Loading...
HomeMy WebLinkAboutContract 60600-CO5CSC No. 60600-005 FORT WORTH Change Order Request Project Namel Water and Sanitary Sewer Replacements Contract 2020, WSM-A Project No.(s)156002106004301070043010200431/5740010 I M&C Project) Water and Sanitary Sewer Replacements Contract 2020, WSM A Description I City Sec No. 160600 23-0983 City Pro. No. 1103361 Contractor woody Contractors, Inc. Change Order # 5 1 Date: 17114/2025 CityProject Mgr.J Clayton Torrance City Inspector Estevan Castillo Phone Number. 817-392.8528 Phone Number: 682-263-4793 Dept. Water Unit 1 Sewer Unit 2 Paving Unit 3 Stormwater Unit 4 Original Contract Amount $3,541,157.00 $2,076.758.50 $793,253.50 $0.00 Extras to Date $0.00 $269,380.22 $0.00 $13,600.00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $3,541,157.00 $2,346,138.72 $793,253.50 $13,600.00 Amount of Proposed Change Order $0.00 $0.00 $0.00 $0.00 Revised Contract Amount $3,541,157.00 $2,346,138.72 $793,253.50 $13,600.00 Orig. Funds Available for Change Orders $106,235.00 $62,303.00 $39,663.50 $0.00 Remaining Funds Available for this CO $106,235.00 $39,663,50 $0.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT Totals Contract Time (Calandar Days) $6,411,169.00 500 $282,980.22 75 $6,694,149.22 575 $0.00 $6,694,149.22 575 $208,201.50 4.41 $8,013,961.25 JUSTIFICATION'(REASONS) FOR'CHANGE ORDER Change Order No. 5 will allow for the removal and replacement of the liner (for an existing sanitary sewer manhole) that had to be replaced in order to connect a project sanitary sewer main. )t is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contrac(ors Company.Name.' ContiraQ12=1 Woody Contractors, Inc. Troy Woody Ins e' 7-15-25 r pa 1 Chrisl-onhe20 farder T.S. hristopher Harder' (Ju118, 202516:46 CDT) "Date 07/24/2M Douglas Black (Ju(22, 202517:55 CDT) M&C Number NIA M&C Date Approved TIA OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth Change Order Additions Project Name Water and Sanitary Sewer Replacements Contract 2020, WSM-A City Sec No, 60600 Project No.(s) 56002/0600430/0700430/0200431/5740010 DOE No. 23 09 City Pro. No. 103361 Project Description Water and Sanitary Sewer Replacements Contract 2020, WSM-A I Contractor Woody Contractors, Inc. Change Order # F-5-1 Date: 1 7/14/2025 City Project Mgr, Clayton Torrance City Inspector I Estevan Castillo ADDITION5 IItM UtSCKIPIIUN DEPT Qty -Unit Unit Cost Total Sewer Unit 2 VF $775.00 $9,300.00 105 R & R EPDXY MH LINER INC.1 ABRASIVE BLAST AND 250 MIL EPDXY LINER 12.0 Water Unit 1 (Sewer Unit 2 $9,300.00 (Paving Unit 3 IStormwater Unit 4 ;Additions Sub Total $9,300.00 Page 1 of 1 FORT' WORTH City of Fort Worth Change Order Deletions Project Name I Water and Sanitary Sewer Replacements Contract 2020, WSM-A City Sec No. 60600 Project No.(s) 5600210600430/0700430/0200431/5740010 DOE No. 1 23-0983 City Pro. No. 103361 Project Description I Water and Sanitary Sewer Replacements Contract 2020, WSM-A I Contractor Woody Contractors, Inc. Change Order #C� Date 7114/2025 I City Project Mgr. Clayton Torrance City Inspector I Estevan Castillo ITEM DESCRIPTION 81 9999,0003 Sanitary Sewer Construction Allowance DELETIONS DEPT City Unit Unit Cost Total Sewer Unit 2 0.093000 LS $100,000.00 $9,300.00 Page 1 of 1 (Water Unit 1 Sewer Unit 2 $9,300.00 Paving Unit 3 Stormwater Unit 4 (Deletions Sub Total $9,300.00 MMBE Breakdown for this Change Order mm mmmmw 4's 'm ie� momm, ma"mam Total Previous Change Orders U T 1 411712024 2 12119/2024 $13,600.00 3 11/19/2024 $0.00 4 4/14/2025 $250,265.22 WINE 110 Im WIX91 Total , 113 7/14/2025 Water & Sanitary Sewer Replacements Contract 2020, WSM-A CSC: 60600 CPN:103361 Change Order 5 Notes Staff has reviewed the requested prices and addition to calendar days and considers them to be fair and reasonable. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Clayton M. Torrance, P.E. Name of Employee Professional Engineer Title ATTEST: Jannette Goodall City Secretary 4,00vnnnb .r4& 0 v�o °.►o Pvo o=0 pad* ° o° °o°*�v as b a TEXA`J'-' �nnuauoo OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX