HomeMy WebLinkAboutOrdinance 27621-05-2025ORDINANCE No. 27621-05-2025
AN ORDINANCE ADOPTING A WATER MAIN
CAPACITY CHARGE PURSUANT TO SECTION 35-90 OF
THE CITY CODE FOR A CITY INITIATED 24-INCH
WESTSIDE III WATER TRANSMISSION MAIN,
LOCATED NEAR MARKUM RANCH RD AND
INTERSTATE HIGHWAY 20; MAKING THIS
ORDINANCE CUMULATIVE OF OTHER ORDINANCES;
REPEALING ALL ORDINANCES IN CONFLICT
HEREWITH; PROVIDING A SAVINGS CLAUSE; AND
PROVIDING AN EFFECTIVE DATE.
WHEREAS, Chapter 35 of the City Code, "Water and Sewers", Article III,
Division 4 entitled "Water Main Capacity Charges" provides for the adoption of Water
Main Capacity charges by City Council to allow for developers and the City to recover cost
incurred from installing water mains and to set forth the method and procedures for
assessing reimbursements from subsequent developers wishing to connect to the offsite
water mains; and
WHEREAS, the City of Fort Worth Water Department is funding the 24-inch
diameter pipe (City Project Number 102689) located near Markum Ranch Rd and Interstate
Highway 20.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF
THE CITY OF FORT WORTH, TEXAS:
SECTION 1.
The City Council finds, in accordance with the Code of the City of Fort Worth as
amended (1986), Chapter 35 "Water and Sewers", Article III, Division 4, Sections 35-87
through 35-93, that the City of Fort Worth has initiated construction of a 24-inch water
transmission main. The City is installing approximately 9,673 linear feet of 24-inch water
main to serve the West Side III water transmission main (City Project 102689).
unconstitutional by the valid judgment or decree of any court of competent jurisdiction,
such unconstitutionality shall not affect any of the remaining phrases, clauses, sentences,
paragraphs and sections of this ordinance, since the same would have been enacted by the
City Council without the incorporation in this ordinance of any such unconstitutional
phrase, clause, sentence, paragraph or section.
SECTION 6.
This ordinance shall be effective upon adoption.
APPROVED AS TO FORM AND LEGALITY:
M. Kevin Anders, II (Jun 3, 202515:02 CDT)
Kevin Anders
Assistant City Attorney
ADOPTED: May 13, 2025
EFFECTIVE: May 13, 202
�J �ATTEPT
-d,�
Jannette S. Goodall
City Secretary
34
P'Y$��fiy�.�
F5 N�Co
IH 99 -� 4•_SR _ = V—'
~�( Ci 1y ti JAVI= i �� CALMDNT G7
�..
f✓'. N
�j
fi'a�'l b 'gyp 3
,�-„$L �OEAAM��
SANTA 8AN1T, CL%1RA t ra
r
} r
�w � MONICA � g-AT
` m s OP'
JH,zD ,. . Y •� h.. f Wi'C! 7^-...-
CAMP n : t u frAi SAN }ACtMTO � a
. Bl]WIE CAMP " I ,:�
A RES14,:. CRV �p AN 3
RLIBY
4 j `ALBFRT K)
K 1
._N CHAPIN Xx! O
DistriCL
ct3
b Ry TESxRA ti \ r'`� o
03
Water Main Capacity
Charge Boundry i F
M
� i ..1.. •� :+^, _ � ! ,....,I�� � � �f „(, * „ 1 I --t-c- ., ry.. _,..DJµ fiF -' •-h
24 Inch WS3�
Water Main
Benbrbak �.
MD-
t" BR_DQKSH . ..
IT
aieizozs Exhibit A FORT WORTH
COPYRIGHT 20'eS CITY OF FORT WOkTN h
UNAUTHORIZED REPRODUCTION IS A VIOIATIOPICFAPPLIC'A13LE LAWS.
THIS DATAISTO BE USED FORA GRAPHICAL REPRESENTATION ONLY, Water Main Capacity Charge
THE ACCURACY IS I40
T TO BE TAKEN I USED AS DPTA. PRODUCED FOR WATER
ENGINEERIN GPU RPOSESORT WORTH
STEREDASSUME NO RS PNSILAND 24_Inch WS3 "
5'URVEYOR. THE CITY OF FORT WORTH ASSUMES NO RE5 PON5781LITY
FOR THE ACCURACY OF SAID DATA
0 1.]50 2.500 5000
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 05/13/25 M&C FILE NUMBER: M&C 25-0429
LOG NAME: 6024IN WSIII WMCC
SUBJECT
(CD 3, CD 7, and ETJ) Adopt Ordinance to Establish and Assess a Water Main Capacity Charge in the Amount of $313,979.95 Per Million
Gallons Per Day for a 24-Inch Westside III Water Transmission Main, Pursuant to Chapter 35, Article III, Division 4 Sections 35-87 through 35-93 of
the City Code
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached ordinance to establish the water main capacity charge for the 24-inch Westside III water transmission main, in
accordance with Chapter 35, Water and Sewers, Article III, Division 4, Sections 35-87 through 35-93 of the City Code; and
2. Establish the boundary area for the water main to allow the Water Department to assess a reimbursement for the City pursuant to Section
35-93(c).
DISCUSSION:
This Mayor and Council Communication (M&C) is to authorize the establishment and assessment of a water main capacity charge for a 24-inch
Westside III water transmission main (City Project 102689, X-27022). The City is installing approximately 9,673 linear feet of 24-inch water main to
serve West Side III and surrounding areas. The qualified costs used to establish this water main capacity charge are outlined below:
City City
Description Project Secretary Total Cost
Number Contract
24-inch WL
102689
57941
$3,488,888.88
Construction
Engineering
102689
54766
$485,286.00'
Costs
............................
Easement
102689
$0.00 1
Costs
Change
102689
57941-
$32,200.84'
Order
C011
Change 102689 57941- $8 40I
Order CO2
24-
inch Cost Per
Net MGD
MGD
i
Order
Change 1102689 5CO3 I 7941- $0.00
Total $4,006,384.12 12.76 i$313,979.95
The water main capacity charge for the 24-inch Westside III water transmission main is $313,979.95 per million gallons per day (MGD) in
accordance with City Code Section 35-92. The water main capacity charge collected will reimburse the City of Fort Worth Water Department.
There is no restriction to the time period for the reimbursement to the City of Fort Worth Water Department.
The boundary area, as shown in Exhibit A, is determined for the purpose of assessment review. The boundary is used as a guideline, not as a
definitive boundary for service area. If a plat meets the definition of "other development' stated in Section 35-88 of the City Code, then the plat will
be assessed the water main capacity charge even though the plat may be located adjacent to, within, and/or outside the boundary area. The
adoption of this charge is in accordance with Chapter 35, Water and Sewers, Article III, Division 4, Water Main Capacity Charges.
The water main capacity charge boundary for City Project No. 102689 is located in Council Districts 3, 7, and ETJ.
A Form 1295 is not required because: This M&C does not request approval of a contract with a business entity.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations and establishment of the charge, funds will be deposited into
the Water & Sewer Fund. The Water Department (and Financial Management Services) is responsible for the collection and deposit of funds due
to the City.
Submitted for Citv Manaaer's Office bv: Jesica McEachern 5804
Oriainatina Business Unit Head: Chris Harder 5020
Matt Kusnir 8219
Additional Information Contact: Makayla Johnson 6529