Loading...
HomeMy WebLinkAboutContract 37375-CO2 ., CITY SECRETARY CONTRACT NO.3 1 315 C DATE: 02/24/2009-MERU TRANSPORTATION AND PUBLIC WOWS CHANGE ORDER JUSTIFICATION RECORD AND PROJECT SUMMARY SHEET PROJECT NAME: 2004 CAPITAL IMPROVEMENT PROGRAM YEAR 4-CONTRACT 47 FORBES, GRIGGS, EASTOVER, MILLET CHANGE ORDER W: 2 D.O.E. Ng: 5447 CLIENT PROJECT W c2oow �„ ,700,. Z„20",05„00,,,M INSPECTOR: RICHARD SALAZAR PHONE Ns: (817)223-2261 CITY SECRETARY Ns: 37375 PROJECT MANAGER: LEON WILSON PHONE Ns: (817) 392-8883 COMBINED WATER SEWER T/PW ORIGINAL CONTRACT AMOUNT $ 2,115,582.39 $ 740,885.00 $ 255,131.00 $ 1,119,566.39 EXTRAS TO DATE $ 146,638.00 $ 144,688.00 $ 1,950.00 $ - CREDITS TO DATE $ - $ - $ - $ - ORIGINAL AMOUNT TO DATE $ 2,262,220.39 $ 885,573.00 $ 257,081.00 $ 1,119,566.39 AMOUNT OF PROPOSED CHANGE ORDER $ 24,430.00 $ 11,930.00 $ - $ 12,500.00 REVISED CONTRACT AMOUNT $ 2,286,650.39 $ 897,503.00 $ 257,081.00 $ 1,132,066.39 ORIG. CONTINGENCY FUNDS AVAILABLE FOR CHANGE ORDERS $ 71,344.00 $ 25,000.00 $ 12,757.00 $ 33,587.00 REMAINING FUNDS AVAILABLE FOR THIS CHANGE ORDER $ 44,394.00 $ - $ 10,807.00 $ 33,587.00 ADDITIONAL FUNDING(IF NECESSARY) $ 11,930.00 $ 11,930.00 $ - $ - REASON-S)FOR CHANGE ORDER: During the street excavation on Millet Ave, large rocks and stone, which are unsuitable for stabilization, were encountered. The rock and stone were removed and borrow material was brought in to fill the voids and bring subgrade up to the proper elevation. Also the existing 20"water line at Forbes and Miller had to be lowered to facilitate the tie-in to the new 24"water line. The contractor has requested that an additional 11 working days be added to the contract r IAL RECORD SECRETARY WORTH, TX Dd p Rr_a�� go a a$' 1 0���°�a a ° d RoMd P �ssc cyy sex * o �d �*o°00oo°o°°o d Xpa o Inspector Date Project Mana r Date Dire of naging Dept. Date Manager of C ction Services Date Director of Contractirfg Dept. - Date _ - O • DISTRIaLOON WHITE-FILE CAMRT-CONSTRUCT"SERVICES CITY OF FORT WORTH PROJECT CHANGE ORDER REQUEST OOIDENR00-CONTRACTOR CHANGE ORDER N9 DATE- TPR?5jE-CT N9 2 0212412009 C200-641200-02051000"MIP253.641200-0 8061700"993IP268.s41200.0705170014983 5847 PROJECT DESCRIPTION CITY SEC N2 2004 CAPITAL IMPROVEMENT PROGRAM YEAR 4-CONTRACT 47 FORBES,GRIGGS,EASTOVER,MILLET 37375 WATER SEWER TIPW TOTALS ORIGINAL CONTRACT AMOUNT.................................................................... $ 740,885.00 $ 255,131.00 $ 1,119,566.39 $ 2,115,582.39 EXTRAS TO DATE........................................................................... $ 144,688.00 $ 1,950.00 $ - $ 146,638.00 CREDITSTO DATE.......................................................................... $ - $ - $ - $ - CONTRACT COST TO DATE............................................................................ $ 885,573.00 $ 257,081.00 $ 1,119,566.39 $ 2,262,220.39 AMOUNT OF PROPOSED CHANGE ORDER.................................................. $ 11,930.00 $ - $ 12,500.00 $ 24,430.00 REVISED CONTRACT AMOUNT...................................................................... $ 897,503.00 $ 257,081.00 $ 1,132,066.39 $ 2,286,650.39 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS............................... $ 25,000.00 $ 12,757.00 $ 33,587.00 REMAINING FUNDS AVAILABLE FOR THIS CHANGE ORDER..................... $ - $ 10,807.00 $ 33,587.00 ADDITIONAL FUNDING(IF NECESSARY)....................................................... $ 11,930.00 $ - $ - $ 11,930.00 CHANGE ORDERS TO DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT COST % 8,09 MAX.ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $ 2,644,477.99 ITEM DESCRIPTION-ADDITIONS DEPARTMENT TY UNIT UNIT COST TOTAL 32. (INC.) UNCLASSIFIED STREET EXCAVATION T/PW 1 475.00 CY $ 20.00 $ 9,500.00 40. (ADD.) BORROW MATERIAL T/PW 250.00 CY $ 12.00 $ 3,000.00 38. (ADD.) 20"DI FITTINGS FOR WATERLINE LOWERING WATER 1.60 TN $ 4,500.00 $ 7,200.00 39.113D.) LOWER 20"WATR LINE WATER 1.00 EA $ 4,730.00 $ 4,730.00 WATER $ 11,930.00 SEWER $ - T/PW $ 12,500.00 SUBTOTAL A $ 24,430.00 IN ACCORDANCE WITH THIS CHANGE ORDER THE CONTRACTOR SHALL: It Is understood and agreed that the acceptance or this Charge Order by the Contractor owtsUtutes an accord and satisfaction and Order. represents.Pa mn ti and narhey)for an costs arising out or,or incidental to,the above charge CONTRACTOR'S NAME: C CT (PREIR CON (S _ • DATE: MCCLENDON CONSTRUCTION 3 O A ORIGINAL CONTRACT TIME ADDL_APPROVED TIME TO DATE APPROVED CONTRACT TO DATE ADDITIONAL ME FOR THIS C.O.' 260 WD 20 WD 280 WD 11 WD MANAG T 9E DATE PROJECT MANAGER DATE 3_/0'109 3 - 11-01 I DATE DIRECTOR I CONTRAC 'T. DATE A� ATE /L GER DATE IF IL ACTION RE , DATE APPROVED _ OVED OTHER \V D TIe C D