W /. 12" W1 (C) 1 N w OL I II W1 (D 1 —I - — — PRosiYYeDc ( D ) ABANDONED— E1 (B) OE cL � I I 0 4" METER X -X-X X X OEX `X - -X—X X X _X_X X- X X- -X—X-J \. I I I X X ❑ E2 (B) mm �Xxl c> E3 — X . X _ - E 06Q q) X @ 1 f I 1 18 G 1 (B) TARRANT COUNTY X — MEDICAL EXAMINER J X \— cle 2 '1 by OE OE I-J, n --OHE1 (C) \ X �X X Jzt - X 1 2"W1 (C) FELIKS GWOZDZ PL. G1 (B) W1 (D — — — W1 (C) — — — — W1 (C) — — — — (C) — — — — W1 (C) — — — W1 (C) — ) 1 CW1 -..--------------------- - - - - - - - - - ----^-------- -�--- teague nail and perkins, inc 5237 N. Riverside Drive, Suite 100 Fort Worth, Texas 76137 817.336.5773 ph 817.336.2813 fx www.tnpinc.com date TBPE: F-230; TBPLS: 10011600, 10011601, 10194381 ol scale " when bar is 1 inch long horiz 1 "=401 vert N/A AUGUST 2022 6" G1 (B) INVESTIGATION LIMITS tnp N 0 20 40 80 W I t U -W I t U 1R1 IV — SCALE: 1 " = 40" HOR. I ors i 12111A11 (D) \ cal .16"W1 (D) i OHE2 (C) 16"W1 (C) 12"W1 (D) a ,-,-ABANDONED el / I / INVESTIGATION LIMITS I I I I I I I I I I I I I 16" W1 (C) I I 0 8" W1 (C) - E OHE1 (C) u w E2(B) I I I I I I I 16"W1 (D) m -�E. of rF94G9 ............................ ® ANDREW R. LUCEop s o ®e � 11 0084 �o� 1 0/21 /2022 d4i <jCENSV JPS HOSPITAL EXIST. WATER, GAS, & ELECTRIC UTILITY PLAN (2 of 2) JPS MOB Parking Garage tnp project JPS 22351 sheet 7 J 6"WW1 (B) 10"WW1 (B) -----------------------------------------------------------------------------------1 8 "WW1 (B) I 8 "WW1 (B) 8 "WW1 (D) o v � I W STM1 (D) 1 INVESTIGATION `� 1 LIMITS Q I 1 I I � I BSI I H 1 I I UNABLE TO Z OPEN COVERED I 1 BY ASPHALT I Q I I o N Th Ly I -I ° El I ° W. MAGNOLIA AVE. r 1 -- WWI (r — — STM 1 — — Ll e 7 c) C , 1 0"WW1 (B) — I �o c � L J I � 4 0 42"RCP STM I N 1 (D) I L N 0 Ln 1-1 w o w+ U) C o0 � 3 n N INVESTIGATION LIMITS i a I c� Ln o I N0 MATC— — On —IN I I (L.. + N 0" a)O 0 .-, N 0� k teague nail and perkins, inc CL N / IN, 5237 N. Riverside Drive, Suite 100 O Fort Worth, Texas 76137 .. .. 817.336.5773 ph 817.336.2813 fx w w J www.tnpinc.com �-qa Li- p `no. revision by date TBPE: F-230; TBPLS: 10011600, 10011601, 10194381 46"x60" ARCH 18 „PVC STM1 (B) STM1 (B) 611WW1 (B) —� — — — WWI (D) -- WW1 (D) -- 6"WW1 (D) L—STM1 (D) French Drains scale " when bar is 1 inch long horiz 1 "=40' vert N/A AUGUST 2022 --- STM1 (D)---- STM1 (D)-- FRENCH DRAIN tnp %I UNABLE TO �j OPEN DUE TO TRAFFIC// OF TFk V 0 �* vJ ® ANDREW R. LUCE O ® o ®� 110084 10/21/2022 �o 4ICENSV kqXoe®X I o N 0 20 40 80 SCALE: 1" = 40" HOR. 6"WW1 (D) JPS HOSPITAL EXIST. STORM DRAIN & WASTEWATER UTILITY PLAN (1 of 2) JPS MOB Parking Garage tnp project JPS 22351 sheet J 1 c N c .o L 0 E 0 V) L a� V) rn O LLI D V) / V) w 0 w+ V) C� /L o� 0 3 / /Q Lr)Ln M O N ee N 0-) N U-) ee 0) vJ + N U (V N O •' N 0� k CL N / IN, .. O W W J F— �-qa LL n ono. W. MORPHY ST. 0"WW1 (B) 4 2 " R C P STM1 (C) 21 "RCP STM1 (D) 4"PVC STM2 (D) I �I 8"WW1 (C) 54"RCP STM1 (B) —� I FRENCH DRAIN x x S rM FRENCH DRAIN 8 "WW2 (B) I CX � WW2 / c(-0 21 "RCP _ - o / STM1 (D) ° 4 "WW2 (D) 8"WW2 (B) UNABLE TO Iee � STM2 (D) OPEN I � I INVESTIGATION LIMITS UNABLE TO OPEN UNABLE TO — — STM2 (D) — — — STM2 (L) E I OPEN DUE TO C �x-xI I TRAFFIC x _X_X -X-X x X `x-x-X I —x—X—X—X—X—X- - - - - - x—xJ� X I , x ABANDONED o �8" STM1 (D) 4"WW2 (D) x I � t I— FRENCH DRAIN X GRATE INLET— X UNABLE TO u ROD I 1 10"WW1 (C) UNABLE TO o X! OPEN DUE TO X 8 WW1 (D) STM1 (D) S STM1 (D) TRAFFIC 1 x —WWI (C:)- - W 1 ((;)— — — —WW1 ((;)— — —Y W1 (C)— — — —WW1 (1) -- I---WW>�C) � � \ 1 �- WW1 )-- �FELIKS GWOZDZ PL. - �� 1 CONNECTING � - o �� II o L------- - (------------------- - ------ I -- ----i CI MH PER o -- ��-� -'�- ^ �- �- a CITY MAPS v n � 21 "RCP STM1 (D) 10"WW1 (C) 8 STM1 (D) o 0 6"WW1 (D) - 36"RCP �- 24"RCP „STM1(D) INVESTIGATION STM1 (D) 10 WW1 (D) LIMITS 8�� WW1 (D) �I teague nail and perkins, inc 5237 N. Riverside Drive, Suite 100 Fort Worth, Texas 76137 817.336.5773 ph 817.336.2813 fx www.tnpinc.com revision by date TBPE: F-230; TBPLS: 10011600, 10011601, 10194381 ol 10011 horiz 1 "=40' vert N/A AUGUST 2022 scale when bar is 1 inch long . . .. .... ......... ANDREW R. LUCE 0 o®o? 110084 6. �® 10/21/2022 69V�_ ®' � ea tnp N 0 20 40 80 SCALE: 1" = 40" HOR. JPS HOSPITAL EXIST. STORM DRAIN & WASTEWATER UTILITY PLAN(2 OF 2) JPS MOB Parking Garage tnp project JPS 22351 sheet z I ♦ / GR-01 60 00 Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH PARKWAY & PEDESTRIAN LIGHT IMPROVEMENTS TO SERVE JPS PARKING GARAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 106001 Revised July 1, 2011 CFW Lighting Approved Products List CFW Product Name Manufacturer I Manufacturer Product Name & Description Residential -Standard MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Makers Sales and Marketing, LLC Galvanized MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Type 11 Pole Makers Sales and Marketing, LLC Black DB01373(page 1 of 6)-Shoe Base Pole Type 11, Valmont Industries, Inc Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Black Type 33B Arm Valmont Industries, Inc D1301373(page 4 of 6)-Single Arm Type 33B, Galvanized American Electric Lighting, ATBO-P101-Mvolt-R2-3K- Acuity Brands Lighting, Inc. MP-NL-P7-AO-RFD325607 American Electric Lighting, ATBO-P101-Mvolt-R4-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD325606 Residential Luminaire American Electric Lighting, ATBO-P101-Mvolt-R2-3K-BK- Acuity Brands Lighting, Inc. MP-NL-P7-AO-RFD325609 American Electric Lighting, ATB0-P101-Mvolt-R4-3K-BK- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD325608 McFarland Cascade CREOSOTE 30/35 FOOT TIMBER POLE Timber Pole Bayou Forest Products 30-35' .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Galvanized Wood Pole Arm Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Black Valmont Industries, Inc DB01373(page 6 of 6)-Wood Pole Arm, Galvanized Arterial -Standard MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Makers Sales and Marketing, LLC Galvanized MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Type 18 Pole Makers Sales and Marketing, LLC Black DB01373(page 2 of 6)-Shoe Base Pole Type 18, Valmont Industries, Inc Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Black Type 33A Arm Valmont Industries, Inc D1301373(page 3 of 6)-Single Arm Type 33A, Galvanized American Electric Lighting, ATBO-P303-Mvolt-R2-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322792 American Electric Lighting, ATBO-P303-Mvolt-R4-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322794 Arterial Luminaire American Electric Lighting, ATBO-P303-Mvolt-R2-3K-BK- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322793 Acuity Brands Lighting, Inc. American Electric Lighting, ATBO-P303-Mvolt-R4-3K-BK- M P-N L-P7-AO-RFD322795 McFarland Cascade CREOSOTE 35/40 FOOT TIMBER POLE Timber Pole Bayou Forest Products 30-35' .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Galvanized Wood Pole Arm Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Black Valmont Industries, Inc DB01373(page 5 of 6)-Wood Pole Arm, Galvanized Decorative -Pedestrian Holophane, CLA 10.6(OAL)FT J20P07BK-MOD, AB-31-4 Washington 10' Pole Acuity Brands Lighting, Inc. RFD110736 Holophane, CLA14FT J20DMODC03BK RFD325026, AB- Washington 14' Pole Acuity Brands Lighting, Inc. 16-4 SPEC RFD325026 Holophane, WFCL3 P40 30K MVOLT FC3 NF BK AO PR7 Washington Luminaire Acuity Brands Lighting, Inc. FRGL RFD338699 Washington Globe Holophane, AWDE3 P40 30K MVOLT MS AL3 BK PR7 Luminaire Acuity Brands Lighting, Inc. AO RFD-315548 Oleander Type A Pole Acuity Brands Lighting, Inc. Holophane, PDA 12S5L20POBBK-MOD Oleander Type B Pole Acuity Brands Lighting, Inc. Holophane, PDA20S5L20P08BK-MOD Oleander Type B Arm Acuity Brands Lighting, Inc. Holophane, OHC 151N 2A TN BK Holophane, AUCL2 P40 30K AS BK L3 N P7 AO Oleander Luminaire Acuity Brands Lighting, Inc. RFD338741 Berry 12' Pole Acuity Brands Lighting, Inc. Holophane, RSA 12 50 G12 SC BK AB-26-4 RFD326400 Berry 20' Pole Acuity Brands Lighting, Inc. Holophane, PD20S5J20P11BK RFD338816 Berry Arm Acuity Brands Lighting, Inc. Holophane, VLC 271N 1A TN QSM BK Holophane, GPLF3 P40 30K MVOLT ASY QSM BK PR7 Berry Luminaire Acuity Brands Lighting, Inc. AO SH Banner Arms Acuity Brands Lighting, Inc. Holophane, BA-241N-2A-CO-S4J-BL-075P-BK System Rigid Nonmetallic Schedule 80 Conduit, Meets UL 651 Cantex Inc. specifi cations and NEMA TC2, Rated for 90°C Cable, Sunlight Resistant, 10' Lengths and 20' lengths Rigid Nonmetallic Schedule 80 Electric Conduit, Meets UL 651 specifications, RUS listed, NEMA TC-2 and Heritage Plastics NEMA TC-3, Rated for 90°C Cable, Sunlight & Weather Conduit Resistant PVC Rigid Schedule 80 Conduit, Conforms to UL 651 Atkore-Heritage Plastics and NEMA TC 2, Sunlight Resistant, Listed for 90°C conductors or cable Schedule 80 PVC Rigid Nonmetallic Conduit, Extra Prime Conduit, Inc Heavy Wall EPC-80, Sunlight resistant, Rated for use with 90°C conductors, Meets UL651 Splice Kit With Connector NSi Industries, LLC Gel Stub Splice Kit with Connector, Easy -Splice, ESSLK Series Copper Wire/Conductor Southwire Encore Wire Encore Wire Service Wire Co Advanced Digital Cable Inc Aluminum Wire -Triplex Priority Wire & Cable, Inc Fuse & Fuse Holder Edison Edison Cooper EATON EATON Connector Thomas & Betts Metered Pedestal 120-240V Electrol Systems, Inc WE Manufacturing & Controls Metered Pedestal 240- Electrol Systems, Inc 480V WE Manufacturing & Controls Ground Box Kearneys Photocell Shorting Caps MacLean Highline Oldcastle Type XHHW-2 copper conductor, 600V TYPE XHHW-2 / RW90, copper conductor, Superslick Elite, 600V/1000V THHN / MTW / THWN-2 Copper conductor, 600V Servicepro-X XHHW-2, 600/1,000 Volt Copper, CT Rated XHHW-2 Low Smoke Halogen Free, Cross -linked Polyethylene Insulated 14 AWG-750 MCM, 600 Volts, 90°C Dry and wet Triplex Overhead Aluminum Conductor General Purpose, Midget Class MEN Fuses, Voltage Rating: MEN - 250 VAC, Ampere Rating: 0.5 - 30 Amps, Interrupting Rating: 10,000 RMS Amps @ 125V Modular Ferrule Fuse Blocks for Midget Class and CC Fuses In -line fuse holders for Single -Pole 13/32" x 1 1/2" Fuses HEB-AA Bussmann Series, HEB breakaway and non -breakaway in -line fuse holders for UL 13/32" x 1- 1/2"supplemental fuses Bussmann Series, FNM 13/32" x 1-1/2- 250Vac time - delay supplemental fuses Wire Joints for Copper Conductor, Cat No: 54615, 54620, 54625-TB, 54635, 54640, 54630 TY A (120/240) 100(NS)AL(E)PS(U) TY A 120/240 100(NS)AL(E)PS(U) TY A (240/480) 100(NS)AL(E)PS(U) TY A 240/480 100(NS)AL(E)PS(U) Polymer Concrete, PHA132412X0002: TIER 22 (X) 22, 500lbs Polymer Concrete, H-SERIES UNIT, H1730-24 TIER-22 - TXDOT 2x 1/2" CAPTIVE BOLT - 2x BRASS FLOATING NUT Polymer Concrete, H-SERIES UNIT, H1324-24 TIER-15 - Oldcastle TXDOT 2x 1/2" CAPTIVE BOLT- 2x BRASS FLOATING NUT NSi Industries, LLC Split Bolt Connectors, Copper Split Bolts 2 Wire, N Series Dark To Light, DLL Elite, Electronic Locking, Type Acuity Brands Lighting, Inc. Photocontrol, DLL-127 or DLL-480 Acuity Brands Lighting, Inc. Dark To Light, Part # DSHORT SBK U Interim Products Residential Luminaire I TRASTARINC. IDURA-STR25-3K-120-3-GR-SCL DURA-STR10A-3K-120-3-GR-SCL Arterial Luminaire TRASTARINC. FORT ORUL CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 Illrrrrr Attention: Mix Designs do not sui2ersede CFW Si2ecifications IIIIIIIIII Spec No. Classification Manufacturer Mix 11) Mix l)—ription Design strength'a 28,1.1, s DesignApproval Concrete Class A (S dewalk, ADA Ramps, Driveways, Curb/Gutter, Median Pavement) 9/9/2022 32 13 20 Mix Desp American Concrete Company 30CAF029 3000 psi 3-5" Slump; 3-6% Air 4/3/2025 32 13 20 Mix Design Big Town Concrete 2211 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix DesP Bumco Texas 30U101AG 3000 psi 3-5" Slump; 3-6% Air 4/1/2024 32 13 20 Mix Design Borneo Texas 30U500BG 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desp Carder Concrete FWCC502001 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desl1F Carder Concrete FWCC502021 3500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Des1P Chisholm Trail Redi Mix C 13020AE 3000 psi 3-5" Slump; 4.5-7.5% Air 4/28/2025 32 13 20 Mix Desl1F Chisholm Trail Redi Mix CT6020A 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Des1P City Concrete Company 30HA20II 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desl1F Cow Town Redi Mix 253-W 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Des1P Cow Town Redi Mix 250 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Des11F Cow Town Redi Mix 350 3000 psi 3-5" Slump; 3-6% Air 1/29/2024 32 13 20 Mix Des1P Estrada Ready Mix R3050AEWR 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Des11F He an - SOR, Inc. 1261 3000 psi 3-5" Slump; 3-6% Air 9/23/2024 32 13 20 Mix Des1P Holcim - SOR, Inc. 5177 3000 psi 3-5" Slump; 3-6% Air 5/8/2025 32 13 20 Mix Desli p Holum - SOR, Inc. 530WA-TI 3000 psi 3-5" Slump; 3-6% Air 4/7/2023 32 13 20 Mix Des Liquid Stone C301D 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desli p Martin Marietta R2136214 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Deswon Martin Marietta R2136014 3000 psi 3-5" Slump; 3-6% Air 4/l/2023 32 13 20 Mix Desp Martin Marietta R2136N14 3000 psi 3-5" Slump; 3-6% Air 6/l/2023 32 13 20 Mix Design Martin Marietta R2136R20 3000 psi 3-5" Slump; 3-6% Air 6/l/2023 32 13 20 Mix Desp Martin Marietta R2136N20 3000 psi 3-5" Slump; 3-6% Air 11/2/2022 32 13 20 Mix Design Martin Marietta R2141K24 4000 psi 3-5" Slump; 3-6% Air 4/7/2023 32 13 20 Mix Desp Martin Marietta R2136KI4 3000 psi 3-5" Slump; 3-6% AQ 9/9/2022 32 13 20 Mix Design Martin Marietta R2131314 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desp Martin Marietta R2132214 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Martin Marietta D9490SC 3000 psi 3-5" Slump; 4.5-7.5% Air 5/9/2025 32 13 20 Mix Desp Martin Marietta R2136R14 3000 psi 3-5" Slump; 3-6% Air 10/4/2023 32 13 20 Mix Design NBR Ready Mix CLS A-YY 3000 psi 3-5" Slump; 3-6% Air 10/4/2023 32 13 20 Mix Desp NBR Ready Mix CLS A -NY 3000 psi 3-5" Slump; 3-6% Air 7/10/2023 32 13 20 Mix Design Dab— 3OA50MR 3000 psi 3-5" Slump; 3-6% Air 1/18/2023 32 13 20 Mix Desp Rapid Redi Mix RRM5020A 3000 psi 3-5" Slump; 3-6% Air 1/24/2023 32 13 20 Mix Design Rapid Redi Mix RRM5525A 3600 psi 3-5" Slump; 3-6% Air 10/24/2024 32 13 20 Mix Desp SRM Concrete 30850 3000 psi 3-5" Slump; 3-6% Air 10/24/2024 32 13 20 Mix Design SRM Concrete 30350 3000 psi 3-5" Slump; 3-6% Air 10/18/2024 32 13 20 Mix Desp SRM Concrete 30050 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Tarrant Concrete FW5025A 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desp Tarrant Concrete CP5020A 3000 psi 3-5" Slump; 3-6% Air 10/10/2022 32 13 20 Mix Design Tarrant Concrete TCFW5020A 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desp Tarrant Concrete FW5525A2 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Titan Ready Mix 3020AE 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design True Grit Redi Mix 0250.230 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design True Grit Redi Mix 0250.2301 3000 psi 3-5" Slump; 3-6% Air Class CIP "Inlets, Manholes, Junction Boxes, Encasement, Blocldn�, Collars, (Spread Footing Pedestal Pole Foundations (Reference Detail 34 41 10-D605A) 9/9/2022 3213 13 : Mix Des tt American Concrete Company 40CNF065 4000 psi 3-5" Slump; 0-3% Air 9/9/2022 3213 13 : Mix Design Borneo Texas 40U500BG 4000 psi 3-5" Slump; 3-6% Air 4/28/2025 32 13 20 : Mix Desp Chisholm Trail Redi Mix CT6020A 3600 psi 3-5" Slump; 3-6% Air 4/28/2025 32 13 20 Mix Design Chisholm Trail Redi Mix CTFW5520A 3600 psi 3-5" Slump; 3-6% Air 4/28/2025 32 13 20 Mix Desp Chisholm Trail Redi Mix CTF W6020A 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 255-2 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 355 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 255 3500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 270 5000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 370 5000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 353 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 257 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 357 3600 psi 3-5" Slump; 3-6% Air 5/7/2025 3213 13 Mix Design Cow Town Redi Mix 265-42 4200 psi 3-5" Slump; 3-6% Air 2/7/2025 3213 13 Mix Desp Holcim - SOR, Inc. 1701 4000 psi 3-5" Slump; 3-6% Air 2/7/2025 3213 13 Mix Design Holcim- SOR, hic. 1551 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Holchn - SOR, Inc. 5409 4000 psi 3-5" Slump; 3-6% Air 4/27/2023 3213 13 Mix Design Liquid Stone C361DNFA 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Martin Marietta R2141230 4000 psi 3-5" Slump; 3-6% Air 8/4/2023 3213 13 Mix Design Martin Marietta R2141R24 4000 psi 3-5" Slump; 3-6% Air Page 1 of 6 FORT ORUL CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 s Illrrrrr Attention: Mix Designs do not supersede CFW S ecifications 11 MIM Spec No. Classification Manufacturer Nli, 11) Nli, D—ription Design strength'a 28,1.1, s DesignApproval ...Concrete (Continues) 11/20/2023 32 13 13 Mix Design Martin Marietta R2146R33 4000 psi 3-5" Slump; 3-6% Air 11/20/2023 3213 13 Mix Design Martin Marietta R2146K33 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2142233 3600 psi 3-5" Slump; 4.5-7.5% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2136224 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2141233 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2146038 4500 psi 3-5" Slump; 3-6% Air 10/24/2024 3213 13 Mix Design Martin Marietta R2146K34 4000 psi 3-5" Slump; 3-6% Air 5/5/2025 3213 13 Mix Design Martin Marietta R2146R35 4000 psi 3-5" Slump; 3-6% Air 5/5/2025 33 13 13 Mix Design Martin Marietta R2146K35 4000 psi 3-5" Slump; 3-6% Air 5/5/2025 33 13 13 Mix Design Martin Marietta R2146N33 4000 psi 3-5" Slump; 3-6% Air 9/12/2023 3213 13 Mix Design NBR Ready Mix CLS PI-YY 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design NBR Ready Mix TX C-YY 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design NBR Ready Mix TX C-NY 3000 psi 3-5" Slump; 3-6% Air 1/18/2023 3213 13 Mix Design Rapid Redi Mix RRM5320A 3000 psi 3-5" Slump; 3-6% Air 1/18/2023 3213 13 Mix Design Rapid Redi Mix RRM6020ASS 4000 psi 3-5" Slump; 3-6% Air 10/24/2024 3213 13 Mix Design SRM Concrete 40350 4000 psi 3-5" Slump; 3-6% Air 10/24/2024 3213 13 Mix Design SRM Concrete 40850 4000 psi 3-5" Slump; 3-6% Air 9/16/2024 3213 13 Mix Design SRM Concrete 35050 3500 psi 3-5" Slump; 3-6% Air 4/28/2025 3213 13 Mix Design SRM Concrete 36850 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete FW5320A 3000 psi 3-5" Slump; 3-6% Air 10/10/2022 3213 13 Mix Design Tarrant Concrete TCFW6025A2 4000 psi 3-5" Slump; 3-6% Air Class C (Drilled Shaft for Traffic Signal Pole Foundations teference Detail 314 10-D605) 9/9/2022 3213 13 Mix Design Bumco Texas 36U500BG 3600 psi 5.5-7.5" Slump; 3-6% Air 6/21/2023 3213 13 Mix Design Cow Town Redi Mix 360-DS 3600 psi 5.5-7.5" Slump; 3-6% Air 10/30/2024 3213 13 Mix Design Estrada Ready Mix R36575AEWR 3600 psi 5.5-7.5" Slump; 3-6% Air 12/5/2022 3213 13 Mix Design Holchn - SOR, Inc. 1822 3600 psi 5.5-7.5" Slump; 0-3% Air 9/9/2022 3213 13 Mix Design Holcim - SOR, Inc. 1859 4000 psi 5.5-7.5" Slump; 3-6% Air 4/7/2023 3213 13 Mix Design Liquid Stone C361DHR 3600 psi 5.5-7.5" Slump; 3-6% Air 6/27/2023 3213 13 Mix Design Martin Marietta U2146N41 3600 psi 5-7" Slump; 3-6% Air 6/27/2023 3213 13 Mix Design Martin Marietta U2146K45 3600 psi 5-7" Slump; 3-6% Air 5/9/2025 2 13 13 Mix Design Martin Marietta U2146R41 3600 psi 5-7" Slump; 3-6% Air 8/22/2024 3213 13 Mix Design NBR Ready Mix 135K2524 3600 psi 5.5" Slump; 3-6% Air 8/22/2024 32 13 13 Mix Design NBR Ready Mix 135KO524 3600 psi 5.5" Slump; 3-6% Air Class C (Headwalls, Wing wills, Culverts) 9/9/2022 3213 13 Mix Design Carder Concrete FWCC602001 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design City Concrete Company 40LA2011 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 260-2 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 360-1 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 260-1 3600 psi 3-5" Slump; 3-6% Air 1/29/2024 3213 13 Mix Design Estrada Ready Mix R3655AEWR 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp GCH Concrete Services GCH4000 4000 psi 3-5" Slump; 3-6% Air 4/l/2023 3213 13 Mix Design Martin Marietta 310LBP 3600 psi 3-5" Slump; 4-7% Air 8/30/2023 3213 13 Mix Desp Martin Marietta R2141R30 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2146035 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp SRM Concrete 40050 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design SRM Concrete 35022 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete FW6020A2 4000 psi 3-5" Slump; 3-6% Air Class P (A achine Placed Pav ng) 4/3/2025 3213 13 Mix Desp Bw Town Concrete 4511 3600 psi 1-3" Slump; 3-6% Air 4/3/2025 3213 13 Mix Design Big Town Concrete 4411 3600 psi 1-3" Slump; 3-6% Air 6/30/2025 3213 13 Mix Desp Bw Town Concrete 5211 With 20% Fly Ash 4000 psi 1-Y Slump; 3-6% Air 6/30/2025 3013 13 Mix Design Big Town Concrete 52113 With 30% slag 4000 psi 1-3" Slump; 3-6% Air 6/30/2025 3013 13 Mix Desp Big Town Concrete 5311 4000 psi 1-3' Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Carder Concrete FWCC552091 3600 psi 1-3" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Carder Concrete FWCC602091 4000 psi 1-Y Slump; 3-6% Air 9/9/2022 3213 13 Mix Design City Concrete Company 36LA2011 3600 psi 1-3" Slump; 3-6% Air 9/9/2022 33 13 13 Mix Desp Cow Town Redi Mix 257-M 3600 psi 1-3" Slump; 3-6% Air 11/14/2022 3213 13 Mix Design Cow Town Redi Mix 357-M 3600 psi 1-3" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 260-M 4000 psi 1-3" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 360-M 4000 psi 1-3" Slump; 3-6% Air 2/6/2024 3213 13 Mix Desp Estrada Ready�Mix TD3655AEWR 3600 psi 1-Y Slump; 3-6% Air 5/20/2025 3213 13 Mix Design Gilco Contracting hrc 36MP1643 3600 psi 1-3" Slump; 3-6% Air 6/20/2025 3213 13 Mix Design Gilco Contracting htc 36MP1629 3600 psi 1-Y Slump; 3-6% Air 5/12/2025 3213 13 Mix Design Holcim - SOR, Inc. 1703 4000 psi 1-3" Slump; 3-6% Air 8/4/2023 3213 13 Mix Design Martin Marietta Q214IR27 4000 psi 1-3" Slump; 3-6% Air 11/2/2022 3213 13 Mix Design Martin Marietta Q214IK30 4000 psi 1-3" Slump; 3-6% Air Page 2 of 6 FORT ORUL CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 s !!liar! Attention: Mix Designs do not supersede CFW S ecifications 1111A1111 Spec No. Classification Manufacturer Nli, 11) Nli, D—ription Design strcrigtli'a 28dal, s DesignApproval ...Concrete (Continues) 5/5/2025 32 13 13 Mix Design Martin Marietta Q214IN27 4000 psi 1-3" Slump; 3-6% Air 10/4/2023 3213 13 Mix Design NBR Ready Mix TX C SF-YY 3600 psi 1-3" Slump; 3-6% Air 10/4/2023 32 13 13 Mix Design NBR Ready Mix TX C SF -NY 3600 psi 1-3" Slump; 3-6% Air 10/24/2024 3213 13 Mix Design SRM Concrete 40068 4000 psi 1-3" Slump; 3-6% Air 10/24/2024 32 13 13 Mix Design SRM Concrete 40825 4000 psi 1-3" Slump; 3-6% Air 9/16/2024 3213 13 Mix Design SRM Concrete 40025 4000 psi 1-3" Slump; 3-6% Air 10/18/2024 3213 13 Mix Design SRM Concrete 35023 3600 psi 1-3" Slump; 3-6% Air 6/5/2025 3213 13 Mix Design SRM Concrete 40324 4000 psi 1-3" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete FW5520AMP 3600 psi 1-3" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design True Grit Redi Mix 0255.2301 3600 psi 1-3" Slump; 3.5-6.5% Air 9/9/2022 3213 13 Mix Design True Grit Redi Mix 0260.2302 4000 psi 1-3" Slump; 3.5-6.5% Air 6/17/2025 3213 13 Mix Design True Grit Redi Mix 460.230M 4000 psi 1-3" Slump; 3-6% Air 6/23/2025 3213 13 Mix Design True Grit Redi Mix 360.230M 4000 psi 1-3" Slump; 3-6% Air Class H (E and Placed Paving, Valley Gutter) 9/9/2022 3213 13 Mix Design American Concrete Company 45CAF076 4500 psi 3-5" Slump; 3-6% Air 5/2/2023 3213 13 Mix Design Big D Concrete CM14520AE 4500 psi 3-5" Slump; 3-6% Air 4/3/2025 3213 13 Mix Design Big Town Concrete 6211 4500 psi 3-5" Slump; 3-6% Air 4/3/2025 3213 13 Mix Design Big Town Concrete 6311 4500 psi 3-5" Slump; 3-6% Air 4/5/2025 3213 13 Mix Design Big Town Concrete 6017 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Burneo Texas 45U500BG 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Carder Concrete FWCC602021 4500 psi 3-5" Slump; 3-6% Air 4/28/2025 3213 13 Mix Design Chisholm Trail Redi Mix CTFW6520A 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design City Concrete Company 45NA20II 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 265 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 365 4500 psi 3-5" Slump; 3-6% Air 1/29/2024 3213 13 Mix Design Estrada Ready Mix R4560AEWR/ 4500 psi 3-5" Slump; 4-6% Air 9/9/2022 3213 13 Mix Design GCH Concrete Services GCH4500 4500 psi 3-5" Slump; 3-6% Air 5/20/2025 3213 13 Mix Design Gilco Contracting Inc 45HP1643 4500 psi 3-5" Slump; 3-6%Air 6/20/2025 3213 13 Mix Design Gilco Contracting Inc 45HP1629 4500 psi 3-5" Slump; 3-6%Air 10/4/2024 3213 13 Mix Design Holcim - SOR, Inc. 5507 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Helena - SOR, Inc. 1851 4500 psi 3-5" Slump; 3-6% Air 5/8/2025 3213 13 Mix Design Holcim - SOR, Inc. 545WA-TI 4500 psi 3-5" Slump; 3-6% Air 4/5/2025 3213 13 Mix Design Liquid Stone C451D 4500 psi 3-5" Slump; 3-6%Air 11/2/2022 3213 13 Mix Design Martin Marietta R2146N35 4500 psi 3-5" Slump; 3-6% Air 8/4/2023 3213 13 Mix Design Martin Marietta R2146R36 4500 psi 3-5" Slump; 3-6% Air 11/2/2022 3213 13 Mix Design Martin Marietta R2146N36 4500 psi 3-5" Slump; 3-6% Air 5/22/2023 3213 13 Mix Desp Martin Marietta R2146K37 4500 psi 3-5" Slump; 3-6% Air 12/22/2023 3213 13 Mix Design Martin Marietta R2146R44 4500 psi 3-5" Slump; 3-6% Air 12/22/2023 3213 13 Mix Desp Martin Marietta R2146K44 4500 psi 3-5" Slump; 3-6% Air 11/15/2022 3213 13 Mix Design Martin Marietta R21461`36 4500 psi 3-5" Slump; 3-6% Air 11/15/2022 3213 13 Mix Desp Martin Marietta R2146K36 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2147241 4500 psi 3-5" Slump; 4.5-7.5% Air 9/9/2022 3213 13 Mix Desp Martin Marietta R2146236 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2146036 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Martin Marietta R2146242 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2146042 4500 psi 3-5" Slump; 3-6% Air 6/3/2025 3213 13 Mix Desp Martin Marietta R2146K43 4500 psi 3-5" Slump; 3-6% Air 10/4/2023 3213 13 Mix Design NBR Ready Mix CLS P2-YY 4500 psi 3-5" Slump; 3-6% Air 10/4/2023 3213 13 Mix Desp NBR Ready Mix CLS P2-NY 4500 psi 3-5" Slump; 3-6% Air 7/10/2023 3213 13 Mix Design Osbum 45A60MR 4500 psi 3-5" Slump; 3-6% Air 1/24/2023 3213 13 Mix Desp Rapid Redi Mix RRM6320AHP 4500 psi 3-5" Slump; 3-6% Air 2/7/2025 3213 13 Mix Design SRM Concrete 45023 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp SRM Concrete 45000 4500 psi 3-5" Slump; 3-6% Air 5/23/2025 3213 13 Mix Design SRM Concrete 45300 4500 psi 3-5" Slump; 3-6% Air 10/24/2024 3213 13 Mix Desp SRM Concrete 45350 4500 psi 3-5" Slump; 3-6% Air 10/24/2024 3213 13 Mix Design SRM Concrete 45850 4500 psi 3-5" Slump; 3-6% Air 10/18/2024 3213 13 Mix Desp SRM Concrete 45050 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete FW6020AHP 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Tarrant Concrete FW60AHP 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete TCFW6020AHP 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Titan Ready Mix TRC4520 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design True Grit Redi Mix 0260.2301 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp True Grit Redi Mix 0265.2301 4500 psi 3-5" Slump; 3.5-6.5% Air 9/9/2022 3213 13 Mix Design True Grit Redi Mix 270.230 4500 psi 3-5" Slump; 3-6% Air 6/12/2025 3213 13 Mix Design True Grit Redi Mix 465.230H 4500 psi 3-5" Slump: 3-6% Air 6/23/2025 3213 13 Mix Design True Grit Redi Mix 365.230H 4500 psi 3-5" Slump: 3-6% Air 10/9/2024 3213 13 Mix Design Wildcatter 4520AI 4500 psi 3-5" Slump; 3-6% Air Page 3 of 6 FORTWORTH., CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 !!!!!!!! Attention; Mix Designs do not sui2ersede CFW S ecifications !!!!!!!!!! Spec No. C11—iti'ation Manufacturer Nli, 11) Nli, l)—ription Design Strength if, 28 da� s DesignApproval Class HES (High Early Stren^th Paving) 9/9/2022 3213 13 Mix DesP Big D Concrete 14500AE 4500 psi 3-5" Slump; 3-6 % Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 370-INC 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix DesP Cow Town Redi Mix 375-NC 5000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 370-NC 4500 psi 3-5" Slump; 3-6% Air 1/18/2023 3213 13 Mix DesP Cow Town Redi Mix 380-NC 4500 psi 3-5" Slump; 3-6% Air 1/29/2024 3213 13 Mix Design Estrada Ready Mix 4575AESC 4500 psi / 3000 psi (a) 3 days 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Holcim - SOR, Inc. 2125 5000 psi 3-5" Slump; 3-6% Air ...Concrete �Confinues) 1/24/2023 3213 13 Mix Design Liquid Stone C451DHR-A 4500 psi 3-5" Slump; 3-6% Air 4/7/2023 3213 13 Mix Design Martin Marietta R2161K70 6000 psi / 3000 psi (a, 24hr. 3-5" Slump; 3-6% Air 2/10/2023 3213 13 Mix Design SRM Concrete 50310 5000 psi 3-5" Slump; 3-6% Air 2/7/2025 3213 13 Mix Design SRM Concrete 40326 4500 psi / 3000 psi (a) 3 days 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete FW6520AMR 4500 psi / 3000 psi @ 3 days 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete FW7520AMR 4500 psi / 3000 psi P 3 days 3-5" Slump; 3-6% Air Class S (Bridle Slabs, Top SI-tbs of Direct Traffic Culverts, Approach Slabs) 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 260 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 360 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 365-STX 4000 psi 3-5" Slump; 3-6% Air 1/29/2024 3213 13 Mix Design Estrada Ready Mix R4060AEWR 4000 psi 4-6" Slump; 3-6% Air 5/3/2023 3213 13 Mix Design Martin Marietta M7842344 4000 psi 3-5" Slump; 4.5-7.5% Air 4/l/2023 3213 13 Mix Design Martin Marietta R2146P33 4000 psi 3-5" Slump; 3-6% Air 4/15/2024 3213 13 Mix Design NBR Ready Mix TX S-NY 4000 psi 3-5" Slump; 3-6% Air 4/15/2024 3213 13 Mix Design NBR Ready Mix TX S-YY 4000 psi 3-5" Slump; 3-6% Air 4/5/2025 3213 13 Mix Design SRM Concrete 40850 4000 psi 3-5" Slump; 3-6% Air 4/5/2025 3213 13 Mix Design SRM Concrete 40350 4000 psi 3-5" Slump; 3-6% Air 5/5/2023 3213 13 Mix Design SRM Concrete D100008553CB 4000 psi 3-5" Slump; 3-6% Air Concrete Base Trench Repair 4/1/2023 03 34 16 1033416 (Mix Design IBumco Texas IOYH50BF I 1000 psi (Flowable; 8.5-11.5%Air 9/9/2022 03 34 16 Mix Design Bumco Texas 08Y450BA 800 psi 5-7" Slump; 3-6% Air Controlled Low Strength Ma'erial (Flowable Fill) 2/7/2025 03 34 13 Mix Design Bumco Texas OIY690BF 100 psi Flowable; 9.5-11.5% Air 5/19/2025 03 34 13 Mix Design Borneo Texas OIZ180AF 100 psi Flowable; 9.5-11.5%Air 9/9/2022 03 34 13 Mix Design Carder Concrete FWCC359101 50-150 psi 3-5" Slump; 8-12% Air 9/9/2022 03 34 13 Mix Design Carder Concrete FWFF237501 50-150 psi Flowable; 8.5-11.5% Air 9/9/2022 03 34 13 Mix Design City Concrete Company 11-350-FF 50-150 psi Flowable; 8-12%Air 9/9/2022 03 34 13 Mix Desp Cow Town Redi Mix Mix# 9 70 psi 7-9" Slump; 8-11 % Air 5/12/2025 03 34 13 Mix Design Holcirn - SOR, Inc. 3741 100 psi Flowable; 12.0-24.0% Air 10/4/2023 03 34 13 Mix Desp NBR Ready Mix FTW FLOW FILL 150 psi 7-10" Slump; 8-12% Air 2/7/2025 03 34 13 Mix Design SRM Concrete 910 150 psi Flowable; 8-12% Air 9/9/2022 03 34 13 Mix Design Tarrant Concrete FWFF150CLSM 50-150 psi Flowable; 8-12%Air Concrete Rip Rap 4/l/2023 I31 37 00 (Mix Design (Martin Marietta R2141030 I 4000 psi I3-5" Slump; 3-6%Air 4/l/2023 31 37 00 Mix Design Martin Marietta R2146033 4000 psi 3-5" Slump; 3-6% Air AShalt Paving 9/9/2022 32 12 16 Mix Design Austin Asphalt FT5B117965 FT5B117965 PG64-22 Type B Fine Base 9/9/2022 321216 Mix Desp Austin Asphalt FTIIB139965 FT1B139965 PG64-22 Type B Fine Base 9/9/2022 321216 Mix Design Austin Asphalt FT1B117.2 FTIB 117.2 PG64-22 Type B Fine Base 5/l/2024 32 12 16 Mix Desp Reynolds Asphalt 340-DG-B P 340-DG-B PG64-22 Type B Base Course 9/9/2022 32 12 16 Mix Design Reynolds Asphalt 1112B 1112B PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Desp Reynolds Asphalt 1612B 1612B PG64-22 Type B Fine Base 4/4/2025 32 12 16 Mix Design Reynolds Asphalt 2315B 2315B PG64-22 Type B Fine Base 12/5/2022 33 1216 Mix Desp Supmount Paving 3076BV6422 3076BV6422 PG62-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Surmount Paving 341-BRAP6422ERG 341-BRAP6422ERG PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Desp TXBIT 37-211305-20 37-211305-20 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 44-211305-17 44-211305-17 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Desp TXBIT 211305 (1757) 211305 (1757) PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 64-224125-18 PG 64-224125-18 PG70-22 Type D Fine Surface 4/l/2024 32 12 16 Mix Design TXBIT 344 MAC-SP-D 70-22XR 344 MAC-SP-D 70-22XR SAC A-R Type D Fine Surface Detectable Warning Surface 9/9/2022 32 13 20 DWS - Pavers Pine Hall Brick (Winston Salem, NC) Tactile Pavers 9/9/2022 32 13 20 DWS - Pavers Western Brick Co. (Houston, TX) Detectable Warning Pavers 9/9/2022 32 13 20 DWS - Composite Armor Tile 9/9/2022 32 13 20 DWS - Composite ADA Solutions (Wilmington, MA) Heritage Brick CIP Composite Paver 4/7/2023 32 13 20 DWS - Pavers ADA Solutions (Wilmington, MA) Detectable Warning Pavers Page 4 of 6 FORT ORUL. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 !!!!!!!! Attention, Mix Designs do not supersede CFW S ecifications 11111!!111 Approval Spec No. Classification Manufacturer Nli, 11) Nli, D—ription 1 Design Silicone Joint Sealant 9/9/2022 13 73 Joint Sealant Dow 890SL 890SL - Cold Applied, Si a Component, Silicone Joint Sealant ASTM D5893 9/9/2022 32 13 73 Joint Sealant Tremco 900SL 900SL - Cold Applied, Sing a Component, Silicone Joint Sealant ASTM D5893 9/9/2022 �32 32 13 73 Joint Sealant Pecom 300SL 300SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 9/9/2022 32 13 73 Joint Sealant Crafco RoadSaver Silicone RoadSaver Silicone - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 Utility Trench Embedment Sand 9/9/2022 3305 lb Embedment Sand Silver Creek Materials Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand Crouch Materials Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand F and L Dirt Movers Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand F and L Dirt Movers Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand Tin Top Martin Marietta Utility Embedment Sand ASTM C33 Storm Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 9/28/2018 3305 13 Manhole Frames and Covers AccuCast (Govind Steel Company, LTD) MHRC #220605 MHRC #220605 (Size - **24" Dia.) ASTM A48 AASHTO M306 9/28/2018 3305 13 Manhole Cover Neenah Foundry NF-1274-T91 NF-1274-T91 (Size - 32" Dia.) ASTM A48 AASHTO M306 9/28/2018 3305 13 Manhole Frames and Cova Neenah Foundry NF-1743-LM (Hinged) NF-1743-LM (Hinged) (Size - 32" Dia.) ASTM A48 AASHTO M306 9/28/2018 3305 13 Manhole Frame Neenah Foundry NF-1930-30 NF-1930-30 (Size - 32.25" Dial ASTM A48 AASHTO M306 9/28/2018 3305 13 Manhole Frames and Cova Neenah Foundry R-1743-HV R-1743-HV (Size - 32" Dial ASTM A48 AASHTO M306 4/3/2019 3305 13 Manhole Frames and Cov SIP Industries ++ 2279ST 2279ST (Size - 24" Dial ASTM A48 AASHTO M306 4/3/2019 3305 13 Manhole Frames and Cov.SIP Industries ++ 2280ST 2280ST (Size - 32" Dial ASTM A48 AASHTO M306 10/8/2020 3305 13 Manhole Frames and Cov/EJ ( Formally East Jordan Iron Works) EJ1033 Z2/A EJ 1033 Z2/A (Size - 32.25" Dial ASTM A536 AASHTO M306 3/8/2024 3305 13 Curb Inlet Covers SIP Industries ++ 2296T 2296T (Size - ***24" Dial ASTM A48 AASHTO M306 6/18/2024 3305 13 Curb Inlet Covers SIP Industries ++ 2279STN 2279STN (Size - 24" Dia.) ASTM A48 AASHTO M306 **Note: All new development and new installation manhole 4hds shall meet the minimum 30-inch opening requirement as specified in City Specification 33 0513. Any smaller opening sizes will only be allowed for existing manholes that require replacement frames and covers. Storm Sewer - Inlet & Structures 33-05-13 10/8/2020 33 49 20 Curb Inlets Fontera FRT-100-405-PRECAST** (Size - 10' X 3) ASTM C913 10/8/2020 33 49 20 Curb Inlets Fonterra FRT-lOx3-406-PRECAST** (Size - 10' X 3') ASTM C913 10/8/2020 33 49 20 Curb Inlets Fonterra FRT-l0x4.5-407-PRECAST** (Size - 10' X 4.5') ASTM C913 10/8/2020 33 49 20 Curb Inlets Fonterra FRT-lOx4.5-420-PRECAST** (Size - 10' X 4.5') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-4X4-409-PRECAST-TOP (Size - 4' X 4') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-4X4-409-PRECAST-BASE (Size - 4' X 4') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-5X5-410-PRECAST-TOP (Size - 5' X 5') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-5X5-410-PRECAST-BASE (Size - 5' X 5') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-6X6-411-PRECAST-TOP (Size - 6' X 6') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-6X6-411-PRECAST-BASE (Size - 6' X 6') ASTM C913 3/19/2021 33 49 20 Curb Inlets Thompson PFe Group TPG-I OX3-405-PRECAST INLET** ((Size - 110' X 3') ASTM 615 3/19/2021 33 49 20 Curb Inlets Thompson Pipe Group TPG-15X3-405-PRECAST INLET** (Size - 15' X 3') ASTM 615 3/19/2021 33 49 20 Curb Inlets Thompson PFe Group TPG-20X3-405-PRECAST INLET** (Size - 20' X T) ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG4X4-409-PRECAST TOP (Size - 4' X 4') ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG4X4-409-PRECAST BASE (Size - 4' X 41 ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG4X4-412-PRECAST 4-FT RISER (Size - 4' X 4') ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG-5X5-410-PRECAST TOP (Size - 5' X 5') ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-5X5-41O-PRECAST BASE (Size - 5' X 5� ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG-5X5-412-PRECAST 5-FT RISER (Size - 5' X 5') ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-6X6-411-PRECAST TOP (Size - 6' X 6') ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG-6X6-411-PRECAST BASE (Size - 6' X 61 ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-6X6-412-PRECAST 6-FT RISER (Size - 6' X 6') ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG-7X7-411-PRECAST TOP (Size - TX T) ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-7X7-411-PRECAST BASE (Size - TX 7') ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG-7X7-412-PRECAST 4-FT RISER (Size - TX T) ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-8X8-411-PRECAST TOP (Size - 8' X 8') ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG-8X8-411-PRECAST BASE (Size - 8' X 81 ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-8X8-412-PRECAST 5-FT RISER (Size - 8' X 8') ASTM 615 3/19/2021 33 49 20 Drop Inlet Thompson PFe Group TPG4X4-408-PRECAST INLET (Size - 4' X 4') ASTM 615 3/19/2021 33 49 20 Drop Inlet Thompson Pipe Group TPG-5X5-408-PRECAST INLET (Size - 5' X 5') ASTM 615 3/19/2021 33 49 20 DroQQ Inlet Thompson Pipe Group TPG-6X6-408-PRECAST INLET (Size - 6' X 6') ASTM 615 8/28/2023 33 49 10 Marilrole Oldcastle Precast 4' x 4' Stacked Manhole (Size - 4' X 41 ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 8' Storm Junction Box (Size - 5' X 8') ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 4' x 4' Storm Junction Box (Size - 4' X 4') ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 5' Storm Junction Box (Size - 5' X 5') ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 6' x 6' Storm Junction Box (Size - 6' X 6') ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 8' x 8' Storm Junction Box Base (Size - 8' X 81 ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 8' Storm Junction Box Base (Size - 5' X 8') ASTM C478 8/28/2023 33 49 10 Manhole Rinker Materials Reinforced 48" Diameter Spread Footing Manhole (Size - 4' X 4') ASTM C433 Page 5 of 6 CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 ....Storm Sewer - Inlet & Structures Continues 8/28/2023 33 39 20 Curb Inlet 10'x 3' Riser Thompson Ppe Group Inlet Riser (Size - 3 FT) ASTM C913-16 8/28/2023 33 39 20 Curb Inlet 15'x 3' Riser Thompson Pipe Group Inlet Riser (Size - 3 FT) ASTM C913-16 8/28/2023 33 39 20 Curb Inlet 20' x 3' Riser Thotrfson Pipe Groin Q Inlet Riser (Size - 3 FT) ASTM C913-16 1/12/2024 33 49 20 Drop Inlet AmeriTex Pipe &Products Drop Inlet (4' X 41) ASTM C913 1/12/2024 33 49 20 Droe Inlet AmeriTex Pipe &Products Drop Inlet (5' X 5') ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Precast 4'x4' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Precast 5'x5' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 5' Precast Transition MH (4' MH on the top of 5' JB) ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Precast 6'x6' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 6' Precast Transition MH (4' MH on the top of 6' JB) ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Precast 8'x8' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 8' Precast Transition MH (4' MH on the top of 8' JB) ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Type C Storm Drain Manhole on Box (4' MH on the top of RCB) ASTM C913 7/16/2024 33 49 20 Curb Inlets AmeriTex Pipe &Products 100 Precast** (Size 10' x 3') ASTM C913 7/16/2024 33 49 20 Curb Inlets AmeriTex Pipe &Products 150 Precast** (Size 15' x 3) ASTM C913 --Note: Pre -cast inlets are approved for the stage l portion of he structure (basin) only. Stage II pardon al the structure are required to be cast in place. No exceptions to this requirement shall be allowed. Storm Sewer - Pipes & Boxes 33-05-13 4/9/2021 3341 13 Storm Drain Pipes Advanced Drainage Systems, Inc. (ADS) ADS HP Stoma Polypropylene (PP) Pipe (Size - 12" - 60") ASTM F2881 & AASHTO M330 8/28/2023 3341 10 Storm Drain Pipes Rinker Materials Reinforced Concrete Pipe Tongue and Groove Joint Pipe (Size - 21" or larger) ASTM C76, C655 8/28/2023 3341 10 Culvert Box Rinker Materials Reinforced Concrete Box Culvert (Sze - Various) ASTM C789, C850 10/12/2023 3341 10 Storm Drain Pipes AmeriTex Pipe &Products Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size - 15" or larger) ASTM C76, C506 10/12/2023 3441 10 Culvert Box AmeriTex Pipe &Products Reinforced Concrete Box Culvert (size - Various)) ASTM C1433,C1577 10/18/2023 3541 10 Storm Drain Pipes The Turner Co. Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size - 15" or larger) ASTM C76, C506 10/18/2023 3341 10 Culvert Box The Turner Co. Reinforced Concrete Box Culvert (size - Various) ASTM C1433,C1577 4/12/2024 3341 10 Storm Drain Pipes Thompson Pipe Group Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size Various) ASTM C76, C506 6/25/2024 3341 10 Culvert Box Oldcastle Reinforced Concrete Box Culvert ASTM C1433,C1577 6/25/2024 3341 10 Storm Drain Pipes Oldcastle Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size Various) ASTM C76, C506 Revision Comments (1-29-2025) Removed Argos, Ingram, Redi-Mix, Charley's (4-3-2025) Bigtown Concrete updated Mix ID's (4-5-2025) 03 34 13 CLSM specification Page 6 of 6