FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 63595
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND PMB TEAM RANCH DEVCO LLC
This FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 63595
("First Amendment") is made and entered into by and between the City of Fort Worth, a home -
rule municipal corporation of the State of Texas ("City"), and PMB Team Ranch Devco LLC, a
Texas limited liability company ("Developer").
WHEREAS, the City and Developer entered into a Community Facilities Agreement for
the construction of public infrastructure Improvements for a project generally described as Aledo
Road Infrastructure, City Project Number 105498 ("CFA"); and
WHEREAS, the Agreement includes City Participation in an amount not to exceed
$2,672,381.40, but inadvertently omitted City participation in the paving improvements; and
WHEREAS, on June 24, 2025, the Fort Worth City Council approved M&C 25-0642
authorizing an amendment to the CFA to increase City Participation in an amount up to
$198,705.33 for the City's share of the paving improvements and associated fees; and
WHEREAS, City and Developer desire to amend the CFA to reflect the additional City
Participation in the CFA; and
NOW THEREFORE, City and Developer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends City Secretary
Contract No. 63595:
1.
The fifth recital of the CFA is amended in its entirety and read as follows:
WHEREAS, the City desires to participate in this Agreement in an amount not to exceed
$2,902,950.92 to enlarge the scope of the Improvements beyond what Developer is responsible for
constructing by oversizing an 8-inch water main to a 16-inch water main and an 8-inch sewer main
to 18-inches, 20-inches, and 27-inches for anticipated future growth located in Southwest Fort
Worth as authorized by City Council through approval of M&C 25-0291 on April 8, 2025 and
M&C 25-0642 on June 24, 2025 ("City Participation"); and
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 63595 Page 1 of 7
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND PMD TEAM RANCH DEVCO LLC
2.
The sixth recital of the CFA is amended in its entirety and read as follows:
WHEREAS, the City Participation includes reimbursement to Developer in amounts not
to exceed $2,379,415.57 for construction costs, $44,785.90 for material testing costs, and
$411,620.14 for design costs. The remaining City Participation in the amount of $67,129.31 shall
not be paid to Developer, but will be used by City to pay for the City's portion of construction
inspection service fees, administrative material testing fees, and water lab testing fees; and
3.
Section 37, subsection (a) of the CFA is amended in its entirety to be and be read as follows:
37.
City Participation; Fiscal Funding Limitation.
(a) The City shall reimburse Developer for 82.1 % of the cost of the oversized 16-inch water
main and 93.3% of the cost of the oversized sewer mains, subject to the adjustments set
forth in subsection (g), in amounts not to exceed $2,379,415.57 for construction costs,
$44,785.90 for material testing costs, and $411,620.14 for design costs. The remaining City
Participation in the amount of $67,129.31 shall not be paid to Developer but will be used
by City to pay for the City's portion of construction inspection service fees, administrative
material testing fees, and water lab testing fees. Developer must register as a vendor of the
City in order for the City Participation to be paid to Developer. The City Participation for
construction costs was calculated as follows:
Bid Summary Developer City Costs Total Costs
Costs
UNIT I: WATER $207,670.61 $952,500.39 $1,160,171.00
IMPROVEMENTS
UNIT II: SEWER $92,406.49 $1,286,794.81 $1,379,201.30
IMPROVEMENTS
UNIT III: PAVING $12,350.44 $171,984.56 $184,335.00
IMPROVEMENTS
UNIT IV: ADJUSTMENT FOR $31,864.19 ($31,864.19) $0.00
PAVING BY TARRANT
COUNTY
Total Construction Bid $344,291.73 $2,379,415.57 $2,723,707.30
9
Section 39 of the CFA is amended in its entirety to be and read as set forth in Exhibit A of
this First Amendment, which is attached hereto and incorporated herein by reference.
5.
a. All other provisions of the CFA, which are not expressly amended herein, shall remain
FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 63595 Page 2 of 7
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND PMD TEAM RANCH DEVCO LLC
in full force and effect.
b. All terms in this First Amendment that are capitalized but not defined shall have the
meanings ascribed to those terms in the CFA.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 63595 Page 3 of 7
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND PMD TEAM RANCH DEVCO LLC
IN TESTIMONY WH REOF, the City and Developer have executed this instrument by
their duly authorized representatives to be effective on the date signed by the City's Assistant City
Manager.
CITY OF FORT WORTH
op*�
Jesica McEachern
Assistant City Manager
Date:
08/10/2025
Recommended by:
)[19me W-0&
Dwayne Hollars
Sr. Contract Compliance Specialist
Development Services
Approved as to Form & Legality:
Richard A. McCracken
Sr. Assistant City Attorney
M&C No. 25-0642
Form 1295: 2025-1305258
FORt�nLp
ATTEST:
pro
o9=do
Jannette S. Goodall
City Secretary
DEVELOPER
PMB Team Ranch Devco LLC
a Texas limited liability company
By: PMB Team Ranch Manager LLC
a Texas limited liability company
TaylorBug 7, 202516:02:25 CDT)
Taylor Baird
Manager
Date: 08/07/2025
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including all
performance and reporting requirements.
jzu�)
Kandice Merrick
Contract Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 63595 Page 4 of 7
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND PMD TEAM RANCH DEVCO LLC
Project Name: Aledo Road Infrastructure
CFA No. 25-0037
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
Exhibit A
39.
Cost Summary Sheet
IPRC No. 24-0059 City Project No.105498
Developer's Cost City's Cost Total Cost
B. TPW Construction
1.a Street Paving
1.b Street Paving - Adjustment for Paving by Tarrant County
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Estimated Construction Fees:
C. Construction Inspection Service Fee
D. Administrative Material Testing Service Fee
E. Material Testing Cost Contingency
F. Water Testing Lab Fee
G. Design Services
Total Estimated Construction Fees:
TOTAL PROJECT COST
Financial Guarantee Options, choose one
Bond = 100%
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Pavinq/Storm Drain = 125%
Letter of Credit = 125%
$ 207,670.61 $ 952,500.39 $ 1,160,171.00
$ 92,406.49 $ 1,286,794.81 $ 1,379,201.30
$ 300,077.10 $ 2,239,295.20 $ 2,539,372.30
$ 12,350.44 $ 171,984.56 $ 184,335.00
$ 31,864.19 $ (31,864.19) $ -
$ 44,214.63 $ 140,120.37 $ 184,335.00
$ 344,291.73 $ 2,379,415.57 $ 2,723,707.30
$ 8,302.50
$
59,197.50
$
67,500.00
$ 1,016.96
$
7,251.04
$
8,268.00
$ -
$
44,785.90
$
44,785.90
$ 95.48
$
680.77
$
776.25
$ 56,599.86
$
411,620.14
$
468,220.00
$ 66,014.80 $ 523,535.35 $ 589,550.15
$ 410,306.53
$ 2,902,950.92 $ 3,313,257.45
Choice
Amount
(Mark one
$ 344,291.73
X
$ 375,096.38
$ 15,438.05
$ 390,534.43
FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 63595 Page 5 of 7
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND PMD TEAM RANCH DEVCO LLC
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 0&24125 M&C FILE 14UMBER: M&C25-0642
LOG NAME; 60ALEDO ROAD IMPRCVEMENTS AMEND M8 C
(CID 3) Authorize Execution of First Amendment to a Comnxmity Facilities. Ag reement with PMB Team Ranch Gevoci LLC, Increasing City
Participation in an Amount Up to $198,705.33 and Authorize a Waiver of the Community Farilibes Agreement Arnendnnent Fee
RECOMMENDATION;
It is, .c,..... 1-.'. J thatthe City Council:
1. Authorize execution of the First Ane€r7dn lent to a Community Facilities Agreement with PMB Team Ranch Devco LLC, increasing City
participation in an amount up to 5198,705.33 for the C FA,41edo Road Stage 1 project (City Project Ne. 105498); and
2. Authorize a waiww of the Community Facilities Agreement t amendment fee.
On April 8, 2025, Mayor and Council Comnxinicaidon "M&C) 25-0291, the City Couneil authorized the e)mT ubon of a Community Facilities
Agreernertt (CFA) with PMB Team Ran ch Devoo LLC. with City partapabon in the amount up to $2,704,245.59 for the Alecto Road project and
appropriated funds for the project. The Mi&C did riot include the Cit r, participation on the paving inprovemerrts_ The Water Departrnent is
requesting to amend the CFA to increase the City& participation in an amount u p to $198,705.33 to the City& share for the paving inpnovennerrty
and associated construction inspection service fees, administrative material testing servicefmes, and water testing lab fees. The Water
Department is also requesting to increase funding for the construction canungency in the amount of $25,797.68 for a total of $W1,691.96_
Tarrant Countys Pred nct 4 agreed to participate in the rehabilitation and resurfacing of a_, _,, :.:7 0.82 miles of the eastern portion of Old
AkAo Road from Fran chto Market Road 2871 going east in connection with this project instead of the Developer performing the work pursuant to
the CFA_ M&C 25-0291 authorized execution of an Intertocal Agreerent between the City and Tanard County by which Tarrant County will provide
at necessary labor and equipment to perform this work, and the City of Fart Worth will pay for the oust of materials and other incidentals in an
an aunt u p to $475,584.96. The Developer agreed to contribute $31,864.19 for their portion of the wok_ In lieu of paying this cost directly to the
City, the Developer has nego&45d an agreement with the Water Departrnent by which the Develcperwill pay $31,864.19 in additional construction
oasts purr,.uanttothe CFA to pay fara portion of the CTtVs participation amount on the project. This,_ y- will be documented In the First
Annendment to the CFA
The folbwing table shoves the cost shining breakdownforthe project between all parties -
Funding for the i nfrastiuctiure I np vwenwrb for public viater and sewer mains Alecto Road project is as depicted below..
A. CorrstTucton
1. Water
2. Sewer
3_ Pawing
G. Adjustment for Pawing by Tarrant Co
Contingency
Inspections & Testing
B. Censtmcdon Inspaetian Fee
C. Admin Material Testirtq Fee
D. Water Lab Fee
E. Materiel Testing Cast CorrbrxMcy
F_ Design Services
TOtal Project Cost
Developer
City Cost
Total Cast
Cost
$207,67t1_61
5952,500-39 $1,16D,171.01
$92,406.4C 1,286,7914.81 $1,379,201.31
$12,350.44
$171,964.56
$184,335.0q
$31,864.7S
-531,864.19
$0.01
SO_D
$361,691.96
$361,691.90
$8,302.5
$59,197.50
$67,500.01
$1,016.9€
$7,251.04
$8,268.0
$95.4E
$160077
S776.2
$0.1)Lr
$44//785.9C
$44 785.9
$56,599.80
$411,fi20.1d
$46Bt60.0
$410,306.5253,264,642.88 $3,674,949.41
City of Fart Worth (93.3%) $443,720.77
PMB Team Rancho DeYD (6.7%)
'A*usted in table above. (RcYw G)
$31,864.19
FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 63595 Page 6 of 7
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND PMD TEAM RANCH DEVCO LLC
IT-w Pawing Improvements #475,5M.96i
FUND Existing ,appropriations :,edition al Project Total'
Appropriations
W&SRev $3,515,725.00 50.00 $3,1-15,725.00
Bonds Series
2022-56020
Waterr-sewer $224,5134.00 $0.00 5224,504.00
Bond 2d16 -
56DD5
Tclal $3,740,229.00 $0.00 $3,740,229.00
* Numbers rounded for pre*entation purposes
Funding is budgeted in t1m V.'aterlsewer Bond 2016 Fund forthe Water Depertrnentforthe purpose of funding the CFA-Weds Road Stage 1
project. as appropriated_
By approval of this M&C, the City Cowl finds that the waiver of the conxnunity facilities agreement arrendment fee serves a publie purpose
because the the City to reintaurse the Developer for the City'.s portion of the pawing costs for the project and the prod is for
the design and construction of public infrastructure that will be owned and maintained by the City. The City Council ftrther finds that adequate
oontractual controls are in place to cams out such public purpose_
This project is is CCUNCIL DISTRICT 3_
FISCAL INFORMAT10N I CERTIFICATION:
The Drectorof Finance certi%es that fund, are currerytly available intheWateriSewer Bond 2D16 fund, as prevlom., y appropriated in the CFA-
AledD Road Stage 1 project to support the approval ofthe above. execution of the agreement. Prior to an expenditure being
incurred, the Water Departrnent has the responsibility of verifying the availability offunds_
5ubmitfed for City Vmnauer s Office by: Jesim McEachern 5804
Oriainatina Business Unit Head; CnrisHarder 5020
Additional :. Contact: SubyVarughese 8009
Melissa Harris L9428
FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 63595 Page 7 of 7
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND PMD TEAM RANCH DEVCO LLC