Loading...
HomeMy WebLinkAboutContract 59271-A1CSC No. 59271-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 59271 WHEREAS, the City of Fort Worth (CITY) and Dunaway Associates,LLC, (ENGINEER) made and entered into City Secretary Contract No. 59271,(the CONTRACT) which was authorized by M&C 23-0241 on the 11th day of April, 2023, in the amount of $356,499.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Rehabilitation, Contract 2021 WSM-C, CPN 103500; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $35,350.00 (Water). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $391,849.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas W&SS Repl. Contract 2021, WSM-C Prof Services Agreement Amendment Template CPN 103500 Revision Date: 12/08/2023 Page 1 of 2 EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth Jesica McEachern Assistant City Manager DATE: 08/06/2025 anIl p OF ..... oa ATTEST: ?°d a°nn pezps4ap Jannette Goodall City Secretary APPROVAL RECOMMENDED: L A'ar", P, MGsu-tti Christopher Harder, P. E. Director, Water Department Contract Compliance Manager: of the date subscribed by the City's ENGINEER Dunaway Assosiatesf L Bz�wa Sherrieb, P.E. Associate o.,E. 7 /zv /z� 25 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Dena Johnson, P.E. Project Manager APPRO W FORM AND LEGALITY: Douglas Black (Jul 28, 202513:58:08 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 2 of 2 M&C No.#: N/A M&C Date: N/A Form 1295: N/A OFFICIAL RECORD W&SS Repl. Contract 2021, WSM-C CITY SECRETARY cpx 103500 FT. WORTH, TX DUNAWA v Dunaway No. 9287.001 June 24, 2025 Ms. Dena Johnson City of Fort Worthen 200 Texas St, Fort Worth, TX 76102 Reference: Amendment # l : Water and Sanitary Sewer Rehabilitation, Contract 2021 WSM-C Scope Adjustments Dear Ms. Johnson: Per direction provided on Tuesday, July 23rd 2024, the City has requested that Dunaway extend the 30" water line on Westridge Avenue from the bend as designed at Westridge Avenue and Edgehill Rd. approximately 350 feet to the intersection of Westridge Avenue and Westridge Ln. terminating at a 30" gate valve and plug. This location will be a connection point for a future 30" water line to be designed by another consultant. In addition, Dunaway has been requested to add the replacement of an 8" line in Sunset Dr. and a 12" line in Milburn Street for a total of 1340 linear feet of water line. Upon completion of review by the City, input from the WSM-C contractor and the firm designing the 30" extension, Dunaway will update the plan sheet and modify any additional sheets that may be required. Dunaway will provide quantity adjustments and a change order for execution on the existing project. A summary of the total project is as follows: Contract Original Contract Amendment No. TOTAL PROJECT Sincerely, lf�L�K Bryan Sherrieb, P.E. DUNAWAY ASSOCIATES, LLC a Texas limited liability company BES/BES Fee $ 356,499.00 $ 35,350.00 $ 391,849.00 dunaway.com �DUNAWAY Task Description Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for City of Fort Worth WSM-C - Amendment #1 City Project No. 103500 DALLC Project No. 9821.001 Labor (hours) Project Project I Project Graduate Civil Designer Admin Total Labor Task No. Director Manager I Engineer Engineer Cost 1.0 Project Management Rate $250 $205 $165 $140 $115 $105 0 0 0 0 0 0$ C1 2.0 Design 2.1 Topographic Survey - Milburn/Sunset 2.2 90%- Sheet -Westridge 30"Extension 2.3 100%- Update to 90% Sheet, Adjustment to Adjoining 2.4 90%/ 100%Sheets Milburn/Sunset (4 Sheets) 0 sheets to match prof 12 4 2 6 58 4 6 48 88 20 20 48 01 0 $ 24,350.0 $ $ 4,280.0 $ 4,200.0 $ 15,870.0 Expense Subconsultant Total Expense Travel Reproduction Cost Task Sub Total MWBE Internal $ 11,000.00 $ $ $ 11,000.00 $ 35,350.00 $ 11,000.00 $ 11,000.00 $ 11,000.00 2.5 $ $ $ $ $ $ 2.6 3.0 Preliminary Design (60 Percent) 0 0 0 0 0 0 $ $ $ $ $ $ $ 4.0 Final Design 0 0 0 0 0 0 $ $ $ $ $ $ $ 5.0 Bid Phase 0 0 0 0 0 0 $ $ $ $ $ $ $ 6.0 Construction Phase Services 0 0 0 0 0 0 $ - $ - $- 7.0 ROW/Easement Services 0 0 0 0 0 0 $ $ $ $ $ $ $ 8.0 Survey 0 0 0 0 0 0 $ - $ - $ - $ - $ - $ - $ - 9.0 Permitting 0 01 01 01 01 0 $ I $ I $ I $ I $ - $ - $ - 10.0 Sub -Consultants 01 01 01 01 01 0 $ 1 $ 1 $ 1 $ 1 $ - $ - $ - Totals 01 121 58 881 01 0 $ 24,350.00 1 $ I $ 11,000.00 1 $ $ $ 11,000.00 $ 35,350.00 Basic Desgin Services* Project Summary Total I $24,350.00 Total Hours 158 *Project Management not included Total Labor $24,350 Total Expense $11,000 MBE/SBE Subconsultant $0 Non-MBE/SBE Subconsultant $11,000 0% Sub Markup $0 MBE/SBE Participation 0.0% Total Project Cost $35,350