HomeMy WebLinkAboutResolution 6142-08-2025A Resolution
NO.6142-08-2025
ADOPTING THE EASTSIDE TRANSPORTATION PLAN
AND INCORPORATING THE PLAN INTO THE COMPREHENSIVE PLAN
WHEREAS, on September 27, 2022, the City Council approved funding to
examine the East Lancaster Corridor from Jones Street to Dottie Lynn Parkway and the
sub -regional study area (M&C 22-0783); and
WHEREAS, on November 29, 2022, the City Council approved a contract with
WSP USA Inc. (City Secretary No. 58833) for the East Lancaster Avenue Corridor and
Sub -Regional Planning Study (later renamed Eastside Transportation Plan); and
WHEREAS, the Eastside Transportation Plan has been reviewed and endorsed by
various local organizations, including Trinity Metro, East Fort Worth Business
Association, the Texas Department of Transportation Fort Worth Regional Office,
Tarrant County, and the City Plan Commission; and
WHEREAS, after a public hearing, the City Plan Commission voted 9-0 to
recommend approval of the plan adoption on June 11, 2025.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF FORT WORTH, TEXAS, THAT:
The City Council hereby adopts the Eastside Transportation Plan, a copy of which
is attached hereto, and incorporates it by reference into the Comprehensive Plan.
AND IT IS SO RESOLVED.
ADOPTED this 12th day of August 2025.
ATTEST:
By:
Jannette S. Goodall, City Secretary
,, --ugrj
®R Tea
o�0
0
000 s C
0
o*�
o �
)o0000000 c
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 08J12/25 M&C FILE NUMBER: M&C 25-0682
LOG NAME: 20EASTSIDE TRANSPORTATION PLAN ADOPTION
SUBJECT
(CD 5, CD 8 and CD 11) Conduct Public Hearing, Adopt a Resolution Adopting the Eastside Transportation Plan and Incorporate the Plan into the
Comprehensive Plan, and Adopt a Resolution in Support of the Revised Eastside Transportation Plan Locally Preferred Alternative: Transit Route
89 Mode and Extension and Cross -Sections for East Lancaster Avenue, Bridge Street, and Brentwood Stair Road
(PUBLIC HEARING - a. Staff Available for Questions: Kelly Porter; b. Public Comment; c. Council Action: Close Public Hearing and Act on M&C)
RECOMMENDATION:
It is recommended that the City Council:
1. Conduct a public hearing regarding the Eastside Transportation Plan;
2. Adopt the attached resolution adopting the Eastside Transportation Plan, which provides recommendations for improving enhanced mobility,
safety, and economic development on the City's Eastside with incorporation into the Comprehensive Plan; and
3. Adopt the attached resolution in support of the Revised Eastside Transportation Plan Locally Preferred Alternative: Transit Route 89 Mode
and Extension and Cross -Sections for East Lancaster Avenue, Bridge Street, and Brentwood Stair Road.
DISCUSSION:
The purpose of this Mayor and Council Communication (M&C) is to adopt the Eastside Transportation Plan (ETP) by reference into the
Comprehensive Plan. The City Council approved M&C 22-0783 to appropriate $1,100,000.00 for the East Lancaster Avenue Corridor and Sub -
Regional Planning Study (retitled the Eastside Transportation Plan) on September 27, 2022. The plan outlines policies and capital projects
necessary to transform East Lancaster Avenue (SH 180), Brentwood Stair Road, Bridge Street, and other parts of the study area into multi -modal,
walkable, mixed -use corridors. The City Council approved M&C 22-1014 to execute a professional services agreement with consultants
from WSP USA, Inc. to oversee and develop the plan. The planning process began in January 2023 and ran until January 2025. The plan includes
existing conditions analysis, locally preferred alternatives, housing and economic development analysis, and the foundation for a set of catalytic
sites with a form -based code. The consultants conducted three rounds of public open houses, a series of neighborhood -specific meetings,
surveys, and maintained a website to keep the public informed and receive input. The survey received over 750 responses. This plan contains
recommendations only. The City Plan Commission recommended the plan for approval on June 11, 2025, after a public hearing.
The Plan contains 10 chapters to guide the City in the overall development of the area:
• Chapter 1: Introduction and Background
• Chapter 2: Plan Process
• Chapter 3: Previous Planning Efforts
• Chapter 4: Plan Engagement
• Chapter 5: Existing Conditions
• Chapter 6: Growth Factors and Forecasted Conditions
• Chapter 7: Alternatives Analysis
• Chapter 8: Thoroughfare Planning
• Chapter 9: Concept Planning
• Chapter 10: Plan Implementation
The City Council adopted Resolution 5876-01-2024 supporting the Locally Preferred Alternatives on January 23, 2024 (listed in chapter 7 of the
attached plan). Once the plan is adopted, City staff will present a form -based code, zoning changes, and Master Thoroughfare Plan amendments
to the City Council for consideration. The plan will be used to guide and support the reconstruction of East Lancaster Avenue (west of Loop 820).
The roadway is currently under design by the Texas Department of Transportation (fXDOT) and is fully funded by the North Central Texas Council
of Governments (NCTCOG). TXDOT is approaching 60% design and includes many of the recommendations shown in the ETP. The proposed
schedule is as follows:
Recommendation
Plan Adoption
Master Thoroughfare Plan Amendment
Form -Based Code Adoption
Zoning Amendments to Match Form -Based
Code
Proposed Schedule
August 2025
August2025
Winter 2026
Winter 2026
The TXDOT-led East Lancaster Avenue (west of Loop 820) project is scheduled to break ground in 2027/2028.
This plan is located in COUNCIL DISTRICTS 5,8, and 11
A Form 1295 is not required because: This M&C does not request approval of a contract with a business entity.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that approval of this recommendation will have no material effect on City funds.
Submitted for Citv Manager's Office bv: Jesica McEachern 5804
Oriainatina Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Monty Hall 8662