HomeMy WebLinkAboutContract 63206-A1CSC No. 63206-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 63206
WHEREAS, the City of Fort Worth (CITY) and Baird, Hampton & Brown,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 63206,
(the CONTRACT) which was authorized on the 2nd day of May, 2025 in
the amount of $ 95,000.00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
City of Fort Worth, Citywide Drainage Improvements Design, CPN
100092; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $300,000.00. (See Attached Funding Breakdown Sheet,
Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $395,000.00.
OFFICIAL RECORD
CITY SECRETARY
3 • FT. WORTH, TX
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas Citywide Storm Drain Improvements
Prof Services Agreement Amendment Template CPN 100092
Revision Date: 12/08/2023
Page 1 of 3
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
cp�
Jesica McEachern
Assistant City Manager
DATE: 08/20/25
91
1
uaaL gATTEST: °
�o
/Vl aa� nEaog4p
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
ENGINEER:
Baird, Hampton & Brown
1, mzs 15.1;za cDT7
Austin Baird
Principal I Senior Civil Engineer
DATE: 08/01/25
Lauren Prieur
Director, Transportation and Public Works
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Berton Guidry, Jr.
Project Manager, Stormwater Capital Delivery Division
APPROVED AS TO FORM AND LEGALITY:
Qcdor-
-&, Black (Aug 18, M25180114 CDT(
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 2 of 3
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
M&C No.#: 25-0604
M&C Date: 06/24/2025
Citywide Storm Drain Improvements
CPN 100092
FUNDING BREAKDOWN SHEET
City Secretary No. 63206
Amendment No. 1
Fund Dept ID Account Project
ID
52002 0200431 4330500 100092
52002 0200431 4330500 100092
Total:
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 3 of 3
CF1-
Activity Reference Amount
002830 Original $95,000.00
Contract
002830 Amendment $300,000.00
$395,000.00
Citywide Storm Drain Improvements
CPN 100092
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 06/24/25 M&C FILE NUMBER: M&C 25-0604
LOG NAME: 20SWM BAIRD HAMPTON & BROWN CITYWIDE DRAINAGE IMPROVEMENTS
SUBJECT
(ALL) Authorize Amendment No. 1 to an Engineering Agreement with Baird, Hampton & Brown, Inc. for the Design of the Citywide Drainage
Improvement Project in the Amount of $300,000.00
RECOMMENDATION:
It is recommended that the City Council authorize execution of Amendment No.1 to City Secretary Contract No. 63206 an engineering agreement
with Baird, Hampton & Brown, Inc., in the amount of $300,000.00 for the design of various citywide minor drainage improvement projects.
DISCUSSION:
This Mayor and Council Communication (M&C) will amend the original task -order engineering agreement to provide design services for various
citywide minor drainage improvement projects. These projects may involve storm drain extensions, installing inlets and outfalls, channel
restoration, mitigating drainage deficiencies and local flooding, and other minor drainage improvements. This contract serves as a tool to quickly
respond to small, high -priority drainage improvement design needs throughout the City that are identified by community members or staff.
Due to the need for quick engineering design assistance, on May 2, 2025, Stormwater executed an administrative contract in the amount of
$95,000.00 for these improvements. The revised contract amount after this amendment will be $395,000.00. See the table below for a
breakdown of the original contract and the amendment. The cost of each task order will be based on hours worked and agreed -upon hourly
rates. The sum of the cost of all task orders will be up to $395,000.00. Staff considers the hourly rates fair and reasonable for the size and
complexity of the minor drainage improvement projects.
M&C Action Amount Date
N/A Original CSC $95,000.00 May 2, 2025
(63206)
This M&C Amendment 1 $300,000.00 TBD
In May 2021, the Transportation and Public Works Department (TPW), Stormwater Management Division (SWMD), published a Request for
Qualifications (RFQ) for various engineering consulting services. Forty-five consultants responded to the RFQ for the project design service area
with Statements of Qualifications (SOQ). An evaluation team of three City staff subject matter experts from the Stormwater Management and
Capital Delivery Divisions of TPW scored the SOQs based on company experience, prior projects, workload, and team experience. The City's
Business Equity team also evaluated the SOQs. A pool of twenty-one consultants was selected based upon these scores to be matched with
specific projects. Based on this scoring, Baird, Hampton & Brown, Inc. was selected as the most qualified consultant to perform design services
for this project.
Funding is budgeted in the Drainage Improvement Projects programmable project within the Stormwater Capital Projects Fund for the purpose of
funding various drainage improvement projects, as appropriated. This task order contract will serve current and future capital projects as -needed,
and a funds availability verification will be performed by Transportation & Public Works Contract Compliance Managers prior to task order
assignment.
Business Equity - The Business Equity Division placed a 12.90% business goal on this solicitation/contract. Baird, Hampton, and Brown, Inc., has
agreed to utilize 12.90% business equity subcontractor participation for the scope of work, meeting the City's Business Equity Ordinance. Any
changes in subcontractors will be reviewed by the Business Equity Division.
This project is located in ALL COUNCIL DISTRICTS.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Stormwater Capital
Projects Fund for future identified task order projects related to the Drainage Improvement Projects programmable project to support the approval
of the above recommendation and execution of the engineering agreement. Prior to any expenditure being incurred, the Transportation & Public
Works Department has the responsibility to validate the availability of funds.
Submitted for Citv Manaaer's Office bv: Jesica McEachern 5804
Oriainatina Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Thanaa Maksimos 2485
Expedited
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Amendment for Contract - CSN 63206
M&C: 25-0604 CPN: 100092
Date:
To: Name
1. Berton Guidry - Signature
2 John Austin Baird
abairdna,bhbinc.com
Thanaa Maksimos — Review
3 **Thanaa will be out until August,
Lissette will sign for until her
return
CSO: 63206
Department Initials
TPW as
Consultant
MT
4.
Lissette Acevedo - Review
TPW
5.
Patricia Wadsack
TPW
6.
Lauren Prieur
TPW
7.
Doug Black - Signature
Legal
9.
Jesica McEachern - Signature
CMO
10.
Ronald Gonzales - Review
CSO
11.
Jannette Goodall - Signature
CSO
12.
Allison Tidwell - Review
CSO
�1�
TM
PLW
DOC#:
Date Out
08/04/25
08/01/25
08/13/25
08/14/25
08/15/25
08/15/25
08/18/25
08/20/25
08/20/25
08/20/25
08/21/25
13. TPW—SW—Contracts TPW _SW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: OYES ®No
Return to: tpw sw contracts(iMrtworthtexas.tiov Call 817-229-3283 with questions. Thank you!
am. B
BAIRD, HAMPTON & BROWN
July 24, 2025
Thanaa Maksimos, PE
Stormwater Program Manager
Capital Delivery Division, Transportation and Public Works
City of Fort Worth
100 Fort Worth Trail
Fort Worth, Texas 76102
Re: Request for Contract Amendment 1
Citywide Drainage Improvements Project
CPN 100092, City Secretary No. 63206, M&C #25-0604
DearThanaa,
3801 William D. Tate Ave., Suite 500
Grapevine, Texas 76051
817.251.8550
The overall scope of the above -mentioned project has grown to include additional professional
services for miscellaneous citywide storm drain improvements. The original design contract was for
$95,000, which provided and addressed the immediate need for on -call storm drain design services.
This amendment (#1) is for a $300,000 increase to the original contract amount, and it establishes a
contract term for all work under the original contract. This amendment must be completed on or
before June 5, 2026. All additional services proposed will be performed per the terms of our original
contract dated June 4, 2025.
This amendment, the funding breakdown, and the Mayor and Council Communication, represents
the entire amendment to the original agreement between the City of Fort Worth and Baird, Hampton
& Brown, Inc. If the terms of this Amendment are acceptable, please return an executed copy
authorizing us to proceed.
Summary of Contract Fee for Citywide Drainage Improvements Project
Original Contract Amount $ 95,000
Amendment No. 1 $300.000
Total for Revised Contract Amount $395,000
We appreciate the opportunity to submit this request for amendment.
Sincerely,
Baird, Hampton & Brown
Austin Baird. PE
Principal, Senior Civil Engineer
bhbinc.com
TBPELS Firm #44 110011302