NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Railhead Building 3
City Project No.: 105552
Improvement Type(s): Water�
Original Contract Price:
Sewer�
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete:
t)tut,, Be/£ 07/23/2025
Dan Bell !Jul 23 2025 21:22:20 CDTj
Contractor Date
Vice President
Title
Commerce Construction
Company Name
� 07/24/2025
Project Inspector Date
��07/24/2025
Project Manager Date
07/24/2025
CFA Manager Date
t3e__,Z...._ 07/25/2025Lauren Prieur (Jul 25, 2025 09:43:53 CDT)
TPW Director Date
07/25/2025
Asst. City Manager Date
$146,446.01
$0.00
$0.00
$146,446.01
Page 1 of 2
Notice of Project Completion
Project Name: Railhead Building 3
City Project No.: 105552
City's Attachments
Final Pay Estimate 0
Change Order(s): ❑ Yes 0 N/A
Pipe Report: 0 Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid �
Consent of Surety ��
Statement of Contract Time
Contract Time:120 WD
Work Start Date: 10/10/2024
Days Charged: 111 WD
Work Complete Date: 5/27/2025
Completed number of Soil Lab Test: 101
Completed number of Water Test: 2
Page 2 of 2
CITY OF FORT WORTH
Contract Name RAILHEAD BUILDING 3
Contract Limits
Project Type WATER & SEWER
DOE Number 5552
Estimate Number 1 Payment Number 1 For Period Ending 5/27/2025
FINAL PAYMENT REQUEST
City Secretary Contract Number
111
WD
Contract Date
COMMERCE CONSTRUCTION
NA
13191 CROSSROADS PKWY N, 6TH FLR
CITY OF INDUSTRY CA 91746
D. WATSON H. TRISTAN
120WDContract Time
Days Charged to Date
CompleteContract is 100.00
Contractor
,
/Inspectors
Project Manager
City Project Numbers 105552
Friday, June 27, 2025 Page 1 of 5
Contract Name RAILHEAD BUILDING 3
Contract Limits
Project Type WATER & SEWER
DOE Number 5552
Estimate Number 1
Payment Number 1
For Period Ending 5/27/2025
Project Funding
City Project Numbers 105552
UNIT I: WATER IMPROVEMENTS
Item
No.Description of Items Estimated
Quanity Unit Unit Cost Estimated
Total
Completed
Quanity
Completed
Total
1 TRENCH SAFETY 97 LF $10.00 $970.00 97 $970.00
2 REMOVE 12" WATER LINE 8.2 LF $129.85 $1,064.77 8.2 $1,064.77
3 4"-12" PRESSURE PLUG 1 EA $1,153.26 $1,153.26 1 $1,153.26
4 UTILITY SERVICE SURFACE RESTORATION
HYDROMULCH
61 SY $1.18 $71.98 61 $71.98
5 8" PVC WATER PIPE 14 LF $120.00 $1,680.00 14 $1,680.00
6 12" PVC WATER PIPE 83 LF $175.00 $14,525.00 83 $14,525.00
7 CONNECTION TO EXISTING 4"-12" WATER
MAIN
1 EA $2,176.33 $2,176.33 1 $2,176.33
8 2" WATER SERVICE 2 EA $3,672.00 $7,344.00 2 $7,344.00
9 DUCTILE IRON WATER FITTINGS W/
RESTRAINT
0.8 TN $16,241.00 $12,992.80 0.8 $12,992.80
10 8" GATE VALVE 1 EA $5,865.59 $5,865.59 1 $5,865.59
11 12" GATE VALVE 1 EA $7,248.00 $7,248.00 1 $7,248.00
12 FLUSH POINT 1 EA $1,800.00 $1,800.00 1 $1,800.00
$56,891.73 $56,891.73Sub-Total of Previous Unit
UNIT II: SANITARY SEWER IMPROVEMENTS
Item
No.Description of Items Estimated
Quanity Unit Unit Cost Estimated
Total
Completed
Quanity
Completed
Total
1 CONC PVMT REPAIR, ARTERIAL/INDUSTRIAL 6.5 SY $220.00 $1,430.00 6.5 $1,430.00
2 UTILITY SERVICE SURFACE RESTORATION
HYDROMULCH
747 SY $1.18 $881.46 747 $881.46
3 TRENCH SAFETY 397 LF $10.00 $3,970.00 397 $3,970.00
4 POST-CCTV INSPECTION 397 LF $10.00 $3,970.00 397 $3,970.00
5 MANHOLE VACUUM TESTING 3 EA $165.00 $495.00 3 $495.00
6 IMPORTED EMBEDMENT/BACKFILL, CSS 11 CY $87.02 $957.22 11 $957.22
7 6" SEWER PIPE 10 LF $96.00 $960.00 10 $960.00
8 6" 2-WAY CLEANOUT 1 EA $589.00 $589.00 1 $589.00
9 8" SEWER PIPE 387 LF $112.00 $43,344.00 387 $43,344.00
10 EPOXY MANHOLE LINER 20 VF $376.85 $7,537.00 20 $7,537.00
11 4' MANHOLE 3 EA $7,821.00 $23,463.00 3 $23,463.00
12 4' EXTRA DEPTH MANHOLE 10 VF $195.76 $1,957.60 10 $1,957.60
Friday, June 27, 2025 Page 2 of 5
Contract Name RAILHEAD BUILDING 3
Contract Limits
Project Type WATER & SEWER
DOE Number 5552
Estimate Number 1
Payment Number 1
For Period Ending 5/27/2025
Project Funding
City Project Numbers 105552
$89,554.28 $89,554.28Sub-Total of Previous Unit
Friday, June 27, 2025 Page 3 of 5
Contract Name RAILHEAD BUILDING 3
Contract Limits
Project Type WATER & SEWER
DOE Number 5552
Estimate Number 1
Payment Number 1
For Period Ending 5/27/2025
Project Funding
City Project Numbers 105552
Contract Information Summary
Change Orders
$146,446.01Original Contract Amount
$146,446.01Total Contract Price
$146,446.01
Less
Total Cost of Work Completed
% Retained $0.00
Net Earned $146,446.01
Plus Material on Hand Less 15%$0.00
Balance Due This Payment $146,446.01
Less Liquidated Damages
Days @ / Day
$0.00
Less Penalty
LessPavement Deficiency $0.00
$0.00
$0.00Less Previous Payment
Earned This Period
Retainage This Period
$146,446.01
$0.00
Friday, June 27, 2025 Page 4 of 5
Contract Name RAILHEAD BUILDING 3
Contract Limits
Project Type WATER & SEWER
DOE Number 5552
Estimate Number 1
Payment Number 1
For Period Ending 5/27/2025
Project Funding
City Project Numbers 105552
Line Fund Account Center
Amount
Funded Gross Retainage Net
CITY OF FORT WORTH
SUMMARY OF CHARGES
$146,446.01
Less
Total Cost of Work Completed
% Retained $0.00
Net Earned $146,446.01
Plus Material on Hand Less 15%$0.00
Balance Due This Payment $146,446.01
Less Liquidated Damages
0 Days @ $0.00 / Day $0.00
Less Penalty
LessPavement Deficiency $0.00
$0.00
$0.00Less Previous Payment
Earned This Period
Retainage This Period
$146,446.01
$0.00
City Secretary Contract Number
111
WD
Contract Date
COMMERCE CONSTRUCTION
NA
13191 CROSSROADS PKWY N, 6TH FLR
CITY OF INDUSTRY CA 91746
D. WATSON H. TRISTAN
120
WD
Contract Time
Days Charged to Date
CompleteContract is 100.000000
Contractor
,
/Inspectors
Project Manager
Friday, June 27, 2025 Page 5 of 5
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME:
PROJECT NUMBER:
DOE NUMBER:
Railhead Building 3
105552
PIPE LAID SIZE
PVC Water Pipe 8"
PVC Water Pipe 12"
FIRE HYDRANTS:
PIPE ABANDONED
SIZE
WATER
TYPE OF PIPE
Blue Pvc
Blue Pvc
VALVES (16" OR LARGER)
TYPE OF PIPE
LF
LF
14
83
DENSITIES: passed
NEW SERVICES:
g„
12"
PIPE LAID SIZE
6" Sewer Pipe 6"
8" Sewer Pipe 8"
PIPE ABANDONED
SIZE
gate Valve
gate Valve
SEWER
TYPE OF PIPE
PVC
PVC
LF
10
387
TYPE OF PIPE
LF
DENSITIES: passed
NEW SERVICES: 6" Sewer Service 1
._�`
,z
TIZ�NSPORT_�TION ��ND PUBLIC ���ORKS
The Cit�� of Fort Worth • 1000 Throckmorton Stieet • Fort Wordi, TX 76012-6311
(817) 392 - 7941 • Fax: (817) 392 - 7845
��������x�
TRANSPORTATION AND PUBLIC WORKS
June 26, 2025
Commerce Construction CO.
131 E. Exchange Ave. Suite 220
Fort worth, TX,76164
RE: Acceptance Letter
Project Name: Railhead Building 3
Project Type: Water,Sewer,Paving,Streetlights
City Project No.: 105552
To Whom It May Concern:
On June 12, 2025 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on June 25, 2025. The final inspection and
the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is
therefore accepted by the City. The warranty period will start on June 25, 2025, which is the date of the
punch list completion and will extend of two (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-6251.
Sincerely,
Andrew Goodman, Project Manager �e;nd�u.w' �o�-
Andrew Goodman, Program Manager
Cc: Henry Tristan, Inspector
Don Watson, Inspection Supervisor
Oscar Aguillon, Senior Inspector
Andrew Goodman, Program Manager
Kimley Horn Engineering, Consultant
Commerce Construction, Contractor
Majestic Fort Worth Partners II, LLC, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
�COMMERCE
CONSTRUCTION C4., L.P.
131 E. Exchange Avenue, Suite 22fl
Fort Worth, TX 76164
(972}72�-0700
CornmerceLP.com
A�'�'IDAVIT
STATE OF T�XAS
COUNTY OF TARRANT
Before nae, t�le Lllldel'Sl�tied 3Uti101'Ity, a�iotary �ublic in tEie state
and county aforesaid, on this day perso3�ally ap�eared Dan Bell, VP,
District Manager of Comme�•ce Const�•uction Co. L,.P., kno�i�n t0 me t0 be
a creciible pe�•son, ���ho beitlg by me duly swo�•n, upon his oath de�osed
a»d said;
That �li perso�as, �►•�ns, associations, cor�oratio��s, or other
organizatioc�s furnishing l�bor ancl/or materials f�ave been �aid in fi�ll;
That the fvage scale established by the City Cot�ncii in the City of
Fo�•t Worth has been paid in fiill;
That tl�ere are zfo claims E�ending for personal inj���y and/or
property damages;
On Cotltract descz•ibed as;
Railfiead Building 3
City Project# 145552, CFA24-0082
IPRC NO, IpRC24-00$7
BY ,.,.�-
Dan Bell, VP District Managei•
S�ibscribed antE s�vorn befo�•e me on this 14'� day of Ju�y, 2025
-. *�r Av4 PATRICIA JOYCE SHEFFIELD
� � Notary ID q6�91003
N�tary �'ubIic ft�+� MyFebf uary527 2o i?es
Tari•auE County, TX `o° ``"
Bell, Dan
From:
Sent:
To:
Subject:
Sheffield, Trisha
Wednesday, July 23, 2025 4:03 PM
Arnold, Mike; Bell, Dan; Smith, Clayton
FW: CPN 105552 Railhead
I sent below in response to the city just now. Forgot to add you all to the
email.
This is the cnnfidence we have
in approaching God.• that if we
ask anything according to his wi//,
he hears us. 1 John 5:14
Trisha Sheffield
Administrative Assistant
�COMMERCE
CONSTRUCTION CO.. L.P.
T 972-232-3762
TSheffield@commercelp.com
www.CommerceLP.com
131 E. Exchange Ave, Suite 220, Fort Worth, TX, 76164
Contractor License #'s: AZ: ROC117720 Class: B-1 � CA: 723302 � Aurora, C0: 788888 00 CL
FL: CGC1535970 � GA: GCQA008807 � OR: 212122 � NV: 0042911 � NM: LPF2010050401
LOS ANGELES • ATLANTA • AUSTIN • BETHLEHEM • DALLAS I FT. WORTH
DENVER • LAREDO • LAS VEGAS • PHOENIX • PORTLAND
From: Sheffield, Trisha
Sent: Wednesday, July 23, 2025 4:02 PM
To:'Aguillon, Oscar' <Oscar.Aguillon@fortworthtexas.gov>; Hagen, Ashley N<Ashley.Hagen@fortworthtexas.gov>; Lane,
Leisa <Leisa.Lane@fortworthtexas.gov>
Cc: Watson, Donald <Donald.Watson@fortworthtexas.gov>; Tristan, Henry <Henry.Tristan@fortworthtexas.gov>
Subject: RE: CPN 105552 Railhead
There is no consent of surety for a maintenance bond which is the only bond
we have on this project. We had this same issue with Railhead Building 2. The
below comment is from our bonding company on that project.
I can't issue you a consent of surety to final payment since there was no performance bond issued. The
consent
requirement for final acceptance by the City should be waived.
Let me know if this is not the case.
Thanks
i
O�d2?�1961 SB
u?d2?G�2� Fv1�
?� esr;
51 CS�,
Tracy Aston
Surety Account Manager
CA License Number 0734980
tracv.aston(a�aon.com
P:213-630-3349 � Main:213-630-3200
www.aon.com
r,,'•.�JE=TIC FORTVv'�F.TH FkRTN
EFS '. , �_iC, n �EL�4'dd�,F�E L'�iiTE
UDr,,'��ERCE CONSTRLiC.T!ON U
0. L.P.
Aon
Surety Department
707 Wilshire Boulevard, Suite 2600
Los Angeles, CA 90017
Aon Risk Insurance Services West, Inc. � CA License #0363334
mailing address: Aon - MSC# 17188, P.O. Box 19640, Irvine, CA 92623
This is the cnnfidence we have
in approaching God.• that if we
ask anything according to his wi//,
he hears us. 1 John 5:14
�'�ater, �ev.�er, Pa4�ing, Stanr Grain. Street Li�h-s &� Signs b�;
T���a Year h,9a;nter�nce, Water Sanitar} Sn�sa�er, DFainage, Pe
From: Aguillon, Oscar <Oscar.A�uillon@fortworthtexas.�ov>
Sent: Wednesday, July 23, 2025 10:05 AM
To: Hagen, Ashley N<Ashley.Ha�en@fortworthtexas.�ov>; Lane, Leisa <Leisa.Lane@fortworthtexas.�ov>
Cc: Watson, Donald <Donald.Watson@fortworthtexas.�ov>; Tristan, Henry <Henry.Tristan@fortworthtexas.�ov>
Subject: CPN 105552 Railhead
Ashley/Leisa
Could you reroute greensheet for CPN 105552 Railhead Building 3. The contractor did not include the
consent of surety form
Thankyou
Oscar Aguillon
Sr Construction Inspector
CoFW/ TPW
Co nta ct: 817-992-2600
Oscar.A�uil lon@fortworthtexas.�ov