HomeMy WebLinkAboutContract 59387-CO2CSC No. 59387-0O2
Ft7RT WORT1� City of Fort Worth
--~' Change Order Request
Project Narne; Fort Worlh Central City Seclfon I: Parl 10 - Water and 5anilary Sewer Relocalions Cily Sec No,; 59387
Pf0�0CE No.(S�: 060043010700430/CA178D DOE No. N/A City Proj, No,: C00969
Project Descriplion: Inslallallon of of 12" waler line, 8" waler Iine, 24" sanilary sewer wilh d8' tunnel liner plale by olher lhan open cul, 2A' fiberglass sewer by open
cul, B' sanilary sewer by open cut and abandonmenl of exisling sanilary sewerwilh grouling.
ConUaclor William J. Schullz, Inc. dba C(rcle C Construclion Co, Change Order #� Date; 712112025
Ciiy ProJecl Mgr. Bijay Upreti City Inspeclor; 5hane Behn
Phone Number 817-392-6909 Phone Number; 682-328-1264
Dept.
Original ConUact Amount
Exlras to Dale
Cretlils to Dale
Pending Change Orders (in M&C Process)
Conlract Cost lo Date
Original Funds Available tor Change Orders
Remaining Funds Availabie for lhis CO
Addilional Funding (it necessary)
(Non-FWCC) I Water (FWCC) I Sewer (FWCC) I Totals I Contract Time
(Calendar days)
�1,198,664.00 $0.00 $3,795,938.00 $4,994,602.00 270
,198,664.00 $0.00 $3,795 938.00 $4,994,602.00 270
•$25,600,00 $81,175.U0 b09,686.00 $465,263.00 260
,173,064.00 $81,175.00 $4,205,626.00 $5,459,865.00 530
$71,920.00 $0.00 $189,797.00 $261,717.00
$71,920.00 $189,797.00 $261,717,00
75.00 I $219,891.00
CHANGE ORDERS to DATE (INCLUDING TNIS ONEJ A$ % OF ORIGINAL CaNTRACT 9.32%
MAXALLOWABLECONTRACTAMOUNI'(ORIGINAl.CONTRACTC05T+25%J $6,243,252.50
E
Change Order No. 2 voids and replaces Change Order No. 1(authorized Ol/06/2025) in this entirety. Subsequent to approval of Change
Order No. 1, it was determined that a relmbursable amount of $81,175.00 ( for Fort Wortl� Central City Improvements) due from TRWD
had been Inadvertently omftted on that Change Order. Change Order No. 2 rectifies that error by listing the omitted amount so TRWD can
relmburse the Water Department the said amount. The total amount of Change Order No. 2 remains the same as on Change Order No. 1.
Change Order No. 2 will provide pay quantities for the following Items that are necessary on the project: the installation of a 411- foot �
segment of a project sewer main by hand tunneling in lieu of open cut due to unstable soil material that was encountered during i
constructlon on N. Main Street and NE 11th Street; the reconstruction of a pavement segment consisting of S-inch reinforced concrete �
base and 6-inch asphalt with 11-inch pulverization and 3-inch asphalt due to extremely poor conditlon of the existing pavement; the �
removal and replacement of existing storm drain structures and curb and gutter that are in direct conflict with the proJect sewer main and '
the replacement of a segment of concrete pavement on Maln Street that broke apart during sewer main installation.
Staff concurs with the contractor's request for an additional 260 calendar days for the project for the delays resulting from acquiring the I I
remaining easements, traffic control permits and conFlicts with previously installed storm drains that were encountered during
construction.
�
W9fiam J,
Director
'n. R WiCsarc
�r's Company Name
Inc dba Circle C ConsUuclubn Co.
Contractnr Name
Teri Skelly
Date
-.� ��J
Oale
07/24/2025
Oate
07/25/202�
Bijay Upreh
Date
Date
�)%����,��)��J
�ate
7.7ii_7�
M&C Number 24-1005
Co
-��i`�r ',<__.,
M&C Dale Approved
c
OFFICIAL RECORD
GTY SECRETARY
FT. WORTH, TX
FURT WORZ'H City of Fort Worth
�=+�-'_'�— Change Order Additions
Project Name Forl Worlh Central Cil Sec(ion I: Part 10 - Waler and Sanitary Sewer Relocaiions City Sec No.: 59387
Projec( No.(s): 060043010700430/C01780 DOE Na. N/A City Proj. No.: C00969
Project
Description
Installation of of 12" waler line, 8" waler line, 24" sanitary sewer with 48" tunnel liner plale by oiher lhan open cuf, 24"
fiberglass sewer by open cuf, 8" sanitary sewer by open cul and abandonmenf of exisling sanitary sewer wilh grouting.
Con(racfor William J. Schultz, Inc, dba Circle C Construcfion Co. Change Ortler:� Date: 7/2112025
City Projecf Mgr. Bi'a Upreli City Inspector Shane Behn
ADDITIONS
FC�RT WORTH City of �ort Worth
a � � Change Order Deletions
_��.
Projecl Name Forl Worlh Cenlral City Seclion I: Part 10 - Waler and Sanitary Sewer Relocalions Cily Sec No.: 59387
Project No.(s): 060043010700430lC01780 DOE No. N/A Ciiy Proj. No.: C00969
Projecf Descriplion Insfallafion of of 12" waler line, 8" waler line, 24" sanilary sewer with 48" tunnel liner plate by ofher than open cut,
24 fiber lass sewer b o en cut, S sanlfar sewer b o en cut and abandonment of exisfin sanitar sewer wilh
Conlraclor William J, Schultz, Inc. dba Circle C Consiruclion Co. Change Order: � paie 7l21I2025
Cily Project Mgr, Bijay Upreii City Inspeclor: Shane Behn
ITEM IDESCRIPTION
DELETIONS
DEP7
15 3201.0132 5' WIDE ASPHAL7 PVMT REPAIR, INDUSTRIAL Water (Non-FWCC)
17 3201,0203 ASPHALT PVMT REPAIR BEYOND DEFINED WIDTH, Water (Non-FWCC}
42 9999.0003 CONSTRUCTION ALLOWANCE Water (Non-FWCC)
1 3331.4324 24" FIBERGLASS SEWER PIPE Sewer (FWCC)
18 3201.0400 7EMPORARY ASPHALT PAVEMENT REPAIR (2" HM Sewer (FWCC)
19 3201.0132 5' WIDE ASPHALT PVMT REPAIR, INDUSTRIAL Sewer (FWCC)
20 3201.0135 8' WIDE ASPHALT PVMT REPAIR, INDUSTRIAL Sewer (FWCC)
22 3201.0203 ASPHALT PUMT REPAIR BEYOND DEFINED WIDTH, Sewer (FWCC)
33 3305.0109 TRENCH SAFETY Sewer (FWCC)
38 3331.3105 4" PRIVATE SEWER SERVICE Sewer (FWCC)
58 9999.0007 CONTAMINA7EED MATERIAL HANDLING Sewer (FWCC)
59 9999.0008 CONTAMINA7ED MATERIAL LOADING Sewer (FWCC)
60 9999.0009 CONS7RUCTION ALLOWANCE Sewer (FWCC)
Page 3 of 4
Qty Unit Unit Cost Total
218.00 LF $125.00
19,00 SY $65.00
p.98 LS $60,000.00
411.00 LF $375.00
411,00 LF $38,00
346.00 LF
521,00 LF
385,00 SY
411.00 LF
1.00 LF
750.00 LF
500.00 CY
1.00 LS
$1
$1
$125
$125
$100,000
Water (Non-FWCC)
Water (FWCC)
Sewer {FWCC)
Delelions Sub Total
$152,250,00
$�,235,00
$58,709.00
$154,125,00
$15,616.00
$29,410.00
$78,150.00
$57,750.00
$125.
$262,500.
$62,500.
$100,000.
$212,194.00
2,233.00
4,427.00
MWBE Su
Same as original Contract
MIWBE Breakdown for this Change Order
1'vae of Service
Miscellaneous
Total
Page 4 of 4
Amount for this GO
$0,00
$0.00
City of Forf Worfh, Texas
IUlayor and Council Communication
DATE: Tuesday, November 12, 2024 REFERENCE NO.: '"M&C 24-1005
LOG NAME: 60WSSRFWCC51P10C01-CIRCLEC
SUBJECT:
(CD 2) Authorize Execution of Change Order No. 1 in the Amount of $465,263.00 to ihe Contract with
Wlliiam J_ Schultz, Inc, dba Circle C Conslruction Company for the Fort Worth Central City ProJect Water &
Sanitary Sewer Main Relocatio�s for Ihe fort Worih Central Cily ProJeol, Seclion 1: Perl 10 — Waler &
Sanilary Sewer Relocatlons - Cily ProJecl Tr(nity River Vfsion Phase 1, Adopi Resolution Expressing Of(icial
Intent to Reimburse Expenditures with Proceeds of Future Debf, and Adopt Approprlation Ordlnances lo
Effecl a Poriion of Water's Conlribullon to 1he Fiscal Years 2025-2029 Capilal Improvement Program
RECOMMENPATION:
It is recommended that the City Councfi:
1. Au�horize execulion of Change Order No. 1 in the amount of $465,263,00 lo Cily Secretary Contract
Number 593Q7 a contract wflh Willlam J. Schultz, Inc. dba Circle C Consirucl(on Company (or Ihe Fort
Worih Central Cily Project Water & Sanitary Sewer Main Relocaflons for ihe Fort Worlh Central Cily
Project, Seciion 1: Part 10 — Water R Sanilary Sewer Relocatlons - Cily Projecl Trinily River Vision
Phase 1 for a revised contract amount o( $5,459,865.00;
2. Adopt Ihe aitached resolution expressing official Inlent to reimburse expenditures with proceeds from
future debt andlor annual paymenls irom the Tarrent Reglonal Water District tor the Fort Worlh
Central Clly Water & Sewer Relocalions proJect;
3. Adopt the altached approprlation ordinance adjusting appropriations in ihe Water & Sewer
Commercial Paper Fund by decreasfng appropriaflons In the Commercial Paper projecl (City Project
No, UCMLPR) in the amount of $2,69a,901.65 and increasing approprielions in Trfnity River Vision,
Phase 1 project (Cily Project No. C00969) by ihe same amount;
4. Adopt the attaohed appropriation ordinance adJusting eslimated receipts and appropriations In the
Sewer Capltal Legacy Fund by decreasfng eslimated receipls and appropriatlons In the Trinity R(ver
Vision, Phase 1(Cily Projecl No. C00969) in ihe amounl of $31,60B.79, and Increasing estimaled
receipts and appropriations in ihe Unspecified All-Funds proJect (City Project No. UNSPEC) by the
seme amount tor the purpose of substituting funding sources and to make funds available (or olher
eligible Waler and Sewer pro)ects;
5. Adopi the atlached approprialion ordinance decreasing estimated receipls and appropriations in Iha
Trinily River Vision, Phase 1(City Project No. C00969) wilhin lhe Water & Sewer Capilal Projecis
Fund, In the amount of $22,629.00, for lhe purpose of subsliluling of (unding sources and lo make
funds available for other eligible Water and Sewer projects;
6. Adopt the ettached appropriation ordinance adjusting esifmated receipis and appropriations in ihe
WatedSewer 8ond 2016 Fund, by decreasing eslimaled recelpls and appropriations in 1he Trinily
River Vislon, Phase 1(City Project No. C00969) In ihe amount of $245,930.86, and increasfng
estirnated receipts and approprlations in ihe Unspecified All-Funds proJect (Clty Projecl No. UNSPEC)
by ihe same amount for the purpose of substituling funding sources lo make funds avallable for olher
eliglble Waler and Sewer projects;
7. Adopt the altached appropriallon ordinance adJusting estimated receipts and appropriations in the
Waler & Sewer Bond 2015A Fund by decreasing estimated re�eipls and approprialions in the Trinity
River Vision, Phase 1(City Projecl No. C00969) In the amount of $1,083,136.00, and increasing
esiimated receipts and approprialions in Ihe Unspecified All-Funds project (City Project No. UNSPEC)
by the same amount for the purpose of substituting funding sources and to make debt proceeds
availa6le for other eligible Wafer and Sewer projects;
8. Adopt the at(ached approprielion ordinance adjusfing estlmaied receipts and appropriations in Ihe
Water & Sewer Revenue Bonds Serles 2021 Fund by decreasing estimated receipls and
appropriafions in the Trinily River Usions, Phase 1(City ProJect No. C00969) in the amount of
$443,312.00, and increasing estimated reoelpts and approprialions in Ihe Unspeaified All-Funds
project (City Project No. UNSPEC) by ihe same amounl for the purpose of subslltuling funding
sources to make debt proceeds available (or oihar eligi6le Waler and Sewer projecis; and
9. Adopt lhe attached eppropriation ordinance adjus�ing eslimated receipls and approprletions in the
Water & Sewer Revenue Bonds Series 2022 Fund by decreasing estimaled receipls and
appropriations fn the Triniiy River Vislon, Phase 1(Clly ProJect No. C00969) In the amounl of
$407,022.00, and Increasing estimaled receipts and approprfations ih the Uhspecified All-Funds
projec[ (Cily Projecl No. UNSPEC) by the same amount tor the purpose of substftuUng funding
sources end lo make debt proceeds availeble for olher eligibla Water and Sewer projac(s and to
effecl a poriion of Water's contribution to lhe Fiscal Years 2025-2029 Capital Improvemeni Program,
DISCUSSION;
On April 111h, 2023, by Mayor and Council Communication (M&C) 23-0239 ihe City Council authorized a
conslruclion conlract with William J. Schullz, Inc. d6a Circle C Consirucllon Company in the amount of
$q,994,602.00 for Forl Worth Cenlral Cily Projecl Wator 8 Sanitary Sewer Maln Relocatlons for Ihe Fort
Worth Ceniral Cily Project, Section 1: Parl 10 — Waler & Sanilary Sewer Relocalions - City Projecl Trinity
River Vision Phase 1.
Chenge Order No. 1 in lhe amount of $465,263.�0 (Waler $55,575.00, Sewer $409,686.00) will pravide pay
fiems quanlilles tor lhe (ollowing lhat ere necessary on the project: �he inslallation o( a 411 foot segment of
a project sewer main by hand tunneling in Ileu of open cul due to unsiable soil materiel that was
encountered during construcUon on N, Main SUeet and NE 11�h Slreet; the reconstruclion o( a pavemenl
segment with 8-Inch reinforced concrete base and 6-inch asphall wilh 11-inch pulverization and 3-inch due
to extremely poor condition oF tlie exisling pavemant; ihe removal and replacement o( exisling storm drain
slructures and curb ond gutler that are in direct conflicl in with the projecl sewer main and the raplacement
oi a segment of concrete pavement on Main Street lhal broke apart during sewer main installation. Staff
concurs with the contraclor's requesf for an additional 260 calendar days on the project.
This M&C will fund lhe parl of Ihe contracl that is being reimbursed by Ihe Tarrant Regfonal Water Disirict
and decrease appropriations in various Funds accordingly. The original contract amounl is $4,994,602.00
and change order #1 is for $465,263.00 for a tolal revised amounl of $5,459,865.00. M&C 60Waler FY2023
and FY2024 FWCC Reimbursement, In the 10lz9/2024 Council Agenda, has relmbursed a lotal of
$1,587,D99.35 for Sewer charyes ($571,599,27 from Fund 59607 and $1,016,300.1A from Fund 56DD5).
The Cily is responsible for $1.173,064.00 of lhe tofal Water costs. For a remaining reimbursable amount of
$2,698,901.65, which is being appropriated in lhis M&C out of Commerclal Paper.
This project is anllcipated lo be repaid from e serles ot annual reimbursements (rom Ihe TArrant Regionel
Water Dislricl(TRWD) as part ot the For1 Wortfi Central Ciry Water 8� Sewer Relocallons project, In lhe
event any bond-eliglble cosls are nol fully reimbursed by TRWD, those costs would be anticipated to be
included in a fulure revenue Uond issue for lhe Water � Sewer Fund. Availeble cash within ihe Waler and
Sewer porifolio and lhe City's porifolio along wilh the appropriation authority authorized under the Callable
Commercial Paper Program (CP) will be used to provfde interim financing for Ihis projecl unlil lhe debl Is
issued. Once payment is received from TRWD andlor debt associated with Ihe unreimbursed portions of
this project is sold, Ihose funds will be used to relmburse lhe Water and Sewer portfolio and Ihe City's
porlFolio in accordance wllh the attached reimbursement resolution. Under federal law, debt musl be issued
wllhin approximately three years in order for these expenses to 6e reim6ursable, Adoption of the ailached
resolulion does not obligale the City to sell bonds bul preserves the abilily �f ihe Ciry to reimburse Ilself
from tax-exempt bond proceeds.
It is Ihe practice of the Water Deparimenl to appropriate Ils CIP plan lhroughout Ihe Fiscal Year (FY),
Inslead of wilhin Ihe annual budgel ordinance, as projecis commence, additional funding needs are
identi(ied, and to comply wilh bond covenanls, The eetions in ihe M&C will appropriale funds (n support of
ihe Water's portlon of ihe Cily of Forl Worth's Flscal Years 2025-2029 Capilal Improvemenf Program, as
follows: �
60WSSRFWCCS1P10C01-GRCLEC
i002 W&5
apital
05
6DWATER
Current �Y2023
Approp AND FY2024
FWCC
REIMB
$ $
2,457,887.00� 8,466,851.96
3ond 2016 I 6,855,400.00I(4,745,941�
i6007 Water'
3 Sewer $
3ond I 6,167,422,4'
t015A j
i6019 W&S r �
�ev Bonds I 443,312.0(
3eries 2021 �
i602Q W&5 '' — _ _ -
�ev Bonds $
ieries 407,022.0(
?022
i6023 W&S �
:ommerciai � 518,400.01
�aper
9D07
peclally $
unded ' S,852,657.94
roJects I
9601 Water� $
apital 14,404,708.40If
IWSSRFWC
S1P10001-
CIRCI.EC
$
(22,629.0
$
$ $
,249,571.96) (1,083,136.00)
$
(443,312.00)
$
(407,022.00)
=—��� � —
(777,G32,61)I 2,698,901.65
—�_
-- —�— —
�- --
(�7,750.00) �
er $ $ � $
ital 7,769,673.12 (60£3,873.21) (31
605WM FWCC
GRAND AVE Total Apprap
�ONSTRUCTI�N
:02WA7ER-SJL .
i_
-- � -- $
10,9D2,109.9
-- �I �
— —'I ,863,527.5
� �
I 2,834,714.4
-- — $ — �
$
$ $
253,192,00 3,692,861,
$
5,852,657.
�- - �
_ 14,396,958.
$
� 7,129,191.
_ - - — � J�_ —� — �
- - - — � i � — --� - _�� $ $ �
I�, A5,876,462.91 � 77,082.56 465,263.00 253,192.00' 46,672,020.47�
Funding is budgeted in lhe Trinity River Vision, Phase 1 projecl within various Funds and in lhe
Commercial Peper project wllh in Ihe Water & Sewer Commercial Paper Fund for the purpose of funding
Ihe Trinlly River Vision, Phase 1.
Funding for Trinily River Visions, Phase 1 are depicted below:
Capital Projecti FY2025 CIP Authority Budget i� Budget ! Budget Change Revised
Fund Name Name Appropriations I Change Change (InclDec) FY2025 I
i (InclDec) (InclDec) 605WM FWCC Budget
6DWATER �60WS5RFWCC GRANDAVE
; FY2023 AND � 51910001- CONSTRUC710N CO2
FW2024 FWCC CIRCLE C
REIMB WATER�SJL
i6002- C00969
JVater & -Trinity M&C 60WATER FY2023 AND � G
5ewer � River � $II,A66,a51.96',
�apital Vision, $0.00 FY2024 FWCC REIMB , $8,466,851.96�
Projecls Phase Recom #3 i �
I M&C 60 ' - - , _ ' - -
Fund 1 _ i '
,� � SSRFWCCS1P10C01- ($22,629.00)I I� ($22,629.00)
' CIRCLE C � I
- - _ - -- - _
C00969' — - - i _ __ �
56005- �-Trinity M&C60WATERFY2023 AND
1Nater/SeweriRiver $0.00 FY2024 FWCC REIMB ($880,824,03)' ($880,824,03)
Vision,
Bond 201 fi Recom #5
Phase
�1 �
I M&C 60WAT[R FY2023 AND�' '
' $0.00 FY202A FWCC REIMB ($3,865,117.59) I l($3,865,117.59)�
� Recom #5 � _ _
—I !I __ � - -- - - - - _ — -
r �
• M SSRF�WCCS1 P10001- ($245,930.86)� ($245,930.8fi)i
I� CIRCLE C � � _ _ __ I
- - ��,� -- - - - _ - - - — -
C00969i
56007 - - Trinily I' M&C 60WATER FY2023 AND �
Water & River $0.00 FY2024 FWCC REIMB
Sewer Bond Vision, ($2,249,571.96) ($2,249,571.96)I
2015A Phase Recom #6
1 � I I _ '
M&C 60
SSRFWCGS1 P10001- ($1,083,136.00)�-- ($1,083,136,00)
, I �
� �C RCLE C
56019 - — - __: M&C 60 = - - — - ; _
W&S Rev W55RFWCCS1P1DC01- ($443,312,00) � ($443,312,00)�
Bonds CIRCLE C ; I
Series 2021 �-_ -- -- - - - -,-- _ - -
56020-W&S M&C 60
Rev Bonds SSRFWCCS1P10C01- ($407,022.00)� �$407,022.00)I
5eries 2022 � �CIRCLE C � _ �
� .� --_ - - - -
C00969
56023 - -Trinity� �M&C 60WATER FY2023 AND
River $777,632.61
777 632.6'I )
Co ercial $0.00 FY2024 FWCC REIMB '($ , ) I�
mm Vision, '
Paper Phase Recom #4 ; �
1 '� �
- - - - - _ ---,- - -, —
1 M&C 60 i
I W55RFWCC51P10C01- � $2,699,901.65� $2,698,901.65I
�CIRCLE C _ __ � � � - - - -- i
� - — �- . _- _ - --
60 WS M FWCC GRANQ AVE I I,�
CONSTRUCTIONCO2WATER-I I; $253,192.00I� $253,192.00�
�SJL � � _
_ �
C00969 - - - - -- - _ ;I _ I �
59601 -�-Trinity �M&C 60WATER FY2023 AND
Water River $O.OD FY2024 FWCC REIMB ($7,750.00} ($7,750.00)
Capital Vision, Recom #7
��hase - — _ _ �, ;
� - -- - -- - -- _ - -- � = -
C009� � ,� I �
59607 - Trinity M&C 60WATER FY2023 AND I I
Sewer River $0.00 FY2024 FWCC REIMB ($37,274.00); I ($37,27A.00)�
Capifal Vision, I Recom #8 �
Legacy Phase �
1 I_ � _ -�'
j M&C 60WATER FY2023 AND I
FY2024 FWCC REIMB ($571,599.21) ($571,599,21)�',
� lRecomtf8 � -- i - - --�
�, C RCLE CCCS1P10C01- I I ($31,608.79) I ($31,60Ei.79)I
�I � _ - - - - - I - -- - _- I
I� I( _ -I _ �� -,� --- i� - -� ,�
-��L � � $77,082.56� $465.263.00� - $253,192.00I�$795,537,56�'
A portion o( the waler line in the amouni of $55,57G.00 of Ihis Change Order is consldered Trinily River
Vision (TRV)-reloceted work. The sanilary sewer $409,688.00 amounl of ihis Chonge Order is considered
(TRV)-related work, are ellgible for funding irom Tax Incremenl Reinveslment Zone No.9 (TRVA TIF)
pursuant to ihe TRVA Projecl Plan. Having mel ils $26.6 million commitmenl to the TRV Projecl, Ihe Cily will
be reimbursed the wator line amount of $81,175,00 and Ihe sanitary sewer amounl of $4,205,626,00 by
Tarrant Regional Water Dislricl (TRWD) on an annual basis, in accordance with provisions of lhe executed
Interlocal Agreement helween the City end the TRWD (City Secrelary Contracl No. 43425 as amended).
The TRV Program Maneger In the FW Lab Qepartmenl will be responsible for collecting the full
relmbursement from TRWD al the end of each Fiscal Year.
*Numbers rounded (or presentatlon purposes.
Business Equlty - William J, Scfiullz, Inc, dba Circle C Conslrucfion Company, has agreed/committed to
mainlain Ils initial Business Equity participation commitmenl of 12.13 percenl thal was made on the original
agreement. William J, Schultz, Inc. dba Circle C Conslruclion Company, has also agread to commit to all
prior change order/s up to and Inciusiva of this Change Order No, Therofore, William J. Schullz, Inc. dba
Clrcle C Construclion Company, remains in compliance wilh the Cily's Business Equlty Ordinance and
atlesls io its commitment by ils signature on lhe Acceptance of Previous M/WBE Commilment form
executed by an aulhorized representative of Ils company,
Thls project is located in COUNCIL DISTRICT 2.
�ISCAI.INFORMATI�N / CERTIFICATION:
7he Direclor of Finance certifies ihat (unds are available In the Commercial Paper project within Ihe W&S
Commercial Paper Fund and in Ihe Trinily River Vision, Phese 1 proJect within W&S Capltal Projects,
Water/Sewer Bond 2016, Water & Sewer Bond 2015A, W&S Rev Bonds Series 2021, W&S f2ev Bonds
Series 2022 and Sewer Capital Legacy Funds, end upon approval of the above recommendations and
adoption of ihe Allached approprlation ordinances, funds wlll be avallable in the W&S Commerclal Paper
Fund, for the Trinity River Vision, Phase 1 proJecl to suppori ihe above recommendations and execution of
ihe chenge order. Prior to any expendilures be3n� fncurred, lhe Water Departmeni has the responsibility of
verifying the availabiliry of funds.
�UND IDEN7IFIERS (�):
ro
�Fun ' Department ccoun ProJect Program ctivity Budget Reference # � moun
� �p �__ � �p __I _ r �Year I (Chartfield 2) - �
FROM
-- — — ---
�Fun Department ccoun Pro�ect Program� ctivify Budget Reference # mount
ID ��_ ID� � I Year _ f (Chartfield 2�
CERTIFICATIONS:
Submllted for City, Manager's ONlce y; Wiiliam Johnson (5806)
O�jgi t g De�artment Head: Chris Harder (5020)
Additional Information Contact: Llam Conlon (6824)
ATTACNMENTS
1,
2.
3.
n.
5,
6,
7.
B.
9.
10.
11.
12.
13.
14.
'u611c)
'ub1lc)
'ubllc)
'ublic)
(Publlc)
'ublic)
'ublic)
�I��WI� ��I ����I�I J V V J rnim��m � �� l��A�A� W W W
lf1 ln ln ln ln Ut ln VI Ul Ln VI lJ1 Ul ln (J1 Vl V1 V� Ul lh Vl Vl lfl �.n lfl Ul Vl ln Vt
Ql Ol m Ol Ol m QI Ql 41 CTl Ol Ol Ol Ql Ol Ol Ol Ql Ql Ql Ol Ql lD �D ln lD 41 U1 U�
O O 4 o O O O O O O O O O O O O o O O O O O Ql m al Ol O O O
N N N N N N F-` F-' 1-+ F-� O o p O O O O O O O O O O O O O N N N
O O � O O O �O lD lO l0 V V V J � � N� � � N N V V V V W W W
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O� J O1 m J rn O1 V m V rn V O� �l al V al Ot V O1 V V m J m V Ol J m
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
p o a O o 0 p 0 o a o p 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
A A �P �P A �A ? ? �P .A �P A A �P A .P .P .A A A �P � A .P �P A A A A
w w w w w w w w w w w w w w w w w w w w w w w w w w w w w
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
�P �P �A A �A �P J> A �P A �P �A
�n t0 tU tD l0 lO tD t0 l� lD lo tD
� O �lJ� O(n �Ot OlJ7 � � � � (n VI
F-� Y �A �P A A ln ln VI O O O
{� J> W(,� W W N N N O O O
�1 V f-� F-� O O O tl O 1-' N N
c n n c n n c n c n c n c c-� c n n c n n n n c n c n � n n
z o o z o o z o z o z o z o z o O z O O O o z O z O n O o
�, o o� o o N o� o � o y o in o o v� o 0 0 o cn o in o � o 0
� � io -o � � � � �a �n v � v � v �n � -o � � �o w v �o �v cn r-. t� �
m� m m�� m a� m m m� m m m m m rn m rn m rn m rn m m v ai ai
n � � n � � n � n � n � n � � � � n � � � � n � n � � � �
zlo zld
r F' � , �-'
o � o �
o � o �
N N N N N N N N N N N N N N N N N N N N N N
O O O O O O O O O O O O O O O O O O O O O O
N N N N N N N N N N N N N N N N N N N N N N
l!� ll� ln V7 ln VI U� ln ln ln ln l!� ln U� ln tn tn ln ln ln ll� ln
oo�avo�i�o
O V W O V w �
V O� O V al o W
�.�.! l�D W N l�0 W F-W�
N N O N N O N
O O O C7 O O O
O �
N ��
'� w
`+1 b
P �
v
w o
P. �
n
� �
�
'd w
'*1 b
P. .�G
v
w o
� �
a N
�n
n
0�0�-0000�0-W
N r� r r
O�o 0�0 0�0 0�0 A N N A N N N
W W W W (!1 O �n Vl O V7 N
r r-� i-� r �o w rn i� v� m m
W W W W W W O W W O N
pi Qi Q1 O1 O O O O O O �
O O O O 0� O� O 00 0o O O
O O O O Ql Q1 O Q1 O� O �
�_ _ � iy p /" !" ' _
T. L� 7: � rr
� � � G
v � � �
''7 ,V
� o � vW W
V
`�'. s °' O O
� � �ti
p, ro p, O O
n � �
'-�d '�d
C� h7
n�
.�.
�
v
b
0
v
�
b
h7
n
� NI�
�000��0�
W W W
N N r
O O O
W W Oo
V V V
lD lD lD
N N
m m
lD F�
00 J
lD V
O N
F-' 41
Q7 Q1
l!1 Vl
a. a
�U' �"
� �
n n
W N W N l0 lD lD 00 00 V V ol Q7 O1 l7i ln A�P
� � 1p (� ln l.n lJl lJ) Ul (f� lJl l!1 �/1 VI lll lh U1 lfl
Ol Ql Ol Ol Ol Ol Ql Ol Ol Ql Ol Ol Ql 01 al Ql lD lD
O O O O o O � O O o O O O O O O Ql Ql
N N N N N N N F-` F' O O O O O O O O O
w W W (N O O O lD lD V V U1 lf1 V1 N N V V
o�o olo
J O� V m
0 0 0 0
0 0 0 0
A �P �P �P
w w w w
0 0 0 0
� � � �
V J V V
� A .P A
0 0 0 0
0 0 0 0
r r � r
O O O O
n n n �
0 0 0 0
0 0 0 0
� in � �o
m rn rn m
� �n � io
nlc�lnlc�
0 0 0 0
N N r� t�
V V V V
a oo w o0
0 0 0 0
�nliol�lto
� � � �
� � � �
in �n � io
�I�I�I�
N O ln
lf� l0 ln
O 00 V
O Oo l!i
O O O
�� O � O
��i+ O � O
N�-. � Q' �
d � � �
�O hj o
�
i-i n
� c�
oon�
�.�.00
,Q ,4 � �
���•��
w w
C� C)
n C)
0 0 0 0 0 0 0 0 0 0 0 0 0 0
m�I al 41 J ai V Q� J O1 m J V V
0 0 0 0 0 0 o c� o 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
J-� .P -P .A .A .h �P A�P A P A J� A
w w w w w w w w u, iu w w w w
0 0 0 0 0 0 0 0 0 0 0 0 0 0
A .P A �A �P �P �P A �P A �A A �P �A
lD �D tn tD lD lo l0 lD lD lD �D W lO tn
O O O o o O o O O O �� N N
vi u, v� tn tn cn v� �n tn tn m rn in v�
N N N �a � � A u� v, v� o 0 0 0
.p .p .p W W W W N N N O O O O
V V V N F' O o O O � F-+ F-' N N
C fl Cl C C't C(l C(1 Cl C Cl C fl
z o o z o z o z o o z o z o
�, o o �, o in o v, o o u, o cn o
-o io in v�n v�n v to t� v� v to
m m m m� m a� m m m m rn m m
n � � n � n � n � � n � n �
c cr� cn c�n c� cc�
z o o z o z o z o o z o z o
N N in N in r �n i-' t-` in N �, r-�
-Np .p .P -p V -p J -o V V � V W `J
n o o n o � w n o o � o o�
� I � ml I�Iv�i �Irnlml I� t�o
.��00�0
(,V N
m o �� w w c�'i� o,cNn
N O N N Q1 � O O O
p O O O O O � Q�i O
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Oigit8lysignedbyBij11yUpreti
Bijay Upreti ����(�!��,ortworthtexa,.gov,
Data:2025.04.11 14:18:42-06'00'
Signature
Bijay Upreti, P.E.
Name of Employee
Sr. Professional Engineer
Title
ATTEST:
�1�
Jannette S. Goodall
City Secretary