HomeMy WebLinkAboutContract 58714-A1CSC No. 58714-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. CSC 58714 WHEREAS, the City of Fort Worth (CITY) and James DeOtte Engineering, Inc., (ENGINEER) made and entered into City Secretary Contract No. CSC 58714, (the CONTRACT) which was authorized by M&C 22-1008 on the 291--h day of November, 2022 in the amount of $ 766,497.00; and WHEREAS, the CONTRACT involves engineering services for the following project: 20SWM Cunningham Road HROM, CPN 104018; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $124,511.00. (See Attached Funding Breakdown Sheet, Page -4-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $891,008.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD City of Fort Worth, Texas CITY SECRETARY Cunningham Rd HROM Prof Services Agreement Amendment Template FT. WORTH, TX Revision Date: 12/08/2023 104018 Page 1 of 3 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth C�P� Jesica McEachern Assistant City Manager DATE: 08/10/25 4� 'ATTEST: ptoo ,;0' 0 0,08 =d �A nlEt 454i'g oad X44 V Jannette Goodall City Secretary APPROVAL RECOMMENDED: ENGINEER James DeOttle Engineering, Inc. �f GfLf'li �GN''t71.� Brian Darby (Jul 29, 2025 13:59:DRDT) Brian Darby Vice President DATE: 07/29/25 Lauren Prieur (Aug 5, 2025 08:50:55 CDT) Lauren Prieur Director, Transportation & Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Berton F. Guidry, Jr., PE, CFM Project Manager APPROVED AS TO FORM AND LEGALITY: Douglas Black (Aug 7, 2025 22:59:32 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 2 of 3 M&C No. # : 25-0605 M&C Date: June 24, 2025 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Cunningham Rd HROM 104018 FUNDING BREAKDOWN SHEET City Secretary No. 58714 Amendment No. 1 Project CF1- CF2 - Fund Dept ID Account Bond ID Activity Reference 52008 0200431 5330500 104018 112830 9999 Total: City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 3 of 3 Amount 124,511.00 $124,511.00 Cunningham Rd HROM 104018 James ................... DeOtte i Eh1G[hIEER[h1G �...0 September 27, 2024 Mr. Mike Crenshaw, PE, CFM Project Manager Capital Delivery Division Transportation / Public Works Department City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Ref: Amendment # 1 Cunningham Road HROM City Project No. 104018 Mr. Crenshaw, Civil Engineering Land Surveying ........................................... Canslructian Management Hydrologic and Hydraulic Modeling This amendment came about due to the City providing a new, updated FEMA model. The new model is significantly different from the model used for project development and original handoff to James DeOtte Engineering, Inc. (JDEI). Thus, impacting several of the contract task items. Additionally, the USACE requires the proposed grading minimal impact to the existing perennial stream and wetlands that exist upstream and down of the project location. Due to additional services that are outside the scope of the existing contracted agreements that have been requested by the City to be performed as part of the referenced project, JDEI will perform the work outlined in the following: Additional services shall include: Additional time on the agreement that extends the number of months. Based on 9 months of the schedule already expended to return to a point where we can confidently begin the 30% design. 2. Revision to the proposed bridge design shifts the spans west along the road profile to create grading that has less impact on the USACE wetlands. Based on the needed alternations to place a new westerly bridge span and remove the current easterly bridge span to preserve the overall bridge length. 3. Additional efforts for coordination with the Water Department to accommodate their utility relocations requests. Based on the efforts and amount of progress achieved per the quantity of Water Department comments and feedback. fax 817.930.0445 2201 Da11ie Lynn Parkway Ste. I19 • Fart Worlh TX. 76120 phone 817.446.6877 ............................................................................................................................................................................................ . TBPLS Firm Reg. No, 10101400 TBPE Rrm Reg. No. 8917 iwon�a�iNu Amendment # 1 Cunningham Road HROM September 27, 2024 Page 2 4. Revision to the easement parcels due to the updated hydraulic modeling provided by the City. Assumes 7 parcels previously prepared and submitted will need to be modified that would be impacted by the updated grading necessary to be Fort Worth design compliant. 5. Additional field topography and tree survey needed due to the updated hydraulic modeling provided by the City. Assumes an additional area impacted by the updated grading necessary to be Fort Worth design compliant. 6. Additional efforts for coordination with the Texas Department of Transportation to obtain the requested temporary and permanent driveway permits with their new staff. Based on the efforts and amount of progress achieved per the quantity of TxDOT comments and feedback and staffing changes that have occurred since these efforts have begun. This can be reduced if the City has other means to obtain the needed permits. 7. Additional efforts to revise the grading to match the updated hydraulic modeling provided by the City and verify design compliance. Based on the efforts and amount anticipated to update grading and modifications to hydraulic model to be Fort Worth design compliant. 8. Additional permitting for environmental and archeological needed due to the updated hydraulic modeling provided by the City. Assumes an additional area impacted by the updated grading necessary to be Fort Worth design compliant. The specific tasks to be accomplished with this Amendment are outlined within the attached Level of Effort spreadsheet. JDEI anticipates the fees listed above for the various elements of the project to be a not to exceed amount of $124,51 1.00. All costs, associated with the identified scope of work, will be lump sum for the scope provided and will be billed as a percentage of completed work as determined by JDEI. This scope of work assumes any services not specifically listed as part of this contract will be treated as an additional service. The owner will be notified before any additional services are performed. fax 817.930.0445 2201 Do15e Lynn Parkway SSe. 119 • Fart Worth TX. 76120 phone 8)7.446.6877 ............................................................................................................................................................................................ . T6PLS Firm Reg. Na. 10101400 film TSPE Rrrn Reg. No. 8917 MNMa kr Amendment # 1 Cunningham Road HROM September 27, 2024 Page 3 Summary of previous contract amendments: Original Contract Amendment # 1 Total Revised Contract Sincerely, N Brian Darby, P.E. Vice -President $ 766,497.00 $ 124,51 1.00 fax 817.930.0445 2201 Do15e Lynn Parkway SSe. 119 • Fart Worlh TX. 76120 phone 817.446.6877 ............................................................................................................................................................................................ . TBPLS Firm Reg. No, 10101400 WE Rrrn Reg. No. 8917 iwon�a�iNu Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Cunningham Road HROM City Project No. 104018 Amendment #1 Task No. 1.0 1.1 1.1.1 1.1.2 1.2 1.2.2 1.2.4 1.2.6 1.2.7 2.0 2.6 2.6.1 2.6.2.2 Task Description Rate Project Manaqement Managing the Team Internal Team Meetings QA/QC Communications and Reportingg Monthly Project Update Mee(ings (up to 36) Prepare B spgline Schedule Prepare VC 11 11 MBE/SBE Reports (up to 36) Invoicing (up to 36) 1 Conceptual Design (30-Percent) Design Drawings (TPW) Bridge Design Water Department City Utility Adjustments and Relocations Project Director $245 1 1 0 Project Manaqer $220 561 9 9 18 2 9 9 20 8 12 Labor (hours) Project EIT Enqineer I $160 $155 361 01 9 9 18 0 0 CADD / Survey $150 181 9 9 6 6 Administrative $95 5.5 1 2.25 2.25 0 Total Labor Cost Expense Subconsultant Travel E Non-MWBE Reproduction Total Expense Cost Task Sub Total $21,548 sol $0 $0 $0 $0 $21,548 $0 $3,500 $0 $0 $4,770 $0 $4,770 $4,770 $0 $4,770 $6,840 $0 $6,840 $780 $0 $780 $2,194 $0 $2,194 $2,194 $0 $2,194 $5,300 $3,500 $8,800 $0 $3,500 $0 $0 $1,760 $3,500 $5,260 $3,540 $0 $3,540 7.0 7.2 ROW/Easement Services Right-of-Way/Easement Preparation and Submittal (revise 7 parcels) 14 0 0 0 84 0 $16,030 $0 $0 $0 $0 $0 $16,036 14 84 $16,030 $0 $16,030 8.0 8.1 8.2 Surve_ Design%urvey 'Free Survey 0 0 8 0 64 0 $10,880 $0 $0 $0 $0 $0 $10,880 4 4 40 2 $6,640 $0 $6,640 $4,240 $0 $4,240 9.0 9.6 Permitting 'FxDOT 4 20 12 0 20 4 $10,680 $0 $0 $60 $0 $60 $10,740 4 20 12 20 4 $10,680 $60 $60 $10,740 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 1 of 2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Cunningham Road HROM City Project No. 104018 Amendment #1 Labor (hours) Task No. Task Description Project Project Project I Es) CADD I Administrative Total La Director Manager Engineer Survey Cost Update grading to match the hydraulic models existing and proposed conditions using Walter P. Moore base and updated Subconsultant I Total Expense) Task Sub Total Travel Reproduction Cost E I Non-MWBE 9.0 Frcheolo81 ermitting 0 8 8 0 24 0 $6,640 $0 $4,230 $60 $0 $4,290 $10,930 9.2 nvironmental Services 4 4 16 $3,920 $1,360 $60 $1,420 $5,340 9.3 gicSurvey 4 4 8 $2.720 1 $2,870 $2.870 $5.590 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 Project Summary Total Hours 551 Total Labor $93,888 Total Expense $27,850 MBE/SBE Subconsultant $20,000 Non-MBE/SBE Subconsultant $7,730 10% Sub Markup $2,773 MBE/SBE Participation 16% Total Project Cost $124,511 2of2 ID Ta.k N— Duan.. sta,t F�.�sh Plods...,. Begin Project Odays u212123 Thu 211121 Design 822 days Tho 2/2/23 Fri 4". 1 Conceptoa130%Design 632 days Mo 2/2/23 Fri]/11/25 Re -Kickoff 1day Thu 2/2/23 Thu 2/2/23 Amendment..... Approval 1day Wed 9/4/24 Wed 9/4/24 Prepare and Submit 30% Conceptual Drawings 72 days Thu 9/5/24 Fn 12/13/24 5 Amendment Approval 150 days Mon 12/16/24 FnT/11/25 6 8 Addni... I G.—thnical lnveshgah.n 39 days Thu 3/2/23 Tue 4/25/I3 —20 days 9 Obtmn additional Survey and SUE 12 days Thu 2/2/23 Fn 3/3/23 455 10 Review 30% Conceptual D.—gs(CFW SW) 59 days Mon 12/16/24 Thu 3/6/25 6 11 Preliminary 60%Design 151 days Fri 3/7/25 Fri 10/3/25 12 Prepare and Submit S0% Preliminary Drawings and 28 days Fri 3/7/35 Tue 4/15/25 10 Specifications . Condu. Constmttability Revlew(Walk Through) 0days Fri 7/11/25 Fri 7/11/25 T 14 Review 60% Preliminary Plans and Speti0cation(CFW) 20 days Mon 7/14/25 Fri 8/8/25 15 Begin Coordination for Community Meeting Bl 40 days M118/11/25 Fri 10/3/25 14 . Conduct C...ulty Meeting dl Odays Fn 10/3/25 Fn 10/3/25 IS 17 Final Design 120 days Mon8/11/25 Fri 1/23/26 18 Prepare and Submit 90% Design Plans and Specifir—r- 60 days Mon8/Il/25 Fri 10/31/25 14 19 Review 90% Plans and Specihcahons(CFW) 20 tlays Mon 11/3/25 Fri 11/28/25 18 20 Begin Coortlina[ion for Community Mee[ing 62 40 days Mon 12/1/25 Fri 1/23/26 19 Conduct Communty Meetng g2 Odays Fn 1/23/26 Fn 1/23/26 20 22 Incorporate Comments and Submit 100%Construction 15 tlays Mon 12/1/25 Fn 12/19/25 19 Documents 23 Prepare &d Package 10 days Mon 12/22/25 Fn 1/2/26 22 Permit Acquisition 290 days Mon 3/1T/23 Fri 4/3/26 25 TxDOT permit 650days Mon 3/1T/23 Fri 9/19/25 Prepare and Submit Plans to TxDOT 10 days Fn 4/28/23 Thu 5/11/23 2] TxDOT Review and[.ordination 32 days Mon 3/27/23 Tue 5/16/23 28 —01- .11ow up 30 days Mon 8/11/25 Fn 9/19/25 14 29 Williams Encroachment Agreement 20 days Mon8/11/25 Fri 9/5/25 30 Prepare and Sub —Plans to Wdliams 5days Mon8/11/25 Fri B/15/25 14 31 Wdliams Reviewand Coordination 15 days Mon8/18/25 Fh9/5/25 30 32 Floodplain Permit 140 days Mon8/11/25 Fri 2120/26 33 Prepare and SubmR Floodplain Permit to City of Fort Woi 110 days Mon8/11/25 Fri 1/9/26 14 34 City of Pon Worth Reviewand Coordination 30 days Mon 1/12/26 Fri 2/20/26 33 35 USACE -404 P.—RAIN BO days Mon 8/12/25 FFI 11/28/25 36 Prepare antl Submit USACE Preconstwit—Notification 20 days Mon8/11/25 Fri 9/5/25 14 (PCN) 37 USACE Review and Determination 60 days Mon 9/8/25 Fn 11/28/25 36 38 TDLR (Texas Dep. Of Ucensing and Regulatlons) 20 days Mon 11/3/25 Fri 11/26/25 39 Prepare antl Submit C—tuctinn Documents for Plan 5days Mon 11/3/25 Fri 11/7/25 18 Review and Prole. Regi.rahon 40 Review antl Co ordinate with Registered Accessibdny 15 days Mon 11/10/25 Fn 11/28/25 39 Spa-hst 41 City Forestry Permit 30 days Mon8/11/25 Fri 9/19/25 Prepare and Submit Cny Forestry Permit 30 days Mon8/11/25 Fn 8/22/25 14 Cityof Fort Wonh Review and Cn,,dwhon 20 days Mon8/25/25 Fn 9/19/25 42 44 Drainage Study/Checklist 30 days Mon 7/28/25 Fri 9/5/25 Prepare a nd Submit Drainage Study/Checklist lOdays Mon T/28/25 Fri B11/11 14FF Gty.f Fort Worth Reviewand Cn.,dmahnn 20 days Mon8/11/25 Fri 9/5/25 45 Grading Permit 30 days Mon 2/23/26 Fri 4/3/26 Prepare and Sub-Gading Permit 30 days Mon 2/23/26 Fn 3/6/26 34,46 Caty of Fart W.nh Review and C..nfimt.n 20 days Mon 3/9/26 Fri 4/3/26 48 50 ROW and Ease..— 222 days no 2/2/23 Fri 1123/26 51 ROW/Easement Preparahon 24 days Thu 2/2/23 Tue 3/T/23 O55 52 Revised Easements Preparahon 25day5 Wed 9/4/14 Tue SO/8/24 555 53 ROW Negotiations 180 days Wed 10/9/24 Tue 6/17/25 52 54 Additional Negotiations and/or Order Environmental Report 53days Wed 6/18/25 Fri 8/29/25 53 (If Needed) .Condemnation (If Needed) 105 day' Mon 9/1/25 Fri 1/23/26 54 % UtllRy Relocation 180 days Mon8/11/25 Fri 4/17/26 SJ 6" Design Coordination with Franchise Utilities 20 days Mon8/11/25 Fri 9/5/25 14 58 Prepare and Submit Relotatlon Design (Utility) 60days Mon 11/3/25 Fri 1/23/26 18 59 Perform Relocation Construction 60 days Mon 1/26/26 Fri 4/17/26 58 60 Con....Ill 370 days Mon 1/5/26 Fri 6/4/27 61Adve.isementand Bhd 30 days Mon 1/5/26 Fri 2/13/26 23 62 Contract Award 80 days Mon 2/16/26 Fri 6/5/26 61 63 Constru.mn Execution 260 days Mon 6/8/26 Fn6/4/2T 62 Inspa— wdh a TDLR Registeretl Accessibility Specialist 0day, on 4/12/27 Mon 4/12/27 63F5-40 days 6 Closeout 140 days Mon 6/7/21 Fri 12/17/27 �LOMR Preparahon C9..—hon and Submittal 140 days Mon 6/7/27 Fn 12/12/22 63 SITE 630 - fUNNINGHAM STREET SCHEDULE .,„ .,.. s zpzs 1-7 a 2 r..........� an,. � DtYign LiM ermit Acquisition Permit and Rag.latlons) Utility Relocation 4117 , ConsWNon 6/5 6/81 614 p 4/12 CI 6/T 12 City of Fort Worth, Texas Mayor and Council Communication DATE: 06/24/25 M&C FILE NUMBER: M&C 25-0605 LOG NAME: 20SWM CUNNINGHAM HROM DESIGN SUBJECT (CD 8) Authorize Execution of Amendment No. 1 to an Engineering Services Agreement with James DeOtte Engineering, Inc., in the Amount of $124,511.00 for the Design of the Cunningham Road Hazardous Road Overtopping Mitigation Project for a Revised Total Contract Amount of $891,008.00, Adopt an Appropriation Ordinance, and Amend the Fiscal Years 2025-2029 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No. 1 to an engineering services agreement with James DeOtte Engineering, Inc., (City Secretary Contract No. 58714), in the Amount of $124,511.00 for the Design of the Cunningham Road Hazardous Road Overtopping Mitigation Project (City Project No. 104018) for a revised total contract amount of $891,008.00; 2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Drainage Revenue Bonds Series 2023 Fund, by increasing estimated receipts and appropriations in the Cunningham Rd HROM project (City Project No. 104018) in the amount of $783,078.00, and decreasing estimated receipts and appropriations in the SW Hazardous Rd Overtopping programmable project (City Project No. P00120) by the same amount; and 3. Amend the Fiscal Years 2025- 2029 Capital Improvement Program. DISCUSSION: On November 29, 2022, Mayor and Council Communication (M&C) 22-1008 authorized an engineering agreement with James DeOtte Engineering, Inc. (City Secretary Contract No. 58714) in the amount of $766,497.00 for the design of the Cunningham Road Hazardous Road Overtopping Mitigation (HROM) project. This M&C will authorize execution of Amendment No. 1 to the agreement and increase the contract amount by $124,511.00, for a revised contract amount of $891,008.00. The original contract included the design and engineering services, easement acquisition, and project administration costs for the Cunningham Road HROM project. Additional contract capacity is needed for changes to design and permitting resulting from the Federal Emergency Management Agency (FEMA) and United States Army Corps of Engineers (USACE) updated requirements. Additional funding of $546,503.00 for right-of-way acquisition and project management is also being added to the Cunningham Road HROM project (City Project No. 104018) since funding was previously transferred from the project on April 30, 2023, via M&C 23-0321 to help fund the faster paced Fort Worth Central City Grand Avenue construction project. Additionally, this M&C will appropriate $112,064.00 of additional project management funding needed due to a longer design timeframe to accommodate changes due to FEMA map updates and USACE comments. The following table summarizes previous contract actions and amendments: Agreement Initial Contract CSC 58714 Amendment #1 Contract Total Amount Justification M&C No. Date $766,497.00 Initial Agreement M&C 22-1008 11/29/2022 Redesign due to FEMA map $124,511.00 changes and This M&C USACE review comments $891,008.00 The action in the M&C will appropriate funds in support of the Cunningham Rd HROM project (City Project No. 104018), as follows: Fund Name I Existing Funding I Additional Funding I Project Total 52002 - Stormwater Capital Projects $157,000.00 $0.00 $157,000.00 (104018) 52007 - Stormwater Rev Bonds 2020 $766,497.00 $0.00 $766,497.00 (104018) 52008 - Drainage Rev Bonds Series $0.00 $783,078.00 $783,078.00 2023 (104018) Project Total $923,497.00 $783,078.00 $1,706,575.00 The Fiscal Years (FY) 2025- 2029 Capital Improvement Plan included $923,497.00 in funding for this project. However, additional funding of $783,078.00 is needed to cover extended design efforts, project management, and replenishing funds removed from the project to fund the Fort Worth Central City Grand Avenue construction project. The action in this M&C will amend the FY2025- 2029 Capital Improvement Program. Funding is budgeted in the SW Hazardous Rd Overtopping project (City Project No. P00120) within the Drainage Rev Bonds Series 2023 Fund for the purpose of funding the Cunningham Road HROM project. James DeOtte Engineering, Inc. agrees to maintain its initial M/WBE commitment of 11.00% that it made on the original agreement and extend and maintain that same M/WBE commitment of 11.00% to this first amendment. Therefore, James DeOtte Engineering, Inc. remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. This project is located in COUNCIL DISTRICT 8. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Stormwater Hazardous Rd Overtopping project within the Drainage Rev Bonds Series 2023 Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the Drainage Rev Bonds Series 2023 Fund for the Cunningham Rd HROM project to support the approval of the above recommendations and execution of the agreement. Prior to any expenditure being incurred, the Transportation & Public Works Department has the responsibility to validate the availability of funds. Submitted for Citv Manaaer's Office bv: Jesica McEachern 5804 Oriainatina Business Unit Head: Lauren Prieur 6035 Additional Information Contact: Thanaa Maksimos 2485 FORTWORTH. Routing and Transmittal Slip Transportation &Public Works Department DOCUMENT TITLE: 104018 Cunningham Rd HROM M&C: M&C 25-0605 CPN: 104018 Date: To: Name 1. Brian Darby (BrianDarby@deotte-eng.com) 3 Berton Guidry (Berton. Guidry@fortworthtexas . gov) 4. Thanaa Maksimos 5. Lissette Acevedo 6. Patricia Wadsack 7. Lauren Prieur 8. Doug Black 9. Jesica McEachern 10. Jannette Goodall 11. Allison Tidwell 12. TPW Contracts CSO: 58714 Department DOC#: Initia Date Out Is Consultant 8si) 07/29/25 BSD TPW Project Manager B 6 08/04/25 BG TPW Program Manager —/W 08/04/25 TPW Sr. CPO 08/04/25 TPW Asst. Director �[.,�/ 08/04/25 TPW Director Lauren Prieur 08/05/25 Legal 08/07/25 Assistant City Manager Douglas Black 08/10/25 CSO-City Secretary a ner 08/11/25 CSO-City Secreatry- 08/12/25 TPW CC: TPW BSPAP Recon Team- Cindy Sengathith , TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial, and Notary Tabs Return to: tpw sw contracts(& fortworthtexas.uov Call 817-229-3283 with questions. Thank you!