HomeMy WebLinkAboutContract 59132-FP1FORT WORTH,
TRANSPORTATION AND PUBLIC WORKS
NOTICE OF PROJECT COMPLETION
-FP1
City Secretary No. 59132
Date Received: 8/6/2025
City Project JV!?: 103055 & 103059
Regarding contract 59132 5th St @ Carroll St & Carroll St @ Merrimac SDR for as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on 2/14/2023 through
M&C 23-0080 the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation & Public Works Department has accepted the project as
complete.
Original Contract Amount:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
TaWcla L. ww(sack
PAL,— L Wad sa Ck(J a 129, 202511'.2357 CD I;
Recommended for Acceptance
Asst. Director, TPW - Capital Delivery
$1,048,090.00 Days 140
$ 0.00 )V2 Days Added by CO
$ Total Days
$ 954,090.00 Days Charged 140
Days @ $
$ 954,090.00
$ 906,385.50
$ 47, 704.50
Jul 29, 2025
Date
L .t4.rm Prt~
Lauren Pri eur IJu129. 202111 21-S / CDT
Accepted
Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
Asst. City Manager
Comments:
Jul 29, 2025
Date
Aug 4, 2025
Date
/ Day
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
C-620 Signature Page
To (Owner)
P. O.
Number:
Project:
Contractor's Application for Payment Invoice No.Final
City of Fort Worth Invoicing Period (From- To): Invoice Date:
City Secretary Contract
Number:
212 zozs
From (Contractor): Remit to ( If Not Automatic Deposit):
Vortex Lining Systems, LLC
103055 & 103059 Contractor's CFW Vendor No.:
7000003631 18150 Imperial Valley Drive, Houston, TX 77060
59132 Contract 5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merri
Name:
Application For Payment
Change Order Summary
Approved Change Orders
Number Additions
1
2
3
4
5
6
7
8
TOTALS
NET CHANGE BY
CHANGE ORDERS
Contractor's Certification
1. ORIGINAL CONTRACT PRICE......................................................... $
Deletions 2. Net change by Change Orders................................................................ $
3. Current Contract Price (Line 1 f 2)....................................................... $
4. TOTAL COMPLETED AND STORED TO DATE
(Progress Estimate, Construction Allowance and Change Orders)...... $
5. RETAINAGE:
a. X $954,090.00 Work Completed.......... $
b. X Not Used $
c. Total Retainage (Line 5a + Line 5b) ............................... $
6. AMOUNT ELIGIBLE TO DATE (Line 4 - Line 5c)............................ $
7. LESS PREVIOUS PAYMENTS (Line 6 from prior Application)......., $
8. AMOUNT DUE THIS APPLICATION ................................................ $
9. BALANCE TO FINISH, PLUS RETAINAGE
(Column G on Progress Estimate+ CA + Cos + Line 5 above) .............. $
10. CONTRACT TIME:
The Contractor certifies with the submittal of this document and associated Payment Request
Submittal on the City of Fort Worth Buzzsaw system that to the best of their knowledge: (1) all
previous progress payments received from Owner on account of Work done under the Contract have
been applied on account to discharge Contractor's legitimate obligations incurred in connection with
Work covered by prior Applications for Payment; (2) title of all Work, materials and equipment
incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass
to Owner at time of payment free and clear of all Liens, security interests and encumbrances (except
such as are covered by a Bond acceptable to Owner indemnifying Owner against any such Liens,
security interest or encumbrances); and (3) all Work covered by this Application for Payment is in
accordance with the Contract Documents and is not defective.
Liquidated Damages $650.00 x day
Ross Cooke Apr 4,20n 0940 EDT)
a, Days Awarded
b, Days Added by CO
C. Total Days
d, Days Charged
e. Days Remaining
Contractor: Vortex Lining Systems, LLC
Brandon Garrastazu
Sr. Accountant
Consent of Surety
IJ fOIU
$1,048,090.00
$1,048,090.00
$954,090.00
$954,090.00
$906,385.50
$47,704.50
$94,000.00
140
140
140
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
Progress Estimate
CitySecmti,
59132
Contract Num
F°t(°°tl°)
5th Street at Carroll Street to Railroad Storm Drain & Carroll
Street and Merrimac Street Storm Drain
Apphcatmn Puwd.
A
B
C
D
I[em
Specification
Bid Qnanhty
Unit P..
Bid Value
Estimated Qi 1y
Value
Previously lnsmlled
Bid Item No.
D-ipt-
S-Nc
Unnof Measure
Installed
Unit 1 -Storm Wale, Rehabilitation b�SAPL -Sth Street at Carroll at -
Raan
AND
2
GROUNDfT�IAO7NF-UffnEAM]O�BILIJZ�AT(IJO}EWATERING
999999
LS
10000
$29,500.0�
$29,500.0
1.000000
$29.50
$29.!
STORM I/�QI(=�i� LU'IUX(i_VATION PLAN(SWPPP) AND
015713
3
IMPLEMENTATION
LS
100000,
$3,025.011
$3,025.00J
1.0000000J
$3,025.IX
$3.1
4
TRAFFIC CONTROL
347113
MO
40000��1
$3,625.0„
$14.500.O'QQ(%
2.000000,Q/%I
$7,250.IX
$7,:
5
CHEMICAL GROUT INJECTION
R}
109000011J
$$5.400.00
109.000000U
$36,750.01•
$36.1
I,1�
J I/(F(��r`�n 1p(/gyp(// �G
W W W
EA
$6 0.011
1
$5,400.0\
$5.i
a
L IEI2AL SE12 (:E 12EINSTATEMENT&BRUSHING
...
EA
120000 i1
$30.011
$4200.00
1z.00000001
$a.zoo.a
$a.:
SOIL VOID)
030132
�/fI,
$$11.2G .010
1
I
0
PRE CCTV INSP�CTOIONL
LF
0000000ff
$10.52 125.0011
900.000000UJJ
$10,125.
$10.'
11
POST CCTVINSPECTION
330132
LF
000000df
$%
$5. 75.00�
90.000000U
$5. 75.0O
$5,'
12
NORMAL CLEANING OF STORM DRAIN
330450
LF
90 000011J
$27.0„
$24. 00.00J
900.000000UJ
$24,300.0d
$24.:
13
HEAVY CLEANING OF STORM DRAIN
330450
LF
100000
$54.011
$540.0
10.000000
$540.0/
V
INSTALLATION OF SAPL, COMPLETE, IN PLACE AND READY TO USE
33 31 71
�
14
PUMPINGI
LF
0000000
$475.0(I
$427,500.00
90.0000000
$427,0O.00J
$427.!
15
iiV�QS�111UM1'jfffASS
ii��li5 1�LfMl'�'�N(L,
330310
LS
1 00000d
$2,500.0f1
$2,500.0
1.000000
$2,00.0a11�
$2.!
Unit 1 - Storm Water Rehabilitation by CIPP - Carroll Street anti
Merrimac Street
BYPASS PUMPIING/DEWATERING/ GROUNDWATER MANAGEMENT
999999
1
LS
1000000
$9,300.0[ 1
$9.300.00
1.0000000
$9.300.0
$9,:
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) AND
015713
2
IMPLEMENTATION
LS
100000
$3,000.0[1
$3,000.00
1.0000000
$3.00.0
$3,1
3
L
347113
WK
20000JJ
$720.0f1
$14,500.0
1.000000JJ
$7250. 1'
$7,:
4
`LAT��%%E
...
EA
30000G/fI,
$3,000.0f1
$9,001
3.000000U
$9.00.a1
$9,1
5
fRfAL
` I
$42$7.00
.800.0'(%I'
$$4,340.00
4000000UJ
$16,SOO.OJ
$16,1
'(.IV INSPECTION
fXflL��('j
330132
EF
62000000
620.000000f
Q
0(
$a.340. f
$4,a
7
fff JfON
['
330132
LF
8200000(1f
620
$3.7.
$2. 25.001
620.000OOOOdf
$2,325.a fJ
$2,:
OF S I�fi(rl $(
33 04 50
LF
00002f
$S.Sf
$5,270.00/
000OOOdf
$5270.5
$5,:
9
HEAVY ���%f ST�j�tyj nJ2 Jn
33 U450
LF
3950000(1
$52.01
$20,540.00
39520
395.000OOOd
$20,540.a1
$20.!
INSTALC'rVF 9U-'1�(.iii i`Iflf', IYMPLETE, IN PLACE AND READY
LA
33 31 12
TO USE
LF
82500001�
$2$3,000.06 .600.00
624.000000t1
$2$2,400.a� 66.600.
661
$2$2.i
11
LATERAL SEROT VICEI(i�ii��TI Q�tiial�l�l�'�i OSHING
...
EA
$600.O0
This document has been moddi,d from its piial form as an E1CDC document and the user did not highhghl the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior , its execution.
C-620 Unit Price Progress Estimate
Contractor's Application
Appliwhon Nember:
Final
Apyli-ion Date:
2/12/2025
E
ls
Va1ne Thiseno Pd hSPmsently
F
Total Completed %
and Stored-
red m Date IF)
G
Balance In Fiiimh
(B - F)
t-d
stored (not in c>
(D+E) B
$51.000.0d 100.0%
$29.500.Od 100.0%
$3.025.00 100.0%
$7250.Od 50.0%
$7,250.00
$26,250.00
$36.750.Od 100.0%
$5.400.od 100.0%
$4200.od 100.0%
$52,650.00
$10.1z5.od 100.0%
$5. 75.od 10o.0%
$24.300.Od 100.0%
$540.0d 100.0%
$427.500.00 100.0%
$2.500.Od 100.0%
$9.300.00 100.0%
$3.000.00 100.0%
$7250.Od 50.0%
$7,250.00
$9.0oo.0d 100.0%
$16,a00.Od 100.0%
$4.340.0d 100.0%
$2.325.Od 100.0%
$5.270.od 100.0%
$20.540.Od 100.0%
$266.600.00 100.0%
$2.400.Od 80.0%
$600.00
Progress Estimate CitySecmtaz 59132
Contract Num
F°r(°°tl°) 5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm Drain
Apphcaho° Perwd
A B
I[em
Bid Item No. D—iphon Specification Unnof Measure Bid Qaanhty U.. P.. Bid Value
S.—Nc
C
Eshmmed Q—Iny
Installed
This document has been modified from its onginal form as an EICDC document and the user did not highhght the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior m its execution.
Previously Insmlled VA
C-620 Unit Price Progress Estimate
Contractor's Application
Appliwhon Number: Final
Apphcmmn Date: 2/12/2025
E F G
Total Completed % Balance to Finish
Valne'I'his Penod Materials Presently and Stored m Date (F) (B - F)
stored (not in G) (n+E) B
Progress Estimate City S—taz 59132
Contract Num
F°rl °°tl° / 5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm Drain
A B
Imm
Bid Item No. D —iphon Specification Unn of Measure Bid Quantity Unn P.. Bid Value
S.—Nc
C-620 Unit Price Progress Estimate
Contractor's Application
Appliwhon Number: Final
Apyhcmmn Date: 2/12/2025
C D E F G
EshmQumtity MeTotal Completed % Balance to Fiuish
I
Insta-lled Value Previously Insmlled Value Valne'I'heno is Pd Store—dd Presently TWO
(not iv CJ and Stored m Da" ((B - P)
� B+EI B
This document has been modified from its ongmal form es an EICDC document and the user did not highhgM the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior m its execution.
Progress Estimate CitySecretaz 59132
Contract Num
F°r( °°tl° ) 5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm Drain
Apphcaho° Perwd
A B
Item
Bid Item No. D—iphon Specification Unnof Measure Bid Quanhry U.. P.. Bid Value
S.—Nc
Totals
C D
Eshmated Quantity Value
In
$954.090.00
This document has been modified from its ongmal folio es an EICDC document and the user did not highhght the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior m its execution.
C-620 Unit Price Progress Estimate
Contractor's Application
Appliwhon Number: Final
Apphcation Date: 2/12/2025
E F G
Total Completed % Balance to Fiuiah
Previously Installed Value Valne'I'his Penod Mt,,,,, Presently and Stored to Date (F) (B - F)
stored (not in c>+E) B
$954,090.001
$954.090.00 91.0% $94.000.00
C-620 Change Order
Progress Estimate Construction Allowance Usage
ADDITIONS
For 5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm City Secretary
O55 & 103 Drain Comma Num: 59132
Application Period:
A B C D
Item
Spec�ficat�on Quantity to Add Umt Pr— Addnm Value Estimated Quantity Value
Item Number Descnphon Unrt of Measure Installed
Section No.
Pre—al
y Value Thas
Installed Value Period
This document has been modified from its original form as an EEICDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
Contractor's Application
Final
Application Date: 2/12/2025
E F
Mat-aTotal Completed / Balance to Finish
Stored tated (not m C) Presently and Stored to Date (F) (B -F)
S(
(D+E) B
C-620 Change Order
I
Totals I I I I I I I
I I I
I I I I
Progress Estimate
Construction Allowance Usage
Contractor's Application
CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED
For (eummet): 055 & 1035th
Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm Drain
Appl—tum Number.
Final
Appl—tron Penod.
Apphcatum Date:
2/12/2025
A B C D
E
F
Item
Specification Quantity to Delete Umt Pnce Reduehon Value Not Used Not Used
Not Used Not Used Not Used
Not Used Not Used Not Used
Bid Item Number
Description Unit of Measure
Section No.
Totals
This document has been modified from its original form as an EEJCDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate
Change Order Number I I
I
Contractor's Application
ADDITIONS
For (contract). 055 & 103 5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm City Secretary
59132
Application Number:
Final
Drain
Contract Num:
Application Period:
Application Date:
2/12/2025
A
B
C D
E
F
Item
Addition
Total Completed Balance to Finish
Change Order Item
Spec CO Quavtny to Add
Unit Puce Change Order
Estimated Quantity
Value
Installed
Prev�wsI l Value This Materials Presently
Installed Period Stored C)
and Stored to Date (F) (B -F)
No. Description
Section No. Unrt of Measure
on No.
Value
Value (not m
� � � B
This document has been modified from its original form as an EEICDC document and the user, did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Totals
Progress Estimate
Change Order Number 1
Contractor's Application
DELETIONS
For (contract): 055 & 103
5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street
Storm Drain
Apphcahon Number.
Final
Application Period:
Application Date:
2/12/2025
A
B C
D E
F
Item
CO Quant�Ty to
Deletron
Change Order Item
Specification
Description Unit Measure Delete
Umt Pace Change Order Not Used
Net Used Net Used Net Used Net Used
Not Used Not Used Not Used
No.
of
Section No.
Value
Totals
This document has been modified from its original form as an EEICDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 2
ADDITIONS
For (contract). 055 & 103 5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm City Secretary 59132
Drain Contract Num:
Application Period:
A B
Item
Change Order Item Specification CO Quantity to Add Una Puce Addmon Change
No. Descnphou Section No. Unrt of Measure Order Value
C D
Estrmated Quacatay Value
Insta led
Previously Value This
Installed Value Perod
This document has been modified from its original form as an EEJCDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
Contractor's Application
Application Number:
Final
Application Date: 2/12/2025
E F
Balance to Finish
Matenals Presently Total Completed %
and Stored to Date (F) (B F)
Stored (vot m C)
(DIE) B
C-620 Change Order
Totals I I I I I
Progress Estimate
Change Order Number 1 2
Contractor's Application
DELETIONS
For (..tact): 055 & 103
51h Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm Drain
Apphcaho, Number.
Final
Apphcaho, Pmod.
Apphcaho. Date:
2/12/2025
A B C
D E
F
Change Order Item
Specification Unit Price CO Quantity to Deletion Change
Not Used
Not Used Not Used Not Used Not Used
Not Used Not Used Not Used
No.
DescriptiItem
Unit of Measure
on Delete Order Value
Section No.
Totals
This document has been modified from its original form as an EEICDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 3
ADDITIONS
For (contract). 055 & 103 5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm City Secretary 59132
Drain Contract Num:
Application Period:
A B
Item
Addition
Change Order Item Unit of Measure
Specification CO Quantity to Add Unit Price Change Order
No. Description Section No. Value
C D
Estimated Quantity Value
Installed
Contractor's Application
. PP co—o mo—, Final
Application Date: 2/12/2025
E F
Balance to Finish
Previously Value This Materials Presently anTotal Completed d Stored to Date (F) (B - F)
Installed Value Period Stored (not in C) (D + E) B
This document has been modified from its original farm as an EEICDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate
Change Order Number 1 3
Contractor's Application
DELETIONS
For (wntmet} 055 & I035th
Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street
Storm Dram
Application' Nambec
Final
Application Period:
Application Date:
2/12/2025
A
B C
D E
F
Item
CO Quantity to
Deletion
Change Order Item
No.
Sp—rcat,Unit of Measure on
Descnp4on Section No. Delete
Umt Pr— Change Order Not Used
Value
Not Used Not Used Not Used Not Used
Not Used Not Used Not Used
Totals
This document has been modified from its original form as an EEICDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 4
ADDITIONS
For (contract). 055 & 103 5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm City Secretary 59132
Drain Contract Num:
Application Period:
A B
Item
Addmon
Change Order Item Descvption Spec�ficat�or, Unit of Measure CO Quantity to Add Unit Puce Change Order
No. Section No. Value
C D
Estimated Quanhly Value
Installed
Contractor's Application
. Pp— —aau,— Final
Application Date: 2/12/2025
E F
Balance to Finish
Total Completed %
Installed V)
Plled Valsly Valueue Pend
MaStored tenals Presently and Stored to Date (F) (B _ P
od (not m C) (D I E) B
This document has been modified from its original form as an EEICDC document and the user, did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate
Change Order Number 1 4
Contractor's Application
DELETIONS
For (wntmet} 055 & I035th
Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street
Storm Dram
Application' Nambec
Final
Application Period:
Application Date:
2/12/2025
A
B C
D E
F
Item
CO Quantity to
Deletion
Change Order Item
No.
Sp—rcat,Unit of Measure on
Descnp4on Section No. Delete
Umt Pr— Change Order Not Used
Value
Not Used Not Used Not Used Not Used
Not Used Not Used Not Used
Totals
This document has been modified from its original form as an EEICDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 5
ADDITIONS
For (contract). 055 & 103 5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm City Secretary 59132
Drain Contract Num:
Application Period:
A B
Item
Addu"
Change Order Item Descnpbon Spec�ficat�or, Unit of Measure CO Quantity to Add Unit Puce Change Order
No. Section No. Value
C D
Estimated Quantity Value
Installed
Contractor's Application
vvaa„ n,.mn� Final
Application Date: 2/12/2025
E F
Balance to Finish
Total Completed % )
Palled Val Value This Matenals Presently and Stored to Date (F) (B _ P
Installed Value Perod Stored (not m C) (D I E) B
This document has been modified from its original farm as an EEICDC document and the user, did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate
Change Order Number 1 5
Contractor's Application
DELETIONS
For (wntmet} 055 & I035th
Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street
Storm Dram
Application Number:
Final
Application Period:
Application Date:
2/12/2025
A
B C
D E
F
Item
CO Quant�Ty to
Delehun
Change Order Item
No.
Speoficat,Dart of Measure on
Descnp4on Section No. Delete
Umt Pr— Change Order Not Used
Value
Not Used Not Used Net Used Net Used
Not Used Not Used Not Used
Totals
This document has been modified from its original form as an EEICDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 6
ADDITIONS
For (contract). 055 & 103 5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm City Secretary 59132
Drain Contract Num:
Application Period:
A B
Item
Addition
Change Order Item Specification CO Quantity to Add Unit Price Change Order
No. Description Section No. Unit ofMeasam Value
C D
Estimated Quantity Value
Installed
Contractor's Application
. Pp-----. Final
Application Date: 2/12/2025
E F
Balance to Finish
Previouslyvane This Materials Presently anTotal Completed d stored to Date <F) B "�
Installed Value
ue Period Stored (not in C) (D + E) B
This document has been modified from its original farm as an EEICDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate
Change Order Number 1 6
Contractor's Application
DELETIONS
For (wntmet} 055 & I035th
Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street
Storm Dram
Application' Nambec
Final
Application Period:
Application Date:
2/12/2025
A
B C
D E
F
Item
CO Quantity to
Deletion
Change Order Item
No.
Sp—rcat,Unit of Measure on
Descnp4on Section No. Delete
Umt Pr— Change Order Not Used
Value
Not Used Not Used Not Used Not Used
Not Used Not Used Not Used
Totals
This document has been modified from its original form as an EEICDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 7
ADDITIONS
For (contract). 055 & 103 5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm City Secretary 59132
Drain Contract Num:
Application Period:
A B
Item
Addaroa
Change Order Item Description Specification Unit of Measure CO Quantity to Add Umt Price Change Order
No. Section No. Value
C D
Estrmated Quanhly Value
Installed
Contractor's Application
. Pp.co— "ano,c.: Final
Application Date: 2/12/2025
E F
Balance to Finish
Total Completed %
Previously Value This MatenalPresently and Stored to Date (F) (B -F)
Installed Value Perod Stored ( (not iv C) (D I F) B
This document has been modified from its original form as an EEICDC document and the user, did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Totals I I I I
Progress Estimate
Change Order Number 1 7
Contractor's Application
DELETIONS
For (..tact): 055 & 103
51h Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street
Storm Drain
Apphcaho, Number.
Final
Apphcaho, Pmod.
Apphcaho, Date:
2/12/2025
A
B C
D E
F
Item
CO Quantity to
Deletion
Change Order Item
Specification
Description Unit afMeasure Delete
Unit Price Change Order Not Used
Not Used Not Used Not Used Not Used
Not Used Not Used Not Used
No.
Section No.
Value
Totals
This document has been modified from its original form as an EEICDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 8
ADDITIONS
For (contract). 055 & 103 5th Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street Storm City Secretary 59132
Drain Contract Num:
Application Period:
A B
Item
Addmon
Change Order Item Descvption Spec�ficat�or, Unit of Measure CO Quantity to Add Unit Puce Change Order
No. Section No. Value
C D
Estimated Quanhly Value
Installed
Contractor's Application
. Pp— —aau,— Final
Application Date: 2/12/2025
E F
Balance to Finish
Total Completed %
Installed V)
Plled Valsly Valueue Pend
MaStored tenals Presently and Stored to Date (F) (B _ P
od (not m C) (D I E) B
This document has been modified from its original form as an EEICDC document and the user, did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Progress Estimate
Change Order Number 1 8
Contractor's Application
DELETIONS
For (wntmet} 055 & I035th
Street at Carroll Street to Railroad Storm Drain & Carroll Street and Merrimac Street
Storm Dram
Application' Nambec
Final
Application Period:
Application Date:
2/12/2025
A
B C
D E
F
Item
CO Quantity to
Deletion
Change Order Item
No.
Sp—rcat,Unit of Measure on
Descnp4on Section No. Delete
Umt Pr— Change Order Not Used
Value
Not Used Not Used Not Used Not Used
Not Used Not Used Not Used
Totals
This document has been modified from its original form as an EEICDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
City of Fort Worth Summary of Charges
City Secretary Contract Num: � 59132 �
Sth Street at Carroll Street to Railroad Storm Drain &c
1P. O.: 0 Project Number: 103055 & 103059
Carroll Street and Merrimac Street
Storm Drain
Application Period:
0
Application
Final Application Date: 2/12/2025
Number:
Funding Identification (FID)
Total Completed
Amt Remaining Gross Retainage Net
Original Contract
52007-0200431-5330500-103055-002880-9999
$346,825.00
$7,850.00
52007-0020431-5330500-103059-002880-9999
$607,265.00
$86,150.00
0
0
0
0
0
0
0
0
0
Change Order 1
52007-0200431-5330500-103055-002880-9999
52007-0020431-5330500-103059-002880-9999
0
0
0
0
0
0
0
0
0
Change Order 2
52007-0200431-5330500-103055-002880-9999
52007-0020431-5330500-103059-002880-9999
0
0
0
0
0
0
0
0
0
Change Order 3
52007-0200431-5330500-103055-002880-9999
City of Fort Worth Summary of Charges
City Secretary Contract Num: 59132
Sth Street at Carroll Street to Railroad Storm Drain & 11' 0
I I O .
Carroll Street and Merrimac Street Storm Drain l
Application Period: I 0 I Application I Final
Number:
Funding Identification (FID)
52007-0020431-5330500-103059-002880-9999
0
0
0
0
0
0
0
0
0
Chance Order 4
52007-0200431-5330500-103055-002880-9999
52007-0020431-5330500-103059-002880-9999
0
0
0
0
0
0
0
0
0
Chance Order 5
52007-0200431-5330500-103055-002880-9999
52007-0020431-5330500-103059-002880-9999
0
0
0
0
0
0
0
0
0
Chance Order 6
52007-0200431-5330500-103055-002880-9999
52007-0020431-5330500-103059-002880-9999
0
Total Completed Amt Remaining Gross
Project Number: 1103055 & 103059
Application Date: 2/12/2025
Retainage Net
City of Fort Worth Summary of Charges
Sth Street at Carroll Street to Railroad Storm Drain &c
City Secretary Contract Num: � 59132 � 1P. O.: 0 Project Number: 103055 & 103059
Carroll Street and Merrimac Street Storm Drain
Application
Application Period: 0 Number: Final Application Date: 2/12/2025
Funding Identification (FID) Total Completed Amt Remaining Gross Retainage Net
0
0
0
0
0
0
0
0
Change Order 7
52007-0200431-5330500-103055-002880-9999
52007-0020431-5330500-103059-002880-9999
0
0
0
0
0
0
0
0
0
Change Order 8
52007-0200431-5330500-103055-002880-9999
52007-0020431-5330500-103059-002880-9999
0
0
0
0
0
0
0
0
0
Totals
52007-0200431-5330500-103055-002880-9999 $346,825.00 $7,850.00
52007-0020431-5330500-103059-002880-9999 $607,265.00 $86,150.00
0
0
0
0
0
0
0
0
0
City of Fort Worth Summary of Charges
Sth Street at Carroll Street to Railroad Storm Drain & 0
City Secretary Contract Num: I 59132 I I P. O.
Carroll Street and Merrimac Street Storm Drain l
Application Period: I 0 I Application I Final
Number:
Funding Identification (FID)
Grand Total
Total Completed Amt Remaining I I Gross
1 1 $954,090.00 1 1
Project Number: 1103055 & 103059
Application Date: 2/12/2025
Retainage Net
$94,000.00 1 1 $0.00 1 1 ($47,704.50)1 1 $47,704.50 1
FORTWORTH.
M,
TRANSPORTATION AND PUBLIC WORKS
September 18, 2023
Vortex Lining Systems, LLC
18150 Imperial Valley Dr.
Houston, TX 77060
RE: Acceptance Letter
Project Name: 5th Street at Carroll St and Carroll St at Merrimac SDR Project
Project Type: Storm Drain
City Project No.: 103055, 103059
To Whom It May Concern:
On August 29, 2023 a final inspection was made on the subject project. There were no punch list items
identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on September 29,
2023, which is the date of the final inspection and will extend of two (2) years in accordance with the
Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
300-9960.
Sincerely,
Mike Crenshaw, P.E., CFM, Project Manager
Cc: Sergio Garcia, Inspector
Donald Watson, Inspection Supervisor
Oscar Aguillon, Senior Inspector
Linda S. Young, P.E., Program Manager
HDR Inc., Consultant
Vortex Lining Systems, LLC, Contractor
N/A, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 08/20/19
CONSENT OF SURETY
OWNER
❑
TO FINAL PAYMENT
ARCHITECT
❑
AIA DOCUMENT G707 A
CONTRACTOR
❑
- .
SURETY
0
OTHER
❑
PROJECT: Carroll Street and Merrimac Street Storm Drain
(name, address) Rehabilitation - CPN 103055 and 5th Street at Carroll Street to Railroad
Storm Drain Rehabilitation - CPN 103059
TO (Owner)
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
ARCHITECT'S PROJECT NO:
CONTRACT FOR:
CONTRACT DATE:
Bond No. ES00010380
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(here insert name and address of Surety as it appears in the bond).
Everest Reinsurance Company
100 Everest Way, Warren Corporate Center, Warren, NJ 07059
, SURETY,
On bond of (here insert name and address of Contractor as it appears in the bond)
Vortex Lining Systems, LLC
18150 Imperial Valley Drive, Houston, Tx 77060 CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor as follows:
Final Payment
The Surety agrees that such final payment to the Contractor shall not relieve the Surety of any
Of Its obligations to (here insert name and address or Owner)
City of Fort Worth
200 Texas Street, Fort Worth, TX 76102 OWNER
as set forth in the said Surety's bond.
IN WITNESS WHEREOF;
the Surely has hereunto set its hand this 2nd day of April 2025
Attest:
(Seal):
Everest Reinsurance Company
S ety
00
Sig ure of Authorized Representative
Aaron P. Clark, Attorney -in -Fact
Title
AIA DOCUMENT G707A • CONSENT OF SURETY TO REDUCTION IN OR PARTIAL RELEASE OF RETAINAG E • JUNE 1971
EDITION • AIA • 1971 • THE AMERICAN INSTITUTE. OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006
A everest`
POWER OF ATTORNEY
EVEREST REINSURANCE COMPANY
KNOW ALL PERSONS BY THESE PRESENTS: That Everest Reinsurance Company, a corporation of the State of Delaware ("Company") having its principal
office located at 100 Everest Way, Warren, New Jersey, 07059, do hereby nominate, constitute, and appoint:
Florence McClellan, Aaron P. Clark, Robert F. Bobo, Timothy F. Kelly, Laura Kneitz, Teresa D. Kelly,
Craig C. Payne, Rachel Richardson
its true and lawful Attorney(s)-in-fact to make, execute, attest, seal and deliver for and on its behalf, as surety, and as its act and deed, where required, any
and all bonds and undertakings in the nature thereof, for the penal sum of no one of which is in any event to exceed UNLIMITED, reserving for itself the full
power of substitution and revocation.
Such bonds and undertakings, when duly executed by the aforesaid Attorney(s)-in-fact shall be binding upon the Company as fully and to the same extent as
if such bonds and undertakings were signed by the President and Secretary of the Company and sealed with its corporate seal.
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Board of Directors of
Company ("Board") on April 21, 2016:
RESOLVED, that the President, any Executive Vice President, and any Senior Vice President are hereby appointed by the Board as authorized to
make, execute, seal and deliver for and on behalf of the Company, any and all bonds, undertakings, contracts or obligations in surety or co -surety with others
and that the Secretary or any Assistant Secretary of the Company be and that each of them hereby is authorized to attest to the execution of any such bonds,
undertakings, contracts or obligations in surety or co -surety and attach thereto the corporate seal of the Company.
RESOLVED, FURTHER, that the President any Executive Vice President, and any Senior Vice President are hereby authorized to execute powers
of attorney qualifying the attorney named in the given power of attorney to execute, on behalf of the Company, bonds and undertakings in surety or co -surety
with others, and that the Secretary or any Assistant Secretary of the Company be, and that each of them is hereby authorized to attest the execution of any
such power of attorney, and to attach thereto the corporate seal of the Company.
RESOLVED, FURTHER, that the signature of such officers named in the preceding resolutions and the corporate seal of the Company may be
affixed to such powers of attorney or to any certificate relating thereto by facsimile, and any such power of attorney or certificate bearing such facsimile
signatures or facsimile seal shall be thereafter valid and binding upon the Company with respect to any bond, undertaking, contract or obligation in surety or
co -surety with others to which it is attached.
IN WITNESS WHEREOF, Everest Reinsurance Company has caused their corporate seals to be affixed hereto, and these presents to be signed by their duly
authorized officers this 151' day of February 2023.
SEAL I
Everest Reinsurance Company
Gam=
By: Anthony Romano, Senior Vice President
On this 15", day of February 2023, before me personally came Anthony Romano, known to me, who, being duly sworn, did execute the above instrument;
that he knows the seal of said Company; that the seal affixed to the aforesaid instrument is such corporate seal and was affixed thereto; and that he executed
said instrument by like order.
LINDA ROBINS
Notary Public, State of New York
No 01RO623973G
Qualified In Queens County
Term Expires April 25, 2027
Linda Robins, Notary Public
I, Nicole Chase, Assistant Secretary of Everest Reinsurance Company do hereby certify that I have compared the foregoing copy of the Power of Attorney and
affidavit, and the copy of the Section of the bylaws and resolutions of said Corporation as set forth in said Power of Attorney, with the ORIGINALS ON FILE IN
THE HOME OFFICE OF SAID CORPORATION, and that the same are correct transcripts thereof, and of the whole of the said originals, and that the said
Power of Attorney has not been revoked and is now in full force and effect.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Company, this 2nd day of April 2025.
urap.,P
Q` `�p40rtyr� O
91 SEAL ' v
6i t97i 0+
'+ruwlko <'
By: Nicole Chase, Assistant Secretary
ES 00 01 04 16
r
2711E R E.SN,
TEXAS IMPORTANT NOTICE
To obtain information or make a complaint:
You may call toll -free for information or to make a
complaint at
1-866-287-1736
You may also write to:
Everest National Insurance Company
477 Martinsville Road, PO Box 830
Liberty Corner, NJ 07938-0830
You may contact the Texas Department of
Insurance to obtain information on companies,
coverages, rights or complaints at 1-800-252-3439
You may write the Texas Department of Insurance
Consumer Protection (111-1A)
P.O. Box 149091
Austin, TX 78714-9091
FAX: (512) 490 —1001
Web: http://www.tdi.texas.Rov
E-mail: ConsumerProtectionC@tdi.texas.sov
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your
premium or about a claim you should first contact
the agent or call 1-908-604-3000. If the dispute is
not resolved, you may contact the Texas
Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY:
This notice is for information only and does not
become a part of condition of the attached
document.
N P 70 68 0901
TEXSAS AVISO IMPORTANTE
Para obener informacion o para someter una
queja:
Usted puede Ilamar al numero de telefono gratis
para informacion o para someter una queja al
1-866-287-1736
Usted tambien puede escribir a:
Everest National Insurance Company
477 Martinsville Road, PO Box 830
Liberty Corner, NJ 07938-0830
Puede comunicarse con el Departamento de
Seguros de Texas para obtener informacion acerca
de companies, coberturas, derechos o quejas al 1-
800-252-3439
Puede escribir al Departamento de Seguros de
Texas Consumer Protection (111-1A)
P.O. Box 149091
Austin, TX 78714-9091
FAX# (512) 490-1007
Web: http://www/tdi.texas.Rov
E-mail: ConsumerProtection(cDtdi.texas.aov
DISPUTAS SOBRE PRIMAS O RECLAMOS:
Si tiena una disputa concerniente a su prima o a un
reclamo, debe comunicarse con el agente o
primero. Si no se resolve la disputa, puede
entonces comunicarse con el departamento (TDI).
UNA ESTE AVISO A SU POLIZA:
Este aviso es solo para proposito de informacion y
no se convierte en parte o condicion del document
adjunto.
Affidavit of Compliance with
City of Fort Worth
Prevailing Wages
I, Ross Cooke Regional Vice Priesident, VLS
(Name of person signing affidavit) (Title)
do hereby certify that the wages paid to all employees of Vortex Lining Systems, LLC
(Company Name)
for all hours worked on the
5th at Carroll Street to RR Storm Drain Rehabilitation CPN 103059 and Carroll and Memmac Street Storm Drain Rehabilitation CPN 10355
(Project name and location)
project, during the period from 7/08/2023 to 9/11/2023
(Project Dates)
are in compliance with the requirements of Chapter 2258, Texas Government Code related to paying established
City of Fort Worth wage rates per the project bid documents. I further certify that no rebates or deductions have
been or will be made, directly or indirectly, from any wages paid in connection with this project, other than those
provided by law.
Sworn to and subscribed in my presence this ]
Revised 3/08/2024
Signatu of Officer or Agent)
day of / �r . 20 Z-S
� W� I
(Notary Public)