Loading...
HomeMy WebLinkAboutOrdinance 27621-05-2025ORDINANCE No. 27621-05-2025 AN ORDINANCE ADOPTING A WATER MAIN CAPACITY CHARGE PURSUANT TO SECTION 35-90 OF THE CITY CODE FOR A CITY INITIATED 24-INCH WESTSIDE III WATER TRANSMISSION MAIN, LOCATED NEAR MARKUM RANCH RD AND INTERSTATE HIGHWAY 20; MAKING THIS ORDINANCE CUMULATIVE OF OTHER ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; PROVIDING A SAVINGS CLAUSE; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, Chapter 35 of the City Code, "Water and Sewers", Article III, Division 4 entitled "Water Main Capacity Charges" provides for the adoption of Water Main Capacity charges by City Council to allow for developers and the City to recover cost incurred from installing water mains and to set forth the method and procedures for assessing reimbursements from subsequent developers wishing to connect to the offsite water mains; and WHEREAS, the City of Fort Worth Water Department is funding the 24-inch diameter pipe (City Project Number 102689) located near Markum Ranch Rd and Interstate Highway 20. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. The City Council finds, in accordance with the Code of the City of Fort Worth as amended (1986), Chapter 35 "Water and Sewers", Article III, Division 4, Sections 35-87 through 35-93, that the City of Fort Worth has initiated construction of a 24-inch water transmission main. The City is installing approximately 9,673 linear feet of 24-inch water main to serve the West Side III water transmission main (City Project 102689). unconstitutional by the valid judgment or decree of any court of competent jurisdiction, such unconstitutionality shall not affect any of the remaining phrases, clauses, sentences, paragraphs and sections of this ordinance, since the same would have been enacted by the City Council without the incorporation in this ordinance of any such unconstitutional phrase, clause, sentence, paragraph or section. SECTION 6. This ordinance shall be effective upon adoption. APPROVED AS TO FORM AND LEGALITY: M. Kevin Anders, II (Jun 3, 202515:02 CDT) Kevin Anders Assistant City Attorney ADOPTED: May 13, 2025 EFFECTIVE: May 13, 202 �J �ATTEPT -d,� Jannette S. Goodall City Secretary 34 P'Y$��fiy�.� F5 N�Co IH 99 -� 4•_SR _ = V—' ~�( Ci 1y ti JAVI= i �� CALMDNT G7 �.. f✓'. N �j fi'a�'l b 'gyp 3 ,�-„$L �OEAAM�� SANTA 8AN1T, CL%1RA t ra r } r �w � MONICA � g-AT ` m s OP' JH,zD ,. . Y •� h.. f Wi'C! 7^-...- CAMP n : t u frAi SAN }ACtMTO � a . Bl]WIE CAMP " I ,:� A RES14,:. CRV �p AN 3 RLIBY 4 j `ALBFRT K) K 1 ._N CHAPIN Xx! O DistriCL ct3 b Ry TESxRA ti \ r'`� o 03 Water Main Capacity Charge Boundry i F M � i ..1.. •� :+^, _ � ! ,....,I�� � � �f „(, * „ 1 I --t-c- ., ry.. _,..DJµ fiF -' •-h 24 Inch WS3� Water Main Benbrbak �. MD- t" BR_DQKSH . .. IT aieizozs Exhibit A FORT WORTH COPYRIGHT 20'eS CITY OF FORT WOkTN h UNAUTHORIZED REPRODUCTION IS A VIOIATIOPICFAPPLIC'A13LE LAWS. THIS DATAISTO BE USED FORA GRAPHICAL REPRESENTATION ONLY, Water Main Capacity Charge THE ACCURACY IS I40 T TO BE TAKEN I USED AS DPTA. PRODUCED FOR WATER ENGINEERIN GPU RPOSESORT WORTH STEREDASSUME NO RS PNSILAND 24_Inch WS3 " 5'URVEYOR. THE CITY OF FORT WORTH ASSUMES NO RE5 PON5781LITY FOR THE ACCURACY OF SAID DATA 0 1.]50 2.500 5000 City of Fort Worth, Texas Mayor and Council Communication DATE: 05/13/25 M&C FILE NUMBER: M&C 25-0429 LOG NAME: 6024IN WSIII WMCC SUBJECT (CD 3, CD 7, and ETJ) Adopt Ordinance to Establish and Assess a Water Main Capacity Charge in the Amount of $313,979.95 Per Million Gallons Per Day for a 24-Inch Westside III Water Transmission Main, Pursuant to Chapter 35, Article III, Division 4 Sections 35-87 through 35-93 of the City Code RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached ordinance to establish the water main capacity charge for the 24-inch Westside III water transmission main, in accordance with Chapter 35, Water and Sewers, Article III, Division 4, Sections 35-87 through 35-93 of the City Code; and 2. Establish the boundary area for the water main to allow the Water Department to assess a reimbursement for the City pursuant to Section 35-93(c). DISCUSSION: This Mayor and Council Communication (M&C) is to authorize the establishment and assessment of a water main capacity charge for a 24-inch Westside III water transmission main (City Project 102689, X-27022). The City is installing approximately 9,673 linear feet of 24-inch water main to serve West Side III and surrounding areas. The qualified costs used to establish this water main capacity charge are outlined below: City City Description Project Secretary Total Cost Number Contract 24-inch WL 102689 57941 $3,488,888.88 Construction Engineering 102689 54766 $485,286.00' Costs ............................ Easement 102689 $0.00 1 Costs Change 102689 57941- $32,200.84' Order C011 Change 102689 57941- $8 40I Order CO2 24- inch Cost Per Net MGD MGD i Order Change 1102689 5CO3 I 7941- $0.00 Total $4,006,384.12 12.76 i$313,979.95 The water main capacity charge for the 24-inch Westside III water transmission main is $313,979.95 per million gallons per day (MGD) in accordance with City Code Section 35-92. The water main capacity charge collected will reimburse the City of Fort Worth Water Department. There is no restriction to the time period for the reimbursement to the City of Fort Worth Water Department. The boundary area, as shown in Exhibit A, is determined for the purpose of assessment review. The boundary is used as a guideline, not as a definitive boundary for service area. If a plat meets the definition of "other development' stated in Section 35-88 of the City Code, then the plat will be assessed the water main capacity charge even though the plat may be located adjacent to, within, and/or outside the boundary area. The adoption of this charge is in accordance with Chapter 35, Water and Sewers, Article III, Division 4, Water Main Capacity Charges. The water main capacity charge boundary for City Project No. 102689 is located in Council Districts 3, 7, and ETJ. A Form 1295 is not required because: This M&C does not request approval of a contract with a business entity. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and establishment of the charge, funds will be deposited into the Water & Sewer Fund. The Water Department (and Financial Management Services) is responsible for the collection and deposit of funds due to the City. Submitted for Citv Manaaer's Office bv: Jesica McEachern 5804 Oriainatina Business Unit Head: Chris Harder 5020 Matt Kusnir 8219 Additional Information Contact: Makayla Johnson 6529