HomeMy WebLinkAboutContract 59470-FP2-FP2 City Secretary Contract No. 59470 FORTWORTH,P) Date Received 8/4/2025 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Cinnamon Creek Industrial City Project No.: 104589 Improvement Type(s): Water ❑x Sewer ❑x Original Contract Price: $594,225.40 Amount of Approved Change Order(s):-$250,920.50 Revised Contract Amount: $343,304.90 Total Cost of Work Complete: $343,304.90 17 ntl 5Yelhhok 08/01/2025 Contractor Date Development Services Director Title Peinado Construction Company Name SE&ve-� %a% 08/01/2025 Steve Johnson IAue 1. 20251119:37 CDT) Project Inspector Date *0161- 08/01/2025 Project Manager Date —V'L� 8/4/2025 CFA Manager Date de 71'; - 8/4/2025 Lauren Prieur (Aug 4, 2025 09:34:56 CDT) TPW Director Date -� 08/04/2025 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: Cinnamon Creek Industrial City Project No.: 104589 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Pipe Report: ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 181 WD Work Start Date: 7/15/2024 Completed number of Soil Lab Test: 762 Completed number of Water Test: 6 Days Charged:175 WD Work Complete Date: 6/13/2025 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name CINNAMON CREEK INDUSTRIAL Contract Limits Project Type WATER & SEWER City Project Numbers 104589 DOE Number 4589 Estimate Number 1 Payment Number 1 For Period Ending 6/13/2025 AID City Secretary Contract Number Contract Date Project Manager NA Contractor FA PEINADO, LLC 15815 EXECUTIVE DRIVE #500 FRISCO, TX 75033 Inspectors M. GLOVER / V. GUTIERREZ Contract Time 18WD Days Charged to Date 175 Contract is 100.00 Complete Friday, June 20, 2025 Page 1 of 5 City Project Numbers 104589 Contract Name CINNAMON CREEK INDUSTRIAL Contract Limits Project Type WATER & SEWER Project Funding UNI1T I: WATER IMPROVEMENTS Item Description of Items No. 1 4" -12" PRESSURE PLUG 2 UTILITY SERVICE SURFACE RESTORATION SEEDING (CO#1) 3 TRENCH SAFETY (CO#1) 4 VALVE BOX ADJUSTEMENT 5 DUCTILE IRON WATER FITTING W/ RESTRAINT 6 8" PVC WATER PIPE (CO#1) 7 12" DIPWATER, CLSM BACKFILL 8 12" PVC WATER PIPE (CO#1) 9 FIRE HYDRANT 10 CONNECTION TO EXISTING 4"-12" WATER MZIN 11 2" WATER SERVICE 12 8" GATE VALVE 13 12" GATE VALVE 14 AUTOMATIC FLUSHER Estimated Unit Quanity 1 EA 1020 SY 1896 LF 8 EA 2.91 TN 70 LF 32 LF 1675 LF 3 EA 1 EA 2 EA 2 EA 4 EA 1 EA Sub -Total of Previous Unit DOE Number 4589 Estimate Number 1 Payment Number 1 For Period Ending 6/13/2025 Unit Cost Estimated Completed Completed Total Quanity Total $850.00 $850.00 1 $850.00 $2.75 $2,805.00 1020 $2,805.00 $1.00 $1,896.00 $700.00 $5,600.00 $6,790.00 $19,758.90 $83.00 $5,810.00 $153.00 $4,896.00 $130.00 $217,750.00 $8,930.00 $26,790.00 $4,863.00 $4,863.00 $3,986.00 $7,972.00 $2,699.00 $5,398.00 $4,443.00 $17,772.00 $13,445.00 $13,445.00 $335,605.90 1896 $1,896.00 8 $5,600.00 2.91 $19,758.90 70 $5,810.00 32 $4,896.00 1675 $217,750.00 3 $26,790.00 1 $4,863.00 2 $7,972.00 2 $5,398.00 4 $17,772.00 1 $13,445.00 $335,605.90 UNLIT II: SANITARY IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 UTILITY SERVICE SURFACE RESTORATION 40 SY $2.75 $110.00 40 $110.00 SEEDING 2 POST -CCTV INSPECTION 38 LF $2.00 $76.00 38 $76.00 3 MANHOLE VACUUM TESTING 0 EA $175.00 $0.00 0 $0.00 4 TRENCH SAFETY 38 LF $1.00 $38.00 38 $38.00 5 CONCRETE COLLAR FOR MANHOLE 0 EA $750.00 $0.00 0 $0.00 6 IMPORTED EMBEDMENT/BACKFILL, CSS 0 CY $100.00 $0.00 0 $0.00 7 IMPORTED EMBEDMENT/BACKFILL, CLSM 0 CY $225.00 $0.00 0 $0.00 8 8" SEWER PIPE 38 LF $72.00 $2,736.00 38 $2,736.00 9 EPDXY MANHOLE LINER 0 VF $550.00 $0.00 0 $0.00 10 4' MANHOLE (CO#1) 1 EA $4,739.00 $4,739.00 1 $4,739.00 Friday, June 20, 2025 Page 2 of 5 City Project Numbers 104589 Contract Name CINNAMON CREEK INDUSTRIAL Contract Limits Project Type WATER & SEWER Project Funding DOE Number 4589 Estimate Number 1 Payment Number 1 For Period Ending 6/13/2025 11 4' EXTRA DEPTH MANHOLE 0 VF $314.00 $0.00 0 $0.00 -------------------------------------- Sub-Total of Previous Unit $7,699.00 $7,699.00 -------------------------------------- Friday, June 20, 2025 Page 3 of 5 City Project Numbers 104589 Contract Name CINNAMON CREEK INDUSTRIAL Contract Limits Project Type WATER & SEWER Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 1 Change Order Number 1 Change Order Number 3 Total Contract Price DOE Number 4589 Estimate Number 1 Payment Number 1 For Period Ending 6/13/2025 $594,225.00 $4,739.00 $4,093.50 ($259,753.00) $343,304.90 Total Cost of Work Completed $343,304.90 Less % Retained $0.00 Net Earned $343,304.90 Earned This Period $343,304.90 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $343,304.90 Friday, June 20, 2025 Page 4 of 5 City Project Numbers 104589 Contract Name CINNAMON CREEK INDUSTRIAL Contract Limits Project Type WATER & SEWER Project Funding Project Manager NA Inspectors M. GLOVER / V. GUTIERREZ Contractor FA PEINADO, LLC 15815 EXECUTIVE DRIVE #500 FRISCO , TX 75033 DOE Number 4589 Estimate Number 1 Payment Number 1 For Period Ending 6/13/2025 City Secretary Contract Number Contract Date Contract Time 181 WD Days Charged to Date 175 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $343,304.90 Less % Retained $0.00 Net Earned $343,304.90 Earned This Period S343,304.90 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $343,304.90 Friday, June 20, 2025 Page 5 of 5 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Cinnamon Creek Industrial CONTRACT: Water, Sewer, and Pavin-: CFA # CFA23-0043 I CITY PROJECT # 104589 CITY SECRETARY CONTRACT # 159470 FID # 30114-0200431-104589-EO7685 �X-27631 X # FILE # I K-3096, X-27631 CITY PARTICIPATION:I NO INSPECTOR: STEVE JOHNSON Phone No: 817-770-3664 PROJECT MANAGER: SANDIP ADHIKARI Phone No: 817-392-8424 CONTRACT UNIT WATER SEWER PAVING Developer Cost City Cost Developer Cost City Cost JDeveloper Cost ORIGINAL CONTRACT $331,512.40 $0.00 $262,713.00 $000 $3,071,610.75 EXTRAS TO DATE 50.00 $0,00 I $0,00 S0,00 $0.00 S0.00 CREDITS TO DATE $0.00 $0,00 $0.00 $0.40 $0.00 $000 CONTRACT TO DATE $331,512.40 t8.00 $262,713.00 $3,071,610.75 SODO AMOUNT OF PROP. CHANGE ORDER $ 4,093.50 $0.00 $ 4,739.00 SO. $ (267,107.25) REVISED CONTRACT AMOUNT $335,605.90 $0.00 $267,452.00 $0.00 $2,804,503.50 TOTAL REVISED CONTRACT AMOUNT PER UNIT $335,605.90 $267,452.00 $2,804,503.50 REVISED COST SHARE Dev. Cost: $3,407,561.40 TOTAL REVISED CONTRACT $3,407,561.40 CHANGE ORDER No: REVIEWED By Sandip Adhikari at 10:48 am, May 07, 2025 CONTRACT DAYS 181 181 0 181 Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: UNIT is WATER IMPROVEMENTS PAY ITEM # CITY BI# ITEM QUANTITY UNIT ITEM DESCRIPTION CFW Unit Price UNIT PRICE Developer Cost City Cost I TOTAL 2 3292.0201 790 SY Utility Surface Restoration Seeding $2.75 $ 2,172.50 $ $ 2,172.50 3 3305.0109 26 LF Trench Safety $1.00 $ 26.00 $ $ 26.00 6 3311.0261 15 LF 8" PVC Water Pipe $83.00 $ 1,245.00 $ $ 1,245.00 8 3311.0461 5 LF 12" PVC Water Pipe $130.00 $ 650.00 $ - $ 650.00 TOTAL UNIT I: WATER IMPROVEMENTS $ 4.093.50 $ $ I 4,093.50 UNIT II: SANITARY SEWER IMPROVEMENTS PAY # CITYM QUANTITY UNITE ITEM DESCRIPTION UNITPog per Cost City Cost TOTAL4,739.00 I I I I DO �evelo4,739 1TOEM 3339# 001 4' Manhole I 00I $ TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $ 4.739.00 $ 4,739.00 PAY ITEM # CITY B# ITEM QUANTITY UNIT 5 241.1506 {6423j SY 13 3201.0133 -- LF 14 3211.0400 25.8 TN 15 3211.0501 1923 SY 16 3212.0302 SY 17 3212.0505 1923 SY `Asterisk (") Indicates New Pay Item UNIT IV: PAVING IMPROVEMENTS ITEM DESCRIPTION CFW Unit Price UNIT PRICE Developer Cost City Cost 2" Surface Milling $6.00 $ (38,538.00) $ - 6' Wide Asphalt Pvmt Repair, Industrial $172.50 $ (274,447.50) $ - Hydrated Lime $350.00 $ 9,030.00 $ - 6" Lime Treatment $20.25 $ 38,940.75 $ 2" Asphalt Pvmt Type D $21.30 $ (116,511.00) $ 8" Asphalt Base Type B $59.50 $ 114,418.50 $ TOTAL UNIT IV: PAVING IMPROVEMENTS $ (267,107.25) REVIEWED By Sandip Adhikari at 10:48 am, May 07, 2025 TOTAL $ (38,538.00)I $ (274,447.50)1 $ 9,030.001 $ 38,940.75I $ (116,511.00)I $ 114,418.50 $(267,107.25) Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER Changes correspond to Plan Revisions 1-5 as shown on Sheets C-03, C-04, C-05, C-08, C-09, C-25, C-26, C-27, C-28, C-29, C-30, C-36, C-37, C-48, C-51, and C-77 of the construction plans. Portions of the mill and overlay of the road are no longer needed as the CoFW recently rehabilitated the roadway. Waterline alignment was adjusted to avoid existing AT&T lines, causing additional pavement repair and a slight increase in water line quantities. Additional sewer manhole added due to sewer rescheduling. Existing roadway width was found to be wider than originally surveyed, reducing the total amount of proposed roadway width that needed to be installed in certain areas. RECOMMENDED: Kimley-Horn By: Name: Tyler Reeves Title: Engineer APPROVAL RECOMMENDED: CFW - Funding Department By: N/A Name: Title: RECOMMENDED: CFW - 'Contract Compliance Manager By: NIA Name: Sandip Adhikari Title: Project Manager M&C Number: M&C Date Approved: NIA APPROVED: SRPF D/Cin/7n�amon Industrial, LP By: � /T -4 -,P ,ff# f& st-6� Name: Lee Belland Title: Developer APPROVED: CFW - Assistant City Manager By: N/A Name: Title: APPROVED: F.A. Peinado, LLC By: _ �• Name: J y Cordes Title: Contractor APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney By: N/A Name: Title: ATTEST ` Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible N/A for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary 7 There are NO City Funds associated with this Contract ❑ There are City Funds associated with this Contract N/A REVIEWED By Sandip Adhikari at 10:48 am, May 07, 2025 Revised: 12-17-2018 Page 3 SRPF D/CINNAMON INDUSTRIAL, L.P., a Delaware limited partnership By: SRPF D/Cinnamon Industrial GP, L.L.C. a Delaware limited liability company By: SRPF D/Cinnamon Industrial Holdings, L.P. a Delaware limited partnership By: Stream Acquisitions CXVII, L.L.C. a Delaware limited liability company By: �— vz Name: (O C5/k Title: President Lee C. Belland Vice President Michael J. McVean Vice President Chris Jackson Vice President Cannon Green Vice President Adam Jackson REVIEWED By Sandip Adhikari at 10:48 am, May 07, 2025 PROJECT NAME: CONTRACT: CFA # CITY PROJECT # CITY SECRETARY CONTRACT # FID # X# FILE # INSPECTOR: PROJECT MANAGER: ORIGINAL CONTRACT EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE AMOUNT OF PROP. CHANGE ORDER REVISED CONTRACT AMOUNT TOTAL REVISED CONTRACT AMOUNT PER UNIT REVISED COST SHARE TOTAL REVISED CONTRACT DEVELOPER -AWARDED -PROJECT CHANGE ORDER Cinnamon Creek Industrial CHANGE Water, Sewer, Drainage, and Paving ORDER No: CFA23-0043 I CITY PARTICIPATION: NO 104589 59470 03 30114-0200431-104589-EO7685 X-27631 K-3096, X-27631 STEVE JOHNSON Phone No: 817-770-3664 SANDIP ADHIKARI Phone No: 817-392-8424 CONTRACT UNIT WATER I SEWER I DRAINAGE I PAVING I CONTRACT Developer DAYS Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost $331,512.40 $0.00 I $262,713.00 $0.00 $0.00 $0.00 I $3,071,610.75 $0.00 I 181 $4,093.50 $0.00 I $4,739.00 $0.00 $20,798.00 $0.00 I $27,361.50 $0.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 I $267,107.25 $0.00 $335,605.90 $0.00 I $267,452.00 $0.00 $20,798.00 $0.00 I $2,831,865.00 $0.00 I 181 $ $0.00 I $ (259,753.00) $0.00 $ $0.00 I $ $0.00 I 0 $335,605.90 $0.00 I $7,699.00 $0.00 $20,798.00 $0.00 I $2,831,865.00 $0.00 I 181 $335,605.90 $7,699.00 $20,798.00 $2,831,865.00 Dev. Cost: $3,196,967.90 City Cost: $0.00 $3,195,967.90 REVIEWED By Sandip Adhikari at 9:12 am, May 08, 2025 Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: PAY ITEM # 1 2 3 4 5 6 7 8 9 10 11 Asterisk (*) indicates New Pay Item UNIT II: SEWER IMPROVEMENTS CITY BID ITEM QUANTITY UNIT ITEM DESCRIPTION 3292.0201 (4904) SY Utility Service Restoration Seeding 3301.0002 (2434) LF Post -CCTV Inspection 3301.0101 (9) EA Manhole Vacuum Testing 3305.0109 (2434) LF Trench Safety 3305.0112 (2) EA Concrete Collar for Manhole 3305.0202 (1) CY Imported EmbedmenUBackfill, CSS 3305.0203 (9) CY Imported Embedment/Backfill, CLSM 3331.4115 (2434) LF 8" Sewer Pipe 3339.0001 (18) VF Epoxy Manhole Liner 3339.1001 (9) EA 4' Manhole 3339.1003 (19) VF 4' Extra Depth Manhole TOTAL UNIT II: SEWER IMPROVEMENTS REVIEWED By Sandip Adhikari at 9:12 am, May 08, 2025 UNIT PRICE Developer Cost City Cost TOTAL $2.75 $ (13,486.00) $ (13,486.00) $2.00 $ (4,868.00) $ (4,868.00) $175.00 $ (1,575.00) $ (1,575.00) $1.00 $ (2,434.00) $ (2,434.00) $750.00 $ (1,500.00) $ (1,500.00) $100.00 $ (100.00) $ (100.00) $225.00 $ (2,025.00) $ (2,025.00) $72.00 $ (175,248.00) $ (175,248.00) $550.00 $ (9,900.00) $ (9,900.00) $4739.00 $ (42,651.00) $ (42,651.00) $314.00 $ (5,966.00) $ (5,966.00) $(259.753.001 $ $(259,753.00) 1 Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER Sheets C-08, C-09, C-10a, C-10b, and C-11 were revised to remove any sewer scope that has not already been constructed. RECOMMENDED: Kimley orn By: �' Name: r Reeves Title: Engineer APPROVAL RECOMMENDED: CFW - Funding Department By. N/A Name: Title: RECOMMENDED: CFW - 'Contract Compliance Manager By: N/A Name: Sandip Adhikari Title: Protect Manager M&C Number: N/A M&C Date Approved: N/A APPROVED: SRPF D/Cinnamon Industrial, LP By: 5 Sl�r✓37�i?l S/i,��f Name: I se Bela, Title: Developer APPROVED: CFW- Assistant City Manager By: N/A Name: Title: APPROVED: / 1 F.A. Peinad C Na rt JR%my Cordes Title: Contractor APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney By: _ _ N/A Name: Title: ATTEST * Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible N/A for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary E]There are NO City Funds associated with this Contract ❑There are City Funds associated with this Contract REVIEWED By Sandip Adhikari at 9:12 am, May 08, 2025 Revised: 12-17-2018 Page 3 SRPF D/CINNAMON INDUSTRIAL, L.P., a Delaware limited partnership By: SRPF D/Cinnamon Industrial GP, L.L.C. a Delaware limited liability company By: SRPF D/Cinnamon Industrial Holdings, L.P. a Delaware limited partnership By: Stream Acquisitions CXVII, L.L.C. a Delaware limited liability corg1par. By: Name: LF- t3 Title: PAP-STi>^ T President Lee C. Belland Vice President Michael J. McVean Vice President Chris Jackson Vice President Cannon Green Vice President Adam Jackson REVIEWED By Sandip Adhikari at 9:12 am, May 08, 2025 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Cinnamon Creek Industrial CITY PROJECT NUMBER: 104589 1 WATER PIPE LAID SIZE TYPE OF PIPE 0+00 to 16+42.79 12" PVC LF 1642.79 FIRE HYDRANTS: 3 VALVES (16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF 4+51.62 12X6" PVC 29 10+51.73 12X6" PVC 29 16+26.54 12X6" PVC 29 DENSITIES: Yes NEW SERVICES: 2" IRR Yes 29 8" FL Yes 29 2" Dom Yes 29 SEWER PIPE LAID SIZE TYPE OF PIPE LF N/A N/A N/A N/A PIPE ABANDONED SIZE TYPE OF PIPE LF N/A N/A N/A N/A DENSITIES: N/A NEW SERVICES: N/A N/A N/A TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS June 13, 2025 Peinado Construction 15815 Executive Drive, Suite 500 Frisco, Texas 75033 RE: Acceptance Letter Project Name: Cinnamon Creek Industrial Project Type: Water, Sewer, Drainage, Paving City Project No.: 104589 To Whom It May Concern: On May 16, 2025 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on June 13, 2025. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on June 13, 2025, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at (817)392-8424. Sincerely, 0"14- Sandip Adhikari, Project Manager Cc: Steve Johnson, Inspector Donald Watson, Inspection Supervisor Aaron Ybarra, Senior Inspector Andrew Goodman, Program Manager Kimley Horn, Consultant F. A. Peinado Construction, LLC, Contractor SRPFD/ Cinnamon Industrial, LP, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 Date: July 8, 2025 Owner: Owner's Mailing Address: Contractor: Contractor's Mailing Address: Affiant: Affiant's Mailing Address Property: See Exhibit A [Final] Bills -Paid Affidavit SRPF D / Cinnamon Industrial, LP 2001 Ross Avenue, Suite 400 Dallas, Texas 75201 Attention: Albert Jarrell F. A. Peinado, LLC 15815 Executive Drive Suite 500 Frisco, Texas 75033 Attention: Jeremy Breinholt Phone: (214) 705-2746 Email: jreinholt@fapeinado.com the undersigned Same as Contractor's Mailing Address (see above) Improvements: public improvements per CPN 104589 Cinnamon Creek Industrial. Affiant swears on behalf of Contractor that the following statements are true and within the personal knowledge of Affiant: 1. Affiant has personal knowledge of the facts stated in this affidavit. Affiant has full authority to make the agreements in this affidavit on behalf of Contractor. 2. Affiant understands that Owner has required this affidavit as a condition of payment for labor or materials used in construction of the Improvements. 3. Contractor has paid each of Contractor's subcontractors, laborers, and materialmen in full for all labor and materials provided to Owner or Contractor for construction of the Improvements, excepting only the amounts owed to the persons identified below: Name: None ACTIVE 60009866v3 Contractor warrants and represents that the following specified bills or classes of bills will be paid by Contractor from the funds paid to Contractor by Owner in reliance on this affidavit: Name of payee or description of class: N/A, all paid In consideration of the funds paid to Contractor by Owner in reliance on this affidavit, Contractor waives and releases all of Contractor's statutory and constitutional mechanic's lien rights connected with the construction of the Improvements, conditioned on the actual payment or collection if payment is made by check or draft. Contractor agrees to indemnify and hold Owner harmless from any loss or expense resulting from false or incorrect information in this affidavit. (AFFIANT) F./PEINO, LLC ByNaemy Breinholt Title: Development Services Director STATE OF TEXAS COUNTY OF Collin SWORN TO, SUBSCRIBED AND ACKNOWLEDGED BEFORE ME, a notary public, in and for said County and State, on this 8th day of July, 2025, by Jeremy Breinholt Development Services Director (title) of F.A. Peinado, LLC, on behalf of said company. Nota blic, State of Texas Nota �sprinted name: Honey Warren My commission expires: 12-15-27 w HONEY WARREN aQ f *: *= My Notary ID # 11623960 Expires December 15, 2027 ACTIVE 60009866v3 EXHIBIT A PROPERTY DESCRIPTION public improvements per CPN 1.04589 Cinnamon Creek Industrial_ ACTIVE 60009866v3