Contract 63741-PM1
CSC No. 63741-PM1 PROJECT MANUAL FOR THE CONSTRUCTION OF WATER, SANITARY SEWER, PAVING, STREET LIGHT & DRAINAGE IMPROVEMENTS TO SERVE BROOKFIELD FRONTIER INDUSTRIAL IPRC Record No. IPRC24-0010 City Project No. 105490 FID No.30114-0200431-105490-EO7685 File No. W-3043 X File No. X-28126 Mattie Parker Jesus "Jay" Chapa Mayor City Manager Christopher P. Harder, P.E. Director, Water Department Lauren Prieur, P.E. Director, Transportation and Public Works Department Prepared for The City of Fort Worth JUNE 2025 " JAIA'1� DUNAWAY ASSOCIATES, L.P. 550 Bailey Avenue, Suite 400 Ft. Worth, TX 76107 Office: 817-335-1121 / Fax: 817-429-1370 TX REG. F-1114 www.dunaway.com DA Project#P008770.002 ® ®� '�F'•TF�fit '• q B . B /...............................� MAURO SANTOS HERNANDEZ ® ..............................� 137107 �v7 ®B �`F•4�CENS�O•���® B�a SS�ONAL •ENG\ 06-09-2025 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 6 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions Last Revised 00 11 13 irviia4io to Bidders 03/20/2020 0021 13 lastFuetions to Bidde :s 03/20/2020 00 41 00 Bid Fe 04/02/2014 00 42 43 Proposal Form Unit Price 05/22/2019 0043 13 Bid Ben 04/02/2014 0045 11 Bidders Pf:eq, alifie tief's 04/02/2014 0045 12 Prequalification Statement 09/01/2015 0045 13 Bidde . Pfegtta1 i;,,a4ien kWiaz.,ian 03/09/2020 00 45 26 Contractor Compliance with Workers' Compensation Law 04/02/2014 00 45 40 r, iner-;ty Business E tefpr- se Goa 08/21/2018 00 52 43 Agreement 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 Maintenance Bond 01/31/2012 00 72 00 General Conditions 11/15/2017 00 73 00 r"„„leme tary Conditions 07/01/2011 0073 10 Standard City Conditions of the Construction Contract for Developer 01/10/2013 Awarded Projects Division 01- General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 013120 D-ejeetMeet;ngs 07/01/2011 01 32 33 Preconstruction Video 08/30/2013 01 33 00 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 50 00 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 7123 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 0177 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 City of Fort Worth Water Department Standard Product List 11/08/2021 CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN.• 105490 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 6 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents NONE CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN.• 105490 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 6 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httD:Hfortworthtexas.aov/tvw/contractors/ or httDs:Hanns.fortworthtexas.Lyov/Proi ectResources/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 12/20/2012 0241 14 Utility Removal/Abandonment 12/20/2012 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 12/20/2012 03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012 0334 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical 26 05 00 Common Work Results for Electrical 11/22/2013 2605 10 Demolition for Electrical Systems 12/20/2012 26 05 33 Raceways and Boxes for Electrical Systems 12/20/2012 26 05 43 Underground Ducts and Raceways for Electrical Systems 07/01/2011 26 05 50 Communications Multi -Duct Conduit 02/26/2016 Division 31- Earthwork 31 1000 Site Clearing 12/20/2012 3123 16 Unclassified Excavation 01/28/2013 31 2323 BE)FFE) 01/28/2013 31 24 00 Em. i-ad1ma-PAs 01/28/2013 31 25 00 Erosion and Sediment Control 12/20/2012 31 36 00 Gabiens 12/20/2012 31 37 00 Riprap 12/20/2012 Division 32 - Exterior Improvements 3201 17 D^,.., anep+ Asphalt Paving Repair- . 12/20/2012 3201 18 A0oralt f\-A-irk 12/20/2012 32 01 29 r'^^efete PaVi g Repa , 12/20/2012 32 1123 Flexible Base Coufs^^ 12/20/2012 32 1129 Lime Treated Base Courses 12/20/2012 32 1133 Cement Treated Base Courses 12/20/2012 32 1137 Liquid Tr^^+^ a tail FXAili ff 08/21/2015 32 1216 A sphah Paying 12/20/2012 32 1273 A ^. ha ft n^.,ing r .^^v Sea' r+^ 12/20/2012 32 13 13 Concrete Paving 12/20/2012 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 06/05/2018 32 1373 Concrete Paving Joint Sealants 12/20/2012 32 14 16 lrial- Una _%:�Mg 12/20/2012 32 16 13 Concrete Curb and Gutters and Valley Gutters 10/05/2016 CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN.• 105490 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 6 32 1723 Pavement Markings 11/22/2013 32 1725 Curb Ad azz llvu:� .rg 11/04/2013 3231 13 Cinr. Fonias and Gates 12/20/2012 32 31 26 Wi .^ Fenees and Gates 12/20/2012 32 31 29 Weed Fences and Gates 12/20/2012 3232 13 Cast i Place C n^.^te D:fn,.-�ing `'4s 06/05/2018 3291 19 Topsoil Placement and Finishing of Parkways 12/20/2012 32 92 13 Hydro -Mulching, Seeding, and Sodding 12/20/2012 32 93 43 Trees 3 f1.-.trubG 12/20/2012 Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 12/20/2012 33 01 31 Closed Circuit Television (CCTV) Inspection 03/03/2016 3303 10 r Du,�-g of Existing Sewer- Systems 12/20/2012 3304 10 jeipA Beading and Qeetfieal 1s la4i -f 12/20/2012 3304 11 Ceffesion C ft,e Test St., iefis 12/20/2012 33 04 12 raagnesitff Anode C.,thedie Pfete tie S ysteffl 12/20/2012 33 04 30 T^mpef -y Water- Se -flees 07/01/2011 33 04 40 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 04 50 Cleaning of Sewer Mains 12/20/2012 3305 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 3305 12 Water Line Lowering 12/20/2012 3305 13 tee, Eev r ,-ad Grade Rings Cast it 01/22/2016 3305 13.10 Frame, Cover and Grade Rings — Composite 01/22/2016 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 12/20/2012 Grade 3305 16 Concrete Water Vaults 12/20/2012 3305 17 Concrete Collars 12/20/2012 33 05 20 ,g 12/20/2012 33 05 21 Tu ewl l.inar- Pla4e 12/20/2012 33 05 22 Steel Casing Pipe 12/20/2012 33 05 23 Ind Turrriling 12/20/2012 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 06/19/2013 33 05 26 Utility Markers/Locators 12/20/2012 33 05 30 Location of Existing Utilities 12/20/2012 33 1105 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/20/2012 33 11 11 Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 11/16/2018 33 11 13 Eenorete P*,z, Bar 114apped Steel Cylinder- Type 12/20/2012 33 11 14 Died Stool Pif"zd Fittings 12/20/2012 33 12 10 Water Services 1-inch to 2-inch 02/14/2017 33 1211 Large Water Meters 12/20/2012 33 1220 Resi efA Sea4ed Gate Valve 12/20/2012 33 1221 AWW4 P_ubsbor. Feated a„tt^.fl., Valves 12/20/2012 33 1225 Connection to Existing Water Mains 02/06/2013 33 1230 Combi.-radar Air- Valve Assemblies Mies for- Potable Wa. er- System 12/20/2012 33 1240 Fire Hydrants 01/03/2014 33 1250 Water Sample Stations 12/20/2012 CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN.• 105490 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 6 33 1260 Standard Blow effValve sseff b! 06/19/2013 33 31 12 Cur-ed ift Dlaee Pipe (CIDU) 12/20/2012 3331 13 Eibffg1xo P_ocfer-ee Pipe for- Gr-av +EG.Iitary s 12/20/2012 3331 15 High Deal t-y Polyethylene (HDPE) Pipe for- Sanitary Sewer- 12/20/2012 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 06/19/2013 33 31 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer 12/20/2012 Pipe 33 31 22 Sa-a Par F)i* liwrff.g 12/20/2012 33 31 23 Sa-ait fy Sewef Pipe E"lar-ge e 12/20/2012 33 31 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 33 31 70 Combi.-Waar Air- Valve anioary Sewef: Fef:ee Mains 12/20/2012 33 39 10 Cast -in -Place Concrete Manholes 12/20/2012 33 39 20 Precast Concrete Manholes 12/20/2012 33 39 30 F-ibcrglxF lees 12/20/2012 33 39 40 Wastewater- n eeess Chaffi ef: (W n C4 12/20/2012 33 39 60 Epoxy Liners for Sanitary Sewer Structures 12/20/2012 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 07/01/2011 3341 11 High Density Polyethylene (HDPE) Pipe for Storm Drain 12/20/2012 3341 12 Reinfer-eed Pelyethlene E) Dina 11/13/2015 33 46 00 e„� 12/20/2012 33 46 01 warm Diuirr 07/01/2011 33 46 02 Tr,-moh Dimionj 07/01/2011 33 49 10 Cast -in -Place Manholes and Junction Boxes 12/20/2012 33 49 20 Curb and Drop Inlets 12/20/2012 33 49 40 Storm Drainage Headwalls and Wingwalls 07/01/2011 Division 34 - Transportation 3441 10 `T'r^ff'^ siggRa °' 10/12/2015 3441 10.01 At4aehffief4 A CepAfeller Cabinet 12/18/2015 3441 10.02 Attaehmeat B Centfallz- ffo men 02/2012 3441 10.03 Att-aehmeat G Se€twafespeeifieatien 01/2012 3441 11 Tempefary "r"^ffi^ Signals 11/22/2013 3441 13 Removing T-"affie Signals 12/20/2012 3441 15 Reetangulx Ram d FlwJ�mg Beaeon 11/22/2013 3441 16 Pedestrian Hybrid Signal 11/22/2013 34 41 20 Roadway Illumination Assemblies 12/20/2012 34 41 20.01 Arterial LED Roadway Luminaires 06/15/2015 34 41 20.02 Freeway LED Road"' 06/15/2015 34 41 20.03 Residefftial LED Rod w Dan. irswi--s 06/15/2015 34 41 30 Aluminum Signs 11/12/2013 34 41 50 Single rlede Fite- Optie C 02/26/2016 3471 13 Traffic Control 11/22/2013 CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN.• 105490 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 6 of 6 Appendix CC4,J 1 a N ck ity-aPLapAs GG 4.02 F/abiYarfaee and P'--siea4 Conditions 7o, .. ,, 1 > n :l:t:on l� a GG 4.06 Ha af:deus >~tw:,., nfner+.,l C nditior at Site GG 6.$6.D )\ ` `�'7 ITT. g -1 t C 6. 19 Dv,-m is and Utilities GC 6. 1 Nandis3nmrzatiaa 34 41 20 LED PILOT PROGRAM CFW LED Residential 100-150W Replacement Specification GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN.• 105490 Revised March 20, 2020 00 42 43 DAP - BID PROPOSAL Page 1 of4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM BROOKFIELD FRONTIER INDUSTRIAL: CPN# - 105490 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity UNIT I: WATER IMPROVEMENTS 1 0241.1118 4" - 12" Pressure Plug 0241 14 EA 3 $500.00 $1,500.00 2 3305.0109 Trench Safety Water 34 05 10 LF 3197 $1.00 $3,197.00 3 3311.0001 Ductile Iron Water Fittings w/ Restraint 33 11 11 TN 5.25 $7,500.00 $39,375.00 4 3311.0141 6" Water Pipe 3311 12 LF 148.5 $55.00 $8,167.50 5 3311.0241 8" Water Pipe 3311 12 LF 208 $100.00 $20,800.00 6 3311.0441 12 Water Pipe 3311 10 LF 2776 $100.00 $277,600.00 7 3311.0451 12 DIP Water 3311 10 LF 64 $112.00 $7,168.00 8 3311.0447 12" Water Pipe, CLMS Backfill 3311 10 LF 20 $140.00 $2,800.00 9 3311.0457 12" DIP, CLSM Backfill 3311 10 LF 40 $120.00 $4,800.00 10 3312.0001 Fire Hydrant 33 1240 EA 10 $4,235.00 $42,350.00 11 3312.0108 Connection to Existing 24" Water Main 33 1225 EA 1 $5,000.00 $5,000.00 12 3312.0117 Connection to Existing 4"-12" Water Main 33 1255 EA 1 $5,000.00 $5,000.00 13 3312.2203 2" Water Service w/ Meter (Domestic) 33 12 10 EA 2 $3,000.00 $6,000.00 14 3312.2203 2" Water Service w/ Meter (Irrigation) 33 1210 EA 4 $3,000.00 $12,000.00 15 3312.3002 6" Gate Valve 33 12 20 EA 10 $1,570.00 $15,700.00 16 3312.3003 8" Gate Valve 33 12 20 EA 5 $2,300.00 $11,500.00 17 3312.3005 12" Gate Valve 33 12 20 EA 10 $4,285.00 $42,850.00 18 3312.4211 24"X12" Tapping Sleeve & Valve 33 12 25 EA 1 $16,940.00 $16,940.00 19 3471.0001 Traffic Control (WL Improvements Only) 3471 13 MO 1 $5,477.14 $5,477.14 20 9999.0001 Remove Existing Fire Hydrant 99 99 99 EA 1 $1,750.00 $1,750.00 21 9999.0002 Water Lowering 99 99 99 EA 2 $7,500.00 $15,000.00 22 9999.0003 12" Restrained Gate Valve 99 99 99 EA 1 $10,000.00 $10,000.00 23 9999.0004 1" Water Service w/ Meter (Domestic) 99 99 99 EA 1 $1,820.00 $1,820.00 24 9999.0005 1" Water Service w/ Meter (Irrigation) 99 99 99 EA 1 $1,820.00 $1,820.00 25 9999.0006 3" Combination Turbine Meter Vault (Domestic) 99 99 99 EA 3 $45,000.00 $135,000.00 26 9999.0007 4" Steel Casing (2" Water Service) 9999 99 LF 60 $100.00 $6,000.00 27 9999.0008 20" Steel Casing (8" Fire Service) 9999 99 LF 20 $230.00 $4,600.00 28 9999.0009 24" Steel Casing (12" DIP Pipe) 9999 99 LF 20 $245.00 $4,900.00 29 9999.0010 2" Service, CLSM Backfill 99 99 99 LF 60 $145.00 $8,700.00 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 TOTAL UNIT I: WATER IMPROVEMENTS $717,814.64 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Tom Version May 22, 2019 Brookfield Bid List UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 00 42 43 DAP - BID PROPOSAL Page 2 of 4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM BROOKFIELD FRONTIER INDUSTRIAL: CPN# - 105490 Bidder's Application Project Item Information Description Specification Unit of Bid Section No. Measure Quantity UNIT II: SANITARY SEWER IMPROVEWF. NTS 0241.1118 4"-12" Pressure Plug 0241 14 EA 1 3301.0002 Post -CCTV Inspection 3301 31 LF 2426 3301.0101 Manhole Vacuum Testing 3301 30 EA 15 3305.0101 Concrete Collar 33 05 17 EA 5 3305.0107 Manhole Adjustment, Minor 33 05 14 EA 2 3305.0109 Trench Safety (Sanitary Sewer) 34 05 10 LF 2426 3305.0113 Trench Water Stops 33 05 15 EA 17 3331.4115 8" Sewer Pipe 3331 20 LF 1746 3331.4119 8" DIP Sewer Pipe 3311 10 LF 377 3331.4201 10" Sewer Pipe 3311 10 LF 303 3331.5747 8" Sewer Pipe, CLSM Backfill 3311 10 LF 50 3331.4116 8" Sewer Pipe, CSS Backfill 3311 10 LF 58 3339.1001 4' Manhole 33 39 20 EA 15 9999.0011 Connect to Existing 10" SSWR 99 99 99 EA 1 9999.0012 Connect to Existing SSWR Manhole 99 99 99 EA 2 9999.0013 20" Steel Casing (8" DIP SSWR) 99 99 99 LF 40 9999.0014 Water Tight Manhole Cover, Rings & Gaskets 99 99 99 EA 1 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Tom Version May 22, 2019 Bidder's Proposal Unit Price I Bid Value $100.00 $100.00 $2.00 $4,852.00 $200.00 $3,000.00 $1,000.00 $5,000.00 $2,500.00 $5,000.00 $1.00 $2,426.00 $1,000.00 $17,000.00 $125.00 $218,250.00 $135.00 $50,895.00 $150.00 $45,450.00 $131.00 $6,550.00 $131.00 $7,598.00 $14,150.00 $212,250.00 $2,409.36 $2,409.36 $3,500.00 $7,000.00 $235.00 $9,400.00 $2,150.00 $2,150.00 $599,330.36 Brookfield Bid List UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 00 42 43 DAP - BID PROPOSAL Page 3 of 4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM BROOKFIELD FRONTIER INDUSTRIAL: CPN# - 105490 Bidder's Application Project Item Information Description Specification Unit of Bid Section No. Measure Quantity UNIT III: DRAINAGE 111FROVEMENTS 3301.0012 Post -CCTV Inspection of Storm Drain 3301 20 LF 4419 3305.0109 Trench Safety Storm 33 05 10 LF 4419 3341.0103 18" RCP, Class III 3341 10 LF 105 3341.0201 21" RCP, Class III 3341 10 LF 21 3341.0205 24" RCP, Class III 3341 10 LF 103 3341.0302 30" RCP, Class III 3341 10 LF 152 3341.0309 36" RCP, Class III 3341 10 LF 977 3341.1102 4x3 Box Culvert 3341 10 LF 906 3341.1303 6X4 Box Culvert 3341 10 LF 1132 3341.1501 8x4 Box Culvert 3341 10 LF 140 3349.0001 4' Storm Junction Box 33 49 10 EA 3 3349.0002 5' Storm Junction Box 33 49 10 EA 1 3349.6001 10' Recessed Inlet 33 49 20 EA 5 3349.6002 15' Recessed Inlet 33 49 20 EA 1 3125.0101 SWPPP > 1 Acre 31 2500 LS 1 9999.0015 5' Recessed Inlet 99 99 99 EA 2 9999.0016 5'x2' Box Culvert 99 99 99 LF 774 9999.0017 36" TxDOT SW-0 Headwall 99 99 99 EA 1 9999.0018 (6) - 5'x2' TxDOT SW-0 Headwall 99 99 99 EA 2 9999.0019 (4) - 4'x3' FW-0 Headwall 99 99 99 EA 1 9999.0020 Combined ((4) - 4'x3')) & 27" FW-0 Headwall 99 99 99 EA 1 9999.0021 (4) - 6'x4' TxDOT FW-0 Headwall 99 99 99 EA 2 9999.0022 (2) - 8'x4' PW-0 Headwall 99 99 99 EA 2 9999.0023 18" 45, WYE 99 99 99 EA 2 9999.0024 27" 45' BEND 99 99 99 EA 1 9999.0025 TxDOT Pedestrian Handrail 99 99 99 LF 130 9999.0026 12" Thick Rip Rap 99 99 99 SY 1700 9999.0027 12" Thick Reinforced Concrete Riprap 99 99 99 SY 525 TOTAL UNIT III: DRAINAGE IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Tom Version May 22, 2019 Bidder's Proposal Unit Price I Bid Value $2.00 $8,838.00 $1.00 $4,419.00 $115.00 $12,075.00 $123.00 $2,583.00 $133.00 $13,699.00 $178.29 $27,100.08 $196.00 $191,492.00 $350.00 $317,100.00 $595.20 $673,766.40 $715.00 $100,100.00 $4,500.00 $13,500.00 $5,500.00 $5,500.00 $9,600.00 $48,000.00 $16,884.10 $16,884.10 $5,000.00 $5,000.00 $6,600.00 $13,200.00 $372.00 $287,928.00 $5,250.00 $5,250.00 $47,247.36 $94,494.72 $13,505.02 $13,505.02 $17,005.02 $17,005.02 $44,497.51 $88,995.02 $30,000.00 $60,000.00 $500.00 $1,000.00 $500.00 $500.00 $160.00 $20,800.00 $115.85 $196,945.00 $135.00 $70,875.00 $2,310,554.36 Brookfield Bid List UNIT PRICE BID Bidlist Item No. � 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM BROOKFIELD FRONTIER INDUSTRIAL: CPN# - 105490 Project Item Information 00 42 43 DAP - BID PROPOSAL Page 4 of 4 Bidder's Application Bidder's Proposal Description Specification Unit of Bid Unit Price Bid Value Section No. Measure Quantity UNIT IV: PAVING IMPROVEMENTS 3292.0100 Block Sod Placement 32 29 13 SY 5075 $5.50 $27,912.50 3211.0400 Hydrated Lime ((� 36 Ib/sy 32 11 29 TN 178 $320.00 $56,960.00 3211.0501 6" Lime Treatment 3211 29 SY 10386 $2.21 $22,953.06 3213.0104 9" Conc Pvmt 32 13 13 SY 10386 $54.45 $565,517.70 3213.0301 4" Conc Sidewalk 32 1320 SF 40223 $5.94 $238,924.62 3213.0402 8" Concrete Driveway 32 1320 SF 12186 $12.26 $149,400.36 3213.0505 Barrier Free Ramp, Type M-3 32 1320 EA 2 $573.50 $1,147.00 3213.0506 Barrier Free Ramp, Type P-1 32 1320 EA 12 $573.50 $6,882.00 3471.0001 Traffic Control (Road Improvements Only) 3471 13 MO 1 $5,000.00 $5,000.00 TOTAL UNIT IV: PAVING IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Tom Version May 22, 2019 $1,074,697.24 Brookfield Bid List 00 42 43 DAP - BID PROPOSAL Page 5 of 4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM BROOKFIELD FRONTIER INDUSTRIAL: CPN# - 105490 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity UNIT V: SIGNAGE AND PAVEMENT MARKING IMPROVEMENTS I 1 3217.0102 6" SLID Pvmt Markinq HAS (Y) 29 1723 LF 5110 $2.50 $12,775.00 2 3217.0201 8" SLID Pvmt Markinq HAS (W) 30 1723 LF 1572 $3.00 $4,716.00 3 3217.0402 18" SLID Pvmt Markinq HAE (W) 31 1723 LF 375 $9.50 $3,562.50 4 3217.0501 24" SLID Pvmt Markinq HAE (W) 32 1723 LF 136 $12.50 $1,700.00 5 3217.1002 Lane Leqend Arrow 32 1723 EA 20 $175.00 $3,500.00 6 3217.1004 Lane Leqend Onlv 32 1723 EA 8 $200.00 $1,600.00 7 3217.2103 REFL Raised Marker TY II -A -A 32 1723 EA 108 $14.00 $1,512.00 8 3217.2104 REFL Raised Marker TY II-C-R 32 1723 EA 79 $14.00 $1,106.00 9 3441.5002 RRFB Double Sided Solar 3441 15 EA 4 $25,000.00 $100,000.00 10 3471.0001 Traffic Control (PVMT MARKINGS ONLY) 3471 13 MO 1 $5,000.00 $5,000.00 11 9999.0028 6" BRK Pvmt Markinq HAS (Y) 99 99 99 LF 3650 $2.50 $9,125.00 12 9999.0029 18" SLID Pvmt Markinq HAE (Y) 99 99 99 LF 110 $9.50 $1,045.00 13 9999.0030 36" SLID White/Black Crosswalk 99 99 99 LF 280 $12.50 $3,500.00 14 9999.0031 Cross Hatchinq (Y) 99 99 99 SF 125 $1.50 $187.50 15 9999.0032 Stop Siqn (R1-1) 99 99 99 EA 1 $475.00 $475.00 16 9999.0033 Street Name Blade 99 99 99 EA 2 $400.00 $800.00 17 9999.0034 Speed Advisory Siqn (R3-5R) 99 99 99 EA 2 $450.00 $900.00 18 9999.0035 Riqht Turn OnIV Siqn (R3-5R) 99 99 99 EA 1 $450.00 $450.00 19 9999.0036 Left/Thru/Right Turn Siqn (R3-8B) 99 99 99 EA 1 $550.00 $550.00 20 9999.0037 "Stop Here For Pedestrian Siqn (R1-5B) 99 99 99 EA 2 $450.00 $900.00 21 9999.0038 Dead End Siqn (W 14-1) 99 99 99 EA 1 $450.00 $450.00 22 9999.0039 Do Not Enter Siqn (R5-1) 99 99 99 EA 1 $450.00 $450.00 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 TOTAL UNIT V: SIGNAGE AND PAVEMENT MARKING IMPROVEMENTS $154,304.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Tom Version May 22, 2019 Brookfield Bid List SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM BROOKFIELD FRONTIER INDUSTRIAL: CPN# - 105490 UNIT PRICE BID Project Item Information 00 42 43 DAP - BID PROPOSAL Page 6 of 4 Bidder's Application Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value IUNITVI: LGHTING IMPROVEMENTS 1 2605.3118 Furnish/Install Conduit -Schedule 80 PVC 2 Inch 26 05 33 Open Cut 2 3441.1771 Furnish/Install 120/240 Volt Single Phase Metered 99 99 99 Pedestal 3 9999.0040 Furnish/Install Luminaire (R2) 99 99 99 4 9999.0041 Furnish/Install Luminaire (R4) 99 99 99 5 9999.0042 Furnish/Install Steel Pole (18) 99 99 99 6 9999.0043 Furnish/Install Arm (33A) 99 99 99 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 LF 2265 $55.00 $124,575.00 EA 1 $16,176.00 $16,176.00 EA 12 $1,079.00 $12,948.00 EA 1 $1,079.00 $1,079.00 EA 13 $7,078.00 $92,014.00 EA 13 $761.00 $9,893.00 TOTAL UNIT VI: LIGHTING IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Tom Version May 22, 2019 $256,685.00 Brookfield Bid List UNIT PRICE BID Bidlist item) No. 00 42 43 DAP -BID PROPOSAL Page 7 of 4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM BROOKFIELD FRONTIER INDUSTRIAL: CPN# - 105490 Bidder's Application Project Item Information Description Specification I Unit of Bid Section No, Measure I Quantity Bid Sununary ➢iddces Proposal Unit Price I Bid Value UNIT is WATER IMPROVEMENTS $717,814.64 UNIT II: SANITARY SEWER IMPROVEMENTS $599,330.36 UNIT III: DRAINAGE IMPROVEMENTS $2,310,554.36 UNIT IV: PAVING IMPROVEMENTS $1,074,697.24 _ UNIT V: SIGNAGE AND PAVEMENT MARKING IMPROVEMENTS $164,304.00 UNIT VI: LIGHTING IMPROVEMENTS $256,685.00 This Sid is submitted by the entity named below: BIDDER: THE CONLAN COMPANY 1501 LBJ FREEWAY, SUITE 450 FARMERS BRANCH, TX 75234 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as prokided in the General Conditions. Total Construction Bid $5,113,385.60 BV:Justin Swaim Signature TITLE• nior Vice President DA :07.01.2025 END OF SECTION 16� working days after the date when the CrfY OF FORT WORTH STANDARD CONSTRUCTfON SPECfFICATfON DOCUMENTS - DEVELOPER AWARDED PROJECTS Fc— Ver5ic. hfay 22, 2019 R roakfield Bid List 0045 12 I)AP PRF,QUALIFICATION STATHMENT Page 1 of I SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the infon-nation below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Maior Work Tvne" box provide the complete maior work tune and actual description as n_ rovided bv_ the Water Denartment for water and sewer and TPW for DavinLy. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Concrete RPM xConstruction 05.30.2027 j Utilities Venus Construction 05.31.2026 Electrical KC Construction Services 01.25.2027 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: THE CONLAN COMPANY 1501 LBJ FREEWAY, SUITE 450 FARMERS BRANCH, TX 75234 BY: Justin waim END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUALIFiCATION 5TATFMFNT— DEVELOPER AWARDED PROJECTS Form Version September 1, 2015 (Signature) TITLW. Senior Vice President DATE: 06.17.2025 Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontler Industrial 00 4S 12_Prequalification Statement 2015_DAP CPN:105490 2 3 4 5 6 7 8 9 10 11 12 13 14 IS 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 lD kill 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page I of I SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 105490 Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: THE CONLAN COMPANY Company 1501 LBJ FREEWAY Address FARMERS BRANCH, TX 75234 City/State/Zip THE STATE OF TEXAS § COUNTY OFTARRANT § By: (Please Print) Signature: jf/,n Jt kiwl Title: ?e1 W V CL Al-'0W (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared ,� IAS'lhn , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of GiC UAAi an for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this VIA" day of 20Ic y ;: O� el '• N -Q: a Z •`•;�FOp t��aj: 07 07'�'�1.0`�``` CITY OF FORT WORTH J)MC.Ae.11UAV�\,xA otaii Public in and for the State of Texas END OF SECTION STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 Water, Sanitary Seiver•, Paving, Street Lights & Drainage Improvements to Sene Brookfield Frontier Industrial CPN 105490 005243-1 Developer Awarded Project Agreement Pagel of4 I SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on Ob. IR•t•LS is made by and between the Developer, 4 IV5 FRONTIER COMMERCE PARK, LP, authorized to do business in Texas ("Developer") , 5 and THE CONLAN COMPANY, authorized to do business in Texas, acting by and through its 6 duly authorized representative, ("Contractor"). 7 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article 1. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the I I Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: 15 BROOKFIELD FRONTIER INDUSTRIAL 16 CITYPROJECTNO.105490 17 Article 3. CONTRACT TIME 18 3.1 Time is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to this Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within 165 working days after the date 23 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard 24 City Conditions of the Construction Contract for Developer Awarded Projects. 25 3.3 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that Developer 27 will suffer financial loss if the Work is not completed within the times specified in 28 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 29 the Standard City Conditions of the Construction Contract for Developer Awarded 30 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 31 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 32 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees 33 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 34 Developer ZERO ($0.00) for each day that expires after the time specified in Paragraph 35 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light A Drainage ha,.nanta to Brookfield Frontier hdaetdal STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN. 105490 Revised June 16, 2016 00 52 43 - 2 Developer Awarded Project Agreement Page 2 of 4 36 Article 4. CONTRACT PRICE 37 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 38 Documents an amount in current funds of FIVE MILLION ONE HUNDRED THIRTEEN 39 THOUSAND THREE HUNDRED EIGHTY FIVE DOLLARS AND SIXTY 40 CENTS(5.113.385.60). 41 Article 5. CONTRACT DOCUMENTS 42 5.1 CONTENTS: 43 A. The Contract Documents which comprise the entire agreement between Developer and 44 Contractor concerning the Work consist of the following: 45 1. This Agreement. 46 2. Attachments to this Agreement: 47 a. Bid Form (As provided by Developer) 48 1) Proposal Form (DAP Version) 49 2) Prequalification Statement 50 3) State and Federal documents (project specific) 51 b. Insurance ACORD Form(s) 52 c. Payment Bond (DAP Version) 53 d. Performance Bond (DAP Version) 54 e. Maintenance Bond (DAP Version) 55 f. Power of Attorney for the Bonds 56 g. Worker's Compensation Affidavit 57 h. MBE and/or SBE Commitment Form (If required) 58 3. Standard City General Conditions of the Construction Contract for Developer 59 Awarded Projects. 60 4. Supplementary Conditions. 61 5. Specifications specifically made a part of the Contract Documents by attachment 62 or, if not attached, as incorporated by reference and described in the Table of 63 Contents of the Project's Contract Documents. 64 6. Drawings. 65 7. Addenda. 66 8. Documentation submitted by Contractor prior to Notice of Award. 67 9. The following which may be delivered or issued after the Effective Date of the 68 Agreement and, if issued, become an incorporated part of the Contract Documents: 69 a. Notice to Proceed. 70 b. Field Orders. 71 c. Change Orders. 72 d. Letter of Final Acceptance. 73 74 CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN.• 105490 Revised June 16, 2016 00 52 43 - 3 Developer Awarded Project Agreement Page 3 of 4 75 Article 6. INDEMNIFICATION 76 1.2 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 77 expense, the city, its officers, servants and employees, from and against any and all 78 claims arising out of, or alleged to arise out of, the work and services to be 79 performed by the contractor, its officers, agents, employees, subcontractors, licenses 80 or invitees under this contract. This indemnification provision is specifically 81 intended to operate and be effective even if it is alleged or proven that all or some of 82 the damages being sought were caused. in whole or in part, by anv act, omission or 83 negligence of the citv. This indemnity provision is intended to include, without 84 limitation, indemnity for costs, expenses and legal fees incurred by the city in 85 defending against such claims and causes of actions. 86 87 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 88 the city, its officers, servants and employees, from and against any and all loss, damage 89 or destruction of property of the city, arising out of, or alleged to arise out of, the work 90 and services to be performed by the contractor, its officers, agents, employees, 91 subcontractors, licensees or invitees under this contract. This indemnification 92 provision is suecifically intended to operate and be effective even if it is alleged or 93 proven that all or some of the damages being sought were caused, in whole or in part, 94 by anv act, omission or negligence of the city. 95 96 Article 7. MISCELLANEOUS 97 7.1 Terms. 98 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 99 the Construction Contract for Developer Awarded Projects. 100 7.2 Assignment of Contract. 101 This Agreement, including all of the Contract Documents may not be assigned by the 102 Contractor without the advanced express written consent of the Developer. 103 7.3 Successors and Assigns. 104 Developer and Contractor each binds itself, its partners, successors, assigns and legal 105 representatives to the other party hereto, in respect to all covenants, agreements and 106 obligations contained in the Contract Documents. 107 7.4 Severability. 108 Any provision or part of the Contract Documents held to be unconstitutional, void or 109 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 110 remaining provisions shall continue to be valid and binding upon DEVELOPER and ill CONTRACTOR. 112 7.5 Governing Law and Venue. 113 This Agreement, including all of the Contract Documents is performable in the State of 114 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 115 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN.• 105490 Revised June 16, 2016 00 52 43 - 4 Developer Awardcd Projcct Agreement Page 4 of 116 117 7.6 Authority to Sign. 118 Contractor shall attach evidence of authority to sign Agreement, if other than duly 119 authorized signatory of the Contractor. 120 121 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 122 counterparts. 123 124 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 125 126 Contractor: �h� Cov�lu,-, Cowy�u�t S/ By: `J� (Signature) J61,I)i < (Printed Name) Developer: IV5 Frontier Commerce Park LP By: / (Signature) �JA;SC�nf �EN t'YERT (Printed Name) Title: Senior Vice President Title: Senior Vice President Company Name: The Conlan Company Company name: IV5 Frontier Commerce Park LP Address: 1501 LBJ Freewav Address: Suite 450 2121 N Pearl St Suite 1210 City/State/Zip: Farmers Branch, 75234 06.17.2025 Date TX City/State/Zip: Dallas, TX 75201 Date 0b, I'T U2�' CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Slrcct Light & Drainage Improvemenk to Nrooktield Frontier Industrial STANDARD CDNS'I'ItUC'I'ION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS CPA!• 103490 Revised June 16, 201E DESCRIPTIONS (Continued from Page 1) 0010, City Project Number 105490 The City of Fort Worth, its officers, employees and servants are included as Additional Insureds for General Liability and Automobile Liability on a Primary & Non -Contributory basis, per enclosed. Waiver of Subrogation in favor of the additional insureds applies to the Workers Compensation, per enclosed. SAGITTA 25.3 (2016/03) 2 of 2 #S37884713/M36142757 This page has been left blank intentionally. 1 2 3 4 5 6 7 a BOND NUMBER: 30233957 00 62 19 - 1 MADIrENANCE BOND Page 1 of3 SECTION 00 6219 MAINTENANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we The Conlan Company known as "Principal" herein And Continental Casualtv Comganv , a corporate surety 9 (sureties, if more than one) duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, fI,V5 I I FRONTIER COMMERCE PARK LP) authorized to do business in Texas ("Developer") and I2 the City of Fort Worth, a Texas municipal corporation ("City"), in the sum of Y REE MI,L,LION I SEVENHUNDREP FOURTY FIVE THOUSAND THREE HUNDRED NINETYDOLLARS 14 AND SEVENTY-ONE CENTS(3.74.5 39a7I), lawful money of the United States, to be paid in 15 Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly 16 unto the Developer and the City as dual obligees and their successors, we bind ourselves, our 17 heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these 18 presents. 19 20 WHEREAS, Developer and City have entered into an Agreement for the construction of 21 community facilities in the City of Fort Worth by and through a Community Facilities 22 Agreement, CFA Number CFA24-0131 and 23 1WHEREAS, the Principal has entered into a certain written contract with the Developer 24 awarded the 9th day of January, 2025, which Contract is hereby referred to and made a part 25 hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and 26 other accessories as defined by law, in the prosecution of the Work, including any Work resulting 27 from a duly authorized Change Order (collectively herein, the "Work") as provided for in said 28 Contract and designated as BROOKFIELD FRONTIER INDUSTRIAL. 105490; and 29 30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 31 accordance with the plans, specifications and Contract Documents that the Work is and will 32 remain free from defects in materials or workmanship for and during the period of hvo (2) years 33 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 34 CITY Or FORT WORTH water, Suni" Surer, Paving, Street Light & Dmieage Improvements to Sacve Rmokfield FrontierinduMdal STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS MV. J0500 Revised January 31, 2012 006219-2 MAU41TNANCEBOND Page 2 of I WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 2 upon receiving notice from the Developer and/or City of the need thereof at any time within the 3 Maintenance Period. n 5 NOW THEREFORE, the condition of this obligation is such that if Principal shall G remedy any defective Work, for which timely notice was provided by Developer or City, to a 7 completion satisfactory to the City, then this obligation shall become null and void; otherwise to 8 remain in full force and effect. 9 la PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 11 noticed defective Work, it is agreed that the Developer or City may cause any and all such 12 defective Work to be repaired and/or reconstructed with all associated costs thereof being home 13 by the Principal and the Surety under this Maintenance Bond; and 14 15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 17 Worth Division; and 18 19 PROVIDED FURTHER, that this obligation shall be continuous in nature and 20 successive recoveries may be had hereon for successive breaches. 21 22 23 CITY OP FORT NORTH water, Sanitary Smer, Paving, Street Light & Dminago Improvements to Sane Brookfield Ftontior Industrial STANDARD CITY CONDFPIONS —DEVELOPER AWARDED PROJECTS CPN.'105490 Revised Jmwry31, 2012 0062,19-3 MAINTENANCE BOND Page 3 of 3 t IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 9th day of January 3 ,20 25. 5 6 7 9 9 la l 1 l2 l3 l4 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3L 32 33 34 35 36 37 38 39 40 41 P1tiNC1P he Conlan Company BY:� Signature ST_ .G_ 1. � K� v i n. 1 u,+-pin ► �re��o[.e�.�' (P CIF11L) Secr ary comp. ���+v�r+rnrrr'rr$* Name and it itle ,A , •QQORar6••.• dress: 1501 LBJ Freeway, Suite 450 c,� •: Farmers Branch, I X lb234 . • �`� GE OR � UItETY, ��'•�,��`r �g9�``�*��'� (atinental Casualty ComDanv �nrrerut�rt+t�. Witness as to Principal ATTEST: {Surety}8e=tary- LISP IVI. 5mlth Witness as la Surety igna re Deborah B. Sasser, Attorney -in -Fact Name and Title Address: McGrlff a Marsh & McLennan Aqency LLC Company 2520 Worthwinds Parkway, Suite 600 Alpnaretta, UA JUUUu J Telephone Number: 770 664-6818 *Note: If signed by an officer of the Surety Company, there must be on tile a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical Address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. 42 'Continental Casualty Company 151 N. Franklin Street Chicago, IL 60606 312 822-5000 CITY OF FORT NORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Water, Sanitary Seiner. Paving, Street bight & Dminage Improvements to serve Broukliald Franc ier Industrial CF)V;)0.5490 POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT Know Ali Men By These Presents, That Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company (Imrein called "the CNA Companies'), are duly organized and existing insurance companies having their principal oBices in the City of Chicago, and State of Illinois, and that they do by virtue of the signatures and seals herein affixed hereby nuke, constitute and appoint Brian E Madden, Deborah B Sasser, Bart Peppers, Brittany L Triplett, Felisa H Vaughan, Individually of Alpharetta, GA, their lire and lawfit Attorney(s)-in-Fact with fall power and authority hereby conferred to sign, seal and execute for and on t air behalf bonds, undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to bind them thereby as fully and to the same extent as if'such instruments were signed by a duly authorized officer of their insurance companies and all the acts of said Attorney, pursuant to the authority, hereby given is hereby ratified and confined. This Power of Attorney is made and executed pursuant to and by authority of the By -Laws and Resolutions, printed below, duly adopted, as indicated, by the Boards of Directors of the insurance companies. In Witness Whereof, the CNA Companies have caused these presents to be signed by their Vice President and their corporate seals to be hereto affixed on this 22nd day of May, 2024. 0�w[ 1N6URgq, �raN rat Continental Casualty Company P3' tgE re, �1V' National Fire Insurance Company of Hartford eoavoaArE � ©n „raaraggT� A,uericao Casualty Company of Pennsylvania o r E SEAL t $ lais`oi �' a MA • mow.•• f aal Lary Kasten / Vice President State of South Dakota, County of Minvic aho, ss: On this 22nd day of May, 2024, before me personally came Larry Kasten to me known, who, being by me duly swom, did depose and say: that he resides in the City of Sioux Falls, Stile of South Dakota; that he is a Vice President of Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company described in and which executed die above instrument; that he knows the seals of said insurance companies; that the seals affixed to the said instrument ire such corporate seals; that they were so affixed personal to authority given by the Boards of Directors of said insurance companies and that he signed his none thereto pursuant to like authority, and acknowledges same to be the not and deed of said insurance companies. My commission expires • M. BENT IQbNarA9Y iU91.IC6Win OANarAM March 2, 2026 :.,,„,,,,,,,,,,,,,,,,,, # M. Bent Notary Public CERTIFICATE 1, Paula Kolsrud, Assistant Secretary of Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading. Pennsylvania, a Permsylvnnla insurance company do hereby certify that the Power of Attomey lherein above set forth is still in force, and further certify that the By -Laws and Resolutions of the Board of Directors of the insurance companies printed below are still fit force. In testimony whereof I lace hereunto subscribed my nnnne and affixed the seal of the said insurance companies this day of Continental Casualty Company a,CASUgtT} MfiUggN �gapNro. National Fire Insurance Company of Hartford e� American Casualty Company of Reading, Pennsylvania F aoarWyTE >� �, ,9WAI9A1TrG A Z • 2 NI90E I' A� U SFJLL K N,{I' 1997 & apPrr Paula Kolsrud Assistant Secretary Authorizing By -Laws and Resolutions ADOPTED BY THE BOARD OF DIRECTORS OF EACH OF CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF HARTFORD, and AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA (as defined above, the "CNA Companies"): This Power of Attorney is made and executed pursuant to and by authority of the following resolution duly adopted by the Board of Directors of each of the above CNA Companies at a meeting held on May 12, 1995: "RESOLVED: That any Senior or Group Vice President may authorize an officer to sign specific documents, agreements and instruments on behalf of the Company provided that the name of such authorized officer mid a description of the documents, agreements or instruments that such officer may sign will he provided in writing by the Senior or Group Vice President to the Secretary of the Company prior to such execution becoming effective." This Powerof Attomey is signed by Larry Kasten, Vice President, who has been authorized pursuant to the above resolution to execute power of attorneys on behalf of each of the CNA Companies, This Power of Attorney is signed and sealed by facsimile under mid by the authority of the following Resolution adopted by the Board of Directors of each of the above Companies by unanimous written consent dated the 25' day of April, 2012: "Whereas, the bylaws of the Company or specific resolution of the Board of Directors Ins authorized various officers (the "Authorized Officers") in execute various policies, bonds, undertakings and other obligatory instruments of like nature; and Whereas, from time to time, the signature of the Authorized Officers, in addition to being provided in original, hard copy fount, may be provided via facsimile or otherwise in an electronic format (collectively, "Electronic Signatures"); Now therefore be it resolved: that the Electronic Signature of any Authorized Officer shall be valid and binding on tire Company." This Power of Attorney may be signed by digital signature and sealed by a digital or otherwise electronic-fonmatted corporate seal under and by the authority of the following Resolution adopted bythe Board of Directors of each of the above CNA Companies by unanimous written consent dated the 27th day of April, 2022: "RESOLVED: That it is in the best interest of the Company to periodically ratify and confirm any corporate documents signed by digital miar mres and to ratify and confirm the rise of a digital or of anise electronic-fomatted corporate seal, rnch to be considered the act and deed of the Company. Go to www.cnasuretv.com > Owner I Obligee Services > Validate Bond Coverage, if you want to verify bond authenticity. Form F6963-6=23 Increase PENALTY RIDER BOND AMOUNT s3.745.390.71 aoNoNo.30233957 To be attached and form a part of Bond No. 30233957 dated the 9th day of January 2025 executed by Continental Casualty Comoanv as surety, on behalf of The Conlan Company as current principal of record, and in favor of JV5 Frontier Park, LP and the City of Fort Worth TX as Obligee, and in the amount Of Three Million Seven Hundred Forty Five Thousand Three Hundred Ninety Dollars and 711100 (.R 3.745390.71 _ ), In consideration of the agreed premium charged for this bond, it is understood and agreed that Continental Casualty Companv hereby consents that effective from the 1st day of July 2025 , said bond shall be amended as follows: THE BOND PENALTY SHALL BE Increased: From: Three Million Seven Hundred Forty Five Thousand Three Hundred Ninetv Dollars and 71/100 ($3,745,390.71 To: Five Million One Hundred Thirteen Thousand Three Hundred Eighty Five Dollars and 60/100 ($ 5,113,385.60 The Increase of said bond penalty shall be effective as of the 1 St day of July 2025 and does hereby agree Iliac the continuity of protection under said bond subject to changes in penalty shall not be impaired hereby, provided that the aggregate liability of the above mentioned bond shall not exceed the amount of liability assumed by it at the time the act and/or acts ofdefault were committed and in no event shall such liability be cumulative. Signed, sealed and dated this, 1st day of July 2025 , 00GONI ...... �i The Conlan Comp an 0 PRINCIPAL rly rt plkSt1g4T � • Fon Continental Casualty Company it,Ofl�lOMr'6 SUR[:fY SEAL nvA an ,AT7ORNRY•IN-PACT 1897 POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT Knorr AB \ten By These Preseuls, That Continental Casualty Company, an Illinois insurance com pmiy, National Fire Insurance Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading, Perursylvania, a Pennsylvania insurance company (herein called "the CNA Companies"), are duly organized and existing insurance conipmues having their pnticipal offices in the City of Chicago, and State of Illinois, aid that they do by virtue of the signatures and seals herein affixed hereby nuke, constitute and appoint Brittany L. Marine , Individually of Alpharetta, GA their true and lawful Attorney(s)-m-Fact vvith ill power and authority hereby conferred to sign, seal acid execute for acid on thew behalf bolds, undertakings mid other obligatory mswnimus of similar nature - In Unfl nited Amounts - Surely Bond No: 30233957 Principal: The Conlon Company Obligee: IVS Frontier Park, LP and the City of Fort Worth TX mid to hod them thereby as fully mid to die sane extent as if well instruments were signed by a duly authorized officer of thew insurance companies mid all the acts of said Attorney, pursuant to the authority hereby given is hereby ratified and confirmed. This Pourer of Attorney is nude mid executed pursuant to and by authority of the By -Laws and Resolutions, printed below, duly adopted, as indicated, by the Boards of Directors of the msumnce co npmues. In Witness Whereol, It* CNA Cotopmues have caused these presents to be signed by their Vim President mid their corporate seals to be hereto affixed on this 9tt day of January, 2024. astr.,cr u15Ua a Continental Casualty Conpmly �' } Sgi 'Nrf s ♦L National Fire Insurance Coulpary of Hartford owir re �� O a s srwo4ero'jas Anenemh CastultyConipmty of Readin Pennsylvania rein Lary Kasten Vice President State of South Dakota, County of Mimhehaha, ss: On this 9th day of January, 2024, before me personally came Larry Kasten to me knowv, who, being by rise duly sworn, did depose mid zany that he resides in the City of Sioux Falls, State of South Dakota; that he is a Vim President of Continental Casualty Co ipany, at Illinois insurance company, National Fire Insurance Company of Hartford, an Illinois insurance company, mid Annerican Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company described in and which executed the above instrument; thin he knsovs the seals of said imuruice conipalues; that the seals affixed to the said instrument are such corporate seals; that they were so affixed pursuant to authority given by die Boards of Directors of said insurance companies mid that he signed his name thereto pmstunl to like authority, and acknowledges smte to lie the act and deed of said insurance companies. Myconmussionexphres I M. BENT 1 /z����aoam sumachz�--��s� va5r�aourx wxoavrrrsr March 2. 2026 ........................ � M. Beni Notary Public CERTIFICATE I, D. Johnson, Assistant Secretary of Continental Casualty Company, an Illinois mmuanom company, National Fire Insurance Company of Hartford, an Illinois insurance conhpany, and Annencan Casualty Company of Reading, Perusyivarua, a Pennsylvania insurance conyiany do hereby certify that the Power of Attorney herein above set forth is still in form, mid hmher certify that the By -Laws mid Resolutions of the Board of Directors of the insurance cmipa ies panted below are still inform lit testimony whereof I have hereunto subseiled my rune mid mixed the seal of die said insurance companies this Ist day of July , 2025 . easta4l atsus q Continental Casualty Company National Fie Insurance Conipa y of Hartford yY� rAaoMre �t a't��rn Anerican Castulty Company of Reading, Pennsylvmua n 4 + SI--•sl a%i ice A` `C J I / IeYi Haaw� D. Johnson /i Assistant Secretary Aulhoilziug By-Lliws slid Resolutions ADOPTED BY THE BOARD OF DIRECTORS OF FACH OF CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF HARTFORD, and AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA (as defined above, the "CNA Companies'): This Power of Attorney is nude mid executed pursumt to and by authority of the following resolution duly adopted by the Board of Directors of each of the above CNA Conyurues at a nceing held on May 12, 1995: "RESOLVED. That any Senior or Group Vice President truly authorize an officer to sign specific docu nems, agreements and instruments on behalf of the Company provided that the narne of such authorized officer and a description of die docmuents, agreements or i stnmenls that such officer nay sign will be provided in writing by the Senior or Group Vice President to the Secretary of the Company prior to well execution becorumg effective." This Power of Attorney is signed by Larry Kasten, Vice President, who lus been authorized pursuant to the above resolution to execute power of attorneys on behalf of each of the CNA Conyiaues. This Power of Attorney is signed mid sealed by facsnule miler mid by the authority of the follosving Resolution adopted by the Board of Directors of each of the above Companies by ururunious written consent dated the 25' day of April, 2012: "Whereas, the bylaws of the Company or specific resolution of the Board of Directors has m ltorized various officers (the "Authorized Officers) to execute various policies, bonds, andedakmgs mid other obligatory instnmaenls of like nature, mid NIiereas, from hole to lime, the signature of the Authorized Officers, in addition to being provided in original, lard copy fumed, nay be provided via facsimile or otherwise itr an electronic fort at (collectively, "Electume Signatures"), Now therefore be it resolved: tut die Electronic Signature of any Authorized Officer shall be valid mid binding on the Company." This Power of Attorney nay be signed by digital signature and sealed by a digital or otherwise electronic-fomulted corporate seal under mid by the authority of the following Resolution adopted by the Board of Directors of each of the above CNA Companies by unauutous wntten consent dated the 271 h day of April, 2022: "RESOLVED: Thal it ism the best interest of the Company to periodically unify mid comfwn any corporate dOctillRrtts signed by digital signatures mid to ratify and conhnn the use of a digital or otherwise electronic-fomutted corpoune seal, each no be considered the act and deed of the Company." Go to www.cnasuretv.com > Owner I Obligee Services > Validate Bond Coverage, If you want to verity bond authenticity. Fain FU53-MO23 DEVELOPMENT BOND GUARANTEEING PERFORMANCE AND PAYMENT OF IMPROVEMENTS Bond No. ES00019879 KNOW ALL MEN BY THESE PRESENTS, that we, ( IV5FmntierCommerc Par LP ), as Principal, and ( EvemstReinsuraumCompany ) a corporation organized and existing under the laws of the State of eel—e , and fully authorized to transact business in the State of Texas, as surety, are held and firmly bound unto CITY OF FORT WORTH, TEXAS, 100 Fort Worth Trail, Fort Worth, Texas, 76102, as Obligee, in the penal sum of ($ 3,745,390.71 ) lawful money of the United States of America, for the payment of which well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEARE AS, ( IV5 Frontier Commerce Park LP ) has agreed to construct in ( Brookfield Frontier Industrial - CPN 105490 ), in the CITY OF FORT WORTH, TEXAS the following improvements: ROW work including street, utilities, sidewalks and street lighting at ( Frontier Commerce Park ) WHEREAS, in the event of bankruptcy, default or other nonperformance by Principal, claims against Principal or the development, Obligee may be left without adequate satisfaction. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall construct, or have constructed, the improvements herein described, and shall pay for the cost of all labor, materials and equipment furnished in connection with the construction of said improvements, and shall save the Obligee harmless from any loss, cost or damage by reason of its failure to complete the construction of said improvements or by reason of its failure to pay for the cost of same, then this obligation shall be null and void, otherwise to remain in full force and effect; and upon receipt of a claim by the City of Fort Worth indicating that the construction of said improvements has not been completed, or that the costs for same have not been paid, the Surety will pay to the City of Fort Worth such amount up to the amount of this bond which will allow the City of Fort Worth to complete construction of said improvements and to pay for the costs of same. We hereby agree with you that the draft(s) drawn under and in compliance with the terms of this bond will be duly honored upon presentation at: (Surety) Everest Reinsurance Company mail code: (Surety Address) P.O. Box 70, Orange, CA 92856 Attn: Kevin Chamber or by facsimile to (surety: Everest Reinsurance Company Fax Number N/A confrimed by a phone call at 714-371-9653 PROVIDED FURTHER, that this bond shall automatically be increased by the amount of any change order, supplemental agreement or amendment which increase the price of the aforementioned contract. PROVIDED FURTHER, that if any legal action be filed on this bond, the laws of the State of Texas shall apply and that venue shall lie exclusively in Tarrant County, Texas. AND PROVIDED FURTER, that the said surety, for value received, hereby stipulates and agrees that no charge, extension of time, alteration or addition to the terms of any contract for the public affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of such contract. This bond is given pursuant to the provisions of Section 212.073 of the Texas Local Government Code, as such may amended from time to time. Signed, sealed and dated this DEVELOPER'S NAME IV5 Frontier Commerce Park LP P By: _ JASON VEUGE'RT, VCE PKESrDa=i�!"� 23rd day of January , 2025 SURETY COMPANY'S NAME Everest Reinsurance CAmpaPy ue B Maria Pena, Attorney -in -Fact CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT Civil Code § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document. State of California ) ss County of Los Angeles ) On J AN 2 3 2025 before me, Patricia Arana. Notary Public. personally appeared Maria Pena , who proved to me on the basis of satisfactory evidence to be the persons; whose names) isfaFe subscribed to the within instrument and acknowledged to me that 4efsheA4+ey executed the same in #isfherAhelF authorized capacity(ies), and that by 4is/her7, signatures} on the instrument the person(, or the entity upon behalf of which the personj&) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. (Seal) 1 ' PATRICIAARANA Notary Public - California Las Angeles county Commis ion, 2401773 ,. My Comm, Expires Apr 23, 2026 Signature: Patricia Arana, Notary Public Z7VE R FSC. POWER OF ATTORNEY EVEREST REINSURANCE COMPANY DELAWARE KNOW ALL PERSONS BY THESE PRESENTS: That Everest Reinsurance Company, a corporation of the State of Delaware ('Company) having its principal office located at 477 Martinsville Road, Liberty Comer, New Jersey 07938, do hereby nominate, constitute, and appoint: C.K. Nakamura, E.S. Albrecht, Jr., Jeffrey Strassner, Jessica L. Rosser, Lisa L. Thornton, Maria Pena, Natalie K. Trorimoff, Noemi Quiroz, Patricia S. Arans, Tim M. Tomko, Tiffany Coronado its (me and lawful Attomey(s)-in-fact to make, execute, attest, seal and deliver for and on its behalf, as surety, and as its act and deed, where required, any and all bonds and undertakings In the nature thereof, for the penal sum of no one of which is in any event to exceed UNLIMITED, reserving for itself the full power of substitution and revocefion. Such bonds and undertakings, when duty executed by the aforesaid Attomey(s)-in-fact shall be binding upon the Company as fully and to the same extent as if such bonds and undertakings were signed by the President and Secretary of the Company and sealed with its corporate seal. This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Board of Directors of Company ('Board') on the 28th day of July 2016: RESOLVED, that the President, any Executive Vice President, and any Senior Vice President and Anthony Romano are hereby appointed by the Board as authorized to make, execute, seal and deliver for and on behalf of the Company, any and all bonds, undertakings, contracts or obligations in surety orcosurety with others and that the Secretary or any Assistant Secretary of the Company be and that each of them hereby is authorized to attest to the execution of any such bonds, undertakings, contracts or obligations in surety or co -surely and attach thereto the corporate seal of the Company. RESOLVED, FURTHER, that the President, any Executive Vice President, and any Senior Vice President and Anthony Romano are hereby authorized to execute powers of attorney qualifying the attorney named in the given power of attorney to execute, on behalf of the Company, bons and undertakings in surety or co -surely with others, and that the Secretary or any Assistant Secretary of the Company be, and that each of them is hereby authorized to attest the execution of any such power of attorney, and to attach thereto the corporate seal of the Company - RESOLVED, FURTHER, that the signature of such officers named in the preceding resolutions and the corporate seal of the Company may be affixed to such powers of attorney or to any certificate misting thereto by facsimile, and any such power of attorney or certificate beating such facsimile signatures or facsimile seal shall be thereafter valid and binding upon the Company with respect to any bond, undedaking, contract or obligation in surety orcosurety with others to which it is attached. IN WITNESS WHEREOF, Everest Reinsurance Company has caused their corporate seals to be affixed hereto, and these presents to be signed by their duly authorized officers this 28th day of July 2016. evn6UrahI Q'� MIkZF. (o+ \4nwrsa�t *)Woc- Attest: Nicole Chase, Assistant Secretary Everest Reinsurance Company By: Anthony Romano, Vice President On this 28th day of July 2016, before me personally came Anthony Romano, known to me, who, being duly swom, did execute the above instrument; that he knows the seal of said Company; (hat the seal affixed to the aforesaid instrument is such corporate seal and was affixed thereto; and that he executed said instrument by like order. LINDA ROBINS Notary Public, State of New York No 01R06239736 Qualified in Queens County Term Expires April 25, 2023 Linda Robins, Notary Public IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Company, at the Liberty Comer, this day of 20_ JAN 2 3 2025 ES 00 0104 le To obtain information or make a complaint: Para obener information o Para someter Una queja: You may call toll -free for information or to make a Usted puede Ilamar al numero de telefono gratis complaint at Para informacion o Para someter una queja al 1-866-287-1736 You may also write to: Everest National Insurance Company 477 Martinsville Road, PO Box 830 Liberty Corner, NJ 07938-0830 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at 1-800-252-3439 You may write the Texas Department of Insurance Consumer Protection (111-1A) P.O. Box 149091 Austin, TX 78714-9091 FAX: (512) 490 —1001 Web: littp://www.t(ii.texas.pov E-mail: ConsumerProtectionCu)tdi.texas.pov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should first contact the agent or call 1-908-604-3000, If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part of condition of the attached document. N P 70 68 0901 0s13tri:YA-Mi"- Usted tambien puede escribir a: Everest National Insurance Company 477 Martinsville Road, PO Box 830 Liberty Corner, NJ 07938-0830 Puede comunicarse con el Departamento de Seguros de Texas Para obtener informacion acerca de companies, coberturas, derechos o quejas al 1- 800-252-3439 Puede escribir al Departamento de Seguros de Texas Consumer Protection (111-1A) P.O. Box 149091 Austin, TX 78714-9091 FAXff(512)490-1007 Web: httl)://www/tdi.texas.Rov E-mail: ConsumerProtection@tdi.texas,gov DISPUTES SOBRE PRIMAS 0 RECLAMOS: Si tiena una disputa concerniente a su prima o a Lin reclamo, debe comunicarse con el agente o primero. Si no se resolve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA: Este aviso es solo Para proposito de informacion y no se convierte en parte o condition del document adjunto. :_ 1 To be attached to and form part of: Bond Number ES00019879 dated January 23, 2025 issued by the Everest Reinsurance Company in the amount of $3,745,390.71 on behalf of IV5 Frontier Commerce Park LP (Principal) and in favor of City of Fort Worth, Texas (Obligee) Now therefore, it is agreed that in consideration of the premium charged, the attached bond shall be amended as follows: Add Change Order Requests No. 001 and No. 002 and Increase Bond Amount FROM: Three Million Seven Hundred Forty -Five Thousand Three Hundred Ninety and 71/100 Dollars ($3,745,390.71) TO: Five Million One Hundred Thirteen Thousand Three Hundred Eighty -Five and 60/100 Dollars ($5,113,385.60) It is further understood and agreed that all other terms and conditions of this bond shall remain unchanged. This Rider is to be Effective this 3rd day of July, 2025. Signed, Sealed & Dated this 3rd day of July, 2025. IV5 Frontier Comore ;ear By: (_ (Principal) Everest Remsuran Company (Surety) By: Autumn Stockton, Attorney -in -Fact A everest POWER OF ATTORNEY EVEREST REINSURANCE COMPANY KNOW ALL PERSONS BY THESE PRESENTS: That Everest Reinsurance Company, a corporation of the State of Delaware ('Company') having its principal office located at Warren Corporate Center, 100 Everest Way, Warren, New Jersey, 07059, do hereby nominate, constitute, and appoint: S. Nicole Evans, Stephanie Gunderson, Diana Cervantes, Carlos A. Albelo, Autumn Stockton its true and lawful Attorney(s)-in-fact to make, execute, attest, seal and deliver for and on its behalf, as surety, and as its act and deed, where required, any and all bonds and undertakings in the nature thereof, for the penal sum of no one of which is in any event to exceed UNLIMITED, reserving for itself the full power of substitution and revocation. Such bonds and undertakings, when duly executed by the aforesaid Attorney(s)-in-fact shall be binding upon the Company as fully and to the same extent as if such bonds and undertakings were signed by the President and Secretary of the Company and sealed with its corporate seal. This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Board of Directors of Company ("Board") on April 21, 2016: RESOLVED, that the President, any Executive Vice President, and any Senior Vice President are hereby appointed by the Board as authorized to make, execute, seal and deliver for and on behalf of the Company, any and all bonds, undertakings, contracts or obligations in surety or co -surety with others and that the Secretary or any Assistant Secretary of the Company be and that each of them hereby is authorized to attest to the execution of any such bonds, undertakings, contracts or obligations in surety or co -surety and attach thereto the corporate seal of the Company. RESOLVED, FURTHER, that the President any Executive Vice President, and any Senior Vice President are hereby authorized to execute powers of attorney qualifying the attorney named in the given power of attorney to execute, on behalf of the Company, bonds and undertakings in surety or co -surety with others, and that the Secretary or any Assistant Secretary of the Company be, and that each of them is hereby authorized to attest the execution of any such power of attorney, and to attach thereto the corporate seal of the Company. RESOLVED, FURTHER, that the signature of such officers named in the preceding resolutions and the corporate seal of the Company may be affixed to such powers of attorney or to any certificate relating thereto by facsimile, and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be thereafter valid and binding upon the Company with respect to any bond, undertaking, contract or obligation in surety or co -surety with others to which it is attached. IN WITNESS WHEREOF, Everest Reinsurance Company has caused their corporate seals to be affixed hereto, and these presents to be signed by their duly authorized officers this 51h day of September2024. SEAL 1j Everest Reinsurance Company ell �-0-- By: Anthony Romano, Senior Vice President On this 51h day of September 2024, before me personally came Anthony Romano, known to me, who, being duly sworn, did execute the above instrument; that he knows the seal of said Company; that the seal affixed to the aforesaid instrument is such corporate seal and was affixed thereto; and that he executed said instrument by like order. LINDA ROBINS Notary Public, State of New York No 01 R06239736 Qualified In Queens County Term Expires April 25, 2027 Linda Robins, Notary Public I, Sylvia Semerdjian, Secretary of Everest Reinsurance Company do hereby certify that I have compared the foregoing copy of the Power of Attorney and affidavit, and the copy of the Section of the bylaws and resolutions of said Corporation as set forth in said Power of Attorney, with the ORIGINALS ON FILE IN THE HOME OFFICE OF SAID CORPORATION, and that the same are correct transcripts thereof, and of the whole of the said originals, and that the said Power of Attorney has not been revoked and is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Company, this 3rd day of July 202 5 uFa� /`nP?eR4lF y 071 7J �ht`w&aE�F * By: Sylvia Semerdjian, Secretary ES 00 01 04 16 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Article 1 — Definitions and Terminology.......... 1.01 Defined Terms ............................... 1.02 Terminology .................................. Article 2 — Preliminary Matters ....................... 2.01 Before Starting Construction...... 2.02 Preconstruction Conference........ 2.03 Public Meeting ............................ Page .............................................1 .............................................1 ............................................. 5 ....................................................... 6 ....................................................... 6 ....................................................... 6 ....................................................... 6 Article 3 — Contract Documents and Amending............................................................................................... 6 3.01 Reference Standards..................................................................................................................... 6 3.02 Amending and Supplementing Contract Documents.................................................................. 6 Article 4 — Bonds and Insurance....................................................................................................................... 7 4.01 Licensed Sureties and Insurers..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7 4.03 Certificates of Insurance............................................................................................................... 7 4.04 Contractor's Insurance.................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12 Article 5 — Contractor's Responsibilities........................................................................................................12 5.01 Supervision and Superintendent.................................................................................................12 5.02 Labor; Working Hours................................................................................................................13 5.03 Services, Materials, and Equipment...........................................................................................13 5.04 Project Schedule..........................................................................................................................14 5.05 Substitutes and "Or-Equals".......................................................................................................14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16 5.07 Concerning Subcontractors, Suppliers, and Others...................................................................16 5.08 Wage Rates..................................................................................................................................18 5.09 Patent Fees and Royalties...........................................................................................................19 5.10 Laws and Regulations.................................................................................................................19 5.11 Use of Site and Other Areas.......................................................................................................19 5.12 Record Documents......................................................................................................................20 5.13 Safety and Protection.................................................................................................................. 21 5.14 Safety Representative.................................................................................................................21 5.15 Hazard Communication Programs.............................................................................................22 5.16 Submittals....................................................................................................................................22 5.17 Contractor's General Warranty and Guarantee..........................................................................23 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification ............................................ 5.19 Delegation of Professional Design Services 5.20 Right to Audit: ............................................. 5.21 Nondiscrimination ........................................ Article 6 - Other Work at the Site....... 6.01 Related Work at Site ....... Article 7 - City's Responsibilities ............................................ 7.01 Inspections, Tests, and Approvals ....................... 7.02 Limitations on City's Responsibilities ................ 7.03 Compliance with Safety Program ........................ Article 8 - City's Observation Status During Construction....... 8.01 City's Project Representative ................................. 8.02 Authorized Variations in Work .............................. 8.03 Rejecting Defective Work ...................................... 8.04 Determinations for Work Performed ...................... Article 9 - Changes in the Work ...................... 9.01 Authorized Changes in the Work 9.02 Notification to Surety ................... Article 10 - Change of Contract Price; Change of Contract Time 10.01 Change of Contract Price ........................................... 10.02 Change of Contract Time ........................................... 10.03 Delays......................................................................... Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ............ 11.01 Notice of Defects.............................................................................................................. 11.02 Access to Work................................................................................................................. 11.03 Tests and Inspections........................................................................................................ 11.04 Uncovering Work............................................................................................................. 11.05 City May Stop the Work................................................................................................... 11.06 Correction or Removal of Defective Work...................................................................... 11.07 Correction Period.............................................................................................................. 11.08 City May Correct Defective Work................................................................................... Article 12 - Completion ........................................... 12.01 Contractor's Warranty of Title ............ 12.02 Partial Utilization ................................. 12.03 Final Inspection .................................... 12.04 Final Acceptance .................................. Article 13 - Suspension of Work ..................................... 13.01 City May Suspend Work ............................. Article 14 - Miscellaneous ......................................... 14.01 Giving Notice ......................................... CITY OF FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 24 24 25 25 26 26 26 26 26 27 a a ... 29 ... 29 ... 29 ... 29 ... 30 ... 30 ... 30 ... 30 ... 31 ................................. 32 ................................. 32 ................................. 32 ................................. 32 ................................. 33 ............................................................. 33 ............................................................. 33 34 34 14.02 Computation of Times................................................................................................................ 34 14.03 Cumulative Remedies................................................................................................................. 34 14.04 Survival of Obligations...............................................................................................................35 14.05 Headings......................................................................................................................................35 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions in. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings P. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day —A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of apart of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p. m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either parry or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: NONE Write the name of the railroad company. (If none, then write none) 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: NONE Enter limits provided by Railroad Company (If none, write none) b. Each Occurrence:: NONE Enter limits provided by Railroad Company (If none, write none) 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. (Check this box if there is any City Participation) ❑ x Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates ❑ Required for this Contract. x❑ Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 Ith day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.13. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. Developer/Contractor. City will forward all invoices for retests to 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given i£ 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 01 11 00 SUMMARY OF WORK 011100-1 DAP SUMMARY OF WORK Pagel of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN: 105490 Revised December 20, 2012 011100-2 DAP SUMMARY OF WORK Page 2 of 3 1 a. A reasonable amount of tools, materials, and equipment for construction 2 purposes may be stored in such space, but no more than is necessary to avoid 3 delay in the construction operations. 4 b. Excavated and waste materials shall be stored in such a way as not to interfere 5 with the use of spaces that may be designated to be left free and unobstructed 6 and so as not to inconvenience occupants of adjacent property. 7 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 8 manner as not to interfere with the operation of the railroad. 9 1) All Work shall be in accordance with railroad requirements set forth in 10 Division 0 as well as the railroad permit. 11 D. Work within Easements 12 1. Do not enter upon private property for any purpose without having previously 13 obtained permission from the owner of such property. 14 2. Do not store equipment or material on private property unless and until the 15 specified approval of the property owner has been secured in writing by the 16 Contractor and a copy furnished to the City. 17 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 18 obstructions which must be removed to make possible proper prosecution of the 19 Work as a part of the project construction operations. 20 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 21 lawns, fences, culverts, curbing, and all other types of structures or improvements, 22 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 23 appurtenances thereof, including the construction of temporary fences and to all 24 other public or private property adjacent to the Work. 25 5. Notify the proper representatives of the owners or occupants of the public or private 26 lands of interest in lands which might be affected by the Work. 27 a. Such notice shall be made at least 48 hours in advance of the beginning of the 28 Work. 29 b. Notices shall be applicable to both public and private utility companies and any 30 corporation, company, individual, or other, either as owners or occupants, 31 whose land or interest in land might be affected by the Work. 32 c. Be responsible for all damage or injury to property of any character resulting 33 from any act, omission, neglect, or misconduct in the manner or method or 34 execution of the Work, or at any time due to defective work, material, or 35 equipment. 36 6. Fence 37 a. Restore all fences encountered and removed during construction of the Project 38 to the original or a better than original condition. 39 b. Erect temporary fencing in place of the fencing removed whenever the Work is 40 not in progress and when the site is vacated overnight, and/or at all times to 41 provide site security. 42 c. The cost for all fence work within easements, including removal, temporary 43 closures and replacement, shall be subsidiary to the various items bid in the 44 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN: 105490 Revised December 20, 2012 011100-3 DAP SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION 12 13 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN: 105490 Revised December 20, 2012 012500-1 DAP SUBSTITUTION PROCEDURES SECTION 0125 00 SUBSTITUTION PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 4 The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised August 30, 2013 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised August 30, 2013 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 4. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer's opinion, acceptance will require substantial revision of the original design d. In the City's or Developer's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME END OF SECTION Revision Log SUMMARY OF CHANGE CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised August 30, 2013 012500-4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature Recommended Recommended as noted Firm Not recommended _Received late Address By Date Date Remarks Telephone For Use by City: Approved Rejected City Date CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised August 30, 2013 013119-1 DAP PRECONSTRUCTION MEETING SECTION 01 31 19 PRECONSTRUCTION MEETING PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised August 30, 2013 01 31 19 - 2 DAP PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Indust al CPN: 105490 Revised August 30, 2013 013119-3 DAP PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised August 30, 2013 013216-1 DAP CONSTRUCTION PROGRESS SCHEDULE Page 1 of 5 SECTION 0132 16 CONSTRUCTION PROGRESS SCHEDULE PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. General requirements for the preparation, submittal, updating, status reporting and management of the Construction Progress Schedule 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance Document B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements IWAKUW41W.Iel7Z%140IBlel89ZIZy011117V A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Definitions 1. Schedule Tiers a. Tier 1 - No schedule submittal required by contract. Small, brief duration projects b. Tier 2 - No schedule submittal required by contract, but will require some milestone dates. Small, brief duration projects c. Tier 3 - Schedule submittal required by contract as described in the Specification and herein. Majority of City projects, including all bond program projects d. Tier 4 - Schedule submittal required by contract as described in the Specification and herein. Large and/or complex projects with long durations 1) Examples: large water pump station project and associated pipeline with interconnection to another governmental entity e. Tier 5 - Schedule submittal required by contract as described in the Specification and herein. Large and/or very complex projects with long durations, high public visibility 1) Examples might include a water or wastewater treatment plant 2. Baseline Schedule - Initial schedule submitted before work begins that will serve as the baseline for measuring progress and departures from the schedule. 3. Progress Schedule - Monthly submittal of a progress schedule documenting progress on the project and any changes anticipated. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised July 1, 2011 013216-2 DAP CONSTRUCTION PROGRESS SCHEDULE Page 2 of 5 4. Schedule Narrative - Concise narrative of the schedule including schedule changes, expected delays, key schedule issues, critical path items, etc B. Reference Standards 1. City of Fort Worth Schedule Guidance Document 1.4 ADMINISTRATIVE REQUIREMENTS A. Baseline Schedule 1. General a. Prepare a cost -loaded baseline Schedule using approved software and the Critical Path Method (CPM) as required in the City of Fort Worth Schedule Guidance Document. b. Review the draft cost -loaded baseline Schedule with the City to demonstrate understanding of the work to be performed and known issues and constraints related to the schedule. c. Designate an authorized representative (Project Scheduler) responsible for developing and updating the schedule and preparing reports. B. Progress Schedule 1. Update the progress Schedule monthly as required in the City of Fort Worth Schedule Guidance Document. 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 3. Change Orders a. Incorporate approved change orders, resulting in a change of contract time, in the baseline Schedule in accordance with City of Fort Worth Schedule Guidance Document. C. Responsibility for Schedule Compliance 1. Whenever it becomes apparent from the current progress Schedule and CPM Status Report that delays to the critical path have resulted and the Contract completion date will not be met, or when so directed by the City, make some or all of the following actions at no additional cost to the City a. Submit a Recovery Plan to the City for approval revised baseline Schedule outlining: 1) A written statement of the steps intended to take to remove or arrest the delay to the critical path in the approved schedule 2) Increase construction manpower in such quantities and crafts as will substantially eliminate the backlog of work and return current Schedule to meet projected baseline completion dates 3) Increase the number of working hours per shift, shifts per day, working days per week, the amount of construction equipment, or any combination of the foregoing, sufficiently to substantially eliminate the backlog of work 4) Reschedule activities to achieve maximum practical concurrency of accomplishment of activities, and comply with the revised schedule 2. If no written statement of the steps intended to take is submitted when so requested by the City, the City may direct the Contractor to increase the level of effort in manpower (trades), equipment and work schedule (overtime, weekend and holiday work, etc.) to be employed by the Contractor in order to remove or arrest the delay to the critical path in the approved schedule. a. No additional cost for such work will be considered. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised July 1, 2011 013216-3 DAP CONSTRUCTION PROGRESS SCHEDULE Page 3 of 5 D. The Contract completion time will be adjusted only for causes specified in this Contract. a. Requests for an extension of any Contract completion date must be supplemented with the following: 1) Furnish justification and supporting evidence as the City may deem necessary to determine whether the requested extension of time is entitled under the provisions of this Contract. a) The City will, after receipt of such justification and supporting evidence, make findings of fact and will advise the Contractor, in writing thereof. 2) If the City finds that the requested extension of time is entitled, the City's determination as to the total number of days allowed for the extensions shall be based upon the approved total baseline schedule and on all data relevant to the extension. a) Such data shall be included in the next updating of the Progress schedule. b) Actual delays in activities which, according to the Baseline schedule, do not affect any Contract completion date shown by the critical path in the network will not be the basis for a change therein. 2. Submit each request for change in Contract completion date to the City within 30 days after the beginning of the delay for which a time extension is requested but before the date of final payment under this Contract. a. No time extension will be granted for requests which are not submitted within the foregoing time limit. b. From time to time, it may be necessary for the Contract schedule or completion time to be adjusted by the City to reflect the effects of job conditions, weather, technical difficulties, strikes, unavoidable delays on the part of the City or its representatives, and other unforeseeable conditions which may indicate schedule adjustments or completion time extensions. 1) Under such conditions, the City will direct the Contractor to reschedule the work or Contract completion time to reflect the changed conditions and the Contractor shall revise his schedule accordingly. a) No additional compensation will be made to the Contractor for such schedule changes except for unavoidable overall contract time extensions beyond the actual completion of unaffected work, in which case the Contractor shall take all possible action to minimize any time extension and any additional cost to the City. b) Available float time in the Baseline schedule may be used by the City as well as by the Contractor. 3. Float or slack time is defined as the amount of time between the earliest start date and the latest start date or between the earliest finish date and the latest finish date of a chain of activities on the Baseline Schedule. a. Float or slack time is not for the exclusive use or benefit of either the Contractor or the City. b. Proceed with work according to early start dates, and the City shall have the right to reserve and apportion float time according to the needs of the project. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised July 1, 2011 013216-4 DAP CONSTRUCTION PROGRESS SCHEDULE Page 4 of 5 c. Acknowledge and agree that actual delays, affecting paths of activities containing float time, will not have any effect upon contract completion times, providing that the actual delay does not exceed the float time associated with those activities. E. Coordinating Schedule with Other Contract Schedules 1. Where work is to be performed under this Contract concurrently with or contingent upon work performed on the same facilities or area under other contracts, the Baseline Schedule shall be coordinated with the schedules of the other contracts. a. Obtain the schedules of the other appropriate contracts from the City for the preparation and updating of Baseline schedule and make the required changes in his schedule when indicated by changes in corresponding schedules. 2. In case of interference between the operations of different contractors, the City will determine the work priority of each contractor and the sequence of work necessary to expedite the completion of the entire Project. a. In such cases, the decision of the City shall be accepted as final. b. The temporary delay of any work due to such circumstances shall not be considered as justification for claims for additional compensation. 1.5 SUBMITTALS A. Baseline Schedule 1. Submit Schedule in native file format and pdf format as required in the City of Fort Worth Schedule Guidance Document. a. Native file format includes: 1) Primavera (P6 or Primavera Contractor) 2. Submit draft baseline Schedule to City prior to the pre -construction meeting and bring in hard copy to the meeting for review and discussion. B. Progress Schedule 1. Submit progress Schedule in native file format and pdf format as required in the City of Fort Worth Schedule Guidance Document. 2. Submit progress Schedule monthly no later than the last day of the month. C. Schedule Narrative 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth Schedule Guidance Document. 2. Submit schedule narrative monthly no later than the last day of the month. D. Submittal Process 1. The City administers and manages schedules through Buzzsaw. 2. Contractor shall submit documents as required in the City of Fort Worth Schedule Guidance Document. 3. Once the project has been completed and Final Acceptance has been issued by the City, no further progress schedules are required. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised July 1, 2011 013216-5 DAP CONSTRUCTION PROGRESS SCHEDULE Page 5 of 5 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. The person preparing and revising the construction Progress Schedule shall be experienced in the preparation of schedules of similar complexity. B. Schedule and supporting documents addressed in this Specification shall be prepared, updated and revised to accurately reflect the performance of the construction. C. Contractor is responsible for the quality of all submittals in this section meeting the standard of care for the construction industry for similar projects. 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised July 1, 2011 013233-1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infill developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Imprvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 to Serve Brookfield Frontier Industrial Revised August 30, 2013 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Imprvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 to Serve Brookfield Frontier Industrial Revised August 30, 2013 SECTION 0133 00 DAP SUBMITTALS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 DAP SUBMITTALS Page 1 of 8 General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised August 30, 2013 013300-2 DAP SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/2 inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised August 30, 2013 013300-3 DAP SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised August 30, 2013 013300-4 DAP SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised August 30, 2013 013300-5 DAP SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised August 30, 2013 013300-6 DAP SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised August 30, 2013 013300-7 DAP SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised August 30, 2013 013300-8 DAP SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] D 31111=1x4011130 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised August 30, 2013 0135 13- 1 DAP SPECIAL PROJECT PROCEDURES Page 1 of 7 1 SECTION 0135 13 2 SPECIAL PROJECT PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 £ Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1 — General Requirements 23 3. Section 33 12 25 — Connection to Existing Water Mains 24 25 1.2 REFERENCES 26 A. Reference Standards 27 1. Reference standards cited in this Specification refer to the current reference 28 standard published at the time of the latest revision date logged at the end of this 29 Specification, unless a date is specifically cited. 30 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 31 High Voltage Overhead Lines. 32 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 33 Specification 34 1.3 ADMINISTRATIVE REQUIREMENTS 35 A. Coordination with the Texas Department of Transportation 36 1. When work in the right-of-way which is under the jurisdiction of the Texas 37 Department of Transportation (TxDOT): 38 a. Notify the Texas Department of Transportation prior to commencing any work 39 therein in accordance with the provisions of the permit CITY OF FORT WORTH Water, Sanitary Sewer. Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 013513-2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 b. All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation B. Work near High Voltage Lines 1. Regulatory Requirements a. All Work near High Voltage Lines (more than 600 volts measured between conductors or between a conductor and the ground) shall be in accordance with Health and Safety Code, Title 9, Subtitle A, Chapter 752. 2. Warning sign a. Provide sign of sufficient size meeting all OSHA requirements. 3. Equipment operating within 10 feet of high voltage lines will require the following safety features a. Insulating cage -type of guard about the boom or arm b. Insulator links on the lift hook connections for back hoes or dippers c. Equipment must meet the safety requirements as set forth by OSHA and the safety requirements of the owner of the high voltage lines 4. Work within 6 feet of high voltage electric lines a. Notification shall be given to: 1) The power company (example: ONCOR) a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section 0131 13 E. Water Department Coordination 1. During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. CITY OF FORT WORTH Water, Sanitary Sewer. Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised August, 30, 2013 013513-3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 1 2. Coordinate any event that will require connecting to or the operation of an existing 2 City water line system with the City's representative. 3 a. Coordination shall be in accordance with Section 33 12 25. 4 b. If needed, obtain a hydrant water meter from the Water Department for use 5 during the life of named project. 6 c. In the event that a water valve on an existing live system be turned off and on 7 to accommodate the construction of the project is required, coordinate this 8 activity through the appropriate City representative. 9 1) Do not operate water line valves of existing water system. 10 a) Failure to comply will render the Contractor in violation of Texas Penal 11 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 12 will be prosecuted to the full extent of the law. 13 b) In addition, the Contractor will assume all liabilities and 14 responsibilities as a result of these actions. 15 F. Public Notification Prior to Beginning Construction 16 1. Prior to beginning construction on any block in the project, on a block by block 17 basis, prepare and deliver a notice or flyer of the pending construction to the front 18 door of each residence or business that will be impacted by construction. The notice 19 shall be prepared as follows: 20 a. Post notice or flyer 7 days prior to beginning any construction activity on each 21 block in the project area. 22 1) Prepare flyer on the Contractor's letterhead and include the following 23 information: 24 a) Name of Project 25 b) City Project No (CPN) 26 c) Scope of Project (i.e. type of construction activity) 27 d) Actual construction duration within the block 28 e) Name of the contractor's foreman and phone number 29 f) Name of the City's inspector and phone number 30 g) City's after-hours phone number 31 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 32 A. 33 3) Submit schedule showing the construction start and finish time for each 34 block of the project to the inspector. 35 4) Deliver flyer to the City Inspector for review prior to distribution. 36 b. No construction will be allowed to begin on any block until the flyer is 37 delivered to all residents of the block. 38 G. Public Notification of Temporary Water Service Interruption during Construction 39 1. In the event it becomes necessary to temporarily shut down water service to 40 residents or businesses during construction, prepare and deliver a notice or flyer of 41 the pending interruption to the front door of each affected resident. 42 2. Prepared notice as follows: 43 a. The notification or flyer shall be posted 24 hours prior to the temporary 44 interruption. 45 b. Prepare flyer on the contractor's letterhead and include the following 46 information: 47 1) Name of the project CITY OF FORT WORTH Water, Sanitary Sewer. Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised August, 30, 2013 0135 13 - 4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 1 2) City Project Number 2 3) Date of the interruption of service 3 4) Period the interruption will take place 4 5) Name of the contractor's foreman and phone number 5 6) Name of the City's inspector and phone number 6 c. A sample of the temporary water service interruption notification is attached as 7 Exhibit B. 8 d. Deliver a copy of the temporary interruption notification to the City inspector 9 for review prior to being distributed. 10 e. No interruption of water service can occur until the flyer has been delivered to 11 all affected residents and businesses. 12 f. Electronic versions of the sample flyers can be obtained from the Project 13 Construction Inspector. 14 H. Coordination with United States Army Corps of Engineers (USACE) 15 1. At locations in the Project where construction activities occur in areas where 16 USACE permits are required, meet all requirements set forth in each designated 17 permit. 18 I. Coordination within Railroad Permit Areas 19 1. At locations in the project where construction activities occur in areas where 20 railroad permits are required, meet all requirements set forth in each designated 21 railroad permit. This includes, but is not limited to, provisions for: 22 a. Flagmen 23 b. Inspectors 24 c. Safety training 25 d. Additional insurance 26 e. Insurance certificates 27 f. Other employees required to protect the right-of-way and property of the 28 Railroad Company from damage arising out of and/or from the construction of 29 the project. Proper utility clearance procedures shall be used in accordance 30 with the permit guidelines. 31 2. Obtain any supplemental information needed to comply with the railroad's 32 requirements. 33 J. Dust Control 34 1. Use acceptable measures to control dust at the Site. 35 a. If water is used to control dust, capture and properly dispose of waste water. 36 b. If wet saw cutting is performed, capture and properly dispose of slurry. 37 K. Employee Parking 38 1. Provide parking for employees at locations approved by the City. 39 L. {Coordination with North Central Texas Council of Governments (NCTCOG) Clean 40 Construction Specification [if required for the project] 41 1. Comply with equipment, operational, reporting and enforcement requirements set 42 forth in NCTCOG's Clean Construction Specification. } CITY OF FORT WORTH Water, Sanitary Sewer. Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised August, 30, 2013 013513-5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 1 1.4 SUBMITTALS [NOT USED] 2 1.5 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.6 CLOSEOUT SUBMITTALS [NOT USED] 4 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.8 QUALITY ASSURANCE [NOT USED] 6 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.10 FIELD [SITE] CONDITIONS [NOT USED] 8 1.11 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION 12 13 Revision Log DATE NAME SUMMARY OF CHANGE 1.3.13— Added requirement of compliance with Health and Safety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH Water, Sanitary Sewer. Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised August, 30, 2013 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 01 35 13 - 6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH Water, Sanitary Sewer. Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised August, 30, 2013 2 4 Date: EXHIBIT B FORT WORTH DOE NO. xxxx Project Name: 013513-7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR CITY OF FORT WORTH Water, Sanitary Sewer. Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 Revised August, 30, 2013 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another form of distribution approved by the City. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 to Serve Brookfield Frontier Industrial Revised March 20, 2020 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 03/20/2020 D.V. Magana Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 to Serve Brookfield Frontier Industrial Revised March 20, 2020 015000-1 DAP TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised JULY 1, 2011 01 50 00 - 2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised JULY 1, 2011 01 50 00 - 3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised JULY 1, 2011 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME END OF SECTION Revision Log SUMMARY OF CHANGE CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised JULY 1, 2011 015526-1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 SECTION 0155 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised July 1, 2011 015526-2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised July 1, 2011 015526-3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised July 1, 2011 015713-1 DAP STORM WATER POLLUTION PREVENTION Page 1 of 3 SECTION 0157 13 STORM WATER POLLUTION PREVENTION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 3125 00 — Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised July 1, 2011 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP Submit in accordance with Section 0133 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised July 1, 2011 0157 13 -3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME END OF SECTION Revision Log SUMMARY OF CHANGE CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised July 1, 2011 015813-1 DAP TEMPORARY PROJECT SIGNAGE Page 1 of 3 SECTION 0158 13 TEMPORARY PROJECT SIGNAGE PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Temporary Project Signage Requirements B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USEDI 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Design Criteria 1. Provide free standing Project Designation Sign in accordance with City's Standard Details for project signs. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookf eld Frontier Industrial CPN: 105490 Revised April 7, 2014 01 58 13 - 2 DAP TEMPORARY PROJECT SIGNAGE Page 2 of 3 B. Materials 1. Sign a. Constructed of 3/4-inch fir plywood, grade A-C (exterior) or better 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Provide vertical installation at extents of project. 2. Relocate sign as needed, upon request of the City. B. Mounting options a. Skids b. Posts c. Barricade 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE A. General 1. Maintenance will include painting and repairs as needed or directed by the City. 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookf eld Frontier Industrial CPN: 105490 Revised April 7, 2014 0158 13 -3 DAP TEMPORARY PROJECT SIGNAGE DATE NAME 4/7/2014 M. Domenech Revision Log SUMMARY OF CHANGE Revised for DAP application Page 3 of 3 CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookf eld Frontier Industrial CPN: 105490 Revised April 7, 2014 SECTION 0160 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 60 00 DAP PRODUCT REQUIREMENTS Page 1 of 2 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City's website at: httDs://apps.fortworthtexas.2ov/ProiectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. C. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. D. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised March 20, 2020 01 60 00 DAP PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/2020 D.V. Magafia Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised March 20, 2020 016600-1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised April 7, 2014 01 66 00 - 2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised April 7, 2014 016600-3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised April 7, 2014 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised April 7, 2014 01 70 00 - 1 MOBILIZATION AND REMOBILIZATION Pagel of 4 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects CITY OF FORT WORTH Water, Sanitary Sewer, Paving Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105490 Revised November 22, 2016 01 70 00 - 2 MOBILIZATION AND REMOBILIZATION Page 2 of 4 1 a. Mobilization and Demobilization 2 1) Mobilization shall consist of the activities and cost on a Work Order basis 3 necessary for: 4 a) Transportation of Contractor's personnel, equipment, and operating 5 supplies to the Site for the issued Work Order. 6 b) Establishment of necessary general facilities for the Contractor's 7 operation at the Site for the issued Work Order 8 2) Demobilization shall consist of the activities and cost necessary for: 9 a) Transportation of Contractor's personnel, equipment, and operating 10 supplies from the Site including disassembly for each issued Work 11 Order 12 b) Site Clean-up for each issued Work Order 13 c) Removal of all buildings or other facilities assembled at the Site for 14 each Work Oder 15 b. Mobilization and Demobilization do not include activities for specific items of 16 work for which payment is provided elsewhere in the contract. 17 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 18 a. A Mobilization for Miscellaneous Projects when directed by the City and the 19 mobilization occurs within 24 hours of the issuance of the Work Order. 20 B. Deviations from this City of Fort Worth Standard Specification 21 1. None. 22 C. Related Specification Sections include, but are not necessarily limited to: 23 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 24 2. Division 1 — General Requirements 25 1.2 PRICE AND PAYMENT PROCEDURES 26 A. Measurement and Payment [Consult City Department/Division for direction on if 27 Mobilization pay item to be included or the item should be subsidiary. Include the 28 appropriate Section 1.2 A. 1.] 29 1. Mobilization and Demobilization 30 a. Measure 31 1) This Item is considered subsidiary to the various Items bid. 32 b. Payment 33 1) The work performed and materials furnished in accordance with this Item 34 are subsidiary to the various Items bid and no other compensation will be 35 allowed. 36 2. Remobilization for suspension of Work as specifically required in the Contract 37 Documents 38 a. Measurement 39 1) Measurement for this Item shall be per each remobilization performed. 40 b. Payment 41 1) The work performed and materials furnished in accordance with this Item 42 and measured as provided under "Measurement" will be paid for at the unit 43 price per each "Specified Remobilization" in accordance with Contract 44 Documents. 45 c. The price shall include: CITY OF FORT WORTH Water, Sanitary Sewer, Paving Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105490 Revised November 22, 2016 01 70 00 - 3 MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 1) Demobilization as described in Section 1.1.A.2.a.1) 2 2) Remobilization as described in Section 1.1.A.2.a.2) 3 d. No payments will be made for standby, idle time, or lost profits associated this 4 Item. 5 3. Remobilization for suspension of Work as required by City 6 a. Measurement and Payment 7 1) This shall be submitted as a Contract Claim in accordance with Article 10 8 of Section 00 72 00. 9 2) No payments will be made for standby, idle time, or lost profits associated 10 with this Item. 11 4. Mobilizations and Demobilizations for Miscellaneous Projects 12 a. Measurement 13 1) Measurement for this Item shall be for each Mobilization and 14 Demobilization required by the Contract Documents 15 b. Payment 16 1) The Work performed and materials furnished in accordance with this Item 17 and measured as provided under "Measurement" will be paid for at the unit 18 price per each "Work Order Mobilization" in accordance with Contract 19 Documents. Demobilization shall be considered subsidiary to mobilization 20 and shall not be paid for separately. 21 c. The price shall include: 22 1) Mobilization as described in Section 1.1.A.3.a.1) 23 2) Demobilization as described in Section 1.1.A.3.a.2) 24 d. No payments will be made for standby, idle time, or lost profits associated this 25 Item. 26 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 27 a. Measurement 28 1) Measurement for this Item shall be for each Mobilization and 29 Demobilization required by the Contract Documents 30 b. Payment 31 1) The Work performed and materials furnished in accordance with this Item 32 and measured as provided under "Measurement" will be paid for at the unit 33 price per each "Work Order Emergency Mobilization" in accordance with 34 Contract Documents. Demobilization shall be considered subsidiary to 35 mobilization and shall not be paid for separately. 36 c. The price shall include 37 1) Mobilization as described in Section 1.1.A.4.a) 38 2) Demobilization as described in Section 1.1.A.3.a.2) 39 d. No payments will be made for standby, idle time, or lost profits associated this 40 Item. 41 1.3 REFERENCES [NOT USED] 42 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 43 1.5 SUBMITTALS [NOT USED] 44 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 45 1.7 CLOSEOUT SUBMITTALS [NOT USED] CITY OF FORT WORTH Water, Sanitary Sewer, Paving Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105490 Revised November 22, 2016 01 70 00 - 4 MOBILIZATION AND REMOBILIZATION Page 4 of 4 1 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 2 1.9 QUALITY ASSURANCE [NOT USED] 3 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 5 1.12 WARRANTY [NOT USED] 6 PART 2 - PRODUCTS [NOT USED] 7 PART 3 - EXECUTION [NOT USED] 8 END OF SECTION 9 Revision Log DATE NAME SUMMARY OF CHANGE 11/22/16 Michael Owen 1.2 Price and Payment Procedures - Revised specification, including blue text, to make specification flexible for either subsidiary or paid bid item for Mobilization. 10 CITY OF FORT WORTH Water, Sanitary Sewer, Paving Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 105490 Revised November 22, 2016 017123-1 CONSTRUCTION STAKING AND SURVEY Pagel of 8 1 SECTION 01 71 23 2 CONSTRUCTION STAKING AND SURVEY 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. See Changes (Highlighted in Yellow). 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Construction Staking 15 a. Measurement 16 1) This Item is considered subsidiary to the various Items bid. 17 b. Payment 18 1) The work performed and the materials furnished in accordance with this 19 Item are subsidiary to the various Items bid and no other compensation will 20 be allowed. 21 2. Construction Survey 22 a. Measurement 23 1) This Item is considered subsidiary to the various Items bid. 24 b. Payment 25 1) The work performed and the materials furnished in accordance with this 26 Item are subsidiary to the various Items bid and no other compensation will be 27 allowed. 28 3. As -Built Survey 29 a. Measurement 30 1) This Item is considered subsidiary to the various Items bid. 31 b. Payment 32 1) The work performed and the materials furnished in accordance with this 33 Item are subsidiary to the various Items bid and no other compensation will be 34 allowed. 35 1.3 REFERENCES 36 A. Definitions 37 1. Construction Survev - The survey measurements made prior to or while 38 construction is in progress to control elevation, horizontal position, dimensions and 39 configuration of structures/improvements included in the Project Drawings. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 105490 Revised February 14, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 2. As -built Survev —The measurements made after the construction of the improvement features are complete to provide position coordinates for the features of a project. 3. Construction Staking — The placement of stakes and markings to provide offsets and elevations to cut and fill in order to locate on the ground the designed structures/improvements included in the Project Drawings. Construction staking shall include staking easements and/or right of way if indicated on the plans. 4. Survev "Field Checks" — Measurements made after construction staking is completed and before construction work begins to ensure that structures marked on the ground are accurately located per Project Drawings. B. Technical References 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) — 01 71 23.16.01— Attachment A Survey Staking Standards 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available on City's Buzzsaw website). 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land Surveying in the State of Texas, Category 5 20 1.4 ADMINISTRATIVE REQUIREMENTS 21 A. The Contractor's selection of a surveyor must comply with Texas Government 22 Code 2254 (qualifications based selection) for this project. 23 1.5 SUBMITTALS 24 A. Submittals, if required, shall be in accordance with Section 0133 00. 25 B. All submittals shall be received and reviewed by the City prior to delivery of work. 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS 27 A. Field Quality Control Submittals 28 1. Documentation verifying accuracy of field engineering work, including coordinate 29 conversions if plans do not indicate grid or ground coordinates. 30 2. Submit "Cut -Sheets" conforming to the standard template provided by the City 31 (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 32 1.7 CLOSEOUT SUBMITTALS 33 B. As -built Redline Drawing Submittal 34 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of 35 constructed improvements signed and sealed by Registered Professional Land 36 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A 37 — Survey Staking Standards). CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 105490 Revised February 14, 2018 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1 2. Contractor shall submit the proposed as -built and completed redline drawing 2 submittal one (1) week prior to scheduling the project final inspection for City 3 review and comment. Revisions, if necessary, shall be made to the as -built redline 4 drawings and resubmitted to the City prior to scheduling the construction final 5 inspection. 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE 8 A. Construction Staking 9 1. Construction staking will be performed by the Contractor. 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 2. Coordination a. Contact City and Developer's Project Representative at least one week in advance notifying the City of when Construction Staking is scheduled. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes. If Developer's Project Representative is required to re -stake for any reason, the Contractor will be responsible for costs to perform staking. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed disturbed or omitted that the contracted Work cannot take place then the Contractor will be required to stake or re -stake the deficient areas. B. Construction Survey 1. Construction Survey will be performed by the Contractor. 2. Coordination a. Contractor to verify that horizontal and vertical control data established in the design survey and required for construction survey is available and in place. 3. General a. Construction survey will be performed in order to construct the work shown on the Construction Drawings and specified in the Contract Documents. b. For construction methods other than open cut, the Contractor shall perform construction survey and verify control data including, but not limited to, the following: 1) Verification that established benchmarks and control are accurate. 2) Use of Benchmarks to furnish and maintain all reference lines and grades for tunneling. 3) Use of line and grades to establish the location of the pipe. 4) Submit to the City copies of field notes used to establish all lines and grades, if requested, and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City, if requested, to verify the guidance system and the line and grade of the carrier pipe. 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 105490 Revised February 14, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 25O linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 25O linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) d) Fire hydrants e) Valves (gate, butterfly, etc.) CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 105490 Revised February 14, 2018 017123-5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 1 f) Air Release valves (Manhole rim and vent pipe) 2 g) Blow off valves (Manhole rim and valve lid) 3 h) Pressure plane valves 4 i) Underground Vaults 5 (1) Rim and flowline elevations and coordinates for each 6 Underground Vault. 7 3) Sanitary Sewer 8 a) Cleanouts 9 (1) Rim and flowline elevations and coordinates for each 10 b) Manholes and Junction Structures 11 (1) Rim and flowline elevations and coordinates for each 12 manhole and junction structure. 13 4) Stormwater — Not Applicable 14 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY 17 PART 2 - PRODUCTS 18 A. A construction survey will produce, but will not be limited to: 19 1. Recovery of relevant control points, points of curvature and points of intersection. 20 2. Establish temporary horizontal and vertical control elevations (benchmarks) 21 sufficiently permanent and located in a manner to be used throughout construction. 22 3. The location of planned facilities, easements and improvements. 23 a. Establishing final line and grade stakes for piers, floors, grade beams, parking 24 areas, utilities, streets, highways, tunnels, and other construction. 25 b. A record of revisions or corrections noted in an orderly manner for reference. 26 c. A drawing, when required by the client, indicating the horizontal and vertical 27 location of facilities, easements and improvements, as built. 28 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all 29 construction staking projects. These cut sheets shall be on the standard city template 30 which can be obtained from the Survey Superintendent (817-392-7925). 31 5. Digital survey files in the following formats shall be acceptable: 32 a. AutoCAD (.dwg) 33 b. ESRI Shapefile (.shp) 34 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use 35 standard templates, if available) 36 6. Survey files shall include vertical and horizontal data tied to original project 37 control and benchmarks, and shall include feature descriptions 38 PART 3 - EXECUTION 39 3.1 INSTALLERS 40 A. Tolerances: CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 105490 Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 1 1. The staked location of any improvement or facility should be as accurate as 2 practical and necessary. The degree of precision required is dependent on many 3 factors all of which must remain judgmental. The tolerances listed hereafter are 4 based on generalities and, under certain circumstances, shall yield to specific 5 requirements. The surveyor shall assess any situation by review of the overall plans 6 and through consultation with responsible parties as to the need for specific 7 tolerances. 8 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical 9 tolerance. Horizontal alignment for earthwork and rough cut should not exceed 10 1.0 ft. tolerance. 11 b. Horizontal alignment on a structure shall be within .0.1 ft tolerance. 12 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and 13 walkways shall be located within the confines of the site boundaries and, 14 occasionally, along a boundary or any other restrictive line. Away from any 15 restrictive line, these facilities should be staked with an accuracy producing no 16 more than 0.05ft. tolerance from their specified locations. 17 d. Underground and overhead utilities, such as sewers, gas, water, telephone and 18 electric lines, shall be located horizontally within their prescribed areas or 19 easements. Within assigned areas, these utilities should be staked with an 20 accuracy producing no more than 0.1 ft tolerance from a specified location. 21 e. The accuracy required for the vertical location of utilities varies widely. Many 22 underground utilities require only a minimum cover and a tolerance of 0.1 ft. 23 should be maintained. Underground and overhead utilities on planned profile, 24 but not depending on gravity flow for performance, should not exceed 0.1 ft. 25 tolerance. 26 B. Surveying instruments shall be kept in close adjustment according to manufacturer's 27 specifications or in compliance to standards. The City reserves the right to request a 28 calibration report at any time and recommends regular maintenance schedule be 29 performed by a certified technician every 6 months. 30 1. Field measurements of angles and distances shall be done in such fashion as to 31 satisfy the closures and tolerances expressed in Part 3.1.A. 32 2. Vertical locations shall be established from a pre -established benchmark and 33 checked by closing to a different bench mark on the same datum. 34 3. Construction survey field work shall correspond to the client's plans. Irregularities 35 or conflicts found shall be reported promptly to the City. 36 4. Revisions, corrections and other pertinent data shall be logged for future reference. 37 38 3.2 EXAMINATION [NOT USED] 39 3.3 PREPARATION [NOT USED] 40 3.4 APPLICATION 41 3.5 REPAIR / RESTORATION 42 A. If the Contractor's work damages or destroys one or more of the control 43 monuments/points set by the Developer's Project Representative, the monuments shall be 44 adequately referenced for expedient restoration. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 105490 Revised February 14, 2018 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 1 1. Notify City or Developer's Project Representative if any control data needs to be 2 restored or replaced due to damage caused during construction operations. 3 a. Contractor shall perform replacements and/or restorations. 4 b. The City or Developer's Project Representative may require at anytime a 5 survey "Field Check" of any monument or benchmarks that are set be verified 6 by the Developer's Project Representative before further associated work can 7 move forward. 8 3.6 RE -INSTALLATION [NOT USED] 9 3.7 FIELD [OR] SITE QUALITY CONTROL 10 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 11 Developer's Project Representative in accordance with this Specification. This includes 12 easements and right of way, if noted on the plans. 13 B. Do not change or relocate stakes or control data without approval from the City. 14 3.8 SYSTEM STARTUP 15 A. Survey Checks 16 1. The City reserves the right to perform a Survey Check at any time deemed 17 necessary. 18 2. Checks by City personnel or 31 party contracted surveyor are not intended to 19 relieve the contractor of his/her responsibility for accuracy. 20 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. 2/14/2018 M Owen Removed "blue text"; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 105490 Revised February 14, 2018 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements to Serve Brookfield Frontier Industrial STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 105490 Revised February 14, 2018 SECTION 0174 23 CLEANING PART1- GENERAL 1.1 SUMMARY 017423-1 DAP CLEANING Page 1 of 4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised April 7, 2014 01 74 23 - 2 DAP CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised April 7, 2014 01 74 23 - 3 DAP CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised April 7, 2014 DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application 01 74 23 - 4 DAP CLEANING Page 4 of 4 CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised April 7, 2014 SECTION 0177 19 CLOSEOUT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY 017719-1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookf eld Frontier Industrial CPM 105490 Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookf eld Frontier Industrial CPM 105490 Revised April 7, 2014 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) £ Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookf eld Frontier Industrial CPM 105490 Revised April 7, 2014 017839-1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 [o Serve Brookfield Frontier Industrial Revised April 7, 2014 01 78 39 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 [o Serve Brookfield Frontier Industrial Revised April 7, 2014 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 [o Serve Brookfield Frontier Industrial Revised April 7, 2014 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP Application CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 105490 [o Serve Brookfield Frontier Industrial Revised April 7, 2014 SECTION 34 4120 - LED PILOT PROGRAM CFW LED Residential 100 - 150W Replacement Specification December 2013 City of Fort Worth Specification for Residential LED Roadway Luminaires PART 1— GENERAL 1.1. REFERENCES The publications listed below form a part of this specification to the extent referenced. Publications are referenced within the text by their basic designation only. Versions listed shall be superseded by updated versions as they become available. A. American National Standards Institute (ANSI) 1. C136.2-2004 (or latest), American National Standard for Roadway and Area Lighting Equipment—Luminaire Voltage Classification 2. C136.10-2010 (or latest), American National Standard for Roadway and Area Lighting Equipment - Locking -Type Photocontrol Devices and Mating Receptacle Physical and Electrical Interchangeability and Testing 3. C136.15-2011 (or latest), American National Standard for Roadway and Area Lighting Equipment— Luminaire Field Identification 4. C136.22-2004 (R2009 or latest), American National Standard for Roadway and Area Lighting Equipment — Internal Labeling of Luminaires 5. C136.25-2009 (or latest), American National Standard for Roadway and Area Lighting Equipment— Ingress Protection (Resistance to Dust, Solid Objects and Moisture) for Luminaire Enclosures 6. C136.31-2010 (or latest), American National Standard for Roadway Lighting Equipment— Luminaire Vibration 7. C136.37-2011 (or latest), American National Standard for Roadway and Area Lighting Equipment - Solid State Light Sources Used in Roadway and Area Lighting B. American Society for Testing and Materials International (ASTM) 1. B117-09 (or latest), Standard Practice for Operating Salt Spray (Fog) Apparatus 2. D1654-08 (or latest), Standard Test Method for Evaluation of Painted or Coated Specimens Subjected to Corrosive Environments 3. D523-08 (or latest), Standard Test Method for Specular Gloss 4. G154-06 (or latest), Standard Practice for Operating Fluorescent Light Apparatus for UV Exposure of Nonmetallic Materials C. Council of the European Union (EC) 1. RoHS Directive 2002/95/EC, on the restriction of the use of certain hazardous substances in electrical and electronic equipment D. Federal Trade Commission (FTC) 1. Green Guides, 16 CFR Part 260, Guides for the Use of Environmental Marketing Claims E. Illuminating Engineering Society of North America (IESNA or IES) 1. DG-4-03 (or latest), Design Guide for Roadway Lighting Maintenance 2. HB-10-11 (or latest), IES Lighting Handbook, 10th Edition 3. LM-50-99 (or latest), IESNA Guide for Photometric Measurement of Roadway Lighting Installations 4. LM-61-06 (or latest), IESNA Approved Guide for Identifying Operating Factors Influencing Measured Vs. Predicted Performance for Installed Outdoor High Intensity Discharge (HID) Luminaires 5. LM-79-08 (or latest), IESNA Approved Method for the Electrical and Photometric Measurements of Solid -Sate Lighting Products Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e I 1 City of Fort Worth Specification for Residential LED Roadway Luminaires 6. LM-80-08 (or latest), IESNA Approved Method for Measuring Lumen Maintenance of LED Light Sources 7. RP-8-00 (or latest), ANSI / IESNA American National Standard Practice for Roadway Lighting 8. RP-16-10 (or latest), ANSI/IES Nomenclature and Definitions for Illuminating Engineering 9. TM-3-95 (or latest), A Discussion of Appendix E - "Classification of Luminaire Lighting Distribution," from ANSI/IESNA RP-8-83 10. TM-15-11 (or latest), Luminaire Classification System for Outdoor Luminaires 11. TM-21-11 (or latest), Projecting Long Term Lumen Maintenance of LED Light Sources F. Institute of Electrical and Electronics Engineers (IEEE) 1. IEEE C62.41.2-2002 (or latest), IEEE Recommended Practice on Characterization of Surges in Low -Voltage (1000 V and less) AC Power Circuits 2. ANSI/IEEE C62.45-2002 (or latest), IEEE Recommended Practice on Surge Testing for Equipment Connected to Low -Voltage (1000 V and Less) AC Power Circuits G. National Electrical Manufacturers Association (NEMA) 1. ANSI/NEMA/ANSLG C78.377-2008 (or latest), American National Standard for the Chromaticity of Solid State Lighting Products H. National Fire Protection Association (NFPA) 1. 70— National Electrical Code (NEC) I. Underwriters Laboratories (UL) 1. 1449, Surge Protective Devices 2. 1598, Luminaires 3. 8750, Light Emitting Diode (LED) Equipment for Use in Lighting Products 1.2. RELATED DOCUMENTS A. Contract Drawings and conditions of Contract (including General Conditions, Addendum to the General Conditions, Special Conditions, Division 01 Specifications Sections and all other Contract Documents) apply to the work of this section. a. See the separate Specification for Adaptive Control and Remote Monitoring of LED Roadway Luminaires for additional driver performance and interface requirements. 1.3. DEFINITIONS A. Lighting terminology used herein is defined in IES RP-16. See referenced documents for additional definitions. Exception: The term "driver" is used herein to broadly cover both drivers and power supplies, where applicable. Clarification: The term "LED light source(s)" is used herein per IES LM-80 to broadly cover LED package(s), module(s), and array(s). 1.4. QUALITY ASSURANCE A. Before approval and purchase, Owner may request luminaire sample(s) identical to product configuration(s) submitted for inspection. Owner may request IES LM-79 testing of luminaire sample(s) to verify performance is within manufacturer -reported tolerances. Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e 12 City of Fort Worth Specification for Residential LED Roadway Luminaires B. After installation, Owner may perform IES LM-50 field measurements to verify performance requirements outlined in Appendix A, giving consideration to measurement uncertainties outlined in IES LM-61. 1.5. LIGHTING SYSTEM PERFORMANCE A. Energy Conservation 1. Connected Load a. Luminaires shall have maximum nominal luminaire input wattage as specified for each luminaire type in Appendix A. 2. Lighting Controls a. See separate controls specification identified in section 1.2 above, if applicable. b. See section 2.1-13 below for driver control interface and performance requirements. c. See section 2.1-K below for photocontrol receptacle requirements. B. Photometric Requirements 1. Luminaires shall meet the general criteria provided in the body of this specification and the particular criteria for each luminaire type defined in Appendix A. 1.6. REQUIRED SUBMITTALS FOR EACH LUMINAIRE TYPE DEFINED IN APPENDIX A A. General submittal content shall include 1. Completed Appendix E submittal form 2. Luminaire cutsheets 3. Cutsheets for LED light sources 4. Cutsheets for LED driver(s) a. If dimmable LED driver is specified, provide diagrams illustrating light output and input power as a function of control signal. 5. Cutsheets for surge protection device, if applicable 6. Instructions for installation and maintenance 7. Summary of luminaire recycled content and recyclability per the FTC Green Guides, expressed by percentage of luminaire weight B. LM-79 luminaire photometric report(s) shall be produced by the test laboratory and include 1. Name of test laboratory a. The test laboratory must hold National Voluntary Laboratory Accreditation Program (NVLAP) accreditation for the IES LM-79 test procedure or must be qualified, verified, and recognized through the U.S. Department of Energy's CALIPER program. For more information, see httr)://ts.nist.gov/standards/scopes/eelit.htm or www.ssl.enerRv.Rov/test labs.html. 2. Report number 3. Date 4. Complete luminaire catalog number a. Provide explanation if catalog number in test report(s) does not match catalog number of luminaire submitted i. Clarify whether discrepancy does not affect performance, e.g., in the case of differing luminaire housing color. Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e 13 City of Fort Worth Specification for Residential LED Roadway Luminaires ii. If nominal performance of submitted and tested products differ, submit additional LM-79 report(s) and derivation as indicated in Appendix C. 5. Description of luminaire, LED light source(s), and LED driver(s) 6. Goniophotometry C. Calculations and supporting test data per Appendix B indicating a lumen maintenance life of not less than 36,000 operating hours D. Computer -generated point -by -point photometric analysis of maintained photopic light levels as per Appendix A 1. Calculations shall be for maintained values, i.e. Light Loss Factor (LLF) < 1.0, where LLF = LLD x LDD x LATF, and a. Lamp Lumen Depreciation (LLD) i. Shall be 0.95. ii. Shall be the percentage of initial output calculated in section 1.6-C. b. Luminaire Dirt Depreciation (LDD) = 0.90, as per IES DG-4 for an enclosed and gasketed roadway luminaire installed in an environment with less than 150 µg/m3 airborne particulate matter and cleaned every four years. c. Luminaire Ambient Temperature Factor (LATF) = 1.00 2. Calculation/measurement points shall be per IES RP-8. E. Summary of reliability testing performed for LED driver(s) F. Written product warranty as per section 1.7 below G. Safety certification and file number 1. Applicable testing bodies are determined by the US Occupational Safety Health Administration (OSHA) as Nationally Recognized Testing Laboratories (NRTL) and include: CSA (Canadian Standards Association), ETL (Edison Testing Laboratory), and UL (Underwriters Laboratory). H. Buy American documentation 1. Manufacturers listed on the current NEMA Listing of Companies Offering Outdoor Luminaires Manufactured in U.S.A. for Recovery Act Projects need only provide a copy of the document. 2. Other manufacturers shall submit documentation as per the DOE Guidance on Documenting Compliance with the Recovery Act Buy American Provisions (http://wwwl.eere.enerizv.jzov/recoverv/buv american provision.html). 1.7. WARRANTY A. Provide a minimum ten-year warranty covering maintained integrity and functionality of 1. Luminaire housing, wiring, and connections 2. LED light source(s) a. Negligible light output from more than 10 percent of the LED packages constitutes luminaire failure. 3. LED driver(s) B. Warranty period shall begin 90 days after date of invoice, or as negotiated by owner such as in the case of an auditable asset management system. PART 2 — PRODUCTS 2.1. LUMINAIRE REQUIREMENTS Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e 14 City of Fort Worth Specification for Residential LED Roadway Luminaires A. General Requirements 1. Luminaires shall be as specified for each type in Appendix A. 2. Luminaire shall have an external label per ANSI C136.15 3. Luminaire shall have an internal label per ANSI C136.22. 4. Luminaire to have internal label of manufactured date visible when drive compartment opened. 5. Nominal luminaire input wattage shall account for nominal applied voltage and any reduction in driver efficiency due to sub -optimal driver loading. 6. Luminaires shall start and operate in -20°C to +40°C ambient. 7. Electrically test fully assembled luminaires before shipment from factory. 8. Effective Projected Area (EPA) and weight of the luminaire shall not exceed the values indicated in Appendix A. 9. Luminaires shall be designed for ease of component replacement and end -of -life disassembly. 10. Luminaires shall have tool -less entry for access to driver compartment 11. Luminaires shall be a minimum of IP65 rated 12. Luminaires must be available in 4000 K and 3000 K options 13. Luminaires shall be rated for the ANSI C136.31 Vibration Level indicated in Appendix A. 14. LED light source(s) and driver(s) shall be RoHS compliant. 15. Transmissive optical components shall be applied in accordance with OEM design guidelines to ensure suitability for the thermal/mechanical/chemical environment. B. Driver 1. Rated case temperature shall be suitable for operation in the luminaire operating in the ambient temperatures indicated in section 2.1-A above. 2. Shall have a drive current no higher than 700mA 3. Shall accept the voltage or voltage range indicated in Appendix A at 50/60 Hz, and shall operate normally for input voltage fluctuations of plus or minus 10 percent. 4. Shall have a minimum Power Factor (PF) of 0.90 at full input power and across specified voltage range. 5. Control signal interface a. Luminaire types indicated "Required" in Appendix A shall accept a control signal as specified via separate controls specification referenced in section 1.2 above, e.g., for dimming. b. Luminaire types indicated "Not Required" in Appendix A need not accept a control signal. C. Electrical immunity Luminaire shall meet the "Basic" requirements in Appendix D. Manufacturer shall indicate on submittal form (Appendix E) whether failure of the electrical immunity system can possibly result in disconnect of power to luminaire. Luminaire shall meet the "Elevated" requirements in Appendix D. Manufacturer shall indicate on submittal form (Appendix E) whether failure of the electrical immunity system can possibly result in disconnect of power to luminaire. D. Electromagnetic interference 1. Shall have a maximum Total Harmonic Distortion (THD) of 20% at full input power and across specified voltage range. 2. Shall comply with FCC 47 CFR part 15 non -consumer RFI/EMI standards. Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 Page 15 City of Fort Worth Specification for Residential LED Roadway Luminaires E. Electrical safety testing 1. Luminaire shall be listed for wet locations by an OSHA NRTL. 2. Luminaires shall have locality -appropriate governing mark and certification. F. Painted or finished luminaire components exposed to the environment 1. Shall exceed a rating of six per ASTM D1654 after 1000hrs of testing per ASTM B117. 2. The coating shall exhibit no greater than 30% reduction of gloss per ASTM D523, after 500 hours of QUV testing at ASTM G154 Cycle 6. G. Thermal management 1. Mechanical design of protruding external surfaces (heat sink fins) for shall facilitate hose -down cleaning and discourage debris accumulation. 2. Liquids or other moving parts shall be clearly indicated in submittals, shall be consistent with product testing, and shall be subject to review by Owner. H. IES TM-15 limits for Backlight, Uplight, and Glare (BUG Ratings) shall be as specified for each luminaire type in Appendix A. 1. Calculation of BUG Ratings shall be for initial (worst -case) values, i.e., Light Loss Factor (LLF) = 1.0. 2. If luminaires are tilted upward for calculations in section 1.6-D, BUG Ratings shall be calculated for the same angle(s) of tilt. I. Minimum Color Rendering Index (CRI): 70. J. Correlated Color Temperature (CCT) 1. If nominal CCT specified in Appendix A is listed in Table 1 below, measured CCT and Duv shall be as listed in Table 1. Table 1. Allowable CCT and Duv (adapted from NEMA C78.377) Manufacturer -Rated Allowable LM-79 Chromaticity Values Nominal CCT (K) Measured CCT (K) =Measured Duv 2700 2580 to 2870 -0.006 to 0.006 3000 2870 to 3220 -0.006 to 0.006 3500 3220 to 3710 -0.006 to 0.006 4000 3710 to 4260 -0.005 to 0.007 4500 4260 to 4746 -0.005 to 0.007 5000 4745 to 5311 -0.004 to 0.008 5700 5310 to 6020 -0.004 to 0.008 6500 6020 to 7040 -0.003 to 0.009 2. If nominal CCT specified in Appendix A is not listed in Table 1, measured CCT and Duv shall be as per the criteria for Flexible CCT defined in NEMA C78.377. K. The following shall be in accordance with corresponding sections of ANSI C136.37 1. Wiring and grounding a. All internal components shall be assembled and pre -wired using modular electrical connections. 2. Mounting provisions a. Specific configurations are indicated in Appendix A 3. Terminal blocks for incoming AC lines 4. Photocontrol receptacle 5. Latching and hinging 6. Ingress protection Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e 16 City of Fort Worth Specification for Residential LED Roadway Luminaires 2.2. PRODUCT MANUFACTURERS A. Any manufacturer offering products that comply with the required product performance and operation criteria may be considered. 2.3. MANUFACTURER SERVICES A. Manufacturer or local sales representative shall provide installation and troubleshooting support via telephone and/or email. END OF SECTION Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e 17 City of Fort Worth Specification for Residential LED Roadway Luminaires APPENDIX A MATERIAL SPECIFICATION LUMINAIRE TYPE "A" EXISTING LUMINAIRE TO BE REPLACED (FOR REFERENCE ONLY) BENCHMARK LUMINAIRE: Lamp wattage and type 100 W HPS/ 150W MH Initial downward luminaire output (lumens below horizontal) -- 0.80 Light loss factor LENS: ❑ Flat ("cutoff' style) 0 Sag/drop IES' FORWARD TYPE: ❑ I ❑ II 2111 ❑ IV ❑ V ❑ VS IES1 LATERAL TYPE: ❑ Very short ❑ Short 0 Medium ❑ Long ❑ Very long PERFORMANCE CRITERIA: LED LUMINAIRE INPUT POWER: Max. nominal luminaire input power 105 W NOMINAL CCT: Rated correlated color temperature 3000 K PHOTOPICZ DOWNWARD Minimum maintained luminaire output below horizontal LUMINAIRE OUTPUT: CUTOFF CLASSIFICATION Full Cutoff Only VOLTAGE: Nominal luminaire input voltage 120/208/240 V FINISH: Luminaire housing finish color Gray WEIGHT: Maximum luminaire weight 30 lb EPA: Maximum effective projected area 0.7 ftz MOUNTING: Mtg. method ❑ Post -top 0 Side -arm ❑ Trunnion/yoke ❑ Swivel -tenon Tenon nominal pipe size (NPS) 1-1/4" to 2-3/8" VIBRATION: ANSI test level 0 Level 1 (normal) ❑ Level 2 (bridge/overpass) DRIVER: Control signal interface 0 Not required ❑ Required Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e 18 Appendix B Estimating LED Lumen Maintenance IES TM-21 allows for extrapolation of expected lumen maintenance from available test data. The extent of such extrapolation is limited by the duration of testing completed and the number of samples used in the testing. The TM-21 methodology shall be used by the manufacturer to determine lamp lumen depreciation (LLD) at end of lumen maintenance life per section 1.6-C. The applicant may estimate lumen maintenance in one of two ways: Option 1: Component Performance Under this compliance path, the applicant must submit calculations per TM-21 predicting lumen maintenance at the luminaire level using In Situ Temperature Measurement Testing (ISTMT) and LM-80 data. To be eligible for the Component Performance option, ALL of the conditions below must be met. If ANY of the conditions is not met, the component performance option may not be used and the applicant must use Option 2 for compliance. 1. The LED light source(s) have been tested according to LM-80. 2. The LED drive current specified by the luminaire manufacturer is less than or equal to the drive current specified in the LM-80 test report. 3. The LED light source(s) manufacturer prescribes/indicates a temperature measurement point (Ts) on the light source(s). 4. The Ts is accessible to allow temporary attachment of a thermocouple for measurement of in situ temperature. Access via a temporary hole in the housing, tightly resealed during testing with putty or other flexible sealant is allowable. 5. For the hottest LED light source in the luminaire, the temperature measured at the Ts during ISTMT is less than or equal to the temperature specified in the LM-80 test report for the corresponding drive current or higher, within the manufacturer's specified operating current range. a. The ISTMT laboratory must be approved by OSHA as a Nationally Recognized Testing Lab (NRTL), must be qualified, verified, and recognized through DOE's CALIPER program, or must be recognized through UL's Data Acceptance Program. b. The ISTMT must be conducted with the luminaire installed in the appropriate application as defined by ANSI/UL 1598 (hardwired luminaires), with bird -fouling appropriately simulated (and documented by photograph) as determined by the manufacturer. Option 2: Luminaire Performance Under this compliance path, the applicant must submit TM-21 calculations based on LM-79 photometric test data for no less than three samples of the entire luminaire. Duration of operation and interval between photometric tests shall conform to the TM-21 criteria for LED light sources. For example, testing solely at 0 and 6000 hours of operation would not be adequate for the purposes of extrapolation. Between LM-79 tests, the luminaire test samples must be operated long-term in the appropriate application as defined by ANSI/UL 1598 (hardwired luminaires). The test laboratory must hold Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I B-1 NVLAP accreditation for the LM-79 test procedure or must be qualified, verified, and recognized through the U.S. Department of Energy (DOE)'s CALIPER program. The extent of allowable extrapolation (either 5.5 or 6 times the test duration) depends on the total number of LED light sources (no less than 10 and preferably more than 19) installed in the luminaire samples, as per TM-21. This compliance path poses a greater testing burden to luminaire manufacturers but incorporates long-term testing of other components in the system, such as drivers. Under either compliance path, values used for extrapolation shall be summarized per TM-21 Tables 1 and 2. Submitted values for lumen maintenance lifetime and the associated percentage lumen maintenance shall be "reported" rather than "projected" as defined by TM-21. Supporting diagrams are requested to facilitate interpretation by Owner. Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I B-2 APPENDIX C PRODUCT FAMILY TESTING LM-79 AND ISTMT It is recognized that due to the time and cost required for product testing, it would not be realistic to expect manufacturers offering a multitude of unique luminaire configurations to test every possible configuration. Therefore, the "product families" method may be utilized for LM-79 and ISTMT, whereby manufacturers identify a set of representative products for which test data can be used to demonstrate the accuracy of interpolated or extrapolated performance of product configurations lacking test data. Precedent for this approach can be found in LM-80. If the particular luminaire configuration submitted has not been tested, the performance may be conservatively represented by test data for another luminaire configuration having: • The same intensity distribution (typically only applies to LM-79) • The same or lower nominal CCT • The same or higher nominal drive current • The same or greater number of LED light source(s) • The same or lower percentage driver loading and efficiency • The same or smaller size luminaire housing. A more accurate estimate of performance can be obtained by linear interpolation between two or more tests differing in terms of the six parameters listed above. For example, consider a hypothetical luminaire offered in a single size housing, and having the following parameters: • Three intensity distributions: IES Type II, III, or IV • Three CCTs: 4000, 5000, and 6000K • Three drive currents: 350, 525, and 700 mA • Four LED quantities: 20, 40, 60, or 80 LEDs. Table CA illustrates a set of tests which could allow for accurate interpolation between tested configurations, given a single luminaire housing size and essentially constant driver efficiency; these 10 tests may provide representative data for the 108 possible product configurations. Note that normalized intensity distribution must not be affected by the other three parameters. Table C.I. Representative testing of a single luminaire housing size Tests Intensity distribution (I ES Type) CCT (K) Drive current (mA) # of LEDs 4,5 6,7 8, 9, 10 II, III, IV IV IV IV 4000 5000, 6000 4000 4000 700 700 325,525 700 80 80 80 20, 40, 60 For example, the manufacturer could detail interpolation as shown in Table C.2, applying the following multipliers to the base test #2 to model a configuration with Type III intensity distribution, 5000K CCT, 525 mA drive current, and 40 LEDs: • Ratio of test #4 lumens to test #3 lumens • Ratio of test #7 lumens to test #3 lumens • Ratio of test #9 lumens to test #3 lumens. Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I C-1 Table C.2. Multipliers for Test #2 to yield: Type III , 5000K, 525mA, 40 LEDs Test # Intensity distribution (I ES Type) CCT (K) Drive current (mA) # of LEDs Multiplier (lumens ratio) 2 III 4000 700 80 n/a 3 IV 4000 700 80 n/a 4 IV I 5000 700 80 #4 / #3 7 IV I 525 80 #7 / #3 4000 9 IV 4000 700 40 #9 / #3 Interpolation between minimal LM-79 and ISTMT data is more difficult if housing size increases with increasing wattage; it may not be clear whether the lowest -wattage configuration would be expected to "run cooler" than the highest -wattage configuration. In these circumstances, the adequacy of submitted data is subject to Owner approval. At this time, the "successor" method cannot be used; luminaires tested must utilize the LED light source(s) characterized by the submitted LM-80 report. Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I C-2 APPENDIX D ELECTRICAL IMMUNITY Test Procedure • Electrical Immunity Tests 1, 2 and 3, as defined by their Test Specifications, shall be performed on an entire powered and connected luminaire, including any control modules housed within the luminaire, but excluding any control modules mounted externally, such as a NEMA socket connected photo -control. A shorting cap should be placed across any such exterior connector. • The luminaire shall be connected to an AC power source with a configuration appropriate for nominal operation. The AC power source shall have a minimum available short-circuit current of 200A. The luminaire shall be tested at the nominal input voltage specified in Appendix A, or at the highest input voltage in the input voltage range specified in Appendix A. • Electrical Immunity test waveforms shall be superimposed on the input AC power line at a point within 6 inches (15cm) of entry into the luminaire using appropriate high -voltage probes and a series coupler/decoupler network (CDN) appropriate for each coupling mode, as defined by ANSI/IEEE C62.45-2002. The test area for all tests shall be set up according to ANSI/IEEE C62.45- 2002, as appropriate. • Prior to electrical immunity testing a set of diagnostic measurements shall be performed, and the results recorded to note the pre -test function of the luminaire after it has reached thermal equilibrium. These measurements should include at a minimum: a) For all luminaires, Real Power, Input RMS Current, Power Factor and THD at full power/light output b) For luminaires specified as dimmable, Real Power, Input RMS Current, Power Factor and THD at a minimum of 4 additional dimmed levels, including the rated minimum dimmed level • Tests shall be applied in sequential order (Test 1, followed by Test 2, followed by Test 3). If a failure occurs during Test 3, then Test 3 shall be re -applied to a secondary luminaire of identical construction. • Following the completion of Tests 1, 2, and 3, the same set of diagnostic measurements performed pre -test should be repeated for all tested luminaires, and the results recorded to note the post-test function of the luminaire(s). • A luminaire must function normally and show no evidence of failure following the completion of Test 1 + Test 2 + Test 3 (for a single tested luminaire), or the completion of Test 1 + Test 2 on a primary luminaire and Test 3 on a secondary luminaire. Abnormal behavior during testing is acceptable. • A luminaire failure will be deemed to have occurred if any of the following conditions exists following the completion of testing: a) A hard power reset is required to return to normal operation b) A noticeable reduction in full light output (e.g. one or more LEDs fail to produce light, or become unstable) is observed c) Any of the post-test diagnostic measurements exceeds by ±5% the corresponding pre -test diagnostic measurement. d) The luminaire, or any component in the luminaire (including but not limited to an electrical connector, a driver, a protection component or module) has ignited or shows evidence of Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I D-1 melting or other heat -induced damage. Evidence of cracking, splitting, rupturing, or smoke damage on any component is acceptable. Test Specifications NOTE: L1 is typically "HOT", L2 is typically "NEUTRAL" and PE = Protective Earth. Test 1) Ring Wave: The luminaire shall be subjected to repetitive strikes of a "C Low Ring Wave" as defined in IEEE C62.41.2-2002, Scenario 1, Location Category C. The test strikes shall be applied as specified by Table D.I. Prior to testing, the ring wave generator shall be calibrated to simultaneously meet BOTH the specified short circuit current peak and open circuit voltage peak MINIMUM requirements. Note that this may require that the generator charging voltage be raised above the specified level to obtain the specified current peak. Calibrated current probes/transformers designed for measuring high -frequency currents shall be used to measure test waveform currents. Test waveform current shapes and peaks for all strikes shall be compared to ensure uniformity throughout each set (coupling mode + polarity/phase angle) of test strikes, and the average peak current shall be calculated and recorded. If any individual peak current in a set exceeds by ±10% the average, the test setup shall be checked, and the test strikes repeated. Table D.1: 0.5 µS — 100Hz Ring Wave Specification Parameter Test Level/Configuration Short Circuit Current Peak 0.5 kA Open Circuit Voltage Peak 6 kV Source Impedance 12 Q Coupling Modes L1 to PE, L2 to PE, L1 to L2 Polarity and Phase Angle Positive at 90' and Negative at 270° Test Strikes 5 for each Coupling Mode and Polarity/Phase Angle combination Time between Strikes 1 minute Total Number of Strikes = 5 strikes x 4 coupling modes x 2 polarity/phase angles = 40 total strikes Test 2) Combination Wave: The luminaire shall be subjected to repetitive strikes of a "C High Combination Wave" or "C Low Combination Wave", as defined in IEEE C62.41.2-2002, Scenario 1, Location Category C. The test strikes shall be applied as specified by Table D.2. The "Low" test level shall be used for luminaires with Basic Electrical Immunity requirements, while the "High" test level shall be used for luminaires with Elevated Electrical Immunity requirements. Prior to testing, the combination wave generator shall be calibrated to simultaneously meet BOTH the specified short circuit current peak and open circuit voltage peak MINIMUM requirements. Note that this may require that the generator charging voltage be raised above the specified level to obtain the specified current peak. Calibrated current probes/transformers designed for measuring high -frequency currents shall be used to measure test waveform currents. Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I D-2 Test Duration Total Test Duration Test waveform current shapes and peaks for all strikes shall be compared to ensure uniformity throughout each set (coupling mode + polarity/phase angle) of test strikes, and the average peak current shall be calculated and recorded. If any individual peak current in a set exceeds by ±10% the average, the test setup shall be checked, and the test strikes repeated. Table D.2: 1.2/50µS — 8/20 µS Combination Wave Specification Parameter Test Level/ Configuration 1.2/50 µS Open Circuit Voltage Peak Low: 6 kV High: 10kV 8/20 µS Short Circuit Current Peak Low: 3 kA High: 10kA Source Impedance 2Q Coupling Modes L1 to PE, L2 to PE, L1 to L2 Polarity and Phase Angle Positive at 90' and Negative at 270° Test Strikes 5 for each Coupling Mode and Polarity/Phase Angle combination Time Between Strikes 1 minute Total Number of Strikes = 5 strikes x 4 coupling modes x 2 polarity/phase angles = 40 total strikes Test 3) Electrical Fast Transient (EFT): The luminaire shall be subjected to "Electrical Fast Transient Bursts", as defined in IEEE C62.41.2 -2002. The test area shall be set up according to IEEE C62.45-2002. The bursts shall be applied as specified by Table D.3. Direct coupling is required; the use of a coupling clamp is not allowed. Table D.3: Electrical Fast Transient (EFT) Specification Parameter Test Level/ Configuration Open Circuit Voltage Peak 3 kV Burst Repetition Rate 2.5 kHz Burst Duration 15 mS Burst Period 300 mS Coupling Modes L1 to PE, L2 to PE, L1 to L2 Polarity Positive and Negative 1 minute for each Coupling Mode and Polarity combination = 1 minute x 7 coupling modes x 2 polarities = 14 minutes Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires Page I D-3 APPENDIX E PRODUCT SUBMITTAL FORM Luminaire Type' Manufacturer Model number Housing finish color Tenon nominal pipe size (inches) Nominal luminaire weight (lb) Nominal luminaire EPA (ft2) Nominal input voltage (V) ANSI vibration test level Nominal BUG Ratings Make/model of LED light source(s) Make/model of LED driver(s) Dimmability Control signal interface Upon electrical immunity system failure Thermal management Lumen maintenance testing duration (hr Reported lumen maintenance life (hr) 2 Warranty period (yr) Parameter Initial photopic output (Im) Maintained photopic output (Im) Lamp lumen depreciation Initial input power (W) Maintained input power (W) Initial LED drive current (mA) Maintained LED drive current (mA) Drive current used In -situ LED Tc ('C) CCT (K) Additional product description 0 Level 1 (Normal) I ❑ Level 2 (bridge/overpass) ❑ Dimmable I 0 Not dimmable ❑ Possible disconnect ❑ No possible disconnect ❑ Moving parts 0 No moving parts Nominal value I Tolerance (%) See Appendix A, and attach supporting documentation as required. 2 Value shall be no less than as specified in section 1.6-C, and shall not exceed six times the testing duration indicated in the row above. Value shall be consistent with values submitted in the rows below for maintained light output, maintained input power, and maintained drive current. Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I E-1 017823-1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 0133 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 1/2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised April 7, 2014 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised April 7, 2014 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Indust al CPN: 105490 Revised April 7, 2014 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Indust al CPN: 105490 Revised April 7, 2014 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME 8/31/2012 D. Johnson 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE 1.5.A.1 — title of section removed Revised for DAP Application CITY OF FORT WORTH Water, Sanitary Sewer, Paving, Street Light & Drainage STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Improvements to Serve Brookfield Frontier Industrial CPN: 105490 Revised April 7, 2014 FORT ORUL CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 Illrrrrr Attention: Mix Designs do not sui2ersede CFW Si2ecifications IIIIIIIIII Spec No. Classification Manufacturer Mix 11) Mix l)—ription Design strength'a 28,1.1, s DesignApproval Concrete Class A (S dewalk, ADA Ramps, Driveways, Curb/Gutter, Median Pavement) 9/9/2022 32 13 20 Mix Desp American Concrete Company 30CAF029 3000 psi 3-5" Slump; 3-6% Air 4/3/2025 32 13 20 Mix Design Big Town Concrete 2211 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix DesP Bumco Texas 30U101AG 3000 psi 3-5" Slump; 3-6% Air 4/1/2024 32 13 20 Mix Design Borneo Texas 30U500BG 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desp Carder Concrete FWCC502001 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desl1F Carder Concrete FWCC502021 3500 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Des1P Chisholm Trail Redi Mix C 13020AE 3000 psi 3-5" Slump; 4.5-7.5% Air 4/28/2025 32 13 20 Mix Desl1F Chisholm Trail Redi Mix CT6020A 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Des1P City Concrete Company 30HA20II 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desl1F Cow Town Redi Mix 253-W 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Des1P Cow Town Redi Mix 250 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Des11F Cow Town Redi Mix 350 3000 psi 3-5" Slump; 3-6% Air 1/29/2024 32 13 20 Mix Des1P Estrada Ready Mix R3050AEWR 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Des11F He an - SOR, Inc. 1261 3000 psi 3-5" Slump; 3-6% Air 9/23/2024 32 13 20 Mix Des1P Holcim - SOR, Inc. 5177 3000 psi 3-5" Slump; 3-6% Air 5/8/2025 32 13 20 Mix Desli p Holum - SOR, Inc. 530WA-TI 3000 psi 3-5" Slump; 3-6% Air 4/7/2023 32 13 20 Mix Des Liquid Stone C301D 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desli p Martin Marietta R2136214 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Deswon Martin Marietta R2136014 3000 psi 3-5" Slump; 3-6% Air 4/l/2023 32 13 20 Mix Desp Martin Marietta R2136N14 3000 psi 3-5" Slump; 3-6% Air 6/l/2023 32 13 20 Mix Design Martin Marietta R2136R20 3000 psi 3-5" Slump; 3-6% Air 6/l/2023 32 13 20 Mix Desp Martin Marietta R2136N20 3000 psi 3-5" Slump; 3-6% Air 11/2/2022 32 13 20 Mix Design Martin Marietta R2141K24 4000 psi 3-5" Slump; 3-6% Air 4/7/2023 32 13 20 Mix Desp Martin Marietta R2136KI4 3000 psi 3-5" Slump; 3-6% AQ 9/9/2022 32 13 20 Mix Design Martin Marietta R2131314 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desp Martin Marietta R2132214 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Martin Marietta D9490SC 3000 psi 3-5" Slump; 4.5-7.5% Air 5/9/2025 32 13 20 Mix Desp Martin Marietta R2136R14 3000 psi 3-5" Slump; 3-6% Air 10/4/2023 32 13 20 Mix Design NBR Ready Mix CLS A-YY 3000 psi 3-5" Slump; 3-6% Air 10/4/2023 32 13 20 Mix Desp NBR Ready Mix CLS A -NY 3000 psi 3-5" Slump; 3-6% Air 7/10/2023 32 13 20 Mix Design Dab— 3OA50MR 3000 psi 3-5" Slump; 3-6% Air 1/18/2023 32 13 20 Mix Desp Rapid Redi Mix RRM5020A 3000 psi 3-5" Slump; 3-6% Air 1/24/2023 32 13 20 Mix Design Rapid Redi Mix RRM5525A 3600 psi 3-5" Slump; 3-6% Air 10/24/2024 32 13 20 Mix Desp SRM Concrete 30850 3000 psi 3-5" Slump; 3-6% Air 10/24/2024 32 13 20 Mix Design SRM Concrete 30350 3000 psi 3-5" Slump; 3-6% Air 10/18/2024 32 13 20 Mix Desp SRM Concrete 30050 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Tarrant Concrete FW5025A 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desp Tarrant Concrete CP5020A 3000 psi 3-5" Slump; 3-6% Air 10/10/2022 32 13 20 Mix Design Tarrant Concrete TCFW5020A 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Desp Tarrant Concrete FW5525A2 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design Titan Ready Mix 3020AE 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design True Grit Redi Mix 0250.230 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 32 13 20 Mix Design True Grit Redi Mix 0250.2301 3000 psi 3-5" Slump; 3-6% Air Class CIP "Inlets, Manholes, Junction Boxes, Encasement, Blocldn�, Collars, (Spread Footing Pedestal Pole Foundations (Reference Detail 34 41 10-D605A) 9/9/2022 3213 13 : Mix Des tt American Concrete Company 40CNF065 4000 psi 3-5" Slump; 0-3% Air 9/9/2022 3213 13 : Mix Design Borneo Texas 40U500BG 4000 psi 3-5" Slump; 3-6% Air 4/28/2025 32 13 20 : Mix Desp Chisholm Trail Redi Mix CT6020A 3600 psi 3-5" Slump; 3-6% Air 4/28/2025 32 13 20 Mix Design Chisholm Trail Redi Mix CTFW5520A 3600 psi 3-5" Slump; 3-6% Air 4/28/2025 32 13 20 Mix Desp Chisholm Trail Redi Mix CTF W6020A 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 255-2 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 355 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 255 3500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 270 5000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 370 5000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 353 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 257 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 357 3600 psi 3-5" Slump; 3-6% Air 5/7/2025 3213 13 Mix Design Cow Town Redi Mix 265-42 4200 psi 3-5" Slump; 3-6% Air 2/7/2025 3213 13 Mix Desp Holcim - SOR, Inc. 1701 4000 psi 3-5" Slump; 3-6% Air 2/7/2025 3213 13 Mix Design Holcim- SOR, hic. 1551 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Holchn - SOR, Inc. 5409 4000 psi 3-5" Slump; 3-6% Air 4/27/2023 3213 13 Mix Design Liquid Stone C361DNFA 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Martin Marietta R2141230 4000 psi 3-5" Slump; 3-6% Air 8/4/2023 3213 13 Mix Design Martin Marietta R2141R24 4000 psi 3-5" Slump; 3-6% Air Page 1 of 6 FORT ORUL CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 s Illrrrrr Attention: Mix Designs do not supersede CFW S ecifications 11 MIM Spec No. Classification Manufacturer Nli, 11) Nli, D—ription Design strength'a 28,1.1, s DesignApproval ...Concrete (Continues) 11/20/2023 32 13 13 Mix Design Martin Marietta R2146R33 4000 psi 3-5" Slump; 3-6% Air 11/20/2023 3213 13 Mix Design Martin Marietta R2146K33 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2142233 3600 psi 3-5" Slump; 4.5-7.5% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2136224 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2141233 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2146038 4500 psi 3-5" Slump; 3-6% Air 10/24/2024 3213 13 Mix Design Martin Marietta R2146K34 4000 psi 3-5" Slump; 3-6% Air 5/5/2025 3213 13 Mix Design Martin Marietta R2146R35 4000 psi 3-5" Slump; 3-6% Air 5/5/2025 33 13 13 Mix Design Martin Marietta R2146K35 4000 psi 3-5" Slump; 3-6% Air 5/5/2025 33 13 13 Mix Design Martin Marietta R2146N33 4000 psi 3-5" Slump; 3-6% Air 9/12/2023 3213 13 Mix Design NBR Ready Mix CLS PI-YY 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design NBR Ready Mix TX C-YY 3000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design NBR Ready Mix TX C-NY 3000 psi 3-5" Slump; 3-6% Air 1/18/2023 3213 13 Mix Design Rapid Redi Mix RRM5320A 3000 psi 3-5" Slump; 3-6% Air 1/18/2023 3213 13 Mix Design Rapid Redi Mix RRM6020ASS 4000 psi 3-5" Slump; 3-6% Air 10/24/2024 3213 13 Mix Design SRM Concrete 40350 4000 psi 3-5" Slump; 3-6% Air 10/24/2024 3213 13 Mix Design SRM Concrete 40850 4000 psi 3-5" Slump; 3-6% Air 9/16/2024 3213 13 Mix Design SRM Concrete 35050 3500 psi 3-5" Slump; 3-6% Air 4/28/2025 3213 13 Mix Design SRM Concrete 36850 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete FW5320A 3000 psi 3-5" Slump; 3-6% Air 10/10/2022 3213 13 Mix Design Tarrant Concrete TCFW6025A2 4000 psi 3-5" Slump; 3-6% Air Class C (Drilled Shaft for Traffic Signal Pole Foundations teference Detail 314 10-D605) 9/9/2022 3213 13 Mix Design Bumco Texas 36U500BG 3600 psi 5.5-7.5" Slump; 3-6% Air 6/21/2023 3213 13 Mix Design Cow Town Redi Mix 360-DS 3600 psi 5.5-7.5" Slump; 3-6% Air 10/30/2024 3213 13 Mix Design Estrada Ready Mix R36575AEWR 3600 psi 5.5-7.5" Slump; 3-6% Air 12/5/2022 3213 13 Mix Design Holchn - SOR, Inc. 1822 3600 psi 5.5-7.5" Slump; 0-3% Air 9/9/2022 3213 13 Mix Design Holcim - SOR, Inc. 1859 4000 psi 5.5-7.5" Slump; 3-6% Air 4/7/2023 3213 13 Mix Design Liquid Stone C361DHR 3600 psi 5.5-7.5" Slump; 3-6% Air 6/27/2023 3213 13 Mix Design Martin Marietta U2146N41 3600 psi 5-7" Slump; 3-6% Air 6/27/2023 3213 13 Mix Design Martin Marietta U2146K45 3600 psi 5-7" Slump; 3-6% Air 5/9/2025 2 13 13 Mix Design Martin Marietta U2146R41 3600 psi 5-7" Slump; 3-6% Air 8/22/2024 3213 13 Mix Design NBR Ready Mix 135K2524 3600 psi 5.5" Slump; 3-6% Air 8/22/2024 32 13 13 Mix Design NBR Ready Mix 135KO524 3600 psi 5.5" Slump; 3-6% Air Class C (Headwalls, Wing wills, Culverts) 9/9/2022 3213 13 Mix Design Carder Concrete FWCC602001 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design City Concrete Company 40LA2011 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 260-2 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 360-1 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 260-1 3600 psi 3-5" Slump; 3-6% Air 1/29/2024 3213 13 Mix Design Estrada Ready Mix R3655AEWR 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp GCH Concrete Services GCH4000 4000 psi 3-5" Slump; 3-6% Air 4/l/2023 3213 13 Mix Design Martin Marietta 310LBP 3600 psi 3-5" Slump; 4-7% Air 8/30/2023 3213 13 Mix Desp Martin Marietta R2141R30 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2146035 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp SRM Concrete 40050 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design SRM Concrete 35022 3600 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete FW6020A2 4000 psi 3-5" Slump; 3-6% Air Class P (A achine Placed Pav ng) 4/3/2025 3213 13 Mix Desp Bw Town Concrete 4511 3600 psi 1-3" Slump; 3-6% Air 4/3/2025 3213 13 Mix Design Big Town Concrete 4411 3600 psi 1-3" Slump; 3-6% Air 6/30/2025 3213 13 Mix Desp Bw Town Concrete 5211 With 20% Fly Ash 4000 psi 1-Y Slump; 3-6% Air 6/30/2025 3013 13 Mix Design Big Town Concrete 52113 With 30% slag 4000 psi 1-3" Slump; 3-6% Air 6/30/2025 3013 13 Mix Desp Big Town Concrete 5311 4000 psi 1-3' Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Carder Concrete FWCC552091 3600 psi 1-3" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Carder Concrete FWCC602091 4000 psi 1-Y Slump; 3-6% Air 9/9/2022 3213 13 Mix Design City Concrete Company 36LA2011 3600 psi 1-3" Slump; 3-6% Air 9/9/2022 33 13 13 Mix Desp Cow Town Redi Mix 257-M 3600 psi 1-3" Slump; 3-6% Air 11/14/2022 3213 13 Mix Design Cow Town Redi Mix 357-M 3600 psi 1-3" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Cow Town Redi Mix 260-M 4000 psi 1-3" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 360-M 4000 psi 1-3" Slump; 3-6% Air 2/6/2024 3213 13 Mix Desp Estrada Ready�Mix TD3655AEWR 3600 psi 1-Y Slump; 3-6% Air 5/20/2025 3213 13 Mix Design Gilco Contracting hrc 36MP1643 3600 psi 1-3" Slump; 3-6% Air 6/20/2025 3213 13 Mix Design Gilco Contracting htc 36MP1629 3600 psi 1-Y Slump; 3-6% Air 5/12/2025 3213 13 Mix Design Holcim - SOR, Inc. 1703 4000 psi 1-3" Slump; 3-6% Air 8/4/2023 3213 13 Mix Design Martin Marietta Q214IR27 4000 psi 1-3" Slump; 3-6% Air 11/2/2022 3213 13 Mix Design Martin Marietta Q214IK30 4000 psi 1-3" Slump; 3-6% Air Page 2 of 6 FORT ORUL CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 s !!liar! Attention: Mix Designs do not supersede CFW S ecifications 1111A1111 Spec No. Classification Manufacturer Nli, 11) Nli, D—ription Design strcrigtli'a 28dal, s DesignApproval ...Concrete (Continues) 5/5/2025 32 13 13 Mix Design Martin Marietta Q214IN27 4000 psi 1-3" Slump; 3-6% Air 10/4/2023 3213 13 Mix Design NBR Ready Mix TX C SF-YY 3600 psi 1-3" Slump; 3-6% Air 10/4/2023 32 13 13 Mix Design NBR Ready Mix TX C SF -NY 3600 psi 1-3" Slump; 3-6% Air 10/24/2024 3213 13 Mix Design SRM Concrete 40068 4000 psi 1-3" Slump; 3-6% Air 10/24/2024 32 13 13 Mix Design SRM Concrete 40825 4000 psi 1-3" Slump; 3-6% Air 9/16/2024 3213 13 Mix Design SRM Concrete 40025 4000 psi 1-3" Slump; 3-6% Air 10/18/2024 3213 13 Mix Design SRM Concrete 35023 3600 psi 1-3" Slump; 3-6% Air 6/5/2025 3213 13 Mix Design SRM Concrete 40324 4000 psi 1-3" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete FW5520AMP 3600 psi 1-3" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design True Grit Redi Mix 0255.2301 3600 psi 1-3" Slump; 3.5-6.5% Air 9/9/2022 3213 13 Mix Design True Grit Redi Mix 0260.2302 4000 psi 1-3" Slump; 3.5-6.5% Air 6/17/2025 3213 13 Mix Design True Grit Redi Mix 460.230M 4000 psi 1-3" Slump; 3-6% Air 6/23/2025 3213 13 Mix Design True Grit Redi Mix 360.230M 4000 psi 1-3" Slump; 3-6% Air Class H (E and Placed Paving, Valley Gutter) 9/9/2022 3213 13 Mix Design American Concrete Company 45CAF076 4500 psi 3-5" Slump; 3-6% Air 5/2/2023 3213 13 Mix Design Big D Concrete CM14520AE 4500 psi 3-5" Slump; 3-6% Air 4/3/2025 3213 13 Mix Design Big Town Concrete 6211 4500 psi 3-5" Slump; 3-6% Air 4/3/2025 3213 13 Mix Design Big Town Concrete 6311 4500 psi 3-5" Slump; 3-6% Air 4/5/2025 3213 13 Mix Design Big Town Concrete 6017 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Burneo Texas 45U500BG 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Carder Concrete FWCC602021 4500 psi 3-5" Slump; 3-6% Air 4/28/2025 3213 13 Mix Design Chisholm Trail Redi Mix CTFW6520A 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design City Concrete Company 45NA20II 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 265 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 365 4500 psi 3-5" Slump; 3-6% Air 1/29/2024 3213 13 Mix Design Estrada Ready Mix R4560AEWR/ 4500 psi 3-5" Slump; 4-6% Air 9/9/2022 3213 13 Mix Design GCH Concrete Services GCH4500 4500 psi 3-5" Slump; 3-6% Air 5/20/2025 3213 13 Mix Design Gilco Contracting Inc 45HP1643 4500 psi 3-5" Slump; 3-6%Air 6/20/2025 3213 13 Mix Design Gilco Contracting Inc 45HP1629 4500 psi 3-5" Slump; 3-6%Air 10/4/2024 3213 13 Mix Design Holcim - SOR, Inc. 5507 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Helena - SOR, Inc. 1851 4500 psi 3-5" Slump; 3-6% Air 5/8/2025 3213 13 Mix Design Holcim - SOR, Inc. 545WA-TI 4500 psi 3-5" Slump; 3-6% Air 4/5/2025 3213 13 Mix Design Liquid Stone C451D 4500 psi 3-5" Slump; 3-6%Air 11/2/2022 3213 13 Mix Design Martin Marietta R2146N35 4500 psi 3-5" Slump; 3-6% Air 8/4/2023 3213 13 Mix Design Martin Marietta R2146R36 4500 psi 3-5" Slump; 3-6% Air 11/2/2022 3213 13 Mix Design Martin Marietta R2146N36 4500 psi 3-5" Slump; 3-6% Air 5/22/2023 3213 13 Mix Desp Martin Marietta R2146K37 4500 psi 3-5" Slump; 3-6% Air 12/22/2023 3213 13 Mix Design Martin Marietta R2146R44 4500 psi 3-5" Slump; 3-6% Air 12/22/2023 3213 13 Mix Desp Martin Marietta R2146K44 4500 psi 3-5" Slump; 3-6% Air 11/15/2022 3213 13 Mix Design Martin Marietta R21461`36 4500 psi 3-5" Slump; 3-6% Air 11/15/2022 3213 13 Mix Desp Martin Marietta R2146K36 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2147241 4500 psi 3-5" Slump; 4.5-7.5% Air 9/9/2022 3213 13 Mix Desp Martin Marietta R2146236 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2146036 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Martin Marietta R2146242 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Martin Marietta R2146042 4500 psi 3-5" Slump; 3-6% Air 6/3/2025 3213 13 Mix Desp Martin Marietta R2146K43 4500 psi 3-5" Slump; 3-6% Air 10/4/2023 3213 13 Mix Design NBR Ready Mix CLS P2-YY 4500 psi 3-5" Slump; 3-6% Air 10/4/2023 3213 13 Mix Desp NBR Ready Mix CLS P2-NY 4500 psi 3-5" Slump; 3-6% Air 7/10/2023 3213 13 Mix Design Osbum 45A60MR 4500 psi 3-5" Slump; 3-6% Air 1/24/2023 3213 13 Mix Desp Rapid Redi Mix RRM6320AHP 4500 psi 3-5" Slump; 3-6% Air 2/7/2025 3213 13 Mix Design SRM Concrete 45023 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp SRM Concrete 45000 4500 psi 3-5" Slump; 3-6% Air 5/23/2025 3213 13 Mix Design SRM Concrete 45300 4500 psi 3-5" Slump; 3-6% Air 10/24/2024 3213 13 Mix Desp SRM Concrete 45350 4500 psi 3-5" Slump; 3-6% Air 10/24/2024 3213 13 Mix Design SRM Concrete 45850 4500 psi 3-5" Slump; 3-6% Air 10/18/2024 3213 13 Mix Desp SRM Concrete 45050 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete FW6020AHP 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Tarrant Concrete FW60AHP 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete TCFW6020AHP 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp Titan Ready Mix TRC4520 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design True Grit Redi Mix 0260.2301 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Desp True Grit Redi Mix 0265.2301 4500 psi 3-5" Slump; 3.5-6.5% Air 9/9/2022 3213 13 Mix Design True Grit Redi Mix 270.230 4500 psi 3-5" Slump; 3-6% Air 6/12/2025 3213 13 Mix Design True Grit Redi Mix 465.230H 4500 psi 3-5" Slump: 3-6% Air 6/23/2025 3213 13 Mix Design True Grit Redi Mix 365.230H 4500 psi 3-5" Slump: 3-6% Air 10/9/2024 3213 13 Mix Design Wildcatter 4520AI 4500 psi 3-5" Slump; 3-6% Air Page 3 of 6 FORTWORTH., CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 !!!!!!!! Attention; Mix Designs do not sui2ersede CFW S ecifications !!!!!!!!!! Spec No. C11—iti'ation Manufacturer Nli, 11) Nli, l)—ription Design Strength if, 28 da� s DesignApproval Class HES (High Early Stren^th Paving) 9/9/2022 3213 13 Mix DesP Big D Concrete 14500AE 4500 psi 3-5" Slump; 3-6 % Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 370-INC 4500 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix DesP Cow Town Redi Mix 375-NC 5000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 370-NC 4500 psi 3-5" Slump; 3-6% Air 1/18/2023 3213 13 Mix DesP Cow Town Redi Mix 380-NC 4500 psi 3-5" Slump; 3-6% Air 1/29/2024 3213 13 Mix Design Estrada Ready Mix 4575AESC 4500 psi / 3000 psi (a) 3 days 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Holcim - SOR, Inc. 2125 5000 psi 3-5" Slump; 3-6% Air ...Concrete �Confinues) 1/24/2023 3213 13 Mix Design Liquid Stone C451DHR-A 4500 psi 3-5" Slump; 3-6% Air 4/7/2023 3213 13 Mix Design Martin Marietta R2161K70 6000 psi / 3000 psi (a, 24hr. 3-5" Slump; 3-6% Air 2/10/2023 3213 13 Mix Design SRM Concrete 50310 5000 psi 3-5" Slump; 3-6% Air 2/7/2025 3213 13 Mix Design SRM Concrete 40326 4500 psi / 3000 psi (a) 3 days 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete FW6520AMR 4500 psi / 3000 psi @ 3 days 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Tarrant Concrete FW7520AMR 4500 psi / 3000 psi P 3 days 3-5" Slump; 3-6% Air Class S (Bridle Slabs, Top SI-tbs of Direct Traffic Culverts, Approach Slabs) 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 260 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 360 4000 psi 3-5" Slump; 3-6% Air 9/9/2022 3213 13 Mix Design Cow Town Redi Mix 365-STX 4000 psi 3-5" Slump; 3-6% Air 1/29/2024 3213 13 Mix Design Estrada Ready Mix R4060AEWR 4000 psi 4-6" Slump; 3-6% Air 5/3/2023 3213 13 Mix Design Martin Marietta M7842344 4000 psi 3-5" Slump; 4.5-7.5% Air 4/l/2023 3213 13 Mix Design Martin Marietta R2146P33 4000 psi 3-5" Slump; 3-6% Air 4/15/2024 3213 13 Mix Design NBR Ready Mix TX S-NY 4000 psi 3-5" Slump; 3-6% Air 4/15/2024 3213 13 Mix Design NBR Ready Mix TX S-YY 4000 psi 3-5" Slump; 3-6% Air 4/5/2025 3213 13 Mix Design SRM Concrete 40850 4000 psi 3-5" Slump; 3-6% Air 4/5/2025 3213 13 Mix Design SRM Concrete 40350 4000 psi 3-5" Slump; 3-6% Air 5/5/2023 3213 13 Mix Design SRM Concrete D100008553CB 4000 psi 3-5" Slump; 3-6% Air Concrete Base Trench Repair 4/1/2023 03 34 16 1033416 (Mix Design IBumco Texas IOYH50BF I 1000 psi (Flowable; 8.5-11.5%Air 9/9/2022 03 34 16 Mix Design Bumco Texas 08Y450BA 800 psi 5-7" Slump; 3-6% Air Controlled Low Strength Ma'erial (Flowable Fill) 2/7/2025 03 34 13 Mix Design Bumco Texas OIY690BF 100 psi Flowable; 9.5-11.5% Air 5/19/2025 03 34 13 Mix Design Borneo Texas OIZ180AF 100 psi Flowable; 9.5-11.5%Air 9/9/2022 03 34 13 Mix Design Carder Concrete FWCC359101 50-150 psi 3-5" Slump; 8-12% Air 9/9/2022 03 34 13 Mix Design Carder Concrete FWFF237501 50-150 psi Flowable; 8.5-11.5% Air 9/9/2022 03 34 13 Mix Design City Concrete Company 11-350-FF 50-150 psi Flowable; 8-12%Air 9/9/2022 03 34 13 Mix Desp Cow Town Redi Mix Mix# 9 70 psi 7-9" Slump; 8-11 % Air 5/12/2025 03 34 13 Mix Design Holcirn - SOR, Inc. 3741 100 psi Flowable; 12.0-24.0% Air 10/4/2023 03 34 13 Mix Desp NBR Ready Mix FTW FLOW FILL 150 psi 7-10" Slump; 8-12% Air 2/7/2025 03 34 13 Mix Design SRM Concrete 910 150 psi Flowable; 8-12% Air 9/9/2022 03 34 13 Mix Design Tarrant Concrete FWFF150CLSM 50-150 psi Flowable; 8-12%Air Concrete Rip Rap 4/l/2023 I31 37 00 (Mix Design (Martin Marietta R2141030 I 4000 psi I3-5" Slump; 3-6%Air 4/l/2023 31 37 00 Mix Design Martin Marietta R2146033 4000 psi 3-5" Slump; 3-6% Air AShalt Paving 9/9/2022 32 12 16 Mix Design Austin Asphalt FT5B117965 FT5B117965 PG64-22 Type B Fine Base 9/9/2022 321216 Mix Desp Austin Asphalt FTIIB139965 FT1B139965 PG64-22 Type B Fine Base 9/9/2022 321216 Mix Design Austin Asphalt FT1B117.2 FTIB 117.2 PG64-22 Type B Fine Base 5/l/2024 32 12 16 Mix Desp Reynolds Asphalt 340-DG-B P 340-DG-B PG64-22 Type B Base Course 9/9/2022 32 12 16 Mix Design Reynolds Asphalt 1112B 1112B PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Desp Reynolds Asphalt 1612B 1612B PG64-22 Type B Fine Base 4/4/2025 32 12 16 Mix Design Reynolds Asphalt 2315B 2315B PG64-22 Type B Fine Base 12/5/2022 33 1216 Mix Desp Supmount Paving 3076BV6422 3076BV6422 PG62-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design Surmount Paving 341-BRAP6422ERG 341-BRAP6422ERG PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Desp TXBIT 37-211305-20 37-211305-20 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 44-211305-17 44-211305-17 PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Desp TXBIT 211305 (1757) 211305 (1757) PG64-22 Type B Fine Base 9/9/2022 32 12 16 Mix Design TXBIT 64-224125-18 PG 64-224125-18 PG70-22 Type D Fine Surface 4/l/2024 32 12 16 Mix Design TXBIT 344 MAC-SP-D 70-22XR 344 MAC-SP-D 70-22XR SAC A-R Type D Fine Surface Detectable Warning Surface 9/9/2022 32 13 20 DWS - Pavers Pine Hall Brick (Winston Salem, NC) Tactile Pavers 9/9/2022 32 13 20 DWS - Pavers Western Brick Co. (Houston, TX) Detectable Warning Pavers 9/9/2022 32 13 20 DWS - Composite Armor Tile 9/9/2022 32 13 20 DWS - Composite ADA Solutions (Wilmington, MA) Heritage Brick CIP Composite Paver 4/7/2023 32 13 20 DWS - Pavers ADA Solutions (Wilmington, MA) Detectable Warning Pavers Page 4 of 6 FORT ORUL. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 !!!!!!!! Attention, Mix Designs do not supersede CFW S ecifications 11111!!111 Approval Spec No. Classification Manufacturer Nli, 11) Nli, D—ription 1 Design Silicone Joint Sealant 9/9/2022 13 73 Joint Sealant Dow 890SL 890SL - Cold Applied, Si a Component, Silicone Joint Sealant ASTM D5893 9/9/2022 32 13 73 Joint Sealant Tremco 900SL 900SL - Cold Applied, Sing a Component, Silicone Joint Sealant ASTM D5893 9/9/2022 �32 32 13 73 Joint Sealant Pecom 300SL 300SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 9/9/2022 32 13 73 Joint Sealant Crafco RoadSaver Silicone RoadSaver Silicone - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 Utility Trench Embedment Sand 9/9/2022 3305 lb Embedment Sand Silver Creek Materials Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand Crouch Materials Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand F and L Dirt Movers Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand F and L Dirt Movers Utility Embedment Sand ASTM C33 9/9/2022 3305 10 Embedment Sand Tin Top Martin Marietta Utility Embedment Sand ASTM C33 Storm Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 9/28/2018 3305 13 Manhole Frames and Covers AccuCast (Govind Steel Company, LTD) MHRC #220605 MHRC #220605 (Size - **24" Dia.) ASTM A48 AASHTO M306 9/28/2018 3305 13 Manhole Cover Neenah Foundry NF-1274-T91 NF-1274-T91 (Size - 32" Dia.) ASTM A48 AASHTO M306 9/28/2018 3305 13 Manhole Frames and Cova Neenah Foundry NF-1743-LM (Hinged) NF-1743-LM (Hinged) (Size - 32" Dia.) ASTM A48 AASHTO M306 9/28/2018 3305 13 Manhole Frame Neenah Foundry NF-1930-30 NF-1930-30 (Size - 32.25" Dial ASTM A48 AASHTO M306 9/28/2018 3305 13 Manhole Frames and Cova Neenah Foundry R-1743-HV R-1743-HV (Size - 32" Dial ASTM A48 AASHTO M306 4/3/2019 3305 13 Manhole Frames and Cov SIP Industries ++ 2279ST 2279ST (Size - 24" Dial ASTM A48 AASHTO M306 4/3/2019 3305 13 Manhole Frames and Cov.SIP Industries ++ 2280ST 2280ST (Size - 32" Dial ASTM A48 AASHTO M306 10/8/2020 3305 13 Manhole Frames and Cov/EJ ( Formally East Jordan Iron Works) EJ1033 Z2/A EJ 1033 Z2/A (Size - 32.25" Dial ASTM A536 AASHTO M306 3/8/2024 3305 13 Curb Inlet Covers SIP Industries ++ 2296T 2296T (Size - ***24" Dial ASTM A48 AASHTO M306 6/18/2024 3305 13 Curb Inlet Covers SIP Industries ++ 2279STN 2279STN (Size - 24" Dia.) ASTM A48 AASHTO M306 **Note: All new development and new installation manhole 4hds shall meet the minimum 30-inch opening requirement as specified in City Specification 33 0513. Any smaller opening sizes will only be allowed for existing manholes that require replacement frames and covers. Storm Sewer - Inlet & Structures 33-05-13 10/8/2020 33 49 20 Curb Inlets Fontera FRT-100-405-PRECAST** (Size - 10' X 3) ASTM C913 10/8/2020 33 49 20 Curb Inlets Fonterra FRT-lOx3-406-PRECAST** (Size - 10' X 3') ASTM C913 10/8/2020 33 49 20 Curb Inlets Fonterra FRT-l0x4.5-407-PRECAST** (Size - 10' X 4.5') ASTM C913 10/8/2020 33 49 20 Curb Inlets Fonterra FRT-lOx4.5-420-PRECAST** (Size - 10' X 4.5') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-4X4-409-PRECAST-TOP (Size - 4' X 4') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-4X4-409-PRECAST-BASE (Size - 4' X 4') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-5X5-410-PRECAST-TOP (Size - 5' X 5') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-5X5-410-PRECAST-BASE (Size - 5' X 5') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-6X6-411-PRECAST-TOP (Size - 6' X 6') ASTM C913 10/8/2020 33 39 20 Manhole Fonterra FRT-6X6-411-PRECAST-BASE (Size - 6' X 6') ASTM C913 3/19/2021 33 49 20 Curb Inlets Thompson PFe Group TPG-I OX3-405-PRECAST INLET** ((Size - 110' X 3') ASTM 615 3/19/2021 33 49 20 Curb Inlets Thompson Pipe Group TPG-15X3-405-PRECAST INLET** (Size - 15' X 3') ASTM 615 3/19/2021 33 49 20 Curb Inlets Thompson PFe Group TPG-20X3-405-PRECAST INLET** (Size - 20' X T) ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG4X4-409-PRECAST TOP (Size - 4' X 4') ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG4X4-409-PRECAST BASE (Size - 4' X 41 ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG4X4-412-PRECAST 4-FT RISER (Size - 4' X 4') ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG-5X5-410-PRECAST TOP (Size - 5' X 5') ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-5X5-41O-PRECAST BASE (Size - 5' X 5� ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG-5X5-412-PRECAST 5-FT RISER (Size - 5' X 5') ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-6X6-411-PRECAST TOP (Size - 6' X 6') ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG-6X6-411-PRECAST BASE (Size - 6' X 61 ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-6X6-412-PRECAST 6-FT RISER (Size - 6' X 6') ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG-7X7-411-PRECAST TOP (Size - TX T) ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-7X7-411-PRECAST BASE (Size - TX 7') ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG-7X7-412-PRECAST 4-FT RISER (Size - TX T) ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-8X8-411-PRECAST TOP (Size - 8' X 8') ASTM 615 3/19/2021 33 39 20 Manhole Thompson PFe Group TPG-8X8-411-PRECAST BASE (Size - 8' X 81 ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-8X8-412-PRECAST 5-FT RISER (Size - 8' X 8') ASTM 615 3/19/2021 33 49 20 Drop Inlet Thompson PFe Group TPG4X4-408-PRECAST INLET (Size - 4' X 4') ASTM 615 3/19/2021 33 49 20 Drop Inlet Thompson Pipe Group TPG-5X5-408-PRECAST INLET (Size - 5' X 5') ASTM 615 3/19/2021 33 49 20 DroQQ Inlet Thompson Pipe Group TPG-6X6-408-PRECAST INLET (Size - 6' X 6') ASTM 615 8/28/2023 33 49 10 Marilrole Oldcastle Precast 4' x 4' Stacked Manhole (Size - 4' X 41 ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 8' Storm Junction Box (Size - 5' X 8') ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 4' x 4' Storm Junction Box (Size - 4' X 4') ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 5' Storm Junction Box (Size - 5' X 5') ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 6' x 6' Storm Junction Box (Size - 6' X 6') ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 8' x 8' Storm Junction Box Base (Size - 8' X 81 ASTM C478 8/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 8' Storm Junction Box Base (Size - 5' X 8') ASTM C478 8/28/2023 33 49 10 Manhole Rinker Materials Reinforced 48" Diameter Spread Footing Manhole (Size - 4' X 4') ASTM C433 Page 5 of 6 CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 6/30/2025 ....Storm Sewer - Inlet & Structures Continues 8/28/2023 33 39 20 Curb Inlet 10'x 3' Riser Thompson Ppe Group Inlet Riser (Size - 3 FT) ASTM C913-16 8/28/2023 33 39 20 Curb Inlet 15'x 3' Riser Thompson Pipe Group Inlet Riser (Size - 3 FT) ASTM C913-16 8/28/2023 33 39 20 Curb Inlet 20' x 3' Riser Thotrfson Pipe Groin Q Inlet Riser (Size - 3 FT) ASTM C913-16 1/12/2024 33 49 20 Drop Inlet AmeriTex Pipe &Products Drop Inlet (4' X 41) ASTM C913 1/12/2024 33 49 20 Droe Inlet AmeriTex Pipe &Products Drop Inlet (5' X 5') ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Precast 4'x4' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Precast 5'x5' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 5' Precast Transition MH (4' MH on the top of 5' JB) ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Precast 6'x6' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 6' Precast Transition MH (4' MH on the top of 6' JB) ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Precast 8'x8' Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 8' Precast Transition MH (4' MH on the top of 8' JB) ASTM C913 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products Type C Storm Drain Manhole on Box (4' MH on the top of RCB) ASTM C913 7/16/2024 33 49 20 Curb Inlets AmeriTex Pipe &Products 100 Precast** (Size 10' x 3') ASTM C913 7/16/2024 33 49 20 Curb Inlets AmeriTex Pipe &Products 150 Precast** (Size 15' x 3) ASTM C913 --Note: Pre -cast inlets are approved for the stage l portion of he structure (basin) only. Stage II pardon al the structure are required to be cast in place. No exceptions to this requirement shall be allowed. Storm Sewer - Pipes & Boxes 33-05-13 4/9/2021 3341 13 Storm Drain Pipes Advanced Drainage Systems, Inc. (ADS) ADS HP Stoma Polypropylene (PP) Pipe (Size - 12" - 60") ASTM F2881 & AASHTO M330 8/28/2023 3341 10 Storm Drain Pipes Rinker Materials Reinforced Concrete Pipe Tongue and Groove Joint Pipe (Size - 21" or larger) ASTM C76, C655 8/28/2023 3341 10 Culvert Box Rinker Materials Reinforced Concrete Box Culvert (Sze - Various) ASTM C789, C850 10/12/2023 3341 10 Storm Drain Pipes AmeriTex Pipe &Products Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size - 15" or larger) ASTM C76, C506 10/12/2023 3441 10 Culvert Box AmeriTex Pipe &Products Reinforced Concrete Box Culvert (size - Various)) ASTM C1433,C1577 10/18/2023 3541 10 Storm Drain Pipes The Turner Co. Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size - 15" or larger) ASTM C76, C506 10/18/2023 3341 10 Culvert Box The Turner Co. Reinforced Concrete Box Culvert (size - Various) ASTM C1433,C1577 4/12/2024 3341 10 Storm Drain Pipes Thompson Pipe Group Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size Various) ASTM C76, C506 6/25/2024 3341 10 Culvert Box Oldcastle Reinforced Concrete Box Culvert ASTM C1433,C1577 6/25/2024 3341 10 Storm Drain Pipes Oldcastle Reinforced Concrete Pipe Tongue and Groove Joint Pipe* (Size Various) ASTM C76, C506 Revision Comments (1-29-2025) Removed Argos, Ingram, Redi-Mix, Charley's (4-3-2025) Bigtown Concrete updated Mix ID's (4-5-2025) 03 34 13 CLSM specification Page 6 of 6 FORT WORTH. Approval Spec No. Classsification CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Manufacturer Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) Model No. National Spec Updated: 11-6-24 Size 07/23/97 33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra -Seal P-201 ASTM D2240/D412/D792 04/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 04/26/00 33 05 13 Profile Gasket for 4' Diam. MH. Press -Seal Gasket Corp. 2504G Gasket ASTM C-443/C-361 SS MH 1/26/99 33 05 13 HDPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring Traffic and Non -traffic area 5/13/05 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System Water & Sewer - Manholes & Bases/FiberLlass 33-39-13 (1/8/13) 1/26/99 33 39 13 Fiberglass Manhole Fluid Containment, Inc. I Flowtite ASTM 3753 Non -traffic area 08/30/06 33 39 13 Fiberglass Manhole L.F. Manufacturing Non -traffic area Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16) * 33 05 13 (Manhole Frames and Covers I Western Iron Works, Bass & Hays Foundry f 1001 24"x40" WD Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) * 33 05 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 30024 24" Dia. * 33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. A 24 AM 24" Dia. 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" Dia. 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. 33 05 13 Manhole Frames and Covers Sigma Corporation MH-144N 33 05 13 Manhole Frames and Covers Sigma Corporation MH-143N 33 05 13 Manhole Frames and Covers Pont-A-Mousson GTS-STD 24" dia. 33 05 13 Manhole Frames and Covers Neenah Casting 24" dia. 10/31/06 33 05 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. 7/25/03 33 05 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-R817S 30" Dia. 01/31/06 33 05 13 30" Dia. MH Ring and Cover East Jordan Iron Works V1432-2 and V1483 Designs AASHTO M306-04 30" Dia. 11/02/10 33 05 13 30" Dia. MH Ring and Cover Sigma Corporation MH1651FWN & MH16502 30" Dia 07/19/11 33 05 13 30" Dia. MH Ring and Cover Star Pipe Products MH32FTWSS-DC 30" Dia 08/10/11 33 05 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring 30" Dia 30" ERGO XL Assembly 10/14/13 33 05 13 30" Dia. MH Ring and Cover (Hinged & Lockable) East Jordan Iron Works with Cam Lock/MPIC/T-Gasket ASSHTO M105 & ASTM A536 30" Dia 06/01/17 3405 13 30" Dia. MH Ring and Cover (Lockable) Cl SIP Industries 2280 (32") ASTM A 48 30" Dia. 12/05/23 3405 13 30" Dia. MH Ring and Cover (Hinged & Lockable) Cl SIP Industries 4267WT - Hinged (32") ASTM A 48 30" Dia. CAP-ONE-30-FTW, Composite, w/ Lock 09/16/19 33 05 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. w/o Hing 30" Dia. 10/07/21 3405 13 30" Dia. MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and Cover 30" Dia. Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16) * 33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamtight 24" Dia. * 33 05 13 Manhole Frames and Covers Neenah Casting 24" Dia. * 33 05 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 24" Dia. * 33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. 03/08/00 33 05 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48 24" Dia. 04/20/01 33 05 13 Manhole Frames and Covers (SIP)Serampore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia. Water & Sewer - Manholes & Bases/Precast Concrete (Rev 1/8/13) * 33 39 10 Manhole, Precast Concrete Hydro Conduit Corp SPL Item #49 ASTM C 478 48" * 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. ASTM C-443 48" 09/23/96 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone 12/05/23 33 39 10 Manhole, Precast Concrete The Turner Company 72" I.D. Manhole w/ 32" Cone ASTM C 478 72" 05/08/18 33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 4811,6011 Manhole, 32" Opening and Flat top, (No 09/03/24 33 39 10 Manhole, Precast Concrete Oldcastle Precast Inc. Transition Cones) ASTM C 478 48" to 84" I.D. 06/09/10 33 39 10 Manhole, Precast (Reinforced Polymer)Concrete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" 09/06/19 33 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" 10/07/21 33 39 20 Manhole, Precast (Reinforced Polymer) Concrete Armorock 48" & 60" I.D. Manhole w/32" Cone 48" & 60" 10/07/21 33 39 20 Manhole, Precast (Hybrid) Polymer & PVC Geneva Pipe and Precast (Predl Systems) 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic Areas ASTM C-478; ASTM C-923; 03/07/23 33 39 20 Manhole, Precast Concrete AmeriTex Pipe and Products, LLC 48" & 60" I.D. Manhole w/32" Cone ASTM C-443 03/07/23 33 39 20 Manhole, Precast (Reinforced Polymer) Concrete P3 Polymers, RockHardscp 48" & 60" I.D. Manhole w/32" Cone 04/28/07 Manhole, Precast (Reinforced Polymer) Concrete Amitech USA Meyer Polycrete Pipe Sewer -(WAC) Wastewater Access Chamber 33 39 40 For use when Std. MH cannot be 12/29/23 33 39 20 Wastewater Access Chamber Quickstream Solutions, Inc. Type 8 Maintenace Shaft (Poopit) installed due to depth Water & Sewer - Manholes & Bases/Rehab Svstems/Cementitious * E1-14 Manhole Rehab Systems Quadex 04/23/01 E1-14 Manhole Rehab Systems Standard Cement Materials, Inc. Reliner MSP E1-14 Manhole Rehab Systems AP/M Permaform 4/20/01 E1-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System 5/12/03 E1-14 Manhole Rehab System (Liner) Triplex Lining System MH repair product to stop infiltration ASTM D5813 08/30/06 General Concrete Repair F1exKrete Technologies Vinyl Polyester Repair Product Misc. Use * From Original Standard Products List 1 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 11-6-24 Approval Spec No. I Classsification I Manufacturer Model No. National Spec Size Water & Sewer - Manholes & Bases/Rehab Svstems/NonCementitious 05/20/96 E1-14 Manhole Rehab Systems Sprayroq, Spray Wall Polyurethane Coating ASTM D639/D790 12/14/01 Coating for Corrosion protection(Exterior) ERTECH Series 20230 and 2100 (Asphatic Emulsion) Structures Only 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, S1, S2 Acid Resistance Test Sewer Applications 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications 33 05 16, 33 39 10, RR&C Dampproofing Non-Fibered Spray For Exterior Coating of Concrete 03/19/18 33 39 20 Coating for Corrosion protection(Exterior) Sherwin Williams Grade (Asphatic Emulsion) Structures Only Water & Sewer - Manhole Inserts - Field Operations Use Onlv (Rev 2/3/16) * 33 05 13 Manhole Insert Knutson Enterprises Made to Order - Plastic ASTM D 1248 For 24" dia. * 33 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia. * 33 05 13 Manhole Insert Noflow-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia. 09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. Lifesaver - Stainless Steel For 24" dia. 09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. TetherLok - Stainless Steel For 24" dia Water & Sewer - Pipe Casino Spacers 33-05-24 (07/01/13) 11/04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI 04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers 09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48" 09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Casing Spacers Up to 48" 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Powerchock Up to 48" 03/19/18 Casing Spacers BWM SS-12 Casing Spacer(Stainless Steel) 03/19/18 Casing Spacers BWM FB-12 Casing Spacer (Coated Carbon Steel) for Non pressure Pipe and Grouted Casing 03/29/22 33 05 13 Casing Spacers CCI Pipeline Systems CSC12, CSS12 09/03/24 33 05 13 Casing Spacers Raci (Completely HDPE) Per Manufacturers Requirements (Sewer 8" - 12" (Sewer Only) Applications Only) Water & Sewer - Pipes/Ductile Iron 33-11-10(1/8/13) * 33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AWWA C150, C151 3" thru 24" 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Fastite Pipe (Bell Spigot) AWWA C150, C151 4" thru 30" 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AWWA C150, C151 4" thru 30" * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AWWA C150, C151 * 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AWWA C150, C151 Water & Sewer - Utility Line Marker (08/24/2018) Sewer - Coatings/Evoxv 33-39-60 (01/08/13) 02/25/02 Epoxy Lining System Sauereisen, Inc SewerGard 210RS LA County #210-1.33 12/14/01 Epoxy Lining System Ertech Technical Coatings Ertech 2030 and 2100 Series 04/14/05 Interior Ductile Iron Pipe Coating Induron Protecto 401 ASTM B-117 Ductile Iron Pipe Only 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, S1, S2 Acid Resistance Test Sewer Applications 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications Sewer - Coatings/Polyurethane Sewer - Combination Air Valves 05/25/18 33-31-70 Air Release Valve A.R.I. USA, Inc. D025LTP02(Composite Body) 2" Sewer - Pipes/Concrete * E1-04 Conc. Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 * E1-04 Conc. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76 * E1-04 Conc. Pipe, Reinforced Hanson Concrete Products SPL i«o. #95 ra,...hol #99 Pip ASTM C 76 * E1-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76 Sewer - Pipe Enlarcment Svstem (Method)33-31-23 (01/18/13) PIM System PIM Corporation Polyethylene PIM Corp., Piscata Way, N.J. Approved Previously McConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously TRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Approved Previously Sewer - Pipe/Fiberclass Reinforced/ 33-31-13(1/8/13) 7/21/97 33 31 13 Cent. Cast Fiberglass (FRP) Hobas Pipe USA, Inc. Hobas Pipe (Non -Pressure) ASTM D3262/D3754 03/22/10 33 31 13 Fiberglass Pipe (FRP) Ameron Bondstrand RPMP Pipe ASTM D3262/D3754 04/09/21 33 31 13 Glass -Fiber Reinforced Polymer Pipe (FRP) Thompson Pipe Group Thompson Pipe (Flowtite) ASTM D3262/D3754 ASTM D3262, ASTM D3681, 03/07/23 33 31 13 Fiberglass Pipe (FRP) Future Pipe Industries Fiberstrong FRP ASTM D4161, AWWA M45 ASTM D3262, ASTM D3517, 09/03/24 33 31 13 Fiberglass Pipe (FRP) Superlit Boru Sanayi A.S. Superlit FRP ASTM 3754, AWWA C950 * From Original Standard Products List 2 FORT WORTH. Approval Spec No. I Classsification Sewer - Pipe/Polymer Pipe 4/14/05 Polymer Modified Concrete Pipe 06/09/10 E1-9 Reinforced Polymer Concrete Pipe Sewer - Pipes/HDPE 33-31-23(1/8/13) * High -density polyethylene pipe * High -density polyethylene pipe * High -density polyethylene pipe High -density polyethylene pipe Sewer - Pipes/PVC (Pressure Sewer) 33-11-12 (4/1/13) 12/02/11 33-11-12 DR-14 PVC Pressure Pipe 10/22/14 33-11-12 DR-14 PVC Pressure Pipe Sewer - Pipes/PVC* 33-31-20 (7/1/13) * 33-31-20 PVC Sewer Pipe 12/23/97* 33-31-20 PVC Sewer Pipe * 33-31-20 PVC Sewer Pipe 12/05/23 33-31-20 PVC Sewer Pipe 12/05/23 33-31-20 PVC Sewer Pipe * 33-31-20 PVC Sewer Pipe 05/06/05 33-31-20 PVC Solid Wall Pipe 04/27/06 33-31-20 PVC Sewer Fittings * 33-31-20 PVC Sewer Fittings 3/19/2018 33 31 20 PVC Sewer Pipe 3/19/2018 33 31 20 PVC Sewer Pipe 3/29/2019 33 31 20 Gasketed Fittings (PVC) 10/21/2020 33 31 20 PVC Sewer Pipe 10/22/2020 33 31 20 PVC Sewer Pipe 10/21/2020 33 3120 PVC Sewer Pipe CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 11-6-24 Manufacturer Model No. National Spec Size Amitech USA Meyer Polycrete Pipe ASTM C33, A276, F477 8" to 102", Class V US Composite Pipe Reinforced Polymer Concrete Pipe ASTM C-76 Phillips Driscopipe, Inc. Opticore Ductile Polyethylene Pipe ASTM D 1248 8" Plexco Inc. ASTM D 1248 8" Polly Pipe, Inc. ASTM D 1248 8" CSR Hydro Conduit/Pipeline Systems McConnell Pipe Enlargement ASTM D 1248 Pipelife Jetstream PVC Pressure Pipe AWWA C900 4" thru 12" Royal Building Products Royal Seal PVC Pressure Pipe AWWA C900 4" thru 12" J-M Manufacturing Co., Inc. QM Eagle) SDR-26 (PSI 15) ASTM D 3034 4" - 15" Diamond Plastics Corporation SDR-26 (PSI 15) ASTM D 3034 4" thru 15" Lamson Vylon Pipe SDR-26 (PSI 15) ASTM D 3034 4" thru 15" Vinyltech PVC Pipe SDR-26 (PSI 15) ASTM D3034 4" thru 15" Vinyltech PVC Pipe Gravity Sewer PS 115 ASTM F 679 18" J-M Manufacturing Co, Inc. (JM Eagle) PS 115 ASTM F 679 18" - 28" Diamond Plastics Corporation PS 115 ASTM F-679 18" to 48" Harco SDR-26 (PS 115) Gasket Fittings ASTM D-3034, D-1784, etc 4" - 15" Plastic Trends, Inc.(Westlake) Gasketed PVC Sewer Main Fittings ASTM D 3034 Pipelife Jet Stream SDR 26 (PS 115) ASTM F679 1811- 24" Pipelife Jet Stream SDR 26 ASTM D3034 4"- 15" GPK Products, Inc. SDR 26 ASTM D3034 4"- 15" NAPCO(Westlake) SDR 26 ASTM D3034 4" - 15" Sanderson Pipe Corp. SDR 26 ASTM D3034 4"- 15" NAPCO(Westlake) SDR 26 PS 115 ASTM F-679 1811- 36" * From Original Standard Products List 3 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 11-6-24 Approval Spec No. I Classsification Manufacturer Model No. National Spec Size Water - Appurtenances 33-12-10 (07/01/13) 09/03/24 33-12-10 Double Strap Saddle Ford Meter Box Co., Inc. 202B V-2" SVC, up to 16" Pipe 01/18/18 33-12-10 Double Strap Saddle Romac 202NS Nylon Coated AWWA C800 V-2" SVC, up to 24" Pipe 08/28/02 Double Strap Saddle Smith Blair #317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AWWA C800 1"-2" SVC, up to 24" Pipe 03/07/23 33-12-10 Double Strap Service Saddle Powerseal 3450AS, Inc]. Corp. Stop, Dbl Strap, Stainless NSF ANSI 372 1"-2" SVC, up to 24" Pipe 10/27/87 Curb Stops -Ball Meter Valves McDonald 6100M,6100MT & 61OMT 3/4" and 1" 10/27/87 Curb Stops -Ball Meter Valves McDonald 4603B, 4604B, 6100M, 610OTM and 6101M 1'/2" and 2" FB600-7NL, FB1600-7-NL, FV23-777-W-NL, 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. L22-77NL AWWA C800 2" FB600-6-NL, FB1600-6-NL, FV23-666-W- 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, L22-66NL AWWA C800 1-1/2" FB600-4-NL, FBI600-4-NL, B I 1-444-WR- 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, B22444-WR-NL, L28-44NL AWWA C800 I" B-25000N, B-24277N-3, B-20200N-3, H- AWWA C800, ANSF 61, 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, , H-1552N, H142276N ANSI/NSF 372 2" B-25000N, B-20200N-3, B-24277N-3,H- AWWA C800, ANSF 61, 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, H-14276N, H-15525N ANSI/NSF 372 1-1/2" B-25000N, B-20200N-3,H-15000N, H- AWWA C800, ANSF 61, 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15530N ANSI/NSF 372 1" 01/26/00 Coated Tapping Saddle with Double SS Straps JCM Industries, Inc. #406 Double Band SS Saddle 1"-2" Taps on up to 12" 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel) JCM Industries, Inc. 412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel) JCM Industries, Inc. 415 Tapping Sleeve AWWA C-223 Concrete Pipe Only 05/10/11 Tapping Sleeve (Stainless Steel) Powerseal 3490AS (Flange) & 3490MJ 4"-8" and 16" 02/29/12 33-12-25 Tapping Sleeve (Coated Steel) Romac FTS 420 AWWA C-223 U p to 42" w/24" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST Stainless Steel AWWA C-223 Up to 24" w/12" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp 4" to 30" Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW37C-12-IEPAF FTW Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW39C-12-IEPAF FTW 08/30/06 Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW65C-14-IEPAF FTW Class "A" Concrete Meter Box Bass & Hays CM1337-1312 1118 LID-9 Concrete Meter Box Bass & Hays CMB-I8-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CM1365-1365 1527 LID-9 Water - Bolts, Nuts, and Gaskets 33-11-05 (01/08/13) None Water - Combination Air Release 33-31-70 (01/08/13) * EI-11 Combination Air Release Valve GA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 1" & 2" * E1-11 Combination Air Release Valve Multiplex Manufacturing Co. Crispin Air and Vacuum Valves, Model No. 1/211, 1" & 2" * E1-11 Combination Air Release Valve Valve and Primer Corp. APCO #143C, #145C and #147C 111, 2" & 3" Water - Dry Barrel Fire Hvdrants 33-12-40 (01/15/14) 10/01/87 E-1-12 Dry Barrel Fire Hydrant American -Darling Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 03/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-502 09/30/87 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AWWA C-502 01/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-502 08/24/88 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502 E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-502 09/24/87 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502 Shop Drawings No. 6461 10/14/87 E-1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Centurion AWWA C-502 Shop Drawing FH-12 01/15/88 E1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Super Centurion 200 AWWA C-502 10/09/87 E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-502 09/16/87 E-1-12 Dry Barrel Fire Hydrant American Flow Control (AFC) Waterous Pacer W1367 AWWA C-502 08/12/16 33-12-40 Dry Barrel Fire Hydrant EJ (East Jordan Iron Works) WaterMaster 5CD250 Water - Meters 02/05/93 E101-5 Detector Check Meter Ames Company Model 1000 Detector Check Valve AWWA C550 4" - 10" 08/05/04 Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6" * From Original Standard Products List 4 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Approval Spec No. �Classsification I Manufacturer I Model No. Water - Pipes/PVC (Pressure Water) 33-31-70 (01/08/13) 12/05/23 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR14 12/05/23 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR18 09/03/24 33-11-12 PVC Pressure Pipe Northern Pipe Products DR14 09/03/24 33-11-12 PVC Pressure Pipe Northern Pipe Products DR18 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR14 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR18 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 14 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 18 9/6/2019 33 11 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR18 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR14 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 Water - Pives/Valves & Fittines/Ductile Iron Fittincs 33-11-11 (01/08/13) 07/23/92 E1-07 Ductile Iron Fittings Star Pipe Products, Inc. * E1-07 Ductile Iron Fittings Griffin Pipe Products, Co. * E1-07 Ductile Iron Fittings McWane/Tyler Pipe/ Union Utilities Division 08/11/98 E1-07 Ductile Iron Fittings Sigma, Co. 02/26/14 E1-07 MJ Fittings Accucast 05/14/98 E1-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flange 05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co./Uni-Flange 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, Inc. 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, Inc. 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. 03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC) Sigma, Co. 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. 08/10/98 E1-07 MJ Fittings(DIP) Sigma, Co. 10/12/10 E1-24 Interior Restrained Joint System S & B Techncial Products 08/16/06 E1-07 Mechanical Joint Fittings SIP Industries(Serampore) 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) Mechanical Joint Fittings Mechanical Joint Fittings Mechanical Joint Fittings, SSB Class 350 Mechanical Joint Fittings, SSB Class 351 Class 350 C-153 MJ Fittings Uni-Flange Series 1400 Uni-Flange Series 1500 Circle -Lock One Bolt Restrained Joint Fitting Megalug Series 1100 (for DI Pipe) Megalug Series 2000 (for PVC Pipe) Sigma One-Lok SLC4 - SLC10 Sigma One-Lok SLCS4 - SLCS12 Sigma One-Lok SLCE Sigma One-Lok SLDE Bulldog System ( Diamond Lok 21 & JM Mechanical Joint Fittings PVC Stargrip Series 4000 DIP Stargrip Series 3000 EZ Grip Joint Restraint (EZD) Black For DIP EZ Grip Joint Restraint (EZD) Red for C900 DR14 PVC Pipe EZ Grip Joint Restraint (EZD) Red for C900 DR18 PVC Pipe National Spec AWWA C900, AWWA C605, ASTM D1784 AWWA C900, AWWA C605, ASTM D1784 AWWA C900, AWWA C605, ASTM D1784 AWWA C900, AWWA C605, ASTM D1784 AWWA C900 AWWA C900 AWWA C900 AWWA C900 AWWA C900-16 UL 1285 ANSI/NSF 61 FM 1612 AWWA C900-16 UL 1285 ANSI/NSF 61 FM 1612 AWWA C900 AWWA C900 AWWA C900 AWWA C900 AWWA C153 & C110 AWWA C 110 AWWA C 153, C 110, C III AWWA C 153, C 110, C 112 AWWA C153 AWWA Clll/C153 AWWA C111/C153 AWWA C111/Cll6/C153 AWWA C111/Cll6/C153 AWWA C111/C116/C153 AWWA C111/C153 AWWA C111/C153 AWWA Clll/C153 AWWA C153 ASTM F-1624 AWWA C153 ASTM A536 AWWA C111 ASTM A536 AWWA C111 ASTM A536 AWWA C111 ASTM A536 AWWA CI I I ASTM A536 AWWA CI I I Updated: 11-6-24 Size 4"-1 6" 16"-18" 4"-1 6" 16"-18" 4"-12" 16"-24" 4"-12" 1 6"-24" 4"-28" 16"-24" 4" - 8" 16" - 24" 4"- 12" 4'1- 12'1 4"-12" 4" to 36" 4" to 24" 4" to 12" 4" to 42" 4" to 24" 4" to 10" 4" to 12" 12" to 24" 4" - 24" 4" to 12" 4" to 24" 3"-48" 4"-12" 16"-24" * From Original Standard Products List 5 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Approval Spec No. I Classsification I Manufacturer Water - Pives/Valves & Fittincs/Resilient Seated Gate Valve* 33-12-20 (05/13/15) Resilient Wedged Gate Valve w/no Gears American Flow Control 12/13/02 Resilient Wedge Gate Valve American Flow Control 08/31/99 Resilient Wedge Gate Valve American Flow Control 05/18/99 Resilient Wedge Gate Valve American Flow Control 10/24/00 E1-26 Resilient Wedge Gate Valve American Flow Control 08/05/04 Resilient Wedge Gate Valve American Flow Control 05/23/91 E1-26 Resilient Wedge Gate Valve American AVK Company 01/24/02 E1-26 Resilient Wedge Gate Valve American AVK Company * E1-26 Resilient Seated Gate Valve Kennedy * E1-26 Resilient Seated Gate Valve M&H * E1-26 Resilient Seated Gate Valve Mueller Co. 11/08/99 Resilient Wedge Gate Valve Mueller Co. 01/23/03 Resilient Wedge Gate Valve Mueller Co. 05/13/05 Resilient Wedge Gate Valve Mueller Co. 01/31/06 Resilient Wedge Gate Valve Mueller Co. 01/28/88 E1-26 Resilient Wedge Gate Valve Clow Valve Co. 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 11/08/99 E1-26 Resilient Wedge Gate Valve Clow Valve Co. 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. 11/30/12 Resilient Wedge Gate Valve Clow Valve Co. 05/08/91 E1-26 Resilient Seated Gate Valve Stockham Valves & Fittings * E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co. 10/26/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works) 08/24/18 Matco Gate Valve Matco-Norca Water - Pives/Valves & Fittincs/Rubber Seated Butterflv Valve 33-12-21 (07/10/14) * E1-30 Rubber Seated Butterfly Valve Henry Pratt Co. * E1-30 Rubber Seated Butterfly Valve Mueller Co. 1/11/99 E1-30 Rubber Seated Butterfly Valve Dezurik Valves Co. 06/12/03 E1-30 Valmatic American Butterfly Valve Valmatic Valve and Manufacturing Corp 04/06/07 E1-30 Rubber Seated Butterfly Valve M&H Valve 03/19/18 33 1221 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) 09/03/24 33 1221 Rubber Seated Butterfly Valve American AVK Company Water - Polvethvlene Encasement 33-11-10 (01/08/13) 05/12/05 E1-13 Polyethylene Encasment 05/12/05 E1-13 Polyethylene Encasment 05/12/05 E1-13 Polyethylene Encasment 09/06/19 33-11-11 Polyethylene Encasment Model No. Series 2500 Drawing # 94-20247 Series 2530 and Series 2536 Series 2520 & 2524 (SD 94-20255) Series 2516 (SD 94-20247) Series 2500 (Ductile Iron) 42" and 48" AFC 2500 American AVK Resilient Seaded GV Series A2361 (SD 6647) Series A2360 for 18"-24" (SD 6709) Mueller 30" & 36", C-515 Mueller 42" & 48", C-515 16" RS GV (SD D-20995) Clow RW Valve (SD D-21652) Clow 30" & 36" C-515 Clow Valve Model 2638 Metroseal 250, requirements SPL #74 EJ F1owMaster Gate Valve & Boxes 225 MR Valmatic American Butterfly Valve. M&H Style 4500 & 1450 AWWA C504 Butterfly Valve AWWA C504 Butterfly Valve Class 250B Flexsol Packaging Fulton Enterprises Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AEP Industries Bullstrong by Cowtown Bolt & Gasket Northtown Products Inc. PE Encasement for DIP National Spec AWWA C515 AWWA C515 AWWA C515 AWWA C515 AWWA C515 AWWA C509 AWWA C515 AWWA C515 AWWA C515 AWWA C515 AWWA C509 AWWA C515 AWWA C515 AWWA C515 AWWA C515 AWWA C 509, ANSI 420 - stem, AWWA/ANSI C115/An21.15 AWWA C-504 AWWA C-504 AWWA C-504 AWWA C-504 AWWA C-504 AWWA C-504 AWWA C-504 AWWA C105 AWWA C105 AWWA C105 AWWA C105 Updated: 11-6-24 Size 16" 30" and 36" 20" and 24" 16" 4" to 12" 42" and 48" 4" to 12" 20" and smaller 4" - 12" 4" - 12" 4" - 12" 16" 24" and smaller 30" and 36" 42" and 48" 4" - 12" 16" 24" and smaller 30" and 36" (Note 3) 24" to 48" (Note 3) 4" - 12" 3" to 16" 4" to 16" 24" 24"and smaller 24" and larger Up to 84" diameter 24" to 48" 30"-54" 24" - 48" 8 mil LLD 8 mil LLD 8 mil LLD 8 mil LLD Water - Samplinc Station 03/07/23 33 12 50 Water Sampling Station Kupferle Foundry Company Eclipse, Number 88 , 12-inch Depth of Bury As shown in spec. 33 12 50 09/02/24 33 i2 50 Mueller Water Products, Inc;a BSS0 r, UDG2 D N This product removed �-rcw ,�Oc� vvvvi-36-rvronvz, C�v-rr�€'�oe$� 10/21/20 04/09/21 04/09/21 Water - Automatic Flusher Automated Flushing System Automated Flushing System Automated Flushing System HG6-A-IN-2-BRN-LPRR(Portable) Mueller Hydroguard HG2-A-IN--2-PVC-018-LPLG(Permanent) Kupferle Foundry Company Eclipse #9800wc Kupferle Foundry Company Eclipse #9700 (Portable) The Fort Worth Water Department's Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department's Standard Specifications during utility construction projects. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's Standard Products List and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Fort Worth Water Yellow Highlight indicates recent changes * From Original Standard Products List 6 CFW Lighting Approved Products List CFW Product Name Manufacturer I Manufacturer Product Name & Description Residential -Standard MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Makers Sales and Marketing, LLC Galvanized MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Type 11 Pole Makers Sales and Marketing, LLC Black DB01373(page 1 of 6)-Shoe Base Pole Type 11, Valmont Industries, Inc Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Black Type 33B Arm Valmont Industries, Inc D1301373(page 4 of 6)-Single Arm Type 33B, Galvanized American Electric Lighting, ATBO-P101-Mvolt-R2-3K- Acuity Brands Lighting, Inc. MP-NL-P7-AO-RFD325607 American Electric Lighting, ATBO-P101-Mvolt-R4-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD325606 Residential Luminaire American Electric Lighting, ATBO-P101-Mvolt-R2-3K-BK- Acuity Brands Lighting, Inc. MP-NL-P7-AO-RFD325609 American Electric Lighting, ATB0-P101-Mvolt-R4-3K-BK- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD325608 McFarland Cascade CREOSOTE 30/35 FOOT TIMBER POLE Timber Pole Bayou Forest Products 30-35' .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Galvanized Wood Pole Arm Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Black Valmont Industries, Inc DB01373(page 6 of 6)-Wood Pole Arm, Galvanized Arterial -Standard MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Makers Sales and Marketing, LLC Galvanized MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Type 18 Pole Makers Sales and Marketing, LLC Black DB01373(page 2 of 6)-Shoe Base Pole Type 18, Valmont Industries, Inc Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Black Type 33A Arm Valmont Industries, Inc D1301373(page 3 of 6)-Single Arm Type 33A, Galvanized American Electric Lighting, ATBO-P303-Mvolt-R2-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322792 American Electric Lighting, ATBO-P303-Mvolt-R4-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322794 Arterial Luminaire American Electric Lighting, ATBO-P303-Mvolt-R2-3K-BK- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322793 Acuity Brands Lighting, Inc. American Electric Lighting, ATBO-P303-Mvolt-R4-3K-BK- M P-N L-P7-AO-RFD322795 McFarland Cascade CREOSOTE 35/40 FOOT TIMBER POLE Timber Pole Bayou Forest Products 30-35' .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Galvanized Wood Pole Arm Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Black Valmont Industries, Inc DB01373(page 5 of 6)-Wood Pole Arm, Galvanized Decorative -Pedestrian Holophane, CLA 10.6(OAL)FT J20P07BK-MOD, AB-31-4 Washington 10' Pole Acuity Brands Lighting, Inc. RFD110736 Holophane, CLA14FT J20DMODC03BK RFD325026, AB- Washington 14' Pole Acuity Brands Lighting, Inc. 16-4 SPEC RFD325026 Holophane, WFCL3 P40 30K MVOLT FC3 NF BK AO PR7 Washington Luminaire Acuity Brands Lighting, Inc. FRGL RFD338699 Washington Globe Holophane, AWDE3 P40 30K MVOLT MS AL3 BK PR7 Luminaire Acuity Brands Lighting, Inc. AO RFD-315548 Oleander Type A Pole Acuity Brands Lighting, Inc. Holophane, PDA 12S5L20POBBK-MOD Oleander Type B Pole Acuity Brands Lighting, Inc. Holophane, PDA20S5L20P08BK-MOD Oleander Type B Arm Acuity Brands Lighting, Inc. Holophane, OHC 151N 2A TN BK Holophane, AUCL2 P40 30K AS BK L3 N P7 AO Oleander Luminaire Acuity Brands Lighting, Inc. RFD338741 Berry 12' Pole Acuity Brands Lighting, Inc. Holophane, RSA 12 50 G12 SC BK AB-26-4 RFD326400 Berry 20' Pole Acuity Brands Lighting, Inc. Holophane, PD20S5J20P11BK RFD338816 Berry Arm Acuity Brands Lighting, Inc. Holophane, VLC 271N 1A TN QSM BK Holophane, GPLF3 P40 30K MVOLT ASY QSM BK PR7 Berry Luminaire Acuity Brands Lighting, Inc. AO SH Banner Arms Acuity Brands Lighting, Inc. Holophane, BA-241N-2A-CO-S4J-BL-075P-BK System Rigid Nonmetallic Schedule 80 Conduit, Meets UL 651 Cantex Inc. specifi cations and NEMA TC2, Rated for 90°C Cable, Sunlight Resistant, 10' Lengths and 20' lengths Rigid Nonmetallic Schedule 80 Electric Conduit, Meets UL 651 specifications, RUS listed, NEMA TC-2 and Heritage Plastics NEMA TC-3, Rated for 90°C Cable, Sunlight & Weather Conduit Resistant PVC Rigid Schedule 80 Conduit, Conforms to UL 651 Atkore-Heritage Plastics and NEMA TC 2, Sunlight Resistant, Listed for 90°C conductors or cable Schedule 80 PVC Rigid Nonmetallic Conduit, Extra Prime Conduit, Inc Heavy Wall EPC-80, Sunlight resistant, Rated for use with 90°C conductors, Meets UL651 Splice Kit With Connector NSi Industries, LLC Gel Stub Splice Kit with Connector, Easy -Splice, ESSLK Series Copper Wire/Conductor Southwire Encore Wire Encore Wire Service Wire Co Advanced Digital Cable Inc Aluminum Wire -Triplex Priority Wire & Cable, Inc Fuse & Fuse Holder Edison Edison Cooper EATON EATON Connector Thomas & Betts Metered Pedestal 120-240V Electrol Systems, Inc WE Manufacturing & Controls Metered Pedestal 240- Electrol Systems, Inc 480V WE Manufacturing & Controls Ground Box Kearneys Photocell Shorting Caps MacLean Highline Oldcastle Type XHHW-2 copper conductor, 600V TYPE XHHW-2 / RW90, copper conductor, Superslick Elite, 600V/1000V THHN / MTW / THWN-2 Copper conductor, 600V Servicepro-X XHHW-2, 600/1,000 Volt Copper, CT Rated XHHW-2 Low Smoke Halogen Free, Cross -linked Polyethylene Insulated 14 AWG-750 MCM, 600 Volts, 90°C Dry and wet Triplex Overhead Aluminum Conductor General Purpose, Midget Class MEN Fuses, Voltage Rating: MEN - 250 VAC, Ampere Rating: 0.5 - 30 Amps, Interrupting Rating: 10,000 RMS Amps @ 125V Modular Ferrule Fuse Blocks for Midget Class and CC Fuses In -line fuse holders for Single -Pole 13/32" x 1 1/2" Fuses HEB-AA Bussmann Series, HEB breakaway and non -breakaway in -line fuse holders for UL 13/32" x 1- 1/2"supplemental fuses Bussmann Series, FNM 13/32" x 1-1/2- 250Vac time - delay supplemental fuses Wire Joints for Copper Conductor, Cat No: 54615, 54620, 54625-TB, 54635, 54640, 54630 TY A (120/240) 100(NS)AL(E)PS(U) TY A 120/240 100(NS)AL(E)PS(U) TY A (240/480) 100(NS)AL(E)PS(U) TY A 240/480 100(NS)AL(E)PS(U) Polymer Concrete, PHA132412X0002: TIER 22 (X) 22, 500lbs Polymer Concrete, H-SERIES UNIT, H1730-24 TIER-22 - TXDOT 2x 1/2" CAPTIVE BOLT - 2x BRASS FLOATING NUT Polymer Concrete, H-SERIES UNIT, H1324-24 TIER-15 - Oldcastle TXDOT 2x 1/2" CAPTIVE BOLT- 2x BRASS FLOATING NUT NSi Industries, LLC Split Bolt Connectors, Copper Split Bolts 2 Wire, N Series Dark To Light, DLL Elite, Electronic Locking, Type Acuity Brands Lighting, Inc. Photocontrol, DLL-127 or DLL-480 Acuity Brands Lighting, Inc. Dark To Light, Part # DSHORT SBK U Interim Products Residential Luminaire I TRASTARINC. IDURA-STR25-3K-120-3-GR-SCL DURA-STR10A-3K-120-3-GR-SCL Arterial Luminaire TRASTARINC.