Loading...
HomeMy WebLinkAboutContract 46135-CO1 (2)Fo wr WC3 RTm City of Fort Worth CoMPACY W0.- Change Order R t.t uost Project Name Sludge Only Landfill (SOL) Slr pt Repair and Tree Removal � City Sec No. � 46135 Project No.(s)l WTR-2001-300007 DOE No. N/A City Proj. No. WTR-2001-300007 Project Description:) Repair of Sludge Only Landfill Levee to meet FEMA Certification Criteria Contractor:Illllll Autsin Filter Systems, Inc. Change Order: ] 1 Date: 9/1112015 City Project Mgr.l M. Rafalko l City Inspector: l R. Walker Phone Number:) 817-392-8215 Phone Number:) 817-944- Dept, Water Sewer Totals Contract Time (Calendar Days) Original Contract Amount $649,483.A14 $13 9,4133.44 180 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $549,483.44 $ 19,483.44= 180 amount of Proposed Change Order_ $72,711,42 $72,711,4� 030 Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) $72,711 A21 $72�71 1_42 FM CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT � 11.20%1 MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST +25%) §41.1j&54.30 I Original Contract Bid Items included Standard Pay Item 0241.900 Remove Concrete Rip Rap (payable in SF). Standard Payment is for 12-inches of depth. During the removal of what was believed to be concrete rip rap, a significant volume of asphalt pieces was found and the depth of the rubble to be removed was much greater than the estimated 12-inches (this was found in places as deep as 12-feet). It is possible to reuse much of the concrete on site; however the asphalt rubble needs to be disposed of in an appropriate landfill. Add the following Pay Items 2041,0901 — Misc. Concrete and/or Asphalt Bubble Removal to be paid in Cubic Yards. Contractor has submitted a cost of $9,00 per CY for approximately 1584 CY of material for a cast of $14,256.00. 2041.0902 - Asphalt Disposal to be paid by the LOAD. Contractor has submitted a cost of $176 per LOAD for approximately 79 LOADS for a cost of $13,904.00, Quantity Overruns on the following pay items: 3110.0102 Additional Tree Removal 6-12-inch - 53 additional trees Q unit bid price $360.00 for a total cost of $19,080.00. 3110.0103 Additional Tree Removal 12-18-inch - 4 additional trees cr unit bid price $1200.00 for a total cost of $4800.00, 3136.0102 Twisted Gabions -additional 6 CY Q unit bid price $240.00 for atotal cost of$1440.00.3136.0104 Twisted Gabions Mattress -additional 77.86 CY u? unit bid price $247.00 for a total cost of $191,2271IL42. It is understood and agreed that the acceptance of this Change Order by the contractor constitute n accord and satisfaction and represents payment ,oft in full (both time and money) for all costs arising out of, or incidental to, the above Change Or Cnrllr: -- Autsin Filter Systems, Inc. Mark Toungate ` i it m- i - o1`114 h 5- • M8C plumber NIA I I I&C Date Aooroved N!A F_ con-r W6 R -r vi City of Fort Worth Change Order Additions Project Name Sludge Only Landfill (SQL) Slope Repair and Tree Removal Project No.(s) WTR-2001-300007 I Project Description I Repair of Sludge Only Landfill Levee to meet FEMA Certification Criteria Contractor City Project Mgr. I City Sec No. , 46135 1 DOE Nod N/A 1. City Proj. No. WTR-2001-301 1 Autsin Filter Systems, Inc. Change Order: { ' E Date: 1 9/11/2015 i M. Rafaiko City Inspector I R. Walker ITEM DESCRIPTION 241.0901 Misc. Concrete and/or Asphalt Rubble Removal 241.0902 Asphalt Disposal 3110.0102 Additional Tree Removal 6-12- inch 3110,0103 Additional Tree Removal 12-16-inch 3136.0102 Twisted Gabions 3136.0104 Twisted Gabions Mattress ADDITIONS DEPT (sty Unit Unit Gast Total Sewer 1584.00 CY $9.00 $14,256.00 Sewer 79.00 EA $176.00 $13,904.00 Sewer 53.00 EA $360.00 $19,080.00 Sewer 4.00 EA $1,200.00 $4,800.00 Sewer 6.00 CY $240.00 $1,440,00 Sewer 77.86 CY $247.00 $19.231.42 Water Sewer $72,711.42 Additions Sub Total $72,711.42 ..._._....._..._____- I°�P,- W4 oi �?,'r*i City of Fort Worth Change Order Deletions Project Name Sludge Only Landfill (SOL) Slope Repair and Tree Removal City Sec No. I 46135 Project No.(s) WTR-2001-300007 I DOE No, I NIA City Proj. No. I WTR-2001-3� Project Description Repair of Sludge Only Landfill Levee to meet FEMA Certification Criteria Contractor I Autsin Filter Systems, Inc. I Change Order: 0 Date 911112015 City Project Mgr, M, Rafalko I City Inspector I R. Walker DELETIONS STEM DESCRIPTION DEPT Glty Unit Unit Cast Fo[M NONE Water _ Sewer Deletions Sub Total .................... _ M/SBE Breakdown for this Change Order J BE Sub Type of Ser+se Ai- unk far this.. Q Total _ a r .00 Previous Change Orders F ` -AMOUNT-- _ .. Total V opt 0. AJ' _-i ' S•set, City Sewduy k r,.�{'eft `,..�{:1L1,��•'7�"�ie�t OFFICIAL RECOrX. CITYSECRETy FT. W0jtTjf, TX 1 RECEIVED se 232015 CITy0f FORT001 ; CITY StMMRY '