HomeMy WebLinkAboutContract 53594-R1FP1.FORT WORTH,
TRANSPORTATION AND PUBLIC WORKS
NOTICE OF PROJECT COMPLETION
FP1
City Secretary No. 53594-Rl
Date Received: 08/25/2025
City Project N!?: Various
Regarding contract 53594-Rl 2020 Paving & Sidewalk Improvements - Renewal 1 for as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on 1/28/2020 through
M&C 20-0047 the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation & Public Works Department has accepted the project as
complete.
Original Contract Amount:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
?atNcra L. Waisack
I'a L,— L Nlad— k ;�,R 3, 20251� 25 53 CD I;
Recommended for Acceptance
Asst. Director, TPW - Capital Delivery
$ 5,000,000.00 Days 730
$ Ns Days Added by CO
$
Total Days
$ 2,659,053.99 Days Charged730
Days @ $
$ 2,659,053.99
$ 2,659,053.99
$ 0.00
Laurel Pri ew
11111 11 1, 2C2512 4252 CD I I
Accepted
Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
Asst. City Manager
08/05/2025
Date
08/05/2025
Date
08/05/2025
Date
/ Day
Comments: OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Forth Worth
2020 Task Order Construction Services at Various Locations
Project Cost Summary
Contractor
Expires
The Fain Group
CSN
53594-R1
PSK
12/152025
12755
Contract
Amount
5,000,000.00
MRF. C,nal
10 %
Construction
Estimated Costs Actual Costs
Actual Costs
Percent Finn]
PO
Otttstandi
TO #
Prewa
Project Name
CPN
NTP Date
Days
Construction Completion
Construction
Contract Remaining Invoiced to Date
I
Contract
Complete Billed?
Issued?
ag
Cost
Remaining
Invoices?
I
10/302021
$4,674,754.43
$ 4,680,336.04
25A
Y
BNSF at Cunningham
101864
8/12021
90
$325,245.57
3I9,663.96
100% YES
YES
NO
26
Y
WJ Boaz at Bmynan Roberts RAB
101867 I
8/52021I
120 1
12/12021
$573.352.75
$4,101,401.68
573352.68
$ 4,106,983.36
100% YES
YES
NO
28
Y
East 1st Street -Shared Used Path
103153
12/2120211
120 1
9/132022
$ 574.488.12
$3,526,913.56
554369.69
$ 3,552,614.67
100% YES
YES
INO
31
Y
WJ Boaz at Bowman Roberts RAB-PArt2
101867
102720211
30 1
11/182021
$ 13-652.89
$3,513,260.67
13.652.89
$ 3,538,961.78
100% YES
YES
NO
I
1
$3,504,440.75
$ 3,530,141.86
32
Y
WJ Boaz at Bowman Roberts RAB-PArt 3
101867
3232022I
10
5/312022
$ 8.819.92
8,819.92
100% YES
YES
NO
33
Y
Stan Six Strcctscaoc
C00705 1
9252023 1
30 1
1/92024
$3,504,440.75
59,825.54
$ 3,470,316.32
100% YES
YES
NO
34
Y
Bonds Ranch Rd interim improvements
103278 1
4/1120231
_
60 I
9/52023
$ 296.000.00 I
$3,208,440.75
290,283.46
$ 3.180,032,86
100% YES
YES
INO
36
Y
Lincoln Library Sidewalk
CO2505
82320231
120
10/30/2023
1 $ 38.522.33 1
$3,169,918:42
36.522.33
$ 3,141,510.53 1
100%AYES
YES
INO
37
Y
Trinity Metro Bus Pad
105012 1
12220241
90 1
4/302024
1 $ 574.742.96 1
$2.595,175.56
521,630.26
$ 2,619,880.271
100%AYES
YES
ENO
38
Y
Trinity Metro Bus Pad
105012 1
I
7/8/20241
I
60 1
I
10262024
1 $ 317.777.90
I i
$2,277,397.66
278.934.26
$ 2,340,946.01 1
I
100%1 YES
I
YES
INO
1
730
S 2,722,602.34
2,659,053.99
1
Larry Frazier (Jul 28, 2025 15:24:18 CDT)
FORT WORTH,
0"
TRANSPORTATION AND PUBLIC WORKS
July 23, 2025
The Fain Group, Inc.
2500 Greatsouthwest Parkway
Fort Worth, Texas 76106
RE: Acceptance Letter
Project Name: 2020 Paving and Sidewalk Improvements Unit Price Contract 1" Renewal
Project Type: Paving
City Project No.: N/A CSN#53594 2020
To Whom It May Concern:
On October 26, 2024 a final inspection was made on the subject project. There were no punch list items
identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on October 26, 2024,
which is the date of the final inspection and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-8021.
Sincerely,
Chad Allen, Project Manager
Chad Allen, Program Manager
Cc: Ignacio Andrade, Inspector
Mike Glover, Inspection Supervisor
Daniel Roy, Senior Inspector
Chad Allen, Program Manager
Kimley-Horn and Associates, Inc., Consultant
The Fain Group, Inc., Contractor
N/A, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 08/20/19
CSC No. 53594-COI
FORT WORTH,. City of Fort Worth
Change Order Request
Project Namel 2020 Paving and Sidewalk Unit Price Construction Contract
Client Project #(s)l Various
Project Description Unit Price Construction Contract for the installation of sidewalk and paving imrpoevements.
Contractorl The Fain Group Change Order #1 1 1 Datel
City Project Mgr.l Shweta Rao P.E. City Inspectorl
Dept TPW
Original Contract Amount $5,000,000.00
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
City Sec # l 53594
212612021
N/A
Contract Time
Totals (CD)
$5,000,000.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $6,250,000.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Additional Bid items that were not included in the original unit price contract is needed in order to install pavement improvements for project CPN C01802 and CPN 101863.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reoortine requirements.
Contractor's Company Name
Contractor (Name)
Contract Signature
I Date
The Fain Group
Larry Frazier
fyKyi
Mar4, 2021
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
ShWOa Rao
Mar 4, 2021
Program Manager
Date
Senior Capital Project Officer
Date
.t1--Z&.r4ceva�.e, /11 •
Mar4,2021
C % f rJ,&.
Mar5,2021
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
L prppnie
Mar5,2021
Mar8,2021
nt City Attorney
Data
Assistant City Manager
Date
o so"
Mar9,2021
�
Mar 11,2021
Council Action (if required)
ATTEST: aj'0
Mary J. Kayser, City Secretary
M&C Number
ba�-FORr uaa Q, *-�
,o0ao.4�ooZ50O
VVp0
OO
* F O 0O {J
n ,Q0000 _ a
I M&C Date Approved I N
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort worth
Change Order Additions
Project Name 1 2020 Paving and Sidewalk Unit Price Construction Contract City Sec # 53594
Client Project # I Various
Contractorl The Fain Group I PMI Shweta Rao P.E. I Inspectorl NIA
Change Order Submittal # O Date 1 2/2612021 1
ADDITIONS
ITEM
UESURIPIIUN
UEPI
Qty
Unit
Unit Cost
total
New
9999.000U
6" Concrete Valley Gutter
I PW
UO00000U
SY
$45.01J
$0.0ul
New
9999.0000
Remove Gravel
TPW
0.00000000
SF
$4.25
$0.001
New
9999.0000
Remove Existing Brick and Sand Subgrade
TPW
0.00000000
SY
$25.00
$0.001
New
0104-6011
REMOVING CONC�MEDIANS)
TPW
0.00000000
SY
$13.91
$0.001
New
0104-6022
REMOVING CONC CURB A D GUTTER)
TPW
0.00000000
LF
$24.00
$0.001
New
0132-6007
EMBANKMENT (FI AL)(ORD COMP)(TY D)
TPW
U.000OOOOU
CY
$5.O0
$0.001
New
0161-6017
COMPOST MAI4UF T SOIL (4")
TPW
0.00000000
SY
$1.&
$0.001
New
0164-6007
BROADCAST SEEO�PERM) ( RBAN) (CLAY)
TPW
0.00000000
SY
$0.62
$0.001
New
0340-6106
D-C. HMASSQ) TY- PG6 -24
TPW
0.00000000
TON
$155.00
$0.001
New
0500-6009
CHAIN LINK FENCE INSTALL(6 )(BARB TOP)
TPW
0.00000000
LF
$125.00
$0.001
New
0550-6003
CHAIN LINK FENCE REMOE)
TPW
0.00000000
LF
$45.00
$0.001
New
0666-6006
REFL PAV MIRK TY I W)4�DOT)(100MIL)
TPW
0.00000000
LF
$1.69-
$0.001
New
0666 6036
RE FL PAV MRK TY I yy(�I) �j SSL��
TPW
0.00000000
LF
$0.83
$0.001
New
06666048
REFL PAV MRKTYI 24"{SLC4"100MIL)
TPW
0.00000000
LF
$6.16
$0.001
New
0666�093
REFL PAV MIRK TY I )! 100M(L)�
TPW
0.00000000
EA
$568.00$O.00j
New
0666-6105
IKEIN
REFL PAV MRK TY I Any )� S100MIL
�RR
TPW
0.00000000
EA
$207.00
$0.00j
New
0666�108
RFL PAV MRK TY I ) I RR XI G 100MI
TPW
0.00000000
EA
$325.00
$0.001
New
0666-6111
SYML 100MIL
REFL PAV MRK T I(W) SBIKNew
TPW
0.00000000
EA
$247.00
$0.001
0666 6300
RE PM WIRET REQ IE
1q4 {BR� {1UOM L)
TPW
0.000OO000
LF
$0.44
$0.001
New
0666�301
RE PM WIRET REQI
TY y/W ((3RK 100MILf
TPW
0.00000000
LF
$0.25
$0.001
New
0666 6303
RE PM WIRET REQ TY I ) 414SL {100M L
TPW
0.00000000
LF
$0.25
$0.001
New
0666 6315
RE PM WIRET REQ TY I Y) 4"(SLD(IUOMW
TPW
0.00000000
LF
$0.38'
$0.001
New
0672-6013
TRAFFIC BUTTON TY II- -A
TPW
0.00000000
EA
$5.25
$0.001
New
0677 6001
ELIM E)CT PAV MIRK & MRKS (4")
TPW
0.00000000
LF
$0.3L,
$0.001
New
0677 6007
ELIM EXT PAV MIRK & MRKS
TPW
0.00000000
LF
$3.44'
$0.001
New
9999.0000
jI24")
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
TPW
0.00000000
SY
$22.00
$0.001
New
9999.0000
PLANE ASPH CONC V(0" TO 2.7 ")
TPW
0.00000000
SY
$2.25
$0.001
New
9999.0001
Wooden Bollards
TPW
0.00000000
EA
$200.00
$0.001
New
9999.0001
Remove steel post
TPW
0.00000000
EA
$200.00
$0.001
New
9999.0002
Remove Pipe Pencing
TPW
0.00000000
LF
$1,750.00
$0.001
TPW $0.001
Change Order Additions Page 1 of 2
I Sub Total Additions 1 $0.001
Change Order Additions Page 2 of 2
HEM
f=M
FORTWORTH City of Fort Worth
Change Order Deletions
Project Name 2020 Paving and Sidewalk Unit Price Construction Contract City Sec # 1 53594
ClientProject# Various
Contractorl The Fain Group I PMI Shweta Rao P.E. I Inspector NIA
Change Order Submittal # Date 1 212612021
DELETIONS
UI=SUKIIJI IUN UEVI Uty Unit Unit UOst total
I
1
1
I
1
I
1
I
1
1
1
I
1
1
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
1
1
1
1
I
1
I
1
I
1
1
1
I
1
I
1
I
1
I
1
I
1
I
1
TOW $0.001
Change Order Deletions Page 4 of 7
Sub Total Deletions 1 $0.001
Change Order Deletions Page 5 of 7
MISBE for this Change Order
MISBE Sub Type of Service Amount for this CO
Total $0.00 N
Previous Change Orders
CO # I DATE I AMOUNT
Total $0.00 1
CSC No.53594-CO2
FORT WORTH® City of Fort Worth
Change Order Request
Project Namel 2020 Paving and Sidewalk Improvements Unit Price Construction Contract City Sec # l 53594
Client Project #(s)� Various
Project Description Unit Price Construction Contract for pavig and sidewalk improvements
Contractorl The Fain Group Change Order #1 2 1 Date
City Project Mgr.l Shweta Rao, RE � City Inspectorl
Dept
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW
$5,000,000.00
7/6/2021
N/A
Contract Time
Totals (CD)
$5,000,000.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $6,250,000.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Additional Bid items that were not included in the original unit price contract is needed in order to construct the sidewalk improvements for project CPN 101700.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Company Name Contractor (Name)11 IIFCntract Signature l)aie
The Fain Group Larry Frazier , a, o„aoa= Jul 14, 2021
Inspector/Inspection Supervisor
bate
Project and Contract Compliance Manager
Date
Jul15,2021
Program Manager
Date
a italProectOfficer
Date
J u 115, 2021
� ,J,1s,-11WID,
Jul 19, 2021
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
R-Iew
Jul 19, 2021
*'�A'91d
Jul 19, 2021
Assistant City Attorney
Date Assistant City Manager
Date
Jul 19, 2021 a- aurgndPff
Jul 20, 2021
RL Council Action (if required)
M&C Number I I M&C Date Approved I I
ATTEST:ftgG d �,) C70111g,Z g
RonaldP.G.—[e ,(Jul II, 202108:27 CDT)
Ronald P. Gonzales, Acting City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort worth
Change Order Additions
Project Name 2020 Paving and Sidewalk Improvements Unit Price Construction Contract City Sec # 53594
Client Project # Various
Contractorl The Fain Group I PMJ Shweta Rao, RE � Inspectorl N/A
Change Order Submittal # O2 Date 1 7/6/2021 1
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
New
REMOVE ANU REINS I ALL ROCK RIPKAP
IPVV
U.000UUUUU
SF
$35.UU
$U.uul
New
10' OPEN BACK INLET (I-COB-FTW) (TXDOT ITEM 465)
TPW
0.0000000U
EA
$7,125.00
$0.001
New
SET (TY II) (24 IN) (RCP) (P) (TXDOT ITEM 467)
TPW
0.0000000U
EA
$2,675.00
$0.001
New
RAIL (HANDRAIL)(TY F) (TXDOT ITEM 450)
TPW
0.0000000U
LF
$225.0U
$0.001
TPVV $0.001
Change Order Additions Page 2 of 7
I Sub Total Additions 1 $0.001
Change Order Additions Page 3 of 7
HEM
EM
FORTWORTH City of Fort Worth
--� IV-- � Change Order Deletions
Project Name 2020 Paving and Sidewalk Improvements Unit Price Construction Contract I City Sec # 53594
Client Project# Various
Contractorl The Fain Group I PMI Shweta Rao, P E I Inspectorl N/A
Change Order Submittal # O2 Date 1 7/6/2021
DELETIONS
UESCKIPIIUN DEN Uty Unit Unit Uost total 1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
1
I
1
I
1
I
1
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
TPW $0.001
I I
I I
I I
Change Order Deletions Page 4 of 7
I Sub Total Deletions 1 $0 001
Change Order Deletions Page 5 of 7
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
Co # DATE I AMOUNT
3/11 /2021
Total I $0.00 I
CSC No.53594-CO3
FOR_ _ T WORTH. City of Fort Worth
Change Order Request
Project Name 2020 Paving and Sidewalk Improvements Unit Price Construction Contract
Client Project #(s)l Various
City Sec # l 53594
Project Description Unit Price Construction Contract for paving and sidewalk improvements
Contractor The Fain Group Change Order #1 3 1 Datel
City Project Mgr.1 Shweta Rao, RE � City Inspector
Dept
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW
$5,000,000.00
11/1/2021
N/A
Contract Time
Totals (CD)
$5,000,000.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0 00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $6,250,000.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Additional Bid items that were not included in the original unit price contract is needed in order to construct the sidewalk improvements for project CPN 103513
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Company Name Contractor (Name)
The Fain Group, Inc. Larry Frazier F
Date
Nov 22, 2021
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
Nov 22, 2021
Program Manager
Date
Senior Capital Project Officer
Date
t
Nov 22, 2021
'� f
Nov 22, 2021
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
+uren pneur
Nov 22, 2021 -
Y"",.
Nov 22, 2021
Assistant City Attorney
Date
17ssistant City Manager
1 Date
Nov 23, 2021
I s,-jhd7f
Nov 23, 2021
Council Action (if required)
M&C Number I I M&C Date Approved
ATTEST: i ,.� _ � aM
Ronald P. Gonzales, Acting City Secretary
4,vdv�nn��
FORtad
v�°° °off-+dd
_moo
Pv0 o=�
pPAd °° o
°°°°°°°
Y p
nEn bsp�
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Fox_ r�W�oRTx
City of Fort Worth
Change Order Additions
Protect Name 2020 Paving and Sidewalk Improvements Unit Price Construction Contract City Sec # 53594
Client Project # Various I
Contractorl The Fain Group PMI Shweta Rao, P E I Inspectorl N/A
Change Order Submittal # O3 Date 1 11/1/2021 1
ADDITIONS
IIEM
UESCHIPIION
UEPI
Oty
Unit
New
Adjust Existing Illumination Ground Box to Grade
I PVV
U.000UUUUU
EA
New
Remove and Reinstall Illumination Pedestal
TPW
0000000DU
EA
New
Sidewalk Flume
TPW
000000000
EA
New
Pedestrian and Cyclist Eco-Counter, Urban Multi
TPW
0.0000000U
EA
New
2" Turf Reinforcement Mat
TPW
000000000
SY
New
Furnish 10-15 Gallon Red Tip Photinia Shrubs
TPW
O.00OOOOOU
EA
New
Furnish 10-15 Gallon Crepe Myrtle Trees
TPW
0.00000000
EA
New
Furnish Mexican Plum Trees
TPW
0000000DU
EA
e
9999.XXXX 12" DOT Pvmt Marking HAS (W)
TPV
0 UUUUUUUU
LF
New
9999.XXXX 18" SLID Pvmt Marking HAE (Y)
TPW
0000000DU
LF
New
2605 3011 2" CONDT PVC SCH 40 (T)
TPW
000000000
LF
New
321 /.0101 6" SLID Pvmt Marking HAS (W)
TPW
0 UUUUUUUU
LF
New
3211.0102 6" SLID Pvmt Marking HAS (Y)
TPW
0 UUUUUUUU
LF
ew
3217.0103 6" BRK Pvmt Marking HAS (W)
TPW
000000009
LF
New
3217.01046" DOT Pvmt Marking HAS (W)
TPW
OOOOOOOOO
LF
New
3211.0401 18" SLID Pvmt Marking HAE (W)
TPW
0000000OU
LF
New
3231.0212 Smooth Wine Fence, Metal Posts
TPW
U.000UUUUU
LF
New
3441 140/ NO 4Insulated Elec Condr
TPW
0000000OU
LF
New 3441 1408 NO 6Insulated Elec Condr
TPW
000000000
LF
Unit Cost
total
$1,SUU UY
$U.UU1
$4,135 OU
$0 001
$2,100 0660�
$12,820 OU
$0.001
$7 26
$0 001
$300 OU
$0 001
$300 06
$0.001
$800 OU
$0.001
$714
0.0q
$9 54
$0 001
$41 06
$0.001
$2 /U
$0.001
$2 7Y
$0.001
$2.94-�W
$4 80
$0.001
$9 54
$0.001
$75.0Y
$0.001
$8.OU
$0 001
$7 06
M.
TPW $0.00
Sub Total Additions $0.00
Change Order Additions Page 2 of 5
I I LIM
FORTWORTH City of Fort Worth
Change Order Deletions
Protect Name 2020 Pawnq and Sidewalk Improvements Unit Price Construction Contract
Client Project# Various
Contractor The Fain Group PMI Shweta Rao, P E
Change Order Submittal # �J
DELETIONS
UtJI.KIKIIUN UtK1 uty
City Sec# 1 53594
Inspectorl N/A
Date 1 11/1/2021
Unit Unit Lost Iotal
TPW
Sub I otal Ueletions
$0.00
$0.00
Change Order Deletions Page 3 of 5
M/SBE Sub
CO #
MISBE for this Change Order
Type of Service Amount for this CO
Total
Previous Change Orders
DATE AMOUNT
3/11 /2021 $0.00
7/20/2021 $0.00
Total $0.00 1
CSC No. 53594-CO4
FORT WORTH City of Fort Worth
`—/ Change Order Request
Project Namel 2020 Paving and Sidewalk Improvements Unit Price Construction Contract
Client Project #(s)l Various
l City Sec # l 53594
Project Description) Unit Price Construction Contract for paving and sidewalk improvements
Contractorl The Fain Group l Change Order #1 4 1 Date
City Project Mgr.l Shweta Rao, RE l City Inspector)
Enter Department(s) to the Right and
Contract Day Type
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
$5,000,000.00
N/A
Totals
$5,000,000.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $6,250,000.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
(CD)
Additional Bid items that were not included in the original unit price contract is needed in order to construct the sidewalk, paving and railroad improvements for project
CPN C00705, 103278,101863 and 101866. Prices for these line items have been verified and compared to the recent paving contract awarded by the City( CPN 102918
and CPN 102980). Some of the line items for CPN C00705 are unique to the project and hence, the prices provided by the contractor were reviewed by the engineer and
considered fair and reasonable based on current market conditions.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Company Name � Contractor (Name) Contract Signature I Date
The Fain Group, Inc. l Larry Frazier „E „ l Aug 3, 2023 l
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
Aug 3, 2023
Program Manager
Date
S t- j PrQjQ91 Qffiwr
Date
Aug 21, 2023
Aug 23, 2023
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
Aug 29, 2023
A�
Aug 29, 2023
Assistant City Attorney
Date
Assistant City Manager
Date
Aug 30, 2023
Sep 1, 2023
Council Action (if required)7A IL
M&C Number
ATTEST:
�° a A-�-
Jannette Goodall, City Secretary
pd44U4nn
�a
�dF F°°Rtk o
8
PVC �=d
Oaa* o *pd
OaII� dEXA`4oO`
M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Foe_
City of Fort Worth
Change Order Additions
ProjectName 1 2020 Paving and Sidewalk Improvements Unit Price Construction Contract City Sec # 1 53594
Client Project # I Various
Contractorl The Fain Group I PMI Shweta Rao, P.E Inspectorl N/A
Change Order Submittal # ® Date
ADDITIONS
ITEM
DESCRIPTION DEPT
Oty
Unit
Unit Cost Total
11b
Remove Concrete Median
U.0000U001J
SY
$41.3 1
$0.001
716
Remove concrete wall
0.00000000
LF
$53.1.
$0.001
717
Remove Inlet Top
0.00000000
EA
$1,110.2
$0.001
718
Furnish/Install Inlet Top
0.00000000
EA
$3,512.00
$0.001
719
Black Vinyl Coated Galvanized Chain Link Fence
0.00000000
EA
$122.0
$0.001
720
Fumish/Install Tree Well
0.00000000
EA
$250.0 J
$0.001
MT
Remove Plastic Delineators
0.00000000
LF
$4.0(If
$0.0Ul
722
Remove Plastic Nail Down Curb
0.00000000
LF
$10.5�
$0.001
723
Remove 6" Slotted Drain
0.00000000
LF
$25.1 )))�
$0.001
724
8" Doweled -In Concrete Curb
0.00000000
LF
$32.1'
$0.001
725
3" Mountable Doweled -In Concrete Curb
0.00000000
LF
$23.82
$0.U01
726
Yellow Thermo Paint (8" Concrete Curb)
0.00000000
LF
$13.5/" I
$0.001
6" SLID Pvmt Marking HAS (Y)
0.00000000
LF
$211
$0.001
728
6" SLID Pvmt Marking HAS (W)
0.00000000
LF
$2.70I
$0.001
729
6" BRK Pvmt Marking HAS (W)
0.00000000
LF
$2.7
$0.001
730
18" SLD Pvmt Marking HAS (Y)
0.00000000
LF
$9.52
$0.001
731
18" SLID Pvmt Marking HAS f W
0.00000000
LF
$9.5
$0.001
732
Furnish/Install 6" SLD I'vmt Marring HAS (Y)
O.000OO000
LF
$6.201
$0.001
733
Fumishllnstall Monolithic Median Nose
0.00000004
EA
$3,750.00.
$0.001
734
Furnish/Install Integral Colored Concrete Median
0.00000004
SF
$36.00
$0.001
140
FUmISNInsian Menlan Nose valnr (Yellow)
U.UUV000U4
to
AZO.0
$U.UUl
738
Remove Metal Post
0.00000004
EA
$225.0 1
$0.001
�S�
Remove Inlet Top
0.00000004
EA
$2,200.00
740
Remove and Replace Conc Box Culy (12'x5')
O.000OOOOJ
LF
$6,852.0 f
743
Furnish/Install 6.5" Asphalt Pvmt Type B
0.00000004
SY
$116.00
$0.001
744
Fumish/Install 6" Gravel Driveway
0.00000004
SF
$7.25
$0.001
745
Fumishllnstall 3" Conc Curb and Gutter
0.00000004
LF
$35.0 .
$0.001
746
Furnish/Install 8" Conc Curb and Gutter
0.00000004
LF
$38.00
$0.001
747
Furnish/Install Metal Post
0.00000004
EA
$225.0
$0.001
748
Fumish/Install Pipe Gate Fence
0.00000004
LF
$225A 1
$0.001
749
Furnish/Install Black Vinyl Coated Galvanized Chain Link Fence
0.0000000J
EA
$135.0?1
$0.0U1
750
Fumish/Install 18" Corrugated Metal Pipe
0.00000004
LF
195.00J.
0.001
�1-
Tree Protection
0.0000000
EA
:350.OUJ
$0.001
752
Fumish/Install 36" Corrugated Metal Pipe
1
0.00000004
LF
$245.00
$0.001
753
5tarburst Prep (Powerwashmg)
0.00000004
L5
$4,263.0
$U.001
754
Barricades
0.00000004
MO
$10,153.01
$0.001
755
Marking Installation
0.00000004
LS
$13,256.001
$0.001
756
Pavement Marking Material
0.0000000(
LS
$17,596.5f4
$0.001
---(5T-
Surveying
0.00000000
LS
$4,185.0(A
$M
758
Supervision
0.00000000
LS
$3,223.O40
$0.001
759
OH&P
0.00000000
LS
$5,093.4Y
$0.001
Sub Total Additions $0.001
Change Order Additions Page 2 of 5
I I EIN
FORT.1WORTH City of Fort Worth
Change Order Deletions
Project Name 1 2020 Paving and Sidewalk Improvements Unit Price Construction Contract City Sec # 1 53594
Client Project # I Various
Contractor The Fain Group I PMI Shweta Rao, RE I Inspectorl NIA l
Change Order Submittal # ® Date
DELETIONS
UESUKIPI ION UEPI Uty Unit Unit Cost total
I
I
I
I
I
I
I
I
I
Sub Total Deletions $0.001
Change Order Deletions Page 3 of 5
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO # DATE I AMOUNT
11 /3/2021
$0.00
4/18/2022
$0.00
11 /23/2021
$0.00
Total I $0.00 1
SUPPORTING BID TABS FROM RECENTLY OPENED BIDS
BID REM
NO.
5S
3I12.05036"Asphalt Base TypeB
89
3217.0101 6" SLD Pvmt Marking HAS (W)
90
321].0102 6" SLD N.Marking HAS n)
91
321].0103 6" BRK Pvmf Marking HAS (W)
491
01211-1 COLORED TEXTURED CONIC(4")
491
119111 CO NCCURB(MONO)(III,
498
0529600] CONC CU RB&GUTTER (TY I)
499
05296008 CONC CURB &GUTTER(TV II)
519
013110/1 CONC MEDIAN(MONO NOSE)
BID TAB
CPN Various 2022 Traffic Signal and Street Lighting Improvements Unit Price Construction Contract
ENGINEER'S ESTIMATE Bidder 1: EARTC
Bidder 2: Bean Electrical,
Inc.
of
%Difference
%Difference
Description Measure
Rangty
Bid Quantity
Unit Price Bid Value Unit Price Bid Value
from Engineer's
Estimate
Unit
Prim Bid Value
from Engineer's
Estimate
SY
500
1 $
30].00 $ 107.00 1 54.00 1 54.09
-50%
$
151.50 1 1"150
42%
LF
800
1 $
2.75 $ 2.75 $ 5.00 $ 5.00
82%
$
2.35 $ 2.15
-22%
LF
800
1 $
2.]5 $ 2.75 $ 5.00 $ 5.00
82%
$
2.15 $ 2.15
-22%
LF
400
1 $
2.75 $ 2.75 $ 5.00 $ 5.00
82%
$
2.15 $ 2.15
-22%
SY
100
1 $
80 DO $ 80.00 $ 95.00 $ 95.00
19%
$
206.50 $ 206.50
358%
LF
111
1 $
10.00 $ 10.00 $ 7. $ 7.00
-90%
$
87.00 $ 87.00
24%
LF
500
1 $
70.00 $ 70.00 $ 4200.$ 42.00
10%
$
144.00 $. 144.00
106%
OF
500
1 $
78.00 $ 78.00 $ 37.00 $ 37.00
-53%
$
159.00 $ 159.00
104%
SY
100
1 1
400.00 $ 400.00 $ 3,500.00 1 3,500.00
775%
$
477.00 $ 477.00
19%
Base Bid T.MTBems
J� $ 1,777,632.75 $ 2,329,638.00
31%
$ 2,906,489.97
64%
TOTAL
BASE BIDI $ 2,936,297.85 - $ 3,993,497.65
33%
$ 4,620,363.52
57%
01110
2020 Traffic Signal and Street LighUn Improvements Unit Price C... -Rion Contras
SUPPORTING BID TABS FROM RECENTLY OPENED BIDS
rases u<i
City nr Pnrt worth
Transpo-fivn and Public works
Bid Tabnlafions
Advertised
1/26/2023
M/WBE Oval
15%
2022 Boud Year 1-Cvvo-acn
Advertised
2/2/2023
ConsfrvrSivv
430 Calevdar
City Project N'pmber 102918
Pre-Btd Conference
2/7/2023
Days
Days
Bid Opevivg
2/23/2023
Bidder
MaGwdon Construonov FNNConshnanoq LLC Smbile$Wien Nc
loclwon Conslmalwv.LTD
Rryu Orovp. LTD
Bngineer's Est
Address
PD Box 9" 500N C—d"py STE 105 O1-79380
1112 San Valley Dr
152o Parker Road
acheco Ko0
%D�flerence
Burlesoq TX 7.17 Plano, TX 75074 Saginaw, TX 76179
JRoa Worth, TX 76119
C dRai TX75050
Between Low
Average ofl---t
Waavtw: BB- Bid Bond CClashiers Chk Cl'C-Cea Chk
BB BB BB
BB
BE
Bidder and
1lidd-
Addenda Acknowledged
I &2 1 &2 I & 2
1 & 2
1 ffi2
Bngi—e, Esfi-
-,-Manager loco Oroaeo, PE
DescriFnov
Spwificetion Swoon No_
M f
^dry Unit Rice Bid Velva -Once Bid Value Und Pvice
Bid Value Unit 1? Bid Valna
Umt Pnce
Bid Valae
Unn Pdae
Bid Valve
Umt Pnw
Una Price
IBSO.,,
QB
Unit I -
Water Improvements
6i
3349.5005 Remove and Rep lace Inlet Top, S'
32310112 $Chew Lmk, Ste el
334920
333113
EA
LP
5
}SO
$ 5.85000
$ 50.00
S 29,M
$ 12,50000
S 6,50000
$ 110.00
$ 32,50000
$ 27,500D0
S 2,300:00
$ 25:00
S 11,50000
$ 6,250Q0
$ 0,5.0m
$ 65.00
$
$
42;50000
Ib,25000
$ 6.29850
$ n50
$ 41.492.50
$ 19,375.00
S 2,40000 S
$ 20.00 $
IZ,00000
5,00090
$ 5, I75.00
S 5000
39
47
3349.5006 Remove and Rmlauefnlet Top, 10'
334920
EA
1
$ 7,350.00
$ 7,35000
$ 12,500.
$ 12,500B0
$ ll'o AO
$ 11,0000D
$ 10,500.00
$
t0,5d000
1 $ 9Bl—
$ 9,,W400
$ 2,500A0 $
2,50000
$ 9,92500
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: 2020 Paving and Sidewalk Unit Price Contract -Change Order 4
M&C: CPN: N/A CSO: 53594 DOC#: 1
Date: 7/11/2023
To:
Name
Department
Initials
Date Out
1.
Michelle McCullough
TPW - initial
?!
Aug 8, 2023
2.
Larry Frazier, Fain Group Contractor-
Signature
Aug 3, 2023
3.
Shweta Rao, PM
TPW - Signaturer&__
Aug 3, 2023
4.
Chad Allen, PgM
TPW -initial
Aug 21, 2023
5.
Lissette Acevedo, Sr. CPO
TPW -initial
C�v
Aug 23, 2023
6.
Patricia Wadsack, AD
TPW - initialer
Aug 29, 2023
7.
Lauren Prieur, Director
TPW - signature
Aug 29, 2023
8.
Doug Black
Legal - signatured.b
Aug 30, 2023
9.
William Johnson
CMO - signature
/47
w
Sep 1, 2023
10.
Jannette Goodall
CSO - signature
_W
Sep 1, 2023
11.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S
SIGNATURE:
All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed
the routing slip,
David
will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(&FortWorthTexas.�,-ov at ext. 7233 or 8363, for pick up when
completed. Thank you!
CSC No. 53594-CO5
FORT WORTH., City of Fort Worth
\ Change Order Request
Project Namel 2020 Paving and Sidewalk Improvements Unit Price Construction Contract
Client Project #(s)l Various
I City Sec # I 53594
Project Description) Unit Price Construction Contract for paving and sidewalk improvements
Contractorl The Fain Group l Change Order #1 5 1 Datel
City Project Mgr.l Shweta Rao, RE l City Inspectorl
Enter Department(s) to the Right and
Contract Day Type
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
$5,000,000.00
N/A
Totals
$5,000,000.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $6,250,000.00
USTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
(CD)
An additional bid item that was not included in the original unit price contract is needed to construct the bus pad improvements for project CPN 105012. Prices for this line
item have been verified and compared to the recent paving contract awarded by the City for CPN 102918. The prices proposed for this line item are higher than the recently
opened bids due to small quantities of concrete delivery per location; the price is considerable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reoortin¢ reauirements.
Contractor's Company Name
Contractor (Name) Contract Signature
Date
The Fain Group
Larry Frazier „
Dec 8, 2023
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
1--o
Nov 30, 2023
o ram Manager
Date
Senior Capital Project Officer
Date
W ..
Dec 8, 2023
.�Q^
Dec 13, 2023
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
,p GK
Dec 20, 2023
.,A—. L
Dec 20, 2023
rney
Date
Assistant City Manager
Date
Dec 20, 2023 r " LRJ--
Council Action (if required)
M&C Number I I M&C Date Approved
Dec 27, 2023
I
ATTEST: FFO!rTpa
PI. 0.
Ay�do
Jannette Goodall, City Secretary
o
pa°°nPXa 654ga
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
Change Order Additions
Project Name 1 2020 Paving and Sidewalk Improvements Unit Price Construction Contract
Client Project# I Various
City Sec # 1 53594
1
Contractorl The Fain Group PMI Shweta Rao, P.E I Inspectorl NIA
Change Order Submittal # OS Date 1 1
ADDITIONS
ITEM DESCRIPTION DEPT Oty Unit Unit Cost
160 6" Concrete Pad 0 0.00000000 SI• $31.bU
Sub Total Additions
Total I
$0.ou1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
$0,001
Change Order Additions Page 2 of 5
HEW
FOR_ T�TH City of Fort Worth
Change Order Deletions
Project Name 12020 Paving and Sidewalk Improvements Unit Price Construction Contract I City Sec # I 53594
Client Project # I Various I
Contractor The Fain Group I PMI Shweta Rao, RE � Inspectorl NIA
Change Order Submittal # 0 Date I I
DELETIONS
UtSUHINI IUN UEPI Uty Unit Unit lost total
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I I
I I
I I
I I
Sub Total Deletions $O.00I
Change Order Deletions Page 3 of 5
M/SBE for this Change Order
M/SBE Sub I Type of Service I Amount for this CO
Total $0.00 1
Previous Change Orders
CO # I DATE I
AMOUNT
1 11 /3/2021
$0.00
2 4/18/2022
$0.00
3 11 /23/2021
$0.00
4 9/1 /2023
$0.00
Total $0.00 1
FORT WORTH,")
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: 2020 Paving and Sidewalk Unit Price Contract -Change Order
5
M&C: CPN: N/A CSO: 53594 DOC#: 1
Date: 11/17/2023
To:
Name
Department
Initials
Date Out
1.
Michelle McCullough
TPW - initial
�
Dec 5, 2023
2.
Larry Frazier, Fain Group
Contractor
oft—
Dec 8, 2023
3.
Shweta Rao, PM
TPW - Signature
4__
Nov 30, 2023
4.
Chad Allen, PgM
TPW -initial
S�
Dec 8 2023
5.
Lissette Acevedo, Sr. CPO
TPW -initial
C�v
Dec 13, 2023
6.
Patricia Wadsack, AD
TPW - initial
PLW
Dec 20, 2023
7.
Lauren Prieur, Director
TPW - signature
�2
Dec 20, 2023
8.
Doug Black
Legal - signature
dwbwb
Dec 20, 2023
9.
William Johnson
CMO - signature
W1
Dec 27, 2023
10.
Jannette Goodall
CSO - signature
,SGTSGi
Dec 27, 2023
11.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S
SIGNATURE:
All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed
the routing slip,
David
will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: []YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Updated 12.07.2022, mdhm
Return To: TPWContracts(a)FortWorthTexas.aov at ext. 7233 or 8363, for pick up when
completed. Thank you!
Chanee order Purpose Statement:
The purpose of this change order is to add a line item for 6" concrete pads or bus pads to the 2020
Paving and Sidewalk Unit Price contract. This item would be used for the City project number: 105012 to
install bus pads at various locations throughout the City of Fort Worth. This line item was not included in
the original contract.
The construction of these bus pads will be issued as a Task order under this contract and hence, it is
important to execute the change order to add the line item. Not approving this change order will delay