Loading...
HomeMy WebLinkAboutContract 42955-A2 AMENDMENT NO. 2 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. 42955— m&c COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Alan Plummer Associates, Inc. (Engineer) made and entered into City Secretary Contract No. 42955 (the Contract) which was authorized by the City Council by M&C C-25449 on the 21 th day of February, 2012; and WHEREAS, the Contract involves engineering services for the following project: Casino Beach and Watercress Drive—Water and Sanitary Sewer Improvements WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: I Article I of the Contract is amended to include the additional engineering services specified in M&C C-26471, adopted on the 24th day of September, 2013, and further amplified in a proposal letter dated June 17, 2013 and attachment A to Amendment 2, a copy of which is attached hereto and incorporated herein. The cost to City for the services to be performed by Engineer total $331,662. See attached Funding Breakdown Sheet, Exhibit B, B I and B2. 2. Article 11 of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$1,067,617. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX Pagel of EXECUTED on this the day of 2013, in Fort Worth, Tarrant County, Texas. ATTEST: CITY OF FORT WORTH J911' /Mary J.Uxer Fernando Costa City Secretary 0 p. Assistant City Manager 0 APPROVED S S. Frank Crumb, P.E. Director, Water Department APROVED AS TO FORM AND LEGALITY ALAN PLUMMER ASSOCIATES, INC. Engineer Vw cly W VIA: [(V�k By: Assistant City Attorney U David L. McPherson, P.E. Principal in Charge, Conveyance Group 174(13 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 2 of 2 ALAN PLUMMER • Celebrating 35 Years of Service ASSOCITES, INC. 1978 - 2013 ENVIRONMENTAL ENGINEERS AND SCIENTISTS 318-052-01 June 17, 2013 Mr. Paul S. Bounds Regulatory/Environmental Coordinator City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-4397 RE: Casino Beach and Watercress Drive Water and Sanitary Sewer Improvements Contract Amendment No.2 Dear Mr. Bounds: This Contract Amendment is for Casino Beach Phase 2, which will provide the lake crossing water main and assistance in one construction project. The following table identifies the original contract, and previous and current amendments. Amount Council Approved Original Contract $696,955.00 2/21/12 Amendment 1 $39,000.00 7/5/12 Amendment 2A $99,629.00 Amendment 213 $232,033.00 Total Cost $1,067,617-00 If you have any comments, please contact me. Sincerely, ALAN PLUMMER ASSOCIATES, INC. Cletus R. Martin, P.E. CRM/vIw Enclosers cc: Mr. David L. McPherson, Ph.D., P.E.,Alan Plummer Associates, Inc. 1320 SOUTH UNIVERSITY DRIVE SUITE 30-0 FORT WORTH,TEXAS 76107 PHONE 817.806.1700 FAX 817.8702536 F:\projem\0318t052-01\DocXCorresp\PaulSBoundsLtr.docx -apaienvxom TBPE firm No t3 ^ ATTACHMENT AFOR CONTRACT AMENDMENT NO. 2 CITY OF FORT WORTH CASINO BEACH AND WATERCRESS DRIVE WATER AND SANITARY SEWER IMPROVEMENTS SCOPE OF SERVICES JUNE 17' 2Q13 The following is a clarification of the tasks that the ENGINEER will perform under ATTACHMENT A. The original Contract and Contract Amendment 1 provided for the Design. Bid and Construction Phase services for the Casino Beach lift station and force main, and o water line from Silver Creek Road to the new development ot Casino Beach Park. This Contract Amendment No. 2 or Casino Beach Phase ||, will provide for a water main to provide a loop, as backup, to the north part of Lake Worth. Future phases will include; gravity and |ovv pressure sanitary sewer force mains along VVateronona Drive, and water and |ovv pressure sanitary aon/io* to residents along Love Circ|e, Peninsula Club Circle, North Lake Drive. Island View Drive, and improvements to Meadow Lakes lift station and abandonment ofJenkin Heights lift station. BASIC ENGINEERING SERVICES SUMMARY A. DESIGN PHASE (PHASE U) 1. Design of up to 1.500 LFnf8-inoh and up to 2.600 LF of 24-inch water main, from the existing valve on Marina Creek Drive from the south side of Lake Worth to Casino Beach |Ut station on the north side per the attached Exhibit 1. The lake crossing pipe material will be HOPE, butt fused and will be constructed by open trench on the bottom of the lake. The 24-inch main will be designed to float out on the lake with weights attechad, than sunk by filling with water, then trench backfiUed. The pipeline will be on several city owned properties as follows: starting on the nouth, the pipeline will be in sih/ ROW- Marina Drive, then it is routed adjacent to Marina Creek Park in water department pvoperty, then in the Parks department owned |ake, then exiting the lake adjacent h» Casino Beach lift station. A special specification will be written to require contractor's experience or qualification for this special lake crossing construction. There will be no residential service taps from the24'inoh main. Service taps will be provided to residences along Marina Drive from the 8-inch line, The lake crossing pipe will have isolation valves and pressure test ports on both sides of lake. The design will be for a single construction project. SPECIAL ENGINEERING SERVICES SUMMARY A. SPECIAL SERVICES FOR LAKE CROSSING PIPE (PHASE ||) 1. Up to four (4) Easement Documents and up to 4,100 LF of topographic survey including lake crossing. 2. Geotachnica| investigation and reporting. Ageoteohnice| report will be prepared based on four (4) soil borings. No underwater borings are planned to be taken from the lake itself. FApn4ectsv0318\052'01\PnAmcomgm$ContramvV\mengmonL2_=cmpe,gonx A'1 Instead, the design will utilize information provided by the city from previous borings and geotechnical and geotechnical engineering from the previous lake dredging project. 3. Preparation of Change Order documents for the lake crossing in order to possibly attract locally mobilized dredging contractors and avoid mobilization cost of different contractor. 4� Repackage Bid set and Change Order(lake crossing) set into one Bid Document|n the event that the previously described change order attempt is not successful. 5. USA Corps of Engineers (COE) permitting. No lake crossing park conversion will be required. C[)E permitting will be by notification and no individual permitting is anticipated to be required. B. SPECIAL SERVICES FOR PHASE /. Coordination and design with Casino Beach development, perks department, City forester, City of Lake Worth, and Town of Lakeside. This item includes many items aofollows: 1. Participate in additional naviavvs and review meetings with the CFA/380agreemen0PRC developer process. 2. Re-alignment of the sanitary sewer (8S) force main through the center of the casino beach development to shorten the pipeline and save construction cost. 3. Re-alignment mfthe SS force main near love circle to go through the open park area and reduce impact to trees-which will include additional topographic survey. 4. Add gravity SS main through the park to reduce construction impact to the park areas, 5' Prepare exhibits for Parks and Development changes to illustrate trees saved. 8. Design ROW and easement for areas where no existing ROW is platted on Watercress Dr. 7. Rem|/gn/re-deaiQn the water line on Watercress [>r. to reduce impact to trees, meeting with Parks dept. 8. Update the water model to determine how much water could be delivered to Town of Lakeside without impacting the City of Fort Worth. 0. Add the design of a low pressure force main near the Casino Beach lift station. 10. Add the design ofm8-inch water line near the Casino Beach lift station. 11. Split the 95% complete Plans into the C|P portion with revised bid tabulation and quantities and provide separate plans, OPC, and bid quantities for the CFA/developer portion, 12. Redesign the water line through the center of Casino Beach development to accommodate changes h)the road layout. 13. Change the lift station wet well from reinforced concrete to fiberglass C. Bid Phase Assistance for Phase |/. Provide Bid phase assistance the same as the original contract scope, O. Construction Administration Assistance for Phase !|. This phase will be the same as the original contract scope with the following changes: The Engineer will visit the site up to six (0) times for construction progress meetings or specific issue meetings. The Engineer will respond toup to twelve (12) Request for Information from the contractor and will review up to twenty (20) submittals and shop drawings, prepare upto eight (8) PCK8a / CMRs, and three (3) Field Orders ur Change Orders. ADDITIONAL SERVICES Additional Services not included in the existing Scope of Services of Phase | or Phase || — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks FAonUeots0318\852'01\PnVectMgmbContracns\\moogmenL2_»copv.Uoux /+2 -7 t 4 yy' - 1 t , t x fi * €!�•" Aaft ere" !�A-6 L Ake park FarGteale, Lake Worth AL South Lake worth 82ff A W l + SINO LAKE CROSSING WAT Dam: • • ATTACHMENT B FOR CONTRACT AMENDMENT NO' 2 CITY OF FORT WORTH CASINO BEACH AND WATERCRESS DRIVE WATER AND SANITARY SEWER IMPROVEMENTS COMPENSATION JUNE 17, 2013 |, Compensation A. The ENGINEER shall be compensated $331.682 as summarized in Exhibit 131 - Engineer Invoice. The fee shall be considered full compensation for the services described Attachment A, including all labor materia|u, supplies, and equipment necessary \o deliver the services. Basic Services shall bm paid onu total lump sum basis of $82'O34. Special Services shall be paid nnatime and material basis not tnexceed $24Q'028. B. The ENGINEER shall be paid monthly payments as described in Section 11 - Method of Payment. ||. Method ufPayment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER, B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D� Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement byan officer of the ENGINEER. |||. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports in the format required by the City. p\pnojects0318\052'01x=n4emmgmt\ContramoV\momdmen(-2--Scnpe.¢oox o'1 ATTACHMENT Bi FOR CONTRACT AMENDMENT NO.2 CITY OF FORT WORTH CASINO BEACH AND WATERCRESS DRIVE WATER AND SANITARY SEWER IMPROVEMENTS JUNE 17, 2013 No. Task Description Contract Value 1 BASIC SERVICES A. Lake Crossing Water Main (Phase 11) $82,034 2. SPECIAL SERVICES A. Lake Crossing Water Main (Phase 11) $83,403 B. Stakeholder Coordination and Design, (Phase 1) $99,629 C. Bid Phase Assistance(Phase 11) $24,470 D. Construction Administration Assistance $42,126 TOTAL CONTRACT AMENDMENT 2 $331,662 F:\projer-ts\0318\052-01\ProjectMgmt\Contracts\Amendment-2—scope.docx Bi-i ATTACHMENT B2 FOR CONTRACT AMENDMENT NO.2 CITY OF FORT WORTH CASINO BEACH AND WATERCRESS DRIVE WATER AND SANITARY SEWER IMPROVEMENTS MWBE BREAKDOWN COST SUMMARY JUNE 17, 2013 Consulting Firm Scope of Services Fee Percent MWBE Subconsultants 1. Spooner and Spooner, Inc. Surveying/Easements $25,230 7Z% 2. Evans Graphics Reproduction/Printing $10,319 3.1% Subtotal MWBE Subconsultants $35,549 10.7% Prime Consultant {and other non- $296,113 $9.3% MWBE Subconsultants} Total $331,662 100% F:\projects\03181052-011ProjectMgmt\Contracts\Amendment_2_scope.docx B2-1 CITY OF FORT WORTH CASINO BEACH-PHASE 2 LAKE CROSSING WATER MAIN CONCEPTUAL ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST Prepared By. Cletus R. Martin,P.E.(Tx 81507) June 17,2013 Item No. Description 17Quantity Units Unit Prices TTotal Cost WMR W-1 24Inch Water Pipe Lake Crossing 1,500 LF $ 305 $ 467,500 W-2 24-Inch Water Pipe 1100 LF $ 90 $ 99,000 W-3 8-Inch Water Pipe 11-50-0 -LF $ 41 $ 61,500 W-4 1-inch Water Services 600 LF $ 18 $ 10,800 W-5 Trench Safety 2.600 LF $ 2 $ 5,200 W-6 Stormwater Polution Prevention Plan&Impl. 41100 LF $ 3 $ 12,300 W-7 Traffic Control Plan 1 LS $ 7,000 $ 7,000 W-8 Utility Location 4,100 LF $ 1 $ 4,100 W-9 Gate Valve,24-Inch and Vault 2 EA $ 25,000 $ 50,000 W-10 Gate Valve,8-Inch 2 EA $ 10,000 $ 20,000 W-11 Combination Air Release Valve and Vault 3 EA $ 15,000 $ 46,000 W-12 Fire Hydrant 4 EA $ 1,800 $ 7-200 W-13 Connection to Existing water line 2 EA $ 4,300 $ 8,600 W-14 Residential Service Taps,copper 15 EA $ 300 $ 4,500 W-15 Residential Pressure Reducing Valve 15 EA $ 350 $ 5,250 W-16 Meter box and cover 15 EA $ 210 $ 3150 W-17 Pressure Testing Vault,inc 2 valves 2 EA $ 50-000 $ 10-0000 W-18 Temporary Pigging 24-Inch Ent /Exit Port 1 LS $ 34 000 $ 34,000 , W-19 Temporary Pig 8-Inch Ent /Exit Port 1 LS $ 14,000 $ 14,000 W-20 Concrete encasement(several locations) 50 CY $ 132 $ 6,600 W-21 Full Width Single Layer Seal Coat 2,000 LF $ 8 $ 16,000 W-22 Asphalt Trench Repair 2,000 LF $ 28 $ 66,000 W-23 Rock Rip Rap 100 CY $ 25 $ 2,500 W-24 Tree,Irrigation,Driveway,Misc Mitigation I LS $ 25,000 $ 25,000 W-25 Grass Sod 500 SY $ 18 $ 9,000 W-26 Miscellaneous Items I LS $ 10,000 $ 1-0 wo W-27 Mobilization and Demobilization(5%) 1- LS $ 53,710 $ 53,710 W-28 Bonds and Insurance(3%) 1 LS $ 32,226 $ 32,226 Contingency(15%) $ 174,020 Subtotal $ 1,3341 F:\projects\0318\052-01\WrkkPreliminary Phase 2 EOPCC Page 1 of 1 ■ 313ldW0O NDISM co to LU I -A .......... z uj ui � « « \ \ ` \ « : z o LLI 0 U. LL LLI 0 U) W. Z CD w mLU 3: CL 0 0 4) m z 0 E 0 16 01 cy, 0 0 0 4D > "0 0 LU c w lo- 0 E -J a - :3 .0 , C, 0. E 2 0 co c — > CL B \ CL to 0 a a 40 0 0 0 m —0 2 0 E 0 = '2 0 IL 0 U) -e I =)I m M t I L z z 0. in &0 0 co ui f5 9 E cq .T z M&C Review Page I of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FoRTWORTH COUNCIL ACTION: Approved on 9/24/2013 -Ordinance Nos. 20966-09-2013 and 20966-09-2013 REFERENCE .,, 60ALAN PLUMMER CASINO DATE: 9/24/2013 NO.: C-26471 LOG NAME: BEACH /WATERCRESS WATER AND SEWER DES CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 2 in the Amount of$331,662.00 with Alan Plummer Associates, Inc., for a Revised Total Contract Amount of$1,067,616.40 for Engineering and Design Services for the Casino Beach/Watercress Water and Sewer Improvements Phase I at Lake Worth and Adopt Appropriation Ordinances (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Lake Worth Gas Lease Capital Improvement Fund by$331,662.00 from Gas Well Revenues; 2. Authorize the transfer of$331,662.00 from the Lake Worth Gas Lease Capital Improvement Fund to the Water Capital Projects Fund; 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of$331,662.00; and 4. Authorize the City Manager to execute Amendment No. 2 in the amount of$331,662.00 with Alan Plummer Associates, Inc., for engineering and design services associated with the Casino Beach/Watercress Water and Sewer Improvements Phase I at Lake Worth. DISCUSSION: On February 21, 2012, (M&C C-25449)the City Council authorized an engineering and design contract with Alan Plummer Associates, Inc., in the amount of$696,954.40 for the Casino Beach/Watercress Water and Sewer Improvements Phase 1. The Casino Beach/Watercress Water and Sewer Improvements will bring water and sewer service to the Casino Beach area to facilitate commercial growth, and to the residents along Watercress to eliminate existing septic systems and substandard water service. The Phase 1 design did not include the lake crossing that will be required to loop the water system and provide a two-way feed for redundancy and water quality. Amendment No. 1 in the amount of$39,000.00 was necessary to cover additional easements, surveying and the design of a larger lift station. The proposed Amendment No. 2 with Alan Plummer Associates, Inc., in the amount of$331,662.00 provides for engineering services and design of 1,500 linear feet of eight inch and 2,600 linear feet of 24 inch water main to cross Lake Worth and complete the loop of the water system in the Casino Beach/Watercress area. With the additions of Amendment No. 2, the total contract amount for this project is$1,067,616.40. M/WBE Office-Alan Plummer Associates Inc., is in compliance with the City's MANBE Ordinance by committing to an additional 11 percent M/WBE participation on this amendment No. 2. The City's goal on this project is 11 percent. http://apps.cfwnet.org/council_packet/mc—review.asp?ID=I 8935&councildate=9/24/2013 10/1/2013 M&C Review Page 2 of 2 V This project is located in COUNCIL DISTRICT 7. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Water Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 1)C246 446100 601159990100 $331,662.0 2)C246 538070 601159990100 $331,662.00 1)C246 538070 601159990100 $331,662.0 4) P253 531200 607140182930 $331,662.00 2) P253 472246 607140182930 $331,662.0 3) P253 531200 607140182930 $331,662.0 3)P253 472246 607140182930 $331,662.0 Submitted for City Manner's Office by: Fernando Costa (6122) Originating Department Head: S. Frank Crumb(8207) Additional Information Contact: Paul Bounds (8567) ATTACHMENTS 60ALAN PLUMMER CASINO BEACH WATERCRESS WATER AND SEWER DES C246 AO.docx 60ALAN PLUMMER CASINO BEACH WATERCRESS WATER AND SEWER DES map.pdf 60ALAN PLUMMER CASINO BEACH WATERCRESS WATER AND SEWER DES P253 AO.docx http://apps.cfwnet.org/council_packet/mc—review.asp?ID=18935&councildate=9/24/2013 10/112013