HomeMy WebLinkAboutContract 62398-CO1CSC No. 62398-COI
FORT WORTH., City of Fort Worth
— Change Order Request
Project Namel 2025 Asphalt Resurfacing Contract 3
Client Project #(s)I 105639
Project Description Asphalt resurfacing at various locations
Contractorl Peachtree Construction, Ltd. I Change Order #1 1 l
City Project Mgr.l Iretomiwa Otuyelu l City Inspector)
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW
$3,605,084.95
City Sec # 1 62398
Date 4/30/2025
Stephen Barnard
Contract Time
Totals (CD)
$3,605,084.95 210
$3,605,084.95 210
$206,779.50 30
$3,811,864.45 240
$180,254.00
$180,254.00
$26,525.50
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 5.74%
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $4,506,356.19
JUSTIFICATION (REASONS) FOR CHANGE ORDER
$3,605,084.95
$206,779.50
$3,811,864.45
$180,254.00
$180,254.00
$26,525.50
This change order increases the quantities of existing bid items to include two additional street sections, W 7th Street from Hillcrest Street to Rivercrest Street, and Andrew
Avenue from E Rosedale Street to Sayles Trail, into the current contract.
The scope of work includes the installation of new curb and gutter and asphalt resurfacing on W 7th Street and curb and gutter repairs and asphalt resurfacing on Andrew
Avenue. No new items will be added to the contract as part of this change order.
In addition, staff supports the contractor's request for an additional 30 calendar days to complete the additional scope. This additional time accounts for the approval process
of the change order and the expanded scope of work, ensuring the contractor can complete the project without compromising quality.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Peachtree Construction Ltd J Barry Clark 1 1—,tS a,',�a ,, „.o=,s_ 07/15/25
Inspector/Inspection Supeiv,-S—Orjm
Date
Project and Contract Compliance Manager
Date
07/16/25
90
07/16/25
Program,WAa&qLr
Date
Senior Ca6tal Pr iect Officer
Date
+^
07/23/25''"J
07/25/25
Assistant Director(Dept)
Date
Director, Contra7fing Department (Dept)
Date
qah-- LVk(
Pat 'icia L. Wadsack Ju 29, 202511:18.33 CDT)
07/29/25
�---'
07/29/25
Date
Assistant City Manager
Date
s4faL
07/30/25
.wfi ,. -
08/05/25
Council Action (if required)
M&C Number I 25-0591 I M&C Date Approved 1 6/24/20251
ATTEST: FOR ,4,
q;i �Y d
off...... A.- aF o 09d0
Jannette Goodall, City Secretary V,O
ddnbTEXa°o�ygd
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WoaTH
Project Name 2025 Asphalt Resurfacing Contract 3
Client Project # 105639
Contractorl Peachtree Construction, Ltd.
City of Fort Worth
Change Order Additions
City Sec # 62398
1
PMI Iretomiwa Otuyelu Inspectorl Stephen Barnard l
Change Order Submittal # 0 Date 1 4/30/2025 1
ADDITIONS
HEM
UESCKIP I ION
DEP I
Oty
Unit
Unit Cost
3
3216.0102
T"Concrete Curb & Gutter
TPW
600.00000000
LF
$86.5U
22
0241.1700
Pavement Pulverization 11"
TPW
3,800.00000000
SY
$8.25
24A
9999.1002
3" Asphalt Pvmt Superpave SP-D
TPW
3,800.00000000
SY
$27.24
25
3211.0601
CEMLIME @32lbs/SY
TPW
61.00000000
TN
$430.00
26
3123.0101
Unclassified Excavation
TPW
75.00000000
CY
$32.50
TPW
Sub Total Additions
I otal 1
$43,250.001
$31,350.001
$103,512.00 1
$26,230.001
$2,437.50 1
$206,779.501
1
1
1
$206,779.501
Change Order Additions Page 1 of 2
HEM
FORT WORTH
Project Name 2025 Asphalt Resurfacing Contract 3
Client Project # 105639
Contractorl Peachtree Construction, Ltd
UESCKIN I ION
City of Fort Worth
Change Order Deletions
City Sec # 62398
1
PMI Iretomiwa Otuyelu Inspectorl Stephen Barnard l
Change Order Submittal # Date 1 4/30/2025 1
DELETIONS
DEPI
Oty Unit Unit Cost I otal
TM $0.001
Sub Total Deletions $0.00 1
Change Order Deletions Page 2 of 2
M/SBE for this Chanae Order
M/SBE Sub I Type of Service I Amount for this CO
Westhill Construction, Inc. Concrete Flat work
Elite Striping, LLC dba Action Ser Striping
$24,491.76
$1,801.03
Total $26,292.79
Previous Change Orders
CO # DATE I AMOUNT
Total I $0.00 1
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 06/24/25 M&C FILE NUMBER: M&C 25-0591
LOG NAME: 202025 ASPHALT RESURFACING CONTRACT 3 — CO1
SUBJECT
(CD 5 and CD 7) Authorize Execution of Change Order No. 1, in the Amount of $206,779.50, and the Addition of 30 Calendar Days to the
Construction Contract with Peachtree Construction, Ltd., for the 2025 Asphalt Resurfacing Contract No. 3 Project for a Revised Contract Amount
of $3,811,864.45
RECOMMENDATION:
It is recommended that the City Council authorize execution of Change Order No. 1, in the amount of $206,779.50, and the addition of 30 calendar
days to the City Secretary Contract No. 62398 with Peachtree Construction, Ltd. for the construction of the 2025 Asphalt Resurfacing Contract No.
3 project (City Project No. 105639) for a revised contract amount of $3,811,864.45.
DISCUSSION:
On November 19, 2024, Mayor & Council Communication (M&C) 24-1028, awarded the City Secretary Contract No. 62398 with Peachtree
Construction, Ltd., in the amount of $3,605,084.95 for the construction of the 2025 Asphalt Resurfacing Contract No. 3 project (City Project No.
105639) at various locations.
Change order No. 1 will add two new street segments to this contract: West 7th Street from Hillcrest Street to Rivercrest Street and Andrew
Avenue from East Rosedale Street to Sayles Trail. The segment of West 7th Street has been deteriorating at an accelerated rate due to the
absence of curb and gutter infrastructure. Also, the segment of Andrew Avenue is experiencing severe deterioration, necessitating immediate
corrective action to prevent further degradation and maintain the road's safety and usability.
Staff has reviewed and verified the quantities for the additional work under this Change Order No. 1. To complete the work, staff
recommends extending the contract time by 30 calendar days.
The following table summarizes previous contract action and change orders:
Construction Contract Date J Amount
IlOriginal Contract Amount (M&C 24-1028) 11/19/2024 $3,605.084.95
IChange Order No. 1 This M&C $206,779.50
Revised Contract Amount $3,811,864.45
This change order will not impact the Transportation and Public Works Department's annual operating budget. Funding is budgeted in the General
Capital Projects Fund for the Transportation and Public Works Department to fund the 2025 Asphalt Resurfacing Contract No. 3 project as
appropriated.
DVIN/Business Equity — Peachtree Construction Ltd agrees to maintain its initial M/WBE commitment of 12.72% that it made on the original
contract and extend and maintain that same M/WBE commitment of 12.72% to this first change order. Therefore, Peachtree Construction Ltd
remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE
Commitment form executed by an authorized representative of its company.
This project is located in COUNCIL DISTRICTS 5 and 7.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the General Capital Projects
Fund for the 2025 Asphalt Resurf Contract 3 project to support the approval of the above recommendation and the execution of the change order.
Prior to any expenditure being incurred, the Transportation & Public Works Department has the responsibility to validate the availability of funds.
Submitted for Citv Manaaer's Office bv: Jesica McEachern 5804
Oriainatina Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Monty Hall 8662
105639-CNCO-2025 Asphalt Resurfacing
Contract 3 - CO 1
Interim Agreement Report 2025-07-25
Created: 2025-07-15
By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
Status: Out for Signature
Transaction ID: CBJCHBCAABAASxJTQGMZ14E7rsYLmUbR9JdOCKeKg5rk
Agreement History
Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will
be generated when the agreement is complete.
"105639-CNCO-2025 Asphalt Resurfacing Contract 3 - CO 1" Hi
story
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2025-07-15 - 9:22:11 PM GMT- IP address: 204.10.90.100
Document emailed to LaKeshia Lynch (LaKeshia.Lynch@fortworthtexas.gov) for filling
2025-07-15 - 9:38:24 PM GMT
Document emailed to J Barry Clark Qbclark@peachtreecon.com) for signature
2025-07-15 - 9:38:25 PM GMT
Document emailed to Stephen Barnard (stephen.barnard@fortworthtexas.gov) for signature
2025-07-15 - 9:38:25 PM GMT
Email viewed by LaKeshia Lynch (LaKeshia.Lynch@fortworthtexas.gov)
2025-07-15 - 9:38:31 PM GMT- IP address: 20.159.64.152
Email viewed by Stephen Barnard (stephen.barnard@fortworthtexas.gov)
2025-07-15 - 9:38:33 PM GMT- IP address: 20.159.64.138
Email viewed by J Barry Clark Qbclark@peachtreecon.com)
2025-07-15 - 9:39:49 PM GMT- IP address: 47.190.61.6
Document e-signed by J Barry Clark Qbclark@peachtreecon.com)
Signature Date: 2025-07-15 - 9:46:46 PM GMT - Time Source: server- IP address: 47.190.61.6
FoRTW❑RTHg I rp1Nem"v
Adobe
Acrobat Sign
Form filled by LaKeshia Lynch (LaKeshia.Lynch@fortworthtexas.gov)
Form filling Date: 2025-07-15 - 10:00:51 PM GMT - Time Source: server- IP address: 204.10.90.100
Document e-signed by Stephen Barnard(stephen.barnard@fortworthtexas.gov)
Signature Date: 2025-07-16 - 3:35:49 PM GMT - Time Source: server- IP address: 107.115.171.106
Document emailed to Daniel Roy (daniel.roy@fortworthtexas.gov) for signature
2025-07-16 - 3:35:52 PM GMT
Document emailed to Iretomiwa Otuyelu (Iretomiwa.Otuyelu@fortworthtexas.gov) for signature
2025-07-16 - 3:35:52 PM GMT
Email viewed by Daniel Roy (daniel.roy@fortworthtexas.gov)
2025-07-16 - 3:36:00 PM GMT- IP address: 52.244.129.126
Email viewed by Iretomiwa Otuyelu (Iretomiwa.Otuyelu@fortworthtexas.gov)
2025-07-16 - 3:36:02 PM GMT- IP address: 52.244.179.71
Document e-signed by Iretomiwa Otuyelu (Iretomiwa.Otuyelu@fortworthtexas.gov)
Signature Date: 2025-07-16 - 3:41:45 PM GMT - Time Source: server- IP address: 204.10.90.100
Document e-signed by Daniel Roy (daniel.roy@fortworthtexas.gov)
Signature Date: 2025-07-16 - 6:34:00 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Zelalem Arega (Zelalem.Arega@fortworthtexas.gov) for signature
2025-07-16 - 6:34:03 PM GMT
Email viewed by Zelalem Arega (Zelalem.Arega@fortworthtexas.gov)
2025-07-16 - 6:34:10 PM GMT- IP address: 20.159.64.138
Email viewed by Zelalem Arega (Zelalem.Arega@fortworthtexas.gov)
2025-07-23 - 2:05:42 PM GMT- IP address: 52.244.129.126
Document e-signed by Zelalem Arega (Zelalem.Arega@fortworthtexas.gov)
Signature Date: 2025-07-23 - 2:15:25 PM GMT - Time Source: server- IP address: 208.184.124.181
Document emailed to Mary Hanna (Mary.Han na@fortworthtexas.gov) for signature
2025-07-23 - 2:15:27 PM GMT
Email viewed by Mary Hanna (Mary.Han na@fortworthtexas.gov)
2025-07-24 - 3:30:36 PM GMT- IP address: 104.47.65.254
FoRTW❑RTHg I r°Ne""v
Adobe
Acrobat Sign
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: 2025 ASPHALT RESURFACING CONTRACT 3 — CO 1
M&C: 25-0591
CPN: 105639
CSO:
DOC#:1
Date:
To:
Name
Department
Initials
Date Out
1.
LaKeshia Lynch
Bus-Sppt
AL-
07/15/25
2.
Peachtree Construction Ltd
Vendor
JB�
07/15/25
3.
Stephen Barnard
TPW - Inspector
Stephen earna c
07/16/25
4.
Daniel Roy
TPW — Sr.Inspector
07/16/25
5.
Iretomiwa Otuyelu
TPW
07/16/25
6.
Zelalem Arega
TPW
Zelalem mega
07/23/25
7.
Mary Hanna
TPW
07/25/25
8.
Patricia Wadsack
TPW AD
�(��/
07/29/25
9.
Lauren Prieur
TPW Director
Lauren Pneur
07/29/25
10.
Doug Black
Legal
�
07/30/25
11.
Jesica McEachern
CMO
Douglas Black
CA
08/05/25
12.
Jannette Goodall
CSO
08/07/25
13.
TPW Contracts
TPW
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts
ALSO List: - Bus Sppt: LaKeshia Lynch; Prg Mgr.: Zelalem Arega; Sr CPO — Mary Hanna
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and
take the next steps.
NEEDS TO BE NOTARIZED: []YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Reauired:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: Please notify TPWContracts(a,fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext.
8363 with questions. Thank you!