Contract 63642-PM1
CSC No. 63642-PM1 FORT WORTH PROJECT MANUAL FOR THE CONSTRUCTION OF WATER, SANITARY SEWER, PAVING, DRAINAGE & STREET LIGHT IMPROVEMENTS FOR TRADITION, PHASE 6B City Project No. 106000 IPRC24-0227 FID# 30114-0200431-106000-EO7685 X- 28427 W-4006 Mattie Parker Mayor Jesus "Jay" Chapa City Manager Christopher P. Harder, P.E. Director, Water Department Lauren L. Prieur, P.E. Director, Transportation and Public Works Department It'i Prepared for The City of Fort Worth July, 2025 mcivil Engineering & Surveying 2559 SW Grapevine Pkwy. Grapevine, Texas 76051 817329A373 07/01 /2025 *f'' `w . MATH-EW J. BAACKE ........................... 99368 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 6 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions Last Revised nno i�3 invitation t Bidders 03/20/2020 00v0 21 13 lnstmc�ka s to Faders 03/20/2020 00 41 00 Bid FE)Fm 04/02/2014 00 42 43 Proposal Form Unit Price 05/22/2019 0043 133 Bid Ben 04/02/2014 nn�T Bidders Pr-eq tali f e iea's 04/02/2014 0045 12 Prequalification Statement 09/01/2015 nn�3 Bidder P -o,,, alifie do A ppliea4ie 03/09/2020 00 45 26 Contractor Compliance with Workers' Compensation Law 04/02/2014 0045 40 Minority Business Enterprise Foal 08/21/2018 00 52 43 Agreement 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 Maintenance Bond 01/31/2012 0072200 General Conditions 11/15/2017 007300 c,,ppleme tar-Y Conditions 07/01/2011 0073 10 Standard City Conditions of the Construction Contract for Developer 01/10/2013 Awarded Projects Division 01 - General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 2500 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 nio�o Projeet Meet' 07/01/2011 01 3233 Preconstruction Video 08/30/2013 01 3300 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 50 00 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 0157 13 Storm Water Pollution Prevention Plan 07/01/2011 01 6000 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 7123 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 6 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents NONE CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 6 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httlD:Hfortworthtexas.uov/tnw/contractors/ or htti)s:Hapgs.fortworthtexas.eov/Proi ectResources/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 12/20/2012 0241 14 Utility Removal/Abandonment 12/20/2012 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 12/20/2012 03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical 26 05 00 Common Work Results for Electrical 11/22/2013 Iry 05 10 Demolition for- Eleetr-ieal Systems 12/20/2012 26 05 33 Raceways and Boxes for Electrical Systems 12/20/2012 26 05 43 Underground Ducts and Raceways for Electrical Systems 07/01/2011 26 05 50 Communications Multi -Duct Conduit 02/26/2016 Division 31- Earthwork 31 1000 Site Clearing 12/20/2012 3123 16 Unclassified Excavation 01/28/2013 3'�3 Borro 01/28/2013 3124 00 Ersb .trr.-,z-ff ts 01/28/2013 31 25 00 Erosion and Sediment Control 12/20/2012 3136-00 Cabiens 12/20/2012 31 37 00 Riprap 12/20/2012 Division 32 - Exterior Improvements 2'�T pet:MaReal !'�t1&t lkavir4 lei 12/20/2012 27�v Temporary plmlt Pav4"ir 12/20/2012 32 01 29 Concrete Paving Repair 12/20/2012 Z7�3 FteXible Base C..,,.SeS 12/20/2012 32 1129 Lime Treated Base Courses 12/20/2012 --2 1133 Cement Treated Base CE)uf 12/20/2012 32 1137 Liquid ,;a Treated Soil Stabilize,.. 08/21/2015 37�6 A3 lt,11lz 41 g 12/20/2012 27�3 Asphalt n.,.,ing C . CAI Eoalrants 12/20/2012 32 13 13 Concrete Paving 12/20/2012 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 06/05/2018 32 1373 Concrete Paving Joint Sealants 12/20/2012 �'��4 To col T;nit Ilning 12/20/2012 CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 6 '27�3 Gone,-ete rffb and G tte,-s and Valley Gtt#e,-s 10/05/2016 Z7�3 P ,o,.ne t ",rafki gs 11/22/2013 27�5 Cu-b Address Pain ng 11/04/2013 3231 132 Chain Fenees and Gates 12/20/2012 323126 Wire Fenees and Gates 12/20/2012 Z7�9• WeedFenees „aa Gates 12/20/2012 Z7�3 Cast in Plc2 C„rer-Ste Retaining Walls 06/05/2018 3291 19 Topsoil Placement and Finishing of Parkways 12/20/2012 3292 13 Hydro -Mulching, Seeding, and Sodding 12/20/2012 3293 43 wand Shrukr 12/20/2012 Division 33 - Utilities 330130 Sewer and Manhole Testing 12/20/2012 330131 Closed Circuit Television (CCTV) Inspection 03/03/2016 2Z�v B'Voo N— mrjmg ofExisting Sewer- Syste 12/20/2012 33 04 100 joint Bending and Qeetfieal 1s l.,tie 12/20/2012 2Z�T Cer-fosion C at of Test et, t; rs 12/20/2012 22�= M.,gnes;,,,,, Anode Cathodic Protection Systeffl 12/20/2012 33 04 300 Temporary Water- Sen,:e 07/01/2011 33 04 40 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 04 50 Cleaning of Sewer Mains 12/20/2012 3305 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 3305 12 Water Line Lowering 12/20/2012 3305 13 Frame, Cover and Grade Rings — Cast Iron 01/22/2016 33 n�0 L'.-.,me, Cover- and Gr- 1i Airrgz Composite 01/22/2016 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 12/20/2012 Grade 2 Z�6 Coner-ete WWeer Vaults 12/20/2012 2'2�T Cr..ne -ete Cell,, -s 12/20/2012 33 05 20 Auger Boring 12/20/2012 2Z�T 'T'u»-�O Tinplate 12/20/2012 33 05 22 Steel Casing Pipe 12/20/2012 330523 Hand Tumeling 12/20/2012 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 06/19/2013 330526 26 TT64y 1, a-ker-s/T ee er- 12/20/2012 33 05 30 Location of Existing Utilities 12/20/2012 33 1105 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/20/2012 33 11 11 Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 11/16/2018 33 11 3 oocluim Piro, Bar lxt appear Steel Cylinder Type 12/20/2012 ✓3 11 I i Bt -ie,a Steel Pipe andFittin,.., 12/20/2012 33 12 10 Water Services 1-inch to 2-inch 02/14/2017 ZZ�T Large rge W.,to,- Metef:s 12/20/2012 33 1220 Resilient Seated Gate Valve 12/20/2012 33 1221 A WW A R—tibbe . S e tea B„tte -fly V l.,e 12/20/2012 33 1225 Connection to Existing Water Mains 02/06/2013 3�-12 30 rombi2WW*E) Air- Valve Assemblies Mies for- Petable Tx eAe- Systems 12/20/2012 33 1240 Fire Hydrants 01/03/2014 CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 6 1331250 er Emjl� j ft-atiens 12/20/2012 33 1260 %rdard Thew off Valve n sso,..b! 06/19/2013 3,13 21 12 Cur-ed in Dlaee Pipe (CIDD\ 12/20/2012 33 31 13 Fiberglass Reinforced Pipe for Gravity Sanitary Sewers 12/20/2012 33 31 15 High Density n l„ethyle,te (1-IDPE) Pira €or gunimr, er 12/20/2012 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 06/19/2013 33 3121 ,;,-PeIy.y C le-ide (PVC) Closed Profile G-.,,,i Eanilary eF 12/20/2012 13 M 22 Saner Uir, liking 12/20/2012 Z Z�3 Sanitary Sewor Pilo E121argement 12/20/2012 Z2�o Saa tatty Sewer- So,.yiee Conne.t; So..N4ee Li 0 04/26/2013 ns and ZZ�o Combination Air- - Valve �q EanitGry &ewe - Fo -ee >,a 12/20/2012 2Z�o ✓azJ ix Dec Cone -ete Manholes 12/20/2012 33 39 20 Precast Concrete Manholes 12/20/2012 33 39 30 Filwrg1a0 moles 12/20/2012 33 3940 Wasto,.,.,tef: n eeess Chamber- (W n C4 12/20/2012 2Z�o Ep,," I ; o s for- Sanitary Sower- Str-uetufes 12/20/2012 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 07/01/2011 P- 11 11 High Density Polyethylene (I-IDPE) Pita for S or.fl D��m 12/20/2012 ✓3 11 12 Reinf reed Pe1yefl4e , (V. PE) Pira 11/13/2015 33-46 00 S/atid2z�mge 12/20/2012 33 4601 worm DAwn.-- 07/01/2011 31 46-Q Trjn-'s Dr&�sc 07/01/2011 3349 10 Cast -in -Place Manholes and Junction Boxes 12/20/2012 33 49 20 Curb and Drop Inlets 12/20/2012 33 49 40 Storm Drainage Headwalls and Wingwalls 07/01/2011 Division 34 - Transportation 34 4 1 100 Tfa ff e Signals 10/ 12/2015 34 ^� 41 10.01 Att-athmeat A Ceatfellller- Gabinet 12/18/2015 3n n�02 Attaehfneat B C—eatrellerSpeeifie-atiea 02/2012 34 ^�03 Attachment C Software Specification 01/2012 ?/1 11 11 TomeoraryT-affi. Signals 11/22/2013 3n�3 Removing T -affi . Signals 12/20/2012 344z1 5 R-eE ular R.W.d Fl ohirrg Beaeon 11/22/2013 2A�6 PedestFia Hybrid Signal 11/22/2013 34 41 20 Roadway Illumination Assemblies 12/20/2012 34 4120.01 4r� I rD n,,.,,1,., - I ir.�i:as � a r�iaJ. ,J=�w-� ,�arif 06/15/2015 3n n�02 Freeway LED Roadway 06/15/2015 34 41 20.03 Residential LED Roadway Luminaires 06/15/2015 34 41 30 Aluminum Signs 11/12/2013 3 n�o Single Mede Fibef Optie Cable 02/26/2016 3471 13 Traffic Control 11/22/2013 CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Appendix Page 6 of 6 G -4. J 1 AvailaNli�y of Lands GC-4.02 Subsurface and Physical Conditions GE-4.04 Uxder-gr-o ,aa > ae lit es GE-4.06 I%m dow Envir on at &.te GG 6.OA.D Miner-ity and Women Owned Business Enterprise Compliance GG 6.0"7 'Ij'4ge-4� GC 6.0-9 Po,-..-,;ts and Utilities GC-6.21 T-andiserimination GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised March 20, 2020 DIVISION 00 GENERAL CONDITIONS UTILITIES UNIT PRICE BID Bidlist Item SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Tradition, Phase 6B, City Project #106000 Project Item Information Description Bidder's Proposal Specification I Unit of I Bid Section No. Measure I Quantity Unit Price Bid Value Water Facilities 1 0241.1118 4"-12" Pressure Plug 0241 14 EA 2 $750.00 $1,500.00 2 3305.0003 8" Waterline Lowering 33 05 12 EA 9 $2,750.00 $24.750.00 3 3305.0109 Trench Safety 3305 10 LF 5.674 $1.75 $9.929,50 4 3311.0001 Ductile Iron Water Fittings w/ Restraint 3311 11 TON 0.8 $12,500.00 $10.000.00 5 3311.0261 8" PVC Water Pipe 3311 12 LF 5,674 $59.00 $334.766.00 6 3312.0001 Std. Fire Hydrant Assembly w/ 6" Gate Valve & Valve Box 33 12 40 EA 9 $6,150.00 $55.350.00 7 3312.2003 1" Water Service (Domestic) 33 12 10 EA 136 $1,050.00 $142.800.00 8 3312.3003 8" Gate Valve 33 12 20 EA 14 $3,200.00 $44.800.00 9 3312.0117 Connection to Existinq 4"-12" Water Main 33 12 25 EA 3 $2,500.00 $7,500.00 Water Subtotal $631,395.50 Sanitaryry Sewer Facilities 10 3301.0602 Post -CCTV Inspection 3301 31 LF 5126 $3.25 $16.659.50 11 3301.0101 Vacuum Test Manholes 3301 30 EA 20 $275.00 $5,500.00 12 3305.0109 Trench Safety 3305 10 LF 5126 $1.75 $8.970.50 13 3305.0113 Trench Water Stops 33 05 15 EA 10 $2,250.06 $22,500.00 14 3331.3101 SDR-26 4" Sewer Services 3331 50 EA 136 $850.00 $115.600.00 3311 10, 15 3331.4115 8" SDR-26 PVC Sewer Pipe 3331 12, LF 4795 $56.00 $268,520.00 3331 20 16 3331.4116 8" PVC Sanitary Sewer Pipe w/ CSS Backfill 33 11 10, 3311 12 LF 331 $65.00 $21,515.00 17 3339.1001 4' Std. Dia. Manhole 33 39 10, 33 39 20 EA 17 $5.500.00 $93,500.00 18 3339.1003 4' Extra Depth Manhole 33 39 10, IF 40 $205.00 $8,200.00 33 39 20 19 3339.1001 5' Drop Manhole 3439 EA 3 $8,000.00 $24,000.00 33392 0 20 3339.1001 5' Extra Depth Manhole 35 39 10, IF 33 $275.00 $9,075.00 33 39 20 21 9999.0001 Connect to Existing 4' Std. Dia. Manhole 00 00 00 EA 1 $2,500.00 $2.500.00 22 9999.0002 Connect to Existing 8" S.S. 00 00 00 EA 2 $1.750.00 $3,500.00 tanitM Sewer Subtotal S600,040.00 CI1'Y OF FOR IWORT I I I rudirion Phew 611 STANDARD CONSTRUCTION HID PROPOSAL: DINN.OPF.R AWARDED PROJECTS City Projuel A106000 Form Re, iced hn-y 20. 2020 004247 Bid Prq-] UNIT PRICE BID Bidlist Item SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Tradition, Phase 6B, City Project 4106000 Project Item Information Description Bidders Proposal Specification Unit of Bid Unit Price Bid Value Section No. I Measure I Quantity Storm Dram Fadlilies 23 0241.3015 Remove 24" Storm Line 2441 14 LF 32 $40.00 $1.280 00 24 0241.3019 Remove 36" Storm Line 2441 14 LF 14 $55.00 $770.00 25 0241.4200 Remove 3' Drop Inlet 2441 14 EA I 2 52,000.00 $4,000.00 26 0241.4201 Remove 4' Drop Inlet 2441 14 EA 1 $3.000.00 $3,000.00 27 3305.0109 Trench safety l 33 05 10 LF 1.397 $1.75 $2.444.75 28 3305.0112 Concrete Cellar 33 05 17 EA 3 $500,00 $1.500.00 29 3341.0201 21" RCP, Class 111 t 3341 10 LF 141 $72.00 $10.152.00 30 3341.0205 24" RCP, Class III I 3341 10 LF 303 $85.00 $25.755.00 31 3341.0205 27" RCP. Class 111 j 3341 10 LF 680 $98.00 $66,640.00 32 3341.0302 30" RCP, Class III j 3341 10 LF 48 $115.00 $5,520.00 33 3341,0402 42" RCP, Class III 1 3341 10 LF I 225 $225.00 $50,625 00 34 3349.0001 4' Storm Junction Box 1 33 49 10 EA 1 5 $4.850.00 $24.250.00 35 3349.OD02 5' Stonn Junction Box 1 33 49 1 D EA I 1 $6.250.00 $8,250.D0 36 3349,5001 10' Curb Inlet 33 49 20 EA I 6 $4,500.00 $27,000.00 37 3349.5002 15' Curb Inlet I 33 49 20 EA I 6 $8.500.00 $51,000.00 38 3349.5003 20' Curb Inlet I Norm 33 49 20 EA I 2 $10.500.001 $21 000.00 Drain Subtotal ' 5301,S6.76 Water/Sanitary Sewer/Storm Drain Facilities Subtotal $1,532,622.251 Bid Summary Water/Sanitary Sewer/Storm Drain Facilities Subtotal Total Bid I 11632.622.251 1:532,622.26 This bld Is submitted by the entity listed below: Company: BCAC Underground, LLC Street Address: 500D Airport Freeway City, State, Zip Code: Haltom City, Tx 76117 Phone:817-492-1604 By /J Signature Date: t Contractor agrees to complete WORK for FINAL ACCEPTANCE within 45 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY nF F0ki woR'rl l I'ruJili"n phQ .S I ANI ART) CO'4S I kIIC I R)N I111)111MRY ).CAI .I )FVFI 01'Fk AWANDIN) Ilk( I.INC I N C'iH Ih„ial 0 W100 k"n, R,,ir.J I 29 2l,IU 0045 12 DAP PREQUALIFICATION STATEMENT Page I of I SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work TVDC" box provide the complete maior work type and actual descrintion as provided by the Water Department for water and sewer and TPW for ravine. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Water and Wastewater New Development Open Cut (12" BCAC Underground, LLC 04/30/2026 and under) The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: BCAC Underground, LLC 5000 Airport Freeway Haltom City, TX 76117 BY: yz (Signature) TITLE: V;CL1' DATE: END OF SECTION CITY OF FORT WORTH Tradition Phase 66, CPN 106000 STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS 0045 12_Prequalifitation Statement 2015 DAP Form Version September 1, 2015 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 106000 . Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: BCAC Underground, LLC Company 5000 Airport Freewav Address Haltom City. TX 76117 City/State/Zip THE STATE OF TEXAS COUNTY OF TARRANT By: u n Signature: , Are 1Z' Title: V pd[, BEFORE ME, the undersigned authority, on this day personally appeared, �$.Vbmt �.a< �- ',� known to me to be the person whose name is subscribed to the foregoing instrument, a�d acknowledged to me that he/she executed the same as the act and deed of,.n,>: purposes and consideration therein expressed and in the capacity therein stated. IVEN UNDER MY HAND AND SEAL OF OFFICE this / day of 2025. Shelley Oimitroff� My Commission Expires 1/28//r2yy026 Notary PubliC and for the State of Texas 2399361W END OF SECTION CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project #106000 Revised April 2, 2014 00 52 43 - 1 Developer Awarded Project Agreement Page 1 of 4 SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on 07/03/2025 is made by and between the Developer, Sour Wildflower Development, L.P. . authorized to do business in Texas and Contractor, BCAC Underaround, L LC authorized to do business in Texas, acting by and through its duly authorized representative. Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Tradition Phase 6B City Proiect #106000 FID #30114-0200431-106000 E07685 Article 3. CONTRACT TIME 3.1 Time is of the essence. All time limits for Milestones, if any, and Final Acceptance as stated in the Contract Documents are of the essence to this Contract. 3.2 Final Acceptance. The Work will be complete for Final Acceptance within 45 working days after the date when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. 3.3 Liquidated damages Contractor recognizes that time is of the essence of this Agreement and that Developer will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the Developer if the Work is not completed on time. Accordingly, instead of requiring any such proof , Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay Developer Two Hundred & FiftYDollars ($250.00) for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project #106000 Revised June 16, 2016 005243-2 Developer Awarded Project Agreement Page 2 of 4 Article 4. CONTRACT PRICE Developer agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount in current funds of One Million Five Hundred Thirtv Two Thousand Six Hundred Twentv Two Sc 25/100 Dollars ($1,532,622,25) Article 5. CONTRACT DOCUMENTS 5.1 CONTENTS: A. The Contract Documents which comprise the entire agreement between Developer and Contractor concerning the Work consist of the following: 1. This Agreement. Attachments to this Agreement: a. Bid Form (As provided by Developer) 1) Proposal Form (DAP Version) 2) Prequalification Statement b. Insurance ACORD Form(s) c. Payment Bond (DAP Version) d. Performance Bond (DAP Version) e. Maintenance Bond (DAP Version) f. Power of Attorney for the Bonds g. Worker's Compensation Affidavit 3. Standard City General Conditions of the Construction Contract for Developer Awarded Projects. 4. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Proj ect's Contract Documents, 5. Drawings. 6. Addenda. 7. Documentation submitted by Contractor prior to Notice of Award. 8. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project #106000 Revised June 16, 2016 005243-3 Developer Awarded Project Agreement Page 3 of 4 Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused. in whole or in part, by anv act. omission or negligence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in Dart._ by anv act, omission or negligence of the city. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the Developer. 7.3 Successors and Assigns. Developer and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. T4 Severability. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon DEVELOPER and CONTRACTOR. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project #106000 Revised June 16, 2016 005243-4 Developer Awarded Project Agreement Page 4 of 4 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date"), Contractor: BCAC Underground, LLC BY: (Signature) w n ( Tinted Name) Title; Vie, 1^ Company Name: BCAC Underground, LLC Address: 5000 Airport Freeway Haltom City, TX 76117 Date: (0 f dli- / Ar Developer: Spur Wildflower Development, L.P. By: , I (Signature) V John Brian (Printed Name) _ i Title: Authorized Signatory Company Name: Spur Wildflower Development, L.P. Address: 8433 Enterprise Circle, Suite 100 Lakewood Ranch, FL 34202 Date: CITY OF FORT WORTH Tradition Phase 6E STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project #106000 Revised June 16, 2016 Policy Number: TB2Z91475553084 Policy Effective: 08/15/2024 COMMERCIAL GENERAL LIABILITY CG 20 10 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury' or "property damage" occurring after: Name Of Additional Insured Person(s) Or Organization(s): 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. Schedule Any person or organization for whom you have agreed in a written contract or agreement, prior to an 'occurrence' or offense, that such person or organization be added as an additional insured to your policy Location(s) Of Covered Operations All locations as required by a written contract or agreement entered into prior to an 'occurrence' or offense. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. CG 20 10 12 19 C Insurance Services Office, Inc., 2018 Page 1 of 1 Policy Number: TB2Z91475553084 Policy Effective: 08/15/2024 COMMERCIAL GENERAL LIABILITY CG20371219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS -COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury' or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products -completed operations hazard". However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. Name Of Additional Insured Person(s) Or Organization(s): B. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. Schedule All persons or organizations with whom you have entered into a written contract or agreement, prior to an "occurrence" or offense, to provide additional insured status. Location And Description Of Completed Operations All locations as required by a written contract or agreement entered into prior to an "occurrence" or offense. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. CG 20 37 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 Policy Number: TB2Z91475553084 Policy Effective: 08/15/2024 Issued by Liberty Mutual Fire Insurance Co. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. COMMERCIAL GENERAL LIABILITY ADDITIONAL INSURED ENHANCEMENT FOR CONTRACTORS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART Index of modified items: Item 1. Blanket Additional Insured Where Required By Written Agreement Lessors of Leased Equipment Managers or Lessors of Premises Mortgagees, Assignees or Receivers Owners, Lessees or Contractors Architects, Engineers or Surveyors Any Person or Organization Item 2. Blanket Additional Insured — Grantor Of Permits Item 3. Other Insurance Amendment Item 1. Blanket Additional Insured Where Required By Written Agreement Paragraph 2. of Section II — Who Is An Insured is amended to add the following: Additional Insured By Written Agreement The following are insureds under the Policy when you have agreed in a written agreement to provide them coverage as additional insureds under your policy: 1. Lessors of Leased Equipment: The person(s) or organization(s) from whom you lease equipment, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury' caused, in whole or in part, by your maintenance, operation or use of equipment leased to you by such person(s) or organization(s). This insurance does not apply to any "occurrence" which takes place after the equipment lease expires. 2. Managers or Lessors of Premises: Any manager(s) or lessor(s) of premises leased to you in which the written lease agreement obligates you to procure additional insured coverage. The coverage afforded to the additional insured is limited to liability in connection with the ownership, maintenance or use of the premises leased to you and caused, in whole or in part, by some negligent act(s) or omission(s) of you, your "employees", your agents or your subcontractors. There is no coverage for the additional insured for liability arising out of the sole negligence of the additional insured or those acting on behalf of the additional insured, except as provided below. If the written agreement obligates you to procure additional insured coverage for the additional insured's sole negligence, then the coverage for the additional insured shall conform to the agreement, but only if the applicable law would allow you to indemnify the additional insured for liability arising out of the additional insured's sole negligence. LC 20 58 11 18 © 2018 Liberty Mutual Insurance Page 1 of 4 Includes copyrighted material of Insurance Services Office, Inc., with its permission. This insurance does not apply to: a. Any "occurrence" which takes place after you cease to be a tenant in that premises or to lease that land; b. Structural alterations, new construction or demolition operations performed by or on behalf of that manager or lessor; or c. Any premises for which coverage is excluded by endorsement. 3. Mortgagees, Assignees or Receivers: Any person(s) or organization(s) with respect to their liability as mortgagee, assignee or receiver and arising out of your ownership, maintenance or use of the premises. This insurance does not apply to structural alterations, new construction and demolition operations performed by or on behalf of such person(s) or organization(s). 4. Owners, Lessees or Contractors: Any person(s) or organization(s) to whom you are obligated to procure additional insured coverage, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your act(s) or omission(s) or the act(s) or omission(s) of your "employees", your agents, or your subcontractors, in the performance of your ongoing operations. This insurance does not apply to "bodily injury", "property damage", or "personal and advertising injury' arising out of "your work" included in the "products -completed operations hazard" unless you are required to provide such coverage for the additional insured by the written agreement, and then only for the period of time required by the written agreement and only for liability caused, in whole or in part, by your act(s) or omission(s) or the act(s) or omission(s) of your "employees", your agents, or your subcontractors. There is no coverage for the additional insured for liability arising out of the sole negligence of the additional insured or those acting on behalf of the additional insured, except as provided below. If the written agreement obligates you to procure additional insured coverage for the additional insured's sole negligence, then the coverage for the additional insured shall conform to the agreement, but only if the applicable law would allow you to indemnify the additional insured for liability arising out the additional insured's sole negligence. This insurance does not apply to "bodily injury', "property damage" or "personal and advertising injury" arising out of the rendering of, or failure to render, any professional architectural, engineering or surveying services, including: a. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or b. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury' or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or failure to render any professional services. S. Architects, Engineers or Surveyors: Any architect, engineer, or surveyor engaged by you but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your act(s) or omission(s) or the act(s) or omission(s) of those acting on your behalf: a. In connection with your premises; or b. In the performance of your ongoing operations. This insurance does not apply to "bodily injury', "property damage" or "personal and advertising injury" arising out of the rendering of or failure to render any professional services by or for you, including: LC 20 58 11 18 © 2018 Liberty Mutual Insurance Page 2 of 4 Includes copyrighted material of Insurance Services Office, Inc., with its permission. a. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or b. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury', involved the rendering of or failure to render any professional services by or for you. 6. Any Person or Organization Other Than a Joint Venture: Any person(s) or organization(s) (other than a joint venture of which you are a member) for whom you are obligated to procure additional insured coverage, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury' caused, in whole or in part, by your act(s) or omission(s) or the act(s) or omission(s) of those acting on your behalf: a. In the performance of your ongoing operations; or b. In connection with premises owned by or rented to you. This insurance does not apply to: a. Any person(s) or organization(s) more specifically covered in Paragraphs 1. through 5. above; b. Any construction, renovation, demolition or installation operations performed by or on behalf of you, or those operating on your behalf; or c. Any person(s) or organization(s) whose profession, business or occupation is that of an architect, surveyor or engineer with respect to liability arising out of the rendering of, or failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving or failing to prepare or approve, maps, drawings, opinions, reports, surveys, field orders, change orders, designs and specifications; or (2) Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury' or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or failure to render any professional services by or on behalf of you, or those operating on your behalf. The insurance afforded to any person(s) or organization(s) as an insured under this Item 1.: 1. Applies to the extent permitted by law; 2. Applies only to the scope of coverage and the minimum limits of insurance required by the written agreement, but in no event exceeds either the scope of coverage or the limits of insurance provided by this Policy; 3. Does not apply to any person(s) or organization(s) for any "bodily injury", "property damage" or "personal and advertising injury" if any other additional insured endorsement attached to this Policy applies to such person(s) or organization(s) with regard to the "bodily injury", "property damage" or "personal and advertising injury"; 4. Applies only if the "bodily injury' or "property damage" occurs, or the offense giving rise to the "personal and advertising injury" is committed, subsequent to the execution of the written agreement; and 5. Applies only if the written agreement is in effect at the time the "bodily injury" or "property damage" occurs, or at the time the offense giving rise to the "personal and advertising injury" is committed. LC 20 58 11 18 © 2018 Liberty Mutual Insurance Page 3 of 4 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Item 2. Blanket Additional Insured — Grantor Of Permits Paragraph 2. of Section II — Who Is An Insured is amended to add the following: Any state, municipality or political subdivision that has issued you a permit in connection with any operations performed by you or on your behalf, or in connection with premises you own, rent or control, and to which this insurance applies, but only to the extent that you are required to provide additional insured status to the state, municipality or political subdivision as a condition of receiving and maintaining the permit. Such state, municipality or political subdivision that has issued you a permit is an insured only with respect to their liability as grantor of such permit to you. However, with respect to the state, municipality or political subdivision: 1. Coverage will be no broader than required; and 2. Limits of insurance will not exceed the minimum limits of insurance required as a condition for receiving or maintaining the permit; but neither the scope of coverage nor the limits of insurance will exceed those provided by this Policy. This insurance does not apply to: 1. "Bodily injury", "property damage" or "personal and advertising injury" arising out of operations performed for the state, municipality or political subdivision; 2. Any "bodily injury" or "property damage" included within the "products -completed operations hazard", except when required by written agreement initiated prior to loss; or 3. "Bodily injury', "property damage" or "personal and advertising injury", unless negligently caused, in whole or in part, by you or those acting on your behalf. Item 3. Other Insurance Amendment If you are obligated under a written agreement to provide liability insurance on a primary, excess, contingent, or any other basis for any person(s) or organization(s) that qualifies as an additional insured on this Policy, this Policy will apply solely on the basis required by such written agreement and Paragraph 4. Other Insurance of Section IV — Commercial General Liability Conditions will not apply. Where the applicable written agreement does not specify on what basis the liability insurance will apply, the provisions of Paragraph 4. Other Insurance of Section IV — Commercial General Liability Conditions will apply. However, this insurance is excess over any other insurance available to the additional insured for which it is also covered as an additional insured for the same "occurrence", claim or "suit". LC 20 58 11 18 © 2018 Liberty Mutual Insurance Page 4 of 4 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Number: TB2Z91475553O 4 Policy Effective: 08115/2024 Issued by LibeM.r Mutual Fire Insurance Co_ COMMERCIAL GENERAL LIABILITY CG 20 01 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance (2) You have agreed in writing in a contract or Condition and supersedes any provision to the agreement that this insurance would be contrary: primary and would not seek contribution Primary And Noncontributory Insurance from any other insurance available to the This insurance is primary to and will not seek additional insured. contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and CG 20 01 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 Policy Number: TB2Z91475553084 Policy Effective: 0811512024 Issued by Liberty Mutual Fire Insurance Co. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. COMMERCIAL GENERAL LIABILITY ENHANCEMENT FOR CONTRACTORS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART Index of modified items: Item 1. Reasonable Force Item 2. Non -Owned Watercraft Extension Item 3. Damage To Premises Rented To You — Expanded Coverage Item 4. Bodily Injury To Co -Employees Item 5. Health Care Professionals As Insureds Item 6. Knowledge Of Occurrence Or Offense Item 7. Notice Of Occurrence Or Offense Item 8. Unintentional Failure To Disclose Item 9. Bodily Injury Redefined Item 10. Supplementary Payments — Increased Limits Item 11. Property In Your Care, Custody Or Control Item 12. Mobile Equipment Redefined Item 13. Newly Formed Or Acquired Entities Item 14. Waiver Of Right Of Recovery By Written Contract Or Agreement Item 1. Reasonable Force Exclusion a. of Section I — Coverage A — Bodily Injury And Property Damage Liability is replaced by the following: a. Expected Or Intended Injury "Bodily injury" or "property damage" expected or intended from the standpoint of the insured. This exclusion does not apply to "bodily injury" or "property damage" resulting from the use of reasonable force to protect persons or property. Item 2. Non -Owned Watercraft Extension Paragraph (2) of Exclusion g. of Section I — Coverage A — Bodily Injury And Property Damage Liability is replaced by the following: (2) A watercraft you do not own that is: (a) Less than 55 feet long; and (b) Not being used to carry persons or property for a charge; Item 3. Damage To Premises Rented To You — Expanded Coverage A. The final paragraph of 2. Exclusions of Section I — Coverage A — Bodily Injury And Property Damage Liability is replaced by the following: LC 32 199 11 18 © 2018 Liberty Mutual Insurance Page 1 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Exclusions c. through n. do not apply to damage by fire, lightning or explosion or subsequent damages resulting from such fire, lightning or explosion including water damage to premises while rented to you or temporarily occupied by you with permission of the owner. A separate limit of insurance applies to this coverage as described in Section III — Limits Of Insurance. B. Paragraph 6. of Section III — Limits Of Insurance is replaced by the following: 6. Subject to Paragraph S. above, the Damage To Premises Rented To You Limit is the most we will pay under Coverage A for damages because of "property damage" to any one premises, while rented to you, or in the case of damage by fire, lightning, explosion or subsequent damages resulting from such fire, lightning or explosion including water damage to premises while rented to you or temporarily occupied by you with permission of the owner. The Damage To Premises Rented To You Limit is the greater of: a. $300,000; or b. The Damage To Premises Rented To You Limit shown on the Declarations. C. Paragraph 9.a. of the definition of "insured contract" in Section V — Definitions is replaced by the following: a. A contract for a lease of premises. However, that portion of the contract for a lease of premises that indemnifies any person or organization for damage by fire, lightning, explosion or subsequent damages resulting from such fire, lightning or explosion including water damage to premises while rented to you or temporarily occupied by you with permission of the owner is not an "insured contract'; D. The paragraph immediately following Paragraph (6) of Exclusion j. of Section I — Coverage A — Bodily Injury And Property Damage Liability is replaced by the following: Paragraphs (1), (3) and (4) of this exclusion do not apply to "property damage" (other than damage by fire, lightning or explosion or subsequent damages resulting from such fire, lightning or explosion including water damage) to premises, including the contents of such premises, rented to you for a period of seven or fewer consecutive days. A separate limit of insurance applies to Damage To Premises Rented To You as described in Section III — Limits of Insurance. Item 4. Bodily Injury To Co -Employees A. Paragraph 2. of Section II — Who Is An Insured is amended to include: Each of the following is also an insured: Your "employees" (other than either your "executive officers" (if you are an organization other than a partnership, joint venture or limited liability company) or your managers (if you are a limited liability company)) or "volunteer workers" are insureds while in the course of their employment or while performing duties related to the conduct of your business with respect to "bodily injury": (1) To you; (2) To your partners or members (if you are a partnership or joint venture); (3) To your members (if you are a limited liability company); or (4) To a co -"employee" or "volunteer worker" while that co -"employee" or "volunteer worker" is either in the course of his or her employment by you or while performing duties related to the conduct of your business (including participation in any recreational activities sponsored by you). Paragraph 2.a.(1)(a) of Section II — Who Is An Insured does not apply to "bodily injury" for which insurance is provided by this paragraph. LC 32 199 11 18 © 2018 Liberty Mutual Insurance Page 2 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. B. The insurance provided by this Item 4. for "bodily injury" to a co -"employee" or "volunteer worker" will not apply if the injured co -"employee's" or "volunteer worker's" sole remedy for such injury is provided under a workers' compensation law or any similar law. C. Other Insurance The insurance provided by this Item 4. is excess over any other valid and collectible insurance available to the insured, whether primary, excess, contingent or on any other basis. Item 5. Health Care Professionals As Insureds A. Paragraph 2.a.(1)(d) of Section II — Who Is An Insured is replaced by the following: (d) Arising out of his or her providing or failure to provide professional health care services. However, any "employee" or "volunteer worker" of the Named Insured who is acting as a Good Samaritan in response to a public or medical emergency or who is a "designated health care provider" is an insured with respect to "bodily injury" and "personal and advertising injury" that: (i) Arises out of the providing of or failure to provide professional health care services; and (ii) Occurs in the course of and within the scope of such "employee's" or "volunteer worker's" employment by the Named Insured. B. With respect to "employees" and "volunteer workers" providing professional health care services, the following exclusions are added to Paragraph 2. Exclusions of Section I — Coverage A — Bodily Injury And Property Damage Liability and Paragraph 2. Exclusions of Section I — Coverage B — Personal And Advertising Injury Liability: This insurance does not apply to: (1) Liability assumed under an "insured contract" or any other contract or agreement; (2) Liability arising out of the providing of professional health care services in violation of law; (3) Liability arising out of the providing of any professional health care services while in any degree under the influence of intoxicants or narcotics; (4) Liability arising out of any dishonest, fraudulent, malicious or knowingly wrongful act or failure to act; or (5) Punitive or exemplary damages, fines or penalties. C. The following definition is added to Section V — Definitions: "Designated health care provider" means any "employee" or "volunteer worker" of the Named Insured whose duties include providing professional health care services, including but not limited to doctors, nurses, emergency medical technicians or designated first aid personnel. D. Other Insurance The insurance provided by this Item S. is excess over any other valid and collectible insurance available to the insured, whether primary, excess, contingent or on any other basis. Item 6. Knowledge Of Occurrence Or Offense Knowledge of an "occurrence" or offense by your agent, servant or "employee" will not in itself constitute knowledge by you unless your "executive officer" or "employee" designated by you to notify us of an "occurrence" or offense has knowledge of the "occurrence" or offense. LC 32 199 11 18 © 2018 Liberty Mutual Insurance Page 3 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Item 7. Notice Of Occurrence Or Offense For purposes of Paragraph 2.a. of Section IV — Commercial General Liability Conditions, you refers to your "executive officer" or "employee" that you have designated to give us notice. Item 8. Unintentional Failure To Disclose Unintentional failure of the Named Insured to disclose all hazards existing at the inception of this Policy shall not be a basis for denial of any coverage afforded by this Policy. However, you must report such an error or omission to us as soon as practicable after its discovery. This provision does not affect our right to collect additional premium or exercise our right of cancellation or non -renewal. Item 9. Bodily Injury Redefined The definition of "bodily injury" in Section V — Definitions is replaced by the following: "Bodily injury" means: a. Bodily injury, sickness or disease sustained by a person, including death resulting from any of these at any time, and b. Mental anguish, shock or humiliation arising out of injury as defined in Paragraph a. above. Mental anguish means any type of mental or emotional illness or distress. Item 10. Supplementary Payments— Increased Limits Paragraphs 1.b. and 1.d. of Section I — Supplementary Payments — Coverages A And B are replaced by the following: b. Up to $3,000 for the cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. d. All reasonable expenses incurred by the insured at our request to assist in the investigation or defense of the claim or "suit', including actual loss of earnings up to $500 a day because of time off from work. Item 11. Property In Your Care, Custody Or Control A. Paragraphs (3) and (4) of Exclusion j. of Section I — Coverage A — Bodily Injury And Property Damage Liability are deleted. B. Additional Exclusion Coverage provided by this endorsement does not apply to "property damage" to property while in transit. C. Limits of Insurance Subject to Paragraphs 2., 3., and 5. of Section III — Limits Of Insurance, the most we will pay for insurance provided by Paragraph A. above is: $10,000 Each Occurrence Limit $75,000 Aggregate Limit The Each Occurrence Limit for this coverage applies to all damages as a result of any one 'occurrence" regardless of the number of persons or organizations who sustain damage because of that "occurrence". The Aggregate Limit is the most we will pay for the sum of all damages under this Item 11. LC 32 199 11 18 © 2018 Liberty Mutual Insurance Page 4 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. D. Other Insurance This insurance does not apply to any portion of a loss for which the insured has available any other valid and collectible insurance, whether primary, excess, contingent, or on any other basis, unless such other insurance was specifically purchased by the insured to apply in excess of this Policy. Item 12. Mobile Equipment Redefined The definition of "mobile equipment" in Section V — Definitions is amended to include self-propelled vehicles with permanently attached equipment less than 1000 pounds gross vehicle weight that are primarily designed for: (1) Snow removal; (2) Road maintenance, but not construction or resurfacing; or (3) Street cleaning. However, "mobile equipment" does not include land vehicles that are subject to a compulsory or financial responsibility law or other motor vehicle insurance law where such vehicles are licensed or principally garaged. Land vehicles subject to a compulsory or financial responsibility law or other motor vehicle insurance law are considered "autos". Item 13. Newly Formed Or Acquired Entities A. Paragraph 3. of Section II — Who Is An Insured is replaced by the following: 3. Any organization you newly acquire or form, other than a partnership or joint venture, and over which you maintain majority ownership or majority interest, will qualify as a Named Insured if there is no other similar insurance available to that organization. However: a. Coverage under this provision is afforded only until: (1) The 180th day after you acquire or form the organization; (2) Separate coverage is purchased for the organization; or (3) The end of the policy period whichever is earlier; b. Section I — Coverage A — Bodily Injury And Property Damage Liability does not apply to "bodily injury' or "property damage" that occurred before you acquired or formed the organization; and c. Section I — Coverage B — Personal And Advertising Injury Liability does not apply to "personal and advertising injury" arising out of an offense committed before you acquired or formed the organization. B. The insurance afforded to any organization as a Named Insured under this Item 13. does not apply if a Broad Form Named Insured endorsement attached to this Policy applies to that organization. Item 14. Waiver Of Right Of Recovery By Written Contract Or Agreement The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV — Commercial General Liability Conditions: We waive any right of recovery because of payments we make under this Policy for injury or damage arising out of your ongoing operations or "your work" included in the "products -completed operations hazard" that we may have against any person or organization with whom you have agreed in a written contract or agreement to waive your rights of recovery but only if the "bodily injury" or "property damage" occurs, or offense giving rise to "personal and advertising injury' is committed subsequent to the execution of the written contract or agreement. LC 32 199 11 18 © 2018 Liberty Mutual Insurance Page 5 of 5 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Number: TB2Z91475553084 Policy Effective: 08/15/2024 Issued by Liberty Mutual Fire Insurance Co. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION TO THIRD PARTIES This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF -INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY - UMBRELLA COVERAGE FORM A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the persons or organizations shown in the Schedule of this endorsement. We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. All other terms and conditions of this policy remain unchanged. Schedule Name of Other Person(s) / Email Address or mailing address: Number Days Notice: Organization(s): Per Schedule On File With The Company Per Schedule On File With The Company 30 LIM 99 01 05 11 © 2011, Liberty Mutual Group of Companies. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Number: AS2Z91475553094_ Policy Effective: 08/15/2024 Issued by Liberty Mutual Fire Insurance Co. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. AUTO ENHANCEMENT ENDORSEMENT This endorsement modifies insurance provided under the following: 1041*&y_NIACiZ61911FAMa]:4IT, I. Newly Acquired or Formed Organizations II. Employees as Insureds III. Lessor - Additional Insured and Loss Payee IV. Supplementary Payments - Increased Limits V. Fellow Employee Coverage VI. Personal Property of Others VII. Additional Transportation Expense and Cost to Recover Stolen Auto Vill. Airbag Coverage IX. Tapes, Records and Discs Coverage X. Physical Damage Deductible - Single Deductible XI. Physical Damage Deductible - Glass XII. Physical Damage Deductible - Vehicle Tracking System XIII. Duties in Event of Accident, Claim, Suit or Loss XIV. Unintentional Failure to Disclose Hazards XV. Worldwide Liability Coverage - Hired and Nonowned Autos XVI. Hired Auto Physical Damage XVII. Auto Medical Payments Coverage Increased Limits XVIII. Drive Other Car Coverage - Broadened Coverage for Designated Individuals XIX. Rental Reimbursement Coverage XX. Notice of Cancellation or Nonrenewal XXI. Loan/Lease Payoff Coverage XXII. Limited Mexico Coverage XXIII. Waiver of Subrogation I. NEWLY ACQUIRED OR FORMED ORGANIZATIONS Throughout this policy, the words "you" and "your" also refer to any organization you newly acquire or form, other than a partnership or joint venture, and over which you maintain ownership of more than 50 percent interest, provided: A. There is no similar insurance available to that organization; B. Unless you notify us to add coverage to your policy, the coverage under this provision is afforded only until: 1. The 90th day after you acquire or form the organization; or 2. The end of the policy period, whichever is earlier; and C. The coverage does not apply to an "accident" which occurred before you acquired or formed the organization. AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 1 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. II. EMPLOYEES AS INSUREDS Paragraph A.1. Who Is An Insured of SECTION II - COVERED AUTOS LIABILITY COVERAGE is amended to add the following: Your "employee" is an "insured" while using with your permission a covered "auto" you do not own, hire or borrow in your business or your personal affairs. III. LESSOR - ADDITIONAL INSURED AND LOSS PAYEE A. Any 'leased auto" will be considered an "auto" you own and not an "auto" you hire or borrow. The coverages provided under this section apply to any "leased auto" until the expiration date of this policy or until the lessor or his or her agent takes possession of the "leased auto" whichever occurs first. B. For any 'leased auto" that is a covered "auto" under SECTION II - COVERED AUTOS LIABILITY COVERAGE, Paragraph A.1. Who Is An Insured provision is changed to include as an "insured" the lessor of the "leased auto". However, the lessor is an "insured" only for "bodily injury" or "property damage" resulting from the acts or omissions by: 1. You. 2. Any of your "employees" or agents; or 3. Any person, except the lessor or any "employee" or agent of the lessor, operating a "leased auto" with the permission of any of the above. C. Loss Payee Clause 1. We will pay, as interests may appear, you and the lessor of the "leased auto" for 'loss" to the covered "leased auto". 2. The insurance covers the interest of the lessor of the "leased auto" unless the 'loss" results from fraudulent acts or omissions on your part. 3. If we make any payment to the lessor of a "leased auto", we will obtain his or her rights against any other party. D. Cancellation 1. If we cancel the policy, we will mail notice to the lessor in accordance with the Cancellation Common Policy Condition. 2. If you cancel the policy, we will mail notice to the lessor. 3. Cancellation ends this agreement. E. The lessor is not liable for payment of your premiums. F. For purposes of this endorsement, the following definitions apply: "Leased auto" means an "auto" which you lease for a period of six months or longer for use in your business, including any "temporary substitute" of such 'leased auto". "Temporary substitute" means an "auto" that is furnished as a substitute for a covered "auto" when the covered "auto" is out of service because of its breakdown, repair, servicing, 'loss" or destruction. AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 2 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. IV. SUPPLEMENTARY PAYMENTS - INCREASED LIMITS Subparagraphs A.2.a.(2) and A.2.a.(4) of SECTION II - COVERED AUTOS LIABILITY COVERAGE are deleted and replaced by the following: (2) Up to $3,000 for cost of bail bonds (including bonds for related traffic law violations) required because of an "accident" we cover. We do not have to furnish these bonds. (4) All reasonable expenses incurred by the "insured" at our request, including actual loss of earnings up to $500 a day because of time off from work. V. FELLOW EMPLOYEE COVERAGE A. Exclusion B.5. of SECTION II - COVERED AUTOS LIABILITY COVERAGE does not apply. B. For the purpose of Fellow Employee Coverage only, Paragraph B.5. of SECTION IV - BUSINESS AUTO CONDITIONS is changed as follows: This Fellow Employee Coverage is excess over any other collectible insurance. VI. PERSONAL PROPERTY OF OTHERS Exclusion 6. in SECTION II - COVERED AUTOS LIABILITY COVERAGE for a covered "auto" is amended to add the following: This exclusion does not apply to "property damage" or "covered pollution cost or expense" involving "personal property" of your "employees" or others while such property is carried by the covered "auto". The Limit of Insurance for this coverage is $5,000 per "accident". Payment under this coverage does not increase the Limit of Insurance. For the purpose of this section of this endorsement, "personal property" is defined as any property that is not used in the individual's trade or business or held for the production or collection of income. VII. ADDITIONAL TRANSPORTATION EXPENSE AND COST TO RECOVER STOLEN AUTO A. Paragraph AA.a. of SECTION III - PHYSICAL DAMAGE COVERAGE is amended as follows: The amount we will pay is increased to $50 per day and to a maximum limit of $1,000. B. Paragraph AA.a. of SECTION III - PHYSICAL DAMAGE COVERAGE is amended to add the following: If your business is shown in the Declarations as something other than an auto dealership, we will also pay up to $1,000 for reasonable and necessary costs incurred by you to return a stolen covered "auto" from the place where it is recovered to its usual garaging location. VIII. AIRBAG COVERAGE Exclusion B.3.a. in SECTION III - PHYSICAL DAMAGE COVERAGE is amended to add the following: This exclusion does not apply to the accidental discharge of an airbag. IX. TAPES, RECORDS AND DISCS COVERAGE Exclusion BA.a. of SECTION III - PHYSICAL DAMAGE COVERAGE is deleted and replaced by the following: a. Tapes, records, discs or other similar audio, visual or data electronic devices designed for use with audio, visual or data electronic equipment except when the tapes, records, discs or other similar audio, visual or data electronic devices: AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 3 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. (1) Are your property or that of a family member; and (2) Are in a covered "auto" at the time of "loss". The most we will pay for "loss" is $200. No Physical Damage Coverage deductible applies to this coverage. X. PHYSICAL DAMAGE DEDUCTIBLE - SINGLE DEDUCTIBLE Paragraph D. in SECTION III - PHYSICAL DAMAGE COVERAGE is deleted and replaced by the following: D. Deductible For each covered "auto", our obligation to pay for, repair, return or replace damaged or stolen property will be reduced by the applicable deductible shown in the Declarations. Any Comprehensive Coverage deductible shown in the Declarations does not apply to "loss" caused by fire or lightning. When two or more covered "autos" sustain "loss" in the same collision, the total of all the "loss" for all the involved covered "autos" will be reduced by a single deductible, which will be the largest of all the deductibles applying to all such covered "autos". XI. PHYSICAL DAMAGE DEDUCTIBLE — GLASS Paragraph D. in SECTION III - PHYSICAL DAMAGE COVERAGE is amended to add the following: No deductible applies to "loss" to glass if you elect to patch or repair it rather than replace it. XII. PHYSICAL DAMAGE DEDUCTIBLE - VEHICLE TRACKING SYSTEM Paragraph D. in SECTION III - PHYSICAL DAMAGE COVERAGE is amended to add: Any Comprehensive Coverage Deductible shown in the Declarations will be reduced by 50% for any "loss" caused by theft if the vehicle is equipped with a vehicle tracking device such as a radio tracking device or a global positioning device and that device was the method of recovery of the vehicle. XIII. DUTIES IN EVENT OF ACCIDENT, CLAIM, SUIT OR LOSS Subparagraphs A.2.a. and A.2.b. of SECTION IV- BUSINESS AUTO CONDITIONS are changed to: a. In the event of "accident", claim, "suit" or "loss", your insurance manager or any other person you designate must notify us as soon as reasonably possible of such "accident", claim, "suit" or "loss". Such notice must include: (1) How, when and where the "accident" or "loss" occurred; (2) The "insured's" name and address; and (3) To the extent possible, the names and addresses of any injured persons and witnesses. Knowledge of an "accident", claim, "suit" or "loss" by your agent, servant or "employee" shall not be considered knowledge by you unless you, your insurance manager or any other person you designate has received notice of the "accident", claim, "suit" or "loss" from your agent, servant or "employee". b. Additionally, you and any other involved "insured" must: (1) Assume no obligation, make no payment or incur no expense without our consent, except at the "insured's" own cost. AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 4 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. (2) Immediately send us copies of any request, demand, order, notice, summons or legal paper received concerning the claim or "suit". (3) Cooperate with us in the investigation or settlement of the claim or defense against the "suit'. (4) Authorize us to obtain medical records or other pertinent information. (5) Submit to examination, at our expense, by physicians of our choice, as often as we reasonably require. XIV. UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS Paragraph B.2. in SECTION IV - BUSINESS AUTO CONDITIONS is amended to add the following: Any unintentional failure to disclose all exposures or hazards existing as of the effective date of the Business Auto Coverage Form or at any time during the policy period will not invalidate or adversely affect the coverage for such exposure or hazard. However, you must report the undisclosed exposure or hazard to us as soon as reasonably possible after its discovery. XV. WORLDWIDE LIABILITY COVERAGE - HIRED AND NONOWNED AUTOS Condition B.7. in SECTION IV - BUSINESS AUTO CONDITIONS is amended to add the following: For "accidents" resulting from the use or operation of covered "autos" you do not own, the coverage territory means all parts of the world subject to the following provisions: a. If claim is made or "suit' is brought against an "insured" outside of the United States of America, its territories and possessions, Puerto Rico and Canada, we shall have the right, but not the duty to investigate, negotiate, and settle or defend such claim or "suit'. If we do not exercise that right, the "insured" shall have the duty to investigate, negotiate, and settle or defend the claim or "suit' and we will reimburse the "insured" for the expenses reasonably incurred in connection with the investigation, settlement or defense. Reimbursement will be paid in the currency of the United States of America at the rate of exchange prevailing on the date of reimbursement. The "insured" shall provide us with such information we shall reasonably request regarding such claim or "suit" and its investigation, negotiation, and settlement or defense. The "insured" shall not agree to any settlement of the claim or "suit' without our consent. We shall not unreasonably withhold consent. b. We are not licensed to write insurance outside of the United States of America, its territories or possessions, Puerto Rico and Canada. We will not furnish certificates of insurance or other evidence of insurance you may need for the purpose of complying with the laws of other countries relating to auto insurance. Failure to comply with the auto insurance laws of other countries may result in fines or penalties. This insurance does not apply to such fines or penalties. XVI. HIRED AUTO PHYSICAL DAMAGE If no deductibles are shown in the Declarations for Physical Damage Coverage for Hired or Borrowed Autos, the following will apply: A. We will pay for "loss" under Comprehensive and Collision coverages to a covered "auto" of the private passenger type hired without an operator for use in your business: AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 5 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. 1. The most we will pay for coverage afforded by this endorsement is the lesser of: a. The actual cost to repair or replace such covered "auto" with other property of like kind and quality; or b. The actual cash value of such covered "auto" at the time of the "loss". 2. An adjustment for depreciation and physical condition will be made in determining actual cash value in the event of a total "loss". 3. If a repair or replacement results in better than like kind or quality, we will not pay for the amount of the betterment. B. For each covered "auto", our obligation to pay for, repair, return or replace the covered "auto" will be reduced by any deductible shown in the Declarations that applies to private passenger "autos" that you own. If no applicable deductible is shown in the Declarations, the deductible will be $250. If the Declarations show other deductibles for Physical Damage Coverages for Hired or Borrowed Autos, this Section XVI of this endorsement does not apply. C. Paragraph AA.b. of SECTION III - PHYSICAL DAMAGE COVERAGE is replaced by the following: b. Loss of Use Expenses For Hired Auto Physical Damage provided by this endorsement, we will pay expenses for which an "insured" becomes legally responsible to pay for loss of use of a private passenger vehicle rented or hired without a driver, under a written rental contract or agreement. We will pay for loss of use expenses caused by: (1) Other than collision only if the Declarations indicate that Comprehensive Coverage is provided for any covered "auto"; (2) Specified Causes of Loss only if the Declarations indicate that Specified Causes of Loss Coverage is provided for any covered "auto"; or (3) Collision only if the Declarations indicate that Collision Coverage is provided for any covered "auto". However, the most we will pay under this coverage is $30 per day, subject to a maximum of $900 XVII. AUTO MEDICAL PAYMENTS COVERAGE - INCREASED LIMITS For any covered "loss", the Limit of Insurance for Auto Medical Payments will be double the limit shown in the Declarations if the "insured" was wearing a seat belt at the time of the "accident". This is the maximum amount we will pay for all covered medical expenses, regardless of the number of covered "autos", "insureds", premiums paid, claims made, or vehicles involved in the "accident". If no limit of insurance for Auto Medical Payments is shown on the Declarations, this paragraph Section XVII of this endorsement does not apply. XVIII. DRIVE OTHER CAR COVERAGE - BROADENED COVERAGE FOR DESIGNATED INDIVIDUALS A. This endorsement amends only those coverages indicated with an "X" in the Drive Other Car section of the Schedule to this endorsement. B. SECTION II - COVERED AUTOS LIABILITY COVERAGE is amended as follows: 1. Any "auto" you don't own, hire or borrow is a covered "auto" for Liability Coverage while being used by any individual named in the Drive Other Car section of the Schedule to this endorsement or by his or her spouse while a resident of the same household except: AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 6 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. a. Any "auto" owned by that individual or by any member of his or her household; or b. Any "auto" used by that individual or his or her spouse while working in a business of selling, servicing, repairing or parking "autos". 2. The following is added to Who Is An Insured: Any individual named in the Drive Other Car section of the Schedule to this endorsement and his or her spouse, while a resident of the same household, are "insureds" while using any covered "auto" described in Paragraph B.1. of this endorsement. C. Auto Medical Payments, Uninsured Motorist, and Underinsured Motorist Coverages are amended as follows: The following is added to Who Is An Insured: Any individual named in the Drive Other Car section of the Schedule to this endorsement and his or her "family members" are "insured" while "occupying" or while a pedestrian when struck by any "auto" you don't own except: Any "auto" owned by that individual or by any "family member". D. SECTION III - PHYSICAL DAMAGE COVERAGE is changed as follows: Any private passenger type "auto" you don't own, hire or borrow is a covered "auto" while in the care, custody or control of any individual named in the Drive Other Car section of the Schedule to this endorsement or his or her spouse while a resident of the same household except: 1. Any "auto" owned by that individual or by any member of his or her household; or 2. Any "auto" used by that individual or his or her spouse while working in a business of selling, servicing, repairing or parking "autos". E. For purposes of this endorsement, SECTION V - DEFINITIONS is amended to add the following: "Family member" means a person related to the individual named in the Drive Other Car section of the Schedule to this endorsement by blood, marriage or adoption who is a resident of the individual's household, including a ward or foster child. XIX. RENTAL REIMBURSEMENT COVERAGE A. For any owned covered "auto" for which Collision and Comprehensive Coverages are provided, we will pay for rental reimbursement expenses incurred by you for the rental of an "auto" because of a covered physical damage "loss" to an owned covered "auto". Such payment applies in addition to the otherwise applicable amount of physical damage coverage you have on a covered "auto". No deductibles apply to this coverage. B. We will pay only for those expenses incurred during the policy period beginning 24 hours after the "loss" and ending with the earlier of the return or repair of the covered "auto", or the exhaustion of the coverage limit. C. Our payment is limited to the lesser of the following amounts: 1. Necessary and actual expenses incurred; or 2. $30 per day with a maximum of $900 in any one period. AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 7 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. D. This coverage does not apply: 1. While there are spare or reserve "autos" available to you for your operations; or 2. If coverage is provided by another endorsement attached to this policy. E. If a covered "loss" results from the total theft of a covered "auto" of the private passenger type, we will pay under this coverage only that amount of your rental reimbursement expenses which is not already provided for under Paragraph A.4. Coverage Extensions of SECTION III — PHYSICAL DAMAGE COVERAGE of the Business Auto Coverage Form or Section VII of this endorsement. XX. NOTICE OF CANCELLATION OR NONRENEWAL A. Paragraph A.2. of the COMMON POLICY CONDITIONS is changed to: 2. We may cancel or non -renew this policy by mailing written notice of cancellation or non -renewal to the Named Insured, and to any name(s) and address(es) shown in the Cancellation and Non -renewal Schedule: a. For reasons of non-payment, the greater of: (1) 10 days; or (2) The number of days specified in any other Cancellation Condition attached to this policy; or b. For reasons other than non-payment, the greater of: (1) 60 days; (2) The number of days shown in the Cancellation and Non -renewal Schedule; or (3) The number of days specified in any other Cancellation Condition attached to this policy, prior to the effective date of the cancellation or non -renewal. B. All other terms of Paragraph A. of the COMMON POLICY CONDITIONS, and any amendments thereto, remain in full force and effect. XXI. LOAN/LEASE PAYOFF COVERAGE The following is added to Paragraph C. Limits Of Insurance of SECTION III - PHYSICAL DAMAGE COVERAGE: In the event of a total 'loss" to a covered "auto" of the private passenger type shown in the schedule or declarations for which Collision and Comprehensive Coverage apply, we will pay any unpaid amount due on the lease or loan for that covered "auto", less: 1. The amount paid under the PHYSICAL DAMAGE COVERAGE SECTION of the policy; and 2. Any: a. Overdue lease/loan payments at the time of the "loss"; b. Financial penalties imposed under a lease for excessive use, abnormal wear and tear or high mileage; C. Security deposits not returned by the lessor; d. Costs for extended warranties, Credit Life Insurance, Health, Accident or Disability Insurance purchased with the loan or lease; and AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 8 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. e. Carry-over balances from previous loans or leases. This coverage is limited to a maximum of $1,500 for each covered "auto". XXILLIMITED MEXICO COVERAGE WARNING AUTO ACCIDENTS IN MEXICO ARE SUBJECT TO THE LAWS OF MEXICO ONLY - NOT THE LAWS OF THE UNITED STATES OF AMERICA. THE REPUBLIC OF MEXICO CONSIDERS ANY AUTO ACCIDENT A CRIMINAL OFFENSE AS WELL AS A CIVIL MATTER. IN SOME CASES THE COVERAGE PROVIDED UNDER THIS ENDORSEMENT MAY NOT BE RECOGNIZED BY THE MEXICAN AUTHORITIES AND WE MAY NOT BE ALLOWED TO IMPLEMENT THIS COVERAGE AT ALL IN MEXICO. YOU SHOULD CONSIDER PURCHASING AUTO COVERAGE FROM A LICENSED MEXICAN INSURANCE COMPANY BEFORE DRIVING INTO MEXICO. THIS ENDORSEMENT DOES NOT APPLY TO ACCIDENTS OR LOSSES WHICH OCCUR BEYOND 25 MILES FROM THE BOUNDARY OF THE UNITED STATES OF AMERICA. A. Coverage 1. Paragraph B.7. of SECTION IV - BUSINESS AUTO CONDITIONS is amended by the addition of the following: The coverage territory is extended to include Mexico but only if all of the following criteria are met: a. The "accidents" or "loss" occurs within 25 miles of the United States border; and b. While on a trip into Mexico for 10 days or less. 2. For coverage provided by this section of the endorsement, Paragraph B.5. Other Insurance in SECTION IV - BUSINESS AUTO CONDITIONS is replaced by the following: The insurance provided by this endorsement will be excess over any other collectible insurance. B. Physical Damage Coverage is amended by the addition of the following: If a "loss" to a covered "auto" occurs in Mexico, we will pay for such "loss" in the United States. If the covered "auto" must be repaired in Mexico in order to be driven, we will not pay more than the actual cash value of such "loss" at the nearest United States point where the repairs can be made. C. Additional Exclusions The following additional exclusions are added: This insurance does not apply: 1. If the covered "auto" is not principally garaged and principally used in the United States. 2. To any "insured" who is not a resident of the United States. XXIII. WAIVER OF SUBROGATION Paragraph A.5. in SECTION IV - BUSINESS AUTO CONDITIONS does not apply to any person or organization where the Named Insured has agreed, by written contract executed prior to the date of "accident", to waive rights of recovery against such person or organization. AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 9 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Premium Liability $360 Physical Damage $240 Total Premium $600 FC XVII. Drive Other Car Name of Individual N/A XX. Notice of Cancellation or Nonrenewal Name and Address N/A LIAB Schedule MP UM UIM COMP COLL Number of Days AC 84 07 11 17 © 2017 Liberty Mutual Insurance Page 10 of 10 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Number: AS2Z91475553094 Policy Effective: 08115/2024 Issued by Liberty Motual Fire Insurance Ca_ COMMERCIAL AUTO CA 04 49 11 16 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. A. The following is added to the Other Insurance B Condition in the Business Auto Coverage Form and the Other Insurance — Primary And Excess Insurance Provisions in the Motor Carrier Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage is primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". The following is added to the Other Insurance Condition in the Auto Dealers Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage and General Liability Coverages are primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". CA 04 49 11 16 © Insurance Services Office, Inc., 2016 Page 1 of 1 TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ( ) Specific Waiver Name of person or organization (X) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: All Texas Operation 3. Premium: The premium charge for this endorsement shall be 2.0 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: Issued by Liberty Mutual Fire Insurance Company 16586 For attachment to Policy WCCZ91475553074 Effective Date 08/15/2024 Premium $ Issued to BCAC Underground, LLC Endorsement No. WC 42 03 04 B © Copyright 2014 National Council on Compensation Insurance, Inc. Page 1 of 1 Ed. 06/01/2014 All Rights Reserved. 0062 14 - 1 PAYMENT BOND Pagc 1 of 2 SECTION 00 62 14 Bond No.: 3200322 PAYMENT BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, BCAC Underground. LLC ., known as "Principal' herein, and Developers Surety and Indemnity Company . a corporate surety ( or sureties if more than one), duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Suur Wildflower Development, L.P., authorized to do business in Texas "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of One Million Five Hundred Thirty Two Thousand Six flundred Tw ntt Two & 25/1110 Dollars 31.532,622.25), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which stun well and truly be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth, by and through a Community Facilities Agreement, CFA Number 25-0041 ; and WHEREAS, Principal has entered into a certain written Contract with Developer, awarded the 3rd day of July . 2025, which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and other accessories as defined by law, in the prosecution of the Work as provided for in said Contract and designated as Tradition Phase 6B. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under the Contract, then this obligation shall be and become null and void; otherwise to remain in full force and effect. CITY OF FORT WORTH Tradition Phase 6B STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROTECTS City Project #106000 Revised January 31.2012 0062 14 - 2 PAYMENT BOND Page 2 of 2 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute. IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 3rd day of July 2025. YEST: 011, (Principal} secretary Witness as to Principal ATTEST: N/A (Surety) Secretary Witness as to Surety BaiLee Islas PRINCIPAL: BCAC Underground, LLC BY: r�.✓�t— Signaturree Name and Title Address: SURETY: Developers Surety and Indemnity Company Y: re 1936 Jennifer Upton, Attorney -in -Fact Name and Title Address: 800 Superior Avenue E., 21st Floor, Cleveland, OH 44114 Telephone Number: (216) 328-6100 __ Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Tradition Phase 68 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project #I06000 Revised January 31, 2012 006213-1 PERFORMANCE BOND Page 1 of 2 SECTION 00 6213 Bond No.: 3200322 PERFORMANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, BCAC Underground. LLC known as "Principal" herein and, Developers Surety and Indemnity Company a corporate surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, 5nur W ildflm, er Deg einoment, L.P. , authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of Orre million Fi%e Ilundrrd 1 hirt% I %�o I housand Six I Iundrrd I tenth 1 tan & 25r 1110 Dollars (S1.532,622.251 , lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth by and through a Community Facilities Agreement, CFA Number 25-0091 :and WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the 3rd day of _ July . 2025, which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories defined by law, in the prosecution of the Work, including any Change Orders, as provided for in said Contract designated as Tradition Pliase 6B. NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully perform the Work, including Change Orders, under the Contract, according to the plans, specifications, and contract documents therein referred to, and as well during any period of extension of the Contract that may be granted on the part of the Developer and/or City, then this obligation shall be and become null and void, otherwise to remain in full force and effect. PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Tradition Phase 6B STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS City Project ii 106000 Revised January 31. 2012 006213-2 PERFORMANCE BOND Page 2 of 2 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 3rd day of July , 20 . PRINCIPAL: BCAC Underground, LLC BY. _�— } EST; Signature (Principal) cretary Name and Title Address: Witness as to Principal SURETY: De, eloaers Suretv and Indemnity Comoanv et of 1936 in Jennifer Upt , Attorney -in -Fact " Name and Title Address: 800 5unerior A%enue E- 21 st Floor. • I�� Cleveland. OH 44114 .^ Witness as to Surety BaiLee Islas Telephone Number: (216} 328-6100 *Note: if signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF PORT WORTH Tradition Phase 68 STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS City Project #106000 Revised January 31, 2012 0062 19 - 1 MAINTENANCE BOND Pagc 1 of 3 Bond No.: 3200322 SECTION 00 62 19 MAINTENANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, BCAC Underground. LLC . known as "Principal" herein and Developers Surety and Indemnity Company, a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Spur Wildflower Development, L.P. authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the sum of One Million Five Hundred Thirl% 7'nn -1 huusand Six Hundred f«entN 'I %Nu & 25, 100 Dollars ($1.532.022.25) , lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum welt and truly be made jointly unto the Developer and the City as dual obligees and their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth by and through a Community Facilities Agreement, CFA Number 25-0091 : and WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the 3rd day of July , 2025, which Contract is hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment tabor and other accessories as defined by law, in the prosecution of the Work, including any Work resulting from a duly authorized Change Order (collectively herein, the "Work") as provided for in said Contract and designated as Tradition Phase 6B, and; WHEREAS, Principal binds itself to use such materials and to so construct the Work in accordance with the plans, specifications and Contract Documents that the Work is and will remain free from defects in materials or workmanship for and during the period of two (2) years after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and CITY OF FORT WORTH Tradition Phase 6B STANDARD CITY CONDITIONS— DEVELOPER AWARDED PROJECTS City Project 4106000 Revised January 31, 2012 006219-2 MAINTENANCE BOND Page 2 of 3 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the Developer and/or City of the need thereof at any time within the Maintenance Period. NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by Developer or City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the Developer or City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance Bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTH Tradition Phase 613 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project #106000 Revised January 31, 2012 0062 19-3 MAINTENANCE BOND Page 3 of3 W WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the. 3rd day of _ J111Y —, 2025. PRINCIPAL: BCAC Underground. LLC BY: J�lf Signature A a, (Principal) Name and Title Address: 40-11 -4- Witness as to Principal SURETY. Developers Surety and-Inde an _runity B M- 1936 Jennifer Upton, Attorney -in -Fact ATTEST: Name and Title N/A Address: 800 Superior Avenue E.. 2 IsE Floor. (Sure ) Secretary Ovveland. OH 44114 (Sure Witness as to Surety BaiLee Islas Telephone Number: (216) 328-6100 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Tradition Phase 6B STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Pmject#1060DO Revised January 31, 2012 POwE.ROFAT-rORNEI FOR COREPOINTE INSI RANCE COMPANY DEVELOPERS SURETY AND INDEMNITY COMPANY 59 Maiden lane. 43rd Floor, New York-, NY 10038 (212) 220-71211 KNOW ALL BY THESE PRFSENTS that, except as expressly .imued herein COREPOINTE INSIIRANCF COMPANY and DEVELOPERS SUREl'Y AND INDEMNITY COMPANY. do hereby make, corsotute and appoint Jennifer Upton. Dana Mickey, Eric D. Barron, Allen. J. Bale, Dane Bubela, Raul Barberena, Jr. and BaiLee Islas of San Antonio, TX as us true and lawful Attorney in -Fact, to make, execute, deliver and acknowledge, for and on behalf of said companies, as sureties, bonds, undertakings and contracts of sureryship givirg and grant tu, unto said gttomev-m-Fact fill power and authority to do and to perform every tit necessary, requisite or proper to be done in conncciion therewith as each of said company could do. but reserving to each of said company full power of substitution and revocauun, end all of the ads of said Attorney-m-Fact, pursuant to these presents. are hereby ratified and confimxd This Power of Attorney is etlective August 9, 2023 and shall expire on December 31, 2025 --- —_— — This Power of Attorney is granted and is signed under and by aunhunn ofthe tbIlowmg resolut ons adopted by the Board afDueclwsufCORtiPOIN'I'fi INSC RANCE COMPANY and DEVELOPERS SURETY AND INDI \hNIrY COMPANY (colleetively. "Company') on February !0.2023 RESOLV'I:D. that Sam 'Lard. Prescient. Suncty U ndenvnuns;, James hell- Vice Presttjgnt. Surety Lindeirwrituir. and Cram Dawson.Ixecutive Underwr ter. Sur each an employee ofAm'rrust North America. Inc . an affiliate nl'thc Company ((he "Authorized Signors"). are hereby authorized to execute a Power of .Attorney, qualifying atlorney(s)-in-fact named in Elie Power of Auorne) to execute on behalf of the Company. bonds, undertakings and contracts of suretyship. or other buretyship ohlieations, and that the Secretary or any Assistant Secretary of the Company be. and each of them hereby is, authorized to attest the execution of any such Power of Attornew RESOLVED. that the signature ofan.y one ofthe Authorized Signor; and the Secretary or any Assistant Secretan• afthc Company. and the seal ofthe Company must be et]iscd to any such Power of Attorney, and any such signature or seal may he affixed by facsimile, and such Power at Attorney shall be valid and binding upon the Company when so affixed and In the future with respivi to any hcnnd, undertaking or contract ofsuret)ship to which it is attached IN WITNESS WHEREOF. COREPOINTF INSURANCE COMPANY and DEVELOPERS SI RFfY AND INDEMNITY' COMPANY have caused these presents to he signed by the Authorord Signor and attested b) then Secretary or Assistant Secretary this March 27, 2023 •� ,,'e�Hee N••,, ,'e�Heeee�•••, S ��•'' �tJSURgN'•.,� �.•` �b •'•. By / / <<G.. j-q AND • rc • ..... 1 G = o�Por�yr. c� z J�`.. GaRPoir. F� •; Pnnluxl Nan c !� Tithe Pits dent 5iiret_Undenvrrtine • taJ c SEAL : 90: S 193 I n • �•••'�FCAW1s;R�: •Y2�• . 'g4/F0VkK-••DS��' ACKNOWLEDGEMENT: •. • ••••• ' .' •. ��''•••••••''�sd .• A notary public or other officer completing this certificate verities only the 'identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity, of that document. STATE OF Caliomia COUNTY OF Orange On this 27 day of March . 2023 hefore me. Iloane-Quyen Phu Phalli peisunall) appeared Sun /.a7a who proved to Inc on the basis of satisfactory evidence to be the person whose name is subscribed to within the instrument and acknowied-.cd to me that they cxccuted the same in their authorized capacity. and that by the signature uo the instrumen: the entities upon behalf which the person acted, executed this instrument I certify. under penalty of perjury. under the laws of the State of C'alil'ornia WITNESS my hand and official seal Signature �,,, CORPORA E C ER'rIFICATION that the foregoing paragraph is true and correct HOANGQUYEN V. INAII ` Notary Pubk - California IL IL Commission N 2432970 My Comm. E*lres Den 31, 2026 The undersigned, the Secretary or Assistant Secretan of C'ORFPOINTf, INSIIRANCF COMPANY and DI:VPI! 1Pl RS SURF I Y AND INDLMNITY COMPANY, does hereby cethty that the provisions ofthe resolutions of the respective Boards of Directors of said corporations set forth in this Power of Attorney are in force as ofthe date of this Cenificati on Ibis Certification is executed in the Citv of Cleveland (kno this March 19. 2023 ........,,, 0 uSigned by: � ,14 AND ' .�0.,,'D By: �u- AtAV-j _ _ Barn• W Moses. Assistant Secrelary pi : f _ POA No NIA W"Ib6ADII . - W 1936 Docu5ignEnvelopelD:3352BFD6-5E9D-4796-837E-C1 E455E6530F •i$' :�+c,ror` a�= Ed 0323 Signed and sealed this 3rd day of July, 2025 PAVING UNIT PRICE BID Bidlist Item SECTION 00 42 43 Developer Awarded Projects - PROPOSAL. FORM Tradition, Phase 613, City Project #106000 Project item Information Description Bidder's Proposal Specification I Unit of I Bid Unit Price Bid Value Section No. I Measure QuantitV Pavin� Facilities 1 3211. 400 Hydrated Lime @ 30 Ibs.IS.Y. (Residential) 3211 29 TON 295.8 $317.00 $93,768.60 2 3211.0501 6" Lime Treated Subgfade (Residential) 32 13 13 SY 19,716 $4,55 $89,707.80 3 _ 3213.0101 6" Concrete Pavement (Residential) 32 13 13 I SY 18,444 $48.35 $891,767.40 I 4 _ 03 3213.01 5' Conc Sidewalk 31 1320 LF 590 $33.75 $19,912.50 I 5 3213.0506 P-1 Ramp 32 13 20 I EA 14 $2,130.00 $29,820.00 I 6 3292.0400 Seeding, Hydromulch 32 92 13 SY 294 $T00 $2,058,00 7 3441 A003 Furnishlinstall Alum Siqn Ground Mount City_ Std. 34 41 30 EA 13 $M.00 $3,510.00 8 9999.0001 Type ill End -of -Road Barricade 006666 EA 2 $2.900.00 $5,800.00 9 9999.0002 Connect to Existing Pavement 00 00 00 EA 3 $450.00 $1,350.00 10 9999.0003 R1-1 Stop Sign 00 00 00 EA 8 $100.00 $800.00 11 9999.0004 St Marker Blade 00 00 00 EA 52 $55.00 $2,860.00 12 9999,0006 Remove Type III Barricade 00 00 00 EA 3 $480.00 $1,440.00 13 9999.0007 Concrete Headers 00 00 00 LF 56 $15.00 $870.00 Paving Subtotal $1,143,664.30 Bid Summary Pavinq Facilities Subtotal Total Bid This bid is submitted by the entity listed below Company: GM Construction TX Street Address: P.O. Box 851 City, State, Zip Code: Prosper, TX 75078 Phone: 214.629.8035 By: M Vd Signature Till.: fJ2!fr_— r (!Arr— Date: c5 —ZC) - ZO Z 5 I $1,143,664.30 $1,143,664.30 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 25 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION Crl'Y OF FOxIWOW111 '1'rahfi Phase 6B STAMIARI) CONSTRUC RON WD PROPOSAL. I11:vF]A VE'R A W ARDI:IJ PROII:C"I"S Ciri PrajrcL A I06000 Farm Revised Janu y29, 2020 00424J Bid Prapasal 0045 12 DAP PREQUALIFICATION STATEMENT Page 1 of] SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Maior Work Tvpe" box provide the complete maior work tvpe and actual description as provided by the Water Denartment for water and sewer and TPW for navina. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Concrete Construction/Reconstruction GM Construction TX 09/30/2027 < 15,000 SY The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalifed for the work types listed. BIDDER: GM Construction TX P. O Box 851 Prosper, TX 75078 BY: 1 , (igignE TITLE: P4bi-dA'rI? DATE: 07/03/2025 END OF SECTION CITY OF FDRT WORTH Tradition Phase 613, CPN 106000 STANDARD CONSTRUCTION PREQVALIFICATION STATEMENT — DEVELOPER AWARDED PROJECTS 00 45 12_Prequalification Statement 2015_DAP Form Version September 1, 2015 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of I SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 106000 . Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: GM Construction TX Company P.O. Box 851 Address Promer. TX 75078 City/State/Zip THE STATE OF TEXAS COUNTY OF TARRANT on Signature: Title: 4/� S� fitdJm BEFORE ME, the undersigned authority, on this day personally appeared, a",, ,, i"u�1 k- known to me to be the person whose name is subscribed to the foregoing i trument, and acknowledged tome that he/she executed the same as the act and deed of for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 2025. f�RY pVB i LISA BUMP `0 1< 4.=Notary Public, State of Texas a'•�r� -,9,F ...+,. Comm. Expires 08-31-2025 Notary Public in and for the State of Texas 4„°;,,11� Notary ID 10740576 END OF SECTION CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project # 106000 Revised April 2, 2014 00 52 43 - 1 Developer Awarded Project Agreement Page I of 4 SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on 07/03/2025 is made by and between the Developer. Spur Wildflower Development, L.P. . authorized to do business in Texas and Contractor. GM Construction TX . authorized to do business in Texas, acting by and through its duly authorized representative. Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Tradition Phase 6B City Proiect #106000 FID #30114-0200431-106000-E07685 Article 3. CONTRACT TIME 3.1 Time is of the essence. All time limits for Milestones, if any, and Final Acceptance as stated in the Contract Documents are of the essence to this Contract. 3.2 Final Acceptance. The Work will be complete for Final Acceptance within 25 working days after the date when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. 3.3 Liquidated damages Contractor recognizes that time is of the essence of this Agreement and that Developer will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the Developer if the Work is not completed on time. Accordingly, instead of requiring any such proof , Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay Developer Two Hundred & Fifty Dollars ($250.00) for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project #106000 Revised June 16, 2016 00 52 43 - 2 Developer Awarded Project Agreement Page 2 of 4 Article 4. CONTRACT PRICE Developer agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount in current funds of One Million One Hundred Fortv Three Thousand Six Hundred Sixtv Four & 301100 Dollars ($1.143.664.30) Article 5. CONTRACT DOCUMENTS 5,1 CONTENTS: A. The Contract Documents which comprise the entire agreement between Developer and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form (As provided by Developer) 1) Proposal Form (DAP Version) 2) Prequalification Statement b. Insurance ACORD Form(s) c. Payment Bond (DAP Version) d. Performance Bond (DAP Version) e. Maintenance Bond (DAP Version) f. Power of Attorney for the Bonds g. Worker's Compensation Affidavit 3, Standard City General Conditions of the Construction Contract for Developer Awarded Projects. 4. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 5. Drawings. 6. Addenda. 7, Documentation submitted by Contractor prior to Notice of Award. 8. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project fl06000 Revised June 16, 2016 00 52 43 - 3 Developer Awarded Project Agreement Page 3 of4 Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in part. by anv act, omission or negligence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in part., by anv act, omission or negligence of the city. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the Developer. 7.3 Successors and Assigns. Developer and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon DEVELOPER and CONTRACTOR. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project{l106000 Revised June 16, 2016 00 52 43 - 4 Developer Awarded Project Agreement Page 4 of 4 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duty authorized signatory of the Contractor. IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date"). Contractor: Developer: GM Construction TX Spur Wildflower Development, L.P. 11 (Signature) '-d,Cr � 2-n il iWd. 61 (Printed Name) Title: I J tcke-� Company Name: GM Construction TX Address: P.O. Box 851 Prosper, TX 75078 Date: �T - By: /(Signature) V John Briars (Printed Name) Title: Authorized Signatory Company Name: Spur Wildflower Development, L.P. Address: 8433 Enterprise Circle, Suite 100 Lakewood Ranch, LF 34202 Date: 4a l C3 CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project#106000 Revised June 16, 2016 DATE (MM/DD/YYYY) A� " CERTIFICATE OF LIABILITY INSURANCE 6/18/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Melissa Krumm Acrisure Texas Risk Advisors & Insurance Services, LLC I PHONE FAX 5057 Keller Springs Road (A/C. No. Extl: 972-201-0100 (A/C. No): 972-201-0123 Suite 200 I ADDRESS: mkrumm@acrisure.com Addison TX 75001 I INSURER(S) AFFORDING COVERAGE NAIC# INSURERA: FCCI Insurance Company 10178 INSURED MIDKHOL-01 INSURERB: Monroe Guaranty Insurance Company 32506 P.O.Bf Holdings, LLC dba GM Construction TX I INSURERC: Texas Mutual Insurance Company 22945 ox 851 Prosper, TX 75078 I INSURER D : INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER:2110974142 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR INSD WVD POLICYNUMBER (MM/DD/YYYY) (MM/DD/YYYYI A X COMMERCIAL GENERAL LIABILITY CPP100031669 10/5/2024 10/5/2025 EACH OCCURRENCE $ 1 000 000 CLAIMS -MADE � OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: ❑X PRO- POLICY JECT LOC OTHER: B AUTOMOBILE LIABILITY CA100017981 X ANY AUTO OWNED SCHEDULED AUTOS ONLY AUTOS X HIRED X NON -OWNED AUTOS ONLY AUTOS ONLY A X UMBRELLA LAB H OCCUR UMB100017986 EXCESS LIAB CLAIMS -MADE DED I X I RETENTION $ in DD.. C WORKERS COMPENSATION 0002067483 AND EMPLOYERS' LIABILITY Y / N ANYPROPRI ETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? NI N/A (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below DAMAGE TO RENTED PREMISES (Ea occurrence) $ 100,000 MED EXP (Any one person) $ 10,000 PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $2,000,000 PRODUCTS - COMP/OP AGG $ 2,000,000 10/5/2024 10/5/2025 COMBINED SINGLE LIMIT $ 1,000,000 (Ea accident) BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE $ (Per accident) 10/5/2024 10/5/2025 EACH OCCURRENCE $ 5,000,000 AGGREGATE $ 5,000,000 10/5/2024 10/5/2025 X I PER STATUTE ERH E.L. EACH ACCIDENT $ 1,000,000 E.L. DISEASE - EA EMPLOYEE $ 1,000,000 E.L. DISEASE - POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Applies only if applicable coverage is evidenced on Acord 25 — CERTIFICATE OF LIABILITY INSURANCE The General Liability, Auto, and Umbrella/Excess policies include a blanket additional insured endorsement that provides additional insured status to the certificate holder only when there is a written contract between the named insured and the certificate holder that requires such status. The General Liability policy includes a blanket additional insured endorsement that provides additional insured status to the certificate holder for ongoing and completed operations only when there is written contract between the named insured and the certificate holder that requires such status. See Attached... CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Fort Worth 100 Fort Worth Trail Fort Worth TX 76102 AUTHORIZED REPRESENTATIVE y Irwin ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: MIDKHOL-01 LOC #: AC")?" ADDITIONAL REMARKS SCHEDULE Page 1 of 1 AGENCY NAMED INSURED Acrisure Texas Risk Advisors & Insurance Services, LLC Midkiff Holdings, LLC dba GM Construction TX P.O. Box 851 POLICY NUMBER Prosper, TX 75078 CARRIER NAIC CODE I EFFECTIVE DATE: ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: CERTIFICATE OF LIABILITY INSURANCE The General Liability, Auto, and Umbrella/Excess policies contain an endorsement with primary and noncontributory wording that may apply only when there is a written contract between the named insured and the certificate holder that may require such status. The General Liability, Auto, Umbrella/Excess, and Workers Compensation policies include a blanket waiver of subrogation endorsement that provides this feature only when there is a written contract between the named insured and the certificate holder that requires this. The Contractors Equipment policy includes a blanket Loss Payee endorsement that provides loss payee status to the certificate holder as their interest may appear. The Automobile policy includes a Loss Payee endorsement that provides loss payee status to the certificate holder as their interest may appear. Umbrella/Excess Liability follows form in respect to Additional Insured subject to policy forms, terms, conditions and exclusions. RE: All Projects Tradition Phase 6B City Project #106000 Certificate holder includes: City of Fort Worth, Spur Wildflower Development, L.P. ACORD 101 (2008/01) © 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD DATE (MM/DD/YYYY) A� " CERTIFICATE OF LIABILITY INSURANCE 6/18/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Melissa Krumm Acrisure Texas Risk Advisors & Insurance Services, LLC I PHONE FAX 5057 Keller Springs Road (A/C. No. Extl: 972-201-0100 (A/C. No): 972-201-0123 Suite 200 I ADDRESS: mkrumm@acrisure.com Addison TX 75001 I INSURER(S) AFFORDING COVERAGE NAIC# INSURERA: FCCI Insurance Company 10178 INSURED MIDKHOL-01 INSURERB: Monroe Guaranty Insurance Company 32506 P.O.Bf Holdings, LLC dba GM Construction TX I INSURERC: Texas Mutual Insurance Company 22945 ox 851 Prosper, TX 75078 I INSURER D : INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER:806443439 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR INSD WVD POLICYNUMBER (MM/DD/YYYY) (MM/DD/YYYYI A X COMMERCIAL GENERAL LIABILITY CPP100031669 10/5/2024 10/5/2025 EACH OCCURRENCE $ 1 000 000 CLAIMS -MADE � OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: ❑X PRO- POLICY JECT LOC OTHER: B AUTOMOBILE LIABILITY CA100017981 X ANY AUTO OWNED SCHEDULED AUTOS ONLY AUTOS X HIRED X NON -OWNED AUTOS ONLY AUTOS ONLY A X UMBRELLA LAB H OCCUR UMB100017986 EXCESS LIAB CLAIMS -MADE DED I X I RETENTION $ in DD.. C WORKERS COMPENSATION 0002067483 AND EMPLOYERS' LIABILITY Y / N ANYPROPRI ETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? NI N/A (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below DAMAGE TO RENTED PREMISES (Ea occurrence) $ 100,000 MED EXP (Any one person) $ 10,000 PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $2,000,000 PRODUCTS - COMP/OP AGG $ 2,000,000 10/5/2024 10/5/2025 COMBINED SINGLE LIMIT $ 1,000,000 (Ea accident) BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE $ (Per accident) 10/5/2024 10/5/2025 EACH OCCURRENCE $ 5,000,000 AGGREGATE $ 5,000,000 10/5/2024 10/5/2025 X I PER STATUTE ERH E.L. EACH ACCIDENT $ 1,000,000 E.L. DISEASE - EA EMPLOYEE $ 1,000,000 E.L. DISEASE - POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Applies only if applicable coverage is evidenced on Acord 25 — CERTIFICATE OF LIABILITY INSURANCE The General Liability, Auto, and Umbrella/Excess policies include a blanket additional insured endorsement that provides additional insured status to the certificate holder only when there is a written contract between the named insured and the certificate holder that requires such status. The General Liability policy includes a blanket additional insured endorsement that provides additional insured status to the certificate holder for ongoing and completed operations only when there is written contract between the named insured and the certificate holder that requires such status. See Attached... CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Spur Wildflower Development, LP 8433 Enterprise Circle, Suite 100 Lakewood Ranch FL 34202 AUTHORIZED REPRESENTATIVE y Irwin ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: MIDKHOL-01 LOC #: AC")?" ADDITIONAL REMARKS SCHEDULE Page 1 of 1 AGENCY NAMED INSURED Acrisure Texas Risk Advisors & Insurance Services, LLC Midkiff Holdings, LLC dba GM Construction TX P.O. Box 851 POLICY NUMBER Prosper, TX 75078 CARRIER NAIC CODE I EFFECTIVE DATE: ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: CERTIFICATE OF LIABILITY INSURANCE The General Liability, Auto, and Umbrella/Excess policies contain an endorsement with primary and noncontributory wording that may apply only when there is a written contract between the named insured and the certificate holder that may require such status. The General Liability, Auto, Umbrella/Excess, and Workers Compensation policies include a blanket waiver of subrogation endorsement that provides this feature only when there is a written contract between the named insured and the certificate holder that requires this. The Contractors Equipment policy includes a blanket Loss Payee endorsement that provides loss payee status to the certificate holder as their interest may appear. The Automobile policy includes a Loss Payee endorsement that provides loss payee status to the certificate holder as their interest may appear. Umbrella/Excess Liability follows form in respect to Additional Insured subject to policy forms, terms, conditions and exclusions. RE: All Projects Tradition Phase 6B City Project #106000 Certificate holder includes: City of Fort Worth, Spur Wildflower Development, L.P. ACORD 101 (2008/01) © 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD THE STATE OF TEXAS COUNTY OF TARRANT 006213- 1 PERFORMANCE BOND Page] of2 SECTION 00 62 13 PERFORMANCE BOND BOND #101395156 § KNOW ALL BY THESE PRESENTS: § That we, GM Construction TX , known as "Principal" herein and, Merchants Bonding Company (Mutual) a corporate surety(sureties, if more than one) duly authorized to do business in the Slate of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Snur Wildflower Development. L.P. , authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of, One Million One Hundred Fortv Three Thousand Six Hundred Sixtv Four & 301100 Dollars ($1,143,664.30) , lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth by and through a Community Facilities Agreement, CFA Number 25-0091 ;and WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the 3rd day of July , 2025, which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories defined by law, in the prosecution of the Work, including any Change Orders, as provided for in said Contract designated as Tradition Phase 6B. NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully perform the Work, including Change Orders, under the Contract, according to the plans, specifications, and contract documents therein referred to, and as well during any period of extension of the Contract that may be granted on the part of the Developer and/or City, then this obligation shall be and become null and void, otherwise to remain in full force and effect. PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Tradition Phase 6B STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS City Project #106000 Revised January 31, 2012 006213-2 PERFORMANCE BOND Page 2 of 2 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 3rd day of July , 2025. PRINCIPAL: GMnsfr ctian TX�/]� r BY:: Co Y: Signature i� te, hn Nfl kA 1 PrvS Name and Title Address: P.O. Box 851 _ Propser, TX 75078 SURETY; Merchants Bonding Company (Mutual) $y���� Signature Debra Lee Moon, Attornev-in-Pact Name and Title Address: P.O Box 14498 Des Moines, IA 50306 Witness as to Surety Telephone Number: (515) 243-B171 *Note: if signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. if Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Tradition Phase 613 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS C4 Project #106000 Revised January 31, 2012 00 62 14 - 1 PAYMENT BOND Page I of 2 SECTION 00 6214 PAYMENT BOND BOND #101396156 THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, GM Construction TX , known as "Principal" herein, and Merchants Bonding Company (Mutual) a corporate surety ( or sureties if more than one), duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Snur Wildflower Develonment, L.P.. authorized to do business in Texas "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of One Million One Hundred Fortv Three Thousand Six Hundred Sixtv Four & 30/100 Dollars (S1.143.664.30) , lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth, by and through a Community Facilities Agreement, CFA Number 25-0091 ; and WHEREAS, Principal has entered into a certain written Contract with Developer, awarded the 3rd day of July , 2025, which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and other accessories as defined by law, in the prosecution of the Work as provided for in said Contract and designated as Tradition Phase 6B. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under the Contract, then this obligation shall be and become null and void; otherwise to remain in full force and effect. CITY OF FORT WORTH Tradition Phase 6B STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project#]06000 Revised January 31, 2012 006214-2 PAYMENTBOND Page 2 of 2 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute. IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 3rd day of July , 2025. ATTE T: rincip } ecretary Witness eoPrincipal ATTEST: (Surety) Se ary Witness as to Surety PRINCIPAL: GM Construction TX BY: Signature CA Ie�tn Ilc �d �, , �,�.S;n� Name and Title Address: P.O. Box 851 Propser, TX 75078 SURETY: Merchants Bonding Company (Mutual) Signature Debra Lee Moon, Attorney -in -Fact Name and Title Address: P.O Box 14498 ❑es Moines, IA 50306 Telephone Number: (515) 243-8171 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Tradition Phase 613 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project#106000 Revised January 31, 2012 006219-1 MAINTENANCE BOND Pagel of 3 SECTION 00 62 19 MAINTENANCE BOND BOND #101395156 THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, GM Construction TX . known as "Principal" herein and Merchants Bonding Company (Mutual) . a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Snur Wildflower Develooment. L.P. , authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the sum of One Million One Hundred Fortv Three Thousand Six Hundred Sixtv Four & 301100 Dollars ($1.143.664.30) , lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly unto the Developer and the City as dual obligees and their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth by and through a Community Facilities Agreement, CFA Number 25-0091 ; and WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the 3rd day of July , 2025, which Contract is hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories as defined by law, in the prosecution of the Work, including any Work resulting from a duly authorized Change Order (collectively herein, the "Work") as provided for in said Contract and designated as Tradition Phase 6B, and; WHEREAS, Principal binds itself to use such materials and to so construct the Work in accordance with the plans, specifications and Contract Documents that the Work is and will remain free from defects in materials or workmanship for and during the period of two (2) years after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and CITY OF FORT WORTH Tradition Phase 6B STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project #106000 Revised January 31, 2012 006219-2 MAINTENANCE BOND Page 2 of 3 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the Developer and/or City of the need thereof at any time within the Maintenance Period. NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by Developer or City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the Developer or City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance Bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTH Tradition Phase 68 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project #106000 Revised January 31, 2012 006219-3 MAINTENANCE BOND Page 3 of 3 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 3rd day of July , 2025. PRINCIPAL: GM Construction TX BY: Signature ATT ri i '1) Secretary Name and Title 1\ddaess : P.O. Box 851 Propser, TX 75078 4itnessas to Principal SURETY: Merchants Bonding Company (Mutual) BY: Signature Debra Lee Moon, Attorney -in -Fact . ATTEST: Name and Title Address: P.O Box 14499 (Surety) Sec y 41--- —Des Moines, IA 50306 Witness as to Surety Telephone Number: (515) 243- `Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Tradition Phase 6B STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROTECTS City Project 4106OW Revised January 31, 2012 MERCHANT'711�, BONDING COMPANY POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa, dlbla Merchants National Indemnity Company (in California only) (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, Allyson W Dean; Andrea Rose Crawford; Andrew Gareth Addison; Andrew Patrick Clark; Brian Paul Bordlee; Bryan Kelly Moore; Colin E Conly; Cory Kiper, Crystal Gail Langhom; Debra Lee Moon; Faith Ann Hilly; John R Ward; Kelli A Gorham; Mark Robert Adams; Michael Wiggins; Patrick Thomas Coyle; Peggy Gradel Hogan; Ross Rudolph Laris; Sandra Lee Roney; Sheri Renne Allen; Steven Wayne Lewis; Teresa Ayala; Thomas Douglas Moore; Troy Russell Key their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and April 27, 2024 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 1E, 2015 and amended on April 27, 2024. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 24th day of April 2025 """""• • • G- "• MERCHANTS BONDING COMPANY (MUTUAL) ...�� 1O.i..... tee '' ,•�QP�fia. �A.• MERCHANTS NATIONAL BONDING, INC. ;�yrGpRpORgr. Z,! ���OFlP094�9y�� dibla MERCHANTS NATIONAL INDEMNITY COMPANY 2003 :� 1933 By ;,a .a.;: `•;'6� 3L; lad. President STATE OFIOWAf ., •• •.••• COUNTY OF DALLAS ss. •+...... On this 241h day of April 2025 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. Penni Miller o 'R Commission Number 787952 • • My Commission Expires \� , / +OWA January 20, 2027 Notary Public (Expiration of notary's commission does not invalidate this instrument) I, Elisabeth Sandersfeld, Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 3rd day of July, 2025 v'y 2003Lj : 1933 Secretary POA 0018 (6/24) �`'""""�•� " �q MERCHANTS� 'BONDING COMPANY IMPORTANT NOTICE To obtain information or make a complaint: You may contact your insurance agent at the telephone number provided by your insurance agent. You may call Merchants Bonding Company's toll -free telephone number for information or to make a complaint at: 1-800-678-8171 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance at: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us PREMIUM AND CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. SUP 0032 TX (1/09) LIGHTING UNIT PRICE 131D SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Tradition, Phase 6B, City Project fi106000 Project Item Information Bidlist Specification Unit of Bid Item Description I I Measure I Quantity 1 2605.3011 2" CONDT PVC SCH 40 (T) 26 05 33 LF 1,184 2 3441.1408 NO 6 Insulated Elec Condr 3441 10 LF 3,552 3 3441.1633 Type 33B Arm 34 41 20 34 41 20 EA EA 22 16 4 3441.3201 LED Li Ming Fixture (R-2 5 3441.3201 LED Li sting Fixture Z4� 1 34 41 20 EA 6 7 3441.3301 Rdwy sum pFoundation T 1,2, and 4 ( 354120 EA 22 6 3441,3341 Rdwy Ilium TY 11 Pole ` 34 41 [u to r[ �treet Lighting Subtotal Bid Summary Street Liqhtinq Facilities Subtotal Total Bid This bid is submitted by the entity listed below: Company: Independent Utility Construction, Inc. ByMird Wolfe Street Address: 5109 Sun Valley Drive City, State, Zip Code: FortWorth, TX 76119 Phone:817-478-4444 ignature Title: President Date: 05/19/2025 Bidder's Proposal Unit Price Bid Value $33.71 $39.912.64 $3.99 $14,172.48 $398.00 $8,756.00 $508.00 $8,128.00 $508,00 $3,048.00 $3,319.00 $73,018.001 �03,Z3y.uU 71,258.00 $218,293.12 I $218,293.12+ $218,293.1211 Contractor agrees to complete WORK for FINAL ACCEPTANCE wlt6is " worklus days after the date when the CONTRACT commence, to run as provided in the General Conditions. END OF SEC'r1ON Tredil-Piny.: 613 MY OF FORT WORTH Ciry Pr sect u S'r:1NDARD CONSTRUCCION BID PROPO.SAL-DEVELOPER AWARDED PRROJECCS 00 42 43 Hid P"ny—.w.."1 Fain Re,izd J—y 29. 2020 0045 12 DAP PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Maior Work Tvpe" box Drovide the complete maior work tvpe and actual description as provided by the Water Department for water and sewer and TPW for Davine. Major Work Type Contractor/Subcontractor Company Name I Prequalification i Expiration Date Roadway and Pedestrian Independent Utility Construction, Inc. I 02/0.5/2027 Lighting The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Independent Utility Construction, Inc. 5109 Sun Valley Drive Ft. Worth, TX 76119 BY: card Wolfe (Signature) TITLE: President DATE: 07/03/2025 END OF SECTION CITY OF FORT WORTH Tradition Phase 68. CPN #106000 STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS 00 45 12_Prequalification Statement 2015 DAP Form Version September 1, 201S 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page I of I SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 106000 . Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Independent Utilitv Construction, Inc. Company .5109 Sun Vallev Drive Address Ft. Worth. TX 76119 City/State/Zip THE STATE OF TEXAS COUNTY OF TARRANT By: RichaP--- fe Signature: U" Title: President BEFORE ME, the undersigned authority, on this day, personally appeared Richard Wolfe. known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of Independent Utilitv Construction. Inc. for the purposes and consideration therein expressed and in the capacity therein stated. GNEN UNDER MY HAND AND SEAL OF OFFICE this -z? day of 2025. CHRISTINA GARCIA Notary Public, State of Texas g ;! Comm. Expires 12-20-2028 jotaryublic in and for the State of Texas '��.` Notary ID 130940785 j END OF SECTION CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project ..4106000 Revised April 2, 2014 00 52 43 - I Developer Awarded Project Agreement Page 1 of4 SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on 07/03/2025 is made by and between the Developer. Spur Wildflower Development, L.P. , authorized to do business in Texas and Contractor, Independent Utilitv Construction, Inc. , authorized to do business in Texas, acting by and through its duly authorized representative. Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Tradition Phase 6B Citv Proiect #106000 FID #30114-0200431-106000-E07685 Article 3. CONTRACT TIME 3.1 Time is of the essence. All time limits for Milestones, if any, and Final Acceptance as stated in the Contract Documents are of the essence to this Contract. 3.2 Final Acceptance. The Work will be complete for Final Acceptance within 90 working days after the date when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. 3.3 Liquidated damages Contractor recognizes that time is of the essence of this Agreement and that Developer will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects, The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the Developer if the Work is not completed on time. Accordingly, instead of requiring any such proof , Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay Developer Two Hundred & Fifty Dollars ($250.00) for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH Tradition Please 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS --DAP City Project #106000 Revised June 16, 2016 00 52 43 -2 Developer Awarded Project Agreement Page 2 of4 Article 4. CONTRACT PRICE Developer agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount in current funds of Two Hundred Eivhteen Thousand Two Hundred Ninetv Three & 12/100 Dollars ($218,293.12) Article 5. CONTRACT DOCUMENTS 5.1 CONTENTS: A. The Contract Documents which comprise the entire agreement between Developer and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form (As provided by Developer) 1) Proposal Form (DAP Version) 2) Prequalification Statement b. Insurance ACORD Form(s) c. Payment Bond (DAP Version) d. Perfonnance Bond (DAP Version) e. Maintenance Bond (DAP Version) f. Power of Attorney for the Bonds g. Worker's Compensation Affidavit 3. Standard City General Conditions of the Construction Contract for Developer Awarded Projects. 4. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 5. Drawings. 6. Addenda. Documentation submitted by Contractor prior to Notice of Award. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project #106000 Revised June 16, 2016 00 52 43 - 3 Developer Awarded Project Agreement Page 3 of 4 Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification vrovision is soecificalty intended to overate and be effective even if it is alleged or uroven that all or some of the dams -es being sought were caused, in whole or in Dart, by anv act, omission or negligence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is snecifically intended to overate and be effective even if it is alle ed or uroven that all or some of the damages being sought were caused, in whole or in Dart, by anv act, omission or negligence of the city. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of the Construction Contract for Developer Awarded Projects. 7.2 Assigntnent of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the Developer. 7.3 Successors and Assigns. Developer and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon DEVELOPER and CONTRACTOR. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Tradition Prase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project #106000 Revised June 16, 2016 00 52 43 - 4 Developer Awarded Project Agreement Page 4 of 4 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date"). Contractor: Independent Utility Construction, Inc. By: (Signature) Richard Wolfe (Printed Name) Title: President Company Name: Independent Utility Construction, Inc. Address: 5109 Sun Valley Drive Ft. Worth, TX 76119 Date: 07/03/2025 `����u n u u rrrrrtt, �ONsrR� J ; 0 'ice':• 2 s C)SEAL'LU:= may• t 7,979.X,' tu iu AMO` ` Developer: Spur Wildflower Development, L.P. >3y: (Signature) John Brian (Printed Name) Title: Authorized Signatory Company Name: Spur Wildflower Development, L.P. Address: 8433 Enterprise Circle, Suite 100 Lakewood Ranch, FL 34202 Date: CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DAP City Project #106000 Revised hme 16, 2016 / 1 DATE (MM1DD/YYYY) ACORE) CERTIFICATE OF LIABILITY INSURANCE 164.� I 06.26/ 2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CUNIACI Rebecca Mata NAME: The Sweeney Company PHONE (817) 457-6700 I FAX (817) 457-7246 1121 E. Loop820 South (A/{Xr Ext): (A/C, No): ADDRESS: Rebecca@thes;veeneyco.com P O BOX 8720 INSURER(S) AFFORDING COVERAGE I NAIC # Fort Worth TX 76124-0720 INSURERA: Am Cas Cc of Reading, PA + 20427 INSURED INSURER 8 : Continental Casualty Co Independent Utility Construction, Inc. INSURER C : Continental Insurance Co 5109 Sun Valley Drive INSURER D: Texas Mutual Insurance Company NSURER E : Fort Worth TX 76119 INSURER F : COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR AUUL"SUWK LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER POLICY EFF POLICY EXP (MM/DD/YYYYI (MM1DD/YYYYI LIMITS 20443 35289 22945 X1 COMMERCIAL GENERAL LIABILITY I EACH OCCURRENCE 1.000,000 CLAIMS UAMAUE IU KtNIEU S -MADE OCCUR I PREMISES (Ea occurrence) S 100,000 X Contractual MED EXP 15,000 A X1 XCU 6076055350 (Any one person) 10/31/2024 10/31/2025 $ 1:000,000 PERSONAL &ADV INJURY S - EN'LAGGREGATE LIMIT APPLIES PER: ❑X GENERAL AGGREGATE S 2.000.000 POLICY T- LOC JECO I PRODUCTS - COMP/OP AGG S 2.000.000 X $1,000 Ded per PD Occ. OTHER $ AUTOMOBILE LIABILITY I COMBINED SINGLE LIMIT $ 1.0001000 X ANYAUTO (Ea accident) I BODILY INJURY (Per person; S B OWNED SCHEDULED AUTOS ONLY AUTOS 6076055364 10/31/2024 10/31/2025 I BODILY INJURY Per accident) $ HIRED NON -OWNED AUTOS ONLY AUTOS ONLY PROPERTY DAMAGE I (Per accident) S I S X UMBRELLA LIAB OCCUR I EACH OCCURRENCE I S 3.000.000 C EXCESS LIAB CLAIMS -MADE 7063371403 10/31%2024 10/31/2025 I Is 3,000,000 DED I >� RETENTION $ 10,000 .AGGREGATE I S COMPENSATIONWORKERS AND EMPLOI ERS' LIABILIITY Y/ N XI STATUTE I I ERH I D ONY FFICER RIETOR.+PARTNER+EXECUTIVE MN N/A OFFICERlhAEMBER EXCLUDED? 0010713602 10/31/2024 10/31/2025 IE.L.EACH ACCIDENT Is 1,OOQ000 (Mandatory in NH) I E.L. DISEASE 1.000.000 I If yes. describe under DESCRIPTION OF OPERATIONS belay - EA EMPLOYEE I E.L. DISEASE - POLICY LIMIT S IS 1.000,000 Contractors' Equipment Policy Leased/Rented 1 400,000 I A 6076055350 10/31,12024 10/31/2025 Deductible 2,500 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101. Additional Remarks Schedule. may be attached if more space is required) City Project 9106000. Tradition Phase 66 - FID #30114-0200431-106000-E07685 The City of Fort Worth, its officers, employees, and servants are additional insureds as required by written contract for the GL and auto policies on a primary and non contributory basis. WC, GL & auto include a blanket automatic waiver of subrogation endorsement & the GL. auto include a blanket automatic additional insured endorsement providing additional insured & waiver of subrogation status to the certificate holder only when there is a written contract bebveen the named insured & the certificate holder that requires such status. The additional insured endorsements contains special primary & noncontributory wording. Umbrella follows form. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Fort Worth ACCORDANCE WITH THE POLICY PROVISIONS. 100 Fort Worth Trail AUTHORIZED REPRESENTATIVE I Fort Worth TX 76102 © 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD / 1 ACOR" CERTIFICATE OF LIABILITY INSURANCE DATE (MMDDIYYYY) �� I 06/26I/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CUNIACI Rebecca Mata NAME: The Sweeney Company PHONE (817) 457-6700 I FAX (817) 457-7246 (A/C. No. Extl: (A/C, Nol: 1121 E. Loop 820 South ADDRESS: Rebecca@thesweeneyco.com P O BOX 8720 INSURER(S) AFFORDING COVERAGE NAIC # Fort Worth TX 76124-0720 INSURERA: Am Cas Cc of Reading, PA 20427 INSURED INSURER B : Continental Casualty CO 20443 Independent Utility Construction, Inc. INSURER C : Continental Insurance Co 35289 5109 Sun Valley Drive INSURER D : Texas Mutual Insurance Company I 22945 I INSURER E : Fort Worth TX 76119 I INSURER F : COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN; THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR AUUL SUBK LTR TYPE OF INSURANCE INSD WVD I POLICY NUMBER POLICY EFF POLICY EXP (MM/DD/YYYY) (MMIDD/YYYYI LIMITS COMMERCIAL GENERAL LIABILITY I EACH OCCURRENCE S 1.000,000 CLAIMS -MADE 7 OCCUR I uAMAUL I U KLN100,000 PREMISES (Ea occurrence) S X Contractual I 15,000 MED EXP (Any one person) S A X XCU 6076055350 10/31/2024 10/31/2025 I PERSONAL & ADV INJURY S 1:000.000 GEN'LAGGREGATE LIMITAPPLIES PER I GENERAL AGGREGATE S 2.000,000 ❑JEC❑LGC 2,000.000POLICY PRODCTS- G OTHER$1,000 Ded per PO OCC. $X AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT S 1.000.000 X ANYAUTO (Ea accident) I BODILY INJURY (Per person) S B -OWNED SCHEDULED 6076055364 AUTOS ONLY AUTOS 10/31/2024 10/31/2025 BODILY INJURY (Per accident) S — HIRED NON -OWNED AUTOS ONLY AUTOS ONLY I PROPERTY DAMAGE S (Per accident) S X UMBRELLA LAB OCCUR EACH OCCURRENCE I S 3,000.000 C EXCESS LIAB CLAIMS -MADE 7063371403 10/31/2024 10/31/2025 I AGGREGATE I S 3,000.000 DED J" l RETENTION $ 10,000 I I S WORKERS OMPENSATION I XI I I AND EMPLOYERS' LIABILITY Y� SPER TATUTE EORH D AN'f PROPRIETORIPARTNER'EXECUTIVE NIA 0010713602 IE.L. EACHACCIDENT Is 1,000,000 OFFICER/MEMBER EXCLUDED? (Mandatory in NH) 10/31/2024 10/3V2025 I E.L. DISEASE - EA EMPLOYEE I S 1,000,000 If yes, describe under DESCRIPTION OF OPERATIONS belo-s I E.L. DISEASE - POLICY LIMIT IS 1.000;000 Contractors' Equipment Policy Leased/Rented 400,000 ( I A 6076055350 10/31/2024 10/31/2025 Deductible 2,500 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101. Additional Remarks Schedule, may be attached if more space is required) City Project 9106000, Tradition Phase 66 - FID #30114-0200431-106000-EO7685 WC, GL & auto include a blanket automatic waiver of subrogation endorsement & the GL, auto include a blanket automatic additional insured endorsement providing additional insured & waiver of subrogation status to the certificate holder only when there is a written contract between the named insured & the certificate holder that requires such status. The additional insured endorsements contains special primary & noncontributory wording. Umbrella follows form, CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Spur Wildflower Development, L.P. ACCORDANCE WITH THE POLICY PROVISIONS. 8433 Enterprise Circle Suite 100 AUTHORIZED REPRESENTATIVE Lakewood Ranch FL 34202 4 © 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD 0061 I: - PERFORMANCE BOND Page I oft Bond No. 4684890 I SECTION 00 62 13 2 PERFORMANCE, BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we. Independent Utilitv Construction. Inc. , known as "Principal" herein and 8 Westfield Insurance Company . a corporate surety(sureties, if more than one) duly 9 authorized to do business in the State of Texas, known as "Surety' herein (whether one or more), 10 are held and Firmly bound unto the Developer, Spur Wildflower Development, L.P. I I authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal 12 corporation (`'City, in the penal sum of, Two Hundred Eiehteen "Thousand, Two Hundred Ninety- 13 Three Dollars & "Twelve Cents ($218.293.12) lawful money of the United States, to be paid in Fort 14 Worth, Tarrant County, -Texas for the payment of which sum well and truly to be made, jointly 15 Unto the Developer and the City as dual obliges, we bind ourselves, our heirs, executors, 16 administrators, successors and assigns, jointly and severally. firmly by these presents. 17 WHEREAS, Developer and City have entered into an Agreement for the construction of 18 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 19 CFA Number 25-0091 : and 20 WHEREAS, the Principal has entered into a certain written contract with the Developer 21 awarded the 3rd day of July , 20 25, which Contract is hereby referred to and 22 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment 23 labor and other accessories defined by law, in the prosecution of the Work, including any Change 24 Orders, as provided for in said Contract designated as Street Lip-htine Facilities to serve Tradition 25 Phase 6B. 26 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 27 shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully 28 perform the Work, including Change Orders, under the Contract, according to the plans, 29 specifications, and contract documents therein referred to, and as well during any period of 30 extension of the Contract that may be granted on the part of the Developer and/or City, then this 31 obligation shall be and become null and void, otherwise to remain in full force and effect. 32 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Tradition Phase 613 City Project No 106000 0061 13-2 PERFORMANCE BOND Page 2 or2 Bond No. 4684890 2 PROVIDED FURTHER, that if any legal action be tiled on this Bond, venLle shall lie in 3 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 4 Worth Division. 5 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 6 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 7 accordance with the provisions of said statue. 8 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this 9 instrument by duly authorized agents and officers on this the 3rdday of July 20 25, 10 12 13 14 15 16 ATTEST: 17 18 _ 19 (Principal) S cr Richard Wolfe 20 21 22 23 24 25 Okitness Ato Principal Christina Garcia 26 27 28 29 30 31 32 33 34 35 36 37 38 Ct kL/4d Joe -914411 39 Witness to Surety Clizabeth Gray 40 PRINCIPAL: INDEPEND UTILITY CONS TR <C ON. INC. BY: _ S gna e Richard Wolfe. President Name and Title Address: 5109 Sun Vallev Drive Fort Worth. Texas 76119 SURE"rY: WESTFIELD INSURANCE COMPANY BY: Signature Kvte W. Sweenev. Anornev-in-Fact Name and Title Address: 955 Garden Park Drive, Suite 230 Allen. Texas 75013 Telephone Number: 972-516-2600 41 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 42 from the by-laws showing that this person has authority to sign such obligation. If 43 Surety's physical address is different from its mailing address,rotn must be provided. 44 The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Tradition Phase 613 STANDARD CITY CONDITIONS — DEVELOPER AW:\RDE-D PROJECTS CiN. Project No 106000 Revised January 31, 2012 0061 13- 1 PAYN41,Nl BOND Page I ot'2 Bond No. 468489Q I SECTION 00 62 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Independent Utility Construction, Inc. , known as "Principal" herein, 8 and Westfield Insurance Comoanv , a corporate surety (or sureties if more than 9 one), duly authorized to do business in the State of Texas, known as "Surety" herein (whether one 10 or more), are held and firmly bound unto the Developer Spur Wildflower Development. L.P.. 1 I authorized to do business in "Texas ("Developer"), and the City of Fort Worth. a Texas municipal 12 corporation ("City"), in the penal stun of Two Hundred Eighteen Thousand. Two Flundred 13 Ninety -Three Dollars & Twelve Cents ($218.293.12) lawful money of the United States. to be 14 paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made 15 jointly unto the Developer and City as dual obligees, we bind ourselves, our heirs, executors, 16 administrators, sticcessors and assigns, jointly and severally, firmly by these presents: 17 WHEREAS, Developer and City have entered into an Agreement for the construction of 18 community facilities in the City of Fort Worth, by and through a Community Facilities 19 Agreement, CFA Number 25-0091 ; and 20 WHEREAS, Principal has entered into a certain written Contract with Developer, 21 awarded the 3rd day of July , V0 25, which Contract is hereby referred to 22 and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, 23 equipment, labor and other accessories as defined by law, in the prosecution of the Work as 24 provided for in said Contract and designated as Street Liahtins Facilities to serve Tradition Phase 25 6B. 26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 27 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 28 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 29 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 30 force and effect. 31 CITY OF PORT WORTH Tradition Phase 6B STANDARD CITY" CONDITIONS —DEVELOPER AWARDED PROJECTS City Project No 106000 Revised January 31. 2012 0061 14-2 PAYMENT BOND Page 2 of? Bond No. 4684890 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 -t 5 6 7 8 9 10 12 13 accordance with the provisions of said statute. IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 3rdday of July 20 25 ATTE (Principal) Secretary Richard Wolfe Witness as to Principal Christina Garcia ATTEST: (Surety) Secretary Frank A. Carrino Witness s to Surety Elizabeth Gray PRINCIPAL: INDEPENDEVT UTILITY CONST ION. INC. / BY: Signature Richard Wolfe. President Name and Title Address: 5109 Sun Vallev Drive Fort Worth. Texas 76119 SURETY: WESTFIELD INSURANCE COMPANY BY: Signature Kvle W. Sweeney. Attornev-in-Fact Name and Title Address: 955 Garden Park Drive. Suite 230 Allen. Texas 75013 Telephone Number: 972-516-2600 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH Tradition Phase 6B STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 106000 Revised January 31.2012 0062 19 - 1 WAINTENi ANCF. BOND Page I ot'3 Bond No. 4684890 I SECTION 00 62 19 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Indeaendent Utilitv Construction, Inc. , known as "Principal" herein and 9 Westfield Insurance Company , a corporate surety (sureties, if more than one) duly 10 authorized to do business in the State of "Texas, known as "Surety" herein (whether one or more), I I are held and firmly bound unto the Developer, Spur Wildflower Development, L.P., authorized to 12 do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation 13 ("'City"), in the sum of Two Hundred Eighteen 'Thousand. Two Hundred Ninety -Three Dollars & 14 Twelve Cents M 18.293.12) lawful money of the United States, to be paid in Fort Worth, Tarrant 15 County, Texas, for payment of which sum well and truly be made jointly unto the Developer and 16 the City as dual obligees and their successors, we bind ourselves, our heirs, executors, 17 administrators, successors and assigns, jointly and severally, firmly by these presents. 18 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities 21 Agreement, CFA Number 25-0091 ; and 22 23 24 25 26 27 78 29 30 31 32 33 34 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded the 3rd day of July .20 25, which Contract is hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories as defined by law, in the prosecution of the Work, including any Work resulting from a duly authorized Change Order (collectively herein, the "Work") as provided for in said Contract and designated as Street LiahtinQ Facilities to serve Tradition Phase 6B; and WHEREAS, Principal binds itself to use such materials and to so construct the Work in accordance with the plans, specifications and Contract Documents that the Work is and will remain free from defects in materials or workmanship for and during the period of two (2) years after the date of Final Acceptance of the Work by the City ("Maintenance Period'); and CITY OF FORT WORTH Tradition Phase 6B STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 106000 Revised January 31. 2012 006219-, MAIN ITNANCE BONI) Page 2 ol'3 Bond No. 468489Q I WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 2 upon receiving notice from the Developer and/or City of the need thereof at any time within the 3 Maintenance Period. 4 5 NOW THEREFORE. the condition of this obligation is such that if Principal shall 6 remedy any defective Work, for which timely notice was provided by Developer or City, to a 7 completion satisfactory to the City, then this obligation shall become null and void; otherwise to 8 remain in full force and effect. 9 10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely I I noticed defective Work, it is agreed that the Developer or City may cause any and all such 12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 13 by the Principal and the Surety under this Maintenance Bond; and 14 15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 17 Worth Division; and 18 19 PROVIDED FURTHER, that this obligation shall be continuous in nature and 20 successive recoveries may be had hereon for successive breaches. 21 22 23 CITY OF FORT WORTH Tradition Phase 66 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 106000 Revised January 31, 2012 4 5 6 7 8 9 10 II 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 0062 19-3 MAINTENANCE BOND Page 3 of 3 Bond No. 468489Q IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 3rd day of July , 20 25, ATT T (Principal) ecretary Rictard Wolfe Oitn,s, dasto Principal C6ristlna Garcia ATTEST: If e .a (Surety) Secretary Frank A. Carrino Wh-nisslfs to Surety lizabet Cray 36 'Note 37 38 39 40 41 PRI14CIPAL: INDEPEND NT UTILITY COION. ION. INC. BY: _ Q� Signature Richard Wolfe. President Name and Title Address: 5109 Sun Valley Drive Fort Worth. Texas 76119 SURETY: WESTFIELD INSURANCE COMPANY i BY: Signature Kyle W. Sweeney. Attornev-in-Fact Name and Title Address: 955 Garden Park Drive. Suite 230 Allen. Texas 75013 Telephone ✓umber: 972-516-2600 If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Tradition Phase 6B STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 106000 Revised January 31, 2012 IMPORTANT NOTICE To obtain information or make a complaint You may call Westfield Insurance Company's and/or Ohio Farmers Insurance Company's toll -free telephone number for information or to make a complaint at: 1-800-368-3597 You may also write to Westfield Insurance Company and/or Ohio Farmers Insurance Company at: 955 Garden Park Drive, Suite 230 Allen, Texas 75013-3742 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtectionro-)tdi.state. tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent or Westfield Insurance Company and/or Ohio Farmers Insurance Comapny first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para obtener informacion o para someter una queja: Usted puede Ilamar al numero de telefono gratis de Westfield Insurance Company's / Ohio Farmers Insurance Company's para informacion o para someter una queja a(: 1-800-368-3597 Usted tambien puede escribir a Westfield Insurance Company / Ohio Farmers Insurance Company: 955 Garden Park Drive, Suite 230 Allen, Texas 75013-3742 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos o quejas al: 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: httr)://www,tdi.state.tx.us E-mail: Cons umerProtection(wtdi.state. tx.us DISPUTAS SOBRE PRIMAS 0 RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o Westfield Insurance Company / Ohio Farmers Insurance Company primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de informacion y no se convierte en parte o condicion del documento adjunto. THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME POWER # AND ISSUED PRIOR TO 09i28/20, FOR ANY PERSON OR PERSONS NAMED BELOW. General POWER NO, 4220052 06 Power Westfield Insurance Co. of Attorney Westfield National Insurance Co. CERTIFIED COPY Ohio Farmers Insurance Co. Westfield Center. Ohio Kreiv Al! Mer..yy T»ese Presents, `hat WESTFIELD INSURANCE COMPANY. WES'FIELO NATIONAL INSURANCE CCMPAN'' and OHiO FARMERS INSURANCE COMPAir/. c:;rprratio ns. hereinafter refer-ed to Inomdually as a 'Compare' arc ;ollectively as "Comoar!es.' dtdy t rganizer, and existing !.,racer the lavl!, of the State of On!o. and havirg its principal office in Westfield Center. Medina C oi,rty. Ohio, do by these presents male, ,orstitutp and aproirt CHARLES D. SWEENEY, MICHAEL A. SWEENEY, KYLE W SWEENEY. ELIZABETH GRAY; DAVID W. SWEENEY, JOINTLY OR SEVERALLY -)f FORT WORTH and State of TX its tri.e an< ewfr.;l attorrev(si-u -Fact. wrtr, full power and authowy serer,,-/ orferred :r its name. place and ;teal. ro execute. acknowledge arc deliver any and all bonds, recognizanees, undertakings, or other instruments or contracts of suretyship in any penal limit.- -- - - - - - - - - - - - - - - - - - - - - - -• - -- - - - - - - - - - - - - - - - - - - - -- - - - LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY MORTGAGE CiuAK/Nr4 i tc. OR BANK DEPOSITORY BONDS. and to bind ary of the Compartes thereby as fully and to the same extent as it such bonds were signed by the Presidert. sealed wnU-, the corporate seal of the applicable Company and duh, attested by its Ser..retary. !herebv ratifying and corfirnurg all teat the said Attcrney(srin-Fact may do in the premises. Said appointment is made under and by authority of the following resolution adopted by the Soard of Directors of each of the WL-51 rlELD '1`15URANCE COMPAN''. iNESTFIELD NATIONAL INSURANCE COMPANY and 01-110 FARM_RS INSURANCE CCMPANY: 'Be It Resolved. that the President, ary Senior Executive, ary 'Secretary or any Ficelity di Surety Operatiors Executive or other Executive shall be and :s hereby vested with full power and authority to appoint ary one or more suitable persons as Attorney, s;-fn-Fact to represent and art for art: on behalf of the Compary subject to the following provisions: The Attorney -in -Fact. may be given full power and authority for and in the name of and on behalf of tf e Company. to execute. acknowledge and deliver, any and all bords, recognizanees. contracts, agreements of mdemr!ty and otter corn. itwnal or obligatory undertakings and ary and all notices and ;7ocuments carcelirg or terminating the Company's liability thereurcer, and any such instruments so executed by any such Attorrey-in-Fact sir all t`e as binding upon the Company as if signed oy the President and sealed and attested by :he Corporate Secretary." 'Be it Further Resoived, that the signature of ary such designated person and the seal of the Company heretofore or hereafter affixed to any power of attor'rey it any certificate relating thereto by facsimile. and ary power of attorrey or certificate bearing facsimile sigratures or facsimile seal shall be valid and binding upon tre Company witri respect to ary bord or uhdertakiry to which it is attached.' iEach adopted at a meeting held on February 8. 2 ('M. it Witress Werereof, WESTFIELD INSURANCE COMPAW/. WES7FI=1_C NATIONAL INSURANCE COMPANY arc OHIO FARMERS INSURANCE COMPANY have caused these presents to be Signed by their National Surety Leader anr. Senior Executive and their :orporate seals to oe hereto affixed tr!s 28th "av cI SEPTEMBER A.D.. 2023 . WESTFIELD INSURANCE COMPANY seals o� ••'• ,C4p`s` :' •.. ,%''� WESTFIELD NATIONAL INSURANCE COMPANY Afti:red i t".• i°�' •n �i - •.rya OHIO FARMERS INSURANCE COMPANY ''-• State of Chic By: County of Medina ss.: Gary W. Stumper, Naiionai Surety Leader and Senior Executive Cr this 28th day of SEPTEMBER A.D.. 2023 , before me persora:ly cairn Gary W. Stumper to me known, who. being by me duly sworn. did depose and say, that he resides in Medina, OH: that re is National Surety Leader and Senior Executive of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO 7ARMERS INSURANCE COMPANY. the comparies describer., in and which executed the above Instrument: that he l,rows the seals of said Companies: that the seals affixed to said instrument are such corporate seals: that they were so affixed by order of the Boards of Directors of said Companies: and that re signed his rame U ereto by At, order. Notarial ••p.NUNyry, Seal r"• R t A L S •. - r State of Ohio David A. Kotnik. Attorney at Law. Notary Public County of Medina ss.: ';, q o My Cornmissior Does Not Expire iSec. 147.03 Ohio, Revised Ccoei rE'oF I. Frank A. Carrino. Secretary of WESTFIELD INSURANCE COMPANY. WESTFIELD NATIONAL INSURANCE COMPANY anc OHIO FARMERS INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies. which is still in full force and affect: and furherrrore, the r'esolutiers of the Boards of Directors, set out in the Power of Attorney are in full force and effect. Ir Witness Whereof. I have hereunto set my nand and affixed the seals of said Cornparies it Westfield Certer. Onio, this 3rd day of July, 2025 .`�; ., 4 ..........ei 1NSWf s .'Lt111RTElfE° • : o - �E.fir _ ,r SEEM, : / szavtary ., . -O • . Frank A. Carrino, Secretary BPOAC2 (combined) (03-22) STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article 1 — Definitions and Terminology..........................................................................................................1 1.01 Defined Terms...............................................................................................................................1 1.02 Terminology..................................................................................................................................5 Article2 — Preliminary Matters......................................................................................................................... 6 2.01 Before Starting Construction........................................................................................................6 2.02 Preconstruction Conference.......................................................................................................... 6 2.03 Public Meeting.............................................................................................................................. 6 Article 3 — Contract Documents and Amending............................................................................................... 6 3.01 Reference Standards.....................................................................................................................6 3.02 Amending and Supplementing Contract Documents.................................................................. 6 Article 4 — Bonds and Insurance....................................................................................................................... 7 4.01 Licensed Sureties and Insurers..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7 4.03 Certificates of Insurance............................................................................................................... 7 4.04 Contractor's Insurance.................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12 Article 5 — Contractor's Responsibilities........................................................................................................12 5.01 Supervision and Superintendent.................................................................................................12 5.02 Labor; Working Hours................................................................................................................13 5.03 Services, Materials, and Equipment...........................................................................................13 5.04 Project Schedule..........................................................................................................................14 5.05 Substitutes and "Or-Equals".......................................................................................................14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16 5.07 Concerning Subcontractors, Suppliers, and Others...................................................................16 5.08 Wage Rates..................................................................................................................................18 5.09 Patent Fees and Royalties...........................................................................................................19 5.10 Laws and Regulations.................................................................................................................19 5.11 Use of Site and Other Areas.......................................................................................................19 5.12 Record Documents......................................................................................................................20 5.13 Safety and Protection..................................................................................................................21 5.14 Safety Representative.................................................................................................................21 5.15 Hazard Communication Programs............................................................................................. 22 5.16 Submittals....................................................................................................................................22 5.17 Contractor's General Warranty and Guarantee..........................................................................23 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification........................................................................................................................... 24 5.19 Delegation of Professional Design Services..............................................................................24 5.20 Right to Audit: ............................................................................................................................ 25 5.21 Nondiscrimination.......................................................................................................................25 Article 6 - Other Work at the Site............ 6.01 Related Work at Site ............ Article 7 - City's Responsibilities ................................ 7.01 Inspections, Tests, and Approvals ........... 7.02 Limitations on City's Responsibilities .... 7.03 Compliance with Safety Program ............ Article 8 - City's Observation Status During Construction.... 8.01 City's Project Representative .............................. 8.02 Authorized Variations in Work ........................... 8.03 Rejecting Defective Work ................................... 8.04 Determinations for Work Performed ................... Article 9 - Changes in the Work ...................... 9.01 Authorized Changes in the Work 9.02 Notification to Surety ................... Article 10 - Change of Contract Price; Change of Contract Time 10.01 Change of Contract Price ........................................... 10.02 Change of Contract Time ........................................... 10.03 Delays......................................................................... Article 11- Tests and Inspections; Correction, Removal or Acceptance of Defective Work 11.01 Notice of Defects.................................................................................................. 11.02 Access to Work..................................................................................................... 11.03 Tests and Inspections............................................................................................ 11.04 Uncovering Work................................................................................................. 11.05 City May Stop the Work....................................................................................... 11.06 Correction or Removal of Defective Work.......................................................... 11.07 Correction Period.................................................................................................. 11.08 City May Correct Defective Work....................................................................... 26 26 26 26 26 27 27 27 27 27 28 a a .................. 29 .................. 29 .................. 29 .................. 29 .................. 30 .................. 30 .................. 30 .................. 30 .................. 31 Article12 - Completion.................................................................................................................................. 32 12.01 Contractor's Warranty of Title................................................................................................... 32 12.02 Partial Utilization........................................................................................................................ 32 12.03 Final Inspection...........................................................................................................................32 12.04 Final Acceptance.........................................................................................................................33 Article13 - Suspension of Work....................................................................................................................33 13.01 City May Suspend Work............................................................................................................ 33 Article14 - Miscellaneous.............................................................................................................................. 34 14.01 Giving Notice.............................................................................................................................. 34 CITY OF FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 14.02 Computation of Times ...... 14.03 Cumulative Remedies ....... 14.04 Survival of Obligations..... 14.05 Headings ............................ CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 34 34 35 35 0073 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 ARTICLE I — DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions M. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings P. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting parry to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits o£ a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: None Write the name of the railroad company. (If none, then write none) 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: None Enter limits provided by Railroad Company (If none, write none) b. Each Occurrence:: None Enter limits provided by Railroad Company (If none, write none) 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. (Check this box if there is any City Participation) ❑x Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates ❑ Required for this Contract. ® Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.13. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a parry to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given i£ 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 DIVISION O1 GENERAL REQUIREMENTS 011100-1 DAP SUMMARY OF WORK SECTION 01 11 00 SUMMARY OF WORK PART1- GENERAL 1.1 SUMMARY A. Section Includes: Pagel of 3 1. Summary of Work to be performed in accordance with the Contract Documents B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN #106000 Revised December 20, 2012 011100-2 DAP SUMMARY OF WORK Page 2 of 3 b. Excavated and waste materials shall be stored in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. c. If the street is occupied by railroad tracks, the Work shall be carried on in such manner as not to interfere with the operation of the railroad. 1) All Work shall be in accordance with railroad requirements set forth in Division 0 as well as the railroad permit. D. Work within Easements 1. Do not enter upon private property for any purpose without having previously obtained permission from the owner of such property. 2. Do not store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the City. 3. Unless specifically provided otherwise, clear all rights -of -way or easements of obstructions which must be removed to make possible proper prosecution of the Work as a part of the project construction operations. 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the Work. a. Such notice shall be made at least 48 hours in advance of the beginning of the Work. b. Notices shall be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6. Fence a. Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence work within easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN #106000 Revised December 20, 2012 011100-3 DAP SUMMARY OF WORK Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log I DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN #106000 Revised December 20, 2012 01 25 00 - 1 DAP SUBSTITUTION PROCEDURES SECTION 0125 00 SUBSTITUTION PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 4 1. The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 4. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer's opinion, acceptance will require substantial revision of the original design d. In the City's or Developer's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 01 25 00 - 4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Firm Address Date Telephone For Use by City: Approved City Recommended Recommended Not recommended _Received late By Date Remarks Date Rejected CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 SECTION 013119 PRECONSTRUCTION MEETING PART1- GENERAL 1.1 SUMMARY A. Section Includes: 0131 19- 1 DAP PRECONSTRUCTION MEETING Page 1 of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 013119-2 DAP PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 013119-3 DAP PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log I DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 013233-1 DAP PRECONSTRUCTION VIDEO Pagel of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infill developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 013233-2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 SECTION 0133 00 DAP SUBMITTALS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 DAP SUBMITTALS Pagel of 8 1. General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 013300-2 DAP SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/z inches x 11 inches to 8 '/z inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 013300-3 DAP SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names o£ a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 013300-4 DAP SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 013300-5 DAP SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 013300-6 DAP SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 013300-7 DAP SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 013300-8 DAP SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August 30, 2013 0135 13- 1 DAP SPECIAL PROJECT PROCEDURES SECTION 0135 13 SPECIAL PROJECT PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 7 The procedures for special project circumstances that includes, but is not limited to: a. Coordination with the Texas Department of Transportation b. Work near High Voltage Lines c. Confined Space Entry Program d. Air Pollution Watch Days e. Use of Explosives, Drop Weight, Etc. f. Water Department Notification g. Public Notification Prior to Beginning Construction h. Coordination with United States Army Corps of Engineers i. Coordination within Railroad permits areas j. Dust Control k. Employee Parking B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 33 12 25 — Connection to Existing Water Mains 1.2 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction Specification 1.3 ADMINISTRATIVE REQUIREMENTS A. Coordination with the Texas Department of Transportation 1. When work in the right-of-way which is under the jurisdiction of the Texas Department of Transportation (TxDOT): a. Notify the Texas Department of Transportation prior to commencing any work therein in accordance with the provisions of the permit CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August, 30, 2013 013513-2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 b. All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation B. Work near High Voltage Lines 1. Regulatory Requirements a. All Work near High Voltage Lines (more than 600 volts measured between conductors or between a conductor and the ground) shall be in accordance with Health and Safety Code, Title 9, Subtitle A, Chapter 752. 2. Warning sign a. Provide sign of sufficient size meeting all OSHA requirements. 3. Equipment operating within 10 feet of high voltage lines will require the following safety features a. Insulating cage -type of guard about the boom or arm b. Insulator links on the lift hook connections for back hoes or dippers c. Equipment must meet the safety requirements as set forth by OSHA and the safety requirements of the owner of the high voltage lines 4. Work within 6 feet of high voltage electric lines a. Notification shall be given to: 1) The power company (example: ONCOR) a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Use of Explosives, Drop Weight, Etc. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section 01 31 13 E. Water Department Coordination During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August, 30, 2013 013513-3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 2. Coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. a. Coordination shall be in accordance with Section 33 12 25. b. If needed, obtain a hydrant water meter from the Water Department for use during the life of named project. c. In the event that a water valve on an existing live system be turned off and on to accommodate the construction of the project is required, coordinate this activity through the appropriate City representative. 1) Do not operate water line valves of existing water system. a) Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. b) In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. F. Public Notification Prior to Beginning Construction Prior to beginning construction on any block in the project, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a. Post notice or flyer 7 days prior to beginning any construction activity on each block in the project area. 1) Prepare flyer on the Contractor's letterhead and include the following information: a) Name of Project b) City Project No (CPN) c) Scope of Project (i.e. type of construction activity) d) Actual construction duration within the block e) Name of the contractor's foreman and phone number f) Name of the City's inspector and phone number g) City's after-hours phone number 2) A sample of the `pre -construction notification' flyer is attached as Exhibit A. 3) Submit schedule showing the construction start and finish time for each block of the project to the inspector. 4) Deliver flyer to the City Inspector for review prior to distribution. b. No construction will be allowed to begin on any block until the flyer is delivered to all residents of the block. G. Public Notification of Temporary Water Service Interruption during Construction 1. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. 2. Prepared notice as follows: a. The notification or flyer shall be posted 24 hours prior to the temporary interruption. b. Prepare flyer on the contractor's letterhead and include the following information: 1) Name of the project 2) City Project Number CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August, 30, 2013 013513-4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 3) Date of the interruption of service 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. H. Coordination with United States Army Corps of Engineers (USACE) At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. I. Coordination within Railroad Permit Areas At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. Obtain any supplemental information needed to comply with the railroad's requirements. J. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. K. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August, 30, 2013 013513-5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 1.4 SUBMITTALS [NOT USED] 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.6 CLOSEOUT SUBMITTALS [NOT USED] 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.8 QUALITY ASSURANCE [NOT USED] 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.10 FIELD [SITE] CONDITIONS [NOT USED] 1.11 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.3.13— Added requirement of compliance with Health and Safety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August, 30, 2013 01 35 13 -6 DAP SPECIAL PROJECT PROCEDURES EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: Page 6 of 7 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August, 30, 2013 013513-7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 EXHIBIT B FORT WORTH DMe: DOB NO. XXXX Project Hama: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised August, 30, 2013 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another form of distribution approved by the City. 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Tradition Phase 6B Revised March 20, 2020 CPN 106000 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 03/20/2020 D.V. Magaiia Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Tradition Phase 613 Revised March 20, 2020 CPN 106000 01 50 00 - 1 DAP TEMPORARY FACILITIES AND CONTROLS Pagel of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised JULY 1, 2011 015000-2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing 1. Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised JULY 1, 2011 015000-3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised JULY 1, 2011 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised JULY 1, 2011 01 55 26 - 1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Pagel of 3 SECTION 0155 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised July 1, 2011 015526-2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control 1. Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised July 1, 2011 015526-3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised July 1, 2011 0157 13- 1 DAP STORM WATER POLLUTION PREVENTION Pagel of 3 1.1 SECTION 0157 13 STORM WATER POLLUTION PREVENTION PART2- GENERAL 2.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 3125 00 — Erosion and Sediment Control 2.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. 2.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 2.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised July 1, 2011 015713-2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2.5 SUBMITTALS A. SWPPP Submit in accordance with Section 0133 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised July 1, 2011 015713-3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 2.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2.7 CLOSEOUT SUBMITTALS [NOT USED] 2.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 2.9 QUALITY ASSURANCE [NOT USED] 2.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2.11 FIELD [SITE] CONDITIONS [NOT USED] 2.12 WARRANTY [NOT USED] PART 3 - PRODUCTS [NOT USED] PART 4 - EXECUTION [NOT USED] END OF SECTION Revision Log I DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised July 1, 2011 SECTION 0160 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 60 00 DAP PRODUCT REQUIREMENTS Page 1 of 2 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City's website at: httvs:Hapes.fortworthtexas.2ov/ProiectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. C. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. D. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Tradition Phase 613 Revised March 20, 2020 CPN 106000 1.9 QUALITY ASSURANCE [NOT USED] 01 6000 DAP PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/2020 D.V. Magana Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106000 Revised March 20, 2020 01 66 00 - 1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Pagel of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 016600-2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 016600-3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 016600-4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 01 70 00 - 1 DAP MOBILIZATION AND REMOBILIZATION Pagel of 4 SECTION 0170 00 MOBILIZATION AND REMOBILIZATION PART1- GENERAL 1.1 SUMMARY A. Section Includes: Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 017000-2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site for the issued Work Order. b) Establishment of necessary general facilities for the Contractor's operation at the Site for the issued Work Order 2) Demobilization shall consist of the activities and cost necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b) Site Clean-up for each issued Work Order c) Removal of all buildings or other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract. 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects a. A Mobilization for Miscellaneous Projects when directed by the City and the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Mobilization and Demobilization a. Measure 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. Remobilization for suspension of Work as specifically required in the Contract Documents a. Measurement 1) Measurement for this Item shall be per each remobilization performed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Specified Remobilization" in accordance with Contract Documents. c. The price shall include: 1) Demobilization as described in Section 1.1.A.2.a.1) 2) Remobilization as described in Section 1.1.A.2.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 017000-3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 Remobilization for suspension of Work as required by City a. Measurement and Payment 1) This shall be submitted as a Contract Claim in accordance with Article 10 of Section 00 72 00. 2) No payments will be made for standby, idle time, or lost profits associated with this Item. 4. Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include: 1) Mobilization as described in Section 1.1.A.3.a.1) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Emergency Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1) Mobilization as described in Section 1.1.A.4.a) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 017000-4 DAP MOBILIZATION AND REMOBILIZATION 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE 4/7/2014 NAME M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application Page 4 of 4 CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 1 2 3 PART1- GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 11 12 1.2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 8 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. See Changes (Highlighted in Yellow). C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Staking a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised February 14, 2018 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 1 1.3 REFERENCES 2 A. Definitions 3 1. Construction Survev - The survey measurements made prior to or while 4 construction is in progress to control elevation, horizontal position, dimensions and 5 configuration of structures/improvements included in the Project Drawings. 6 2. As -built Survev —The measurements made after the construction of the 7 improvement features are complete to provide position coordinates for the features 8 of a project. 9 3. Construction Staking — The placement of stakes and markings to provide offsets 10 and elevations to cut and fill in order to locate on the ground the designed 11 structures/improvements included in the Project Drawings. Construction staking 12 shall include staking easements and/or right of way if indicated on the plans. 13 4. Survev "Field Checks" — Measurements made after construction staking is 14 completed and before construction work begins to ensure that structures marked on 15 the ground are accurately located per Project Drawings. 16 B. Technical References 17 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw 18 website) — 01 71 23.16.01— Attachment A —Survey Staking Standards 19 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available 20 on City's Buzzsaw website). 21 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 22 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land 23 Surveying in the State of Texas, Category 5 24 25 1.4 ADMINISTRATIVE REQUIREMENTS 26 A. The Contractor's selection of a surveyor must comply with Texas Government 27 Code 2254 (qualifications based selection) for this project. 28 1.5 SUBMITTALS 29 A. Submittals, if required, shall be in accordance with Section 0133 00. 30 B. All submittals shall be received and reviewed by the City prior to delivery of work. 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 32 A. Field Quality Control Submittals 33 1. Documentation verifying accuracy of field engineering work, including coordinate 34 conversions if plans do not indicate grid or ground coordinates. 35 2. Submit "Cut -Sheets" conforming to the standard template provided by the City 36 (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 37 38 1.7 CLOSEOUT SUBMITTALS 39 B. As -built Redline Drawing Submittal CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised February 14, 2018 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of 2 constructed improvements signed and sealed by Registered Professional Land 3 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A 4 — Survey Staking Standards). 5 2. Contractor shall submit the proposed as -built and completed redline drawing 6 submittal one (1) week prior to scheduling the project final inspection for City 7 review and comment. Revisions, if necessary, shall be made to the as -built redline 8 drawings and resubmitted to the City prior to scheduling the construction final 9 inspection. 10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11 1.9 QUALITY ASSURANCE 12 A. Construction Staking 13 1. Construction staking will be performed by the Contractor. 14 2. Coordination 15 a. Contact City and Developer's Project Representative at least one week in 16 advance notifying the City of when Construction Staking is scheduled. 17 b. It is the Contractor's responsibility to coordinate staking such that 18 construction activities are not delayed or negatively impacted. 19 3. General 20 a. Contractor is responsible for preserving and maintaining stakes. If City 21 surveyors or Developer's Project Representative are required to re -stake for 22 any reason, the Contractor will be responsible for costs to perform staking. If 23 in the opinion of the City, a sufficient number of stakes or markings have been 24 lost, destroyed disturbed or omitted that the contracted Work cannot take place 25 then the Contractor will be required to stake or re -stake the deficient areas. 26 B. Construction Survey 27 1. Construction Survey will be performed by the Contractor. 28 2. Coordination 29 a. Contractor to verify that horizontal and vertical control data established in the 30 design survey and required for construction survey is available and in place. 31 3. General 32 a. Construction survey will be performed in order to construct the work shown 33 on the Construction Drawings and specified in the Contract Documents. 34 b. For construction methods other than open cut, the Contractor shall perform 35 construction survey and verify control data including, but not limited to, the 36 following: 37 1) Verification that established benchmarks and control are accurate. 38 2) Use of Benchmarks to furnish and maintain all reference lines and grades 39 for tunneling. 40 3) Use of line and grades to establish the location of the pipe. 41 4) Submit to the City copies of field notes used to establish all lines and 42 grades, if requested, and allow the City to check guidance system setup prior 43 to beginning each tunneling drive. 44 5) Provide access for the City, if requested, to verify the guidance system and 45 the line and grade of the carrier pipe. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised February 14, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) W ter Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 25O linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 25O linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) W ter Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised February 14, 2018 017123-5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 1 d) Fire hydrants 2 e) Valves (gate, butterfly, etc.) 3 f) Air Release valves (Manhole rim and vent pipe) 4 g) Blow off valves (Manhole rim and valve lid) 5 h) Pressure plane valves 6 i) Underground Vaults 7 (1) Rim and flowline elevations and coordinates for each 8 Underground Vault. 9 3) Sanitary Sewer 10 a) Cleanouts 11 (1) Rim and flowline elevations and coordinates for each 12 b) Manholes and Junction Structures 13 (1) Rim and flowline elevations and coordinates for each 14 manhole and junction structure. 15 4) Stormwater — Not Applicable 16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 17 1.11 FIELD [SITE] CONDITIONS [NOT USED] 18 1.12 WARRANTY 19 PART 2 - PRODUCTS 20 A. A construction survey will produce, but will not be limited to: 21 1. Recovery of relevant control points, points of curvature and points of intersection. 22 2. Establish temporary horizontal and vertical control elevations (benchmarks) 23 sufficiently permanent and located in a manner to be used throughout construction. 24 3. The location of planned facilities, easements and improvements. 25 a. Establishing final line and grade stakes for piers, floors, grade beams, parking 26 areas, utilities, streets, highways, tunnels, and other construction. 27 b. A record of revisions or corrections noted in an orderly manner for reference. 28 c. A drawing, when required by the client, indicating the horizontal and vertical 29 location of facilities, easements and improvements, as built. 30 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all 31 construction staking projects. These cut sheets shall be on the standard city template 32 which can be obtained from the Survey Superintendent (817-392-7925). 33 5. Digital survey files in the following formats shall be acceptable: 34 a. AutoCAD (.dwg) 35 b. ESRI Shapefile (.shp) 36 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use 37 standard templates, if available) 38 6. Survey files shall include vertical and horizontal data tied to original project 39 control and benchmarks, and shall include feature descriptions 40 PART 3 - EXECUTION 41 3.1 INSTALLERS CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 1 A. Tolerances: 2 1. The staked location of any improvement or facility should be as accurate as 3 practical and necessary. The degree of precision required is dependent on many 4 factors all of which must remain judgmental. The tolerances listed hereafter are 5 based on generalities and, under certain circumstances, shall yield to specific 6 requirements. The surveyor shall assess any situation by review of the overall plans 7 and through consultation with responsible parties as to the need for specific 8 tolerances. 9 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical 10 tolerance. Horizontal alignment for earthwork and rough cut should not exceed 11 1.0 ft. tolerance. 12 b. Horizontal alignment on a structure shall be within .0.1ft tolerance. 13 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and 14 walkways shall be located within the confines of the site boundaries and, 15 occasionally, along a boundary or any other restrictive line. Away from any 16 restrictive line, these facilities should be staked with an accuracy producing no 17 more than 0.05ft. tolerance from their specified locations. 18 d. Underground and overhead utilities, such as sewers, gas, water, telephone and 19 electric lines, shall be located horizontally within their prescribed areas or 20 easements. Within assigned areas, these utilities should be staked with an 21 accuracy producing no more than 0.1 ft tolerance from a specified location. 22 e. The accuracy required for the vertical location of utilities varies widely. Many 23 underground utilities require only a minimum cover and a tolerance of 0.1 ft. 24 should be maintained. Underground and overhead utilities on planned profile, 25 but not depending on gravity flow for performance, should not exceed 0.1 ft. 26 tolerance. 27 B. Surveying instruments shall be kept in close adjustment according to manufacturer's 28 specifications or in compliance to standards. The City reserves the right to request a 29 calibration report at any time and recommends regular maintenance schedule be 30 performed by a certified technician every 6 months. 31 1. Field measurements of angles and distances shall be done in such fashion as to 32 satisfy the closures and tolerances expressed in Part 3. LA. 33 2. Vertical locations shall be established from a pre -established benchmark and 34 checked by closing to a different bench mark on the same datum. 35 3. Construction survey field work shall correspond to the client's plans. Irregularities 36 or conflicts found shall be reported promptly to the City. 37 4. Revisions, corrections and other pertinent data shall be logged for future reference. 38 39 3.2 EXAMINATION [NOT USED] 40 3.3 PREPARATION [NOT USED] 41 3.4 APPLICATION 42 3.5 REPAIR / RESTORATION 43 A. If the Contractor's work damages or destroys one or more of the control 44 monuments/points set by the City or Developer's Project Representative, the monuments 45 shall be adequately referenced for expedient restoration. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised February 14, 2018 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 1 1. Notify City or Developer's Project Representative if any control data needs to be 2 restored or replaced due to damage caused during construction operations. 3 a. Contractor shall perform replacements and/or restorations. 4 b. The City or Developer's Project Representative may require at anytime a 5 survey "Field Check" of any monument or benchmarks that are set be verified 6 by the City surveyors or Developer's Project Representative before further 7 associated work can move forward. 8 3.6 RE -INSTALLATION [NOT USED] 9 3.7 FIELD [OR] SITE QUALITY CONTROL 10 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 11 City or Developer's Project Representative in accordance with this Specification. This 12 includes easements and right of way, if noted on the plans. 13 B. Do not change or relocate stakes or control data without approval from the City. 14 3.8 SYSTEM STARTUP 15 A. Survey Checks 16 1. The City reserves the right to perform a Survey Check at any time deemed 17 necessary. 18 2. Checks by City personnel or 3rd party contracted surveyor are not intended to 19 relieve the contractor of his/her responsibility for accuracy. 20 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D.Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text"; revised measurement and payment sections for Construction 2/14/2018 M Owen Staking and As -Built Survey; added reference to selection compliance with TGC 2254; revised action and Closeout submittal requirements; added acceptable depth CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised February 14, 2018 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised February 14, 2018 017123-1 DAP CONSTRUCTION STAKING AND SURVEY Page 1 of 4 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Staking a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Submittals, if required, shall be in accordance with Section 0133 00. B. All submittals shall be approved by the City prior to delivery. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Certificates 1. Provide certificate certifying that elevations and locations of improvements are in conformance or non-conformance with requirements of the Contract Documents. a. Certificate must be sealed by a registered professional land surveyor in the State of Texas. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106000 Revised April 7, 2014 01 71 23 - 2 DAP CONSTRUCTION STAKING AND SURVEY Page 2 of 4 B. Field Quality Control Submittals 1. Documentation verifying accuracy of field engineering work. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Construction Staking 1. Construction staking will be performed by the City. 2. Coordination a. Contact City's Project Representative at least 2 weeks in advance for scheduling of Construction Staking. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes furnished by City. b. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed or disturbed, by Contractor's neglect, such that the contracted Work cannot take place, then the Contractor will be required to pay the City for new staking with a 25 percent markup. The cost for staking will be deducted from the payment due to the Contractor for the Project. B. Construction Survey 1. Construction Survey will be performed by the City. 2. Coordination a. Contractor to verify that control data established in the design survey remains intact. b. Coordinate with the City prior to field investigation to determine which horizontal and vertical control data will be required for construction survey. c. It is the Contractor's responsibility to coordinate Construction Survey such that construction activities are not delayed or negatively impacted. d. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. 1) City shall perform replacements and/or restorations. General a. Construction survey will be performed in order to maintain complete and accurate logs of control and survey work as it progresses for Project Records. b. The Contractor will need to ensure coordination is maintained with the City to perform construction survey to obtain construction features, including but not limited to the following: 1) All Utility Lines a) Rim and flowline elevations and coordinates for each manhole or junction structure 2) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Every 250 linear feet (2) Horizontal and vertical points of inflection, curvature, etc. (All CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106000 Revised April 7, 2014 01 71 23 - 3 DAP CONSTRUCTION STAKING AND SURVEY Page 3 of 4 Fittings) (3) Cathodic protection test stations (4) Sampling stations (5) Meter boxes/vaults (All sizes) (6) Fire lines (7) Fire hydrants (8) Gate valves (9) Plugs, stubouts, dead-end lines (10) Air Release valves (Manhole rim and vent pipe) (11) Blow off valves (Manhole rim and valve lid) (12) Pressure plane valves (13) Cleaning wyes (14) Casing pipe (each end) b) Storm Sewer (1) Top of pipe elevations and coordinates at the following locations: (a) Every 250 linear feet (b) Horizontal and vertical points of inflection, curvature, etc. c) Sanitary Sewer (1) Top of pipe elevations and coordinates for sanitary sewer lines at the following locations: (a) Every 250 linear feet (b) Horizontal and vertical points of inflection, curvature, etc. (c) Cleanouts c. Construction survey will be performed in order to maintain complete and accurate logs of control and survey work associated with meeting or exceeding the line and grade required by these Specifications. d. The Contractor will need to ensure coordination is maintained with the City to perform construction survey and to verify control data, including but not limited to the following: 1) Established benchmarks and control points provided for the Contractor's use are accurate 2) Benchmarks were used to furnish and maintain all reference lines and grades for tunneling 3) Lines and grades were used to establish the location of the pipe 4) Submit to the City copies of field notes used to establish all lines and grades and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City to verify the guidance system and the line and grade of the carrier pipe on a daily basis. 6) The Contractor remains fully responsible for the accuracy of the work and the correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to City. 9) If the installation does not meet the specified tolerances, immediately notify the City and correct the installation in accordance with the Contract Documents. 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106000 Revised April 7, 2014 01 71 23 - 4 DAP CONSTRUCTION STAKING AND SURVEY Page 4 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. It is the Contractor's responsibility to maintain all stakes and control data placed by the City in accordance with this Specification. B. Do not change or relocate stakes or control data without approval from the City. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 106000 Revised April 7, 2014 SECTION 0174 23 CLEANING PART1- GENERAL 1.1 SUMMARY 017423-1 DAP CLEANING Pagel of 4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 01 74 23 - 2 DAP CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 017423-3 DAP CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 01 74 23 - 4 DAP CLEANING Page 4 of 4 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 SECTION 01 7719 CLOSEOUT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY 017719-1 DAP CLOSEOUT REQUIREMENTS Pagel of 3 A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE 4/7/2014 NAME M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 017823-1 DAP OPERATION AND MAINTENANCE DATA Pagel of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 1/2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 017823-5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME 8/31/2012 D. Johnson 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE 1.5.A.1 — title of section removed Revised for DAP Application CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 017839-1 DAP PROJECT RECORD DOCUMENTS Pagel of 4 SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division I — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 017839-2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH Tradition Phase 613 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 017839-4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP Application CITY OF FORT WORTH Tradition Phase 6B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN #106000 Revised April 7, 2014 GEOTECHNICAL REPORT Environmental Geotechnical 'Engineering Materials Testing Field Inspections & Code Compliance Geophysical Technologies August 16, 2024 HINES INTERESTS, LP — Dallas2 2700 Commerce Street, Suite 1600 Dallas, Texas 75226 Attention: Mr. Dusty Dellinger Re: Pavement Recommendations Wildflower (Traditions) — Phase 6113 Off Winding Meadows Drive Justin, Texas UES Report No. W241201-A Submitted herein are the recommended pavement sections for the proposed subdivision (Wildflower — Phase 613) on a tract of land located west of Winding Meadows Drive, about half mile north of Highway 114, in Justin, Texas. This study was authorized by Mr. Dusty Dellinger on April 17, 2024 and performed in accordance with UES Professional Solutions, LLC Proposal No. 104299 dated April 17, 2024. This report is an extension of UES Report No. W241201 dated August 7, 2024. The purpose of this study is to develop pavement sections for the planned streets in the subject subdivision in accordance with the City of Fort Worth Pavement Design Manual (January 2015). We understand the proposed streets within the subdivision could be classified as "Residential - Urban", "Collector" or "Arterial", as described in the referenced manual. PURPOSE AND SCOPE The purpose of this geotechnical exploration is for UES PROFESSIONAL SOLUTIONS 44, LLC (UES) to evaluate for Hines Interests LP — Dallas2 (Client) some of the physical and engineering properties of subsurface materials at selected locations on the subject site with respect to formulation of appropriate geotechnical design parameters for the proposed pavement. The field exploration was accomplished by securing subsurface samples from widely spaced test borings performed across the expanse of the site. Engineering analyses were performed from results of the field exploration and results of laboratory tests performed on representative samples. Also included are general comments pertaining to reasonably anticipated construction problems and recommendations concerning earthwork and quality control testing during construction. This information can be used to evaluate subsurface conditions and to aid in ascertaining construction meets project specifications. 5058 Brush Creek Rd I Fort Worth, TX 761191 ph 817-496-5600 TeamUES.com Recommendations provided in this report were developed from information obtained in test borings depicting subsurface conditions only at the specific boring locations and at the particular time designated on the logs. Subsurface conditions at other locations may differ from those observed at the boring locations, and subsurface conditions at the boring locations may vary at different times of the year. The scope of work may not fully define the variability of subsurface materials and conditions that are present on the site. The nature and extent of variations between borings may not become evident until construction. If significant variations then appear evident, our office should be contacted to re-evaluate our recommendations after performing on -site observations and possibly other tests. SUMMARY OF RECOMMENDATIONS Table A contains a summary of pavement section requirements for proposed streets at the subject project. TABLE A Summary of Pavement Section Requirements Street Classification Residential -Urban Collector Arterial PCC Pavement Thickness(in) placed 6 7% 10 on lime stabilized subgrade soil 28-day Concrete Compressive 3,600 3,600 3,600 Strength (psi) Subgrade Treatment 6 inches Lime 8 inches Lime 8 inches Lime Application Rate (Ibs per sq yd) 30 36 36 Reinforcing Bar No. 3 3 4 Reinforcing Bar Spacing (in) 18 18 18 Further recommendations and analyses used to develop the summary in Table A are provided further in this report. FIELD EXPLORATION Subsurface conditions on the site were explored by drilling a total of 48 test borings to depths of about 15 ft to 20 ft. The borings were drilled in general accordance with ASTM Standard D 420 using standard rotary drilling equipment. The approximate location of each test boring is shown on the Boring Location Plan, Figure 1. Subsurface types encountered during the field exploration are presented on the attached Log of Boring sheets (boring logs). These boring logs contain our Field Technician's and Engineer's interpretation of conditions believed to exist between actual samples retrieved. Therefore, the boring logs contain both factual and interpretive information. Lines delineating subsurface strata on the boring logs are approximate and the actual transition between strata may be gradual. LABORATORY TESTS Selected samples of the subsurface materials were tested in the laboratory to evaluate their engineering properties as a basis in providing recommendations for pavement sections design and earthwork construction. The following laboratory tests were performed to facilitate pavement section recommendations: • Moisture Content (ASTM D 2216) • Atterberg-Limits (ASTM D 4318) • Unconfined Compressive Strength (ASTM D 2166) • Sulfate Content (TX-145-E Part II) • Lime Series (Plasticity Index vs. Lime Content) Individual test results are presented on the attached Log of Boring or summary data sheets. GENERAL SUBSURFACE CONDITIONS Based on geological atlas maps available from the Bureau of Economic Geology, published by the University of Texas at Austin, the project site lies within the Fort Worth Limestone and Duck Creek formation, mapped as undivided. This geological formation consists predominantly of limestone, shale and marl, (limey shale). Residual soils associated with the formation generally consist of clay soils with low to high shrink/swell potential. Subsurface conditions encountered in most of the borings generally consisted of clay to depths of about 2 ft to 10 ft below the ground surface underlain by limestone extending to the 15 ft to 20 ft termination depths of the borings. Subsurface conditions encountered in Borings 1, 3, 5, 6, 7, 9, 11, 13, 17, 20, 22, 24 and 39 generally consisted of clay to depths of about 2 ft to 8 ft below the ground surface underlain by limestone to depths of about 12 ft to 18 ft. Shale was then encountered extending to the 15 ft to 20 ft termination depths of the borings. Subsurface conditions encountered in Boring 19 generally consisted of clay to a depth of about 12 ft below the ground surface underlain by limestone extending to the 20 ft termination depth of the boring. Subsurface conditions encountered in Boring 25 generally consisted of gravel to a depth of about 1 ft below the ground surface underlain by limestone extending to the 15 ft termination depth of the boring. Subsurface conditions encountered in Boring 33 generally consisted of clay and shaly clay extending to the 20 ft termination depth of the boring. Layers of limestone about 1 ft and 9 ft thick were encountered between clay and/or shaly clay layers in Borings 14 and 33 at depths of about 2 ft and 4 ft below the ground surface, respectively. The upper 1 ft to 4 ft of clay or gravel encountered in Borings 25, 26, 37, 38 and 45 were visually identified as fill and possible fill material. More detailed stratigraphic information is presented on the attached Log of Boring sheets. Most of the materials encountered in the borings are considered relatively impermeable and are expected to have a relatively slow response to water movement. Therefore, several days of observation would be required to evaluate actual groundwater levels within the depths explored. Also, the groundwater level at the site is anticipated to fluctuate seasonally depending on the amount of rainfall, prevailing weather conditions and subsurface drainage characteristics. Free groundwater was encountered on drilling tools during drilling in Borings 6, 8, 14, 30, 31 and 32 at depths of about 4 ft to 6 ft below the ground surface. Groundwater was then encountered in Borings 30 and 31 immediately upon completion of drilling at depths of about 4 ft and 13 ft, respectively. Borings 6, 8, 14 and 32 were dry immediately upon completion of drilling. No free groundwater was encountered in the remaining borings. It is common to encounter seasonal groundwater within existing fill material and granular soil, from natural fractures within the clayey matrix, at the soil/rock (limestone and/or shale) interface and from fractures within the rock (limestone and/or shale), particularly during or after periods of precipitation. If more detailed groundwater information is required, monitoring wells or piezometers can be installed. Further information concerning subsurface materials and conditions encountered can be obtained from the attached boring logs. ENGINEERING ANALYSIS AND RECOMMENDATIONS Calculations used to determine the required pavement thickness are based only on the physical and engineering properties of the materials and conventional thickness determination procedures. Related civil design factors such as subgrade drainage, shoulder support, cross - sectional configurations, surface elevations, joint design and environmental factors will significantly affect the service life and must be included in preparation of the construction drawings and specifications but were not included in the scope of this study. Normal periodic maintenance will be required for all pavement to achieve the design life of the pavement system. Pavement Subgrade Preparation Based on review of the borings and grading plans prepared by GM Civil Engineering and Surveying (Job No. 10720, dated July 15, 2024, Sheet No. 3, 4 and 5), we expect the pavement subgrade could consist of clay soils or similar onsite materials used for grading the site. The pavement subgrade could also consist of limestone in some areas depending on the given location along the alignment and grading requirements. Since the subgrade conditions and required treatments could vary along the proposed road alignment, UES should be retained to observe construction to verify conditions are as expected. Also, we should be provided with the final grading plan for review prior to construction to verify or modify in writing the recommendations contained in this report. The exposed clayey surface soils should be scarified to a depth of 6 inches and 8 inches for Residential Urban and Collector/Arterial streets, respectively, and mixed with a minimum 30 and 36 Ibs per sq yard of hydrated lime (by dry soil weight) in conformance with TxDOT Standard Specifications Item 260. The application rate for Residential Urban streets is the minimum required by the City of Fort Worth. The application rate for Collector/Arterial streets equates to about 6 percent lime based on a dry unit soil weight of 100 pcf. The results of lime series tests performed on representative clay samples are attached (Figures 2A and 213). We recommend lime stabilization procedures extend at least 1 ft beyond the edge of the pavement to reduce effects of seasonal shrinking and swelling upon the extreme edges of pavement. The soil -lime mixture should be compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 0 to 4 percentage points above the mixture's optimum moisture content. In all areas where hydrated lime is used to stabilize subgrade soil, routine Atterberg-limit tests should be performed to verify the resulting plasticity index of the soil -lime mixture is at/or below 15. Lime stabilization of the pavement subgrade is not required where the pavement subgrade consists of limestone. In pavement areas where limestone is exposed after final subgrade elevation is achieved, on -site lime stabilized clay cuttings, on -site processed limestone cuttings, or flexible base material could be used as a leveling course (as needed) to provide a smooth surface for placement of the pavement. Mechanical lime stabilization of the pavement subgrade soil will not prevent normal seasonal movement of the underlying untreated materials. Pavement and other flatwork constructed at final grades as could experience soil -related potential seasonal movements up to about 4% inches as discussed in the referenced foundation report. Potential seasonal movements are discussed in more detail in UES Report No. W241201 performed for the residential foundations to be constructed at the site. California Bearing Ratio (CBR) tests were not performed for this specific project. However, based on our experience in the area and similar conditions, the CBR value for the natural clay soil is estimated to be about 2 to 3. Following improvement with lime, the CBR value for the lime stabilized clayey soils is expected to be at least 10. Portland Cement Concrete Pavement Section Using the 1993 AASHTO pavement design procedures (WinPAS computer program distributed by American Concrete Pavement Association), the following design parameters were used in analyses of the PCC pavement section. • Compressive strength of concrete • Modulus of Elasticity • Modulus of Rupture • Modulus of Subgrade Reaction* • Load Transfer Co -efficient • Drainage Coefficient 3,600 psi at 28 days 4,400,000 psi 600 psi 250 pci 3.1 1.0 • Initial PSI • Terminal PSI for • Standard Deviation • Reliability 4.5 2.0 (Residential Urban) 2.25 (Collector) 2.5 (Arterial) 0.35 85 percent *Subgrade prepared with lime stabilization, or graded limestone as discussed in the previous section. Using the Street Classification of "Residential -Urban" as described in the referenced Fort Worth Pavement Design Manual, it is estimated annual traffic volume will be about 35,000 Equivalent Single Axle Loads (ESALs) in one direction over a 25-year design life with 0.5 percent annual traffic growth. Based on this, we estimate the cumulative ESALs over the design life of the Residential Urban street pavement to be about 930,000. Using the Street Classification of "Collector" as described in the referenced Fort Worth Pavement Design Manual, the annual traffic volume will be about 100,000 Equivalent Single Axle Loads (ESALs) in one direction over a 25-year design life with 1.5 percent annual traffic growth. Based on this, we estimate the cumulative ESALs over the design life of the pavement to be about 3,000,000. Using the Street Classification of "Arterial" as described in the referenced Fort Worth Pavement Design Manual, the annual traffic volume will be about 300,000 Equivalent Single Axle Loads (ESALs) in one direction over a 30-year design life with 2.5 percent annual traffic growth. Based on this, we estimate the cumulative ESALs over the design life of the pavement to be about 13, 000, 000. If the actual expected traffic volume is different than used for our analysis herein, our office should be provided with the actual expected traffic volume so that we can re-evaluate our recommendations. Based on the subgrade preparations recommended herein, the projected traffic volume and stated design parameters, a minimum 6-inch section of Portland cement concrete is required for Residential Urban classified streets, a minimum 7%-inch section of Portland cement concrete is required for Collector classified streets and a minimum 10-inch section of Portland cement concrete is required for Arterial classified streets at this project. PCC should have a minimum 3,600 psi compressive strength at 28 days. The concrete section should be placed over a properly prepared subgrade as discussed herein. Concrete should be designed with 4.5 ± 1.5 percent entrained air. Reinforcing steel for concrete pavement should be in accordance with Table 4.1 of the referenced Pavement Design Manual. Joints and saw - cutting in concrete should be in accordance with Section Four of the referenced Pavement Design Manual. Drainage and Maintenance Routine maintenance, including sealing of cracks and joints should be performed over the life of the pavement. Adequate drainage should be provided to reduce seasonal variations in the moisture content of subgrade soils. Maintaining positive surface drainage throughout the life of the pavement is essential. Soluble Sulfates A total of 11 samples obtained from the borings were tested for soluble sulfate concentrations. Results of the laboratory testing (TxDOT Test Method TEX-145-E Part II) are summarized in Table B. TABLE B Soluble Sulfates Sample Boring Depth, Soluble Sulfate, Material Type No. No. ft mg/Kg (ppm) 1 2 0-2 Brown CLAY 50 2 5 0-2 Dark Brown CLAY 71 3 8 0-2 Brown CLAY 60 4 16 0-2 Brown CLAY 28 5 20 2-4 Brown CLAY 57 6 23 2-4 Tan CLAY 69 7 29 2-4 Tan and Gray CLAY 14 8 35 0-2 Dark Brown CLAY 68 9 37 2-4 Tan CLAY 48 10 41 0-2 Dark Brown CLAY 65 11 43 2-4 Brown and Tan CLAY 62 Based on the results of laboratory testing, the soluble sulfate content measured in the samples tested is considered relatively low (<3,000 ppm). It should be noted that concentrations of soluble sulfates in soil are typically very localized and concentrations in other areas of the site could vary significantly. Hence, it is recommended sulfate sampling/testing be performed along the pavement subgrade alignment during construction. During construction, experienced geotechnical personnel should make close observations for possible sulfate reactions. GENERAL CONSTRUCTION PROCEDURES AND RECOMMENDATIONS Variations in subsurface conditions could be encountered during construction. To permit correlation between test boring data and actual subsurface conditions encountered during construction, it is recommended a registered Professional Engineering firm be retained to observe construction procedures and materials. Some construction problems, particularly degree or magnitude, cannot be reasonably anticipated until the course of construction. The recommendations offered in the following paragraphs are intended not to limit or preclude other conceivable solutions, but rather to provide our observations based on our experience and understanding of the project characteristics and subsurface conditions encountered in the borings. Site Preparation and Grading Limestone was encountered within 4 ft of the ground surface in several borings. We expect limestone will be encountered during grading and general excavation at this site. From our experience, this limestone can be hard and difficult to excavate. Rock excavation methods (including, but not limited to rock teeth, rippers, jack hammers, or sawcutting) may be required to remove the limestone. Crushing equipment may be required to process this limestone if it is desired to use this material as compacted fill on the site. The contractor selected should have experience with excavation in hard limestone. All areas supporting pavement or areas to receive new fill should be properly prepared. • After completion of the necessary stripping, clearing, and excavating and prior to placing any required fill, the exposed subgrade should be carefully evaluated by probing and testing. Any undesirable material (organic material, wet, soft, or loose soil) still in place should be removed. • The exposed subgrade should be further evaluated by proof -rolling with a heavy pneumatic tired roller, loaded dump truck or similar equipment weighing approximately 25 tons to check for pockets of soft or loose material hidden beneath a thin crust of possibly better soil. • Proof -rolling procedures should be observed routinely by a Professional Engineer or his designated representative. Any undesirable material (organic material, wet, soft, or loose soil) exposed from the proof -roll should be removed and replaced with well -compacted material as outlined in the Fill Compaction section. • Prior to placement of any fill, the exposed subgrade should then be scarified to a minimum depth of 6 inches and recompacted as outlined in the Fill Compaction section. If fill is to be placed on existing slopes (natural or constructed) steeper than six horizontal to one vertical (6:1), the fill materials should be benched into the existing slopes in such a manner as to provide a minimum bench width of five (5) ft. This should provide a good contact between the existing soils and new fill materials, reduce potential sliding planes, and allow relatively horizontal lift placements. Even if fill is properly compacted as recommended in the Fill Compaction section, fills in excess of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the total fill thickness. This should be considered when planning or placing deep fills. Slope stability analysis of embankments (natural or constructed) and global stability analysis for retaining walls was not within the scope of this study. The contractor is responsible for designing any excavation slopes, temporary sheeting or shoring. Design of these structures should include any imposed surface surcharges. Construction site safety is the sole responsibility of the contractor, who shall also be solely responsible for the means, methods and sequencing of construction operations. The contractor should also be aware that slope height, slope inclination or excavation depths (including utility trench excavations) should in no case exceed those specified in local, state and/or federal safety regulations, such as OSHA Health and Safety Standard for Excavations, 29 CFR Part 1926, or successor regulations. Stockpiles should be place well away from the edge of the excavation and their heights should be controlled so they do not surcharge the sides of the excavation. Surface drainage should be carefully controlled to prevent flow of water over the slopes and/or into the excavations. Construction slopes should be closely observed for signs of mass movement, including tension cracks near the crest or bulging at the toe. If potential stability problems are observed, a geotechnical engineer should be contacted immediately. Shoring, bracing or underpinning required for the project (if any) should be designed by a professional engineer registered in the State of Texas. Traffic of heavy equipment (including heavy compaction equipment) may create pumping and general deterioration of shallow soils. Therefore, some construction difficulties should be anticipated during periods when these soils are saturated. Fill Compaction The following compaction recommendations pertain to general filling and site grading. The pavement subgrade should be prepared as discussed in the Pavement Subgrade Preparation section. Clay soils with a plasticity index equal to or greater than 25 should be compacted to a dry density between 93 and 98 percent of standard Proctor maximum dry density (ASTM D 698). The compacted moisture content of the clays during placement should be within the range of +2 to +6 percentage points of the material's optimum moisture. Clay soils used for general fill with a plasticity index less than 25 should be compacted to a dry density of at least 95 percent of standard Proctor maximum dry density (ASTM D 698). The compacted moisture content of the clays during placement should be within the range of -1 to +3 percentage points of the material's optimum moisture. Clay soils used as fill should be processed and the largest particle or clod should be less than 6 inches prior to compaction. Processed limestone used as fill should be compacted to at least 95 percent of standard Proctor maximum dry density. The compacted moisture content of the processed limestone is not considered crucial to proper performance. However, if the material's moisture content during placement is within 3 percentage points of optimum, the compactive effort required to achieve the minimum compaction criteria may be minimized. Individual rock pieces larger than 6 inches in dimension should not be used as fill. However, if rock fill is utilized within 3 ft below the bottom of floor slabs, the maximum allowable size of individual rock pieces should be reduced to 3 inches. Processed limestone used as fill should incorporate sufficient fines to prevent the presence of voids around larger diameter rock pieces. A gradation of at least 40 percent passing a standard No. 4 sieve is recommended. Where mass fills or utility lines are deeper than 10 ft, the fill/backfill below 10 ft should be compacted to at least 100 percent of standard Proctor maximum dry density (ASTM D 698) and within — 2 to +2 percentage points of the material's optimum moisture content. The portion of the fill/backfill shallower than 10 ft should be compacted as outlined herein. Compaction should be accomplished by placing fill in about 8-inch thick loose lifts and compacting each lift to at least the specified minimum dry density. Field density and moisture content tests should be performed on each lift. In general site grading areas where final fill slopes will be four horizontal to one vertical (4:1) or steeper and greater than 5 ft in height, field density and moisture content tests should be performed on each lift. Utilities Where utility lines are deeper than 10 ft, the fill/backfill below 10 ft should be compacted to at least 100 percent of standard Proctor maximum dry density (ASTM D 698) and within —2 to +2 percentage points of the material's optimum moisture content. The portion of the fill/backfill shallower than 10 ft should be compacted as previously outlined. Density tests should be performed on each lift (maximum 12-inch thick) and should be performed as the trench is being backfilled. Even if fill is properly compacted, fills in excess of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the total fill thickness. This should be considered when designing pavement over utility lines and/or other areas with deep fill. If utility trenches or other excavations extend to or beyond a depth of 5 ft below construction grade, the contractor or others shall be required to develop an excavation safety plan to protect personnel entering the excavation or excavation vicinity. The collection of specific geotechnical data and the development of such a plan, which could include designs for sloping and benching or various types of temporary shoring, is beyond the scope of this study. Any such designs and safety plans shall be developed in accordance with current OSHA guidelines and other applicable industry standards. Groundwater Groundwater was encountered in Borings 6, 8, 14, 30, 31 and 32 at depths of about 4 ft to 6 ft below the ground surface. From our experience, shallower groundwater seepage could be encountered in excavations for foundations, utilities and other general excavations at this site. The risk of seepage increases with depth of excavation and during or after periods of precipitation. Standard sump pits and pumping may be adequate to control seepage on a local basis in clayey soils. In any areas where cuts are made, attention should be given to possible seasonal water seepage that could occur through natural cracks and fissures in the newly exposed stratigraphy. The risk of seepage is increased where limestone is exposed in excavations and slopes or is near final grade. In these areas subsurface drains may be required to intercept seasonal groundwater seepage. The need for these or other dewatering devices should be carefully addressed during construction. Our office could be contacted to visually observe final grades to evaluate the need for such drains. LIMITATIONS Professional services provided in this geotechnical exploration were performed, findings obtained, and recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices. The scope of services provided herein does not include an environmental assessment of the site or investigation for the presence or absence of hazardous materials in the soil, surface water or groundwater. UES, upon written request, can be retained to provide same. UES is not responsible for conclusions, opinions or recommendations made by others based on this data. Information contained in this report is intended for the exclusive use of the Client (and their designated design representatives), and is related solely to design of the specific structures outlined in Section 2.0. No party other than the Client (and their designated design representatives) shall use or rely upon this report in any manner whatsoever unless such party shall have obtained UES's written acceptance of such intended use. Any such third party using this report after obtaining UES's written acceptance shall be bound by the limitations and limitations of liability contained herein, including UES's liability being limited to the fee paid to it for this report. Recommendations presented in this report should not be used for design of any other structures except those specifically described in this report. In all areas of this report in which UES may provide additional services if requested to do so in writing, it is presumed that such requests have not been made if not evidenced by a written document accepted by UES. Further, subsurface conditions can change with passage of time. Recommendations contained herein are not considered applicable for an extended period of time after the completion date of this report. It is recommended our office be contacted for a review of the contents of this report for construction commencing more than one (1) year after completion of this report. Non- compliance with any of these requirements by the Client or anyone else shall release UES from any liability resulting from the use of, or reliance upon, this report. Recommendations provided in this report are based on our understanding of information provided by the Client about characteristics of the project. If the Client notes any deviation from the facts about project characteristics, our office should be contacted immediately since this may materially alter the recommendations. Further, UES is not responsible for damages resulting from workmanship of designers or contractors. It is recommended the Owner retain qualified personnel, such as a Geotechnical Engineering firm, to verify construction is performed in accordance with plans and specifications. CLOSING All recommendations in the referenced geotechnical report remain unchanged unless specifically modified herein. We appreciate the opportunity to be of service. Please contact us with any questions or comments. Sincerely, UES PROFESSIONAL SOLUTIONS 44, LLC TBPE Firm No. 813 �E OF j GREGORY S. FAGAN �� 116518 . ENS h s1ONALEN /14 August 16, 2024 Karina Cohuo Geotechnical Project Manager KC/GFS/nl Copies: (1-PDF) Client Attachments: Boring Location Plan — Figure 1 Mechanical Lime Series — Figures 2A and 2B WinPAS Analysis Results Log of Borings (Borings 1 through 48) Key to Soil Symbols and Classifications Gregory S. Fagan, P.E. Geotechnical Department Manager B-1 B-2 B-3 B 4 B75 B-6 B-7 44 a B-8 B-9 45 14 f 12 i 10 7 2 4 P-10 r 3L 4J � 37 B-10 " -- B-11 B-12 X A B-13 B-14 _ -- , B-15 'I B-16# 8-17 B-18 B-19 CT-- 4 7 lC 1 7 5 4 3 1 - -I 34 B-20 _Jul _ B-2424 - B-28 _ B 21� ; B 22 , B-23, B-25 ' B 26; B-27 1� B 29 /{ y.... .. N - - B-30 an\ 19 B-40 18 17 16 !r' F 1 1 B-41 B-42 B-43 i _ B-44. s � - B-46 B-47 2 LP4 41 48 1.13 Ac. .�-40 �B-45— 22 jr) 39 ao �e 21 37 20 B-48 - - --1 , 36 V 35 PAVEMENT RECOMMENDATIONS WILDFLOWER (TRADITIONS) - PHASE 6B OFF HIGHWAY 114 FORT WORTH, TEXAS UES PROJECT NO. W241201-A B-34) B-35 '3 B-36'� B-37' (B-38„ B--39 1 Ail 43 4* 0 t ldm V/0 UES. Formerly Alpha Testing FIGURE 1 APPROXIMATE PRELIMINARY BORING LOCATION (W163040) APPROXIMATE BORING LOCATION 7 BORING LOCATION PLAN 70 65 60 55 50 45 40 a 35 30 i 25 20 15 10 5 �10 U E S,. Formerly Alpha Testing Geotechnical • Construction Materials • Environmental • TBPE Firm No. 813 REPORT OF MECHANICAL LIME SERIES RESULTS Project No: W241201 Date: 06/19/24 % Lime 0% 4% 6% 8% 10% PI 28 13 11 7 6 +++++++++++++++ +++++++++++++++ +++++++++++++++ +++++++++++++++ +++++++++++++++ 0 0% 1% 2% 3% 4% 5% 6% 7% 8% 9% 10% 11% 12% 13% 14% 15% Percent Dry Weight of Lime FIGURE 2A 0 0% 1% 2% 3% 4% 5% 6% 7% 8% 9% 10% 11% 12% 13% 14% 15% Percent Dry Weight of Lime FIGURE 2A �10 U E S,. Formerly Alpha Testing Geotechnical • Construction Materials • Environmental • TBPE Firm No. 813 REPORT OF MECHANICAL LIME SERIES RESULTS Project No: W241201 Date: 06/19/24 % Lime 0% 4% 6% 8% 10% PI 30 17 14 11 9 70 65 60 55 50 45 40 a 35 30 25 20 A 15 10 5 0 0% 1% 2% 3% 4% 5% 6% 7% 8% 9% 10% 11% 12% 13% 14% 15% Percent Dry Weight of Lime FIGURE 2B Win PAS Pavement Thickness Design According to 1993 AASHTO Guide for Design of Pavements Structures American Concrete Pavement Association Rigid Design Inputs Agency: City of Fort Worth Company: Alpha Testing Inc. Contractor: Project Description: Residential Pavement Analysis Location: Fort Worth, TX Rigid Pavement Design/Evaluation PCC Thickness 5.91 inches Load Transfer, J Design ESALs 930,000 Mod. Subgrade Reaction, k Reliability 85.00 percent Drainage Coefficient, Cd Overall Deviation 0.39 Initial Serviceability Modulus of Rupture 620 psi Terminal Serviceability Modulus of Elasticity 4,000,000 psi Modulus of Subgrade Reaction (k-value) Determination Resilient Modulus of the Subgrade 0.0 psi Resilient Modulus of the Subbase 0.0 psi Subbase Thickness 0.00 inches Depth to Rigid Foundation 0.00 feet Loss of Support Value (0,1,2,3) 0.0 Modulus of Subgrade Reaction 280.00 psi/in 3.00 280 psi/in 1.00 4.50 2.00 Thursday, April 23, 2015 1:12:04PM Engineer: Win PAS Pavement Thickness Design According to 1993 AASHTO Guide for Design of Pavements Structures American Concrete Pavement Association Rigid Design Inputs Agency: City of Fort Worth Company: Alpha Testing Inc. Contractor: Project Description: Collector Pavement Analysis Location: Fort Worth, TX Rigid Pavement Design/Evaluation PCC Thickness 7.52 inches Load Transfer, J Design ESALs 3,000,000 Mod. Subgrade Reaction, k Reliability 85.00 percent Drainage Coefficient, Cd Overall Deviation 0.39 Initial Serviceability Modulus of Rupture 620 psi Terminal Serviceability Modulus of Elasticity 4,000,000 psi Modulus of Subgrade Reaction (k-value) Determination Resilient Modulus of the Subgrade 0.0 psi Resilient Modulus of the Subbase 0.0 psi Subbase Thickness 0.00 inches Depth to Rigid Foundation 0.00 feet Loss of Support Value (0,1,2,3) 0.0 Modulus of Subgrade Reaction 280.00 psi/in 3.00 280 psi/in 1.00 4.50 2.25 Thursday, April 23, 2015 1:11:04PM Engineer: Win PAS Pavement Thickness Design According to 1993 AASHTO Guide for Design of Pavements Structures American Concrete Pavement Association Rigid Design Inputs Agency: City of Fort Worth Company: Alpha Testing Inc. Contractor: Project Description: Arterial Pavement Analysis Location: Fort Worth, TX Rigid Pavement Design/Evaluation PCC Thickness 9.87 inches Load Transfer, J Design ESALs 13,000,000 Mod. Subgrade Reaction, k Reliability 85.00 percent Drainage Coefficient, Cd Overall Deviation 0.39 Initial Serviceability Modulus of Rupture 620 psi Terminal Serviceability Modulus of Elasticity 4,000,000 psi Modulus of Subgrade Reaction (k-value) Determination Resilient Modulus of the Subgrade 0.0 psi Resilient Modulus of the Subbase 0.0 psi Subbase Thickness 0.00 inches Depth to Rigid Foundation 0.00 feet Loss of Support Value (0,1,2,3) 0.0 Modulus of Subgrade Reaction 280.00 psi/in 3.00 280 psi/in 1.00 4.50 2.50 Thursday, April 23, 2015 1:09:59PM Engineer: Wo UES- Formerly Alpho Testing 5058 Brush Creek Rd. Fort Worth, Texas 76119 Phone: 817-496-5600 Fax: 817-496-5608 www.alphatesting.com Client: Hines Interests Limited Partnership Project: Monterra Phases 1A, 1B, 2 and 3 Start Date: 12/22/2016 End Date: 12/22/2016 Drilling Method: CONTINUOUS FLIGHT AUGER GROUND WATER OBSERVATIONS 0 w ZZ On Rods (ft): NONE L 1 After Drilling (ft): DRY o After Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Brown CLAY with calcareous nodules Tan CLAY with clacareous nodules and limestone 5 � fragments 1 _ 1 j j j 10 j j Gray SHALY CLAY _15 Tan LIMESTONE with clay seams and layers _ 20 TEST BORING TERMINATED AT 20 FT 2.0 4.0 12.0 16.0 LOG OF BORING NO.: 10 Sheet 1 of 1 PROJECT NO.: W 163040 Location: Fort Worth, Texas Surface Elevation: West: North: Hammer Drop (lbs / in): 140 / 30 .N. E a) L 8-1 X fl a o .--. (n \ `O Y m> m E a) E a Ji O_ >0 O (Do YiE a°m U p c C ov mo O aN �' Cl o U � - 'U E e a UC� a) o .. o o o s X a) C U (n ra a ? Z C D @ d a. 1 3.5 24 20.0, 100/ 1" 3.0 22 66 24 42 4.5+ 13 3.5 13 41 19 22 4.25 13 3.5 23 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 1 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/29/2024 End Date: 5/29/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION Brown CLAY with limestone fragments j Tan LIMESTONE with clay seams and layers 5 10 15 Gray SHALE with limestone seams and layers 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 140 / 30 a o -6.S 2 E o I _ x to 017) c' E y 8-1��am°oa:of .5a oaN 0- EUz0- 'E C 2 ° 3 1.5 25 48 21 27 2.0 1" 4 18.0 100/ 20.0 L 3" �10 U E S. 5058 Brush Creek Rd. BORING NO.: 2 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/29/2024 End Date: 5/29/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE 1After Drilling (ft): DRY o 7After Hours (ft): MATERIAL DESCRIPTION jBrown CLAY with limestone fragments Tan CLAY with calcareous deposits and limestone fragments — Tan LIMESTONE with clay seams and 5 layers 10 15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x `o C) E 8-1 f �� ) a o a °o aa W: U o4d 9C 2 aN 0` .y_E 3 co U x°�UC o _° ° J o (n _ 2.25 25 2.0 2.5 14 48 18 30 4.0 15" 100/ 15.0 , 3.5" �10 U E S. 5058 Brush Creek Rd. BORING NO.: 3 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/30/2024 End Date: 5/30/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o1After Drilling (ft): DRY O 7After Hours (ft): MATERIAL DESCRIPTION Brown CLAY with limestone fragments /1 1 Tan LIMESTONE with clay seams and layers —5— 10 15 Gray SHALE with limestone seams and layers 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x 8-1�� o ) a m a�of °o .5a `—' y 2 2 co � °� x o-- _o° ° (n 2.0 27 61 22 39 2.0 1" 4 17.0 100/ 20.0 2 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 4 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/30/2024 End Date: 5/30/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5_ 10 15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x 8-1�� o ) a m a�of °o .5a `—' y 2 2 co � °� x o-- _o° ° (n 2.0 31 62 20 42 2.0 15" 100/ 15.0 L 4 �10 U E 5058 Brush Creek Rd. BORING NO.: 5M Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/1/2024 End Date: 6/1/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Brown CLAY with limestone fragments and calcareous deposits Tan CLAY with calcareous deposits 5 j Tan LIMESTONE with clay seams and layers 10 Gray SHALE with limestone seams and 15 layers —20_ — TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x > `o C) E E 8-1 a �� of �a� v) a� mo �`a ° .5 `-' y E o� U� oz d 9 C � aN 0— 0 � � ._2 3 co U x° oU �C_ o ° ° J o (n _ 1 2.25 30 61 21 40 2.0 4.0 6.0 1" 4 14.0 100/ 20.0 L 1.5" 3.25 26 2.5 1.0 112 19 49 17 32 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 6 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/1/2024 End Date: 6/1/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): 6 o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY Brown CLAY with calcareous deposits and limestone fragments Tan LIMESTONE with clay seams and 5 _ layers 10 Gray SHALE with limestone seams and 15 layers TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x � 8-1�� o ) a m a�of °o .5a � x O° - (1)o o � cd J D_ (n 1.75 32 61 20 41 2.0 3.25 29 4.0 15" 14.0 100/ 15.0 4 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 7 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/1/2024 End Date: 6/1/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE 1After Drilling (ft): DRY o 7After Hours (ft): MATERIAL DESCRIPTION jBrown CLAY with calcareous deposits Tan CLAY with calcareous deposits — j Tan LIMESTONE with clay seams and 5 layers 10 Gray SHALE with limestone seams and 15 layers 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x > `o C) E E 8-1 a :o of �a� v) a� mo �a ° a `-' y E oW U� oz d 9 C � aN 0— 0 � � ._2 3 co U x° � oU �C_ o ° ° J o (n _ 0.5 30 2.0 0.75 22 38 18 20 0.0 4.0 100/ 3.5" 14.0 100/ 20.0 , 2 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 8 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/1/2024 End Date: 6/1/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): 4 1After Drilling (ft): DRY o 7After Hours (ft): MATERIAL DESCRIPTION jBrown CLAY with calcareous deposits � Tan CLAY — j Tan LIMESTONE with clay seams and 5 layers 10 Gray LIMESTONE _15 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x � 8-1�� o ) a m a�of °o .5a � x O° - (1)o O � cd J D_ (n 0.25 39 50 17 33 2.0 1.5 19 4.0 100/ 3.5" 13.0 100/ 20.0 , 1.5" �10 U E S. 5058 Brush Creek Rd. BORING NO.: 9 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/3/2024 End Date: 6/3/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jBrown CLAY with calcareous deposits Tan and Gray CLAY with calcareous deposits and limestone fragments _5� j j j Tan LIMESTONE with clay seams and layers 10 Gray SHALE with limestone seams and layers 15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x 8-1�� o ) a m a�of °o .5a `—' y 2 2 co � °� x o-- _o° ° (n 2.0 8.0 12.0 100/ 15.0 2.5" 1.75 25 3.5 20 3.5 18 43 17 26 0.0 4.0 17 5058 Brush Creek Rd. BORING NO.: 10 �10 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Project: Wildflower (Traditions) - Phase 6B Surface Elevation: Start Date: 5/29/2024 End Date: 5/29/2024 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (Ibs / in): 140 / 30 GROUND WATER OBSERVATIONS m -6•E E - o � ff _ _ x NONE T i m Ut- �'.� E E c o S/On Rods (ft): 0 3 Y a> s s � w c n a ZAfter Drilling (ft): DRY a o� �� o o m u) a� mo �a U -o o m After Hours (ft): " ° - a aN o" a- d- MATERIAL Z DESCRIPTION j Brown CLAY with limestone fragments and calcareous deposits 4.5+ 25 / 2.0 Tan and Gray CLAY with calcareous deposits jand limestone fragments / 1.25 0.5 106 21 40 16 24 -5—'/ 4.0 13 j 7.0 Tan LIMESTONE with clay seams and layers _10 100/ 151 15.0 L 4.5" TEST BORING TERMINATED AT 15 FT 20 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 11 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/29/2024 End Date: 5/29/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jBrown CLAY with limestone fragments Tan CLAY with limestone fragments and calcareous deposits _5� j Tan LIMESTONE with clay seams and layers 10 _15_ Gray SHALE with limestone seams and layers 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x `o C) E 8-1 a �� of �a� v) a� mo �`a ° .5 `-' y o� E U o4 d 9 C � aN 0`--' 0 ._2 3 co U x° oU �C_ o ° ° J o (n _ 2.0 6.0 18.0 20.0 IL 100/ 3" 100/ 3.5" 3.75 16 0.5 24 4.5+ 17 31 17 14 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 12 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/30/2024 End Date: 5/30/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY 77, Tan CLAY with calcareous deposits and limestone fragments _5� j Tan LIMESTONE with clay seams and layers 10 15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x � 8-1�� o ) a m a�of °o .5a � x O° - (1)o o � cd J D_ (n 1 4.25 27 65 21 44 2.0 6.0 100/ 15.0 L 4 1.0 18 1.0 21 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 13 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/31/2024 End Date: 5/31/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jBrown CLAY with limestone fragments Tan CLAY with limestone fragments and calcareous deposits _5� j Tan LIMESTONE with clay seams and layers 10 _15_ Gray SHALE with limestone seams and layers 20 TEST BORING TERMINATED AT 20 FT 2.0 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x > `o U� E E o a �� of �a� v) a� mo �`a ° .5 E o� U� oz d 9 C � aN 0— 0 � co � x° o- -_ o ° ° m J o (n 1 2.25 28 57 21 36 1.25 13 0.75 18 6.0 1" 4 16.0 100/ 20.0 , 2.5" 5058 Brush Creek Rd. BORING NO.: 14 �10 S. Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 U E Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Project: Wildflower (Traditions) - Phase 6B Surface Elevation: Start Date: 5/31/2024 End Date: 5/31/2024 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (Ibs / in): 140 / 30 8-1 GROUND WATER OBSERVATIONS m -6•E E - o 15_ x w a o v) o n n � N J 6 >' i N Vt- �.� C.� E E -C o S/On Rods (ft): 0 3 Y a> s s .V5� w n a ZAfter Drilling (ft): DRY a oW �� o o m u) a� mo �a U -o o m After Hours (ft): " ° - a aN o" 1� �' 3 a- d- MATERIAL Z DESCRIPTION jDark Brown CLAY with limestone fragments - 0.75 32 _ 2.0 - � Tan LIMESTONE 3.0 Tan CLAY with limestone fragments j - 5 2.0 16 j - 3.5 12 27 15 12 0.0 Tan LIMESTONE with clay seams and 8.0 layers 10 100/ 15 15.0 L 5.5" TEST BORING TERMINATED AT 15 FT 20 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 155 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/6/2024 End Date: 6/6/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with limestone fragments Tan and Gray CLAY with calcareous deposits j _5� j Tan LIMESTONE with clay seams and layers 10 Gray LIMESTONE with shale seams _15 _20_ TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x > `o U� E E o a �� of �a� v) a� mo �`a ° .5 E o� U� oz d 9 C � aN 0— 0 � � x O° - - o o � cd J D_ (n 1 2.5 26 65 22 43 2.0 6.0 100/ 4.5" 13.0 100/ 20.0 3" 1.5 18 2.75 16 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 16 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/3/2024 End Date: 6/3/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jBrown CLAY with limestone fragments Tan CLAY with calcareous deposits j _5 j Tan LIMESTONE with clay seams and layers 10 15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x 8-1�� o ) a m a�of °o .5a `—' y 2 2 co � °� x o-- _o° ° (n 1 1.25 31 54 19 35 2.0 6.0 100/ 15.0 L 3 0.25 24 2.5 16 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 17 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/3/2024 End Date: 6/3/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE 1After Drilling (ft): DRY o 7After Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY with limestone fragments Brown CLAY Tan LIMESTONE with clay seams and 5 layers _ I 10 15 Gray SHALE with limestone seams and layers 20�ffl TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x `o U� E o a �� of �a� v) a� mo �`a ° .5 `-' y E o� U o 4 d 9 C � 0- N 0 `--' 0 ._2 3 co U x° o� ��_ o ° ° J co FL (n 0.5 43 2.0 0.25 19 54 17 37 4.0 100/ 2.5" 17.0 100/ 20.0 L 30 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 18 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/1/2024 End Date: 6/1/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jBrown CLAY with limestone fragments Tan CLAY with calcareous deposits and limestone fragments _5� j Tan LIMESTONE with clay seams and layers 10 15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 �.S a E ° I o _ x > > `o U� ( E E -o 8-1 a �� of �a� v) a� mo �`a ° a `-' y o� E U� oz d 9 C � aN 0— U ._2 3 co U x° oU �C_ o ° ° J o (n 2.0 6.0 100/ 15.0 L 4 0.5 53 1.0 21 4.5+ 16 48 17 31 0.0 5058 Brush Creek Rd. BORING NO.: 19 �10 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Project: Wildflower (Traditions) - Phase 6B Surface Elevation: Start Date: 6/4/2024 End Date: 6/4/2024 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (Ibs / in): 140 / 30 GROUND WATER OBSERVATIONS m -6•E E - o � ff _ _ x NONE T i m Ut- �'.� E E c o SIOn Rods (ft): 0 3 Y u s s � n a ZAfter Drilling (ft): DRY a o� �� o o m u) a� mo �a U -o o m After Hours (ft): " ° - a aN o" a- d- MATERIAL Z DESCRIPTION jBrown CLAY with Iimgestone fragments 1.25 31 _ 2.0 Tan and Gray CLAY with calcareous deposits j and limestone fragments - �0.75 17 j -5�j 2.0 19 38 17 21 0.0 3.25 15 1/ j 4.5 21 _10 j 12.0 — - Gray SHALE with limestone seams and layers _15 100/ 20 20.0 L 1.5" TEST BORING TERMINATED AT 20 FT �10 U E S. 5058 Brush Creek Rd. BORING NO.: 20 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/29/2024 End Date: 5/29/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION Brown CLAY with limestone fragments ZZA Tan LIMESTONE with clay seams and 5 layers 10 15 Gray SHALE with limestone seams and layers _20—ffi TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x � 8-1�� o ) a m a�of °o .5a � x O° - (1)o O � cd J D_ (n 1.75 29 2.75 22 58 18 40 0.0 4.0 1" 4 17.0 100/ 20.0 L 3.5" �10 U E S. 5058 Brush Creek Rd. BORING NO.: 21 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/30/2024 End Date: 5/30/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE 1After Drilling (ft): DRY o 7After Hours (ft): MATERIAL DESCRIPTION — j Brown CLAY with limestone fragments Tan CLAY with calcareous deposits and limestone fragments / 5 Tan LIMESTONE with clay seams and layers _10 15_ TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 �.S a E ° I o _ x to `o — 017) U� F E 8-1 of �� ) a m a °o aa co oU( �_o° ° Jx o (n 2.0 5.0 100/ 15.0 L 4 2.0 25 1.25 21 42 16 26 0.1 0.5 21 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 22 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/30/2024 End Date: 5/30/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with limestone fragments Tan CLAY with limestone fragments and jcalcareous deposits _5 j Tan LIMESTONE with clay seams and layers 10 15 Gray SHALE with limestone seams and layers 20 TEST BORING TERMINATED AT 20 FT 2.0 6.0 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x > `o C) E E 8-1 a �� of �a� v) a� mo �`a ° .5 `-' y E o� U� oz d 9 C � aN 0— 0 � � ._2 3 co U x° oU �C_ o ° ° J o (n _ 1 2.75 26 63 20 43 1" 4 100/ 20.0 L 2.5" 1.75 21 2.25 19 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 23 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/31/2024 End Date: 5/31/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION Brown CLAY with limestone fragments and calcareous deposits — j Tan CLAY with calcareous deposits j _5� j Tan LIMESTONE with clay seams and layers 10 15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x `o C) E 8-1 a �� of �a� v) a� mo �`a ° .5 `-' y E o� U o4 d 9 C � aN 0`--' 0 ._2 3 co U x° � oU �C_ o ° ° J o (n _ 1 1.0 29 47 21 26 2.0 6.0 100/ 15.0 , 5.5" 4.5+ 16 3.75 15 35 16 19 0.0 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 24 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/31/2024 End Date: 5/31/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION Tan CLAY with limestone fragments and jcalcareous deposits j _5 j j Tan LIMESTONE with clay seams and layers 10 15_ Gray SHALE with limestone seams and layers 20�ffl TEST BORING TERMINATED AT 20 FT ft Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x `o C) E 8-1 a �� of �a� v) a� mo �`a ° .5 `-' y E o� U o4 d 9 C � aN 0`--' 0 ._° 3 co U x° � oU �C_ o ° ° J o (n _ 1 2.0 28 47 22 25 100/ 4.5" 17.0 100/ 20.0 L 4" 2.0 20 2.0 20 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 25 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: 0 (D 5_ _10_ 15 20 Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/4/2024 End Date: 6/4/2024 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 7On Rods (ft): NONE 1After Drilling (ft): DRY '7After Hours (ft): MATERIAL DESCRIPTION GRAVEL - FILL Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x � 8-1�� o : f ) a m °o aa y° U o zd 9C � aNE 3 c X 0 °- - O (n 1.0 m 100/ 5.5" 100/ 15.0 L 3.5" �10 U E S. 5058 Brush Creek Rd. BORING NO.: 26 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/5/2024 End Date: 6/5/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE 1After Drilling (ft): DRY o 7After Hours (ft): MATERIAL DESCRIPTION Tan and Gray CLAY with calcareous deposits - FILL Tan CLAY with limestone fragments and 5 calcareous deposits - possible fill j Tan LIMESTONE with clay seams and layers 10 _15_ _20 TEST BORING TERMINATED AT 20 FT 4.0 6.0 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x `o C) E 8-1 a �� of �a� v) a� mo �`a ° .5 `-' y o� E U o4 d 9 C � aN 0`--' 0 ._° 3 U x O°U � o o C J D_ t_ (n 100/ 4.5" 100/ 20.0 L 3" 1.5 21 3.0 17 39 14 25 2.5 20 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 27 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: WX _10_ 15 20 Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/3/2024 End Date: 6/3/2024 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 7On Rods (ft): NONE 1After Drilling (ft): DRY '7After Hours (ft): MATERIAL DESCRIPTION Brown CLAY Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x `o U� E o a �� of �a� v) a� mo �`a ° .5 E o� U� oz d 9 C � aN 0— U ° 3 U) X °� o O J d (n 2.0 29 4.5+ 13 54 19 35 4.0 1" 4 100/ 15.0 , 2.5" �10 U E S. 5058 Brush Creek Rd. BORING NO.: 28 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/1/2024 End Date: 6/1/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE 1After Drilling (ft): DRY o 7After Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with limestone fragments Tan CLAY with calcareous deposits — j Tan LIMESTONE with clay seams and 5 layers 10 _15 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x 8-1�� o ) a m a�of °o .5a `—' y 2 2 co � °� x o-- _o° ° (n 1.75 29 64 19 45 2.0 4.5+ 11 4.0 100/ 3.5" 100/ 20.0 L 2.5" Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 29 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 TM Fox: 817-496-5608 PROJECT NO.: W241201 www alphatesting com Formerly Alpha Testing Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/4/2024 End Date: 6/4/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jBrown CLAY with limestone fragments _ 2.0 Tan and Gray CLAY with calcareous deposits 5 10 Tan LIMESTONE with clay seams and layers 15 TEST BORING TERMINATED AT 15 FT 20 10.0 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ X 8-1�� o ) a m a�of °o .5a `—' y 2 2 co � °� x o-- _o° ° (n 1 1.75 26 100/ 15.0 , 4 1.25 21 4.5 16 3.25 22 60 19 41 1.2 4.5+ 18 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 30 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/29/2024 End Date: 5/29/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): 4 o 1After Drilling (ft): 4 7After Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Tan and Gray CLAY j 1 — j - with calcareous deposits at 4-6' 5 j Tan LIMESTONE with clay seams and layers 10 15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x `o U� E 8-1a �o of �a� v) C: m ) �a ° a 0 y o� x� a) O°� �_ o O J a_ (n I-a a� Z � a 1 0.75 35 64 22 42 2.0 6.0 100/ 15.0 L 2.5" 3.5 13 2.75 15 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 31 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/31/2024 End Date: 5/31/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): 4 o1After Drilling (ft): 13 C2 After Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with limestone fragments 77, Tan and Gray CLAY with calcareous deposits j SZ _5� j Tan LIMESTONE with clay seams and layers 10 1 _15_ 20 TEST BORING TERMINATED AT 20 FT 2.0 6.0 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x `o U� E 8-1a �o of �a� v) C: m ) �a ° a 0 y o� x� a) O°� �_ o O J a_ (n I— - d � Z a 1" 4 100/ 20.0 , 2.5" 1.5 27 0.5 0.9 110 19 2.75 19 35 16 19 0.0 i0 UES, Formerly Alpha Testing 5058 Brush Creek Rd. BORING NO.: 32 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 www.alphatesting.com Client: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Project: Wildflower (Traditions) - Phase 6B Surface Elevation: Start Date: 5/29/2024 End Date: 5/29/2024 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): 6 o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION Brown CLAY with limestone fragments j Tan and Gray CLAY —/j _5� j j Tan LIMESTONE with clay seams and layers 10 15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 �.S a E ° I o _ X to `o — 017) U� F E 8-1 � of �� ) a m a °o aa x O°U (1)o o C J 2.0 8.0 100/ 15.0 , 4.5" 3.0 25 42 18 24 1.0 21 1.5 14 4.5+ 14 30 16 14 0.0 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 33 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/31/2024 End Date: 5/31/2024 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) SIOn Rods (ft): NONE 1After Drilling (ft): DRY o 7After Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY Brown CLAY with limestone fragments and calcareous deposits Tan LIMESTONE with clay seams and 5 layers 10 jTan and Gray SHALY CLAY 15 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x > `o U� E E o a �� of �a� v) a� mo �`a ° .5 `-' y E o� U� oz d 9 C � aN 0 --' 0 � � ._2 3 U x ��_ �_ o o J d (n 1.75 28 2.0 4.5+ 18 55 18 37 0.0 4.0 13.0 20.0 13" 4.0 20 53 18 35 4.5+ 16 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 34 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 5/31/2024 End Date: 5/31/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION - �Tan CLAY j Tan LIMESTONE with clay seams and layers _5 10 15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x 8-1�� o ) a m a�of °o .5a `—' y 2 2 co � °� x o-- _o° ° (n 4.5+ 14 30 17 13 2.0 100/ 3.5" 100/ 15.0 , 3 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 35 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/5/2024 End Date: 6/5/2024 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 7On Rods (ft): NONE 1After Drilling (ft): DRY '7After Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x `o U� E o a �� of �a� v) a� mo �`a ° .5 o� E U� oz d 9 C � aN 0— U ° 3 U) X� o� o O J co d (n ft Tan LIMESTONE with clay seams and layers 20.0 L TEST BORING TERMINATED AT 20 FT 100/ 4" 100/ 3" 4.5+ 13 3.5 22 3.75 18 61 20 41 0.1 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 36 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/5/2024 End Date: 6/5/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION Tan CLAY with calcareous deposits j j Tan LIMESTONE with clay seams and 5 layers 10 15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x `o C) E 8-1 a :o of �a� v) a� mo �a ° a `-' y E oW U o4 d 9 C � aN 0`--' 0 ._° 3 co U x° � oU �C_ o ° ° J o (n _ 2.75 16 3.75 17 34 16 18 4.0 15" 100/ 15.0 , 2.5" �10 U E S. 5058 Brush Creek Rd. BORING NO.: 37 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/5/2024 End Date: 6/5/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION Brown, Tan and Gray CLAY with calcareous deposits and limestone fragments - FILL Tan CLAY with calcareous deposits j _5� j Tan LIMESTONE with clay seams and layers 10 _15_ 20 TEST BORING TERMINATED AT 20 FT 2.0 6.0 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x 8-1�� o ) a m a�of °o .5a `—' y 2 2 co � °� x o-- _o° ° (n 1 2.5 20 56 20 36 15" 100/ 20.0 L 4" 4.0 13 2.75 15 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 38 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/5/2024 End Date: 6/5/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE Drilling (ft): DRY o1After 7After Hours (ft): O MATERIAL DESCRIPTION Brown and Tan CLAY with limestone fragments - FILL _5_ _101 15 20 Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x 8-1�� o ) a m a�of °o .5a `—' y 2 2 co � °� x o-- _o° ° (n 4.0 17 37 16 21 2.0 100/ 6.5" 100/ 15.0 L 4 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 39 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/3/2024 End Date: 6/3/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jBrown CLAY — � Tan CLAY j j - - with calcareous deposits at 4 6' 5 j Tan LIMESTONE with clay seams and layers 10 _15_ Gray SHALE with limestone seams and layers 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x > `o U� E E o a �� of �a� v) a� mo �`a ° .5 o� E U� oz d 9 C � aN 0— 0 � co � x° o- -_ o ° ° m J o (n 2.0 6.0 15" 16.0 100/ 20.0 , 3.5" 0.5 31 3.5 20 2.0 20 35 16 19 0.0 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 40 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/6/2024 End Date: 6/6/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION j Dark Brown CLAY with limestone fragments and calcareous deposits Tan CLAY with limestone fragments and jcalcareous deposits _5 j Tan LIMESTONE with clay seams and layers 10 _15_ 20 TEST BORING TERMINATED AT 20 FT 2.0 6.0 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x 8-1�� o ) a m a�of °o .5a `—' y 2 2 co � °� x o-- _o° ° (n 1 2.0 29 55 18 37 15" 100/ 20.0 L 4" 2.25 14 3.5 16 5058 Brush Creek Rd. BORING NO.: 41 �10 S. Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 U E Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Project: Wildflower (Traditions) - Phase 6B Surface Elevation: Start Date: 6/3/2024 End Date: 6/3/2024 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (Ibs / in): 140 / 30 GROUND WATER OBSERVATIONS m -6•E E - o � ff _ _ x NONE T i m Ut- �'.� E E c o S/On Rods (ft): 0 3 Y a> s s .V5� w c n a ZAfter Drilling (ft): DRY a oW �� o o m u) a� mo �a U -o o m After Hours (ft): " ° - a aN o" a- d- MATERIAL Z DESCRIPTION jDark Brown CLAY with limestone fragments 3.5 25 _ 2.0 Tan CLAY with limestone fragments and calcareous deposits / 1.0 0.9 107 19 46 17 29 — 5 2.75 14 j j1.75 22 Tan LIMESTONE with clay seams and 8.0 layers 10 100/ 15 15.0 , 4 TEST BORING TERMINATED AT 15 FT 20 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 42 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/6/2024 End Date: 6/6/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with calcareous deposits Tan CLAY with limestone fragments and jcalcareous deposits _5 j Tan LIMESTONE with clay seams and layers _10_ 15 20 TEST BORING TERMINATED AT 20 FT 2.0 5.0 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x 8-1�� o ) a m a�of °o .5a `—' y 2 2 co � °� x o-- _o° ° (n 1 3.0 25 56 21 35 100/ 4.5" 100/ 20.0 L 3.5" 2.0 18 1.0 19 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 43 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Hines Interests, LP - Dallas2 Project: Wildflower (Traditions) - Phas Start Date: 6/6/2024 End Date: Drilling Method: CONTINUOUS FLIGHT AU AUG 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY with limestone fragments _ 2.0 Brown and Tan CLAY with calcareous deposits and limestone fragments 4.0 j Tan CLAY with calcareous deposits _5� 6.0 Tan LIMESTONE with clay seams and layers 10 15 TEST BORING TERMINATED AT 15 FT 20 Location: Fort Worth, TX e 6B Surface Elevation: 6/6/2024 West: 15.0 , 100/ 2.5" 2.5 24 2.75 0.9 104 16 34 14 20 4.5 IN 5058 Brush Creek Rd. BORING NO.: 44 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 TM Fox: 817-496-5608 PROJECT NO.: W241201 www alnhntectinv rnm Formerly Alpha Testing Client: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Project: Wildflower (Traditions) - Phase 6B Surface Elevation: Start Date: 6/6/2024 End Date: 6/6/2024 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 7On Rods (ft): NONE 1After Drilling (ft): DRY '7After Hours (ft): MATERIAL DESCRIPTION Brown CLAY with calcareous deposits and limestone fragments Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ X � 8-1�� o �of ) a m a °o .5a `—' y° E U o zd 9C � aN 0' 3 c X o- -oO=2 (n 2.0 Tan CLAY with calcareous deposits 6.0 Tan LIMESTONE with clay seams and layers 20.0 , TEST BORING TERMINATED AT 20 FT 100/ 4" 100/ 3" 1.0 31 3.5 19 60 19 41 1.7 2.25 19 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 45 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/4/2024 End Date: 6/4/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE 1After Drilling (ft): DRY o 7After Hours (ft): MATERIAL DESCRIPTION j Brown and Tan CLAY with calcareous deposits - possible fill Tan CLAY with calcareous deposits — j Tan LIMESTONE with clay seams and 5 layers 10 15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 140 / 30 -6.S 2 a E ° I o _ x `o C) E 8-1 a :o of �a� v) a� mo �a ° a `-' y E oW U o4 d 9 C � aN 0`--' 0 ._2 3 co U x° � oU �C_ o ° ° J o (n _ 3.5 18 56 18 38 2.0 2.5 22 4.0 100/ 5.5" 100/ 15.0 , 2 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 46 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/6/2024 End Date: 6/6/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE o 1After Drilling (ft): DRY 7After Hours (ft): MATERIAL DESCRIPTION Brown CLAY with calcareous deposits j j Tan CLAY with calcareous deposits _5 Tan LIMESTONE with clay seams and layers 10 _15_ Gray LIMESTONE with shale seams 20 TEST BORING TERMINATED AT 20 FT 4.0 6.0 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x `o C) E 8-1 a �� of �a� v) a� mo �`a ° .5 `-' y E o� U o4 d 9 C � aN 0`--' 0 ._° 3 co U x° � oU �C_ o ° ° J o (n _ 1 1.5 29 36 17 19 100/ 4.5" 17.0 100/ 20.0 L 2 2.25 24 1.5 16 5058 Brush Creek Rd. BORING NO.: 47 Fort Worth, Texas 76119 Phone: 817-496-5600 Sheet 1 of 1 TM Fox: 817-496-5608 PROJECT NO.: W241201 www alnhntectinv rnm Formerly Alpha Testing Client: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Project: Wildflower (Traditions) - Phase 6B Surface Elevation: Start Date: 6/4/2024 End Date: 6/4/2024 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: 5 _10_ 15 20 GROUND WATER OBSERVATIONS 7On Rods (ft): NONE 1After Drilling (ft): DRY '7After Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY with calcareous deposits Brown CLAY with calcareous deposits Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ X `o U� E o a �� of �a� v) a� mo �`a ° .5 o� E U� oz d 9 C � aN 0— U ° 3 coco ) X o� o O J d (n 4.0 8.0 100/ 15.0 L 2.5" 1.25 32 3.5 23 64 20 44 2.25 17 2.5 23 66 23 43 0.8 �10 U E S. 5058 Brush Creek Rd. BORING NO.: 48 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W241201 Formerly Alpha Testing www.alphatesting.com Client: Project: Start Date: Drilling Method: Hines Interests, LP - Dallas2 Location: Fort Worth, TX Wildflower (Traditions) - Phase 6B Surface Elevation: 6/4/2024 End Date: 6/4/2024 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS SIOn Rods (ft): NONE 1After Drilling (ft): DRY o 7After Hours (ft): MATERIAL DESCRIPTION jBrown CLAY with calcareous deposits Tan CLAY with calcareous deposits 5 j Tan LIMESTONE with clay seams and layers 10 _15_ _20 TEST BORING TERMINATED AT 20 FT 4.0 6.0 Hammer Drop (Ibs / in): 140 / 30 -6.S a E ° I o _ x `o C) E 8-1 a �� of �a� v) a� mo �`a ° .5 `-' y o� E U o4 d 9 C � aN 0`--' 0 ._° 3 co U x° oU �C_ o ° ° J o (n _ 100/ 2.5" 100/ 20.0 , 2 1.5 28 2.5 22 64 19 45 4.5+ 12 IKEY TO SOIL SYMBOLS 10 UESTM AND CLASSIFICATIONS Formerly Alpha Testing SOIL & ROCK SYMBOLS RELATIVE DENSITY OF COHESIONLESS SOILS (blows/ft) ® (CH), High Plasticity CLAY VERY LOOSE 0 TO 4 ® (CL), Low Plasticity CLAY LOOSE 5 TO 10 MEDIUM 11 TO 30 (SC), CLAYEY SAND DENSE 31 TO 50 VERY DENSE OVER 50 (SP), Poorly Graded SAND (SW), Well Graded SAND SHEAR STRENGTH OF COHESIVE SOILS (tsfl E (SM), SILTY SAND VERY SOFT LESS THAN 0.25 SOFT 0.25 TO 0.50 IN (ML), SILT FIRM 0.50 TO 1.00 STIFF 1.00 TO 2.00 ® (MH), Elastic SILT VERY STIFF 2.00 TO 4.00 HARD OVER 4.00 LIMESTONE RELATIVE DEGREE OF PLASTICITY (PI) ® SHALE / MARL LOW 4 TO 15 SANDSTONE MEDIUM 16 TO 25 HIGH 26 TO 35 o (GP), Poorly Graded GRAVEL VERY HIGH OVER 35 (GW), Well Graded GRAVEL ® (GC), CLAYEY GRAVEL RELATIVE PROPORTIONS (%) (GM), SILTY GRAVEL (OL), ORGANIC SILT TRACE 1 TO 10 LITTLE 11 TO 20 SOME 21 TO 35 (OH), ORGANIC CLAY AND 36 TO 50 1♦ S SAMPLING SYMBOLS PARTICLE SIZE IDENTIFICATION (DIAMETER) ■SHELBY TUBE (3" OD except where BOULDERS 8.0" OR LARGER noted otherwise) COBBLES 3.0" TO 8.0" SPLIT SPOON (2" OD except where COARSE GRAVEL 0.75' TO 3.0" noted otherwise) FINE GRAVEL 5.0 mm TO 3.0" ® AUGER SAMPLE COURSE SAND 2.0 mm TO 5.0 mm ❑ TEXAS CONE PENETRATION MEDIUM SAND FINE SAND 0.4 mm TO 5.0 mm 0.07 mm TO 0.4 mm ❑SILT ROCK CORE (2" ID except where CLAY 0.002 mm TO 0.07 mm LESS THAN 0.002 mm noted otherwise) CFW Lighting Approved Products List CFW Product Name Manufacturer I Manufacturer Product Name & Description Residential -Standard MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Makers Sales and Marketing, LLC Galvanized MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Type 11 Pole Makers Sales and Marketing, LLC Black D601373(page 1 of 6)-Shoe Base Pole Type 11, Valmont Industries, Inc Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Black Type 33B Arm Valmont Industries, Inc D1301373(page 4 of 6)-Single Arm Type 33B, Galvanized American Electric Lighting, ATB0-P101-Mvolt-R2-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD325607 American Electric Lighting, ATBO-P101-Mvolt-R4-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD325606 Residential Luminaire American Electric Lighting, ATBO-P101-Mvolt-R2-3K-BK- Acuity Brands Lighting, Inc. MP-NL-P7-AO-RFD325609 American Electric Lighting, ATB0-P101-Mvolt-R4-3K-BK- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD325608 McFarland Cascade CREOSOTE 30/35 FOOT TIMBER POLE Timber Pole Bayou Forest Products 30-35' .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Galvanized Wood Pole Arm Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Black Valmont Industries, Inc D1301373(page 6 of 6)-Wood Pole Arm, Galvanized Arterial -Standard MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Makers Sales and Marketing, LLC Galvanized MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Type 18 Pole Makers Sales and Marketing, LLC Black DB01373(page 2 of 6)-Shoe Base Pole Type 18, Valmont Industries, Inc Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Black Type 33A Arm Valmont Industries, Inc D1301373(page 3 of 6)-Single Arm Type 33A, Galvanized American Electric Lighting, ATBO-P303-Mvolt-R2-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322792 American Electric Lighting, ATBO-P303-Mvolt-R4-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322794 Arterial Luminaire American Electric Lighting, ATBO-P303-Mvolt-R2-3K-BK- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322793 Acuity Brands Lighting, Inc. American Electric Lighting, ATBO-P303-Mvolt-R4-3K-BK- M P-N L-P7-AO-RFD322795 McFarland Cascade CREOSOTE 35/40 FOOT TIMBER POLE Timber Pole Bayou Forest Products 30-35' .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Galvanized Wood Pole Arm Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Black Valmont Industries, Inc DB01373(page 5 of 6)-Wood Pole Arm, Galvanized Decorative -Pedestrian Holophane, CLA 10.6(OAL)FT J20P07BK-MOD, AB-31-4 Washington 10' Pole Acuity Brands Lighting, Inc. RFD110736 Holophane, CLA14FT J20DMODC03BK RFD325026, AB- Washington 14' Pole Acuity Brands Lighting, Inc. 16-4 SPEC RFD325026 Holophane, WFCL3 P40 30K MVOLT FC3 NF BK AO PR7 Washington Luminaire Acuity Brands Lighting, Inc. FRGL RFD338699 Washington Globe Holophane, AWDE3 P40 30K MVOLT MS AL3 BK PR7 Luminaire Acuity Brands Lighting, Inc. AO RFD-315548 Oleander Type A Pole Acuity Brands Lighting, Inc. Holophane, PDA 12S5L20POBBK-MOD Oleander Type B Pole Acuity Brands Lighting, Inc. Holophane, PDA20S5L20P08BK-MOD Oleander Type B Arm Acuity Brands Lighting, Inc. Holophane, OHC 151N 2A TN BK Holophane, AUCL2 P40 30K AS BK L3 N P7 AO Oleander Luminaire Acuity Brands Lighting, Inc. RFD338741 Berry 12' Pole Acuity Brands Lighting, Inc. Holophane, RSA 12 50 G12 SC BK AB-26-4 RFD326400 Berry 20' Pole Acuity Brands Lighting, Inc. Holophane, PD20S5J20P11BK RFD338816 Berry Arm Acuity Brands Lighting, Inc. Holophane, VLC 271N 1A TN QSM BK Holophane, GPLF3 P40 30K MVOLT ASY QSM BK PR7 Berry Luminaire Acuity Brands Lighting, Inc. AO SH Banner Arms Acuity Brands Lighting, Inc. Holophane, BA-241N-2A-CO-S4J-BL-075P-BK System Rigid Nonmetallic Schedule 80 Conduit, Meets UL 651 Cantex Inc. specifi cations and NEMA TC2, Rated for 90°C Cable, Sunlight Resistant, 10' Lengths and 20' lengths Rigid Nonmetallic Schedule 80 Electric Conduit, Meets UL 651 specifications, RUS listed, NEMA TC-2 and Heritage Plastics NEMA TC-3, Rated for 90°C Cable, Sunlight & Weather Conduit Resistant PVC Rigid Schedule 80 Conduit, Conforms to UL 651 Atkore-Heritage Plastics and NEMA TC 2, Sunlight Resistant, Listed for 90°C conductors or cable Schedule 80 PVC Rigid Nonmetallic Conduit, Extra Prime Conduit, Inc Heavy Wall EPC-80, Sunlight resistant, Rated for use with 90°C conductors, Meets UL651 Splice Kit With Connector NSi Industries, LLC Gel Stub Splice Kit with Connector, Easy -Splice, ESSLK Series Copper Wire/Conductor Southwire Encore Wire Encore Wire Service Wire Co Advanced Digital Cable Inc Aluminum Wire -Triplex Priority Wire & Cable, Inc Fuse & Fuse Holder Edison Edison Cooper EATON EATON Connector Thomas & Betts Metered Pedestal 120-240V Electrol Systems, Inc WE Manufacturing & Controls Metered Pedestal 240- Electrol Systems, Inc 480V WE Manufacturing & Controls Ground Box Kearneys Photocell Shorting Caps MacLean Highline Oldcastle Type XHHW-2 copper conductor, 600V TYPE XHHW-2 / RW90, copper conductor, Superslick Elite, 600V/1000V THHN / MTW / THWN-2 Copper conductor, 600V Servicepro-X XHHW-2, 600/1,000 Volt Copper, CT Rated XHHW-2 Low Smoke Halogen Free, Cross -linked Polyethylene Insulated 14 AWG-750 MCM, 600 Volts, 90°C Dry and wet Triplex Overhead Aluminum Conductor General Purpose, Midget Class MEN Fuses, Voltage Rating: MEN - 250 VAC, Ampere Rating: 0.5 - 30 Amps, Interrupting Rating: 10,000 RMS Amps @ 125V Modular Ferrule Fuse Blocks for Midget Class and CC Fuses In -line fuse holders for Single -Pole 13/32" x 1 1/2" Fuses HEB-AA Bussmann Series, HEB breakaway and non -breakaway in -line fuse holders for UL 13/32" x 1- 1/2"supplemental fuses Bussmann Series, FNM 13/32" x 1-1/2" 250Vac time - delay supplemental fuses Wire Joints for Copper Conductor, Cat No: 54615, 54620, 54625-TB, 54635, 54640, 54630 TY A (120/240) 100(NS)AL(E)PS(U) TY A 120/240 100(NS)AL(E)PS(U) TY A (240/480) 100(NS)AL(E)PS(U) TY A 240/480 100(NS)AL(E)PS(U) Polymer Concrete, PHA132412X0002: TIER 22 (X) 22, 500l bs Polymer Concrete, H-SERIES UNIT, H1730-24 TIER-22 - TXDOT 2x 1/2" CAPTIVE BOLT- 2x BRASS FLOATING NUT Polymer Concrete, H-SERIES UNIT, H1324-24 TIER-15 - Oldcastle TXDOT 2x 1/2" CAPTIVE BOLT- 2x BRASS FLOATING NUT NSi Industries, LLC Split Bolt Connectors, Copper Split Bolts 2 Wire, N Series Dark To Light, DLL Elite, Electronic Locking, Type Acuity Brands Lighting, Inc. Photocontrol, DLL-127 or DLL-480 Acuity Brands Lighting, Inc. Dark To Light, Part # DSHORT SBK U Interim Products Residential Luminaire ITRASTAR INC. Arterial Luminaire ITRASTAR INC. DU RA-STR10A-3K-120-3-G R-SCL D U RA-STR25-3 K-120-3-G R-SCL CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 Concrete Class A (S dewalk, ADA Ramps, Driveways, Curb/Gutter, Median Pavement) 9/9/2022 32 1320 Mix Design American Concrete Company 30CAF029 3000 psi 3-5" Slump; 3-6% Air 4/3/2025 32 13 20 Mix Design Big Town Concrete 2211 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 1320 Mix Design Borneo Texas 30U101AG 3000 psi 3-5" Slump; 3-6% Air 4/l/2024 32 13 20 Mix Design Bunten Texas 30U500BG 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 1320 Mix Design Carder Concrete FWCC502001 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Carder Concrete FWCC502021 3500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 1320 Mix Design Chisholm Trail Redi Mix C 13020AE 3000 psi 3-5" Slump; 4.5-7.5% Air 4/28/2025 32 13 20 Mix Design Chisholm Trail Redi Mix CT6020A 3600 psi 3-5" Slump; 3-6 % Air 9/9/2022 32 1320 Mix Design City Concrete Company 30HA20H 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Cow Town Redi Mix 253-W 3000 psi 3-5" Slump; 3-6 % Air 9/9/2022 32 1320 Mix Design Cow Town Redi Mix 250 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Cow Town Redi Mix 350 3000 psi 3-5" Slump; 3-6 % Air 1/29/2024 32 1320 Mix Design Estrada Ready Mix R3050AEWR 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Holcim - SOR, hic. 1261 3000 psi 3-5" Slump; 3-6 % Air 9/23/2024 32 1320 Mix Design Holcim - SOR, Inc. 5177 3000 psi 3-5" Slump; 3-6% Air 5/8/2025 32 13 20 Mix Design Holcim - SOR, hic. 530WA-TI 3000 psi 3-5" Slump; 3-6% Air 4/7/2023 32 1320 Mix Design Liquid Stone C301D 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Martin Marietta R2136214 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 1320 Mix Design Martin Marietta R2136014 3000 psi 3-5" Slump; 3-6% Air 4/l/2023 32 13 20 Mix Design Martin Marietta R2136N14 3000 psi 3-5" Slump; 3-6% Air 6/l/2023 32 1320 Mix Design Martin Marietta R2136R20 3000 psi 3-5" Slump; 3-6% Air 6/l/2023 32 1320 Mix Design Martin Marietta R2136N20 3000 psi 3-5" Slump; 3-6%Air 11/2/2022 32 1320 Mix Design Martin Marietta R2141K24 4000 psi 3-5" Slump; 3-6% Air 4/7/2023 32 1320 Mix Design Martin Marietta R2136K14 3000 psi 3-5" Slump; 3-6%Air 9/9/2022 32 1320 Mix Design Martin Marietta R2131314 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 1320 Mix Design Martin Marietta R2132214 3000 psi 3-5" Slump; 3-6%Air 9/9/2022 32 1320 Mix Design Martin Marietta D9490SC 3000 psi 3-5" Slump; 4.5-7.5% Air 5/9/2025 32 1320 Mix Design Martin Marietta 112136R14 3000 psi 3-5" Slump; 3-6% Air 10/4/2023 32 1320 Mix Design NBR Ready Mix CLS A-YY 3000 psi 3-5" Slump; 3-6% Air 10/4/2023 32 13 20 Mix Design NBR Ready Mix CLS A -NY 3000 psi 3-5" Slump; 3-6 % Air 7/10/2023 32 1320 Mix Design Osborn 30A50MR 3000 psi 3-5" Slump; 3-6% Air 1/18/2023 32 13 20 Mix Design Rapid Redi Mix RRM5020A 3000 psi 3-5" Slump; 3-6%Air 1/24/2023 32 1320 Mix Design Rapid Redi Mix RRM5525A 3600 psi 3-5" Slump; 3-6% Air 10/24/2024 32 13 20 Mix Design SRM Concrete 30850 3000 psi 3-5" Slump; 3-6 % Air 10/24/2024 32 1320 Mix Design SRM Concrete 30350 3000 psi 3-5" Slump; 3-6% Air 10/18/2024 32 13 20 Mix Design SRM Concrete 30050 3000 psi 3-5" Slump; 3-6 % Air 9/9/2022 32 1320 Mix Design Tarrant Concrete FW5025A 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mac Design Tarrant Concrete CP5020A 3000 psi 3-5" Slump; 3-6 % Air 10/10/2022 32 13 20 Mac Design Tarrant Concrete TCFW5020A 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Tarrant Concrete FW5525A2 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 1320 Mix Design Titan Ready Mix 3020AE 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design True Grit Redi Mix 0250.230 3000 psi 3-5" Slump; 3-6 % Air 9/9/2022 32 13 20 Mix Design True Grit Redi Mix 0250.2301 3000 psi 3-5" Slump; 3-6 % Air Class CIP "Inlets, Manholes, Junction Boxes, Encasement, Blockin . Collars, (Spread Footing Pedestal Pole Foundations (Reference Detail 34 41 10-D605A� 9/9/2022 3213 13 Mix Design American Concrete Company 40CNF06 4000 psi 3-5" Slump; 0-3 % Air 9/9/2022 32 13 13 : Mix Design Bumco Texas 4OU500BG 4000 psi 3-5" Slump; 3-6% Air 4/28/2025 32 13 20 Mix Design Chisholm Trail Redi Mix CT6020A 3600 psi 3-5" Slump; 3-6 % Air 4/28/2025 32 13 20 Mix Design Chisholm Trail Redi Mix CTFW5520A 3600 psi 3-5" Slump; 3-6% Air 4/28/2025 32 13 20 Mix Design Chisholm Trail Redi Mix CTFW6020A 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 255-2 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 355 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 255 3500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 270 5000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 370 5000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 353 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 257 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 357 3600 psi 3-5" Slump; 3-6% Air 5/7/2025 3213 13 Mix Design Cow Town Redi Mix 265-42 4200 psi 3-5" Slump; 3-6% Air 2/7/2025 3213 13 Mix Design Holum - SOR, Inc. 1701 4000 psi 3-5" Slump; 3-6% Air 2/7/2025 3213 13 Mix Design Holcim - SOR, Inc. 1551 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Holcan - SOR, Inc. 5409 4000 psi 3-5" Slump; 3-6% Air 4/27/2023 32 13 13 Mix Design Liquid Stone C361DNFA 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Martin Marietta R2141230 4000 psi 3-5" Slump; 3-6% Air 8/4/2023 3213 13 Mix Design Martin Marietta R2141R24 4000 psi 3-5" Slump; 3-6% Air Page 1 of 6 CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 ...Concrete (Continues) 11/20/2023 32 13 13 Mix Design Martin Marietta R2146R33 11/20/2023 32 13 13 Mix Design Martin Marietta R2146K33 9/9/2022 3213 13 Mix Design Martin Marietta R2142233 9/9/2022 32 13 13 Mix Design Martin Marietta R2136224 9/9/2022 3213 13 Mix Design Martin Marietta R2141233 9/9/2022 32 13 13 Mix Design Martin Marietta R2146038 10/24/2024 3213 13 Mix Design Martin Marietta R2146K34 5/5/2025 32 13 13 Mix Design Martin Marietta R2146R35 5/5/2025 33 13 13 Mix Design Martin Marietta R2146K35 5/5/2025 33 13 13 Mix Design Martin Marietta R2146N33 9/12/2023 321313 Mix Design NBR Ready Mix CLS PI-YY 9/9/2022 32 13 13 Mix Design NBR Read}' Mix TX C-YY 9/9/2022 3213 13 Mix Design NBR Ready Mix TX C-NY 1/18/2023 32 13 13 Mix Design Rapid Redi Mix RRM5320A 1/18/2023 3213 13 Mix Design Rapid Redi Mix RRM6020ASS 10/24/2024 32 13 13 Mix Design SRM Concrete 40350 10/24/2024 3213 13 Mix Design SRM Concrete 40850 9/16/2024 32 13 13 Mix Design SRM Concrete 35050 4/28/2025 3213 13 Mix Design SRM Concrete 36850 9/9/2022 32 13 13 Mix Design Tarrant Concrete FW5320A 10/10/2022 32 13 13 Mix Design Tarrant Concrete TCFW6025A2 Class C (Drilled Shaft for Traffic Signal Pole Foundations Reference Detail 314 9/9/2022 32 13 13 Mix Design Bumco Texas 36U500BG 6/21/2023 32 13 13 Mix Design Cow Town Redi Mix 360-DS 10/30/2024 32 13 13 Mix Design Estrada Ready Mix R36575AEWR 12/5/2022 32 13 13 Mix Design Holcim - SOR, Inc. 1822 9/9/2022 32 13 13 Mix Design Holcim - SOR, Inc. 1859 4/7/2023 32 13 13 Mix Design Liquid Stone C361DHR 6/27/2023 32 13 13 Mix Design Martin Marietta U2146N41 6/27/2023 32 13 13 Mix Design Martin Marietta U2146K45 5/9/2025 2 13 13 Mix Design Martin Marietta U2146R41 8/22/2024 32 13 13 Mix Design NBR Ready Mix 135K2524 8/22/2024 32 13 13 Mix Design NBR Ready Mix 135KO524 Class C (Headwalls, Wing walls, Culverts) 9/9/2022 32 13 13 Mix Design Carder Concrete FWCC602001 9/9/2022 32 13 13 Mix Design City Concrete Company 40LA2011 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 260-2 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 360-1 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 260-1 1/29/2024 321313 Mix Design Estrada Ready Mix R3655AEWR 9/9/2022 3213 13 Mix Desp GCH Concrete Services GCH4000 4/1/2023 321313 Mix Design Martin Marietta 310LBP 8/30/2023 3213 13 Mix Desp Martin Marietta R2141R30 9/9/2022 3213 13 Mix Design Martin Marietta R2146035 9/9/2022 3213 13 Mix Desp SRM Concrete 40050 9/9/2022 3213 13 Mix Design SRM Concrete 35022 9/9/2022 321313 Mix Design Tarrant Concrete FW6020A2 Class P (Machine Placed Pav ng� 4/3/2025 3213 13 Mix Dei Bl�n own Concrete 4511 4/3/2025 3213 13 Mix Design Big Town Concrete 4411 6/30/2025 3213 13 Mix Desp Blwn Town Concrete 5211 6/30/2025 3013 13 Mix Design Big Town Concrete 52113 6/30/2025 3013 13 Mix Desp Big Town Concrete 5311 9/9/2022 3213 13 Mix Design Carder Concrete FWCC552091 9/9/2022 3213 13 Mix Desp Carder Concrete FWCC602091 9/9/2022 3213 13 Mix Design City Concrete Company 36LA2011 9/9/2022 33 13 13 Mix Desp Cow Town Redi Mix 257-M 11/14/2022 3213 13 Mix Design Cow Town Redi Mix 357-M 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 260-M 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 360-M 2/6/2024 3213 13 Mix Desp Estrada Read�Mix TD3655AEWR 5/20/2025 3213 13 Mix Design Gilco Contracting Inc 36MP 1643 6/20/2025 3213 13 Mix Design Gilco Contracting Inc 36MP1629 5/12/2025 3213 13 Mix Design Holcim - SOR, Inc. 1703 8/4/2023 32 13 13 Mix Design Martin Marietta Q214IR27 11/2/2022 3213 13 Mix Design Martin Marietta Q214IK30 10-D605) With 20%Fly Ash With 30% slag 4000 psi 3-5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6% Air 3600 psi 3-5" Slump; 4.5-7.5% Air 3600 psi 3-5" Slump; 3-6% Air 3600 psi 3-5" Slump; 3-6% Air 4500 psi 3-5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6% Air 3000 psi 3-5" Slump; 3-6% Air 3000 psi 3-5" Slump; 3-6% Air 3000 psi 3-5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6% Air 3500 psi 3-5" Slump; 3-6% Air 3600 psi 3-5" Slump; 3-6% Air 3000 psi 3-5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6% Air 3600 psi 5.5-7.5" Slump; 3-6% Air 3600 psi 5.5-7.5" Slump; 3-6% Air 3600 psi 5.5-7.5" Slump; 3-6% Air 3600 psi 5.5-7.5" Slump; 0-3% Air 4000 psi 5.5-7.5" Slump; 3-6% Air 3600 psi 5.5-7.5" Slump; 3-6% Air 3600 psi 5-7" Slump; 3-6% Air 3600 psi 5-7" Slump; 3-6% Air 3600 psi 5-7" Slump; 3-6% Air 3600 psi 5.5" Slump; 3-6% Air 3600 psi 5.5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6 % Air 4000 psi 3-5" Slump; 3-6 % Air 3600 psi 3-5" Slump; 3-6% Air 3600 psi 3-5" Slump; 3-6% Air 3600 psi 3-5" Slump; 3-6% Air 3600 psi 3-5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6% Air 3600 psi 3-5" Slump; 4-7 % Air 4000 psi 3-5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6 % Air 4000 psi 3-5" Slump; 3-6% Air 3600 psi 3-5" Slump; 3-6% Air 4000 psi 3-5" Slump; 3-6% Air 3600 psi 1-Y Slump; 3-6% Air 3600 psi 1-3" Slump; 3-6% Air 4000 psi 1-3" Slump; 3-6% Air 4000 psi 1-3" Slump; 3-6% Air 4000 psi 1-3' Slump; 3-6% Air 3600 psi 1-3" Slump; 3-6% Air 4000 psi 1-Y Slump; 3-6% Air 3600 psi 1-3" Slump; 3-6% Air 3600 psi 1-3" Slump; 3-6% Air 3600 psi 1-3" Slump; 3-6% Air 4000 psi 1-3" Slump; 3-6% Air 4000 psi 1-3" Slump; 3-6% Air 3600 psi 1-Y Slump; 3-6% Air 3600 psi 1-3" Slump; 3-6% Air 3600 psi 1-Y Slump; 3-6% Air 4000 psi 1-3" Slump; 3-6% Air 4000 psi 1-Y Slump; 3-6% Air 4000 psi 1-3" Slump; 3-6% Air Page 2 of 6 CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 ...Concrete (Continues) 5/5/2025 32 13 13 Mix Dex Martin Marietta 10/4/2023 3213 13 Mix Design NBR Ready Mix 10/4/2023 3213 13 Mix Design NBR Ready Mix 10/24/2024 3213 13 Mix Design SRM Concrete 10/24/2024 32 13 13 Mix Design SRM Concrete 9/16/2024 3213 13 Mix Design SRM Concrete 10/18/2024 32 13 13 Mix Design SRM Concrete 6/5/2025 3213 13 Mix Design SRM Concrete 9/9/2022 32 13 13 Mix Design Tarrant Concrete 9/9/2022 3213 13 Mix Design True Grit Redi Mix 9/9/2022 32 13 13 Mix Design True Grit Redi Mix 6/17/2025 3213 13 Mix Design True Grit Redi Mix 6/23/2025 32 13 13 Mix Design True Grit Redi Mix Class H (Vand Placed Paving, Valley Gutter) 9/9/2022 3213 13 Mix Design American Concrete Company 5/2/2023 32 13 13 Mix Design Big D Concrete 4/3/2025 3213 13 Mix Design Big Town Concrete 4/3/2025 32 13 13 Mix Design Big Town Concrete 4/5/2025 3213 13 Mix Design Big Town Concrete 9/9/2022 32 13 13 Mix Design Bumco Texas 9/9/2022 3213 13 Mix Design Curler Concrete 4/28/2025 32 13 13 Mix Design Chisholm Trail Redi Mix 9/9/2022 3213 13 Mix Design City Concrete Company 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 1/29/2024 32 13 13 Mix Design Estrada Ready Mix 9/9/2022 32 13 13 Mix Design GCH Concrete Services 5/20/2025 32 13 13 Mix Design Gilco Contracting Inc 6/20/2025 32 13 13 Mix Design Gilco Contracting hic 10/4/2024 32 13 13 Mix Design Holcim - SOR, Inc. 9/9/2022 32 13 13 Mix Design Holchm - SOR, htc. 5/8/2025 32 13 13 Mix Design Holcim - SOR, Inc. 4/5/2025 32 13 13 Mix Design Liquid Stone 11/2/2022 32 13 13 Mix Design Martin Marietta 8/4/2023 3213 13 Mix Design Martin Marietta 11/2/2022 32 13 13 Mix Design Martin Marietta 5/22/2023 3213 13 Mix Desl�tt Martin Marietta 12/22/2023 3213 13 Mix Design Martin Marietta 12/22/2023 3213 13 Mix Design Martin Marietta 11/15/2022 3213 13 Mix Design Martin Marietta 11/15/2022 3213 13 Mix Desl�t Martin Marietta 9/9/2022 3213 13 Mix Design Martin Marietta 9/9/2022 3213 13 Mix Dela Martin Marietta 9/9/2022 3213 13 Mix Design Martin Marietta 9/9/2022 3213 13 Mix Dela Martin Marietta 9/9/2022 3213 13 Mix Design Martin Marietta 6/3/2025 3213 13 Mix Dela Martin Marietta 10/4/2023 3213 13 Mix Design NBR Ready Mix 10/4/2023 3213 13 Mix Deza NBR Ready Mix 7/10/2023 321313 Mix Design Oahu- 1/24/2023 3213 13 Mix Dex Rapid Redi Mix 2/7/2025 3213 13 Mix Design SRM Concrete 9/9/2022 3213 13 Mix Dex SRM Concrete 5/23/2025 3213 13 Mix Design SRM Concrete 10/24/2024 3213 13 Mix Dex SRM Concrete 10/24/2024 3213 13 Mix Design SRM Concrete 10/18/2024 3213 13 Mix Dex SRM Concrete 9/9/2022 3213 13 Mix Design Tarrant Concrete 9/9/2022 3213 13 Mix Des�gtt Tarrant Concrete 9/9/2022 3213 13 Mix Design Tarrant Concrete 9/9/2022 3213 13 Mix Des�gtt Titan Ready Mix 9/9/2022 3213 13 Mix Design True Grit Redi Mix 9/9/2022 3213 13 Mix Dex True Grit Redi Mix 9/9/2022 3213 13 Mix Design True Grit Redi Mix 6/12/2025 32 13 13 Mix Design True Grit Redi Mix 6/23/2025 3213 13 Mix Design True Grit Redi Mix 10/9/2024 32 13 13 Mix Design Wildcatter Q214IN27 4000 psi 1-3" Slump; 3-6% Air TX C SF-YY 3600 psi 1-3" Slump; 3-6% Am TX C SF -NY 3600 psi 1-Y Slump; 3-6% Air 40068 4000 psi 1-3" Slump; 3-6% Air 40825 4000 psi 1-Y Slump; 3-6% Air 40025 4000 psi 1-3" Slump; 3-6% Air 35023 3600 psi 1-3" Slump; 3-6% Air 40324 4000 psi 1-Y Slump; 3-6% Am FW5520AMP 3600 psi 1-3" Slump; 3-6%Air 0255.2301 3600 psi 1-Y Slump; 3.5-6.5% Air 0260.2302 4000 psi 1-3" Slump; 3.5-6.5% Air 460.230M 4000 psi 1-Y Slump; 3-6% Air 360.230M 4000 psi 1-3" Slump; 3-6% Air 45CAF076 4500 psi 3-5" Slump; 3-6% Am CM14520AE 4500 psi 3-5" Slump; 3-6% Air 6211 4500 psi 3-5" Slump; 3-6% Am 6311 4500 psi 3-5" Slump; 3-6% Air 6017 4500 psi 3-5" Slump; 3-6% Am 45U500BG 4500 psi 3-5" Slump; 3-6% Air FWCC602021 4500 psi 3-5" Slump; 3-6% Am CTFW6520A 4500 psi 3-5" Slump; 3-6% Air 45NA20H 4500 psi 3-5" Slump; 3-6% Air 265 4500 psi 3-5" Slump; 3-6% Air 365 4500 psi 3-5" Slump; 3-6% Air R4560AEWR/ 4500 psi 3-5" Slump; 4-6% Air GCH4500 4500 psi 3-5" Slump; 3-6% Air 45HP 1643 4500 psi 3-5" Slump; 3-6% Air 45HP 1629 4500 psi 3-5" Slump; 3-6% Air 5507 4500 psi 3-5" Slump; 3-6% Air 1851 4500 psi 3-5" Slump; 3-6% Air 545WA-Tl 4500 psi 3-5" Slump; 3-6%Air C451D 4500 psi 3-5" Slump; 3-6% Air R2146N35 4500 psi 3-5" Slump; 3-6% Air R21461136 4500 psi 3-5" Slump; 3-6% Air R2146N36 4500 psi 3-5" Slump; 3-6 % Air R2146K37 4500 psi 3-5" Slump; 3-6% Air R2146R44 4500 psi 3-5" Slump; 3-6 % Air R2146K44 4500 psi 3-5" Slump; 3-6% Air R21461`36 4500 psi 3-5" Slump; 3-6 % Air R2146K36 4500 psi 3-5" Slump; 3-6% Air R2147241 4500 psi 3-5" Slump; 4.5-7.5 % Air R2146236 4500 psi 3-5" Slump; 3-6% Air R2146036 4500 psi 3-5" Slump; 3-6% Air R2146242 4500 psi 3-5" Slump; 3-6% Air R2146042 4500 psi 3-5" Slump; 3-6% Air R2146K43 4500 psi 3-5" Slump; 3-6% Air CLS P2-YY 4500 psi 3-5" Slump; 3-6% Air CLS P2-NY 4500 psi 3-5" Slump; 3-6% Air 45A60MR 4500 psi 3-5" Slump; 3-6% Air RRM6320AHP 4500 psi 3-5" Slump; 3-6% Air 45023 4500 psi 3-5" Slump; 3-6% Air 45000 4500 psi 3-5" Slump; 3-6% Air 45300 4500 psi 3-5" Slump; 3-6% Air 45350 4500 psi 3-5" Slump; 3-6% Air 45850 4500 psi 3-5" Slump; 3-6% Air 45050 4500 psi 3-5" Slump; 3-6% Air FW6020AHP 4500 psi 3-5" Slump; 3-6% Air FW60AHP 4500 psi 3-5" Slump; 3-6% Air TCFW6020AHP 4500 psi 3-5" Slump; 3-6% Air TRC4520 4500 psi 3-5" Slump; 3-6% Air 0260.2301 4500 psi 3-5" Slump; 3-6% Air 0265.2301 4500 psi 3-5" Slump; 3.5-6.5% Air 270.230 4500 psi 3-5" Slump; 3-6% Air 465.230H 4500 psi 3-5" Slump: 3-6%Air 365.230H 4500 psi 3-5" Slump: 3-6%Air 4520AI 4500 psi 3-5" Slump; 3-6% Air Page 3 of 6 CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 Class HES (High Early Stren^th Paving) 9/9/2022 32 13 13 ix Design Big D Concrete 14500AE 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 370-INC 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 375-NC 5000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 370-NC 4500 psi 3-5" Slump; 3-6% Air 1/18/2023 32 13 13 Mix Design Cow Town Redi Mix 380-NC 4500 psi 3-5" Slump; 3-6% Air 1/29/2024 3213 13 Mix Design Estrada Ready Mix 4575AESC 4500 psi / 3000 psi (a? 3 days 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Holcim - SOR, Inc. 2125 5000 psi 3-5" Shoo; 3-6% Air / ...Concrete (Continues) 1/24/2023 32 13 13 Mix Design Liquid Stone C451DHR-A 4500 psi 3-5" Slump; 3-6% Air 4/7/2023 3213 13 Mix Design Martin Marietta R2161K70 6000 psi / 3000 psi (il 24hr. 3-5" Slump; 3-6% Air 2/10/2023 32 13 13 Mix Design SRM Concrete 50310 5000 psi 3-5" Slump; 3-6% Air 2/7/2025 3213 13 Mix Design SRM Concrete 40326 4500 psi / 3000 psi (7� 3 days 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Tarrant Concrete FW6520AMR 4500 psi / 3000 psi 3 days 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete FW7520AMR 4500 psi / 3000 psi , 3 days 3-5" Slump; 3-6% Air Class S (BrillQ` Slabs, Top Slabs of Direct Traffic Culverts, Approach Slabs) 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 260 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 13 Mix Design Cow Town Redi Mix 360 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 365-STX 4000 psi 3-5" Slump; 3-6% Air 1/29/2024 32 13 13 Mix Design Estrada Ready Mix R4060AEWR 4000 psi 4-6" Slump; 3-6% Air 5/3/2023 3213 13 Mix Design Martin Marietta M7842344 4000 psi 3-5" Slump; 4.5-7.5% Air 4/l/2023 32 13 13 Mix Design Martin Marietta R2146P33 4000 psi 3-5" Slump; 3-6% Air 4/15/2024 32 13 13 Mix Design NBR Ready Mix TX S-NY 4000 psi 3-5" Slump; 3-6% Air 4/15/2024 32 13 13 Mix Design NBR Ready Mix TX S-YY 4000 psi 3-5" Slump; 3-6% Air 4/5/2025 32 13 13 Mix Design SRM Concrete 40850 4000 psi 3-5" Slump; 3-6% Air 4/5/2025 32 13 13 Mix Design SRM Concrete 40350 4000 psi 3-5" Slump; 3-6% Air 5/5/2023 32 13 13 Mix Design SRM Concrete D100008553CB 4000 psi 3-5" Slump; 3-6% Air Concrete Base Trench Repair 4/l/2023 I033416 IMix Design (Bumco Texas lOYH50BF I I 1000 psi (Flowable; 8.5-11.5%Air 9/9/2022 03 34 16 Mix Design Bumco Texas 08Y450BA 800 psi 5-7" Slump; 3-6% Air Controlled Low Strength Material (Flowable Fill) 2/7/2025 03 34 13 Mix Design Bumco Texas O1Y690BF 100 psi Flowable; 9.5-11.5%Air 5/19/2025 03 34 13 Mix Design Bumco Texas OlZI80AF 100 psi Flowable; 9.5-11.5% Air 9/9/2022 03 34 13 Mix Design Carder Concrete FWCC359101 50-150 psi 3-5" Slump; 8-12% Air 9/9/2022 03 34 13 Mix Design Carder Concrete FWFF237501 50-150 psi Flowable; 8.5-11.5% Air 9/9/2022 03 34 13 Mix Design City Concrete Company 11-350-FF 50-150 psi Flowable; 8-12%Air 9/9/2022 03 34 13 Mix Desp Cow Town Redi Mix Mix# 9 70 psi 7-9" Slump; 8-11% Air 5/12/2025 03 34 13 Mix Design Holcim - SOR, Inc. 3741 100 psi Flowable; 12.0-24.0%Air 10/4/2023 03 34 13 Mix Desp NBR Ready Mix FTW FLOW FILL 150 psi 7-10" Slump; 8-12% Air 2/7/2025 03 34 13 Mix Design SRM Concrete 910 150 psi Flowable; 8-12%Air 9/9/2022 03 34 13 Mix Design Tarrant Concrete FW1717150CLSM 50-150 psi Flowable; 8-12%Air Concrete RiR RaP 4/l/2023 I31 37 00 IMix Design (Martin Marietta R2141030 I 4000 psi I3-5" Slump; 3-6% Air 4/l/2023 31 37 00 Mix Design Martin Marietta R2146033 4000 psi 3-5" Slump; 3-6% Air AT Paving 9/9/2022 32 12 16 Mix Design Austin Asphalt FT513 117965 FT513117965 PG64-22 Type B Fine Base 9/9/2022 321216 Mix Design Austin Asphalt FT113139965 FTIB139965 PG64-22 Type B Fine Base 9/9/2022 321216 Mix Design Austin Asphalt FT113117.2 FT1B117.2 PG64-22 Type B Fine Base 5/l/2024 32 12 16 Mix Design Reynolds Asphalt 340-DG-B P 340-DG-B PG64-22 Type B Base Course 9/9/2022 32 12 16 Mix Design Reynolds Asphalt 1112B 1112B PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Reynolds Asphalt 1612B 1612B PG64-22 Type B Fine Base 4/4/2025 32 12 16 Mix Design Reynolds Asphalt 2315B 2315B PG64-22 Type B Fine Base 12/5/2022 33 1216 Mix Design Surmount Paving 3076BV6422 3076BV6422 PG62-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Surmount Paving 341-BRAP6422ERG 341-BRAP6422ERG PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 37-211305-20 37-211305-20 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 44-211305-17 44-211305-17 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 211305 (1757) 211305 (1757) PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 64-224125-18 PG 64-224125-18 PG70-22 Type D Fine Surface 4/l/2024 32 12 16 Mix Design TXBIT 344 MAC-SP-D 70-22XR 344 MAC-SP-D 70-22XR SAC A-R Type D Fine Surface Detectable Warning Surface 9/9/2022 32 1320 DWS - Pavers Pine Hall Brick (Winston Salem, NC) Tactile Pavers 9/9/2022 32 13 20 DWS - Pavers Western Brick Co. (Houston, TX) Detectable Warring Pavers 9/9/2022 32 13 20 DWS - Composite Armor Tile 9/9/2022 32 1320 DWS - Composite ADA Solutions (Wilmington, MA) Heritage Brick CIP Composite Paver 4/7/2023 32 1320 DWS - Pavers ADA Solutions (Wilmington, MA) Detectable Warning Pavers Page 4 of 6 FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 !!!!!!!! Attention: Mix Designs do not su ersede CFW S ecifications !!!!rlrrr! Approval Spec No. Classification Manufacturer Nli, ID Mix DescriptionDesignDesign Silicone Joint Sealant 9/9/2022 32 13 73 Joint Sealant w 890SL 0SL - Cold Applied, Si a Component, Silicone Joint Sealant ASTM D5893 9/9/2022 32 13 73 �32 Joint Sealant emco Eaten 900SL 0SL - Cold Applied, Sing a Component, Silicone Joint Sealant EadSaver ASTM D5893 9/9/2022 32 1373 Joint Sealant com 300SL 0SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 9/9/2022 13 73 Joint Sealant RoadSaver Silicone Silicone - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 Utility Trench Embedment Sand 9/9/2022 33 OS 1 Embedment Sand Silver Creek Materials Utility Entcrent Sand ASTM C33 9/9/2022 3305 10 Embedment Sand Crouch Materials Utility Em e eat Sand ASTM C33 9/9/2022 3305 10 Embedment Sand F and L Dirt Movers Utility Em elment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand F and L Dirt Movers Utility Erae meat Sand ASTM C33 9/9/2022 3305 10 Embedment Sand Tin Top Martin Marietta Utility Embedment Sand ASTM C33 Storm Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 9/28/2018 3305 13 Manhole Frames and Covers AccuCast (Govind Steel Company, LTD) MHRC #220605 MHRC #220605 (Size - **24" Dia.) ASTM A48 AASHTO M306 9/28/2018 3305 13 Manhole Cover Neenah Foundry NF-1274-T91 NF-1274-T91 (Size - 32" Dia.) ASTM A48 AASHTO M306 9/28/2018 3305 13 Manhole Frames and Covr Neenah Foun NF-1743-LM (Hinged) NF-1743-LM (Hinged) (Size - 32" Dial ASTM A48 AASHTO M306 9/28/2018 3305 13 Manhole Frame Neenah Foundry NF-1930-30 NF-1930-30 (Size - 32.25" Dia.) ASTM A48 AASHTO M306 9/28/2018 3305 13 Manhole Frames and Covr Neenah Foun R-1743-ITV R-1743-HV (Size - 32" Dia.) ASTM A48 AASHTO M306 4/3/2019 3305 13 Manhole Frames and CovwSIP Industries ++ 2279ST 2279ST (Size - 24" Dia.) ASTM A48 AASHTO M306 4/3/2019 3305 13 Manhole Frames and Cov,.SIP Industries ++ 2280ST 2280ST (Size - 32" Dia.) ASTM A48 AASHTO M306 10/8/2020 3305 13 Manhole Frames and Cov/EJ ( Formally East Jordan Iron Works) EJ1033 Z2/A EJ1033 Z2/A (Size - 32.25" Dia.) ASTM A536 AASHTO M306 3/8/2024 3305 13 Curb Inlet Covers SIP Industries ++ 2296T 2296T (Size - ***24" Dial ASTM A48 AASHTO M306 6/18/2024 3305 13 Curb Inlet Covers SIP Industries ++ 2279STN 2279STN (Size - 24" Dial ASTM A48 AASHTO M306 —Note: All new development and new installation manhole lids shall meet the minimum 30-inch opening requirement as specified in City Specification 33 0513. Any smaller opening sizes will only be allowed for existing manholes that require replacement frames and covers. Storm Sewer - Inlet & Structures 33-05-13 10/8/2020 33 49 20 Curb Inlets Fonterra FRT-lOx3-405-PRECAST** (Size - 10' X 39 ASTM C913 10/8/2020 33 49 20 Curb Inlets Fonterm FRT-lOx3-406-PRECAST** (Size - 10' X 3') ASTM C913 10/8/2020 33 49 20 Curb Inlets Fonterm FRT-lOx4.5-407-PRECAST** (Size - 10' X 4.5') ASTM C913 10/8/2020 33 49 20 Curb Inlets Fonterm FRT-lOx4.5-420-PRECAST** (Size - 10' X 4.5') ASTM C913 10/8/2020 33 39 20 Manhole Fonterm FRT-4X4-409-PRECAST-TOP (Size - TX 4') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-4X4-409-PRECAST-BASE (Size - 4' X 4') ASTM C913 10/8/2020 33 39 20 Manhole Fonterm FRT-5X5-410-PRECAST-TOP (Size - 5' X 5� ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-5X5-410-PRECAST-BASE (Size - 5' X 5') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-6X6-411-PRECAST-TOP (Size - 6' X 6� ASTM C913 10/8/2020 33 39 20 Manhole Fonterm FRT-6X6-411-PRECAST-BASE (Size - 6' X 6') ASTM C913 3/19/2021 33 49 20 Curb Inlets Thompson Pipe Group TPG-1 OX3-405-PRECAST INLET** (Size - 10' X T) ASTM 615 3/19/2021 33 49 20 Curb Inlets Thompson Pipe Group TPG-15X3-405-PRECAST INLET** (Size - 15' X 3') ASTM 615 3/19/2021 33 49 20 Curb Inlets Thompson Pipe Group TPG-20X3-405-PRECAST INLET** (Size - 20' X T) ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-4X4-409-PRECAST TOP (Size - 4' X 4') ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-4X4-409-PRE�AST (Size - TX 4') ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group VASE TPG-4X4-412-PRE AST FT RISER (Size - 4' X 4') ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-5X5410-PRE JT TOP (Size - 5' X 5') ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-5X5-410-PRE A T BASE (Size - 5' X 5') ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-5X5-412-PRECAST 5-FT RISER (Size - 5' X 5') ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-6X6-411-PRECAST TOP (Size - 6' X 6') ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-6X6-411-PRECAST BASE (Size - 6' X 6') ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-6X6-412-PRECAST 6-FT RISER (Size - 6' X 6') ASTM 615 3/19/2021 33 39 20 Manhole Thompson P}pe Group TPG-7X7-411-PRECAST TOP (kize - TX T) ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-7X7-411-PRECAST BASE Size - TX T) ASTM 615 3/19/2021 33 39 20 Manhole Thompson P}pe Group TPG-7X7-412-PRECAST 4-FT RISER (Size - TX T) ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-8X8-411-PRECAST TOP (Size - 8' X 8') ASTM 615 3/19/2021 33 39 20 Manhole Thompson PTe Group TPG-8X8-411-PRECAST BASE (Size - 8' X 8� ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-8X8-412-PRECAST 5-FT RISER (Size - 8' X 8') ASTM 615 3/19/2021 33 49 20 Drop Inlet Thompson P}pe Group TPG-4X4-408-PRECAST INLET (Size - 4' X 4') ASTM 615 3/19/2021 33 49 20 Drop Inlet Thompson Pipe Group TPG-5X5-408-PRECAST INLET (Size - 5' X 5') ASTM 615 3/19/2021 33 49 20 Droqq bilet Thompson Pipe Group TPG-6X6-408-Pk rf ST LET (Size - 6' X 6') Manhole ASTM 615 8/28/2023 33 49 10 Manhole Oldcastle Precast 4' x 4' Stacked (Size - TX 4') ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 8' Storm Junction Box (Size - 5' X 8') ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 4' x 4' Storm Junction Box (Size - 4' X T) ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 5' Storm Junction Box (Size - 5' X 5') ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 6' x 6' Storm Junction Box (Size - 6' X 6') ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 8' x 8' Stomr Junction Box Base (Size - 8' X 81 ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 8' Storm Junction Box Base (Size - 5' X 8') ASTM C478 8/28/2023 33 49 10 Manhole Rinker Materials Reinforced 48" Diameter Spread Footing Manhole (Size - 4' X 4') ASTM C433 Page 5 of 6 CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 ....Storm Sewer -Inlet & Structures Continues 8/28/2023 33 39 20 Curb Inlet 10'x 3' Riser Thompson Pipe Group Inlet Riser (Size - 3 FT) ASTM C913-16 8/28/2023 33 39 20 Curb Inlet 15'x 3' Riser Thompson Pipe Group Inlet Riser (Size - 3 FT) ASTM C913-16 8/28/2023 33 39 20 Curb Met 20' x 3' Riser Thomson Pipe Group Inlet Riser (Size - 3 FT) ASTM C913-16 1/12/2024 33 49 20 Drop Inlet AmenTex Pipe Pr nets Drop Inlet (4' X 4') ASTM C913 1/12/2024 33 49 20 Droq Wet AmenTex Pipe &Products Drop Inlet (5' X 5') ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Precast 4'x4' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex PP &Products Precast 5'x5' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 5' Precast Transition MH (4' MH on the top of 5' JB) ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex PP &Products Precast 6'x6' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 6' Precast Transition MH (4' MH on the top of 6' JB) ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex PP &Products Precast 8'x8' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 8' Precast Transition MH (4' MH on the top of 8' JB) ASTM C913 1/19/2024 33 49 20 Manhole AmenTex Pipe &Products Type C Storm Drain Manhole on Box (4' MH on the top of RCB) ASTM C913 7/16/2024 33 49 20 Curb Inlets AmcriTex Pipe &Products 10x3 Precast** (Size 10' x 3') ASTM C913 7/16/2024 33 49 20 Curb Inlets AmeriTex Pipe &Products I SO Precast** (Size 15' x 3') ASTM C913 **Note: Precast inlets are approved for the stage t portion of he structure (basin) only. Stage 77portion of the structure are required to be cast in -place. No exceptions to this requirement shall be allowed Storm Sewer - Pipes & Boxes 33-05-13 4/9/2021 3341 13 Storm Drain Pipes Advanced Drainage Systems, Inc. (ADS) ADS HP Storm Polypropylene (PP) P a (Size - 12" - 60") ASTM F2881 & AASHTO M330 8/28/2023 3341 10 Storm Drain Pipes Rinker Materials Reinforced Concrete Pipe Tongue and Groove Joint Pipe (Size - 21" or larger) ASTM C76, C655 8/28/2023 3341 10 Culvert Box Rinker Materials Reinforced Concrete Box Culvert (Sze - Various) ASTM C789, C850 10/12/2023 3341 10 Storm Drain Pipes AmenTex Pipe &Products Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size - 15" or larger) ASTM C76, C506 10/12/2023 3441 10 Culvert Box AmeriTex Pipe &Products Reinforced Concrete Box Culvert (size - Various)) ASTM C1433,C 1577 10/18/2023 3541 10 Storm Drain Pipes The Turner Co. Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size - 15" or larger) ASTM C76, C506 10/18/2023 3341 10 Culvert Box The Turner Co. Reinforced Concrete Box Culvert (size - Various) ASTM C1433,C1577 4/12/2024 3341 10 Storm Drain Pipes Thompson Pipe Group Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size Various) ASTM C76, C506 6/25/2024 3341 10 Culvert Box Oldcastle Reinforced Concrete Box Culvert ASTM C1433,C1577 6/25/2024 3341 10 Storm Drain Pipes Oldcastle Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size Various) ASTM C76, C506 Revision Comments (1-29-2025) Removed Argos, Ingram, Redi-Mix, Charley's (4-3-2025) Bigtown Concrete updated Mix ID's (4-5-2025) 03 34 13 CLSM specification Page 6 of 6 FORT WORTH. (Approval I I 07/23/97 I 04/26/00 I 04/26/00 I 1/26/99 I 5/13/05 I 1/26/99 I 08/30/06 I 08/24/18 08/24/18 I 10/31/06 I 7/25/03 I 01/31/06 I 11/02/10 I 07/19/11 08/10/11 I 10/14/13 I 06/O1117 12/05/23 I 09/16/19 10/07/21 I 03/04/28/00 00/01 I 09/23/96 I 12/05/23 I 05/08/18 09/03/24 I 06/09/10 I 09/06/19 I 10/07/21 I 10/07/21 I 10/07/21 03/07/23 I 03/07/23 I 04/28/07 iWi47i4! I 14/23/01 I I 4/20/01 I 5/12/03 I 08/30/06 I Spec No. lClasssification CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Manufacturer I Model No. Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) 3305 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra -Seal P-201 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 33 05 13 Profile Gasket for 4' Diam. MH. Press -Seal Gasket Corp. 250-4G Gasket 33 05 13 HDPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System Water & Sewer - Manholes & Bases/Fiberelass 33-39-13 (1/8/13) 33 39 13 Fiberglass Manhole Fluid Containment, Inc. 33 39 13 Fiberglass Manhole L.F. Manufacturing Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16) 33 05 13 MManhole Frames and Covers I Western Iron Works, Bass & Hays Foundry ( Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) 33 05 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. 33 05 13 Manhole Frames and Covers Neenah Foundry 33 05 13 Manhole Frames and Covers Neenah Foundry 33 05 13 Manhole Frames and Covers Sigma Corporation 33 05 13 Manhole Frames and Covers Sigma Corporation 33 05 13 Manhole Frames and Covers Pont-A-Mousson 33 05 13 Manhole Frames and Covers Neenah Casting 33 05 13 Manhole Frame: and Covers (Hinged) Powerseal 33 05 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) 33 05 13 30" Dia. MH Ring and Cover East Jordan Iron Works 33 05 13 30" Dia. MH Ring and Cover Sigma Corporation 33 05 13 30" Dia. MH Ring and Cover Star Pipe Products 33 05 13 30" Dia. MH Ring and Cover Accucast 33 05 13 30" Dia. MH Ring and Cover (Hinged & Lockable) East Jordan Iron Works 3405 13 30" Dia. MH Ring and Cover (Lockable) CI SIP Industries 3405 13 30" Dia. MH Ring and Cover (Hinged & Lockable) CI SIP Industries 33 05 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. 3405 13 30" Dia. MH Ring and Cover Trumbull Manufacturing Flowtite 1001 National Spec ASTM D2240/D412/D792 ASTM C-443/C-361 ASTM 3753 30024 A24AM R-1272 ASTM A48 & AASHTO M306 NF 1274 ASTM A48 & AASHTO M306 MH-144N MH-143N GTS-STD Hinged Ductile Iron Manhole RE32-R8FS V1432-2 and V1483 Designs MH1651FWN & MH16502 MR32FTWSS-DC 220700 Heavy Duty with Gasket Ring 30" ERGO XL Assembly with Cam Lock/MPIC/T-Gasket 2280 (32") 4267WT - Hinged (32") CAP-ONE-30-FTW, Composite, w/ Lock w/o Hmg 32"(30") Frame and Cover Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 Bev 2/3/16) 33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamhght 3305 13 Manhole Frames and Covers Neenah Casting 3305 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 33 05 13 Manhole Frames and Covers Accucast RC-2100 33 05 13 Manhole Frames and Covers (SIP)Scrampore Industries Private Ltd. 300-24-23.75 Ring and Cover Water & Sewer - Manholes & Bases/Precast Concrete ( tev 1/8/13) 33 39 10 Manhole, Precast Concrete Hydro Conduit Corp 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 33 39 10 Manhole, Precast Concrete The Turner Company 33 39 10 Manhole, Precast Concrete The Turner Company 33 39 10 Manhole, Precast Concrete 33 39 10 Manhole, Precast (Reinforced Polymer)Concrete 33 3920 Manhole, Precast Concrete 32 39 20 Manhole, Precast Concrete 33 3920 Manhole, Precast (Reinforced Polymer) Concrete 33 39 20 Manhole, Precast (Hybrid) Polymer & PVC 33 39 20 Manhole, Precast Concrete 33 3920 Manhole, Precast (Reinforced Polymer) Concrete Manhole, Precast (Reinforced Polymer) Concrete Sewer -(WAC) Wastewater Access Chamber 33 39 40 33 3920 I Wastewater Access Chamber Oldcastle Precast Inc US Composite Pipe Forterra Pipe and Precast Fortes Pipe and Precast Armorock Geneva Pipe and Precast (Predl Systems) AmeriTex Pipe and Products, LLC P3 Polymers, RmkFIardscp Amitech USA Omckstream Solutions, Inc. Water & Sewer - Manholes & Bases/Rehab Svstems/Cementitious E1-14 Manhole Rehab Systems Quarles E I - 1 4 Manhole Rehab Systems Standard Cement Materials, Inc. E1-14 Manhole Rehab Systems AP/M Permaform E1-14 Manhole Rehab System Strong Company EI-14 Manhole Rehab System (Liner) Triplex Lining System General Concrete Repair FI-Krete Technologies SPL Item 449 48" I.D. Manhole w/ 32" Cone 72" I.D. Manhole w/ 32" Cone 48", 60" I.D. Manhole w/ 32" Cone Manhole, 32" Opening and Plat top, (No Transition Cones) Reinforced Polymer Concrete 60" & 72" I.D. Manhole w/32" Cone 48" I.D. Manhole w/32" Cone 48" & 60" I.D. Manhole w/32" Cone 48" & 60" I.D. Manhole w/32" Cone 48" & 60" I.D. Manhole w/32" Cone 48" & 60" I.D. Manhole w/32" Cone Meyer Polycrete Pipe Type 8 Maintenace Shaft (Poopit) Relmer MSP Strong Seal MS2A Rehab System MH repair product to stop infiltration Vinyl Polyester Repair Product ASTM A536 AASHTO M306-04 ASSFITO M105 & ASTM A536 ASTM A 48 ASTM A 48 ASTM A 48 ASTM A 48 ASTM C 478 ASTM C-443 ASTM C 478 ASTM C 478 ASTM C 478 ASTM C 478 ASTM C-76 ASTM C-76 ASTM C-77 ASTM C-478; ASTM C-923; ASTM C-443 ASTM D5813 Updated: 11-6-24 Size SS MH Traffic and Non -traffic area Non -traffic area Non -traffic area 24"x40" WD 24" Dia. 24" Dia. 24" Dia. 30" Dia. 24" dia. 24" dia. 24" Dia, 30" Dia. 30" Dia. 30" Dia 30" Dia 30" Dia 30" Dia 30" Dia. 30" Dia. 30" Dia. 30" Dia. 24" Dia. 24" Dia. 24" Dia. 24" Dia. 24" Dia. 24" Dia. 48" 48" 48" w/32" cone 72" 48", 60" 48" to 84" I.D. 48" to 72" 60" & 72" 48" 48" & 60" 48" & 60" Non Traffic Areas For use when Std. MH cannot be installed due to depth I I I I I I I Misc. Use I I * From Original Standard Products List FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST (Approval Spec No. IClasssification I Manufacturer Water & Sewer - Manholes & Bases/Rehab Svstems/NonCementitious I 05/20/96 E1-14 Manhole Rehab Systems Smayrou, I 12/14/01 Coating for Corrosion protection(Exterior) ERTECH I01/31/06 Coatings for Corrosion Protection Chesterton I8/28/2006 Coatings for Corrosion Protection Warren Environmental 33 11 16, 33 3111, 03/19/18 333920 Coating for Corrosion protection(Exterior) Sherwin Williams I Water & Sewer - Manhole Inserts - Field Onerations Use Onlv (Rev 2/3/16) I* 33 05 13 Manhole Insert Knutson Enterprises I* 33 05 13 Manhole Insert South Western Packaging I * 33 05 13 Manhole Insert Noflow-Inflow I 09/23/96 33 05 13 Manhole Insert Southwestem Packing & Seals, Inc. I 09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. I Water & Sewer - Pine Casine Spacers 33-05-24 (07/01/131 11/04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. 04/22/87 Casing Spacers Cascade Waterworks Manufacturing 09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator 09/14/10 Coated Steel Cosin Spacers Pipeline Seal and Insulator 05/10/11 Stainless Steel Casing Spacer Powerseal 03/19/18 Casing Spacers BWM 03/19/18 Casing Spacers BWM 03/29/22 310 13 Casing Spacers CCI Pipeline Systems 09/03/24 33 0 13 Casing Spacers Ravi (Completely BETE) I Water & Sewer - Pines/Ductile Iron 33-11-10(1/8/13), I * 33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co. 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. * 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. I Water & Sewer - Utility Line Marker (08/24/2018) I Sewer - Coatines/EDoav 33-39-60 (01/08/13). IO2/25/02 Epoxy Lining System Sauereisen, Inc I 12/14/01 Epoxy Lining System Ertech Technical Coatings I04/14/05 Interior Ductile Iron Pipe Coating Induron I01/31/06 Coatings for Corrosion Protection Chesterton I8/28/2006 I Coatings for Corrosion Protection Warren Environmental I Sewer - Coatines/Polvurethane I I Sewer - Combination Air Valves I 05/25/18 I 33-31-70 1 Air Release Valve A. -I. USA, Inc. I Sewer - Pioes/Concrete * EI-04 Conc. Pipe, Reinforced Wall Concrete Pipe Co. Inc. * EI-04 Conc. Pipe, Reinforced Hydro Conduit Corporation * EI-04 Conc. Pipe, Reinforced Hanson Concrete Products * EI-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc Sewer - Pioe Enlar¢ment Svstem (Method)33-31-23 (01/18/13) PIM System PIM Corporation McConnell Systems McLat Construction I TRS Systems Trenchless Replacement System Sewer- P1De/Fiberglass Reinforced/33-31-13(1/8/13) I 7/21/97 3331 13 Cent. Cast Fiberglass (FRP) Hobas Pipe USA, Inc. I 03/22/10 3331 13 Fiberglass Pipe (FRP) Ameron I 04/09/21 3331 13 Glass -Fiber Reinforced Polymer Pipe (FRP) Thompson Pipe Group 03.7/23 3331 13 Fiberglass Pipe (FRP) Future Pipe Industries 09/03/24 I 3331 13 Fiberglass Pipe (FRP) Superlit Berm Sanar A.S. Model No. Spray Wall Polyurethane Coating Series 20230 and 2100 (Asphatic Emulsion) Are 791, S1HB, Sl, S2 S-301 and M-301 RR&C Dampproofing Non-Fibered Spray Grade (Asphatic Emulsion) Made to Order - Plastic Made to Order - Plastic Made to Order - Plastic LifeSaver - Stainless Steel TetherLok - Stainless Steel Carbon Steel Spacers, Model SI Stainless Steel Spacer, Model SSI Casing Spacers Stainless Steel Casing Spacer Coated Steel Casing Spacers 4810 Powerchock SS-12 Casing Spacer(Stainless Steel) FB-12 Casing Spacer (Coated Carbon Steel) for N._pressme Pipe and Grouted Casing CSC12, CSS12 Per Manufacturers Requirements (Sewer Applications Only) Super Bell-Tite Ductile Iron Pressure Pipe, Amerman Futile Pipe (Bell Spigot) American Flex Ring (Restrained Joint) S—Gard 21ORS Ertech 2030 and 2100 Series Protecto 401 Are 791, S1HB, S1, S2 S-301 and M-301 National Spec ASTM D639/D790 Acid Resistance Teat ASTM D 1248 ASTM D 1248 ASTM D 1248 AW WA C150, C151 AW WA C150, C151 AW WA C150, C151 AWWA C150, C151 AW WA C150, C151 LA County 9210-1.33 ASTM B-117 Acid Resistance Test D025LTP02(Composite Body) AST. C 76 Class III T&G, SPL Item #77 ASTM C 76 ASTM C 76 ASTM C 76 Polyethylene Polyethylene Polyethylene Hobas Pipe (Non -Pressure) Bondstrand RPMP Pipe Thompson Pipe (Flowtite) Fiberstrong FRP Superht FRP PIM Corr., Piscata Way, N.J. Houston, Texas Calgary. Canada ASTM D3262/D3754 ASTM D3262/D3754 ASTM D3262/D3754 ASTM D3262, ASTM D3681, ASTM D4161, AW WA M45 ASTM D3262, ASTM D3517, ASTM 3754, AW WA C950 Updated: 11-6-24 Size I I Structures Only I Sewer Applications I Sewer Applications I For Exterior Coating of Concrete Structures Only I I For 24" dia. I For 24" dia. I For 24" dia. I For 24" dia. I For 24" dia I I I I I I Up to 48" Up to 48" Up to 48" 8" - 12" (Sewer Only) I I I 3" thin 24" 4" it— 30" 4" thru 30" I I I I I I I Ductile Iron Pvc Only I Sewer Applications I sewer Applications I I I I I I 2" I I I I I I I I I I Approved Previously I Approved Previously I Approved Previously I I I I I I * From Original Standard Products List 2 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 11-6-24 IApprovall Spec No. [Classsification I Manufacturer I Model No. I National Spec I Size Sewer - Pioe/Polvmer Pioe 4/14/05 Polymer Modified Concrete Pipe Amitech USA Meyer Polycrete Pipe AS— C33, -16, -11 8" to 102", Class V 06/09/10 EI-9 Reinforced Polymer Concrete Pipe US Composite Pipe Reinforced Polymer Concrete Pipe ASTM C-76 Sewer - Piues/HDPE 33-31-23(1/8/13) * polyethylene pipe Phillips Dnscwpipe, Inc. Gpticore Ductile Polyethylene Pipe ASTM D 1248 8" * �1lipla-de"ity ILgh-density polyethylene pipe Plexco Inc. ASTM D 1248 8" * High -density polyethylene pipe Polly Pipe, Inc. ASTM D 1248 8" High -density polyethylene pipe CSR Hydro Condun/Piveline Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - PiDes/PVC (Pressure Sewer) 33-11-12 (4/1/131 12/02/11 33-11-12 DR-14 PVC Pressmc Pipe P,pelife letstream PVC Pressure Pipe AW WA C900 4" thou 12" 10/22/14 33-11-12 DR-14 PVC Pressure Pipe Royal Building Products Royal Seal PVC Pressure Pipe AW WA C900 4" thru 12" Sewer - PiDes/PVC* 33-31-20 (7/1/13) * 33-31-20 PVC Sewer Pipe 1-M Manufacturing Co., Inc. (1M Eagle) SDR-26 (PSI 15) ASTM D 3034 4" - 15" 12/23/97* 33-31-20 PVC Sewer Pipe Diamond Plastics Corporation SDR-26 (PSI 15) ASTM D 3034 4" thou 15" * 33-31-20 PVC Sewer Pipe Lamson Vylon Pipe SDR-26 (PSI 15) ASTM D 3034 4" thou 15" 12/05/23 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe SDR-26 (PSI 15) ASTM D3034 4" thou 15" 12/05/23 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe Gravity Sewer PS 115 ASTM F 679 18" * 33-31-20 PVC Sewer Pipe 1-M Manufacturing Co, Inc. (1M Eagle) PS 115 ASTM F 679 18" - 28" 05/06/05 33-31-20 PVC Solid Wall Pipe Diamond Plastics Corporation PS 115 ASTM F-679 18" to 48" 04/27/06 33-31-20 PVC Sewer Fittings Harco SDR-26 (PS 115) Gasket Fittings ASTM D-3034, D-1784, etc 4" - 11" * 33-31-20 PVC Sewer Fittings Plastic Trends, Inc.(Westlak) Gasketed PVC Sewer Main Fnnngs ASTM D 3034 3/19/2018 33 3120 PVC Sewer Pipe Pipelife Jet Stream SDR 26 (PS 115) ASTM F679 18"- 24" 3/19/2018 33 31 20 PVC Sewer Pipe Pipelife Jet Stream SDR 26 ASTM D3034 4"- 15" 3/29/2019 33 3120 Gasketed Fittings (PVC) GPK Products, Inc. SDR 26 ASTM D3034 4"- 15" 10/21/2020 33 3120 PVC Sewer Pipe NAPCO(Westlak) SDR 26 ASTM D3034 4" - 15" 10/22/2020 33 3120 PVC Sewer Pipe Sanderson Pipe Corp. SDR 26 ASTM D3034 4"- 15" 10/21/2020 33 3120 PVC Sewer Pipe NAPCO(Westlak) SDR 26 PS 115 ASTM F-679 18"-36" * From Original Standard Products List FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST (Approval Spec No. Classsification Manufacturer Model No. National Spec Water - Ammr enances 33-12-10 (07/01/13) 09/03/24 33-12-10 Double Strap Saddle Ford Meter Box Co, hrc. 202B 01/18/18 33-12-10 Double Strap Saddle Ronnie 202NS Nylon Coated AW WA C800 08/28/02 Double Strap Saddle Smith Blau 4317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AW WA C800 03/07/23 33-12-10 Double Strap Service Saddle Powerseal 3450AS, Incl. Corp. Stop, Dbl Strap, Stainless NSF ANSI 372 10/27/97 Curb Stops -Hall Meter Valves McDonald 610UM,6100MT & 610MT 1./17/87 Curb Stops -Ball Meter Valves McDonald 4603B, 4604B, 6100M, 610OTM and 6101M FB600-7NL, FB1600-7-NL, FV23-777-W-NL, 111101. 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co, Inc. 122-77NL AW WA C800 FB600-6-NL, FB1600-6-NL, FV23-666-W- 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co, Inc. NL, L22-66NL AW WA C800 FB600-4-NL, FB1600-4-NL, B11-444-WR- 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co, Inc. NL, B22444-WR-NL, L28-44NL AW WA C800 B-25000N, B-24277N-3, B-20200N-3, H- AW WA C800, ANSF 61, 5/25/2018 33-12-10 Club Stops -Ball Meter Valves Mueller Co, Ltd. 15000N, , H-1552N, H142276N ANSI/NSF 372 B-25000N, B-20200N-3, B-24277N-3,H- AW WA C800, ANSF 61, 5/25/2018 33-12-10 Cub Stops -Ball Meter Valves Mueller Co, Ltd. 15000N, H-14276N, H-15525N ANSI/NSF 372 B-25000N, B-20200N-3,H-15000N, H- AW WA C800, ANSF 61, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co, Ltd. 1553ON ANSI/NSF 372 01/26/00 Coated Tapping Saddle with Double SS Straps JCM Industries, Inc. #406 Double Band SS Saddle 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steep JCM Industries, he. 412 Tapping Sleeve ESS AW WA C-223 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steep JCM Industries, Inc. 415 Tapping Sleeve AW WA C-223 05/10/11 Tapping Sleeve (Stainless Steep Powerseal 3490AS (Flange) & 3490MJ 02/29/12 33-12-25 Tapping Sleeve (Coated Steep Romac FTS 420 AW WA C-223 02/29/12 33-12-25 Tapping Sleeve (Stainless Steep Romac SST Stainless Steel AW WA C-223 02/29/12 33-12-25 Tapping Sleeve (Stainless Steep Ronnie SST III Stainless Steel AW WA C-223 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp Plastic Meter Box w/Composite Lid DEW Plastics Inc. DFW37C-12-1EPAF FTW Plastic Meter Box w/Composite Lid DEW Plastics Inc. DFW39C-12-1EPAF FTW 08/30/06 Plastic Meter Box w/Composite Lid DEW Plastics Inc. DFW65C-14-]EPAF FTW Concrete Meter Box Bass & Bays CMB37-B12 1118 LID-9 Concrete Meter Box Bass & Hays CMB-18-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CMB65-1365 1527 LID-9 Water - Bolts. Nuts. and Gaskets 33-11-05 (01/08/13) None � Water - Combination Air Release 33-31-70 (01/08/13) * E1-11 Combination Air Release Valve * E1-I I Combination Air Release Valve * EI-11 Combination Air Release Valve Water - Dry Barrel Fire Hvdrants 33-12-40 (01/15/14) 10/01/87 E-1-12 Dry Barrel Fire Hydrant 03/31/88 E-1-12 Dry Barrel Fire Hydrant 09/30/87 E-1-12 Dry Barrel Fire Hydrant 01/12/93 E-1-12 Dry Barrel Fire Hydrant 08/24/88 E-1-12 Dry Barrel Fire Hydrant E-1-12 Dry Barrel Fire Hydrant 09/24/87 E-1-12 Dry Barrel Fire Hydrant 10/14/87 E-1-12 Dry Barrel Fire Hydrant 01/15/88 E1-12 Dry Barrel Fire Hydrant 10/09/87 E-1-12 Dry Barrel Fire Hydrant 09/16/87 E-1-12 Dry Barrel Fire Hydrant 08/12/16 33-12-40 Dry Barrel Fire Hydrant Water - Meters 02/05/93 E101-5 Detector Check Meter 08/05/04 Magnetic Drive Vertical Turbine GA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A Multiplex Manufacnning Co. Crispin Air and Vacuum Valves, Model No. Valve and Primer Corp. APCO #143C, #145C and #147C Updated: 11-6-24 Size 1"-2" SVC, up to 16" Pipe 1"1" SVC, up to 24" Pipe 1"-2" SVC, up to 24" Pipe 1"-2" SVC, up to 24" Pipe 3/4" and 1" 1'/:" and 2" 2" 1-1/2" 1" 2" 1" 1"-2" Taps on up to 12" Up to 30" w/l2" Out Concrete Pipe Only 4%8" and 16" U p to 42" w/24" Out Up to 24" w/12" Out Up to 30" w/12" Out 4" to 30" Class "A V&2" 1/2" 1"&2" 1" 2" & 3" American -Darling Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 American Darling Valve Shop Drawing No. 94-18791 AW WA C-502 Clow Corporation Shop Drawing No. D-19895 AW WA C-502 American AVK Company Model 2700 AW WA C-502 Clow Corporation Drawings D20435, D20436, B20506 AW WA C-502 ITT Kennedy Valve Shop Drawing No. D-80783FW AW WA C-502 M&H Valve Company Shop Drawing No. 13476 AW WA C-502 Shop Drawings No. 6461 Mueller Company A423 Centmron AW WA C-502 Shop Drawing FH-12 Mueller Company A-423 Super Centurion 200 AW WA C-502 U.S. Pipe & Foundry Shop Drawing No. 960250 AW WA C-502 American Flow Control (AFC) Waterous Pacer WB67 AW WA C-502 EJ (East Jordan Iron Works) WaterMaster 5CD250 Ames Company Model 1000 Detector Check Valve AW WA C550 4" - 10" Hersey Magnetic Drive Vertical AW WA C701, Class 1 3/4" - 6" * From Original Standard Products List 4 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 11-6-24 IApprovall Spec No. IClasssification I Manufacturer Model No. National Spec Size Water - Pines/PVC (Pressure Water) 33-31-70 (01/08/13) AWWA C900, AWWA C605, 1.113 33-1142 PVC Pressure Pipe Vinyltech PVC Pipe DR14 ASTM D1784 4"-16" AWWA C900, AWWA C605, 1.113 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR18 ASTM D1784 16"-18" AWWA C900, AWWA C605, 09/03/24 33-11-12 PVC Pressure Pipe Northern Pipe Products DR14 ASTM D1784 4"-16" AWWA C900, AWWA C605, 09/03/24 33-11-12 PVC Pressure Pipe Northem Pipe Products DR18 ASTM D1784 16"-18" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR14 AWWA C900 4"-12" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AWWA C900 16"-24" 5/25/2018 3311 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AWWA C900 4"-12" 5/25/2018 3311 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AWWA C900 16"-24" AWWA C900-16 UL 1285 12/6/2018 3311 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/h/a JM Eagle DR 14 ANSIMSF 61 4"-28" FM 1612 AWWA C900-16 UL 1285 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/h/a JM Eagle DR 18 ANSIMSF 61 16"-24" FM 1612 9/6/2019 3311 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 331112 PVC Pressure Pipe NAPCO(Westlake) DR18 AWWA C900 16"-24" 9/6/2019 33 1112 PVC Pressure Pipe NAPCO(Westlake) DR14 AWWA C900 4"- 12" 9/6/2019 3311 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 AWWA C900 4"- 12" Water - PinesNalves & Fittinas/Ductile Iron Fittings 33-11-11 (01/08/13) 07/23/92 EI-07 Ductile Iron Fittings 'tar Pope Produces, Inc. Mechanical Joint Fittings AWWA C153 & CHO * EI-07 Ductile Iron Fittings Griffin Pipe Products, Co. Mechanical Joint Fittiil� AWWA C 110 * EI-07 Ductile Iron Fittings McWane/Tyler Pipe/ Union Utilities Division Mechanical Joint Fittings, SSB ass 350 AW WA C 153, C I IO, C 111 08/11/98 E1-07 Ductile Iron Fittings Sigma, Co. Mechanical Joint Fittings, SSB Class 351 AWWA C 153, C 110, C 112 02/26/14 E1-07 MJ Fittings Accucast Class 350 C-153 MJ Fittings AW WA C153 4"-12" 05/14/98 EI-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1400 AW WA CI I I/CI53 4" to 36" 05/14/98 EI-24 PVC Joint Restraints Ford Meter Box Co.fUni-Flange Uni-Flange Series 1500 Circle -Lock AW WA CI I I/CI53 4" to 24" 11/09/04 EI-07 Ductile Iron Joint Restraints One Bolt, Inc. One Bolt Restrained Joint Fitting AW WA CI I I/CI16/CI53 4" to 12" 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inp. Megalug Series 1100 (for DI Pipe) AW WA CI I I/CI16/CI53 4" to 42" 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 2000 (for PVC Pipe) AW WA CI I I/CI16/CI53 4" to 24" 08/05/04 EI-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLC4 - SLCIO AWWA Cl I VC153 4" to 10" 03/06/19 33-I1-I1 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCS4 - SLCS12 AWWA Cl I1/C153 4" to 12" 08/05/04 EI-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCE AWWA Cl I I/C153 12" to 24" 08/10/98 E1-07 MJ Fittings(DIP) Sigma, Co. Sigma One-Lok SLDE AWWA C153 4" - 24" 10/12/10 E1-24 Interior Restrained Joint System S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-I624 4" to 12" 08/16/06 EI-07 Mechanical Joint Fittings SIP Industries(Serampore) Mechanical Joint Fittings AWWA C153 4" to 24" 11/07/16 33-I1-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargrip Series 4000 ASTM A536 AW WA CIII 11/07/16 33-I1-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stargrip Series 3000 ASTM A536 AW WA CIII EZ Grip Joint Restraint (EZD) Black For DIP 03/19/18 33-I1-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) ASTM A536 AW WA CIII 3"-48" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 3341-11 Mechanical Joint Retainer Glands SIP Industnes(Serampore) DR14 PVC Pipe ASTM A536 AW WA CI I I 4"-12" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 3341-11 Mechanical Joint Retainer Glands SIP Industnes(Serampore) DR18 PVC Pipe ASTM A536 AW WA C111 16"-24" * From Original Standard Products List 5 FORT WORTH. (Approval I 12/11/02 I 08/31/99 I 05/18/99 I 10/24/00 I 08/05/04 I 05/23/91 I 01/24/02 11/08/99 01/23/03 05/13/05 01/31/06 01/28/88 10/04/94 11/08/99 11/29/04 11/30/12 05/08/91 10/26/16 08/24/18 1/11/99 06/12/03 04/06/07 03/19/18 09/03/24 05/12/05 05/12/05 05/12/05 09/06/19 I 03/07/23 09l02F24 CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Spec No. �Classsification Manufacturer Water - Pinea alves & Fittings/Resilient Seated Gate alve* 33-12-20 (05/13/151 Readrent Wedged Gate Valve w/no Gears Resilient Wedge Gate Valve Resilient Wedge Gate Valve Resilient Wedge Gate Valve E1-26 Resilient Wedge Gate Valve Resilient Wedge Gate Valve EI-26 Resilient Wedge Gate Valve EI-26 Resilient Wedge Gate Valve E1-26 Resilient Seated Gate Valve E1-26 Resilient Seated Gate Valve E1-26 Resilient Seated Gate Valve Resilient Wedge Gate Valve Resilient Wedge Gate Valve Resilient Wedge Gate Valve Resilient Wedge Gate Valve E1-26 Resilient Wedge Gate Valve Resilient Wedge Gate Valve EI-26 Resilient Wedge Gate Valve Resilient Wedge Gate Valve Resilient Wedge Gate Valve EI-26 Resilient Seated Gate Valve E1-26 Resilient Seated Gate Valve 33-12-20 Resilient Seated Gate Valve Mateo Gate Valve American Flow Control American Flow Control American Flow Control American Flow Control American Flow Control American Flow Control American AVK Company American AVK Company Kennedy M&H Mueller Co. Mueller Co. Mueller Co. Mueller Co. Mueller Co. Clow Valve Co. Clow Valve Co. Clow Valve Co. Clow Valve Co. Clow Valve Co. Stockham Valves & Fittings U.S. Pipe and Foundry Co. EJ (East Jordan Iron Works) Matco-Norca Water - Pil/es/Valve9 & Fittings/Rubber Seated Butterfly Valve 33-12-21 (07/10/14) Model No. Series 2500 Drawing # 94-20247 Series 2530 and Series 2536 Series 2520 & 2524 (SD 94-20255) Series 2516 (SD 94-20247) Series 2500 (Ductile Iron) 42" and 48" AFC 2500 American AVK Resilient Seaded GV Series A2361 (SD 6647) Series A2360 for 18"-24" (SO 6709) Mueller 30" & 36", C-515 Mueller 42" & 48", C-515 16" RS GV (SD D-20995) Clow RW Valve (SD D-21652) Clow 30" & 36" C-515 Clow Valve Model 2638 Metrosea1250, requirements SPL #74 El Fl—Master Gate Valve & Boxes 225 MR National Spec AW WA C515 AW WA C515 AW WA C515 AW WA C515 AW WA C515 AW WA C509 AW WA C515 AW WA C515 AW WA C515 AW WA C515 AW WA C509 AW WA C515 AW WA C515 AW WA C515 AW WA C515 AW WA C 509, ANSI 420 - stem AW WA/ANSI C115/An21.15 E1-30 Rubber Seated Butterfly Valve Henry Pratt Co. AW WA C-504 E1-30 Rubber Seated Butterfly Valve Mueller Co. AW WA C-504 E1-30 Rubber Seated Butterfly Valve Dezmik Valves Co. AW WA C-504 E1-30 Valmatic American Butterfly Valve Valmatic Valve and Manufacturing Corp Valmatic American Butterfly Valve. AW WA C-504 E1-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AW WA C-504 33 1221 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) AW WA C504 Butterfly Valve AW WA C-504 33 1221 Rubber Seated Butterfly Valve American AVK Company AW WA C504 Butterfly Valve Class 250B AW WA C-504 Water - Polvet] vlene Encasement 33-11-10 (01/08/13) EI-13 Polyethylene Encasment E1-13 Polyethylene Encssment EI-13 Polyethylene Encasment 33-I1-11 Polyethylene Encasment Water - Samuline Station 33 12 50 Water Sampling Station 3341—M Water - Automatic Flusher 10/21/20 Automated Flushing System 04/09/21 Automated Flushing System 04/09/21 Automated Flushing System I Flexsol Packaging Fulton Enterprises Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AEP Industries Bullstrong by Cowtown Bolt & Gasket Northtown Products Inc. PE Encasement for DIP Kupf le Foundry Company Mueller Hydroguard Kupferle Foundry Company Kupferle Foundry Company Eclipse, Number M , 12-inch Depth of Bury Proof, Hasp for Locking Access !latch HG6-A-IN-2-BRN-LPRR(Portable) HG2-A-IN--2-PVG0I8-LPLG(Permanent) Eclipse #9800wc Eclipse #9700 (Portable) AW WA C105 AW WA C105 AW WA C105 AWWAC105 This product removed Updated: 11-6-24 Size I 16" I 30" and 36" I 20" and 24" I 16" I 4" to 12" I 42" and 48" I 4" to 12" I 20" and smaller I 4" - 12" I 4" - 12" I 4" - 12" I 16" I 24" and smaller I 30" and 36" I 42" and 48" I 4" - 12" I 16" I 24" and smaller I 30" and 36" (Note 3) I 24" to 48" (Note 3) 4" - 12" 3" to 16" I 4" to 16" I I I 24" I 24"and smaller I 24" and larger I Up to 84" diameter 24" to 48" I 30"-54" I 24" - 48" I I I 8 mil LLD 8 it LLD I 8 and LLD 8 mil LLD I I I As shown m spec 33 12 50 I The Fort Worth Water Department's Standard Products List has been developed to minimize the submittal review ofproducts which meet the Fort Worth Water Department's Standard Specifications during utility construction projects. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's Standard Products List and approval ofthe specific products will be based on the requirements of the Technical Specification whether in not the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Fort Worth Water —Yellow Highlight indicates recent changes * From Original Standard Products List CFW Lighting Approved Products List CFW Product Name Manufacturer I Manufacturer Product Name & Description Residential -Standard MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Makers Sales and Marketing, LLC Galvanized MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Type 11 Pole Makers Sales and Marketing, LLC Black D601373(page 1 of 6)-Shoe Base Pole Type 11, Valmont Industries, Inc Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Black Type 33B Arm Valmont Industries, Inc D1301373(page 4 of 6)-Single Arm Type 33B, Galvanized American Electric Lighting, ATB0-P101-Mvolt-R2-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD325607 American Electric Lighting, ATBO-P101-Mvolt-R4-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD325606 Residential Luminaire American Electric Lighting, ATBO-P101-Mvolt-R2-3K-BK- Acuity Brands Lighting, Inc. MP-NL-P7-AO-RFD325609 American Electric Lighting, ATB0-P101-Mvolt-R4-3K-BK- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD325608 McFarland Cascade CREOSOTE 30/35 FOOT TIMBER POLE Timber Pole Bayou Forest Products 30-35' .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Galvanized Wood Pole Arm Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Black Valmont Industries, Inc D1301373(page 6 of 6)-Wood Pole Arm, Galvanized Arterial -Standard MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Makers Sales and Marketing, LLC Galvanized MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Type 18 Pole Makers Sales and Marketing, LLC Black DB01373(page 2 of 6)-Shoe Base Pole Type 18, Valmont Industries, Inc Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Black Type 33A Arm Valmont Industries, Inc D1301373(page 3 of 6)-Single Arm Type 33A, Galvanized American Electric Lighting, ATBO-P303-Mvolt-R2-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322792 American Electric Lighting, ATBO-P303-Mvolt-R4-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322794 Arterial Luminaire American Electric Lighting, ATBO-P303-Mvolt-R2-3K-BK- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322793 Acuity Brands Lighting, Inc. American Electric Lighting, ATBO-P303-Mvolt-R4-3K-BK- M P-N L-P7-AO-RFD322795 McFarland Cascade CREOSOTE 35/40 FOOT TIMBER POLE Timber Pole Bayou Forest Products 30-35' .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Galvanized Wood Pole Arm Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Black Valmont Industries, Inc DB01373(page 5 of 6)-Wood Pole Arm, Galvanized Decorative -Pedestrian Holophane, CLA 10.6(OAL)FT J20P07BK-MOD, AB-31-4 Washington 10' Pole Acuity Brands Lighting, Inc. RFD110736 Holophane, CLA14FT J20DMODC03BK RFD325026, AB- Washington 14' Pole Acuity Brands Lighting, Inc. 16-4 SPEC RFD325026 Holophane, WFCL3 P40 30K MVOLT FC3 NF BK AO PR7 Washington Luminaire Acuity Brands Lighting, Inc. FRGL RFD338699 Washington Globe Holophane, AWDE3 P40 30K MVOLT MS AL3 BK PR7 Luminaire Acuity Brands Lighting, Inc. AO RFD-315548 Oleander Type A Pole Acuity Brands Lighting, Inc. Holophane, PDA 12S5L20POBBK-MOD Oleander Type B Pole Acuity Brands Lighting, Inc. Holophane, PDA20S5L20P08BK-MOD Oleander Type B Arm Acuity Brands Lighting, Inc. Holophane, OHC 151N 2A TN BK Holophane, AUCL2 P40 30K AS BK L3 N P7 AO Oleander Luminaire Acuity Brands Lighting, Inc. RFD338741 Berry 12' Pole Acuity Brands Lighting, Inc. Holophane, RSA 12 50 G12 SC BK AB-26-4 RFD326400 Berry 20' Pole Acuity Brands Lighting, Inc. Holophane, PD20S5J20P11BK RFD338816 Berry Arm Acuity Brands Lighting, Inc. Holophane, VLC 271N 1A TN QSM BK Holophane, GPLF3 P40 30K MVOLT ASY QSM BK PR7 Berry Luminaire Acuity Brands Lighting, Inc. AO SH Banner Arms Acuity Brands Lighting, Inc. Holophane, BA-241N-2A-CO-S4J-BL-075P-BK System Rigid Nonmetallic Schedule 80 Conduit, Meets UL 651 Cantex Inc. specifi cations and NEMA TC2, Rated for 90°C Cable, Sunlight Resistant, 10' Lengths and 20' lengths Rigid Nonmetallic Schedule 80 Electric Conduit, Meets UL 651 specifications, RUS listed, NEMA TC-2 and Heritage Plastics NEMA TC-3, Rated for 90°C Cable, Sunlight & Weather Conduit Resistant PVC Rigid Schedule 80 Conduit, Conforms to UL 651 Atkore-Heritage Plastics and NEMA TC 2, Sunlight Resistant, Listed for 90°C conductors or cable Schedule 80 PVC Rigid Nonmetallic Conduit, Extra Prime Conduit, Inc Heavy Wall EPC-80, Sunlight resistant, Rated for use with 90°C conductors, Meets UL651 Splice Kit With Connector NSi Industries, LLC Gel Stub Splice Kit with Connector, Easy -Splice, ESSLK Series Copper Wire/Conductor Southwire Encore Wire Encore Wire Service Wire Co Advanced Digital Cable Inc Aluminum Wire -Triplex Priority Wire & Cable, Inc Fuse & Fuse Holder Edison Edison Cooper EATON EATON Connector Thomas & Betts Metered Pedestal 120-240V Electrol Systems, Inc WE Manufacturing & Controls Metered Pedestal 240- Electrol Systems, Inc 480V WE Manufacturing & Controls Ground Box Kearneys Photocell Shorting Caps MacLean Highline Oldcastle Type XHHW-2 copper conductor, 600V TYPE XHHW-2 / RW90, copper conductor, Superslick Elite, 600V/1000V THHN / MTW / THWN-2 Copper conductor, 600V Servicepro-X XHHW-2, 600/1,000 Volt Copper, CT Rated XHHW-2 Low Smoke Halogen Free, Cross -linked Polyethylene Insulated 14 AWG-750 MCM, 600 Volts, 90°C Dry and wet Triplex Overhead Aluminum Conductor General Purpose, Midget Class MEN Fuses, Voltage Rating: MEN - 250 VAC, Ampere Rating: 0.5 - 30 Amps, Interrupting Rating: 10,000 RMS Amps @ 125V Modular Ferrule Fuse Blocks for Midget Class and CC Fuses In -line fuse holders for Single -Pole 13/32" x 1 1/2" Fuses HEB-AA Bussmann Series, HEB breakaway and non -breakaway in -line fuse holders for UL 13/32" x 1- 1/2"supplemental fuses Bussmann Series, FNM 13/32" x 1-1/2" 250Vac time - delay supplemental fuses Wire Joints for Copper Conductor, Cat No: 54615, 54620, 54625-TB, 54635, 54640, 54630 TY A (120/240) 100(NS)AL(E)PS(U) TY A 120/240 100(NS)AL(E)PS(U) TY A (240/480) 100(NS)AL(E)PS(U) TY A 240/480 100(NS)AL(E)PS(U) Polymer Concrete, PHA132412X0002: TIER 22 (X) 22, 500l bs Polymer Concrete, H-SERIES UNIT, H1730-24 TIER-22 - TXDOT 2x 1/2" CAPTIVE BOLT- 2x BRASS FLOATING NUT Polymer Concrete, H-SERIES UNIT, H1324-24 TIER-15 - Oldcastle TXDOT 2x 1/2" CAPTIVE BOLT- 2x BRASS FLOATING NUT NSi Industries, LLC Split Bolt Connectors, Copper Split Bolts 2 Wire, N Series Dark To Light, DLL Elite, Electronic Locking, Type Acuity Brands Lighting, Inc. Photocontrol, DLL-127 or DLL-480 Acuity Brands Lighting, Inc. Dark To Light, Part # DSHORT SBK U Interim Products Residential Luminaire ITRASTAR INC. Arterial Luminaire ITRASTAR INC. DU RA-STR10A-3K-120-3-G R-SCL D U RA-STR25-3 K-120-3-G R-SCL