Loading...
HomeMy WebLinkAboutContract 63916FORT WORTH. CONTRACT FOR THE CONSTRUCTION OF CSC No. 63916 WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 — WSM-N, PART I City Project No. 103358-1 Mattie Parker Jesus "Jay" Chapa Mayor City Manager Chris Harder Director, Water Department Lauren Prieur Director, Transportation and Public Works Department Prepared for The City of Fort Worth WATER DEPARTMENT February 2025 ............................. . DAVID M. Tn 135193 id Digitally Signed: 02/25/2025 Prepared By: GARVER, LLC F-5713 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORTWORTH. City of Fort Worth Standard Construction Specification Documents Adopted September 2011 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 4 SECTION 00 00 00 TABLE OF CONTENTS Division 00 - General Conditions Last Revised 0005 10 Mayor and Council Communication 07/01/2011 0005 15 Addenda 07/01/2011 0011 13 Invitation to Bidders 02/08/2024 0021 13 Instructions to Bidders 01/17/2024 0035 13 Conflict of Interest Statement 02/24/2020 00 41 00 Bid Form 09/30/2021 00 42 43 Proposal Form Unit Price 01/20/2012 0043 13 Bid Bond 09/11/2017 00 43 37 Vendor Compliance to State Law Nonresident Bidder 06/27/2011 0045 11 Bidder's Prequalifications 08/13/2021 0045 12 Prequalification Statement 09/30/2021 0045 13 Prequalification Application 08/13/2021 00 45 26 Contractor Compliance with Workers' Compensation Law 07/01/2011 00 45 40 Business Equity Goal 06/07/2024 00 52 43 Agreement 3/08/2024 0061 13 Performance Bond 12/08/2023 0061 14 Payment Bond 12/08/2023 0061 19 Maintenance Bond 12/08/2023 00 61 25 Certificate of Insurance 07/01/2011 00 72 00 General Conditions 03/08/2024 00 73 00 Supplementary Conditions 03/08/2024 Division 01 - General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 07/01/2011 01 31 19 Preconstruction Meeting 08/17/2012 01 3120 Project Meetings 07/01/2011 01 32 16 Construction Schedule 10/06/2023 01 3233 Preconstruction Video 07/01/2011 01 3300 Submittals 12/20/2012 01 35 13 Special Project Procedures 03/11/2022 01 45 23 Testing and Inspection Services 03/09/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 03/22/2021 0157 13 Storm Water Pollution Prevention Plan 07/01/2011 0158 13 Temporary Project Signage 07/01/2011 01 60 00 Product Requirements 03/09/2020 01 66 00 Product Storage and Handling Requirements 07/01/2011 01 70 00 Mobilization and Remobilization 11/22/2016 01 71 23 Construction Staking and Survey 02/14/2018 01 74 23 Cleaning 07/01/2011 0177 19 Closeout Requirements 03/22/2021 01 78 23 Operation and Maintenance Data 12/20/2012 01 78 39 Project Record Documents 07/01/2011 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised June 7, 2024 City Project No. 103358-1 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 4 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents Division 02 - Existing Conditions 0241 14 1 Utility Removal/ Abandonment Division 03 - Concrete None Division 26 - Electrical None Division 31 - Earthwork None Division 32 - Exterior Improvements None Division 33 - Utilities 33 04 30 Temporary Water Services 33 12 10 Water Services 1-Inch to 2-Inch Division 34 - Transportation 34 71 13.01 1 Traffic Control Date Modified 01/25/2023 09/22/2023 O1/25/2023 1 01/26/2023 1 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: http://fortworthtexas.gov/tpw/contractors/ or htti)s:Happs.fortworthtexas.2ov/Proi ectResources/ Division 02 - Existing Conditions 0241 13 Selective Site Demolition 0241 14 Utility Removal/Abandonment 0241 15 Paving Removal Last Revised 03/11/2022 12/20/2012 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 03/11/2022 03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical None Division 31 - Earthwork 31 1000 Site Clearing 3123 16 Unclassified Excavation 31 25 00 Erosion and Sediment Control 03/22/2021 O1/28/2013 04/29/2021 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised June 7, 2024 City Project No. 103358-1 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 4 Division 32 - Exterior Improvements 3201 17 Permanent Asphalt Paving Repair 12/20/2012 3201 18 Temporary Asphalt Paving Repair 12/20/2012 32 01 29 Concrete Paving Repair 12/20/2012 32 1123 Flexible Base Courses 12/20/2012 32 1216 Asphalt Paving 06/07/2024 32 13 13 Concrete Paving 06/10/2022 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 12/09/2022 32 1373 Concrete Paving Joint Sealants 12/20/2012 32 1613 Concrete Curb and Gutters and Valley Gutters 12/09/2022 32 1723 Pavement Markings 06/10/2022 32 1725 Curb Address Painting 11/04/2013 3231 13 Chain Fences and Gates 12/20/2012 32 31 26 Wire Fences and Gates 12/20/2012 32 31 29 Wood Fences and Gates 12/20/2012 3291 19 Topsoil Placement and Finishing of Roadways Right -of -Ways 03/11/2022 3292 13 Sodding 05/13/2021 32 93 43 Trees and Shrubs 12/20/2012 Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 09/07/2018 33 01 31 Closed Circuit Television (CCTV) Inspection — Sanitary Sewer 03/11/2022 3303 10 Bypass Pumping of Existing Sewer Systems 12/20/2012 33 04 10 Joint Bonding and Electrical Isolation 12/20/2012 3304 11 Corrosion Control Test Stations 12/20/2012 33 04 12 Magnesium Anode Cathodic Protection System 12/20/2012 33 04 30 Temporary Water Services 07/01/2011 33 04 40 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 04 50 Cleaning of Pipes 03/11/2022 3305 10 Utility Trench Excavation, Embedment, and Backfill 04/02/2021 3305 12 Water Line Lowering 12/20/2012 3305 13 Frame, Cover and Grade Rings 09/09/2022 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 03/11/2022 3305 16 Concrete Water Vaults 12/20/2012 3305 17 Concrete Collars 03/11/2022 33 05 22 Steel Casing Pipe 12/20/2012 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 12/09/2022 33 05 26 Utility Markers/Locators 12/20/2012 33 05 30 Location of Existing Utilities 12/20/2012 33 1105 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/09/2022 33 11 11 Ductile Iron Fittings 09/20/2017 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 09/09/2022 33 11 13 Concrete Pressure Pipe, Bar -Wrapped, Steel Cylinder Type 12/20/2012 33 11 14 Buried Steel Pipe and Fittings 12/20/2012 33 12 10 Water Services 1-inch to 2-inch 02/14/2017 33 12 11 Large Water Meters 12/20/2012 33 1220 Resilient Seated Gate Valve 05/06/2015 33 1225 Connection to Existing Water Mains 02/06/2013 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised June 7, 2024 City Project No. 103358-1 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 4 33 1230 Combination Air Valve Assemblies for Potable Water Systems 33 1240 Fire Hydrants 33 1250 Water Sample Stations 33 1260 Standard Blow -off Valve Assembly 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 33 3150 Sanitary Sewer Service Connections and Service Line 3339 10 Cast -in -Place Concrete Manholes 33 39 20 Precast Concrete Manholes 33 39 60 Liners for Sanitary Sewer Structures 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 33 49 20 Curb and Drop Inlets Division 34 - Transportation 3471 13 1 Traffic Control Appendix GC-4.02 Subsurface and Physical Conditions GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GR-01 60 00 Product Requirements END OF SECTION 12/20/2012 01 /03/2014 12/20/2012 06/ 19/2013 09/09/2022 04/26/2013 12/20/2012 12/20/2012 04/29/2021 07/01 /2011 03/11/2022 1 03/22/2021 1 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised June 7, 2024 City Project No. 103358-1 FORTWORTH. City of Fort Worth Division 00 - General Conditions 05/10/2023 City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, August 12, 2025 LOG NAME: 60WSSC19WSMNPI-WOODY SUBJECT: REFERENCE NO.: **M&C 25-0727 (CD 9 and CD 11) Authorize Execution of a Contract with Woody Contractors, Inc., in the Amount of $6,807,311.50, for Water and Sanitary Sewer Replacement Contract 2019, WSM-N Project Part 1, and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2025-2029 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of a contract with Woody Contractors, Inc., in the amount of $6,807,311.50 for Water and Sanitary Sewer Replacement Contract 2019 WSM-N project Part 1; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $7,619,355.00, transferred from available PayGo funds within the Water and Sewer Fund, for the purpose of funding the Water and Sanitary Sewer Replacement's Contract 2019 WSM-N project Part 1 (City Project No. 103358) and to effect a portion of Water's contribution to the Fiscal Years 2025-2029 Capital Improvement Program. DISCUSSION: This Mayor & Council Communication (M&C) is to authorize execution of a construction contract with Woody Contractors, Inc., in the amount of $6,807,311.50 for the replacement of cast iron water and deteriorated sanitary sewer mains as indicated on the following streets and easements: Street From To Scope of Work W. Hammond East dead end at Street College Avenue Union Pacific Water/Sewer Railroad May Street W Hammond W Felix Street Water Street W. Spurgeon East dead end at Street Hemphill Street Union Pacific Water Railroad E. Waggoman I. H 35 North East dead end at Street Bound Frontage Union Pacific Water/Sewer Road Railroad W. Boyce East dead end at Avenue Hemphill Street Union Pacific Water Railroad W. Felix Street Hemphill Street 100 feet East of Water May Street Additionally, asphalt pavement rehabilitation will be conducted on all the roadways curb to curb subsequent to the water and sanitary sewer main replacement. The project was advertised for bids on February 26, 2025 and March 3, 2025, in the Fort Worth Star - Telegram. On April 24, 2025, the following bids were received: Bidder Amount Time of Completion Woody Contractors, Inc. $6,807,311.50 54 s Calendar �Day William J. Schultz, Inc. dba Circle C Construction Company, Inc. $6,993,208.90 Jackson Construction Ltd 1$7,917,460.30�1 Western Municipal Construction of Texas, LLC $8,179,560.24 In addition to the contract amount, $493,840.50 (Water: $421,874.50; Sewer: $71,966.00) is required for project management, material testing and inspection, and $318,203.00 (Water: $241,685.00; Sewer: $76,518.00) is provided for project contingencies. The sanitary sewer component of this project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. Approximately 5,135 linear feet of cast iron water and 840 feet of sanitary sewer pipe will be removed and replaced as part of this project. This project will have no impact on the Water Department's operating budget when completed. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY), instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2025-2029 Capital Improvement Program. Funding is available in the Transfer to Water/Sewer account of the Water and Sewer operating budget for the purpose of funding the Contract 2019 WSM-N project. FY2025 — Water PayGo Appropriations per City Ordinance 27107-09-2024 FY2025 Amended FY2025 PayGo Original (includes any Adopted council actions PayGo subsequent to budget adoption) YTD PayGo Approved for / Moved to Capital Projects This M&C FY2025 Remaining PayGo Balance $92,597,771.00�1$151,458,196.001($77,342,050.00)11($7,619,355.00)�1$66,496,791.00� Appropriations for the Contract 2019 WSM-N project as are depicted below: Fund Existing Additional project Total* Appropriations Appropriations W&S Capital Projects Fund $696,600.00 $7,619,355.00 $8,315,955.00 56002 Project Total 'I $696,600.00�1 $7,619,355.00�1$8,315,955.00 *Numbers rounded for presentation purposes. The project is located in COUNCIL DISTRICTS 9 and 11. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Water & Sewer Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the Contract 2019 WSM-N project to support the above recommendations and execution of the contract. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs).: TO Fund Department Account Project ProgramActivity Budget Reference # Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project ProgramActivity Budget Reference # Amount ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for Citv Manaaer's Office bv: Jesica McEachern (5804) Originating Department Head: Additional Information Contact: Chris Harder (5020) Preeti KC (5467) ATTACHMENTS 1. 1295 FORM.pdf (CFW Internal) 2. 25-0105 (103358-1 CON ITB Water and Sanitary Sewer replacement Contract 2019 WSM-N)-CC.pdf (CFW Internal) 3. 60 WSSC19WSMNPI-WOODY - ORD.APP A025(r2) - REVISED.docx (Public) 4.60WSSC19WSMNP1-WOODY R.pdf (Public) 5. 60WSSC19WSMNPI-WOODY FID Table (WCF 06.11.25).xlsx (CFW Internal) 6. 60WSSC19WSMNPI-WOODY funds avail.docx (CFW Internal) 7. PBS CPN 103358.pdf (CFW Internal) 60WSSC19WSMNPI-WOODY FID Table 2 56002 0600430 103358 2025 $6,705,689.00 2 56002 0700430 4956001 103358 2025 $913,666.00 2 56002 0700430 103358 2025 $913,666.00 2 56001 0609010 5956001 $6,705,689.00 2 56002 0600430 4956001 103358 001780 9999 ($6,705,689.00) 2 56001 0709020 15956001 $913,666.00 2 56002 0700430 4956001 103358 001780 9999 (5913.666.00) 2 56002 0600430 4956001 103358 001780 9999 ($6,705,689.00) 2 56002 0600430 5110101 103358 001780 I 9999 $62,838.00 Water Staff Costs 2 56002 0600430 5550102 103358 001780 I 9999 $4,000.00 Public Outreach 1 56002 0600430 5740010 103358 001780 I 9999 $6,042,129.50 Pay to Contractor for Water 2 56002 0600430 5740010 103358 001780 I 9999 $241,685.00 Contract Contingency 2 56002 0600430 5330500 103358 001784 I 9999 $81,690.00 Soil Lab Consultant 2 56002 0600430 5310350 103358 001784 I 9999 $21,993.00 Soil Lab TPW Staff Cost 2 56002 0600430 5310350 103358 001785 I 9999 $251,353.00 TPW Inspection Staff 56002 0600430 I $0.50 Rounding 2 56002 0700430 4956001 103358 001780 I 9999 ($913,666.00) 2 56002 0700430 5110101 103358 001780 I 9999 $11,363.00 Water Staff Costs 1 56002 0700430 5740010 103358 001780 I 9999 $765,182.00 Pay to Contractor for Sewer 2 56002 0700430 5740010 103358 001780 I 9999 $76,518.00 Contract Contingency 2 56002 0700430 5330500 103358 001784 I 9999 $11,784.00 Soil Lab Consultant 2 56002 0700430 5310350 103358 001784 I 9999 $6,734.00 Soil Lab TPW Staff Cost 2 56002 0700430 5110101 103358 001785 I 9999 $42,085.00 Water Inspection Staff 56002 2060000 103358 RETAIN Retainage FID 56002 0700430 Rounding 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0005 10-1 MAYOR AND COUNCIL COMMUNICATION (M&C) Page 1 of 1 SECTION 00 05 10 MAYOR AND COUNCIL COMMUNICATION (M&C) END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 ADDENDUM NO. 1 CITY OF FORT WORTH WATER DEPARTMENT WATER AND SANITARY SEWER REPLACMENTS CONTRACT 2019-WSM-NN, PART-1 City Project No. 103358-1 Addendum No. 1 Issue Date: March 13, 2025 Bid Opening Date: March 27, 2025 This addendum forms part of the contract documents referenced above and modifies the original Contract Documents. Acknowledge receipt of this addendum by signing and attaching it to the Contract Documents (inside). Note receipt of the Addendum in the Bid Proposal and on the outer envelope of your bid. I IU II : 1V 1. An updated bid workbook excel file with editable cells (unit price only) will be available in the Project's Bonfire Folder. 2. Pre -bid meeting date has been changed to March 17th to 10:00AM. Link to the meeting has been uploaded in Bonfire. PLANS 1. Sheet 2 of 51 has been revised. Updated sheet attached. 2. Sheet 12 of 51 has been revised. Updated sheet attached. 3. Sheet 13 of 51 has been revised. Updated sheet attached. 4. Sheet 14 of 51 has been revised. Updated sheet attached. 5. Sheet 15 of 51 has been revised. Updated sheet attached. 6. Sheet 16 of 51 has been revised. Updated sheet attached. 7. Sheet 18 of 51 has been revised. Updated sheet attached. 8. Sheet 19 of 51 has been revised. Updated sheet attached. 9. Sheet 20 of 51 has been revised. Updated sheet attached. 10. Sheet 21 of 51 has been revised. Updated sheet attached. 11. Sheet 22 of 51 has been revised. Updated sheet attached. 12. Sheet 23 of 51 has been revised. Updated sheet attached. 13. Sheet 24 of 51 has been revised. Updated sheet attached. 14. Sheet 25 of 51 has been revised. Updated sheet attached. SPECIFICATIONS 1. Specification 00 42 43 —Proposal Form- Bid Proposal form has been revised in entirety. ADDENDUM NO. 1 ADDENDUM NO. 1 CONTRACTOR OUESTIONS 1. AIS Requirement - Does this project have a Domestic requirement when it comes to Iron and steel pipe? o Answer: No 2. Pipe Wall Thickness - 33 11 14/ 2.2.C.4.a — request that minimum pipe wall steel thickness shall be greater of 0.1875", or D/240 o Answer: Yes, please refer to the updated specification 33 1114 attached to this Addendum. 3. Pipe Wall Thickness Carrier - 33 11 14/ 2.2.C.4.d — request that minimum pipe wall steel thickness shall be greater of 0.250", or D/144. o Answer: Casing or tunneling pipe is not needed for this project. 4. Cement Mortar - 33 11 14/ 2.2.B 11 - request ASTM C595 Type IL cement allowed in lieu of ASTM C150 11, in accordance with the latest addendwn to AWWA C205. o Answer: Please refer to the updated specification 33 1114 attached to this Addendum. 5. Pipeline Coating - Reference specification 33 11 14, Part 2.2.B.2.a.1.k.2: Please allow DurashieId 110 as a substitute for Durashield 210 as manufactured by Lifelast, Inc. o Answer: Please refer to the updated specification 33 1114 attached to this Addendum. 6. Steel/PCCP Connection - On previous experience, connecting Steel with PCCP with the proposed solution makes the Carnegie joints to sag with a result to weld up the joints. Can we propose a Built Up connection instead of the Carnegie joints? o Answer: Contractor is responsible for field verifying the existing pipe material prior to ordering materials. A submittal shall be provided with the appropriate connection per the material identified in the field. 7. Estimate - Is an estimate cost available? o Answer: Ranges from $8.25 million to $8.75 million. 8. Prebid Meeting - How do we attend the prebid meeting? o Answer: Pre -bid meeting date has been changed to March 17th to 10: 00AM. Link to the meeting has been uploaded in Bonfire. ADDENDUM NO. I ADDENDUM NO. 1 All other terms and conditions remain unchanged. TONY SHOLOLA, P.E. ASSISTANT DIRECTOR, WATER DEPARTMENT By the signature affixed below, Addendum No. 1 is hereby incorporated into and made part of the above referenced Invitation to Bid. COMPANY NAME: o^ArGi4ofs. iylC SIGNATURE: NOTE: Company name an ignature ,ast e the same as on the original bid documents. Failure to return this form with your sealed bid may constitute grounds for rejection of your offer. ADDENDUM NO. 1 ADDENDUM NO.2 CITY OF FORT WORTH WATER DEPARTMENT WATER AND SANITARY SEWER REPLACMENTS CONTRACT 2019-WSM-N, PART-1 City Project No. 103358-1 Addendum No. 2 Issue Date: March 25, 2025 Addendum No. 1 Issue Date: March 13, 2025 Bid Opening Date: April 03, 2025 This addendum forms part of the contract documents referenced above and modifies the original Contract Documents. Acknowledge receipt of this addendum by signing and attaching it to the Contract Documents (inside). Note receipt of the Addendum in the Bid Proposal and on the outer envelope of your bid. INFORMATION 1. Bid opening date has been changed to April 3`d at 2:00 pm. All other terms and conditions remain unchanged. %p17_ ��P,B�d� 03/25/2025 TONY SHOLOLA, P.E. ASSISTANT DIRECTOR, WATER DEPARTMENT By the signature affixed below, Addendum Na. 2 is hereby incorporated into and made part of the above referenced Invitation to Bid. COMPANYNAME: 006U, Con+-rOLC'+0,��lrr�• SIGNATURE: NOTE: Company name and signature must be the same as on the original bid documents. Failure to return this form with your sealed bid may constitute grounds for rejection of your offer. ADDENDUM NO.2 ADDENDUM NO.3 CITY OF FORT WORTH WATER DEPARTMENT WATER AND SANITARY SEWER REPLACMENTS CONTRACT 2019-WSM-N, PART-1 City Project No.103358-1 Addendum No. 3 Issue Date: March 31, 2025 Addendum No. 2 Issue Date: March 25, 2025 Addendum No. 1 Issue Date: March 13, 2025 Bid Opening Date: April 17, 2025 This addendum forms part of the contract documents referenced above and modifies the original Contract Documents. Acknowledge receipt of this addendum by signing and attaching it to the Contract Documents (inside). Note receipt of the Addendum in the Bid Proposal and on the outer envelope of your bid. 1. Bid opening date has been changed to April 17th at 2:00 pm. All other terms and conditions remain unchanged. 03/31 /2025 TONY SHOLOLA, P.E. ASSISTANT DIRECTOR, WATER DEPARTMENT .■■■■■.;■ .■�����■■■■■■■a■■■■■■■■■■■■■a■■■■■■■■■■■a■■■■■■■■■■■■■■■......■■■Nora. By the signature affixed below, Addendum No. 1 is hereby incorporated into and made part of the above referenced Imitation to Bid. COMPANY NAME: �lksignature 'orn- r#'C�•rS tht . SIGNATURE: NOTE: Company name aust bethe same as on the original bid documents. Failure to return this form with your sealed bid may constitute grounds for rejection of your offer. I_\ 1111 DQI 11Ill Y11111041w, ADDENDUM NO.4 CITY OF FORT WORTH WATER DEPARTMENT WATER AND SANITARY SEWER REPLACMENTS CONTRACT 2019-WSM-N, PART-1 City Project No.103358-1 Addendum No. 4 Issue Date: April 14, 2025 Addendum No. 3 Issue Date: March 31, 2025 Addendum No. 2 Issue Date: March 25, 2025 Addendum No. 1 Issue Date: March 13, 2025 Bid Opening Date: April 17, 2025 This addendum forms part of the contract documents referenced above and modifies the original Contract Documents. Acknowledge receipt of this addendumn by signing and attaching it to the Contract Documents (inside). Note receipt of the Addendum in the Bid Proposal and on the outer envelope of your bid. INFORMATION 1. An updated bid workbook excel file with editable cells (unit price only) will be available in the Project's Bonfire Folder. PLANS 1. Sheet 10 of 51 has been revised. Updated sheet attached. 2. Sheet 11 of 51 has been revised. Updated sheet attached. 3. Sheet 12 of 51 has been revised. Updated sheet attached. 4. Sheet 13 of 51 has been revised. Updated sheet attached. 5. Sheet 14 of 51 has been revised. Updated sheet attached. 6. Sheet 15 of 51 has been revised. Updated sheet attached. 7. Sheet 16 of 51 has been revised. Updated sheet attached. 8. Sheet 18 of 51 has been revised. Updated sheet attached. 9. Sheet 19 of 51 has been revised. Updated sheet attached. 10. Sheet 20 of 51 has been revised. Updated sheet attached. 11. Sheet 21 of 51 has been revised. Updated sheet attached. 12. Sheet 22 of 51 has been revised. Updated sheet attached. 13. Sheet 23 of 51 has been revised. Updated sheet attached. 14. Sheet 24 of 51 has been revised. Updated sheet attached. 15. Sheet 25 of 51 has been revised. Updated sheet attached. 16. Sheet 27 of 51 has been revised. Updated sheet attached. 17. Sheet 28 of 51 has been revised. Updated sheet attached. ADDENDUM NO. 4 ADDENDUM NO.4 SPECIFICATIONS 1. Specification 00 42 43 — Proposal Form- Bid Proposal form has been revised in entirety. CONTRACTOR OUESTIONS 1. Could you please confirm the working pressure of the 24" Pipe? o Answer: Working pressure shall be 150 psi as indicated in Section 33 1114. 2. Based on the coordinates and stations on the plan and profile sheets 24 and 25 of 51, there appears to be an 80-foot bust between the start and the first horizontal elbow. Also request locations in the plan view for the last two horizontal elbows o Answer: See revised plan set in Addendum No. 4 3. The 80 foot drawing bust (station to coordinates) equates to a 20 foot bust on the bid schedule. The bid schedule calls for 1,240 feet of 24" Water Pipe, The drawings indicate 1,260 feet of 24" Water Pipe o Answer: Plans and bid form have been revised The contractor shall provide bid per revised bid form. See Addendum No. 4 4. There are two fire lines on the project and we need direction on how the city wants to maintain service to those lines. One is on sheet 18 and the other is on sheet 23. o Answer: At least one fire line shall remain in service at all time during construction. Refer to Construction Note No.9 for construction sequencing. See revised plan set in Addendum No. 4 5. We need a prebid total for bid item 32- Utility adjustments o This Bid Item has been updated to a Lump Sum, refer to Bid Item 95. See revised bid form in Addendum No. 4 6. We need a bid item for the cathodic protection design. o Refer to Bid Item 33 and Bid Item 34. See revised bid form in Addendum No. 4 7. We need a bid item for I" private water service o See revised bid form in Addendum No. 4 8. We need bid items for imported embedment / backfill for this project.. Imported embedment / backfill, CSS- 50 CY, Imported embedment / backfill, CLSM- 50 CY, Imported embedment / backfill, Select Fill- 500 CY o Refer to Bid Item 71, Bid Item 72 and Bid Item 73. See revised bid form in Addendum No. 4 9, West Felix is a concrete street with an asphalt overlay so we should be doing concrete pavement repair with a 2" mill & overlay. The plaits call for 4' wide permanent asphalt, residential. Don't delete the 4' wide permanent asphalt item because we will need it in other locations, just reduce the quantity to 50 LF. Also, reduce the quantity for asphalt pavement repair beyond defined width to 20 SY. o This Bid Item has been updated, refer to Bid Item 39. See revised bid form in Addendum No. 4. 10. 112 of May Street will need to be rebuilt, it will need to be stabilised, and machine paved. The driveways on that half will also need to be rebuilt because they will have to be removed in order to run the paving machine. Here are the items and quantities we'll need for the concrete paving: Hydrated Lime (40 lbs /SY)- 50 Tons, 6°Lime Treatment-1970 SY, 7" concrete pavement- 1850 SY ADDENDUM NO.4 ADDENDUM NO.4 o See revised bid farm in Addendum No. 4 11. The quantityfor concrete pvmt repair, residential needs to be reduced to 1160 SY. This item is for the concrete pavement hand pours and the concrete trench repair on W. Felix (705'x 5). o Answer. Plans and bid form have been revised, refer to Bid Item 38 and Bid Item 40. The contractor shall provide bid per revised bid form. See Addendum No. 4 12. We need a pay item for Rem Cone PVMT for 1850 SY o See revised bid form in Addendum No. 4 13. We need an item in the water section for - 4"-12" connect 15 EA and a 24" connect 2 EA, Also, Item 68 in water section and item 31 in sewer section MH Adj With Cone Collar needs to be clarified if it's a Major Adj or a Minor Adj o See revised hid form in Addendum No. 4 14. Pouring the street back with a paving machine will require removing and replacing portions of approximately seven driveway approaches and the sidewalk located at back of curb from Felix street to the north. What items will this work be covered under? o Refer to Bid Item 46, Bid Item 47 and Bid Item 48. See revised bid form in Addendum No. 4 15. In the water section you have the Traffic control Item @ 1 MO. In the Sewer section you have the Traffic Control item @ 1 IS and you do not have a traffic control item in the paving section. Yall need to have 18 Months of TrajJc control split into the 3 sections. Paid for by the month. o Updated quantity for Unit I is 10 months, refer to Bid Item 92. Updated quantityfar Unit II is 2 months, refer to Bid Item 17. See revised bid form in Addendum No. 4. 16. Sheet 25 Approx station 10+00 (Contractor shall coordinate with powerprovider to relocate power pole) typically this is handled through the Franchise utilities and the Cities franchise coordinator and done prior to the project starting please to confirm if this is on the contractor to handle? o Answer, Contractor shall coordinate any needed relocation or protection of the utilities with the utility owner. All work associated with coordination for the relocation or protection of the power pole is considered subsidiary to the various item bid. 17. I may be missing something, but 1 am seeing for cathodic protection the Isolation at the two tie-in locations and a test station at each. 1 do not see an indication of Cathodic protection being installed on the new section of 24 ". If there is, we needed to be either provided a design or given bid items for the cathodic protection design. o Refer to Bid Item 33 and Bid Item 34. See revised bid form in Addendum No. 4 18. No bid Items for the following: 24" (Restrained joint) with CSS Backfll — 60 LF, 12 " PVC Water with CSS Backfill — 30 IF, Connect to Existing 4 "-12 " - 9 Each, Connect to Existing 24 " Water — 2 Each o Refer to Bid Item 2a-2e, Bid Item 5, Bid Item 18, and Bid Item 19, respectively. See revised bid form in Addendum No. 4 19. Please provide a separate bid item as well as required detail for 10" Temporary water line and if it is supposed to be above ground or buried as called out on note 3 sheet 24. o Contractor shall maintain at least one fire line in service at all time during construction. No temporary waterline greater than 2" is required. Refer to Construction Note No.9 for construction sequencing. See revised plan set in Addendum No. 4 ADDENDUM NO. 4 ADDENDUM NO.4 20. Please remove the decimal points from the below bid items as they add differently, and the spreadsheetprints with no decimal place. o See revised bid farm in Addendum No. 4 21. Need bid item for paving repair on West Felix. This is a Concrete street with Asphalt overlay and the reason it is a 2 " Mill and overlay. The paving repair is typically Permanent paving repair with asphalt overlay and then after it would be milled an over-layed, but it would not be permanent asphalt paving repair as the base layers are different materials. o Answer: This Bid Item has been updated, refer to Bid Item 39. See revised plan set in Addendum No. 4 22. Item 10 in the water section should read as 24" GV with vault. o This Bid Item has been updated, refer to Bid Item 12. See revised bid form in Addendum No. 4 23. Item 21, 3" water meter and vault - there is already a fairly new meter and vault out there are you wanting to replace that or tie into it. o The 3"meter and vault shall be replaced as it doesn't meet current standard. 24. In the sewer section Item 27 asphalt beyond width should be deleted because there is no 4' wide asphalt pvmt repair in the sewer section. o Bid Item has been removed. See revised bid form in Addendum No. 4 ADDENDUM NO. 4 ADDENDUM NO.4 All other terms and conditions remain unchanged. 04/14/2025 47 TONY SHOLOLA, P.E. ASSISTANT DIRECTOR, WATER DEPARTMENT s s s ■ i a ■ a : ■ l k 1 i ....................... By the signature affixed below, Addendum No. 1 is hereby incorporated into and made part of the above referenced Invitation to Bid. COMPANY NAME: 4asign C4o�S flC SIGNATURE: NOTE: Company name the same as on the original bid documents. Failure to return this form with your sealed bid may constitute grounds for rejection of your offer. ADDENDUM NO. 4 ADDENDUM NO.5 CITY OF FORT WORTH WATER DEPARTMENT WATER AND SANITARY SEWER REPLACMENTS CONTRACT 2019-WSM-N, PART-1 City Project No. 103358-1 Addendum No. 5 Issue Date: April 17, 2025 Addendum No. 4 Issue Date: April 14, 2025 Addendum No. 3 Issue Date: March 31, 2025 Addendum No. 2 Issue Date: March 25, 2025 Addendum No. 1 Issue Date: March 13, 2025 Bid Opening Date: April 24, 2025 This addendum forms part of the contract documents referenced above and modifies the original Contract Documents. Acknowledge receipt of this addendum by signing and attaching it to the Contract Documents (inside). Note receipt of the Addendum in the Bid Proposal and on the outer envelope of your bid. INFORMATION 1. Bidders are hereby informed that the bid opening date has been changed to April 24th at 2:00 pm. All other terms and conditions remain unchanged. TONY SHOLOLA, P.E. ASSISTANT DIRECTOR, WATER DEPARTMENT By the signature affixed below, Addendum No. 5 is hereby incorporated into and made part of the above referenced Invitation to Bid. 1 COMPANY NAME: YV O04 �?T/A/i�n f L SIGNATURE: NOTE: Company name and signature must be the same as on the original bid documents. Failure to return this form with your sealed bid may constitute grounds for rejection of your offer. • ! 1 rill 1 ► • i ADDENDUM NO. 6 CITY OF FORT WORTH WATER DEPARTMENT WATER AND SANITARY SEWER REPLACMENTS CONTRACT 2019-WSM-N, PART-1 City Project No. 103358-1 Addendum No. 6 Issue Date: April 22, 2025 Addendum No. 5 Issue Date: April 17, 2025 Addendum No. 4 Issue Date: April 14, 2025 Addendum No. 3 Issue Date: March 31, 2025 Addendum No. 2 Issue Date: March 25, 2025 Addendum No. 1 Issue Date: March 13, 2025 Bid Opening Date: April 24, 2025 This addendum forms part of the contract documents referenced above and modifies the original Contract Documents. Acknowledge receipt of this addendum by signing and attaching it to the Contract Documents. (inside). Note receipt of the Addendum in the Bid Proposal and on the outer envelope of your bid. INFORMATION 1. An updated bid workbook excel file with editable cells (unit price only) will be available in the Project's Bonfire Folder. �PECiFiCATION� 1. Specification 00 42 43 — Proposal Form- Bid Proposal form has been revised in its entirety. All other terms and conditions remain unchanged. 1&.gl �S&4& 04/22/2025 TONY SHOLOLA, P.E. ASSISTANT DIRECTOR, WATER DEPARTMENT By the signature affixed below, Addendum No. 6 is hereby incorporated into and made part of the above referenced Invitation toy� Bid. II I COMPANY NAME: b✓GM� �arF 014-- -4---�-�'7 SIGNATURE: �V_a_r_Ld���nature NOTE: Company nt be the same as on the original bid documents. Failure to return this form with your sealed bid may constitute grounds for rejection of your offer. /\ 1113 plot 1_1110 i 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 000515-1 ADDENDA Page 1 of 1 SECTION 00 05 15 ADDENDA END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 0011 13 INVITATION TO BIDDERS Page 1 of 3 SECTION 00 1113 INVITATION TO BIDDERS RECEIPT OF BIDS Electronic bids for the construction of WATER AND SANITAR Y SE WER REPLACEMENTS CONTRACTS 2019 — WSM-N. Part I City Project No. 103358-1 will be received by the City of Fort Worth via the Procurement Portal httos:Hfortworthtexas.bonfirehub.com/portal/?tab=oven0pportunities, under the respective Project until 2:00 P.M. CST, Thursday, March 27, 2025. Bids will then be opened publicly and read aloud beginning at 2:00 PM CST at New City Hall, 100 Fort Worth Trail, Fort Worth, Texas on the Mezzanine of New City Hall (NCH); Room MZ10_12. Bidders shall also e-mail the completed Business Equity forms and all applicable letters of intent to the City Project Manager no later than 1:30 PM on the third City Business day after bid opening date, exclusive of the bid opening date. Your submissions must be uploaded, finalized and submitted prior to the Project's posted due date. The City strongly recommends allowing sufficient time to complete this process (ideally a week prior to the deadline) to begin the uploading process and to finalize your submission. Uploading large documents may take time, depending on the size of the file(s) and your Internet connection speed. The Bonfire portal can be accessed using Microsoft Edge, Google Chrome, or Mozilla Firefox. Javascript must be enabled. Browser cookies must be enabled. Electronic submission is subject to electronic interface latency, which can result in transmission delays. All bidders or proposers assume the risk of late transmission/ submission. The City shall not be held liable if an interested bidder or proposer is unable to submit a complete bid/response before the published deadline due to transmission delays or any other technical issues or obstructions. The City strongly recommends allowing sufficient time to complete the submission process (ideally a week before the deadline) to begin the uploading process and to finalize your submission to give adequate time in the event an issue arises. All submissions must be submitted electronically prior to the close date and time under the respective Project via the Procurement Portal: httDs: Hfortworthtexas.bonfirehub. com/Dortal/?tab=oDenODDortunities Failure to submit all completed required information listed in the respective Solicitation will be grounds for rejection of a bid as non -responsive. No late bids/proposals shall be accepted. Bids delivered in any other manner than using the Bonfire Platform (Procurement Portal) will not be accepted or considered. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised 2/08/2024 City Project No. 103358-1 0011 13 INVITATION TO BIDDERS Page 2 of 3 If, upon being opened, a submission is unreadable to the degree that material conformance to the requirements of the procurement specifications cannot be ascertained, such submission will be rejected without liability to the City, unless such bidder provides clear and convincing evidence (a) of the content of the submission as originally submitted and (b) that the unreadable condition of the Electronic Bid was caused solely by error or malfunction of the Bonfire Platform (Procurement Portal). Failure to scan a clear or readable copy of a bid into the system does not constitute and shall not be considered an error or malfunction of the Bonfire Platform (Procurement Portal). Bidders are encouraged to fully review each page of every document within their submission prior to submitting to ensure all documents are clear, legible, and complete. SUPPORT For technical questions, visit Bonfire's help forum at https://vendorsupport.gobonfire.com/hc/en- us Contact the Bonfire support team at Support@GoBonfire.com or by calling 1-800-354-8010. To get started with Bonfire, watch this five-minute training video: Vendor Registration and Submission [VIDEO] — Bonfire Vendor Support (gobonfire.com) GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: 6,870 LF 8-inch Water Replacement by Open Cut 1,030 LF 12-inch Water Replacement by Open Cut 1,210 LF 24-inch Water Replacement by Open Cut 1,320 LF 8-inch Sewer Replacement by Open Cut The work will take place on the following streets with its respective quantities: WATER W Hammond Street from College Ave. to East dead end at Union Pacific Railroad Tracks — 2,270 LF Water Replacement W Spurgeon from Hemphill St. to East Dead End at Union Pacific Railroad Tracks — 2,530 LF of Water Replacement May Street from W Hammond St. to W Spurgeon Ave. - 660 LF of Water Replacement E Waggoman Street from IH-35 North Bound Frontage Road to East Dead End at Union Pacific Railroad Tracks-1,340 LF Water Replacement W Boyce Avenue from Hemphill St. to East Dead End at Union Pacific Railroad Tracks — 1,280 LF Water Replacement W Felix Street from Hemphill St. to East of May St. —1,030 LF Water Replacement SANITARY SEWER E Waggoman Street from IH-35 North Bound Frontage Road to East Dead End at Union Pacific Railroad Tracks-1,320 LF Sewer Replacement PREQUALIFICATION Certain improvements included in this project must be performed by a contractor or designated subcontractor who is pre -qualified by the City at the time of bid opening. The procedures for qualification and pre -qualification are outlined in the Section 3 of 00 21 13 — INSTRUCTIONS TO BIDDERS. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised 2/08/2024 City Project No. 103358-1 0011 13 INVITATION TO BIDDERS Page 3 of 3 DOCUMENT EXAMINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or obtained via the Procurement Portal https:Hfortworthtexas.bonfirehub.com/portal/?tab=openOpportunities, under the respective Project. Contract Documents may be downloaded, viewed, and printed by interested contractors and/or suppliers. EXPRESSION OF INTEREST To ensure potential bidders are kept up to date of any new information pertinent to this project, all interested parties should indicate their intent to bid in the Procurement Portal by selecting "yes" under the Intent to Bid section. All Addenda will be posted in the Procurement Portal https:Hfortworthtexas.bonfirehub.com/portal/?tab=openOpportunities, under the respective Project. PREBID CONFERENCE — Web Conference A prebid conference will be held as discussed in Section 00 21 13 - INSTRUCTIONS TO BIDDERS at the following date, and time via a web conferencing application: DATE: March 18, 2025 TIME: 10: 00 AM CST Invitations with links to the web conferencing application will be distributed directly to those who have submitted an Expression of Interest. If a prebid conference is held, the presentation and any questions and answers provided at the prebid conference will be issued as an Addendum to the call for bids. If a prebid conference is not being held, prospective bidders should direct all questions about the meaning and intent of the Bidding Documents electronically through the Vendors discussions section under the respective Project via the Procurement Portal. If necessary, Addenda will be issued pursuant to the Instructions to Bidders. CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject any or all bids. AWARD City will award a contract to the Bidder presenting the lowest price, qualifications and competencies considered. ADVERTISEMENT DATES February 26,2025 March 05,2025 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised 2/08/2024 City Project No. 103358-1 0021 13 INSTRUCTIONS TO BIDDERS SECTION 00 2113 INSTRUCTIONS TO BIDDERS 1. Defined Terms Page 1 of 9 1.1. Capitalized terms used in these INSTRUCTIONS TO BIDDERS are defined in Section 00 72 00 - GENERAL CONDITIONS. 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the meanings indicated below which are applicable to both the singular and plural thereof. 1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents. 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents whose principal place of business is not in the State of Texas. 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City (on the basis of City's evaluation as hereinafter provided) makes an award. 2. Copies of Bidding Documents 2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations resulting from the Bidders use of incomplete sets of Bidding Documents. 2.2. City and Engineer in making electronic Bidding Documents available do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license or grant for any other use. 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 3.1. Bidders or their designated subcontractors are required to be prequalified for the work types requiring prequalification as per Sections 00 45 11 BIDDERS PREQUALIFICATIONS and 00 45 12 PREQUALIFICATION STATEMENT. Firms seeking pre -qualification, must submit the documentation identified in Section 00 45 11 on Section 00 45 13 PREQUALIFICATION APPLICATION at least seven (7) calendar days prior to Bid opening for review and, if qualified, acceptance. The subcontractors listed by a Bidder on 00 45 12 must be prequalified for the appropriate work types. Subcontractors must follow the same timelines as Bidders for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at the time bids are opened and reviewed may cause the bid to be rejected. Prequalification requirement work types and documentation are available by accessing all required files through the City's website at: h"s: //apes. fortworthtexas. aov/Proi ectResources/ CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised/Updated 1/17/2024 City Project No. 103358-1 0021 13 INSTRUCTIONS TO BIDDERS Page 2 of 9 3.1.1. Paving — Requirements document located at: httDs:HaDDs.fortworthtexas. Qov/ProiectResources/ResourcesP/02%20- %20Construction%2ODocuments/Contractor%2OPreaualification/TPW%2OPavina %20Contractor%2OPreaualification%2OPro2ram/PREOUALIFICATION%20REO UIREMENTS%20FOR%20PAVING%2000NTRACTORS. i)df 3.1.2. Roadway and Pedestrian Lighting — Requirements document located at: httDs:Hanns.fortworthtexas. aov/ProiectResources/ResourcesP/02%20- %20Construction%2ODocuments/Contractor%2OPreaualification/TPW%2ORoadwa v%20and%2OPedestrian%2OLii!htin2%2OPreaualification%2OPro2Tam/STREET% 20LIGHT%20PREOUAL%20REOMNTS.Udf 3.1.3. Water and Sanitary Sewer — Requirements document located at: httDs:Hanns.fortworthtexas. aov/ProiectResources/ResourcesP/02%20- %20Construction%2ODocuments/Contractor%2OPreaualification/Water%20and%2 OSanitarv%2OSewer%2OContractor%2OPrequalification%2OPro2ram/WS S%20i)re aual%20reauirements.1)df 3.2. Each Bidder, unless currently prequalified, must submit to City at least seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 45 11, BIDDERS PREQUALIFICATIONS. 3.2. 1. Submission of and/or questions related to prequalification should be addressed to the City contact as provided in Paragraph 6.1. 3.3. The City reserves the right to require any pre -qualified contractor who is the apparent low bidder for a project to submit such additional information as the City, in its sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule to assist the City in evaluating and assessing the ability of the apparent low bidder to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information, if requested, may be grounds for rejecting the apparent low bidder as non -responsive. Affected contractors will be notified in writing of a recommendation to the City Council. 3.4. In addition to prequalification, additional requirements for qualification may be required within various sections of the Contract Documents. 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 4.1. Before submitting a Bid, each Bidder: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised/Updated 1/17/2024 City Project No. 103358-1 0021 13 INSTRUCTIONS TO BIDDERS Page 3 of 9 4.1.1. Shall examine and carefully study the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to in Paragraph 4.2. below). No information given by City or any representative of the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.2. Should visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work. 4.1.3. Shall consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work. 4.1.4. Shall study all: (i) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in the Contract Documents as containing reliable "technical data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in the Contract Documents as containing reliable "technical data." 4.1.5. Is advised that the Contract Documents on file with the City shall constitute all of the information which the City will furnish. All additional information and data which the City will supply after promulgation of the formal Contract Documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. No information given by the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.6. Should perform independent research, investigations, tests, borings, and such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project. For projects with restricted access, upon request, City may provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies. 4.1.7. Shall determine the difficulties of the Work and all attending circumstances affecting the cost of doing the Work, time required for its completion, and obtain all information required to make a proposal. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is understood that the submission of a proposal or bid is prima -facie evidence that the Bidder has made the investigations, examinations and tests herein required. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised/Updated 1/17/2024 City Project No. 103358-1 0021 13 INSTRUCTIONS TO BIDDERS Page 4 of 9 4.1.8. Shall promptly notify City of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related documents. The Contractor shall not take advantage of any gross error or omission in the Contract Documents, and the City shall be permitted to make such corrections or interpretations as may be deemed necessary for fulfillment of the intent of the Contract Documents. 4.1.9.Indicate their intent to bid by selecting "yes" in the Procurement Portal under the Intent to Bid section. You must indicate your intent to bid to be able to submit a bid to the City. 4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of: 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by City in preparation of the Contract Documents. The logs of Soil Borings, if any, on the plans are for general information only. Neither the City nor the Engineer guarantee that the data shown is representative of conditions which actually exist. 4.2.2. those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by City in preparation of the Contract Documents. 4.2.3. copies of such reports and drawings will be made available by City to any Bidder on request. Those reports and drawings may not be part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02. of the General Conditions has been identified and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any "technical data" or any other data, interpretations, opinions or information. 4.2.4. Standard insurance requirements, coverages and limits. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder: (i) that Bidder has complied with every requirement of this Paragraph 4, (ii) that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, (iii) that Bidder has given City written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolutions thereof by City are acceptable to Bidder, and when said conflicts, etc., have not been resolved through the interpretations by City as described in Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract Documents. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised/Updated 1/17/2024 City Project No. 103358-1 0021 13 INSTRUCTIONS TO BIDDERS Page 5 of 9 5. Availability of Lands for Work, Etc. 5.1. The lands upon which the Work is to be performed, rights -of -way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by City unless otherwise provided in the Contract Documents. 5.2. Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- of-way, easements, and/or permits are not obtained, the City reserves the right to cancel the award of contract at any time before the Bidder begins any construction work on the project. 5.3. The Bidder shall be prepared to commence construction without all executed right-of- way, easements, and/or permits, and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require permits and/or easements. 6. Interpretations and Addenda 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to City electrically through the Vendor Discussions section under the respective Project via the Procurement Portal https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities on or before 2 p.m., the Monday prior to the Bid opening. Questions received after this day may not be responded to. Interpretations or clarifications considered necessary by City in response to such questions will be issued by Addenda. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by City. 6.3. Addenda or clarifications shall be posted under the respective Project via the Procurement Portal https://fortworthtexas.bonfirehub.com/aortal/?tab=onen0nnortunities 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or INVITATION TO BIDDERS. Representatives of City will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. City will transmit to all prospective Bidders of record such Addenda as City considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. 7. Bid Security CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised/Updated 1/17/2024 City Project No. 103358-1 0021 13 INSTRUCTIONS TO BIDDERS Page 6 of 9 7.1. Each Bid must be accompanied by a Bid Bond made payable to City in an amount of five (5) percent of Bidder's maximum Bid price, on the form attached or equivalent, issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. 7.2. The Bid Bonds provided by a Bidder will be retained until the conditions of the Notice of Award have been satisfied. If the Successful Bidder fails to execute and return the Contract Documents within 14 days after the Notice of Award conveying same, City may consider Bidder to be in default, rescind the Notice of Award and act on the Bid Bond. Such action shall be City's exclusive remedy in the event Bidder is deemed to have defaulted. 8. Contract Times The number of days within which, or the dates by which, Milestones are to be achieved in accordance with the General Requirements and the Work is to be completed and ready for Final Acceptance is set forth in the Agreement or incorporated therein by reference to the attached Bid Form. 9. Liquidated Damages Provisions for liquidated damages are set forth in the Agreement. 10. Substitute and "Or -Equal" Items The Contract, if awarded, will be on the basis of materials and equipment described in the Bidding Documents without consideration of possible substitute or "or -equal" items. Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or - equal" item of material or equipment may be furnished or used by Contractor if acceptable to City, application for such acceptance will not be considered by City until after the Effective Date of the Agreement. The procedure for submission of any such application by Contractor and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General Conditions and is supplemented in Section 0125 00 of the General Requirements. 11. Subcontractors, Suppliers and Others 11.1. In accordance with the City's Business Equity Ordinance No.25165-10-2021 the City has goals for the participation of minority business and/or women business enterprises in City contracts $100,000 or greater. See Section 00 45 40 for the M/WBE Project Goals and additional requirements. Failure to comply shall render the Bidder as non -responsive. Business Equity Ordinance No.25165-10-2021, as amended (replacing Ordinance No. 24534-11-2020), codified at: httr)s://codelibrarv.amle2al.com/codes/ftworth/latest/ftworth tx/O-0-0-22593 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Contractor or City has reasonable objection. 12. Bid Form 12.1. The Bid Form is included with the Bidding Documents. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised/Updated 1/17/2024 City Project No. 103358-1 0021 13 INSTRUCTIONS TO BIDDERS Page 7 of 9 12.2. All blanks on the Bid Form must be completed and the Bid Form signed electronically or signed in ink and scan. A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein. In the case of optional alternatives, the words "No Bid," "No Change," or "Not Applicable" may be entered. Bidder shall state the prices for which the Bidder proposes to do the work contemplated or furnish materials required. 12.3. Bids by corporations shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the signature. 12.4. Bids by partnerships shall be executed in the partnership name and signed by a partner, whose title must appear under the signature accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 12.5. Bids by limited liability companies shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown. 12.6. Bids by individuals shall show the Bidder's name and official address. 12.7. Bids by joint ventures shall be executed by each joint venture in the manner indicated on the Bid Form. The official address of the joint venture shall be shown. 12.8. All names shall be typed or printed in ink below the signature. 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. 12.10. Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown. 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance to State Law Non Resident Bidder. 13. Submission of Bids Bids shall be submitted electronically in the Procurement Portal on the prescribed Bid Form, provided with the Bidding Documents, prior to the time indicated in the Advertisement or INVITATION TO BIDDERS. 14. Withdrawal of Bids 14.1. Bids submitted electronically may be withdrawn prior to the time set for bid opening via the Procurement Portal hops://fortworthtexas.bonfirehub.com/aortal/?tab=oi)en0nnortunities. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised/Updated 1/17/2024 City Project No. 103358-1 0021 13 INSTRUCTIONS TO BIDDERS Page 8 of 9 15. Opening of Bids Bids will be opened and read aloud publicly. An abstract of the amounts of the base Bids and major alternates (if any) will be made available to Bidders after the opening of Bids. 16. Bids to Remain Subject to Acceptance All Bids will remain subject to acceptance for a minimum of 90 days or the time period specified for Notice of Award and execution and delivery of a complete Agreement by Successful Bidder. City may, at City's sole discretion, release any Bid and nullify the Bid security prior to that date. 17. Evaluation of Bids and Award of Contract 17.1. City reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if City believes that it would not be in the best interest of the Project to make an award to that Bidder. City reserves the right to waive informalities not involving price, contract time or changes in the Work and award a contract to such Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists among the Bidders, Bidder is an interested party to any litigation against City, City or Bidder may have a claim against the other or be engaged in litigation, Bidder is in arrears on any existing contract or has defaulted on a previous contract, Bidder has performed a prior contract in an unsatisfactory manner, or Bidder has uncompleted work which in the judgment of the City will prevent or hinder the prompt completion of additional work if awarded. 17.2. In addition to Bidder's relevant prequalification requirements, City may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work where the identity of such Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Contract Documents or upon the request of the City. City also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.3. City may conduct such investigations as City deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to City's satisfaction within the prescribed time. 17.4. Contractor shall perform with his own organization, work of a value not less than 3 5 % of the value embraced on the Contract, unless otherwise approved by the City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised/Updated 1/17/2024 City Project No. 103358-1 0021 13 INSTRUCTIONS TO BIDDERS Page 9 of 9 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and responsive Bidder whose evaluation by City indicates that the award will be in the best interests of the City. 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. 17.7. A contract is not awarded until formal City Council authorization. If the Contract is to be awarded, City will award the Contract within 90 days after the day of the Bid opening unless extended in writing. No other act of City or others will constitute acceptance of a Bid. Upon the contract award, a Notice of Award will be issued by the City. 17.7.1. The contractor is required to fill out and sign the Certificate of Interested Parties Form 1295 and the form must be submitted to the Project Manager before the contract will be presented to the City Council. The form can be obtained at httiDs://www.ethics.state.tx.us/data/forms/1295/1295.vdf 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 18. Signing of Agreement 18.1. When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Project Manual. Within 14 days thereafter, Contractor shall sign and deliver the required number of counterparts of the Project Manual to City with the required Bonds, Certificates of Insurance, and all other required documentation. 18.2. City shall thereafter deliver one fully signed counterpart to Contractor. END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised/Updated 1/17/2024 City Project No. 103358-1 0035 13 CONFLICT OF INTEREST STATEMENT Page 1 of 1 SECTION 00 35 13 CONFLICT OF INTEREST STATEMENT Each bidder, offeror or respondent to a City of Fort Worth procurement is required to complete a Conflict of Interest Questionnaire or certify that one is current and on file with the City Secretary's Office pursuant to state law. If a member of the Fort Worth City Council, any one or more of the City Manager or Assistant City Managers, or an agent of the City who exercise discretion in the planning, recommending, selecting or contracting with a bidder, offeror or respondent is affiliated with your company, then a Local Government Officer Conflicts Disclosure Statement (CIS) may be required. You are urged to consult with counsel regarding the applicability of these forms and Local Government Code Chapter 176 to your company. The referenced forms may be downloaded from the links provided below. Form CIQ (Conflict of Interest Questionnaire) (state.tx.us) httr)s://www.ethics.state.tx.us/data/formsiconflict/CIS.r)df CIQ Form does not apply CIQ Form is on file with City Secretary 11 CIQ Form is being provided to the City Secretary 13 CIS Form does not apply El CIS Form is on File with City Secretary CIS Form is being provided to the City Secretary BIDDER: Woody Contractors, Inc. 650 Tower Dr Kennedale, TX 76060 twoody202O@aol.com 817-483-4787 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised February 24, 2020 By: Troy Wood Signature: Title: President WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 SECTION 00 41 00 BID FORM TO: The Purchasing Manager clo: The Purchasing Division 200 Texas Street City of Fort Worth, Texas 76102 004100 BID FORM Page 1 of 3 FOR: WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Multiple locations in South Fort Worth Area City Project No.: 103368-1 Units/Sections: Unit I: WATER IMPROVMENTS Unit Il: SANITARY SEWER IMPROVEMENTS Unit III: PAVING 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly Induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive levels. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019- WSM-N, PART 1 Revised 9/30/2021 City Project No. 103358-1 00 41 00 BID FORM Page 2 of 3 d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Water Transmission, UrbanlRenewal, 24-inches and smaller b. Sewer Collection System, Urban/Renewal, 8-inches and smaller G. Sanitary Sewer Manhole/Structure Interior Lining (Warren or Chesterton) Coating d. Asphalt Paving Construction/Reconstruction (Unlimited) e. Concrete Paving Construction/Reconstruction (Unlimited) f. - 9.- h. - 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 540 CD days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work (and/or achievement of Milestones) within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 *If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised 9=12021 City Project No. 103358-1 0041 00 BID FORM Page 3of3 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. Total Bid 7. Bid Submittal This Bid is submitted on April 24, 2025 Respectfully submitt j By: ��5�'gna u< TroyWoody Y (Printed Name) Title: President Company: Woody Contractors, Inc. Address: 650 Tower Dr Kennedale, TX 76060 State of Incorporation: Texas Email: twoody202O@aol.com Phone:817-483-4787 END OF SECTION $ ( 1?67131t�5- 0 by the entity named below. Receipt is acknowledged of the Initial following Addenda: JAddendum No. 1: [Addendum No. 2: lAddendum No. 3: �� 1 Addendum No. 4: - kddendum No. 5: l �! Addendum No. 6: Corporate Seal: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised 9/30/2021 City Project No. 103358-1 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application City of Fort Worth Water and Sanitary Sewer Replacement Contract 2019 WSM-N-Part 1 Bidder's Proposal CPN No. 103358-1 Unit I: Water Improvements Bid list Specification Unit of Description Bid Quantity Unit Price Bid Value Item No. Section No. Measure Is' 24" DIP Water (Restrained Joints)' 33 11 10 LF 1,260 $ 44100 $ 555,660 00 Ib' 24" Steel AW WA C200 Water Pipe (Restrained Joints)' 33 11 14 LF 1,260 $ - $ - tc' 24" Concrete AW WA C303 Water Pipe (Restrained Joints)' 33 11 13 LF 1,260 $ - $ - 2a' 24" DIP Water, CSS Backfill (Restrained Joints) 33 11 10 LF 60 $ 73300 $ 43,980 00 2b' 24" Steel AW WA C200, CSS Backfill (Restrained Joints) 33 11 10 LF 60 $ - $ - 2c' 24" Concrete AW WA C303, CSS Backfill (Restrained Joints) 33 11 10 LF 60 $ - $ - 3a' Ductile Iron Water Fittings w/ Restraint' 33 11 11 TON 5 $ 16,000 00 $ 80,000 00 3b' Steel Fittings' 33 11 14 LS 1 $ - $ - 3c' C303 Finings' 33 11 13 LS 1 $ - $ - 'Contractor to provide a Unit PriceBid for only one of the pipe material alternatives for items 1 and 2 DO NOT PROVIDE UNIT PRICE/RID FOR EACH ALTERNATIVE 4 12" PVC Water Pipe DR-14 33 11 12 LF 1,030 $ 19200 $ 197,760 00 5 12" PVC Water Pipe, CSS Backfill 33 11 10 LF 30 $ 31200 $ 9,36000 6 10" PVC Water Pipe DR-14 33 11 12 LF 150 $ 10600 $ 15,900 00 7 8" PVC Water Pipe DR-14 33 11 12 LF 6,880 $ 8700 $ 598,560 00 8 6" PVC Water Pipe DR-14 33 11 12 LF 170 $ 7800 $ 13,260 00 9 6" Gate Valve 33 1220 EA 15 $ 1,80000 $ 27,000 00 10 8" Gate Valve 33 1220 EA 17 $ 2,60000 $ 44,200 00 11 12" Gate Valve 33 1220 EA 6 $ 4,70000 $ 28,200 00 12 24" Gate Valve with Vault 33 1220 EA 1 $ 56,300 00 $ 56,300 00 13 8" Blow Off Valve 331260 EA 1 $ 28,15000 $ 28,15000 14 Salvage Water Valve 0241 14 EA 7 $ 20000 $ 1,40000 15 Ductile Iron Water Fittings w/ Restraint 33 11 11 TON 6 $ 10,000 00 $ 60,000 00 16 Fire Hydmnt 33 1240 EA 14 $ 5,35000 $ 74,900 00 17 Salvage Fire Hydrant 0241 14 EA 8 $ 45000 $ 3,60000 18 Connection to Existing 4"- 12" Water Pipe 33 1225 EA 15 $ 8,90000 $ 133,500 00 19 Connection to Exisiing 24" Water Pipe 33 1225 EA 2 $ 26,680 00 $ 53,360 00 20 V Water Service, Meter Reconnection and Salvage Meter 33 1210 EA 183 $ 75000 $ 137,250 00 21 V New Water Service 33 1210 EA 183 $ 2,35000 $ 430,050 00 22 2" Meter Reconnection 33 1210 EA 1 $ 1,40000 $ 1,40000 23 2" Water Service 33 1210 EA 1 $ 4,50000 $ 4,50000 24 1" Private Water Service 33 12 10 EA 1 $ 30000 $ 30000 25 1" Standard Concrete Water Meter Box Adjustment 33 12 10 EA 2 $ 25000 $ 50000 26 3" Water Meter and Vault 33 1211 EA 1 $ 43,000 00 $ 43,000 00 27 8" Waterline Lowering 3305 12 EA 5 $ 15,200 00 $ 76,000 00 28 Trench Safety 3305 10 LF 3,500 $ 010 $ 35000 29 Exploratory Excavation of Existing Utilities 33 05 30 EA 11 $ 2,10000 $ 23,100 00 30 24" Water Abandonment Plug 0241 14 EA 2 $ 80000 $ 1,60000 31 Water Line Grouting (12") 0241 14 CY 10 $ 60000 $ 6,00000 32 Water Line Grouting (24") 0241 14 CY 60 $ 47000 $ 28,200 00 33 Cathodic Protection Design 3304 12 LS 1 $ 13,500 00 $ 13,500 00 34 Cathodic Protection Installation 3304 12 LS 1 $ 61,600 00 $ 61,600 00 35 Temporary Water Services 33 04 30 LS 1 $ 263,957 00 $ 263,957 00 36 6-12" Tree Removal 31 1000 EA 10 $ 500.00 $ 5,000.00 37 18-24" Tree Removal 31 1000 EA 1 $ 1,500.00 $ 1,500.00 38 Cone Pvmt Repair, Residential 3201 17 SY 1,160 $ 141.00 $ 163,560.00 39 Cone Pvmt Repair with 2" Asphalt Overlay (Felix St) 3201 17 SY 425 $ 205.00 $ 87,125.00 40 Remove Existing Conc. Pvmm 32 01 29 SY 1,850 $ 26.00 $ 48,100.00 41 Remove Existing Brick Driveway (4621 Hemphill St.) 0241 13 SF 74 $ 5.00 $ 370.00 42 Install New Brick Driveway (4621 Hemphill St.) 32 1320 SF 74 $ 15.00 $ 1,110.00 43 Remove Existing Lead Way (501 Spurgeon St.) 0241 13 SF 36 S 3.00 $ 10800 44 Install New Lead Way (501 Spurgeon St ) 32 1320 SF 36 S 9.00 $ 32400 45 Remove Existing Concrete Curb and Gutter 0241 15 LF 7,745 $ 1000 $ 77,450 00 46 6" Concrete Curb and Gutter 32 16 13 LF 7,745 $ 5600 $ 433,720 00 47 Remove Existing Concrete Driveway 0241 13 SF 4,553 $ 400 $ 18,211 20 48 Remove Asphalt Driveway 024113 SF 2,110 $ 500 $ 10,54900 49 Install New 6-Inch Concrete Driveway 32 1320 SF 6,663 $ 1300 $ 86,613 80 50 Remove 4-Inch Concrete Sidewalk 0241 13 SF 7,300 $ 300 $ 21,900 00 51 Install New 4-Inch Concrete Sidewalk 32 1320 SF 7,300 $ 900 $ 65,700 00 52 Remove Existing Wheelchair Ramp 0241 13 EA 4 $ 84000 $ 3,36000 53 Barrier Free Ramp, Type R-1 32 1320 EA 2 $ 3,70000 $ 7,40000 54 Remove Existing Concrete Valley Gutter 0241 15 SY 86 $ 5000 $ 4,30000 55 Install New 7" Concrete Valley Gutter 32 16 13 SY 120 $ 16700 $ 20,040 00 56 11-Inch Pavement Pulverization 0241 15 SY 15,500 $ 1100 $ 170,500 00 57 8-Inch Cent -Lime Stabilization @ 32Lbs/SY 32 1133 TN 240 $ 49600 $ 119,040 00 58 3" Asphalt Pvmt Superpave SP-D 32 12 16 SY 15,500 $ 2900 $ 449,500 00 59 4" Cone Sidewalk, Adjacent to Curb 32 1320 SF 500 $ 1200 $ 6,00000 60 Cone Sidewalk, Adjacent to get Wall 32 1320 SF 500 $ 1300 $ 6,50000 61 Cone Curb at Back of Sidewalk 32 1320 LF 500 $ 2800 $ 14,000 00 62 Preformed Thermoplastic Contrast Markings - 6" Dashed (W) 32 1723 LF 650 $ 1200 $ 7,80000 63 Preformed Thermoplastic Contrast Markings - 6" SLD (Y) 32 1723 LF 2,400 $ 1200 $ 28,800 00 64 8" SLD Pvmt Marking HAS (W) 32 1723 LF 305 $ 250 $ 76250 65 Preformed Thermoplastic Contrast Markings - 24" Stop Bars 32 1723 LF 15 $ 4000 $ 60000 66 Unclassified Street Excavation 3123 16 CY 150 $ 4700 $ 7,05000 67 Lane Legend Arrow 32 1723 EA 2 $ 30000 $ 60000 68 Lane Legend Only 32 1723 EA 2 $ 30000 $ 60000 69 REFL Raised Marker TY B-A-A 32 1723 EA 250 $ 500 $ 1,25000 70 REFL Raised Marker TY B-C-R 32 1723 EA 150 $ 500 $ 75000 71 Imported EmbedmentBackfill, CSS 3305 10 CY 50 $ 20000 $ 10,000 00 72 Imported EmbedmentBackfill, CLSM 3305 10 CY 130 $ 18000 $ 23,400 00 73 Imported Embedment/Backfill, Select Fill 3305 10 CY 500 $ 4500 $ 22,500 00 74 2" Surface Milling 0241 15 SY 6,550 $ 500 $ 32,750 00 75 2" Asphalt Pvmt Superpave SP-D 32 12 16 SY 6,550 $ 1900 $ 124,450 00 76 Water Valve Box Adjustment with Concrete Collar 3305 14 EA 13 $ 1,200 00 $ 15,600 00 77 Manhole Minor Adjustment With Concrete Collar 3305 14 EA 6 $ 1,50000 $ 9,00000 78 Painting Curb Addresses 32 1725 EA 56 $ 10000 $ 5,60000 79 Topsoil 3291 19 CY 190 $ 6600 $ 12,540 00 80 Black Sod Replacement 3292 19 SY 850 $ 1600 $ 13,600 00 81 HMAC Transition 32 12 16 TN 75 $ 24600 $ 18,450 00 82 Temporary Asphalt Paving Repair 3201 18 LF 5,831 $ 3500 $ 204,085 00 83 4' Wide Asphalt Pvmt Repair, Residential 3201 17 LF 50 $ 14600 $ 7,30000 84 Asphalt Pvmt Repair Beyond Defined Width, Residential 3201 17 SY 25 $ 7100 $ 1,77500 85 Hydrated Lime (40 lbs/SY) 32 1129 TN 50 $ 38700 $ 19,350 00 86 6" Lime Treament 32 1129 SY 1,971 $ 900 $ 17,739 00 87 7" Concrete Pavemsmt 32 1129 SY 1,850 $ 15400 $ 284,900 00 88 SWPPP > 1 acre 31 25 00 LS 1 $ 4,00000 $ 4,00000 89 Portable Message Sign 3471 13 WK 4 $ 50000 $ 2,00000 90 Construction Staking 01 71 23 LS 1 $ 14,000 00 $ 14,000 00 91 As -Built Survey (Red Line Survey) 01 71 23 LS 1 $ 5,00000 $ 5,00000 92 Traffic Control 3471 13 MO 10 $ 3,40000 $ 34,000 00 93 Remove and Replace Storm Inlet 33 49 20 EA 1 $ 13,000 00 $ 13,000 00 94 Tree Protection 31 1000 EA 2 $ 25000 $ 50000 95 Utility Adjustment (Irrigation Adjustments) (2) 3305 14 LS 1 $ 10,000 00 $ 10,000 00 96 Water Conswction Allowance LS 1 $ 150,000.00 $ 150,000.00 Sub-TandUnitI $ 6,042,129.50 City of Fort Worth Water and Sanitary Sewer Replacement Contract 2019 WSM-N-Part 1 CPN No. 103358-1 Unit II: Sewer Improvements Bid list Specification Unit of Description Bid Quantity Unit Price Item No. Section No. Measure 1 8" SDR 26 PVC Sewer Pipe 33 31 20 LF 1,340 $ 110.00 $ 2 4' Manhole 3339 10 EA 3 $ 7,400.00 $ 3 4' Extra Depth Manhole 3339 10 VF 10 $ 180.00 $ 4 4" Sewer Service 33 31 50 EA 15 $ 2,700.00 $ 5 Remove 4' Manhole Riser 0241 14 EA 1 $ 2,300.00 $ 6 4' Manhole Riser 3349 10 EA 1 $ 2,600.00 $ 7 Poet -CCTV Ivspechon 330131 LF 1,340 $ 7.00 $ 8 Final -CCTV Inspect— 330131 LF 1,340 $ 7.00 $ 9 Final MH-CCTV Ivspech— 330131 EA 3 $ 250.00 $ 10 Manhole Va—um Teshvg 330130 EA 3 $ 150.00 $ 11 Exploratory Excavah— of Ex ta,g Utilities 33 05 30 EA 2 $ 2,100.00 $ 12 VAT' Tree Removal 31 1000 EA 14 $ 500.00 $ 13 12"48" Tree Removal 31 1000 EA 2 $ 1,000.00 $ 14 18"-24" Tree Removal 31 1000 EA 4 $ 1,500.00 $ 15 24" and Larger Tree Removal 31 1000 w 2 $ 2,000.00 $ 16 Trench Safety 3305 10 LF 1,340 $ 0.60 $ 17 Traffic Covteel 3471 13 MO 2 $ 3,400.00 $ 18 Trench Water Stop 3305 15 EA 4 $ 650.00 $ 19 SWPPP=>Iacre 312500 LS 1 $ 4,000.00 $ 20 Remove Ex,shng Concrete Curb and Gutter 0241 15 LF 250 $ 10.00 $ 21 6" C—crete Curb and Gutter 32 16 13 LF 750 $ 56.00 $ 22 Covc Pvmt Repair, Residevhal 3201 17 SY 550 $ 141.00 $ 23 Remove Exeshvg Conc, Pvmvt 32 01 29 SY 1,850 $ 26.00 $ 24 11-Ivch Pavement Pulveriash— 024115 SY 3,460 $ 11.00 $ 25 8-Ivch Cem-Lime Stabili-h— ® 32Lbs/SY 32 1133 TN 28 $ 496.00 $ 26 3" Asphalt Pvmt Superpave SP-D 32 12 16 SY 3,460 $ 29.00 $ 27 Temporary Asphalt Paving Repay 3201 18 LF 765 $ 36.00 $ 28 Uvclassdied Sheet Excavah— 312316 CY 100 $ 47.00 $ 29 Water Valve Box Adjushnevt with Concrete Collar 330514 EA 4 $ 1,200.00 $ 30 Manhole Minor Adjushnent With Concrete Collar 330514 EA 2 $ 1,500.00 $ 31 As -Built Survey (Red Line Survey) 01 71 23 LS 1 $ 1,500.00 $ 32 Painting Curb Addresses 32 1725 EA 6 $ 100.00 $ 33 Topsoil 3291 19 CY 170 $ 66.00 $ 34 Block Sod Replacement 3292 19 SY 550 $ 16.00 $ 35 HMAC Transition 32 12 16 TN 20 $ 246.00 $ 36 Construction Staking 01 71 23 LS 1 $ 1,500.00 $ 37 Sewer Construction Allowance LS 1 $ 100,000.00 $ Sub -Total Unit ll $ Bid Summary ITatal (Unit I +Unit I)-- I $ Bidder's Proposal Bid Value 147,400.00 22,200.00 1,800.00 40,500.00 2,300.00 2,600.00 9,380.00 9,380.00 750.00 450.00 4,200.00 7,000.00 2,000.00 6,000.00 4,000.00 804.00 6,800.00 2,600.00 4,000.00 2,500.00 42,000.00 77,550.00 48,100.00 38,060.00 13,888.00 100,340.00 27,540.00 4,700.00 4,800.00 3,000.00 1,500.00 600.00 11,220.00 8,800.00 4,920.00 1,500.00 100,000.00 765,182.00 6,807,311.50 FO-TRIVIONJUDI The American Institute of Architects, AIA Document No. A310 (February, 1970 Edition.) KNOW ALL MEN BY THESE PRESENTS, that we Woody Contractors, Inc. as Principal hereinafter called the Principal, and Vilzilant Insurance Company as Surety, hereinafter called the Surety, are held and firmly bound unto City of Fort Worth, TX as Obligee, hereinafter called the Obligee, in the sum of Five Percent of Bid Amount (5%) Dollars (5--------------------- ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Water and Sanitary Sewer Replacement Contract 2019 WSM-N, Part 1, City Proiect Number 103358-1 NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 3rd day of April 2025 WOODY CONTRACTORS, INC. Principal Sefal) By: Name/Title VIGILANT INSURANCE COMPANY 7� surety (Seal) By:� Ky e W. Sween Attorney -in -Fact H U Power of Attorney Federal Insurance Company I Vigilant Insurance Company I Pacific Indemnity Company Know All by These Presents. That FEDERAL INSURANCE COMPANY, an Indiana corporation, VIGILANT INSURANCE COMPANY, a New York corporation, and PACIFIC INDEMNITY COMPANY, a Wisconsin corporation, do each hereby constitute and appoint Elizabeth Gray, Charles D. Sweeney, Kyle W. Sweeney and Michael A. Sweeney of Fort Worth, Texas-------------------------------------------------------------------------------------------------------- -______-_____________------ each as their true and lawful Attorney -in -Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety thereon or otherwise, bonds and undertakings and other writings obligatory in the nature thereof (other than bail bonds) given or executed in the course of business, and any instruments amending or altering the same, and consents to the modification or alteration of any instrument referred to in said bonds or obligations. In Witness Whereof, said FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY have each executed and attested these presents and affixed their corporate seals on this 161^ day ofSeptember, 2019, Iuwn tl c:hlt.trt .;Gzsi�[:.mESt ,rettuy STATE OF NEW JERSEY County ofHumerdon ss. A ".,k°(then N1_ hinny, Pica Prtsi lens � fy on dais 1S1° day of September, 2019, before me, a Notary Public of New Jersey, personally came Dawn M. Chloros, to me known to be Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY, the companies which executed the foregoing Power of Attorney, and the said Dawn M. Chloros, being by me duly sworn, did depose and say that she is Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY and knows the corporate seals thereof, that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of said Companies: and that she signed said Power of Attorney as Assistant Secretary of said Companies by like authority; and that she is acquainted with Stephen M. Haney, and knows him to be Vice President ofsaid Companies; and that the signature of Stephen M. Haney, subscribed to said Power of Attorney is in the genuine handwriting of Stephen M. Haney, and was thereto subscribed by authority ofsaid Companies and in deponent's presence. No[arta] Seal �A� [tOTAtty KAiF£J. R NOTARY PUSLIC OF NEWJERS EY y Atl�Ll� Ia. 29. -aS - GornmissionExpires uly Yti, 7,024 NUrsry Pv[itlr CERTIFICATION Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY on August 30, 2016: -RESOLVED. that the following authorizations relate to the execution, for and on behalf ofthe Company, of6ends, undertakings, recognizances, contracts and otter written commitments of the Company entered into in the ordinary course af business (each a "Written Commitment"): (1) Each of the Chairman, the President and the Vice Presidents of die Company is hereby authorized to execute any Written Commitment for and onbehalfoftheCompany, under the seal ofthe Company or otherwise. (2) Each duly appointed attorney -in -fact of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company, under the seal of the Company or otherwise, to the extent that such action is authorized by the grant ofpowers provided for in such persons written appointment as such attorney -in -Fact. (3) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized, for and on behalrurthe Company. to appoint in writing any person the attorney - in -fact of the Company with full power and -authority to execute, for and on behalfof the Company, under the seal of the Company or otherwise, such Written Commitments ofthe Company as may be specified in such written appointment, which specification may be by general type or class of Written Commitments or by specification of one Or more particular Written Commitments. (4) Each of the Chairman, the President and the Vice ['residents of [lie Company is hereby authorized, for and on behalf of the Company. to delegate in writing to any other olHcer orthe Company the authority to execute, for and on behalf of the Company, under the Company's sea) or otherwise, such Written Commitments ofthe Company as are specified in such written delegation, whichspecifnadon may be by general type or class of written Commitments or byspecifcaimnofoneormore particular tl'rttenCummivaents. (5) The signature of any officer or other person executing any Written Commitment oy appointment Or deleption pursuant to this Resolution, and the seal ofthe Company. may be affixed by facsimile on such Written Commitment or written appointment or delegation. FURTHERRESOLVED, that the foregoing Resolution shall not be deemed to be an exclusive statement or the powers and authority ofvficens employees and other persons to act for and on behalf of the Company, and such Resolution shall not limit or otherwise affect the exercise of any such power or authority otherwise validly granted or vested - 1. Dawn M. Chloros, Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY (the "Companies") do hereby certify that (() the foregoim Resolutions adopted by the Board ofDirectors ofthe Companies are true, correct and in full force and effect, (ii) the foregoing Power o€Attorney is true, correct and in full force and effect. Given under my hand and seals ofsaid Companies at Whitehouse Station, NJ, this 3rd day of April, 2025. It ivsn F1.1 `,hlc riz.:Pavi<tant Sc rct:lr IN THE EVENTYOU WISH TO VERIFY THE AUMENT'ICITY OFTHIS BOND OR NOTIFY US OF ANY OTHER MATTER, PLEASE CONTAGI' US AT: Telephone MOR) 903- 3493 Fax (908) 903- 3656 a -mail: surety@chubb.coni FED- VIG-PI (rev. 08-18) 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page 1 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of are not required to underbid resident bidders. , our principal place of business, B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. BIDDER: Woody Contractors, Inc. 650 Tower Dr Kennedale, TX 76060 817-483-4787 twoody2020@aol.com END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revfsed 9/30/2021 By. Troy Woody (Signature) Title: President Date: L( WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 0045 11 -1 BIDDERS PREQUALIFICATIONS Pagel of 3 1 SECTION 00 45 11 2 BIDDERS PREQUALIFICATIONS 4 1. Summary. A Bidder or their designated subcontractors are required to be prequalifled or 5 have applied for prequalification by the City for the work types requiring prequalification 6 prior to submitting bids. To be considered for award of contract the Bidder must submit 7 Section 00 45 12, PREQUALIFICATION STATEMENT for the work type(s) listed with 8 their Bid. Any contractor or subcontractor who is not prequalifled for the work type(s) listed 9 must submit Section 00 45 13, PREQUALIFICATION APPLICATION in accordance with 10 the requirements below. The information must be submitted seven (7) days prior to the 11 date of the opening of bids. Subcontractors must follow the same timelines as contractors 12 for obtaining prequalification review. Bidders or Subcontractors who are not prequalifled at 13 the time bids are opened and reviewed may cause the bid to be rejected. 14 15 16 The prequalification process will establish a bid limit based on a technical evaluation and 17 financial analysis of the contractor. For example, a contractor wishing to submit bids on 18 projects to be opened on the 7th of April must file the information by the 31 st day of March 19 in order to eligible to work on these projects. In order to facilitate the approval of a Bidder's 20 Prequalification Application, the following must accompany the submission. 21 a. A complete set of audited or reviewed financial statements. 22 (1) Classified Balance Sheet 23 (2) Income Statement 24 (3) Statement of Cash Flows 25 (4) Statement of Retained Earnings 26 (5) Notes to the Financial Statements, if any 27 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles 28 of Incorporation, Articles of Organization, Certificate of Formation, LLC 29 Regulations, and Certificate of Limited Partnership Agreement). 30 c. A completed Bidder Prequalification Application. 31 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 32 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 33 number visit the Texas Comptroller of Public Accounts online at the 34 following web address www.window.state.tx.us/taxDermit/ and fill out the 35 application to apply for your Texas tax ID. 36 (2) The firm's e-mail address and fax number. 37 (3) The firm's DUNS number as issued by Dun & Bradstreet. This number 38 is used by the City for required reporting on Federal Aid projects. The DUNS 39 number may be obtained at www.dnb.com. 40 d. Resumes reflecting the construction experience of the principles of the firm for firms 41 submitting their initial prequalification. These resumes should include the size and 42 scope of the work performed. 43 e. Other information as requested by the City. 44 45 2. Prequalification Requirements 46 a. Financial Statements. Financial statement submission must be provided in 47 accordance with the following: 48 (1) The City requires that the original Financial Statement or a certified copy 49 be submitted for consideration. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 0045 11 -2 BIDDERS PREQUALIFICATIONS Page 2 of 3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1) express an unqualified opinion, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital = current assets — current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Prequalification Application. A Bidder Prequalification Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None" or "N/A" should be inserted. 38 (2) A minimum of five (5) references of related work must be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility for Award of Contract 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance. 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 0045 11 -3 BIDDERS PREQUALIFICATIONS Page 3 of 3 1 d. If a contractor has a valid prequalification letter, the contractor will be eligible to 2 perform the prequalified work types until the expiration date stated in the letter. 3 8 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 0% 23 24 25 0045 12- 1 PREQUALIFICATION STATEMENT Page I of i SECTION 00 45 12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Water Transmission, Urban/Renewal, 24-inches and smaller Sewer Collection System, Urban/Renewal, 8-inches and smaller Sanitary Sewer manhole/Structure Interior Lining (Warren or Chesterton) Coating Asphalt Paving Construction/Reconstruction (Unlimited) Concrete Paving Construction/Reconstruction (Unlimited) Contractor/Subcontractor Company Name Prequalification Expiration Date Woody Contractors, Inc. 4/30/26 Woody Contractors, Inc. 4/30/26 Madero Engineers, Architects & Constructors, LLC 4/30125 Texas Material Group, Inc. 4/30/26 Stabile & Winn, Inc. 9/30/26 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: 11J0oci� Cor4rd'c rs I [(\C . By: Company so Towee Dr Signature Address KthnedVL(e , TX -7&Na0 Title: City/State/Zip Date END OF SECTION 7�011 W naal,L1 (Please Pri t) (Please Print) 4/ r1 / 2,5- CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART I Revised September 30, 2021 City Project No. 103358-1 FORT WORTH. SECTION 00 45 13 PREQUALIFICATION APPLICATION Date of Balance Sheet Name under which you wish to qualify Post Office Box Street Address (required) ( 1 Telephone Mark only one: Individual Limited Partnership General Partnership Corporation Limited Liability Company City State Zip Code City State Zip Code ( 1 Fax Email Texas Taxpayer Identification No. Federal Employers Identification No. DUNS No. (if applicable) Email/mail this questionnaire along with financial statements to the appropriate group below. A separate submittal is required for water/sewer, paving, and lighting: Work Category — Water Dept - Water/sewer Work Category — TPW Paving Work Category — TPW Ped/Rdwy Lighting john.kasavich@FortWorthTexas.gov TPW_ Prequalification@fortworthtexas.gov clint.hoover@fortworthtexas.gov Fort Worth Water Department Engineering and City of Fort Worth Transportation and Public City of Fort Worth TPW Transportation Fiscal Services Division 200 Texas St. Fort Works Dept. 3741 SW Loop 820, Fort Worth, Management Attn: Clint Hoover, P.E. 5001 Worth, TX 76102 TX 76133 Attn: Alicia Garcia James Ave. Fort Worth, TX 76115 *Financial Statements must be mailed. Mark the envelope: "Bidder Prequalification Application" 0045 13 - 2 BIDDER PREQUALIFICATION APPLICATION Page 2 of 8 BUSINESS CLASSIFICATION The following should be completed in order that we may properly classify your firm: (Check the block(s) which are applicable — Block 3 is to be left blank if Block 1 and/or Block 2 is checked) Has fewer than 100 employees and/or Has less than $6,000,000.00 in annual gross receipts OR Does not meet the criteria for being designated a small business as provided in Section 2006.001 of the Texas Government Code. The classification of your firm as a small or large business is not a factor in determining eligibility to become prequalified. Select major work categories for which you would like to be prequalified (City may deem you are not qualified for selected category or may approve you at a lesser size/length and maximum size may not be listed specifically under a major work category): MAJOR WORK CATEGORIES Water Department Augur Boring - 24-inch diameter casing and less Augur Boring - Greater than 24-inch diameter casing and greater Tunneling — 36-Inches — 60 —inches, and 350 LF or less Tunneling - 36-Inches — 60 —inches, and greater than 350 LF Tunneling — 66" and greater, 350 LF and greater Tunneling — 66" and greater, 350 LF or Less _ Cathodic Protection Water Distribution, Development, 8-inch diameter and smaller _ Water Distribution, Urban and Renewal, 8-inch diameter and smaller Water Distribution, Development, 12-inch diameter and smaller _ Water Distribution, Urban and Renewal, 12-inch diameter and smaller Water Transmission, Development, 24-inches and smaller _ Water Transmission, Urban/Renewal, 24-inches and smaller Water Transmission, Development, 42-inches and smaller _ Water Transmission, Urban/Renewal, 42-inches and smaller Water Transmission, Development, All Sizes _ Water Transmission, Urban/Renewal, All Sizes Sewer Bypass Pumping, 18-inches and smaller Sewer Bypass Pumping, 18-inches — 36-inches Sewer Bypass Pumping 42-inches and larger _ CCTV, 8-inches and smaller _ CCTV, 12-inches and smaller _ CCTV, 18-inches and smaller CCTV, 24-inches and smaller CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 004513-3 BIDDER PREQUALIFICATION APPLICATION Page 3 of 8 MAJOR WORK CATEGORIES, CONTINUED _! CCTV, 42-inches and smaller _ CCTV, 48-inches and smaller _ Sewer CIPP, 12-inches and smaller _ Sewer CIPP, 24-inches and smaller _ Sewer CIPP, 42-inches and smaller _ Sewer CIPP, All Sizes Sewer Collection System, Development, 8-inches and smaller Sewer Collection System, Urban/Renewal, 8-inches and smaller Sewer Collection System, Development, 12-inches and smaller Sewer Collection System, Urban/Renewal, 12-inches and smaller Sewer Interceptors, Development, 24-inches and smaller Sewer Interceptors, Urban/Renewal, 24-inches and smaller Sewer Interceptors, Development, 42-inches and smaller Sewer Interceptors, Urban/Renewal, 42-inches and smaller Sewer Interceptors, Development, 48-inches and smaller Sewer Interceptors, Urban/Renewal, 48-inches and smaller Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement, All Sizes Sewer Cleaning, 24-inches and smaller Sewer Cleaning, 42-inches and smaller Sewer Cleaning, All Sizes Sewer Cleaning, 8-inches and smaller Sewer Cleaning, 12-inches and smaller Sewer Siphons 12-inches or less Sewer Siphons 24-inches or less Sewer Siphons 42-inches or less Sewer Siphons All Sizes Transportation Public Works Asphalt Paving Construction/Reconstruction (LESS THAN 15,000 square yards) Asphalt Paving Construction/Reconstruction (15,000 square yards and GREATER) Asphalt Paving Heavy Maintenance (UNDER $1,000,000) Asphalt Paving Heavy Maintenance ($1,000,000 and OVER) Concrete Paving Construction/Reconstruction (LESS THAN 15,000 square yards)* Concrete Paving Construction/Reconstruction (15,000 square yards and GREATER)* Roadway and Pedestrian Lighting NOTE *There is not a prequalification requirement for installation of concrete sidewalk, curb & gutter, driveways, and panel replacement, only on concrete street / ROW paving CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 0045 13 - 4 BIDDER PREQUALIFICATION APPLICATION Page 4 of 8 1. List equipment you do not own but which is available by renting DESCRIPTION OF EQUIPMENT NAME AND DETAILED ADDRESS OF OWNER 2. How many years has your organization been in business as a general contractor under your present name? List previous business names: 3. How many years of experience in had: (a) As a General Contractor: construction work has your organization (b) As a Sub -Contractor: 4. *What projects has your organization completed in Texas and elsewhere? CLASS LOCATION CONTRACT OF DATE CITY -COUNTY - AMOUNT WORK COMPLETED STATE *If requalifying only show work performed since last statement. 5.Have you ever failed to complete any work awarded to you? If so, where and why? NAME AND DETAILED ADDRESS OF OFFICIAL TO WHOM YOU REFER 6. Has any officer or owner of your organization ever been an officer of another organization that failed to complete a contract? If so, state the name of the individual, other organization and reason. 7. Has any officer or owner of your organization ever failed to complete a contract executed in his/her name? If so, state the name of the individual, name of owner and reason. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 0045 13-5 BIDDER PREQUALIFICATION APPLICATION Page 5 of 8 8. In what other lines of business are you financially interested? 9. Have you ever performed any work for the City? If so, when and to whom do you refer? 10. State names and detailed addresses of all producers from whom you have purchased principal materials during the last three years. I NAME OF FIRM OR COMPANY DETAILED ADDRESS 11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. 12. What is the construction experience of the principal individuals in your organization? PRESENT MAGNITUDE POSITION OR YEARS OF AND TYPE OF IN WHAT NAME OFFICE EXPERIENCE WORK CAPACITY 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household with a City employee, please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not live in the same household but who receives care and assistance from that person as a direct result of a documented medical condition. This includes foster children or those related by adoption or marriage. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 CORPORATION BLOCK If a corporation: Date of Incorporation Charter/File No. President Vice Presidents Secretary Treasurer LIMITED LIABILITY COMPANY BLOCK If a corporation: State of Incorporation Date of organization File No. Officers or Managers (with titles, if any) 0045 13 - 6 BIDDER PREQUALIFICATION APPLICATION Page 6 of 8 PARTNERSHIP BLOCK If a partnership: State of Organization Date of organization Is partnership general, limited, or registered limited liability partnership? File No. (if Limited Partnership) General Partners/Officers Limited Partners (if applicable) Individuals authorized to sign for Partnership Except for limited partners, the individuals listed in the blocks above are presumed to have full signature authority for your firm unless otherwise advised. Should you wish to grant signature authority for additional individuals, please attach a certified copy of the corporate resolution, corporate minutes, partnership agreement, power of attorney or other legal documentation which grants this authority. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 0045 13-7 BIDDER PREQUALIFICATION APPLICATION Page 7 of 8 14. Equipment TOTAL Similar types of equipment may be lumped together. If your firm has more than 30 types of equipment, you may show these 30 types and show the remainder as 'various". The City, by allowing you to show only 30 types of equipment, reserves the right to request a complete, detailed list of all your equipment. The equipment list is a representation of equipment under the control of the firm and which is related to the type of work for which the firm is seeking qualification. In the description include, the manufacturer, model, and general common description of each. ITEM QUANTITY 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 ITEM DESCRIPTION Various - CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 BALANCE SHEET VALUE TOTAL WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 0045 13 - 8 BIDDER PREQUALIFICATION APPLICATION Page 8 of 8 BIDDER PREQUALIFICATION AFFIDAVIT STATE OF COUNTY OF The undersigned hereby declares that the foregoing is a true statement of the financial condition of the entity herein first named, as of the date herein first given; that this statement is for the express purpose of inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency herein named is hereby authorized to supply each party with any information, while this statement is in force, necessary to verify said statement. , being duly sworn, deposes and says that he/she is the of , the entity described in and which executed the foregoing statement that he/she is familiar with the books of the said entity showing its financial condition; that the foregoing financial statement taken from the books of the said entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalification Application are correct and true as of the date of this affidavit. Firm Name: Signature: Sworn to before me this day of Notary Public Notary Public must not be an officer, director, or stockholder or relative thereof. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 _ICE 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 103358. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: WOOC� By: 9l-I WOO Company (Please Print) 0-0 J pVHr Or . Signature: _ Address Klem K da V� l7 t� © Title: City/State/Zip (Please Print) THE STATE OF TEXAS § COUNTY OFTARRANT § BEFORE ME, the undersigned authority, on this day personally appeared /�o, GI/o001�, , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of W ,f• r S 1 o c for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this 19f� day of t— , 20_21r ��� „• LUXAMVE�LO , Notary Pu ie�in and for the State of Texas NOMt� ow mo IIMM of iTqm t" • • uy Con+niMN" ExpItM ''.,� ur ��.•' AW 26, 2027 NWAW ID IM410-0 !'iii) OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART I Revised July 1, 2011 City Project No. 103358-1 00 45 40 - 1 Business Equity Goal Page 1 of 2 1 SECTION 00 45 40 2 Business Equity Goal 4 APPLICATION OF POLICY 5 If the total dollar value of the contract is $100,000 or more, then a Business Equity goal is applicable. 6 A Business Equity Firm refers to certified Minority-, and/or Women-, owned Business Enterprises 7 (M/WBEs). 9 POLICY STATEMENT 10 It is the policy of the City of Fort Worth to ensure the full and equitable participation of Business Equity 11 Firms when applicable, in the procurement of all goods and services. All requirements and regulations 12 stated in the City's Business Equity Ordinance No.25165-10-2021, (replacing Ordinance No. 24534-11- 13 2020 (codified at: httl)s:Hcodelibrarv.amleaal.com/codes/ftworth/latest/ftworth tx/0-0-0-22593) apply to 14 this bid. 15 16 BUSINESS EQUITY PROJECT GOAL 17 The City's Business Equity goal on this project is 5.62% of the total bid value of the contract (Base bid 18 applies to Parks and Community Services). 19 20 METHODS TO COMPLY WITH THE GOAL 21 On City contracts where a Business Equity Goal is applied, offerors are required to comply with the City's 22 Business Equity Ordinance by meeting or exceeding the above stated goal or otherwise comply with the 23 ordinance through one of the following methods: 1. Commercially useful services performed by a 24 Business Equity prime contractor, 2. Business Equity subcontracting participation, 3. Combination 25 of Business Equity prime services and Business Equity subcontracting participation, 4. Business 26 Equity Joint Venture/Mentor-Protege participation, 5. Good Faith Effort documentation, or 6. Prime 27 contractor Waiver documentation. 28 29 SUBMITTAL OF REOUIRED DOCUMENTATION 30 Applicable documents (listed below) must be submitted electronically with the other required bidding 31 documents at the time of the bid under the respective Project via the Procurement Portal: 32 httDs://fortworthtexas.bonfirehub.com/l)ortal/?tab=ol)enOl3Dortunities 33 OR received no later than 2:00 p.m., on the third City business day after the bid opening date, 34 exclusive of the bid opening date with the respective Project via the Procurement Portal by 35 responding to the message sent within Bonfire to all the bidders. It is highly encouraged that bidders 36 submit required documentation at the time of bid submission. 37 38 The Offeror must submit one or more of the following documents: 39 1. Utilization Form and Letter(s) of Intent, if the goal is met or exceeded; 40 2. Letter of Intent, for all M/WBE Subcontractors; 41 3. Good Faith Effort Form and Utilization Form, including supporting documentation, if 42 participation is less than stated goal, or no Business Equity participation is accomplished; 43 4. Prime Contractor Waiver Form, including supporting documentation, if the Offeror will perform 44 all subcontracting/supplier opportunities; or 45 5. Joint Venture/Mentor-Protege Form, if goal is met or exceeded with a Joint Venture or Mentor- 46 Protege participation. 47 48 These forms can be accessed at: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised June 7, 2024 City Project No. 103358-1 004540-2 Business Equity Goal Page 2 of 2 1 Business Equity Utilization Form and Letter of Intent 2 httDs:HaDDs.fortworthtexas.jzov/Pro_iectResources/ResourcesP/60 - MWBE/Business Equity Utilization 3 Form DVIN 2022 220324.1)df 5 Letter of Intent 6 h"s:HaDDs.fortworthtexas.2ov/Pro_iectResources/ResourcesP/60 - MWBE/Letter of Intent DVIN 7 2021.pdf 8 9 Business Equity Good Faith Effort Form 10 httDs://apps.fortworthtexas.aov/ProiectResources/ResourcesP/60 - MWBE/Good Faith Effort 11 Form DVIN 2022.Ddf 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Business Equity Prime Contractor Waiver Form httl)s://aDDs.fortworthtexas.aov/ProiectResources/ResourcesP/60 - MWBE/MWBE Prime Contractor Waiver-220313.1)df Business Equity Joint Venture Form https:HaDDs.fortworthtexas.izov/ProiectResources/ResourcesP/60 - MWBE/MWBE Joint Venture 220225.pdf FAILURE TO ACHIEVE THE GOAL OR OTHERWISE COMPLY WITH THE ORDINANCE WILL RESULT IN THE BIDDER/OFFEROR BEING DECLARED NON -RESPONSIVE AND THE BID REJECTED. FAILURE TO SUBMIT THE REOUIRED BUSINESS EOUITY DOCUMENTATION OR OTHERWISE COMPLY WITH THE ORDINANCE WILL RESULT IN THE BID BEING DECLARED NON- RESPONSIVE. THE BID REJECTED AND MAY SUBJECT THE BIDDER/OFFEROR TO SANCTIONS AS DESCRIBED IN SEC. 20-373 OF THE ORDINANCE. For Questions, Please Contact the Business Equity Division of the Access and Opportunity Services Department at (817) 392-2674. END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised June 7, 2024 City Project No. 103358-1 005243-1 Agreement Pagel of 6 SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on August 12', 2025, is made by and between the City of Fort Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, ("City"), and Woodv Contractors. Inc. authorized to do business in Texas, acting by and through its duly authorized representative, ("Contractor"). City and Contractor may jointly be referred to as Parties. City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 — WSM-N, Part 1 City Proiect No.103358-1 Article 3. CONTRACT PRICE City agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount, in current funds, of Six Million Ei6t Hundred Seven Thousand Three Hundred Eleven and 501100 Dollars ($6,807,311.50). Contract price maybe adjusted by change orders duly authorized by the Parties. Article 4. CONTRACT TIME 4.1 Final Acceptance. The Work shall be complete for Final Acceptance within 540 days after the date when the Contract Time commences to run, as provided in Paragraph 2.02 of the General Conditions, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. 4.2 Liquidated Damages Contractor recognizes that time is of the essence for completion of Milestones, if any, and to achieve Final Acceptance of the Work and City and the public will suffer from loss of use if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding, the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay City Six Hundred and Fifty Dollars ($650) for each day that expires after the time specified in Paragraph 4.1 for Final Acceptance until the City issues the Final Letter of Acceptance. Article 5. CONTRACT DOCUMENTS 5.1 CONTENTS: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX A.The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised December 8, 2023 City Project No. 103358-1 00 52 43 - 2 Agreement Page 2 of 6 1. This Agreement. Attachments to this Agreement: a. Bid Form 1) Proposal Form 2) Vendor Compliance to State Law Non -Resident Bidder 3) Prequalification Statement 4) State and Federal documents (project specific) b. Current Prevailing Wage Rate Table c. Insurance Certification Form (ACORD or equivalent) d. Payment Bond e. Performance Bond f. Maintenance Bond g. Power of Attorney for the Bonds h. Worker's Compensation Affidavit i. MBE and/or SBE Utilization Form 3. General Conditions. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused. in whole or in part, by anv act. omission or negligence of the citv. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised December 8, 2023 City Project No. 103358-1 005243-3 Agreement Page 3 of 6 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is suecifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in part, by anv act, omission or negligence of the citv. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the City. 7.3 Successors and Assigns. City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability/Non-Waiver of Claims. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor. The failure of City or Contractor to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of City's or Contractor's respective right to insist upon appropriate performance or to assert any such right on any future occasion. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement if signed by someone other than the duly authorized signatory of the Contractor. 7.7 Non -appropriation of Funds. In the event no funds or insufficient funds are appropriated by City in any fiscal period for any payments due hereunder, City will notify Vendor of such occurrence and this Agreement shall terminate on the last day of the fiscal period for which appropriations were received without penalty or expense to City of any kind whatsoever, except as to the portions of the payments herein agreed upon for which funds have been appropriated. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised December 8, 2023 City Project No. 103358-1 00 52 43 - 4 Agreement Page 4 of 6 7.8 Prohibition On Contracts With Companies Boycotting Israel. Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if Contractor has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Contractor certifies that Contractor's signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. 7.9 Prohibition on Boycotting Energy Companies. Contractor acknowledges that in accordance with Chapter 2276 of the Texas Government Code, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2276 of the Texas Government Code. To the extent that Chapter 2276 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries. Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised December 8, 2023 City Project No. 103358-1 005243-5 Agreement Page 5 of 6 7.11 Immigration Nationality Act. Contractor shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Contractor shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Contractor shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Contractor employee who is not legally eligible to perform such services. CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right to immediately terminate this Agreement for violations of this provision by Contractor. 7.12 No Third -Party Beneficiaries. This Agreement gives no rights or benefits to anyone other than the City and the Contractor and there are no third -party beneficiaries. 7.13 No Cause of Action Against Engineer. Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their sureties, shall maintain no direct action against the Engineer, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the City will be the beneficiary of any undertaking by the Engineer. The presence or duties of the Engineer's personnel at a construction site, whether as on -site representatives or otherwise, do not make the Engineer or its personnel in any way responsible for those duties that belong to the City and/or the City's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The Engineer and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised December 8, 2023 City Project No. 103358-1 005243-6 Agreement Page 6 of 6 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective as of the date subscribed by the City's designated Assistant City Manager ("Effective Date"). Contractor: Woody Contractors, Inc. By: gnatur 1 row, l.✓000-7 (Printed Name / Title 4 5-0 Toi,te e- Address City/State/Zip Date City of Fort Worth By: Jesica McEachern Assistant City Manager 08/29/2025 Date 4FORTnaII Attest: =,o ope sv aaan�z os6g4 Jannette Goodall, City Secretary (Seal) M&C: 25-0727 Date: August 12, 2025 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 10KG Preeti KC, P.E. Senior Professional Engineer Approved as to Form and Legality: Douglas Black (Aug 27, 2025 11:00:28 CDT) Douglas W. Black Sr. Assistant City Attorney APPROVAL RECOMMENDED: CWc ,ice i-la. dw Christopher H a rder (A6g 25, 2025 07:41:52 CDT) Chris Harder, P.E., Director Water Department OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised December 8, 2023 WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 — WSM-N, PART I City Project No. 103358-1 0061 13 - 1 PERFORMANCE BOND Page I or2 Bond No. K42081735 I SECTION 00 6113 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, Woodv Contractors. Inc. , known as "Principal" herein 9 and Viailant Insurance Company , a corporate surety(sureties, if more than one) 10 duly authorized to do business in the State of Texas, known as "Surety" herein (whether one oi- 1 I more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created 12 pursuant to the laws of Texas, known as "City" herein, in the penal sum of, Six Million. Eight 13 Hundred Seven Thousand, Three Hundred Eleven Dollars & Fifty Cents Dollars ($6,807,31 1.50), 14 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment 15 of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, 16 successors and assigns, jointly and severally, firmly by these presents. 17 WHEREAS, the Principal has entered into a certain written contract with the City awarded 18 the 12111 day of Auaust , 20 25 , which Contract is hereby referred to and made a part hereof 19 for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other 20 accessories defined by law, in the prosecution of the Work, including any Change Orders, as 21 provided for in said Contract designated as WATER AND SANITARY SEWER 22 REPLACEMENTS CONTRACTS 2019 — WSM-N. PART 1. City Proiect No. 103358-1. 23 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 24 shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully 25 perform the Work, including Change Orders, under the Contract, according to the plans, 26 specifications, and contract documents therein referred to, and as well during any period of 27 extension of the Contract that may be granted on the part of the City, then this obligation shall be 28 and become null and void, otherwise to remain in full force and effect. 29 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 30 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 31 Worth Division. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART I Revised December 8, 2023 City Project No. 103358-1 0061 13-2 PERFORMANCE BOND Page 2 of 2 Bond No. K42081735 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this 5 instrument by duly authorized agents and officers on this the 15"' day of August 2025 . 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 ST: Scipal WitV ncipal Witness as to Surety Elizabeth Gray PRINCIPAL: WOODY CONTRACTORS. INC. BY: Wnd. lL it J rO7�N2me and DTitle) Address: 650 Tower Drive Kennedale. TX 76060 SURETY: VIGILANT INSURANCE COMPANY A BY: Signature / Kvle W. Sweenev. Attornev-in-Fact Name and Title Address: 5400 LBJ Frwv. Suite 600 Dallas. TX 75240 Telephone Number: 214-754-0777 Email Address: suretv cni.chubb.com *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019— WSM-N, PART I Revised December 8, 2023 City Project No. 103358-1 0061 14- 1 PAYMENT BOND Page 1 of 2 Bond No. K42081735 SECTION 00 61 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Woody Contractors, Inc. , known as "Principal" herein, 8 and Vigilant Insurance Cotnt)anv , a corporate surety (sureties), duly 9 authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), 10 are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to I 1 the laws of the State of Texas, known as "City" herein, in the penal sum of Six Million, Eight 12 Hundred Seven Thousand, Three Hundred Eleven Dollars & Fifty Cents Dollars ($6,807,311.50), 13 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment 14 of which sum well and truly be made, we bind ourselves, our heirs, executors, administrators, 15 successors and assigns, jointly and severally, firmly by these presents: 16 WHEREAS, Principal has entered into a certain written Contract with City, awarded the 17 12" day of August , 20 25 , which Contract is hereby referred to and made a part hereof 18 for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and other 19 accessories as defined by law, in the prosecution of the Work as provided for in said Contract and 20 designated as WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 — 2 t WSM-N, PART 1, City Proiect No. 103358-1. 22 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 23 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 24 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 25 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 26 force and effect. 27 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 28 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 29 accordance with the provisions of said statute. 30 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART I Revised December 8, 2023 City Project No. 103358-1 0061 14-2 PAYMENT BOND Page 2 of 2 Bond No. K42081735 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 15`I' day of August , 20 25 . ATTEST: /(Principal) Secretary Wit to Principal ATTEST: (Surety) Secretary Dawn M. Chloros c�a Witnes''s as to Surety Elizabeth Gra 4 PRINCIPAL: WOODY CONTRACTORS, INC. BY: S i 4r: 7rpn (✓O"J,4 Name ale / ' Address: 650 Tower Drive Kennedale. TX 76060 SURETY: VIGILANT INSURANCE COMPANY BY: _ Signature Kvle W. Sweeney. Attorney -in -Fact Name and Title Address: 5400 LBJ Frwv, Suite 600 Dallas, TX 75240 Telephone Number: 214-754-0777 Email Address: surety n,chubb.com 5 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws 6 showing that this person has authority to sign such obligation. If Surety's physical address is 7 different from its mailing address, both must be provided. 8 9 The date of the bond shall not be prior to the date the Contract is awarded. 10 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019— WSM-N, PART I Revised December 8, 2023 City Project No. 103358-1 0061 19 - 1 MAINTENANCE BOND Page I of 3 Bond No. K42081735 I SECTION 00 6119 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Woodv Contractors, Inc. , known as "Principal" herein 9 and Vivilant Insurance Company , a corporate surety (sureties, if more than 10 one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one 1 I or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created 12 pursuant to the laws of the State of Texas, known as "City" herein, in the sum of Six Million, Eiaht 13 Hundred Seven Thousand, Three Hundred Eleven Dollars & Fifty Cents Dollars ($6,807,311.50), 14 lawful money of the United States, to be paid in Font Worth, Tarrant County, Texas, for payment 15 of which sum well and truly be made unto the City and its successors, we bind ourselves, our heirs, 16 executors, administrators, successors and assigns, jointly and severally, firmly by these presents. 17 18 WHEREAS, the Principal has entered into a certain written contract with the City awarded 19 the day of Awo►u'1 �' 20� which Contract is hereby referred to and a made part 20 hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other 21 accessories as defined by law, in the prosecution of the Work, including any Work resulting from 22 a duly authorized Change Order (collectively herein, the "Work") as provided for in said contract 23 and designated as WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 — 24 WSM-N, PART I. City Proiect No. 103358-1, and 25 26 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 27 accordance with the plans, specifications and Contract Documents that the Work is and will remain 28 free from defects in materials or workmanship for and during the period of two (2) years after the 29 date of Final Acceptance of the Work by the City ("Maintenance Period"); and 30 31 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon 32 receiving notice from the City of the need therefor at any time within the Maintenance Period. 33 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART I Revised December 8, 2023 City Project No. 103358-1 0061 19-2 MAINTENANCE BOND Page 2 of 3 Bond No. K42081735 1 NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy 2 any defective Work, for which timely notice was provided by City, to a completion satisfactory to 3 the City, then this obligation shall become null and void; otherwise to remain in full force and 4 effect. 5 6 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 7 noticed defective Work, it is agreed that the City may cause any and all such defective Work to be 8 repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the 9 Surety under this Maintenance bond; and 10 11 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 12 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 13 Worth Division; and 14 15 PROVIDED FURTHER, that this obligation shall be continuous in nature and successive 16 recoveries may be had hereon for successive breaches. 17 18 E CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019— WSM-N, PART 1 Revised December 8, 2023 City Project No. 103358-1 4 5 6 7 8 9 l0 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 0061 19-3 MAINTENANCE BOND Page 3 of 3 Bond No. K42081735 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 15"' day of August 2025 ATTE ((Principal) Secretary Witnes t Principal ATTEST: (Surety) Secretary Dawn iV�oros YSL Witnes rety Elizabeth Gray PRINCIPAL: WOODY CONTRACTORS. INC. BY: Sig re Q� (NOD�Cj Name and Title Address: 650 Tower Drive Kennedale. TX 76060 SURETY: VIGILANT INSURANCE COMPANY BY: Signature Kvle W. Sweenev. Attorney -in -Fact Name and Title Address: 5400 LBJ Frwv. Suite 600 Dallas, TX 75240 Telephone Number: 214-754-0777 Email Address: suretv(@,chubb.com 36 37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address, both must be provided. 40 The date of the bond shall not be prior to the date the Contract is awarded. 41 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019— WSM-N, PART I Revised December 8, 2023 City Project No. 103358-1 Policyholder Information Notice IMPORTANT NOTICE To obtain information or make a complaint You may call Chubb's toll -free telephone number for information or to make a complaint at 1-800-36-CHUBB You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at 1-800-252-3439 You may write the Texas Department of Insurance P.O. Box 149104 Austin, TX 78714-9104 FAX # (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY,• This notice is for information only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para obtener informacion o para someter una queja: Usted puede llamar al numero de telefono gratis de Chubb's para informacion o para someter una queja al 1-800-36-CHUBB Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companfas, coberturas, derechos o quejas al 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas P.O. Box 149104 Austin, TX 78714-9104 FAX # (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection @ tdi. state. tx.us DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiene una disputa concemiente a su prima o a un reclamo, debe comunicarse con el agente primero. Si no se resueve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de informacion y no se convierte en parte o condicion del documento adjunto. Norm 99-10-0299 (Rev. 1-08) C—_HLJBB Power of Attorney Federal Insurance Company I Vigilant Insurance Company I Pacific Indemnity Company Know All by These Presents, That FEDERAL INSURANCE COMPANY, an Indiana corporation, VIGILANT INSURANCE COMPANY, a New York corporation, and PACIFIC INDEMNITY COMPANY, a Wisconsin corporation, do each hereby constitute and appoint Elizabeth Gray, Charles D. Sweeney, Kyle W. Sweeney and MichaelA. Sweeney of Fort Worth, Texas---------------------------------------------------------------------------------------------------------------------------------------- each as their true and lawful Attorney -in -Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety thereon or otherwise, bonds and undertakings and other writings obligatory in the nature thereof (other than bail bonds) given or executed in the course of business, and any instruments amending or altering the same, and consents to the modification or alteration of any instrument referred to in said bonds or obligations. In Witness Whereof, said FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY have each executed and attested these presents and affixed their corporate seals on this 161 day ofSeptember, 2019. Ikiwn M. Chloros. 1ssistant Secretary STATE OF NEW JERSEY County of Hunterdon Stephen M. Hancy. Vice President On this 1611 day of September, 2019, before me, a Notary Public of New Jersey, personally came Dawn M. Chloros, tome known to be Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY, the companies which executed the foregoing Power of Attorney, and the said Dawn M. Chloros, being by me duly sworn, did depose and say that she is Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY and knows the corporate seals thereof, that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of said Companies; and that she signed said Power of Attorney as Assistant Secretary of said Companies by like authority; and that she is acquainted with Stephen M. Haney, and knows him to be Vice President of said Companies; and that the signature of Stephen M. Haney, subscribed to said Power of Attorney is in the genuine handwriting of Stephen M. Haney, and was thereto subscribed by authority of said Companies and in deponent's presence. Notarial Seal q KATHERINE J, ADELAAR NOTARY PUBLIC OF NEW JERSEY �pUBLtO �►'JER9 c� No.2316686 COfM[tIShion Expires July 16, 2024 _ Nulaq' Fuhllc CERTIFICATION Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY on August 30, 2016: "RESOLVED, that the following authorizations relate to the execution, for and on behalf ofthe Company, of bonds, undertakings, recognimrices, contracts and other written commitments orthe Company entered into in the ordinary course of business (each a "written Commitment"): (1) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized to execute any Written Commitment for and on behalfof the Company, under the seal of the Company or otherwise. (2) Each duly appointed attorney -in -fact of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company, under the seal of the Company or otherwise, to the extent that such action is authorized by the grant of powers provided for in such person's written appointment as such attorney -in -fact. (3) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized, for and on behalf of the Company, to appoint in writing any person the attorney - in -fact of the Company with full power and authority to execute, for and on behalf of the Company, under the seal of the Company or otherwise, such Written Commitments of the Company as may be specified in such written appointment, which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments. (4) Each of the Chairman, the President and the vice Presidents of the Company is hereby authorized, for and on behalfof the Company, to delegate in writing to any other officer of the Company the authority to execute, for and on behalf of the Company, under the Company's seal or otherwise, such Written Commitments of the Company as are specified in such written delegation, which specification may, be by general type or class of Written Commitments or by specification ofone or more particular Written Commitments. (5) The signature orally officer or other person executing any Written Commitment or appointment or delegation pursuant to this Resolution, and the seal of the Company, may be affixed by facsimile on such Written Commitment or written appointment or delegation. FURTHER RESOLVED, that the foregoing Resolution shall not be deemed to be an exclusive statement of the powers and authority of officers, employees and other persons to act for and on behalfof the Company, and such Resolution shall not limit orotherwise affect the exercise of any such power or authority otherwise validly granted or vested." I, Dawn NI. Chloros, Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY (the "Companies") do hereby certify that (i) the foregoing Resolutions adopted by the Board of Directors of the Companies are true, correct and in full force and effect, (III the foregoing Power of Attorney is true, correct and in full force and effect. Given under my hand and seals ofsaid Companies at Whitehouse Station, NJ, this 15th day of August, 2025. uggust,2025. ® n 5111-,1ka11l..Cl� 'AUTAMA , 4 �,, IIy ; Dawn M.Chloros.AssistantSecretar? IN'fHE EVENT' YOU WISH TO VERIFY'111E AUTHENTICITY OF THIS BOND OR NOTIFY US OF ANY OTHER MNITER, PLEASE CONTACT US Kr: Telephone (908) 903.3493 Fax (908) 903.3656 e-mail: surety@chubb.com FED- VIG-PI (rev. 08-18) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 006125-1 CERTIFICATE OF INSURANCE Page 1 of 1 SECTION 00 6125 CERTIFICATE OF INSURANCE END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Article 1 — Definitions and Terminology ..................................... 1.01 Defined Terms.......................................................... 1.02 Terminology............................................................. Article 2 — Preliminary Matters............................................................. 2.01 Copies of Documents........................................................ 2.02 Commencement of Contract Time; Notice to Proceed .... 2.03 Starting the Work.............................................................. 2.04 Before Starting Construction ............................................ 2.05 Preconstruction Conference .............................................. 2.06 Public Meeting.................................................................. 2.07 Initial Acceptance of Schedules ........................................ Article 3 — Contract Documents: Intent, Amending, Reuse ......... 3.01 Intent........................................................................... 3.02 Reference Standards ................................................... 3.03 Reporting and Resolving Discrepancies .................... 3.04 Amending and Supplementing Contract Documents 3.05 Reuse of Documents .................................................. 3.06 Electronic Data........................................................... Page ......................................1 ......................................1 ...................................... 6 ................... 7 .................. 7 .................. 7 .................. 8 .................. 8 .................. 8 .................. 8 .................. 8 Article 4 — Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions; Reference Points...........................................................................................................11 4.01 Availability of Lands.................................................................................................................. 11 4.02 Subsurface and Physical Conditions..........................................................................................12 4.03 Differing Subsurface or Physical Conditions.............................................................................12 4.04 Underground Facilities...............................................................................................................13 4.05 Reference Points.........................................................................................................................14 4.06 Hazardous Environmental Condition at Site..............................................................................14 Article 5 — Bonds and Insurance.....................................................................................................................16 5.01 Licensed Sureties and Insurers................................................................................................... 16 5.02 Performance, Payment, and Maintenance Bonds.......................................................................16 5.03 Certificates of Insurance.............................................................................................................16 5.04 Contractor's Insurance................................................................................................................18 5.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................19 Article 6 — Contractor's Responsibilities........................................................................................................19 6.01 Supervision and Superintendence...............................................................................................19 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 6.02 Labor; Working Hours................................................................................................................20 6.03 Services, Materials, and Equipment........................................................................................... 20 6.04 Project Schedule..........................................................................................................................21 6.05 Substitutes and "Or-Equals"....................................................................................................... 21 6.06 Concerning Subcontractors, Suppliers, and Others....................................................................24 6.07 Wage Rates..................................................................................................................................25 6.08 Patent Fees and Royalties........................................................................................................... 26 6.09 Permits and Utilities....................................................................................................................27 6.10 Laws and Regulations................................................................................................................. 27 6.11 Taxes...........................................................................................................................................28 6.12 Use of Site and Other Areas....................................................................................................... 28 6.13 Record Documents......................................................................................................................29 6.14 Safety and Protection.................................................................................................................. 29 6.15 Safety Representative.................................................................................................................. 30 6.16 Hazard Communication Programs............................................................................................. 30 6.17 Emergencies and/or Rectification............................................................................................... 30 6.18 Submittals....................................................................................................................................31 6.19 Continuing the Work................................................................................................................... 32 6.20 Contractor's General Warranty and Guarantee..........................................................................32 6.21 Indemnification......................................................................................................................... 33 6.22 Delegation of Professional Design Services.............................................................................. 34 6.23 Right to Audit.............................................................................................................................. 34 6.24 Nondiscrimination.......................................................................................................................35 Article 7 - Other Work at the Site................................................................................................................... 35 7.01 Related Work at Site................................................................................................................... 35 7.02 Coordination................................................................................................................................36 Article 8 - City's Responsibilities................................................................................................................... 36 8.01 Communications to Contractor...................................................................................................36 8.02 Furnish Data................................................................................................................................36 8.03 Pay When Due............................................................................................................................36 8.04 Lands and Easements; Reports and Tests...................................................................................36 8.05 Change Orders.............................................................................................................................36 8.06 Inspections, Tests, and Approvals.............................................................................................. 36 8.07 Limitations on City's Responsibilities....................................................................................... 37 8.08 Undisclosed Hazardous Environmental Condition....................................................................37 8.09 Compliance with Safety Program............................................................................................... 37 Article 9 - City's Observation Status During Construction...........................................................................37 9.01 City's Project Manager............................................................................................................37 9.02 Visits to Site................................................................................................................................ 37 9.03 Authorized Variations in Work..................................................................................................38 9.04 Rejecting Defective Work..........................................................................................................38 9.05 Determinations for Work Performed..........................................................................................38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work ..................... 38 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 Article 10 - Changes in the Work; Claims; Extra Work................................................................................38 10.01 Authorized Changes in the Work............................................................................................... 38 10.02 Unauthorized Changes in the Work........................................................................................... 39 10.03 Execution of Change Orders....................................................................................................... 39 10.04 Extra Work.................................................................................................................................. 39 10.05 Notification to Surety.................................................................................................................. 39 10.06 Contract Claims Process............................................................................................................. 40 Article 11 - Cost of the Work; Allowances; Unit Price Work; Plans Quantity Measurement ...................... 41 11.01 Cost of the Work.........................................................................................................................41 11.02 Allowances..................................................................................................................................43 11.03 Unit Price Work.......................................................................................................................... 44 11.04 Plans Quantity Measurement......................................................................................................45 Article 12 - Change of Contract Price; Change of Contract Time.................................................................46 12.01 Change of Contract Price............................................................................................................ 46 12.02 Change of Contract Time............................................................................................................ 47 12.03 Delays..........................................................................................................................................47 Article 13 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 48 13.01 Notice of Defects........................................................................................................................ 48 13.02 Access to Work........................................................................................................................... 48 13.03 Tests and Inspections.................................................................................................................. 48 13.04 Uncovering Work........................................................................................................................49 13.05 City May Stop the Work............................................................................................................. 49 13.06 Correction or Removal of Defective Work................................................................................ 50 13.07 Correction Period........................................................................................................................ 50 13.08 Acceptance of Defective Work................................................................................................... 51 13.09 City May Correct Defective Work............................................................................................. 51 Article 14 - Payments to Contractor and Completion....................................................................................52 14.01 Schedule of Values...................................................................................................................... 52 14.02 Progress Payments...................................................................................................................... 52 14.03 Contractor's Warranty of Title................................................................................................... 54 14.04 Partial Utilization........................................................................................................................ 55 14.05 Final Inspection...........................................................................................................................55 14.06 Final Acceptance......................................................................................................................... 55 14.07 Final Payment..............................................................................................................................56 14.08 Final Completion Delayed and Partial Retainage Release........................................................ 56 14.09 Waiver of Claims........................................................................................................................ 57 Article 15 - Suspension of Work and Termination........................................................................................ 57 15.01 City May Suspend Work............................................................................................................. 57 15.02 City May Terminate for Cause................................................................................................... 58 15.03 City May Terminate For Convenience....................................................................................... 60 Article 16 - Dispute Resolution...................................................................................................................... 61 16.01 Methods and Procedures.............................................................................................................61 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 Article 17 — Miscellaneous ............................................. 17.01 Giving Notice ............................................. 17.02 Computation of Times ............................... 17.03 Cumulative Remedies ................................ 17.04 Survival of Obligations .............................. 17.05 Headings ..................................................... CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 ................................................................................. 62 ................................................................................. 62 ................................................................................. 62 ................................................................................. 62 ................................................................................. 63 ................................................................................. 63 WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 1 of 63 ARTICLE I — DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda —Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement —The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment —The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award — Authorization by the City Council for the City to enter into an Agreement. 6. Bid —The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder —The individual or entity who submits a Bid directly to City. 8. Bidding Documents —The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements —The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 2 of 63 12. Change Order —A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 13. City— The City of Fort Worth, Texas, a home -rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 14. City Attorney — The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 15. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 16. City Manager — The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 17. Contract Claim —A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 18. Contract —The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, or agreements, whether written or oral. 19. Contract Documents —Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 20. Contract Price —The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 21. Contract Time —The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance. 22. Contractor —The individual or entity with whom City has entered into the Agreement. 23. Cost of the Work —See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 3 of 63 24. Damage Claims — A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 25. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 26. Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 27. Director of Parks and Community Services — The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Planning and Development — The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Transportation Public Works — The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30. Director of Water Department — The officially appointed Director of the Water Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 32. Effective Date of the Agreement —The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 33. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 34. Extra Work — Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 35. Field Order — A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 36. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 4 of 63 37. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 38. General Requirements —Sections of Division 1 of the Contract Documents. 39. Hazardous Environmental Condition —The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 40. Hazardous Waste —Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 41. Laws and Regulations —Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 42. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 43. Major Item — An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or $25,000 whichever is less. 44. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 45. Notice of Award —The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 46. Notice to Proceed —A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 47. PCBs —Polychlorinated biphenyls. 48. Petroleum —Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non -Hazardous Waste and crude oils. 49. Plans — See definition of Drawings. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 5 of 63 50. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 51. Project —The Work to be performed under the Contract Documents. 52. Project Manager —The authorized representative of the City who will be assigned to the Site. 53. Public Meeting — An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 54. Radioactive Material —Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 55. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 56. Samples —Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 57. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 58. Schedule of Values —A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 59. Site —Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 60. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 61. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 6 of 63 62. Submittals —All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 63. Substantial Completion — The stage in the progress of the Project when the Work is sufficiently complete in accordance with the Contract Documents for Final Inspection. 64. Successful Bidder —The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions —That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities —All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 69 Unit Price Work —See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours — Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain Terms orAdjectives: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 — PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time; Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given no earlier than 14 days after the Effective Date of the Agreement, unless agreed to by both parties in writing. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to the Public Meeting if scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3 — CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation, (b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subject to the provisions of Paragraph 6.18.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 11 of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's on-line electronic document management and collaboration system site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4 — AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated.• The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated.• 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized.- Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06. G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 16 of 63 ARTICLE 5 — BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (other evidence of insurance requested by City or any other additional insured) in at least the minimum amount as specified in the Supplementary Conditions which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6 — CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid, unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 01 32 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.13. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions: No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Minority and Women Business Enterprise Compliance: It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for MWBE goal, Contractor is required to comply with the intent of the City's MWBE Business Enterprise Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 25 of 63 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 lth day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Affadavit. Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code related to paying prevailing wage rates on completion of the project. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 27 of 63 the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.13. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: hUs://co=troUer.texas. Qov/taxes/permit/ 6.12 Use of Site and Other Areas A. Limitation on Use of Site and OtherAreas: Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review.• 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.B. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDFD TO OPERATE AND BF FFFF,CTIVF F`TFN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 34 of 63 SPECIFICALLY INTFNDFD TO OPERATE AND BE EFFECTTVF FVFN IF TT TS ALLEGED OR PROVEN THAT ALL OR SOME, OF THE DAMAGES RFTNG SOUGHT WERE CAUSED. TN WVLOLE OR IN PART. BY ANY ACT. OMjSSTON OIR NEGLIGFNCF, OF THE CITY. 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7 — OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8 — CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements; Reports and Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Project Manager City will provide one or more Project Manager(s) during the construction period. The duties and responsibilities and the limitations of authority of City's Project Manager during construction are set forth in the Contract Documents. The City's Project Manager for this Contract is identified in the Supplementary Conditions. 9.02 Visits to Site A. City's Project Manager will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Manager will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Manager will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Manager's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Manager's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 38 of 63 9.03 Authorized Variations in Work City's Project Manager may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Manager believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Manager will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 39 of 63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.0 LA, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11— COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Costs Included.- The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.013, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.0l.B, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55% markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded.• The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.0I.A.I or specifically covered by Paragraph 11.0I.A.4, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.01.A and 11.01.13, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre -bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 44 of 63 a. the pre -bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre -bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outlined under "Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 46 of 63 E. For callout work or non -site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.0l.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.0l.B.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit (determined as provided in Paragraph 12.01.C). C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.0l.A.1, 11.0l.A.2. and 11.0l.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 11.01.A.4 and 11.01.A.5, the Contractor's fee shall be five percent (5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.0l.C.2.a and 12.0l.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.0l.A.1 and 11.0l.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; no fee shall be payable on the basis of costs itemized under Paragraphs I1.0l.A.6, and 11.01.13; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 48 of 63 ARTICLE 13 — TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 49 of 63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 50 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as described in subsection C. unless otherwise stipulated in the Contract Documents. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 53 of 63 B. Review of Applications: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules, that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor; or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective or completed Work has been damaged by the Contractor or subcontractors requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement will be assessed against the monies due the Contractor, not as a penalty, but as damages suffered by the City. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment: 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any part of the Work which has specifically been identified in the Contract Documents, or which City determines constitutes a separately functioning and usable part of the Work that can be used for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Finallnspection A. Upon written notice from Contractor that the entire Work is Substantially Complete in accordance with the Contract Documents: 1. Within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective ("Punch List Items"). Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification to the City of Substantial Completion and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 2. Should the City concur that Substantial Completion has been achieved with the exception of any Punch List Items, Contract Time will resume for the duration it takes for Contractor to achieve Final Acceptance. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 56 of 63 14.07 Final Payment A. Application for Payment: 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any, to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments for employees, subcontractors, and suppliers; and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15 — SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 58 of 63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-2011 established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature, the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily; or 8. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.02.13, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 60 of 63 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16 — DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.1) shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 62 of 63 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17 — MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 007200-1 GENERAL CONDITIONS Page 63 of 63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revision: 3/08/2024 City Project No. 103358-1 00 73 00 SUPPLEMENTARY CONDITIONS SECTION 00 73 00 SUPPLEMENTARY CONDITIONS TO GENERAL CONDITIONS Supplementary Conditions Page 1 of 5 These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are modified or supplemented remain in full force and effect as so modified or supplemented. All provisions of the General Conditions which are not so modified or supplemented remain in full force and effect. Defined Terms The terms used in these Supplementary Conditions which are defined in the General Conditions have the meaning assigned to them in the General Conditions, unless specifically noted herein. Modifications and Supplements The following are instructions that modify or supplement specific paragraphs in the General Conditions and other Contract Documents. SC-3.03B.2, "Resolving Discrepancies" Plans govern over Specifications. SC-4.01A Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the Contract Drawings. SC-4.01A.1., "Availability of Lands" The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of November 6, 2024: Outstanding Right -Of -Way, and/or Easements to Be Acquired PARCEL OWNER TARGET DATE NUMBER OF POSSESSION None The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. If Contractor considers the final easements provided to differ materially from the representations on the Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, notify City in writing associated with the differing easement line locations. SC-4.01A.2, "Availability of Lands" CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised March 08, 2024 City Project No. 103358-1 00 73 00 SUPPLEMENTARY CONDITIONS Page 2 of 5 Utilities or obstructions to be removed, adjusted, and/or relocated The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated as of November 6, 2024. EXPECTED UTILITY AND LOCATION TARGET DATE OF OWNER ADJUSTMENT None The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. SC-4.02A., "Subsurface and Physical Conditions" The following are reports of explorations and tests of subsurface conditions at the site of the Work: A Laboratory Test Results for 2019 WSM-N Coring Project Report No. CPN# 103358, dated September 2, 2022, prepared by the City of Fort Worth Capital Delivery Division/Soil Lab. The following are drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site of the Work: Summary of Test Hole Information and Coordinates, May 10, 2023, Yellow Rose Mapping LLC. SC-4.06A., "Hazardous Environmental Conditions at Site" The following are reports and drawings of existing hazardous environmental conditions known to the City: None SC-5.03A., "Certificates of Insurance" The entities listed below are "additional insureds as their interest may appear" including their respective officers, directors, agents and employees. (1) City (2) Consultant: None (3) Other: None SC-5.04A., "Contractor's Insurance" The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following coverages for not less than the following amounts or greater where required by laws and regulations: 5.04A. Workers' Compensation, under Paragraph GC-5.04A. Statutory limits Employer's liability $100, 000 each accident/occurrence $100, 000 Disease - each employee $500, 000 Disease -policy limit SC-5.04B., "Contractor's Insurance" CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART I Revised March 08, 2024 City Project No. 103358-1 00 73 00 SUPPLEMENTARY CONDITIONS Page 3 of 5 5.04B. Commercial General Liability, under Paragraph GC-5.0413. Contractor's Liability Insurance under Paragraph GC-5.04B., which shall be on a per project basis covering the Contractor with minimum limits of: $1,000,000 each occurrence $2, 000, 000 aggregate limit The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. SC 5.04C., "Contractor's Insurance" 5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor's Liability Insurance under Paragraph GC-5.04C., which shall be in an amount not less than the following amounts: (1) Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: $250, 000 Bodily Injury per person / $500, 000 Bodily Injury per accident / $100, 000 Property Damage SC-5.04D., "Contractor's Insurance" The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks. None The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: (1) General Aggregate: (2) Each Occurrence: Required for this Contract CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised March 08, 2024 $Confirm Limits with Railroad $Confirm Limits with Railroad X Not required for this Contract WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 City Project No. 103358-1 00 73 00 SUPPLEMENTARY CONDITIONS Page 4 of 5 With respect to the above outlined insurance requirements, the following shall govern: I. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. 2. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of -way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. 3. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. 4. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. SC-6.04., "Project Schedule" Project schedule shall be tier 3 for the project. SC-6.07 A.., "Duty to pay Prevailing Wage Rates" The following is the prevailing wage rate table(s) applicable to this project and is provided in the Appendixes: CFW Horizontal Wage Rate Table A copy of the table is also available by accessing the City's website at: httas:Hauns.fortworthtexas.eov/Pro i ectResources/ You can access the file by following the directory path: 02-Construction Documents/Specifications/Div00 — General Conditions SC-6.09., "Permits and Utilities" SC-6.09A., "Contractor obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: 1) Street Use Permit 2) Stormwater Pollution Prevention (SWPPP) 3) Floodplain Development Permit 4) Tree Removal Permit CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART I Revised March 08, 2024 City Project No. 103358-1 00 73 00 SUPPLEMENTARY CONDITIONS Page 5 of 5 SC-6.09B. "City obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the City: None SC-6.09C. "Outstanding permits and licenses" The following is a list of known outstanding permits and/or licenses to be acquired, if any as of November 6, 2024. Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION None SC-7.02., "Coordination" The individuals or entities listed below have contracts with the City for the performance of other work at the Site: Vendor None Scope of Work SC-8.01, "Communications to Contractor" None SC-9.01., "City's Project Manager" Coordination Authority The City's Project Manager for this Contract is Preeti KC, or his/her successor pursuant to written notification from the Director of Water Department. SC-13.03C., "Tests and Inspections" None SC-16.01C.1, "Methods and Procedures" None END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1/22/2016 F. Griffin SC-9.01., "City's Project Representative" wording changed to City's Project Manager. 3/9/2020 D.V. Magana SC-6.07, Updated the link such that files can be accessed via the City's website. 10/06/23 Michael Owen SC-6.07, Allow affidavit regarding paying prevailing wages to be submitted on completion of job, as opposed to with each progress report 3/08/24 Michael Owen Removed revisions related to affidavit, as those changes have been made in General Conditions CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised March 08, 2024 City Project No. 103358-1 FORTWORTH. City of Fort Worth Division 01 - General Requirements 05/10/2023 011100-1 SUMMARY OF WORK SECTION 01 11 00 SUMMARY OF WORK PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 3 1. Summary of Work to be performed in accordance with the Contract Documents B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 01 11 00 - 2 SUMMARY OF WORK Page 2 of 3 b. Excavated and waste materials shall be stored in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. c. If the street is occupied by railroad tracks, the Work shall be carried on in such manner as not to interfere with the operation of the railroad. 1) All Work shall be in accordance with railroad requirements set forth in Division 0 as well as the railroad permit. D. Work within Easements 1. Do not enter upon private property for any purpose without having previously obtained permission from the owner of such property. 2. Do not store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the City. 3. Unless specifically provided otherwise, clear all rights -of -way or easements of obstructions which must be removed to make possible proper prosecution of the Work as a part of the project construction operations. 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the Work. a. Such notice shall be made at least 48 hours in advance of the beginning of the Work. b. Notices shall be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6. Fence a. Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence work within easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 01 11 00 - 3 SUMMARY OF WORK Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 012500-1 SUBSTITUTION PROCEDURES SECTION 0125 00 SUBSTITUTION PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 4 The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 012500-2 SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, the resulting cost and/or time reduction will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 012500-3 SUBSTITUTION PROCEDURES Page 3 of 4 4. No additional contract time will be given for substitution. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the City's opinion, acceptance will require substantial revision of the original design d. In the City's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 012500-4 SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Firm Address Date Telephone For Use by City: Approved City CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Recommended Not recommended By Date Remarks Date Rej ected Recommended Received late WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 SECTION 01 31 19 PRECONSTRUCTION MEETING PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013119-1 PRECONSTRUCTION MEETING Page 1 of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the execution of the Agreement and before Work is started. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Project Representative b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 17, 2012 City Project No. 103358-1 01 31 19 - 2 PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Construction Schedule a. Prepare baseline construction schedule in accordance with Section 0132 16 and provide at Preconstruction Meeting. b. City will notify Contractor of any schedule changes upon Notice of Preconstruction Meeting. 5. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals in. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. M/WBE or MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 17, 2012 City Project No. 103358-1 013119-3 PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 17, 2012 City Project No. 103358-1 SECTION 013120 PROJECT MEETINGS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 013120-1 PROJECT MEETINGS Page 1 of 3 1. Provisions for project meetings throughout the construction period to enable orderly review of the progress of the Work and to provide for systematic discussion of potential problems B. Deviations this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Schedule, attend and administer as specified, periodic progress meetings, and specially called meetings throughout progress of the Work. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meetings administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. 4. Meetings, in addition to those specified in this Section, may be held when requested by the City, Engineer or Contractor. B. Pre -Construction Neighborhood Meeting 1. After the execution of the Agreement, but before construction is allowed to begin, attend 1 Public Meeting with affected residents to: a. Present projected schedule, including construction start date b. Answer any construction related questions 2. Meeting Location a. Location of meeting to be determined by the City. 3. Attendees CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N-1 Revised July 1, 2011 City Project No. 103358-1 013120-2 PROJECT MEETINGS Page 2 of 3 a. Contractor b. Project Representative c. Other City representatives 4. Meeting Schedule a. In general, the neighborhood meeting will occur within the 2 weeks following the pre -construction conference. b. In no case will construction be allowed to begin until this meeting is held. C. Progress Meetings 1. Formal project coordination meetings will be held periodically. Meetings will be scheduled and administered by Project Representative. 2. Additional progress meetings to discuss specific topics will be conducted on an asneeded basis. Such additional meetings shall include, but not be limited to: a. Coordinating shutdowns b. Installation of piping and equipment c. Coordination between other construction projects d. Resolution of construction issues e. Equipment approval 3. The Project Representative will preside at progress meetings, prepare the notes of the meeting and distribute copies of the same to all participants who so request by fully completing the attendance form to be circulated at the beginning of each meeting. 4. Attendance shall include: a. Contractor's project manager b. Contractor's superintendent c. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request d. Engineer's representatives e. City's representatives f. Others, as requested by the Project Representative 5. Preliminary Agenda may include: a. Review of Work progress since previous meeting b. Field observations, problems, conflicts c. Items which impede construction schedule d. Review of off -site fabrication, delivery schedules e. Review of construction interfacing and sequencing requirements with other construction contracts f. Corrective measures and procedures to regain projected schedule g. Revisions to construction schedule h. Progress, schedule, during succeeding Work period i. Coordination of schedules j. Review submittal schedules k. Maintenance of quality standards 1. Pending changes and substitutions in. Review proposed changes for: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N-1 Revised July 1, 2011 City Project No. 103358-1 013120-3 PROJECT MEETINGS Page 3 of 3 1) Effect on construction schedule and on completion date 2) Effect on other contracts of the Project n. Review Record Documents o. Review monthly pay request p. Review status of Requests for Information 6. Meeting Schedule a. Progress meetings will be held periodically as determined by the Project Representative. 1) Additional meetings may be held at the request of the: a) City b) Engineer c) Contractor 7. Meeting Location a. The City will establish a meeting location. 1) To the extent practicable, meetings will be held at the Site. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 — WSM-N-1 City Project No. 103358-1 013216-1 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 10 1 SECTION 0132 16 2 CONSTRUCTION SCHEDULE 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General requirements for the preparation, submittal, updating, status reporting and 7 management of the Construction Progress Schedule 8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance 9 Document 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 — General Requirements 15 D. Purpose 16 The City of Fort Worth (City) is committed to delivering quality, cost-effective 17 infrastructure to its citizens in a timely manner. A key tool to achieve this purpose is a 18 properly structured schedule with accurate updates. This supports effective monitoring 19 of progress and is input to critical decision making by the project manager throughout 20 the life of the project. Data from the updated project schedule is utilized in status 21 reporting to various levels of the City organization and the citizenry. 22 23 This Document complements the City's Standard Agreement to guide the construction 24 contractor (Contractor) in preparing and submitting acceptable schedules for use by the 25 City in project delivery. The expectation is the performance of the work follows the 26 accepted schedule and adhere to the contractual timeline. 27 28 The Contractor will designate a qualified representative (Project Scheduler) responsible 29 for developing and updating the schedule and preparing status reporting as required by 30 the City. 31 1.2 PRICE AND PAYMENT PROCEDURES 32 A. Measurement and Payment 33 1. Work associated with this Item is considered subsidiary to the various items bid. 34 No separate payment will be allowed for this Item. 35 2. Non-compliance with this specification is grounds for City to withhold payment of 36 the Contractor's invoices until Contractor achieves said compliance. 37 1.3 REFERENCES 38 A. Project Schedules CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised October 6, 2023 City Project No. 103358-1 013216-2 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 10 1 Each project is represented by City's master project schedule that encompasses the 2 entire scope of activities envisioned by the City to properly deliver the work. When the 3 City contracts with a Contractor to perform construction of the Work, the Contractor 4 will develop and maintain a schedule for their scope of work in alignment with the 5 City's standard schedule requirements as defined herein. The data and information of 6 each such schedule will be leveraged and become integral in the master project 7 schedule as deemed appropriate by the City's Project Control Specialist and approved 8 by the City's Project Manager. 9 10 1. Master Project Schedule 11 The master project schedule is a holistic representation of the scheduled activities 12 and milestones for the total project and be Critical Path Method (CPM) based. The 13 City's Project Manager is accountable for oversight of the development and 14 maintaining a master project schedule for each project. When the City contracts for 15 the design and/or construction of the project, the master project schedule will 16 incorporate elements of the Design and Construction schedules as deemed 17 appropriate by the City's Project Control Specialist. The assigned City Project 18 Control Specialist creates and maintains the master project schedule in P6 (City's 19 scheduling software). 20 21 2. Construction Schedule 22 The Contractor is responsible for developing and maintaining a schedule for the 23 scope of the Contractor's contractual requirements. The Contractor will issue an 24 initial schedule for review and acceptance by the City's Project Control Specialist 25 and the City's Project Manager as a baseline schedule for Contractor's scope of 26 work. Contractor will issue current, accurate updates of their schedule (Progress 27 Schedule) to the City at the end of each month throughout the life of their work. 28 B. Schedule Tiers 29 The City has a portfolio of projects that vary widely in size, complexity and content 30 requiring different scheduling to effectively deliver each project. The City uses a 31 "tiered" approach to align the proper schedule with the criteria for each project. The 32 City's Project Manager determines the appropriate schedule tier for each project, and 33 includes that designation and the associated requirements in the Contractor's scope of 34 work. The following is a summary of the "tiers". 35 36 1. Tier 1: Small Size and Short Duration Project (design not required) 37 The City develops and maintains a Master Project Schedule for the project. No 38 schedule submittal is required from Contractor. City's Project Control Specialist 39 acquires any necessary schedule status data or information through discussions with 40 the respective party on an as -needed basis. 41 42 2. Tier 2: Small Size and Short to Medium Duration Project 43 The City develops and maintains a Master Project Schedule for the project. The 44 Contractor identifies "start" and "finish" milestone dates on key elements of their 45 work as agreed with the City's Project Manager at the kickoff of their work effort. 46 The Contractor issues to the City, updates to the "start" and "finish" dates for such 47 milestones at the end of each month throughout the life of their work on the project. 48 49 3. Tier 3: Medium and Large Size and/or Complex Projects Regardless of Duration CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised October 6, 2023 City Project No. 103358-1 013216-3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 10 1 The City develops and maintains a Master Project Schedule for the project. The 2 Contractor develops a Baseline Schedule and maintains the schedule of their 3 respective scope of work on the project at a level of detail (generally Level 3) and in 4 alignment with the WBS structure in Section 1.4.H as agreed by the Project 5 Manager. The Contractor issues to the City, updates of their respective schedule 6 (Progress Schedule) at the end of each month throughout the life of their work on the 7 project. 8 C. Schedule Types 9 Project delivery for the City utilizes two types of schedules as noted below. The City 10 develops and maintains a Master Project Schedule as a "baseline" schedule and issue 11 monthly updates to the City Project Manager (end of each month) as a "progress" 12 schedule. The Contractor prepares and submits each schedule type to fulfill their 13 contractual requirements. 14 15 1. Baseline Schedule 16 The Contractor develops and submits to the City, an initial schedule for their scope 17 of work in alignment with this specification. Once reviewed and accepted by the 18 City, it becomes the "Baseline" schedule and is the basis against which all progress 19 is measured. The baseline schedule will be updated when there is a change or 20 addition to the scope of work impacting the duration of the work, and only after 21 receipt of a duly authorized change order issued by the City. In the event progress is 22 significantly behind schedule, the City's Project Manager may authorize an update 23 to the baseline schedule to facilitate a more practical evaluation of progress. An 24 example of a Baseline Schedule is provided in Specification 0132 16.1 25 Construction Project Schedule Baseline Example. 26 27 2. Progress Schedule 28 The Contractor updates their schedule at the end of each month to represent the 29 progress achieved in the work which includes any impact from authorized changes 30 in the work. The updated schedule must accurately reflect the current status of the 31 work at that point in time and is referred to as the "Progress Schedule". The City's 32 Project Manager and Project Control Specialist reviews and accepts each progress 33 schedule. In the event a progress schedule is deemed not acceptable, the 34 unacceptable issues are identified by the City within 5 working days and the 35 Contractor must provide an acceptable progress schedule within 5 working days 36 after receipt of non -acceptance notification. An example of a Progress Schedule is 37 provided in Specification 0132 16.2 Construction Project Schedule Progress 38 Example. 39 D. City Standard Schedule requirements 40 The following is an overview of the methodology for developing and maintaining a 41 schedule for delivery of a project. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised October 6, 2023 City Project No. 103358-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 0132 16 - 4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 10 1. Schedule Framework - The schedule will be based on the defined scope of work and follow the (Critical Path Methodology) CPM method. The Contractor's schedule will align with the requirements of this specification and will be cost loaded to reflect their plan for execution. Compliance with cost loading can be provided with traditional cost loading of line items OR a projected cost per month for the project when the initial schedule is submitted, updated on a quarterly basis is significant change is anticipated. Overall schedule duration will align with the contractual requirements for the respective scope of work and be reflected in City's Master Project Schedule. The Project Number and Name of the Project is required on each schedule and must match the City's project data. E. Schedule File Name All schedules submitted to the City for a project will have a file name that begins with the City's project number followed by the name of the project followed by baseline (if a baseline schedule) or the year and month (if a progress schedule), as shown below. • Baseline Schedule File Name Format: City Project Number _Project Name —Baseline Example: 101376 North Montgomery Street HMAC Baseline • Progress Schedule File Name Format: City Project Number _Project Name_YYYY-MM Example: 101376 North Montgomery Street HNIAC_2018_01 • Project Schedule Progress Narrative File Name Format: City Project Number —Project Name_PN_YYYY-MM Example: 101376 North Montgomery Street HMAC PN_2018_01 F. Schedule Templates The Contractor will utilize the relevant sections from the City's templates provided in the City's document management system as the basis for creating their respective project schedule. Specifically, the Contractor's schedule will align with the layout of the Construction section. The templates are identified by type of project as noted below. • Arterials • Aviation • Neighborhood Streets • Sidewalks (later) • Quiet Zones (later) • Street Lights (later) • Intersection Improvements (later) • Parks • Storm water • Street Maintenance • Traffic • Water 48 G. Schedule Calendar CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised October 6, 2023 City Project No. 103358-1 013216-5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 10 1 The City's standard calendar for schedule development purposes is based on a 5-day 2 workweek and accounts for the City's nine standard holidays (New Years, Martin 3 Luther King, Memorial, Juneteenth, Independence, Labor, Thanksgiving, day after 4 Thanksgiving, and Christmas). The Contractor will establish a schedule calendar as 5 part of the schedule development process and provide to the Project Control Specialist 6 as part of the basis for their schedule. Variations between the City's calendar and the 7 Contractor's calendar must be resolved prior to the City's acceptance of their Baseline 8 project schedule. 9 10 H. WBS & Milestone Standards for Schedule Development 11 The scope of work to be accomplished by the Contractor is represented in the schedule 12 in the form of a Work Breakdown Structure (WBS). The WBS is the basis for the 13 development of the schedule activities and shall be imbedded and depicted in the 14 schedule. 15 16 The following is a summary of the standards to be followed in preparing and 17 maintaining a schedule for project delivery. 18 19 1. Contractor is required to utilize the City's WBS structure and respective 20 project type template for "Construction" as shown in Section 1.4.1-1 below. 21 Additional activities may be added to Levels 1 - 4 to accommodate the needs 22 of the organization executing the work. Specifically, the Contractor will add 23 activities under WBS XXXXXX.80.83 "Construction Execution" that 24 delineates the activities associated with the various components of the work. 25 26 2. Contractor is required to adhere to the City's Standard Milestones as shown 27 in Section 1.4.1 below. Contractor will include additional milestones 28 representing intermediate deliverables as required to accurately reflect their 29 scope of work. 30 31 I. Schedule Activities 32 Activities are the discrete elements of work that make up the schedule. They will be 33 organized under the umbrella of the WBS. Activity descriptions should adequately 34 describe the activity, and in some cases the extent of the activity. All activities are 35 logically tied with a predecessor and a successor. The only exception to this rule is for 36 "project start" and "project finish" milestones. 37 38 The activity duration is based on the physical amount of work to be performed for the 39 stated activity, with a maximum duration of 20 working days OR a continuous activity 40 in one location. If the work for any one activity exceeds 20 days, break that activity 41 down incrementally to achieve this duration constraint. Any exception to this requires 42 review and acceptance by the City's Project Control Specialist. 43 44 J. Change Orders 45 When a Change Order is issued by the City, the impact is incorporated into the 46 previously accepted baseline schedule as an update, to clearly show impact to the 47 project timeline. The Contractor submits this updated baseline schedule to the City for CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised October 6, 2023 City Project No. 103358-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 013216-6 CONSTRUCTION PROGRESS SCHEDULE Page 6 of 10 review and acceptance as described in Section 1.5 below. Updated baseline schedules adhere to the following: 1. Time extensions associated with approved contract modifications are limited to the actual amount of time the project activities are anticipated to be delayed, unless otherwise approved by the Program Manager. 2. The re-baselined schedule is submitted by the Contractor within ten workdays after the date of receipt of the approved Change Order. 3. The changes in logic or durations approved by the City are used to analyze the impact of the change and is included in the Change Order. The coding for a new activity(s) added to the schedule for the Change Order includes the Change Order number in the Activity ID. Use as many activities as needed to accurately show the work of the Change Order. Revisions to the baseline schedule are not effective until accepted by the City. K. City's Work Breakdown Structure WBS Code WBS Name XXXXXX Project Name XXXXXX.30 Design XXXXXX.30.10 Design Contractor Agreement XXXXXX.30.20 Conceptual Design (30%) XXXXXX30.30 Preliminary Design (60%) XXXXXX30.40 Final Design XXXXXX.30.50 Environmental XXXXXX.30.60 Permits XXXXXX.30.60.10 Permits - Identification XXXXXX.30.60.20 Permits - Review/Approve XXXXXX.40 ROW & Easements XXXXXX.40.10 ROW Negotiations XXXXXX.40.20 Condemnation XXXXXX.70 Utility Relocation XXXXXX.70.10 Utility Relocation Co-ordination XXXXXX.80 Construction XXXXXX.80.81 Bid and Award XXXXXX.80.83 Construction Execution XXXXXX.80.85 Inspection XXXXXX.80.86 Landscaping XXXXXX.90 Closeout XXXXXX.90.10 Construction Contract Close-out XXXXXX.90.40 Design Contract Closure L. City's Standard Milestones The following milestone activities (i.e., important events on a project that mark critical points in time) are of particular interest to the City and must be reflected in the project schedule for all phases of work. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised October 6, 2023 City Project No. 103358-1 013216-7 CONSTRUCTION PROGRESS SCHEDULE Page 7 of 10 1 Activity ID Activity Name 2 Design 3 3020 Award Design Agreement 4 3040 Issue Notice to Proceed - Design Engineer 5 3100 Design Kick-off Meeting 6 3120 Submit Conceptual Plans to Utilities, ROW, Traffic, Parks, Storm Water, 7 Water & Sewer 8 3150 Peer Review Meeting/Design Review meeting (technical) 9 3160 Conduct Design Public Meeting #1 (required) 10 3170 Conceptual Design Complete 11 3220 Submit Preliminary Plans and Specifications to Utilities, ROW, Traffic, 12 Parks, Storm Water, Water & Sewer 13 3250 Conduct Design Public Meeting #2 (required) 14 3260 Preliminary Design Complete 15 3310 Submit Final Design to Utilities, ROW, Traffic, Parks, Storm Water, 16 Water & Sewer 17 3330 Conduct Design Public Meeting #3 (if required) 18 3360 Final Design Complete 19 ROW & Easements 20 4000 Right of Way Start 21 4230 Right of Way Complete 22 Utility Relocation 23 7000 Utilities Start 24 7120 Utilities Cleared/Complete 25 Construction 26 Bid and Award 27 8110 Start Advertisement 28 8150 Conduct Bid Opening 29 8240 Award Construction Contract 30 Construction Execution 31 8330 Conduct Construction Public Meeting #4 Pre -Construction 32 8350 Construction Start 33 8370 Substantial Completion 34 8540 Construction Completion 35 9130 Notice of Completion/Green Sheet 36 9150 Construction Contract Closed 37 9420 Design Contract Closed 38 39 1.4 SUBMITTALS 40 A. Schedule Submittal & Review 41 The City's Project Manager is responsible for reviews and acceptance of the Contractor's 42 schedule. The City's Project Control Specialist is responsible for ensuring alignment of 43 the Contractor's baseline and progress schedules with the Master Project Schedule as 44 support to the City's Project Manager. The City reviews and accepts or rejects the 45 schedule within ten workdays of Contractor's submittal. 46 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised October 6, 2023 City Project No. 103358-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 013216-8 CONSTRUCTION PROGRESS SCHEDULE Page 8 of 10 Schedule Format The Contractor will submit each schedule in two electronic forms, one in native file format (.xer, .xml, .mpx) and the second in a pdf format, in the City's document management system in the location dedicated for this purpose and identified by the Project Manager. In the event the Contractor does not use Primavera P6 or MS Project for scheduling purposes, the schedule information must be submitted in .xls or .xlsx format in compliance with the sample layout (See Specification 0132 16.1 Construction Project Schedule Baseline Example), including activity predecessors, successors and total float. 2. Initial & Baseline Schedule The Contractor will develop their schedule for their scope of work and submit their initial schedule in electronic form (in the file formats noted above), in the City's document management system in the location dedicated for this purpose at least 5 working days prior to Pre Construction Meeting. The City's Project Manager and Project Control Specialist review this initial schedule to determine alignment with the City's Master Project Schedule, including format & WBS structure. Following the City's review, feedback is provided to the Contractor for their use in finalizing their initial schedule and issuing (within five workdays) their Baseline Schedule for final review and acceptance by the City. 3. Progress Schedule The Contractor will update and issue their project schedule (Progress Schedule) by the last day of each month throughout the life of their work on the project. The Progress Schedule is submitted in electronic form as noted above, in the City's document management system in the location dedicated for this purpose. The City's Project Control team reviews each Progress Schedule for data and information that support the assessment of the update to the schedule. In the event data or information is missing or incomplete, the Project Controls Specialist communicates directly with the Contractor's scheduler for providing same. The Contractor re -submits the corrected Progress Schedule within S workdays, following the submittal process noted above. The City's Project Manager and Project Control Specialist review the Contractor's progress schedule for acceptance and to monitor performance and progress. The following list of items are required to ensure proper status information is contained in the Progress Schedule. • Baseline Start date • Baseline Finish Date • % Complete • Float • Activity Logic (dependencies) • Critical Path • Activities added or deleted • Expected Baseline Finish date • Variance to the Baseline Finish Date CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised October 6, 2023 City Project No. 103358-1 013216-9 CONSTRUCTION PROGRESS SCHEDULE Page 9 of 10 1 B. Monthly Construction Status Report 2 The Contractor submits a written status report (referred to as a progress narrative) at the 3 monthly progress meeting (if monthly meetings are held) or at the end of each month to 4 accompany the Progress Schedule submittal, using the standard format provided in 5 Specification 0132 16.3 Construction Project Schedule Progress Narrative. The content 6 of the Construction Project Schedule Progress Narrative should be concise and complete 7 to include only changes, delays, and anticipated problems. 8 9 C. Submittal Process 10 • Schedules and Monthly Construction Status Reports are submitted in in the City's 11 document management system in the location dedicated for this purpose. 12 • Once the project has been completed and Final Acceptance has been issued by the 13 City, no further progress schedules or construction status reports are required from 14 the Contractor. 15 1. 16 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 17 1.6 CLOSEOUT SUBMITTALS [NOT USED] 18 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 19 1.8 QUALITY ASSURANCE 20 A. The person preparing and revising the construction Progress Schedule shall be 21 experienced in the preparation of schedules of similar complexity. 22 B. Schedule and supporting documents addressed in this Specification shall be prepared, 23 updated and revised to accurately reflect the performance of the construction. 24 C. Contractor is responsible for the quality of all submittals in this section meeting the 25 standard of care for the construction industry for similar projects. 26 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 27 1.10 FIELD [SITE] CONDITIONS [NOT USED] 28 1.11 WARRANTY [NOT USED] 29 1.12 ATTACHMENTS 30 Spec 0132 16.1 Construction Project Schedule Baseline Example 31 Spec 0132 16.2 Construction Project Schedule Progress Example 32 Spec 0132 16.3 Construction Project Schedule Progress Narrative 33 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised October 6, 2023 City Project No. 103358-1 10 01 32 16 - 10 CONSTRUCTION PROGRESS SCHEDULE Page 10 of 10 2 PART 2 - PRODUCTS [NOT USED] 3 PART 3 - EXECUTION [NOT USED] 4 5 6 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/13/2021 Michael Owen Revised to update specification requirements and eliminate duplicate schedule specifications. 10/06/2023 Michael Owen Added "Juneteenth" to list of City Holidays under 1.3 G. "Schedule Calendar" CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised October 6, 2023 City Project No. 103358-1 0132 16.1 CONSTRUCTION PROGRESS SCHEDULE — BASELINE EXAMPLE Pagel of 5 1 SECTION 0132 16.1 2 CONSTRUCTION SCHEDULE - BASELINE EXAMPLE 3 PART1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 The following is an example of a Contractor's project schedule that illustrates the data and expectation for schedule content depicting the baseline for the project. This version of the schedule is referred to as a "baseline" schedule. This example is intended to provide guidance for the Contractor when developing and submitting a baseline schedule. See CFW Specification 0132 16 Construction Schedule for details and requirements regarding the Contractor's project schedule. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 r �z �c 0 0 CFW - Integrated Program �+ vttviry iu I Httiviry Iva me O No FTW - Project Manager uu I nu � orarc I rinisn 434 1 434 02-Ap,18 17-D-19 Pre -Construction 38 8200 Award Construction Contract 0 8210 SW Pollution Prevention Plan (Contractor Prepare and Submit) 10 8220 Site WalkThrough 1 82 PrwCon Sruction 38 8230 Notice To ProceedtPreCondrudion Meeting 1 8240 Pre -Construction -Public Meeting 1 8250 Mobilization 20 Construction Contract Execution 230 83 Coushu dion 230 Sheet 1 90 Water & Stain 40 3010 Temp Water 10 3000 Construction Start 0 3020 Lay 8'' water and services 25 3030 Temp Paving Repair 5 Paving 45 3040 Excavaion 5 3050 +Stablization 5 3060 Paving 30 3070 Flat Work 20 3080 Clean up 10 3090 Street 1 Complete 0 Sheet 2 113 Water & Slam 63 3100 Temp Water 10 3110 La 8" water and services 15 Actual Work • • Milestone � Remaining Work • • Critical Milestone � Critical Remaining Work • • Completed Milestone 38 0 0 38 0 30 30 90 40 0 0 5 5 45 5 5 30 20 0 0 3 63 0 5 8 5 0 45 5 5 02-Apr-18 23May-18 02-Apr-18 02-Apr-18 13Apr-18 02-Apr-18 02-Apr-18 02-Apr-18 23May-18 17-Apr-18 17-APF18 25-Apr-18 25-Apr-18 26-Apr-18 23May-18 03May-18 01-Apr-19 03May- 18 01-Apr-19 03May, 18 10-Sep-18 03-May-18 28-,L rF18 03May- 18 16May-18 03May 18 17-May-18 21-,Ln-18 22-Junr18 --- 28-JJ rr18 09,L F18 1 0-Sep-18 09-,ll F18 13Ju118 16.L F18 20-Jul- 8 23,L F18 31-Aug18 06Aug18 31-Aug18 27-Aug18 10.Sep-18 14Sep 18 29-Junr18 14Deo-18 29-Jun-18 27- Sep -18 29-Junr18 13Jul-18 16_,L F18 03Aug18 06Aug18 10-Aug18 1 &Aug18 22-Aug18 23Aug18 29-Aug18 30-Aug-18 27Sep -18 05-0d-18 10Deo-18 05-0d-18 I 11-01-18 12-0d-18 I 18-Oc[-18 Project Schedule Data Date: 30-Mar-18 YYedece55[ JlI WeSS0Y5 ",I tut, LVlB 2,2 Float M AIMIJIJullAISIOINID JIFIMlAIMIJIJn1lAISIOINID JI 396 8210, 8220 0 8200 424 F 8200 8230 0 - ___'__________ 8220 8240 0 8230 3000, 8250 0 8240 3310 81 ---- - - ' g I I I 0 ' 140 0 I I I 3000 3020 0 8240 3010, 8500 0 3010 3030 0 3020 3040, 3100 0 140 3030 13050 110 3040 I3060 3050 3070, 3180 110 3060 3080 140 3070 3090 140 3080 8510 140 -- - ' 77 67 3030 3110 0 3100 3120 0 3110 3130 0 ' 3120 3140 0 ' 3130 3150, 3220 0 3140 13160 67 ' ■ ■ i7 3150 3170, 3250 77 3160 3180 77 , � Remainin... Actual rev... CIP-01B -Neighborhood Street Project Ba... Construction Baseline Schedule Example FORT WORTH 00 r �z 10 z C-i z°::� za t=] C7 O b z zUJ obi 00 CFW - Integrated Program I Project Schedule I Data Date: 30-Mar-18 --- ' I """ M I ull A I9I C11 N I D I J I FlI A I M I J J,Tll A I S O I N I D 2 JFA 20 20 19-0Oct 18 15Nov-18 3170 30t 3190 77" 3190 Flat Work 20 20 0&Nov-18 03Dec18 317 3200 I 77 I 3100 Clean up 10 10 27-Norr18 10.Dec-18 3190 3210 77 3210 Street 2 Complete 0 0 10Dec18 r3200 8510 77 ----------=---------=--------- - r-- Street 3 80 80 30-Aug-13 24-Dec18 571I Water & Storm 13 13 30-Arl 1 &Sep-18 0 I I l Z 3220 IempVVater 4 4 Yl Arl 0b5ep-18 3140 3230 3230 Lay 8'' water and seNiaaS 8 8 06-Sep 18 17Sep -18 3220 3240 0 3240 Temp Pacng Repair 1 1 18-Sep-18 1&Sep-18 3230 3250, 3310 0 Paving 50 50 12Oct 18 24-Dec18 ------------------- 6i 3250 Excavation S 5 12-Oct18 18-Oct-18 3240, 31t 3260 57 3260 Stabllzatlon 5 -5 19-oct-18 25-Oct-18 22� 3270 67 ' 3270 Pacing 20 20 26-Oct-18 26Nov-18 3260 3280 - --- --- -_ 6� - -�' 3280 Flat Work 20 20 15-Nov-18 17-Dec 18 3270 3290 57 3290 Clean up 10 10 11-0ec18 24-Dec18 3280 3300 57 3300 Street 3 Complete 0 0 24-Di 3290 8510 _- - - - _____ __-- ----- _-_ "-�---- - I---------- ; 67 - �I Street 134 134 19-Sep-18 01-Apr-19 0',', Water&Storm 69 69 13Sep-18 27-Dec18 0 3310 Temp Water 6 6 19-Sep-18 26-Sep-18 3240, 82` 3320 0 , Lay �',o4er and services 20 20 24-Oct-18 Jv310 3'�Jvi1 t5 , 3330 Temp Paving Repair 3 3 25-0ct-18 2&0ct-18 3320 3340 0 3340 Lay 8'' Sewer Lines L-3203 & L-8346 and Services 20 20 30-Oct-18 2&Nov-18 3330 3350 --- ------ - - 0 3350 Lay 8'' Sewer Lines L-3212 & L-8355 and Services 15 15 29-N-18 19-De&18 3340 3360 0 3360 Temp Faking Repair 5 5 20-Dec 18 27-Dec18 3350 3370 0 Paving 60 60 07-Jan-19 01-Apr-19 I T I D 3370 Excavation 10 10 07-Jan-19 18fin-19 3360 3380 0 3380 Stablizatlon 10 10 22-Jan-19 04-Feb-19 3370 3390 0 , 3390 Paving 20 20 05Fetr 19 01 3380 3400 0 - -_ - -------------- - 3400 Flat Work 20 20 25-Felr19 25Mar-19 3390 3410 D 3410 Clean up 10 10 19-Mar-19 01-Apr-19 3400 3420 0 ; 3420 Street Complete/Substantial Complete 0 0 01-Apr-19 3410 8510 r - 0 - �I -�I ; ----- - Inspections 27 276 0May-18 & OOJarr19 50 Inspection 276 276 03-May-18 O�Ja n-19 0 500 Inspectiony22� m5 18 Y5-h�ar-19 3000 8510 5 ----------------- - -- -- 8510 Final Inspection 10 10 02-Apr-19 15-Apr-19 �420, 33r 8520 0 8520 Corr plete Punch List Tasks 30 30 16-Apr-19 I 28-May-19 8510 18530 0 Actual Work O O Milestone Remainin... � Remaining Work • O Critical Milestone � Actual Lev... - CIP01B - Neighborhood Street FORT WORTH. w Critical Remaining Work • •Completed Milestone Project Ba... Construction Baseline Schedule Example — — uA r u CFW - Integrated Program >cmlty I u Project Schedule H=al Iva me I uu I Hu I 'a,a I "i" I rredecesscl su 8530 1 Final WalkThrough for -Completed Punch List Tasl6. 1 1 1 1 1 05-Jun-19 05-J-19 8520 18540 8540 Constiu don Final Completion 0 0 05-JJrr19 8530 9100,9110 Closeout 135 135 06-Jun-19 17-DecI9 90 Closeout 135 135 06-Jun-19 17-Dec 19 Construction Contract Close-out 135 135 06-Jun-19 17-DecI9 As-BakSurvey 5 5 06-Jun-19 12-,Ln-19 9100 AsBuilt Survey (Submitted by Contractor) 5 5 05-Jun-19 12-J-19 8540 9110 contract Closeout 135 135 05-Jun-19 17-De,19 M 9110 Contract Reconciliation 30 30 05-Jun-19 18-Jul19 9070,85= 9120 9120 Submittals (Project Closeout Documentation) 38 38 19-JW9 11Sep-19 9110 9130 9130 0 0 230ct-19 9120 9140 9140 Final Constmchon Contract Invoice Paid 1 1 14-NM9 14-Nov-19 9130 9150 9150 ConstmtLon Contract Closed 0 0 14-Nov-19 9140 916o 1 9160 Lessons Learned 1 1 17-Dec -19 17-DGc 19 19150 � Actual Work O � Remaining Work O � Critical Remaining Work • Data Date: 30-Mar-18 tutu 2uta 2u2u M,AIMIJ�JuIIAIS 0 1 N I D JIFIMIAIM JJJuIIAISIOINID JIF - ----- --I111111 I I I I ---- ----- - ------ -- O Milestone o Remainin... FORT WORTH. 00 O Critical Milestone - Actual Lev... CIP-01B - Neighborhood Street • Completed Milestone Project Ba... Construction Baseline Schedule Example aA DATE July 20, 2018 0132 16.1 CONSTRUCTION PROGRESS SCHEDULE — BASELINE EXAMPLE Page 5 of 5 END OF SECTION NAME M. Jarrell Initial Issue Revision Log SUMMARY OF CHANGE May 7, 2021 M Owen Revised name due to revising the schedule specification CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 0132 16.2 CONSTRUCTION PROGRESS SCHEDULE — PROGRESS EXAMPLE Pagel of 5 SECTION 0132 16.2 CONSTRUCTION SCHEDULE - PROGRESS EXAMPLE PART1- GENERAL The following is an example of a Contractor's project schedule that illustrates the data and expectation for schedule content depicting the progress for the project. This version of the schedule is referred to as a "progress" schedule. This example is intended to provide guidance for the Contractor when developing and submitting a progress schedule. See CFW Specification 0132 16 Construction Schedule for details and requirements regarding the Contractor's project schedule. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 ~c 0 CFW - Integrated Program �+ vttvity w � ettiviry Iva me O No FTW - Project Manager Pre -Construction 8200 Award Construction Contrail Project Schedule VU I KU tlyssal%o I LL rroiea Jtalt I L L totiea FInlan a mplete 432 411 02-Apr-18 17Dec 19 8220 Site 1 8210 SW 0 8230 Notice1 8240 PreC 82 Pre C 8 8250 Mobilization 20 Construction Contract Execution 230 83 Cori dion 230 Sheet 1 90 Water & Storm 40 3000 Construction Start 0 3010 Temp Water f 10 3020 Lay 8'' water and services 25 3030 Temp Paving Repair 5 Paving 45 2040 Excavation 5 3050 Stabh"'on 5 3060 Paving 30 3070 Flat Work 20 3080 Clean up 10 3090 Street 1 Complete 0 Sheet 2 113 Water & Slam 63 3100 Temp Water 10 3110 La 15 3120 Temp5 3130 La 8 3140 Tem 5 3150 Storm Erain & Structures 20 Paving ■ 45 3160 Excavation 5 3170 Stablizatlon 5 WalkThrough Pollution Prevention Plan (Contractor Prepare and Submit} 1 To ProceedtP reCons[rudion Meeting on5ructlon - Pubic Meeting on dructlon 3 8" water end services Pawing Repair 8" Sewer and Sernces p Paving Repair JTarc I Finim 02Apr-18A ' 13Dec-19 11 02-Apr-18 23May-18 02-Apr-18A 15May-18 0 100% � 02-Apr-18 02- Apr -18A 0 100% 02- Apr -18 02- Apr -18 02-Apr-18A 02-Apr-18A 0 100°5 r 02-Apr-18 13Apr-18 02 Apr-18A 13-Apr-18 A 0 100% 17-Apr-18 17-Apr -18 17Apr -18A 17-Apr-18A 0 100% 25-18 25-Apr-18 1&Apr-18A 19-Apr-18A 11 0% 02-Apr-18 23-May-18 02-Apr-18A 15-May-18 11 50% 26-Apr-18 23May-18 18-18A 15-May-18 230 03May-18 01-Apr-19 01-May-18 2&Mar-Mar 230 0% 03May-18 01-Apr-19 01-May-18 2&Mar19 90 03May-18 10-Sep-18 �I 01 May-18 05-Sep-18 40 -� 03May-18 28-J-18 01-May-18 26-J-18 0 0% I03May-18 01-May-18 10 090 03May-18 16-May-18 01-May-18 14-MEW-18 25 0% 17-May-18 21-J1n-18 15-May-18 19-Jin-18 5 0% �22-Jun-18 2&Jirr18 20-Jun-18 26-llrr18 45 _ _ ■ `09 Jul-18 10-Sep-18� 0`Ju F18 05-Sep-18 5 t G% �0&Juk18 1&J1118 O5Juk18 11-Jul-18 5 0% 16Ju018 20-,LN8 12JullI 18-Jul-18 30 Oq6 23Juk18 11-Aug-18 1&Jull8 29-Arl 20 046 06Aug18 31-Aug18 02-Aug13 29-Aug18 10 640 27-Aug-18 10-Sep-18 23Aug18 OFSep-18 0 i 046 � 10-Sep-18� 06Sep-18 113 2&Jun-18 14Lgo-18 27Jurr18 05-Dec-18 63 2&Jun-18 27-Sep18 27-Jun-18 25 Sep 10 0% 2&Jun-18 13JJ118 27Jurr18 11-Jul-18 15 I. 0 1&Jull 03Aug18 12-JU-18 01-Arl 5 046 OFrAug18 10-Aug18 02Arl 0&Arl 8 046 13Aug18 22-Aug18 0&Aug18 21-Aug 2&Aug18 20-Aug18 27-Aug18 _ 25-Sep 18 5 0% 23Aug-18 29-Aug18 20 0% 30-Aug18 27-Sep18 45 05Oct 18 10-Dwo-18 03-Od 18 06C1ec-18 5 0% � O5Oct 18 i 11-Oot 18 03-0c611 09-0c618 5 QRo 11,0,18 11&Oct-18 1,, ( d r8 I 16-(,.r8 Actual Work • • Milestone - Remainin... Remaining Work • • Critical Milestone - Actual Lev... Critical Remaining Work • • Completed Milestone Project Ba... Data Date: 30-Apr-18 140 2 140 2 77 � I oral variance-CL zuru turn Float Finish [Date `"IJlJ JIY IW IJ�JIAI� I'Y� 0 2 400 6 0 4 j 85 6 I . 0 2 0 2 I I I 0 2 � 0 2 0 2 i F I 140 � I 110 2 110 2 110 2 - - - 140 2 140 2 67, 52 I I 0 2 0 2 0 2 0 2 67 2 77 2 I I 67 2 77 2 CIP-01P -Neighborhood Street Construction Progress Schedule Example FORT WORTH® N 0 P e� CFW - Integrated Program Project Schedule Data Date: 30-Apr-18 CA mplete Float Finish Date JJA J JJA .J 3180 ' Paving h 20 20 0% 19-Oct 18 1`Nov 18 17-od 18 13Nov-18 7 2 I, 3190 Flat Work 20 20 0% 0 Nw-18 03uec 18 31 Cot-18 29-Nw-18 77 2 3200 Clear up 10 10 0% 1 27-Nw-18 10.�o- 18 21-Non 18 %-Dec-18 77 2 3210 Street 2 Complete 0 0 0% 1&Dec18 06-Dec-18 77 - 2 _ Street 3 80 80 K-Aug-18 24-Dec18 23-Aug18 20-Dec-18 67 2 1 I I I Water &Storm 13 13 30-Aug-18 18-Sep-18 28-Aug18 14-Sep-18 0 2 3220 1—pVVater 4 4 U% R(IAu9_18 05-Sep-18 28-Aug18 31-Aug18 0 2 rK 3230 Lay 8'' water and sawices 8 8 0% 06-Sep-18 17-Sep -18 04Sep-18 13Sep-18 0 2 I I ' 3240 Temp Paving Repair 1 1 0% 18Sep-18 18-18 14Sep-18 14Sep-18 0 2 Paving 50 50 _ 120ct-18 24Deo-18 10-0ct 18 20-Dec-18 67 2 -' - - --- 3250 Excavation .,_ S 5 0% 12-Oct 18-Oct-18 10-oct-18 - 16-Oct-18 67 2 3260 Stall 5 -5 0% 19-oct-18 25-Oct18 17-Oct18 23-Oct18 67 2 3270 Pacing 20 20 a% 260ct-18 26-Nov-18 24-0ct-18 20Nw-18 67 3280 Flat Work 20 20 0% 16-Nov-18 17 Dec l8 14-Nov-18 I DeC 18 67 2 3290 Cleanup 10 10 q% fl-Do-18. 24Dwo-18 07-Dec-18 20Dec-18 67 2 3300 Street 3 Complete 0 0 01% 24-Dw,18 20 Dec 1867 2 .. Street 134 134 Jllff 19Sep-18 01-Apr-19 17Sep -18 28-Mar-19 0 ,2 Water & Storm 69 69 19-Sep-18 27-Dec18 I TSep-18 24-Dec-18 2 2 3310 TempWater 6 6 096 1&Se(-18 25-Sep-18 17Sep-18 24Sep-18 O 2 Lay �w4er and services 20 20 boo �4Sep�B 22-6c4- 0 2 3330 Temp Paving Repair 3 3 0% 25 Oct-18 2&0ct-18 23-0ct-18 25-0ct-18 Q 2 l 3340 Lay 8'' Sewer Lines L-3203 & L-8346 and Services 20 20 0% 30 0,F 18 2&Nov-18 26-Od 18 2&Nov-18 0 --__, _--_ 2 3350 Lay 8'' Sewer Lines L 3212 & L 8355 and Services 15 15 0% 29-Nov-18 19-Dwo-18 27-Nov-18 17-Dec -18 0 2 I I I I I 3360 Temp Paving Repair 5 5 0% 20-Dec 18 27 Lee 18 1gDee 18 24-Dec-18 0 2 Paving 60 60 67-Jan-19 01-Apr-19 03-Jan-19 28-Mar-19 0 1 3370 Excavation 10 10 0% 07-Jan-19 18Jan-19 03-Jan-19 16-Jan-19 0 2 3380 Stabl¢ahon 10 10 0% 22-Jan-19 04-Feb-19 17-Jan-19 31-Jan-19 0 2 3390 Pacng 20 20 0% 05-Feb-19 04-Mar-19 01-FatF19 28-Felr19 0 2 3400 Flat Work 2@ 20 0% 26-Feb 19 25-Mar-19 22 Feb 19 21-Mar-19 0 2 3410 Cleanup 10 10 a% 19-Mar-19. 01-Apr-19 15-Mar1928Mar19 0 2 ------- 3420 - Street 4 Complete/Substantial Complete 0 0 U% 01-Apr-19 2&Mar19 0 2 - -�I ---- __------- Inspections _ 276 276 03May-l8 05-Jarr19 014vYay-18 03-Jin-19 0 2 8500 Inspection 225 225 690 03May-18 25-Mar--19 01-May-18 21-Mar-19 5 2 8510 Final inspection �6 16 64o 62-Aprrr 19 �r 4pr 11 1&Mar-19 1l-Aprr 19 0 8520 Complete Funch List Tasks 30 30 0% 16-Apr-19 28-May-19 12-Apr-19 23May-19 0� 2 8540 Constru lion Final Completion 0 0 0% 05-Jin-19 I 03-,Ln-18 OI 2 I I � Actual Work O O Milestone o Remainin... ro � Remaining Work • O Critical Milestone Actual Lev... CIP-01P -Neighborhood Street FORT WORTH® � Critical Remaining Work • • Completed Milestone Project Ba... Construction Progress Schedule Example — yr w r !L CFW - Integrated Program I Project Schedule ac[NIly IU Acnvny Name UU KU CL F'rolect Start CL Y[oJec[ Finisn I I I Co mlplelteo I I 8530 Final WalkThrough for Completed Punch List Tai 1 1 0% 05-Jun-19 105-.Ln-19 85 Inspection 275 276 . 0% 03May-18 _I 05-J1rr19 Closeout 135 135 �_ 06-Jun-19 17 Dec 19 90 Closeout 135 135 0% O6-Jun-19 17-Deo-19 Construction Contract Closeout IL135 135 06Jun-19 17 Dec 19 As -Built Survey 5 5 06-JUn-19 12-Jan-19 .� 9100 AsBuitSurvey(Submilted by Contractor) 5 5 0% 06-Jun-19 12-J1n-19 Contract Closeout 135 135 O6-J-19 17 Dec 19 9110 Contract Reconciliation 30 30 0% 06JUn-19 18-Jll-N9 91�mittals(Protect Closeout Documentation) 38 38 0% 19-JUI-19 11- Sep -19 9130 Notice of CompletionlGreen Sheet 0 0 0% 230et-19 9140 Final Construction Contract Invoice Paid 1 1 0% 14-Nov-19 7Nov-19 9150 Constmdion Contract nosed -0 0 0% 14Nov-19 9160 Lessons Learned 1 1 090 17 D-10 17 [�o-19 Actual Work O O Milestone Remaining Work O O Critical Milestone Critical Remaining Work • ♦ Completed Milestone Data Date: 30-Apr-18 dart Fimh 1 lobl Van— -CL L111tl Lnla 1. at R—h Date �NIJIJIAlIII JII IA�JIJIAII IIY -'JI 03-Jun-19 03-.Ln-19 0 2 01-May-18 03.11rr19 0 2 04-Jun-19 13De&19 0 2 04-Jun-19 13Dec-19 0 2 f �. 04-Jun-19 13Di9 0 2 04-Jun-19 10-Jan-19 25 2 04-Jun-19 1 10-.Ln-19 25 2 04-Jun-19 J 13Dec 19 0 2 04-Jun-19 16-Jul19 0 2 17�J19 09-Sep-19 0 2 --- --- ----I 21-Oct-19 0 2 12-Nov-19 12-Nov-19 0 2 12-Nov-19 0 2 13DQc19 13Dec 9 0 2 - Remainin... - - Actual Lev. CIP-01P - Neighborhood Street FORT WORTH, .. Project Ba... Construction Progress Schedule Example DATE July 20, 2018 0132 16.2 CONSTRUCTION PROGRESS SCHEDULE — PROGRESS EXAMPLE Page 5 of 5 END OF SECTION NAME M. Jarrell Initial Issue Revision Log SUMMARY OF CHANGE May 7, 2021 M Owen Revised name due to revising the schedule specification CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 Reporting Period: Project Name: City Project No: City Project Manager: 0132 16.3 —PROGRESS NARRATIVE Page 1 of 1 SECTION 0132 16.3 CONSTRUCTION PROJECT SCHEDULE PROGRESS NARRATIVE Date Issued: Contractor Company Name: Contractor Schedule Contact: A. List of activities changed in the reporting period. 1. (insert text here) 2. (insert text here) 3. (insert text here) 4. (insert text here) 5. (insert text here) 6. (insert text here) B. List any potential delays and provide mitigation actions 1. (insert text here) 2. (insert text here) 3. (insert text here) C. List any actual delays and provide recovery actions 1. (insert text here) 2. (insert text here) 3. (insert text here) City of Fort Worth, Texas WATER AND SANITARY SEWER Construction Project Schedule Narrative Report for CFW Projects REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised August 13, 2021 City Project No. 103358-1 Page 1 of 1 013233-1 PRECONSTRUCTION VIDEO Page 1 of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 01 32 33 - 2 PRECONSTRUCTION VIDEO PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE Page 2 of 2 WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 SECTION 0133 00 SUBMITTALS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 SUBMITTALS Pagel of 8 General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 01 33 00 - 2 SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 %2 inches x 11 inches to 8 %2 inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 01 33 00 - 3 SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 01 33 00 - 4 SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 01 33 00 - 5 SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code I 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 01 33 00 - 6 SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 01 33 00 - 7 SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Use the Request for Information (RFI) form provided by the City. 3. Numbering of RFI a. Prefix with "RFI" followed by series number, "-xxx", beginning with "01" and increasing sequentially with each additional transmittal. 4. Sufficient information shall be attached to permit a written response without further information. 5. The City will log each request and will review the request. a. If review of the project information request indicates that a change to the Contract Documents is required, the City will issue a Field Order or Change Order, as appropriate. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 013300-8 SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 0135 13- 1 SPECIAL PROJECT PROCEDURES Page 1 of 8 1 SECTION 0135 13 2 SPECIAL PROJECT PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Use of Explosives, Drop Weight, Etc. 11 e. Water Department Notification 12 f. Public Notification Prior to Beginning Construction 13 g. Coordination with United States Army Corps of Engineers 14 h. Coordination within Railroad permits areas 15 i. Dust Control 16 j. Employee Parking 17 B. Deviations from this City of Fort Worth Standard Specification 18 1. None. 19 C. Related Specification Sections include, but are not necessarily limited to: 20 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 21 2. Division 1 — General Requirements 22 3. Section 33 12 25 — Connection to Existing Water Mains 23 1.2 PRICE AND PAYMENT PROCEDURES 24 A. Measurement and Payment 25 1. Coordination within Railroad permit areas 26 a. Measurement 27 1) Measurement for this Item will be by lump sum. 28 b. Payment 29 1) The work performed and materials furnished in accordance with this Item 30 will be paid for at the lump sum price bid for Railroad Coordination. 31 c. The price bid shall include: 32 1) Mobilization 33 2) Inspection 34 3) Safety training 35 4) Additional Insurance 36 5) Insurance Certificates 37 6) Other requirements associated with general coordination with Railroad, 38 including additional employees required to protect the right-of-way and 39 property of the Railroad from damage arising out of and/or from the 40 construction of the Project. 41 2. Railroad Flagmen 42 a. Measurement CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised March 11, 2022 City Project No. 103358-1 013513-2 SPECIAL PROJECT PROCEDURES Page 2 of 8 1 1) M asurement for this Item will be per working day. 2 b. Payment 3 1) The work performed and materials furnished in accordance with this Item 4 will be paid for each working day that Railroad Flagmen are present at the 5 Site. 6 c. The price bid shall include: 7 1) Coordination for scheduling flagmen 8 2) Flagmen 9 3) Other requirements associated with Railroad 10 3. All other items 11 a. Work associated with these Items is considered subsidiary to the various Items 12 bid. No separate payment will be allowed for this Item. 13 1.3 REFERENCES 14 A. Reference Standards 15 1. Reference standards cited in this Specification refer to the current reference 16 standard published at the time of the latest revision date logged at the end of this 17 Specification, unless a date is specifically cited. 18 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 19 High Voltage Overhead Lines. 20 1.4 ADMINISTRATIVE REQUIREMENTS 21 A. Coordination with the Texas Department of Transportation 22 1. When work in the right-of-way which is under the jurisdiction of the Texas 23 Department of Transportation (TxDOT): 24 a. Notify the Texas Department of Transportation prior to commencing any work 25 therein in accordance with the provisions of the permit 26 b. All work performed in the TxDOT right-of-way shall be performed in 27 compliance with and subject to approval from the Texas Department of 28 Transportation 29 B. Work near High Voltage Lines 30 1. Regulatory Requirements 31 a. All Work near High Voltage Lines (more than 600 volts measured between 32 conductors or between a conductor and the ground) shall be in accordance with 33 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 34 2. Warning sign 35 a. Provide sign of sufficient size meeting all OSHA requirements. 36 3. Equipment operating within 10 feet of high voltage lines will require the following 37 safety features 38 a. Insulating cage -type of guard about the boom or arm 39 b. Insulator links on the lift hook connections for back hoes or dippers 40 c. Equipment must meet the safety requirements as set forth by OSHA and the 41 safety requirements of the owner of the high voltage lines 42 4. Work within 6 feet of high voltage electric lines 43 a. Notification shall be given to: 44 1) The power company (example: ONCOR) CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised March 11, 2022 City Project No. 103358-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 01 35 13-3 SPECIAL PROJECT PROCEDURES Page 3 of 8 a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. TCEQ Air Permit 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. E. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section 013 1 13 F. Water Department Coordination 1. During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. 2. Coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. a. Coordination shall be in accordance with Section 33 12 25. b. If needed, obtain a hydrant water meter from the Water Department for use during the life of named project. c. In the event that a water valve on an existing live system be turned off and on to accommodate the construction of the project is required, coordinate this activity through the appropriate City representative. 1) Do not operate water line valves of existing water system. a) Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. b) In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. 43 G. Public Notification Prior to Beginning Construction CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised March 11, 2022 City Project No. 103358-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 O1 35 13 - 4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1. Prior to beginning construction on any block in the project, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a. Post notice or flyer and City of Fort Worth Door Hangers, 7 days prior to beginning any construction activity on each block in the project area. 1) Prepare flyer on the Contractor's letterhead and include the following information: a) Name of Project b) City Project No (CPN) c) Scope of Project (i.e. type of construction activity) d) Actual construction duration within the block e) Name of the contractor's foreman and phone number f) Name of the City's inspector and phone number g) City's after-hours phone number 2) A sample of the `pre -construction notification' flyer is attached as Exhibit A. 3) City of Fort Worth Door Hangers will be provided to the Contractor for distribution with their notice. 4) Submit schedule showing the construction start and finish time for each block of the project to the inspector. 5) Deliver flyer to the City Inspector for review prior to distribution. b. No construction will be allowed to begin on any block until the flyer and door hangers are delivered to all residents of the block. H. Public Notification of Temporary Water Service Interruption during Construction 1. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. 2. Prepared notice as follows: a. The notification or flyer shall be posted 24 hours prior to the temporary interruption. b. Prepare flyer on the contractor's letterhead and include the following information: 1) Name of the project 2) City Project Number 3) Date of the interruption of service 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. I. Coordination with United States Army Corps of Engineers (USACE) CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised March 11, 2022 City Project No. 103358-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 013513-5 SPECIAL PROJECT PROCEDURES Page 5 of 8 1. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. J. Coordination within Railroad Permit Areas 1. At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed to comply with the railroad's requirements. 3. Railroad Flagmen a. Submit receipts to City for verification of working days that railroad flagmen were present on Site. K. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. L. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised March 11, 2022 City Project No. 103358-1 013513-6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 DATE NAME 8/31/2012 D.Johnson 13 3/11/2022 M Owen END OF SECTION Revision Log SUMMARY OF CHANGE 1.4.13— Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 1.4.E — Added Contractor responsibility for obtaining a TCEQ Air Permit Remove references to Air Pollution watch Days and NCTCOG Clean construction Specification requirements. Clarify need for Door Hangers under in addition to contractor notification of public. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised March 11, 2022 City Project No. 103358-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 01 35 13 -7 SPECIAL PROJECT PROCEDURES Page 7 of 8 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised March 11, 2022 City Project No. 103358-1 1 2 3 4 Date: EXHIBIT B FORT WORTH: DOE NO. XXXX Project Name: 013513-8 SPECIAL PROJECT PROCEDURES Page 8 of 8 NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised March 11, 2022 City Project No. 103358-1 01 45 23 TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another external FTP site approved by the City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised March 9, 2020 City Project No. 103358-1 01 45 23 TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 3/9/2020 D.V. Magaiia Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised March 9, 2020 City Project No. 103358-1 015000-1 TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 01 50 00 - 2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 01 50 00 - 3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 01 50 00 - 4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 01 55 26 -1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 1 SECTION 0155 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1— General Requirements 15 3. Section 34 71 13 — Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 spec ific ation, unles s a date is spec ific ally c ited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Traffic Control 28 1. General 29 a. Contractor shall minimize lane closures and impact to vehicular/pedestrian 30 traffic. 31 b. When traffic control plans are included in the Drawings, provide Traffic 32 Control in accordance with Drawings and Section 34 71 13. 33 c. When traffic control plans are not included in the Drawings, prepare traffic 34 controlplans in accordance with Section 34 71 13 and submit to City for 35 review. 36 1) Allow minimum 10 working days for review of proposed Traffic Control. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised March 22, 2021 City Project No. 103358-1 01 55 26 - 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2of3 1 2) A traffic control "Typical" published by City of Fort Worth, the Texas 2 Manual Unified Traffic Control Devices (TMUTCD) or Texas Department 3 of Transportation (TxDOT) can be used as an alternative to preparing 4 project/site specific traffic control plan if the typical is applicable to the 5 specific project/site. 6 B. Street Use Permit 7 1. Prior to installation of Traffic Control, a City Street Use Permit is required. 8 a. To obtain Street Use Permit, submit Traffic Control Plans to City 9 Transportation and Public Works Department. 10 1) Allow a minimum of 5 working days for permit review. 11 2) It is the Contractor's responsibility to coordinate review of Traffic Control 12 plans for Street Use Permit, such that construction is not delayed. 13 C. Modification to Approved Traffic Control 14 1. Prior to installation traffic control: 15 a. Submit revised traffic control plans to City Department Transportation and 16 Public Works Department. 17 1) Revise Traffic Controlplans in accordance with Section 34 71 13. 18 2) Allow minimum 5 working days for review of revised Traffic Control. 19 3) It is the Contractor's responsibility to coordinate review of Traffic Control 20 plans for Street Use Permit, such that construction is not delayed. 21 D. Removal of Street Sign 22 1. If it is determined that a street sign must be removed for construction, then contact 23 City Transportation and Public Works Department, Signs and Markings Division to 24 remove the sign. 25 E. Temporary Signage 26 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 27 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 28 Devices (MUTCD). 29 2. Install temporary sign before the removal of permanent sign. 30 3. When construction is complete, to the extent that the permanent sign can be 31 reinstalled, contact the City Transportation and Public Works Department, Signs 32 and Markings Division, to reinstall the permanent sign. 33 F. Traffic Control Standards 34 1. Traffic Control Standards can be found on the City's web site. 35 1.5 SUBMITTALS [NOT USED] 36 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised March 22, 2021 City Project No. 103358-1 1 2 3 4 5 6 7 8 01 55 26 - 3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 9 PART 3 - EXECUTION [NOT USED] 10 11 12 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.4 A. Added language to emphasize minimizing of lane closures and impact to traffic. 1.4 A. 1. c. Added language to allow for use of published traffic control "Typicals" if 3/22/2021 M Owen applicable to specific project/site. 1.4 F. 1) Removed reference to Buzzsaw 1.5 Added language re: submittal of permit CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised March 22, 2021 City Project No. 103358-1 015713-1 STORM WATER POLLUTION PREVENTION Page 1 of 3 SECTION 0157 13 STORM WATER POLLUTION PREVENTION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 3125 00 — Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 01 57 13 - 2 STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP 1. Submit in accordance with Section 0133 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 0157 13 -3 STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 SECTION 0158 13 TEMPORARY PROJECT SIGNAGE PART1- GENERAL 1.1 SUMMARY 015813-1 TEMPORARY PROJECT SIGNAGE Page 1 of 3 A. Section Includes: 1. Temporary Project Signage Requirements B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Design Criteria 1. Provide free standing Project Designation Sign in accordance with City's Standard Details for project signs. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 01 58 13 - 2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 B. Materials 1. Sign a. Constructed of 3/4-inch fir plywood, grade A-C (exterior) or better 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Provide vertical installation at extents of project. 2. Relocate sign as needed, upon request of the City. B. Mounting options a. Skids b. Posts c. Barricade 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE A. General 1. Maintenance will include painting and repairs as needed or directed by the City. 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 0158 13 -3 TEMPORARY PROJECT SIGNAGE Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Page 3 of 3 WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 SECTION 0160 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 60 00 PRODUCT REQUIREMENTS Page 1 of 2 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. A list of City approved products for use is available through the City's website at: https:Happs.fortworthtexas.gov/ProjectResources/ and following the directory path; 02 - Construction Documents/Standard Products List B. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. C. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. D. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. E. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised March 9, 2020 City Project No. 103358-1 01 60 00 PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 3/9/2020 D.V. Magafia Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised March 9, 2020 City Project No. 103358-1 016600-1 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 01 66 00 - 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 016600-3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 01 66 00 - 4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 01 70 00 - 1 MOBILIZATION AND REMOBILIZATION Page 1 of 4 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised November 22, 2016 City Project No. 103358-1 017000-2 MOBILIZATION AND REMOBILIZATION Page 2 of 4 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel, equipment, and operating 4 supplies to the Site for the issued Work Order. 5 b) Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for: 8 a) Transportation of Contractor's personnel, equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order 11 b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include, but are not necessarily limited to: 22 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1 — General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment [Consult City Department/Division for direction on if 26 Mobilization pay item to be included or the item should be subsidiary. Include the 27 appropriate Section 1.2 A. 1.] 28 1. Mobilization and Demobilization 29 a. Measure 30 1) This Item is considered subsidiary to the various Items bid. 31 b. Payment 32 1) The work performed and materials furnished in accordance with this Item 33 are subsidiary to the various Items bid and no other compensation will be 34 allowed. 35 2. Remobilization for suspension of Work as specifically required in the Contract 36 Documents 37 a. Measurement 38 1) Measurement for this Item shall be per each remobilization performed. 39 b. Payment 40 1) The work performed and materials furnished in accordance with this Item 41 and measured as provided under "Measurement" will be paid for at the unit 42 price per each "Specified Remobilization" in accordance with Contract 43 Documents. 44 c. The price shall include: 45 1) Demobilization as described in Section 1.1.A.2.a.1) 46 2) Remobilization as described in Section 1.1.A.2.a.2) CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised November 22, 2016 City Project No. 103358-1 017000-3 MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 d. No payments will be made for standby, idle time, or lost profits associated this 2 Item. 3 3. Remobilization for suspension of Work as required by City 4 a. Measurement and Payment 5 1) This shall be submitted as a Contract Claim in accordance with Article 10 6 of Section 00 72 00. 7 2) No payments will be made for standby, idle time, or lost profits associated 8 with this Item. 9 4. Mobilizations and Demobilizations for Miscellaneous Projects 10 a. Measurement 11 1) Measurement for this Item shall be for each Mobilization and 12 Demobilization required by the Contract Documents 13 b. Payment 14 1) The Work performed and materials furnished in accordance with this Item 15 and measured as provided under "Measurement" will be paid for at the unit 16 price per each "Work Order Mobilization" in accordance with Contract 17 Documents. Demobilization shall be considered subsidiary to mobilization 18 and shall not be paid for separately. 19 c. The price shall include: 20 1) Mobilization as described in Section 1.1.A.3.a.1) 21 2) Demobilization as described in Section 1.1.A.3.a.2) 22 d. No payments will be made for standby, idle time, or lost profits associated this 23 Item. 24 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 25 a. Measurement 26 1) Measurement for this Item shall be for each Mobilization and 27 Demobilization required by the Contract Documents 28 b. Payment 29 1) The Work performed and materials furnished in accordance with this Item 30 and measured as provided under "Measurement" will be paid for at the unit 31 price per each "Work Order Emergency Mobilization" in accordance with 32 Contract Documents. Demobilization shall be considered subsidiary to 33 mobilization and shall not be paid for separately. 34 c. The price shall include 35 1) Mobilization as described in Section 1.1.A.4.a) 36 2) Demobilization as described in Section 1.1.A.3.a.2) 37 d. No payments will be made for standby, idle time, or lost profits associated this 38 Item. 39 1.3 REFERENCES [NOT USED] 40 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 41 1.5 SUBMITTALS [NOT USED] 42 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 43 1.7 CLOSEOUT SUBMITTALS [NOT USED] 44 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised November 22, 2016 City Project No. 103358-1 01 70 00 - 4 MOBILIZATION AND REMOBILIZATION Page 4 of 4 1 1.9 QUALITY ASSURANCE [NOT USED] 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 3 1.11 FIELD [SITE] CONDITIONS [NOT USED] 4 1.12 WARRANTY [NOT USED] 5 PART 2 - PRODUCTS [NOT USED] 6 PART 3 - EXECUTION [NOT USED] 7 END OF SECTION 8 Revision Log DATE NAME SUMMARY OF CHANGE 11/22/16 Michael Owen 1.2 Price and Payment Procedures - Revised specification, including blue text, to make specification flexible for either subsidiary or paid bid item for Mobilization. 9 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised November 22, 2016 City Project No. 103358-1 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 8 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Construction Staking a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "Construction Staking". 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following: 1) Verification of control data provided by City. 2) Placement, maintenance and replacement of required stakes and markings in the field. 3) Preparation and submittal of construction staking documentation in the form of "cut sheets" using the City's standard template. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "As -Built Survey". CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised February 14, 2018 City Project No. 103358-1 01 71 23 - 2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following:: 1) Field measurements and survey shots to identify location of completed facilities. 2) Documentation and submittal of as -built survey data onto contractor redline plans and digital survey files. 1.3 REFERENCES A. Definitions 1. Construction Survey - The survey measurements made prior to or while construction is in progress to control elevation, horizontal position, dimensions and configuration of structures/improvements included in the Project Drawings. 2. As -built Survey —The measurements made after the construction of the improvement features are complete to provide position coordinates for the features of a project. 3. Construction Stakiniz — The placement of stakes and markings to provide offsets and elevations to cut and fill in order to locate on the ground the designed structures/improvements included in the Project Drawings. Construction staking shall include staking easements and/or right of way if indicated on the plans. 4. Survey "Field Checks" — Measurements made after construction staking is completed and before construction work begins to ensure that structures marked on the ground are accurately located per Project Drawings. B. Technical References 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) — 01 71 23.16.01— Attachment A —Survey Staking Standards 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available on City's Buzzsaw website). 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land Surveying in the State of Texas, Category 5 1.4 ADMINISTRATIVE REQUIREMENTS A. The Contractor's selection of a surveyor must comply with Texas Government Code 2254 (qualifications based selection) for this project. 1.5 SUBMITTALS A. Submittals, if required, shall be in accordance with Section 01 33 00. B. All submittals shall be received and reviewed by the City prior to delivery of work. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Field Quality Control Submittals CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised February 14, 2018 City Project No. 103358-1 01 71 23 - 3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1. Documentation verifying accuracy of field engineering work, including coordinate conversions if plans do not indicate grid or ground coordinates. 2. Submit "Cut -Sheets" conforming to the standard template provided by the City (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 1.7 CLOSEOUT SUBMITTALS B. As -built Redline Drawing Submittal 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of constructed improvements signed and sealed by Registered Professional Land Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards) . 2. Contractor shall submit the proposed as -built and completed redline drawing submittal one (1) week prior to scheduling the project final inspection for City review and comment. Revisions, if necessary, shall be made to the as -built redline drawings and resubmitted to the City prior to scheduling the construction final inspection. 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Construction Staking 1. Construction staking will be performed by the Contractor. 2. Coordination a. Contact City's Project Representative at least one week in advance notifying the City of when Construction Staking is scheduled. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes. If City surveyors are required to re -stake for any reason, the Contractor will be responsible for costs to perform staking. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed disturbed or omitted that the contracted Work cannot take place then the Contractor will be required to stake or re -stake the deficient areas. B. Construction Survey 1. Construction Survey will be performed by the Contractor. 2. Coordination a. Contractor to verify that horizontal and vertical control data established in the design survey and required for construction survey is available and in place. General a. Construction survey will be performed in order to construct the work shown on the Construction Drawings and specified in the Contract Documents. b. For construction methods other than open cut, the Contractor shall perform construction survey and verify control data including, but not limited to, the following: 1) Verification that established benchmarks and control are accurate. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised February 14, 2018 City Project No. 103358-1 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 2) Use of Benchmarks to furnish and maintain all reference lines and grades for tunneling. 3) Use of line and grades to establish the location of the pipe. 4) Submit to the City copies of field notesused to establish all lines and grades, if requested, and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City, if requested, to verify the guidance system and the line and grade of the carrier pipe. 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) W ter Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 250 linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised February 14, 2018 City Project No. 103358-1 017123-5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) W ter Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) d) Fire hydrants e) Valves (gate, butterfly, etc.) f) Air Release valves (Manhole rim and vent pipe) g) Blow off valves (Manhole rim and valve lid) h) Pressure plane valves i) Underground Vaults (1) Rim and flowline elevations and coordinates for each Underground Vault. 3) Sanitary Sewer a) Cleanouts (1) Rim and flowline elevations and coordinates for each b) Manholes and Junction Structures (1) Rim and flowline elevations and coordinates for each manhole and junction structure. 4) Stormwater — Not Applicable 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY PART2- PRODUCTS A. A construction survey will produce, but will not be limited to: 1. Recovery of relevant control points, points of curvature and points of intersection. 2. Establish temporary horizontal and vertical control elevations (benchmarks) sufficiently permanent and located in a manner to be used throughout construction. 3. The location of planned facilities, easements and improvements. a. Establishing final line and grade stakes for piers, floors, grade beams, parking areas, utilities, streets, highways, tunnels, and other construction. b. A record of revisions or corrections noted in an orderly manner for reference. c. A drawing, when required by the client, indicating the horizontal and vertical location of facilities, easements and improvements, as built. 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all construction staking projects. These cut sheets shall be on the standard city template which can be obtained from the Survey Superintendent (817-392-7925). 5. Digital survey files in the following formats shall be acceptable: a. AutoCAD (.dwg) b. ESRI Shapefile (.shp) CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised February 14, 2018 City Project No. 103358-1 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use standard templates, if available) 6. Survey files shall include vertical and horizontal data tied to original project control and benchmarks, and shall include feature descriptions PART 3 - EXECUTION A. Tolerances: The staked location of any improvement or facility should be as accurate as practical and necessary. The degree of precision required is dependent on many factors all of which must remain judgmental. The tolerances listed hereafter are based on generalities and, under certain circumstances, shall yield to specific requirements. The surveyor shall assess any situation by review of the overall plans and through consultation with responsible parties as to the need for specific tolerances. a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical tolerance. Horizontal alignment for earthwork and rough cut should not exceed 1.0 ft. tolerance. b. Horizontal alignment on a structure shall be within .0.1 ft tolerance. c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and walkways shall be located within the confines of the site boundaries and, occasionally, along a boundary or any other restrictive line. Away from any restrictive line, these facilities should be staked with an accuracy producing no more than 0.05ft. tolerance from their specified locations. d. Underground and overhead utilities, such as sewers, gas, water, telephone and electric lines, shall be located horizontally within their prescribed areas or easements. Within assigned areas, these utilities should be staked with an accuracy producing no more than 0.1 ft tolerance from a specified location. e. The accuracy required for the vertical location of utilities varies widely. Many underground utilities require only a minimum cover and a tolerance of 0.1 ft. should be maintained. Underground and overhead utilities on planned profile, but not depending on gravity flow for performance, should not exceed 0.1 ft. tolerance. B. Surveying instruments shall be kept in close adjustment according to manufacturer's specifications or in compliance to standards. The City reserves the right to request a calibration report at any time and recommends regular maintenance schedule be performed by a certified technician every 6 months. 1. Field measurements of angles and distances shall be done in such fashion as to satisfy the closures and tolerances expressed in Part 3.1.A. 2. Vertical locations shall be established from a pre -established benchmark and checked by closing to a different bench mark on the same datum. 3. Construction survey field work shall correspond to the client's plans. Irregularities or conflicts found shall be reported promptly to the City. 4. Revisions, corrections and other pertinent data shall be logged for future reference. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised February 14, 2018 City Project No. 103358-1 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION 3.5 REPAIR / RESTORATION A. If the Contractor's work damages or destroys one or more of the control monuments/points set by the City, the monuments shall be adequately referenced for expedient restoration. 1. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. a. Contractor shall perform replacements and/or restorations. b. The City may require at any time a survey "Field Check" of any monument or benchmarks that are set be verified by the City surveyors before further associated work can move forward. 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. It is the Contractor's responsibility to maintain all stakes and control data placed by the City in accordance with this Specification. This includes easements and right of way, if noted on the plans. B. Do not change or relocate stakes or control data without approval from the City. 3.8 SYSTEM STARTUP A. Survey Checks 1. The City reserves the right to perform a Survey Check at any time deemed necessary. 2. Checks by City personnel or 3' party contracted surveyor are not intended to relieve the contractor of his/her responsibility for accuracy. 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised February 14, 2018 City Project No. 103358-1 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text'; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised February 14, 2018 City Project No. 103358-1 FORTWORTH. Section 01 71 23.01 - Attachment A Survey Staking Standards February 2017 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 1 of 22 These procedures are intended to provide a standard method for construction staking services associated with the City of Fort Worth projects. These are not to be considered all inclusive, but only as a general guideline. For projects on TXDOT right-of-way or through joint TXDOT participation, adherence to the TXDOT Survey Manual shall be followed and if a discrepancy arises, the TXDOT manual shall prevail. (http://onlinemanuals.txdot.gov/txdotmanuals/ess/ess.Ddf) If you have a unique circumstance, please consult with the project manager, inspector, or survey department at 817-392-7925. Table of Contents I. City of Fort Worth Contact Information II. Construction Colors III. Standard Staking Supplies IV. Survey Equipment, Control, and Datum Standards V. Water Staking VI. Sanitary Sewer Staking VI I. Storm Staking VIII. Curb and Gutter Staking IX. Cut Sheets X. As -built Survey O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 2 of 22 I. Survey Department Contact Information Physical and mailing address: 8851 Camp Bowie West Boulevard Suite 300 Fort Worth, Texas 76116 Office: (817) 392-7925 Survey Superintendent, direct line: (817) 392-8971 II. Construction Colors The following colors shall be used for staking or identifying features in the field. This includes flagging, paint of laths/stakes, paint of hubs, and any identification such as pin flags if necessary. Utility Color PROPOSED EXCAVATION WHITE ALL ELECTRIC AND CONDUITS POTABLE WATER GAS OR OIL YELLOW TELEPHONE/FIBER OPTIC ORANGE SURVEY CONTROL POINTS, BENCHMARKS, PROPERTY CORNERS, RIGHT-OF-WAYS, AND PINK ALL PAVING INCLUDING CURB, SIDEWALK, BUILDING CORNERS SANITARY SEWER 6NUMA IRRIGATION AND RECLAIMED WATER III. Standard Staking Supplies Item Minimum size Lath/Stake 36" tall Wooden Hub (2"x2" min. square preferred) 6" tall Pin Flags (2.5" x 3.5" preferred) 21" long Guard Stakes Not required PK or Mag nails 1" long Iron Rods (1/2" or greater diameter) 18" long Survey Marking Paint Water -based Flagging 1" wide Marking Whiskers (feathers) 6" long Tacks (for marking hubs) 3/4" long 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 3 of 22 IV. Survev Equipment, Control, and Datum Standards A. City Benchmarks All city benchmarks can be found here: httr)://fortworthtexas.eov/itsolutions/GIS/ Look for 'Zoning Maps'. Under 'Layers' , expand 'Basemap Layers', and check on 'Benchmarks'. B. Conventional or Robotic Total Station Equipment I. A minimum of a 10 arc -second instrument is required. II. A copy of the latest calibration report may be requested by the City at any time. It is recommended that an instrument be calibrated by certified technician at least 1 occurrence every 6 months. C. Network/V.R.S. and static GPS Equipment I. It is critical that the surveyor verify the correct horizontal and vertical datum prior commencing work. A site calibration may be required and shall consist of at least 4 control points spaced evenly apart and in varying quadrants. Additional field checks of the horizontal and vertical accuracies shall be completed and the City may ask for a copy of the calibration report at any time. Network GPS such as the Western Data Systems or SmartNet systems may be used for staking of property/R.O.W, forced -main water lines, and rough -grade only. No GPS staking for concrete, sanitary sewer, storm drain, final grade, or anvthing that needs vertical grading with a tolerance of 0.25' or less is allowed. D. Control Points Set All control points set shall be accompanied by a lath with the appropriate Northing, Easting, and Elevation (if applicable) of the point set. Control points can be set rebar, 'X' in concrete, or any other appropriate item with a stable base and of a semi -permanent nature. A rebar cap is optional, but preferred if the cap is marked 'control point' or similar wording. Datasheets are required for all control points set. Datasheet should include: A. Horizontal and Vertical Datum used, Example: N.A.D.83, North Central Zone 4202, NAVD 88 Elevations B. Grid or ground distance. — If ground, provide scale factor used and base point coordinate, Example: C.S.F.=0.999125, Base point=North: 0, East=O C. Geoid model used, Example: GEOID12A 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 4 of 22 E. Preferred Grid Datum Although many plan sets can be in surface coordinates, the City's preferred grid datum is listed below. Careful consideration must be taken to verify what datum each project is in prior to beginning work. It is essential the surveyor be familiar with coordinate transformations and how a grid/surface/assumed coordinate system affect a project. Proiected Coordinate System: NAD_1983_StatePlane_Texas_North_Central_FIPS_4202_Feet Projection: Lambert_ Conformal_ Conic Fa Ise_Easti ng: 1968500.00000000 False —Northing: 6561666.66666667 Central Meridian:-98.50000000 Standard Parallel 1: 32.13333333 Standard Parallel 2: 33.96666667 Latitude —Of —Origin: 31.66666667 Linear Unit: Foot US Geographic Coordinate System: GCS_North_American_1983 Datum: D North American 1983 Prime Meridian: Greenwich Angular Unit: Degree Note: Regardless of what datum each particular project is in, deliverables to the City must be converted/translated into this preferred grid datum. 1 copy of the deliverable should be in the project datum (whatever it may be) and 1 copy should be in the NAD83, TX North Central 4202 zone. See Preferred File Naming Convention below F. Preferred Deliverable Format txt csv dwg .job G. Preferred Data Format P,N,E,Z,D,N Point Number, Northing, Easting, Elevation, Description, Notes (if applicable) H. Preferred File Naming Convention This is the preferred format: City Project Number_Description_Datum.csv Example for a proiect that has surface coordinates which must be translated: File 1: C1234 As -built of Water on Main Street Grid NAD83 TXSP 4202.csv O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 5 of 22 File 2: C1234_As-built of Water on Main Street —Project Specific Datum.csv Example Control Stakes O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 6 of 22 W d w m � Q � w w m> � < m � w 1 015 EL.— 100, 00' m w m V Cn m w [ri J O w � J 1-- W O CD U � CP #1 N=5000.00 E=5000.00 o w z ~ � w o m � = o W LL ~ W < X m W W CC D V. Water Staking Standards 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 7 of 22 A. Centerline Staking— Straight Line Tangents I. Offset lath/stakes every 200' on even stations II. Painted blue lath/stake only, no hub is required III. Grade is to top of pipe (T/P) for 12" diameter pipes or smaller IV. Grade to flow line (F/L) for 16" and larger diameter pipes V. Grade should be 3.50' below the proposed top of curb line for 10" and smaller diameter pipes VI. Grade should be 4.00' below the proposed top of curb line for 12" and larger diameter pipes VI I. Cut Sheets are required on all staking and a copy can be received from the survey superintendent Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking - Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Same grading guidelines as above III. Staking of radius points of greater than 100' may be omitted C. Water Meter Boxes I. 7.0' perpendicular offset is preferred to the center of the box II. Center of the meter should be 3.0' behind the proposed face of curb III. Meter should be staked a minimum of 4.5' away from the edge of a driveway IV. Grade is to top of box and should be +0.06' higher than the proposed top of curb unless shown otherwise on the plans D. Fire Hydrants I. Center of Hydrant should be 3.0' behind proposed face of curb II. Survey offset stake should be 7.0' from the center and perpendicular to the curb line or water main III. Grade of hydrants should be +0.30 higher than the adjacent top of curb E. Water Valves & Vaults I. Offsets should be perpendicular to the proposed water main II. RIM grades should only be provided if on plans Example Water Stakes 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 8 of 22 WE N � W � n N � CD N O ID ry � n rD zT 3 3 -, Z O � ry ono I D rD I.D rD n O < � T N N L rD IL i 77- n IL 00 �. � r-r 7 0 Q m ff < Q rD O n n Iv x -a 0 rD rD NO FLAGGING REQUIRED IN LIEU OF BLUE PAINTED LATH FRONT (SIDE FACING BACK 0 OFFSET DISTANCE (SIDE FACING R.O.W.) POINT # ICI CENTERLINE OF L% WATER LINE r 1 HLIR ELEVATION o � o i STAT ONING 4 4 �Z/fP IDENTIFIES TOP OF PIPE n _ I IDENTIFIES CUT - ~- OR FILL + HUB PAINTED BLUE, FLUSH 'MTH r GRCIUND, WITH TACK OR BLACK DOT HUB PI TEDNALBLUE WITH BLUE WHISKERS OR 60D NAIL WTH BLUE '{WHISKER FRONT FRONT (SIDE FACING] (SIDE FACING } 0 BACK rF' 0 (SIDE FACING R_O_W.} J f) P � CONTINUE STAKING IDENTIFY ANY rlv EVERY 200' r n TEES, METERS + GATE VALVES, — CROSSES, ETC. — Ln T/P + I � In Tf P I w � � �S� ti 1P A. Centerline Staking — Straight Line Tangents I. Inverts shall be field verified and compared against the plans before staking II. Painted green lath/stake WITH hub and tack or marker dot, no flagging required III. 1 offset stake between manholes if manholes are 400' or less apart IV. Offset stakes should be located at even distances and perpendicular to the centerline V. Grades will be per plan and the date of the plans used should be noted VI. If multiple lines are at one manhole, each line shall have a cut/fill and direction noted VI I. Stakes at every grade break VIII. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Staking of radius points of greater than 100' may be omitted C. Sanitary Sewer Manholes I. 2 offset stakes per manhole for the purpose of providing alignment to the contractor II. Flowline grade should be on the lath/stake for each flowline and direction noted III. RIM grade should only be on the stake when provided in the plans 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 10 of 22 FRONT 0 (SIDE FACING) V) 2nd OFFSET STAKE _ N FOR ALIGNMENT rD FOR SSMH'S FRONT FRONT V) (SIDE FACING ) (SIDE FACING NO FLAGGING REQUIRED MH j 2nd 4FFT£T STAKE IN LIEU aF GREEN PAINTED LATH = Iak OFFSET STAKE {{ LJ FOR ALIGNMENT N N FOR ALIGNMENT FOR SSMH'S w FOR SSMH'S 0 64 V) re FRONT co rD In D NO 2ND OFFSET STAKE FJL (SIDE FACING) FOR CENTERLINE s MH v = NEEDED n rD MH let OFFSET STAKE �R L1 N T I n 3 f FOR ALIGNMENT Ic II rD o ss�IHs (SIDE FACING ) FJL &6,ME STATIONING AS 1 ON NE 0o ID < FIRST OFFSET STAKE re rD o SANITARY SEWER LINE F� rD o 0 FA < r� FrL n `G T N Hi IDENTIFIES MANHOLE RIM N L n rn � n w Q5 a = IN,to FA aq 6 STATIONING �_ NE LI) FJL n 0 IL IDENTIFIES FLONLINE OF2, <' N NORTH PIPE GRADE to \ RIM Q rD REC4NSE STATIONING ty RIM I IDENTIFIES CUT - BETWEEN SSMH'S WAS Q n N DR FILLS FOR NORTH PIPE F LESS THAN 400'. SPLIT \ 6 O n I THE DIFFERENCE AND SET � 1 STAKE IN THE MIDDLE x 19 IdENTIFIES FLOVfUNE OF _ 1 S SOUTH PIPE GRADE < n IDENTIFIES CUT - �04;TVVy rD r" OR FILL + FCR SOUTH PIPE Vk RIM IDENTIFIES RIM GRADE p HUB D. PAINTED TACK FLUSH NTH " IDENTIFIES CUT - �o GROUND. NTH TACK OR BLACK DOT O OR FILL 4 TO OF MANHOLE J N Z— (OPTIONAL) HUB PAINTER GREEN WITH EILUE NHISKERS OR 80D NAIL WITH BWE WHISKERS — IT! x a� fD V1 fu rF CA m m (/1 r+ m VII. Storm Sewer & Inlet Staking A. Centerline Staking — Straight Line Tangents I. 1 offset stake every 200' on even stations II. Grades are to flowline of pipe unless otherwise shown on plans III. Stakes at every grade break IV. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Staking of radius points of greater than 100' may be omitted C. Storm Drain Inlets I. Staking distances should be measured from end of wing II. Standard 10' Inlet = 16.00' total length III. Recessed 10' Inlet = 20.00' total length IV. Standard double 10' inlet = 26.67' total length V. Recessed double 10' inlet = 30.67' total length D. Storm Drain Manholes I. 2 offset stakes per manhole for the purpose of providing alignment to the contractor II. Flowline grade should be on the lath/stake for each flowline and direction noted III. RIM grade should only be on the stake when provided in the plans O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 12 of 22 BACK C30E FAahr- R.ELW.) POINT # i Hue ELEvnnrn Example Storm Inlet Stakes FRONT (SIDE FACING NO FLAGGING REQUIRED IN LIEU OF PINK PAINTED LATH IDENTIFIES M-1101-1 END OF THE WING BEING STAKED INLET STATION [IF NOTED ON PLANS] IDENTIFIES GRADE TO TOP OF CURB IDENTIFIES GRADE TO FLOMJNE DISTANCES FOR INLETS STANDARD 10' - 16' RECESSED W - 20' STANDARD DUJBLE 10' - 2&67 BACK {SUE FA13NG R.QW_) PRINT 0 Q HUB ELE ATUN c FRONT (SIDE FACING M IIDE NTI FIES 1lHICH END OF THE YdNG BEING STAKED RECESSED ELMLE 10= -30_67 HUB %MM TACK T*- — — — — — — — I BACK OF INLET I BACK OF CURB BACK OF CURB 1 �. FLOYLINE FACE OF INLET FACE OF INLET FLDMJNE EDGE OF PAVEMENT EDGE OF PAVEMENT II EDGE OF PAVEMENT EDGE OF PAVEMENT 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 13 of 22 VIII. Curb and Gutter Staking A. Centerline Staking— Straight Line Tangents V. 1 offset stake every 50' on even stations VI. Grades are to top of curb unless otherwise shown on plans VI I. Stakes at every grade break VIII. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking— Curves III. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval IV. Staking of radius points of greater than 100' may be omitted 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 14 of 22 Example Curb & Gutter Stakes FRONT (SIDE FACING CL) FRONT (SIDE FACING CL) DENTIFIES START POW OF CURVATURE 4 BACK IDENTIFIES OFFSET I3 T4 (SIDE FACING R.4. Yi.) BACK CF CURB CR FIC FOR FACE OF CURB POINT HUB ELEVA110N BACK p� II O + P. IDENTIFIES GRADE IS TIC TD TQP OF DURH P FRONT ASIDE FACING} A P 0 2 BfC NO GRXi E ON RhPlu-L 5 FUNT5 FRONT IDENTIFIES END (SIDE FACING POINT OF T GENT d BC m PT T III I Q III I III I I I III III NO FLAGGING REQUIRED f f I ti IN LIEU OF PINK PAINTED LATH r I TOP OF CURB OF CURB FACE OF CURB I FLOKI NE EDGE OF PAVEMENT Example Curb & Gutter Stakes at Intersection 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 15 of 22 N W � rD Ql -u O 0 � O IDrD r-F Vf v � n rD zT 3 3 -, rD O Z -u r* v sv D Oq O I� � <rD t) 0 mG T N r v� N / 77- n 7 N 00 �. Ln r v 7 0 ,? m ff <' Q rD fl- % O v x —a 0 rD 10' ❑/S STAKE 1D' ❑/S STAKE W/GRADE AT W/GRADE AT EVEN STATION ELEN STATION 1 W MAX. DISTANCE � 50' MAX. DISTANCE � 50' MAX. DISTANCE � 5V MAX. DISTANCE � 50' MAX. DISTANCE � 50' MAX. DISTANCE <> 0 BACK OF CURB BACK OF CURB IF ARC LENGTH 15 I _ T GREATER THAN 100', I A PCC OFFSET STAKE C] 50' MAX. DISTANCE O SHOULD BE SET r I r10' � O/S f'1"1 fl"1 STAKE / 10' O/S W/GRADE AT PC STARE /GRDT 4STATION 1 f STAKE l W/GRADE f AT PT Qe E; 3G' RADIUS w POINT W/NO GRADE a d x � � 10' O/S M d Y u ¢ STAKE El W/GRACE AT EVEN STATION I BAC1< OF CURB I I Q Q S9' MAX. DISTANCE rml r S E� I E 10' 0/S STAKE rA4TPC\ W/GRADE AT EVEN STATION 30' RADIUS POINT � F IN/NO GRADE c� o 0 72 V Q� m o 'O 16' O/S STAKE q' W/GRADE AT EVEN STATION TYP FRONT (SIDE FACING TL) 0 4 B/ IDENTIFIES OFFSET 15 TO cu CK a OF P a T/C IX. Cut Sheets A. Date of field work B. Staking Method (GPS, total station) C. Project Name D. City Project Number (Example: C01234) E. Location (Address, cross streets, GPS coordinate) F. Survey company name G. Crew chief name H. A blank template can be obtained from the survey superintendent (see item I above) Standard Citv Cut Sheet City Project Date: Number: Project Name: ❑ TOTAL Staking Method: ❑ GPS STATION ❑ OTHER LOCATION: CONSULTANT/CONTRACTOR SURVEY CREW INITIALS ALL GRADES ARE TO FLOWLINE OR TOP OF CURB UNLESS OTHERWISE NOTED. PT # STATION OFFSET DESCRIPTION PROP. STAKED _ CUT + FILL -LT/+RT GRADE ELEV. O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 17 of 22 X. As -built Survey A. Definition and Purpose The purpose of an as -built survey is to verify the asset was installed in the proper location and grade. Furthermore, the information gathered will be used to supplement the City's GIS data and must be in the proper format when submitted. See section IV. As -built survey should include the following (additional items may be requested): Manholes Top of pipe elevations every 250 feet Horizontal and vertical points of inflection, curvature, etc. (All Fittings) Cathodic protection test stations Sampling stations Meter boxes/vaults (All sizes) Fire lines Fire hydrants Gate valves (rim and top of nut) Plugs, stub -outs, dead-end lines Air Release valves (Manhole rim and vent pipe) Blow off valves (Manhole rim and valve lid) Pressure plane valves Cleaning wyes Clean outs Casing pipe (each end) Inverts of pipes Turbo Meters O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 18 of 22 B. Example Deliverable A hand written red line by the field surveyor is acceptable in most cases. This should be a copy of the plans with the point number noted by each asset. If the asset is missing, then the surveyor should write "NOT FOUND" to notify the City. O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 19 of 22 V) 1p V) O N � W r) n N (D O 0 O D (D v � (D 3 7 o ILn Ln N ((DD G f D T N N j ;,z- n Dil L rt rt � Q Q V7 � Q % O n X � 0 (D 11_ IXSTAG_ 450 1F I� P/6 WA7ER S _ CL4UON RA W ir�� LlXE A SAVIIPAI' SE%'ER VNx � l / SEF SHEtT 5 �A' � � � i i4i PROPOSED 12WATFR !!NF Ar — _ 1' PEACxV.Vtl(S:Povre'oa 100 a'IY MAE Na. 2. 201�1'!6 MAYSLO PAGE NOO..74 ]dN.S. ..ar wmnvri rn+evcn u_.er 8 pppp ey��u�ui ,vElmnYx ,�,k 0.S t96KnL-+'erns - � �PPARTMENi- a a Sm rr. V• iMivknmm�w Iv. �af1. 1 I n[i � im �A• d�yp0 - X 'W ClAT7iW RM STA 657A7 - 12•WL fFLGYD LWl . �A 0.97lp - IM lFLDYD m - RE"E 6 $",WWE EXIST. IWO ppvp r2wATER GATE V"E s REmm �� AiY = M EXIST.O%TER jrXrNsrMl, 1-IP'SDLID S1EE1rE BEND FNOr aEAWN 1°As l 11 i• 7Y X W REMr.F_R f F l2NA9sP095� E j JV PIS E�?�?SlJ79f �/• 2 CDr 16 � wu rrecww Ire, ELK S LOT 2 REM"WE EXIS! 12WATE/i •xalr N.BTIP765.M E r O (Cy� • STAOew- OWL AYSTAG., F I2 w5Y£R7; @FjYp N691701475125 E,az�vr svo . STA OW75 - a,WL . IWSTALL, F 72 x B ANWM TEE r �P r ' FB'6ATI= VALVE ' FFIRE' 1A'LiRANT RLF E1IIYaWr LEM F W OTE VMVE �u•55avD3on2a9 / Epiea rer •0 IZWATE� RE&UVE & S"A^.E EXIST. GATE V"E STAd321- A NHSTAW � 12W / F lY rsV£Rr. SCAO ° ' abcroti a W�W70lJ14fl9! rmvwxz ur i •!,i v4cm,an7a x.F�•rxma d7Q3&6JOC7L,77p?V 223M .� Y kr„ - s STA Q1wm - 12 WL fFIDYD LVf1 STA 03T59 - le -.TA D'mm - IPWI INSTML: L ALG F --Md. SCYID SFEV£ I-!E'•IS'YEft7: SEND .7 LF OF IP•WATEN PIPEACWNECr TO FX1517. 0 WATER2%30rB3/D N•694I145_4a9 EM22�..iD4dT36 FROMSED SANITARY Si SEE SHEET P O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 21 of 22 CONSANirAI' 457 OF B PVC ST RUCT SEWEE R / PMPOSED WATEfl YAW CLAYTON[ SEE SHFEi fi a-gyy wr aeX.WM w e �' \� moo n rsntt 4 5 eex zv cd a L-3771 & L-3f54 PROPOSED F SAN. SEWER UNE A A iA h flEXGHYARNS mur ���� � �xm��x urwr�ts � .mwnrr.r �a °b .mwurlr vxn. "'E' �� CFTY MAP NO.�M2018-376 nxer erxuivwe. MAPSCO PAGE N0.741j,�T.W,X z Ti!$ .. M,rtax vxe rcu y — T xevi5,a�q ' I s ljG~i TA 1 — oa FORT woA'1f3. -- - WATHR J)=ARThMiT - seven nenn�>�vr� - _- - wA,m s eAu+rARr mean Ti muwsNrr w*�adwamw a.- _ _____ A.c (uu.half si. Rws scl C nx I— W. (FLOVn ox. -ROWAN DR) lfTlR7M �MaAseocmles,mcq�, �zyb _-_- --- - o UHmY Es�F � I i BLK 29 �T k jQ 3]OS LYgfm Fe w,Fw}wann .ma croxap, nn x.� axwrn �. a 1 W {SANfTARY SEWER ` i • Z sEHvrE wi CLEMVff wj.IAYTON[RD.g Ni'EM � �i 'qh a • v J _ k 0— COQi' ✓ n, •O 1 `�A'fRw r � v COQ 2iYH 16 ex. 0 waw 0WA! ER - U) re a w ER ONE A L-3654 — '- " i Q * T REMOVE EX15T. J a _ SM SEWER F . T gy i r5r�'r `L / i roA / STA hS%q - FSS LINE A • LOT ST2 Ej� XIST. AO-0ML-31Tl- rro� rain wd r.la l E Er�� CY.WSTRUtT s LE OF ass uHe 11 ir CA1GLLLLAR !I SERr .� W/ C.FMSgM PROTECTIaV CONNECT PR(P. aSS MW) GEWNECT PRW.B'SS MESSY) TO PRQ? SSYH. N-694ESMZ252 E229SEEM31 CITY MA.Y NO. Z018-380, 2018-3' MAPSCO PAGE NO.74N, S, `i', W i -i — — --I- 1—'�_-- _ — T. 71 II I -.I NR:1 _-- - �- - - 6 0:\Spec 2-00 )1\0171 23.16.01—Attachment A —Survey Staking Standards.docx Page 23 of 23 Obviously the .csv or .txt file cannot be signed/sealed by a surveyor in the format requested. This is just an example and all this information should be noted when delivered to the City so it is clear to what coordinate system the data is in. POINT NO. NORTHING EASTING ELEV. DESCRIPTION 1 6946257.189 2296079.165 726.09 SSMH RIM 2 6946260.893 2296062.141 725.668 GV RIM 3 6946307,399 2296038.306 726.85 GV RIM CV V/&� f}j`-z-:S 4 6946220.582 2296011,025 723.358 SSMH RIM 5 6946195.23 2296015.116 722.123 GV RIM f �J 6 6946190,528 2296022.721 722.325 FH i `3 7 6946136.012 2295992.115 719,448 WM RIM 8 6946002.267 2295919.133 713.331 WM RIM TXCE�-I#L 9 6946003.056 2295933.418 713.652 CO RIM 10 6945984.677 2295880.52 711.662 SSMH RIM 11 6945996.473 2295869,892 710.046 WM RIM 12 6945895.077 2295360.962 707.72 WM RIM � pp 13 6945896.591 2295862.188 708.205 WM RIM yl�� 14 6945934.286 2295841.925 709.467 WM RIM 15 6945936,727 2295830.441 710.084 CO RIM C 16 6945835.678 2295799.707 707.774 SSMH RIM r 17 6945817.488 2295827.011 708.392 SSMH RIM 18 6945759.776 2295758,643 711.218 SSMH RIM 6p 19 6945768.563 2295779,424 710,086 GV RIM 20 6945743.318 2295788.392 710.631 GV RIM 21 6945723.219 2295754.394 712.849 GV RIM 22 6945682.21 2295744.22 716.686 WM RIM r_ 23 6945621.902 2295669.471 723.76 WM RIM r 24 6945643.407 2295736.03 719,737 CO RIM C ��� �n II I, l�T 25 6945571.059 2295655.195 727.514 SSMH RIM 26 6945539.498 2295667.803 729.123 WM RIM 27 6945519.834 2295619.49 732.689 WM RIM r('d L_ pv �S 28 6945417.879 2795580.27 740.521 WM RIM S�t� 29 6945456.557 2295643.145 736.451 CO RIM 30 6945387.356 2295597.101 740.756 GV RIM *r}F ( f}N S 31 6945370.688 2295606.793 740.976 GV RIM 32 6945383.53 2295610.559 740.408 FH 33 6945321.228 2295551.105 746.34 WM RIM 34 6945319.365 2295539.728 746.777 CO RIM 35 6945242.289 2295570.715 748.454 WM RIM 36 6945233.624 2295544.626 749.59 SSMH RIM 37 6945206.483 2295529.305 751.058 WM RIMP �- 38 6945142.015 2295557.666 750.853 WM RIM p { rnV C 39 6945113.445 2295520.335 751.871 WM RIM 7 40 6945049.02 2295527.345 752.257 SSMH RIM o�41 6945041.024 2295552.675 751.79 WM RIM 742 6945038.878 2295552.147 751.88 WM RIMS�VY43 CAh-,J 6945006.397 2295518.135 752.615 WM RIM�#{� 44 6944944.782 2295520.635 752.801 WM RIMS 45 6944943.432 2295556.479 752.156 WM RIM 46 6944860.416 2295534.397 752.986 SSMH RIM C - 1l , SUT� yo(- ��I3cJ12� O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 24 of 24 C. Other preferred as -built deliverable Some vendors have indicated that it is easier to deliver this information in a different format. Below is an example spreadsheet that is also acceptable and can be obtained by request from the survey superintendent. O:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 25 of 25 V) (D T to rt Q O FD fD 7 N � W r) F� (D O 0 O n D ,rt•F / v � n (D 3 (D o O O v D fD ILn (n N (DD (n O (D ys � T N Ln (D N / ;'i n f1U �. Ln rt rt � 7 � O_ (D N Q (D N � O n X _0 0 (D Home I Insert Page Layout Formulas Data Review view Acrobat cut Calion - 11 - A Al =rW 9Pj- aWrap Test y3 • General - LlS,', NomLel Bad Good Neutral Calculation m- Copy Paste B I ❑ • (jj• A - _ ,. . Merge&Center• +4lignment $ °!° a +.de' Conditional F_t � Exn'c!:ctory ... Followed Hy... Hypedink Input _ InseR Delete ,u Format Painter - Formatting•as Table• - Clipboard Font r„ Number Styles Cells N31 A A 6 C D E F G I H I 1 k L M N 1 Proiect Name and Number- [Street Name} Valve Box Water Main Bends Meter Boxes GPSIGritll Looridnenes,Te°as; StaA! GPS(Gridj Cooridnates,Texas Fire Hydrants Hytlrant Valve GPSIGritll Looridnates,Te°as j Nut Elevation Ste.0 GPSIGritll Camidmates,TeKas Nut Elevation TIP-Y50' imervales Sta. p IGP5(Grid) Coaridnates,Tekas ElevationlZl Sta.p NC 4202 NC 4202 NC 4202 NC 4202 NC 4202 NIY1=6934779.6510' N(Y)=5934784.3970' NIY1=6934790.8950' N(Y)=5934791.0300' r+2005 71E.1;3 0+25.On 0+51.22 0+3142 718.555 E(%)=2320950.1460' El%1=2320924.5750' E(%)=2320959.7550 El%1=2320951.9640' NIY1=6935913.4520' NlY1-5934849.4310' NIYi=6935979.3410' NlYi-tM5979.1580' 11+5369 716A38 6t90.05 12+1971 12+1958 714431 El%1=2320942.4830 El%1=2320922. 5940' E(%)=2520949.6250' ElX(=5935979.1580' N(Y)=69359525340' NlY1=5934849 8250' N(Y)=69%11595080 NlY1=5935849 9940' 11a9267 717.489 9+9C 15 20+99.76 20+90.25 M4241' EI%1=23m966S290 El% 2320950.1410' I EIX1=2320960.4650 El%1-2320950.4250' I NIY1 9359521510' NlY1=5934a54.6750' NIYi=6937492MR NlY1=5937491 8650' 11a92.93 715.094 0+9520 27+32.65 27+32.33 69658 El%�=2320897.8250' El%1=2320959 %M' FI%1=2320938A970 El%1-2320931 5950' NIY1=6935974.74W' N(Y)=5934855.4530 12+75.17 715.001 0-96.07 E(%)=2320942.3170' E(%)=2320922.5780' NIY1=69368112340' N(Y)�9934959.5300' 2OF51.69 704.Las 1+99,Sfi EI%1=2320935.9070' E(x)-2320959.0260' ^'_^•M NIY1=6937494.5290' N(Y)=5934932.1570' . EI%1=2320930.543O E(%)=2320921.8150' SECTION 0174 23 CLEANING PART1- GENERAL 1.1 SUMMARY 017423-1 CLEANING Page 1 of 4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 01 74 23 - 2 CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 01 74 23 - 3 CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Interior Final Cleaning 1. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and other foreign materials from sight -exposed surfaces. 2. Wipe all lighting fixture reflectors, lenses, lamps and trims clean. 3. Wash and shine glazing and mirrors. 4. Polish glossy surfaces to a clear shine. 5. Ventilating systems a. Clean permanent filters and replace disposable filters if units were operated during construction. b. Clean ducts, blowers and coils if units were operated without filters during construction. 6. Replace all burned out lamps. 7. Broom clean process area floors. 8. Mop office and control room floors. D. Exterior (Site or Right of Way) Final Cleaning Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 01 74 23 - 4 CLEANING Page 4 of 4 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 01 77 19 -1 CLOSEOUT REQUIREMENTS Page I of 3 1 SECTION 0177 19 2 CLOSEOUT REQUIREMENTS 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees, Bonds and Affidavits 19 1. No application for final payment will be accepted until all guarantees, bonds, 20 certificates, licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. 27 28 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 29 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 PART 2 - PRODUCTS [NOT USED] 32 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised March 22, 2021 City Project No. 103358-1 01 77 19 - 2 CLOSEOUT REQUIREMENTS Page 2of3 1 PART 3 - EXECUTION 2 3.1 INSTALLERS [NOT USED] 3 3.2 EXAMINATION [NOT USED] 4 3.3 PREPARATION [NOT USED] 5 3.4 CLOSEOUT PROCEDURE 6 A. Prior to requesting Final Inspection, submit: 7 1. Project Record Documents in accordance with Section 0178 39 8 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 9 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 10 01 74 23. 11 C. Final Inspection 12 1. After final cleaning, provide notice to the City Project Representative that the Work 13 is completed. 14 a. The City will make an initial Final Inspection with the Contrac tor pres ent 15 b. Upon completion of this inspection, the City will notify the Contractor, in 16 writing within 10 business days, of any particulars in which this inspection 17 reveals that the Work is defective or incomplete. 18 2. Upon receiving written notice from the City, immediately undertake the Work 19 required to remedy deficiencies and complete the Work to the satisfaction of the 20 City. 21 3. The Right-of-way shall be cleared of all construction materials, barricades, and 22 temporary signage. 23 4. Upon completion of Work associated with the items listed in the City's written 24 notice, inform the City that the required Work has been completed. Upon receipt of 25 this notice, the City, in the presence of the Contractor, will make a subsequent Final 26 Inspection of the project. 27 5. Provide all special accessories required to place each item of equipment in full 28 operation. These special accessory items include, but are not limited to: 29 a. Specked spare parts 30 b. Adequate oil and grease as required for the first lubrication of the equipment 31 c. Initial fill up of all chemical tanks and fuel tanks 32 d. Light bulbs 33 e. Fuses 34 f. Vault keys 35 g. Handwheels 36 h. Other expendable items as required for initial start-up and operation of all 37 equipment 38 D. Notice of Project Completion 39 1. Once the City Project Representative finds the Work subsequent to Final Inspection 40 to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). 41 E. Supporting Documentation CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised March 22, 2021 City Project No. 103358-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 01 7719 - 3 CLOSEOUT REQUIREMENTS Page 3 of 3 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 3/22/2021 M Owen 3.4 C. Added language to clarify and emphasize requirement to "Clearing ROW" CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised March 22, 2021 City Project No. 103358-1 017823-1 OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 0133 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 1/2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 01 78 23 - 2 OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 01 78 23 - 3 OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 01 78 23 - 4 OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised December 20, 2012 City Project No. 103358-1 01 78 23 - 5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME 8/31/2012 D. Johnson CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 SUMMARY OF CHANGE 1.5.A.1 — title of section removed WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 017839-1 PROJECT RECORD DOCUMENTS Page 1 of 4 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 01 78 39 - 2 PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED 3.3 PREPARATION [NOT USED 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 017839-3 PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum, in accordance with the intervals set forth in Section 01 7123, clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 Revised July 1, 2011 City Project No. 103358-1 01 78 39 - 4 PROJECT RECORD DOCUMENTS Page 4 of 4 c. Call attention to each entry by drawing a "cloud" around the area or areas affected. d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE WATER AND SANITARY SEWER REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 FORTWORTH. City of Fort Worth Division 02 -Existing Conditions 05/10/2023 0241 14 - 1 UTILITY REMOVAL/ABANDONMENT Page 1 of 17 SECTION 02 4114 UTILITY REMOVAL/ABANDONMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Direction for the removal, abandonment or salvaging of the following utilities: a. Cathodic Protection Test Stations b. Water Lines c. Gate Valves d. Water Valves e. Fire Hydrants f. Water Meters and Meter Box g. Water Sampling Station h. Concrete Water Vaults i. Sanitary Sewer Lines j. Sanitary Sewer Manholes k. Sanitary Sewer Junction Boxes 1. Storm Sewer Lines m. Storm Sewer Manhole Risers n. Storm Sewer Junction Boxes o. Storm Sewer Inlets p. Box Culverts q. Headwalls and Safety End Treatments r. Trench Drains B. Deviations from this City of Fort Worth Standard Specification 1. Removal of Existing Lead Services — The Work for removal and disposal of the existing lead water services to be replaced shall be considered subsidiary to the bid price for the appropriate water service. The lead service lines shall be disposed of at a certified metal recycling center with receipts of said recycling and submitted for verification to the City of Fort Worth Water Department. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 03 34 13 — Controlled Low Strength Material (CLSM) 4. Section 33 05 10 — Utility Trench Excavation, Embedment and Backfill 5. Section 33 05 24 — Installation of Carrier Pipe in Casing or Tunnel Liner Plate 6. Section 33 11 11 — Ductile Iron Fittings 7. Section 33 11 13 — Concrete Pressure Pipe, Bar -wrapped, Steel Cylinder Type CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 0241 14 - 2 UTILITY REMOVAL/ABANDONMENT Page 2 of 17 8. Section 33 11 14 — Buried Steel Pipe and Fittings 9. Section 33 12 25 — Connection to Existing Water Mains 1.2 PRICE AND PAYMENT PROCEDURES A. Utility Lines 1. Abandonment of Utility Line by Grouting a. Measurement 1) Measurement for this Item shall be per cubic yard of existing utility line to be grouted. Measure by tickets showing cubic yards of grout applied. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price per cubic yard of "Line Grouting" for: a) Various types of utility line c. The price bid shall include: 1) Low density cellular grout or CLSM 2) Water 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backEll 8) Clean-up 2. Utility Line Removal, Separate Trench a. Measurement 1) Measurement for this Item shall be per linear foot of existing utility line to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per linear foot of "Remove Line" for: a) Various types of existing utility line b) Various sizes c. The price bid shall include: 1) Removal and disposal of existing utility pipe 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 3. Utility Line Removal, Same Trench a. Measurement 1) This Item is considered subsidiary the proposed utility line being installed. b. Payment CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 024114-3 UTILITY REMOVAL/ABANDONMENT Page 3 of 17 1) The work performed and materials furnished in accordance with this Item are subsidiary to the installation of proposed utility pipe and shall be subsidiary to the unit price bid per linear foot of pipe complete in place, and no other compensation will be allowed. 4. Manhole Abandonment a. Measurement 1) Measurement for this Item will be per each manhole to be abandoned. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Abandon Manhole" for: a) Various diameters b) Various types c. The price bid shall include: 1) Removal and disposal of manhole cone 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Cutting and plugging of existing sewer lines 4) Concrete 5) Acceptable material for backfilling manhole void 6) Pavement removal 7) Excavation 8) Hauling 9) Disposal of excess materials 10) Furnishing, placement and compaction of backEll 11) Surface restoration 12) Clean-up 5. Cathodic Test Station Abandonment a. Measurement 1) Measurement for this Item will be per each cathodic test station to be abandoned. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Abandon Cathodic Test Station". c. The price bid shall include: 1) Abandon cathodic test station 2) CLSM 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up B. Water Lines and Appurtenances 1. Installation of a Water Line Pressure Plug CITY OF FORT WORTH W TER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 0241 14 - 4 UTILITY REMOVAL/ABANDONMENT Page 4 of 17 a. Measurement 1) Measurement for this Item shall be per each pressure plug to be installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Pressure Plug" installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing pressure plug 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess material 6) Gaskets 7) Bolts and Nuts 8) Furnishing, placement and compaction of embedment 9) Furnishing, placement and compaction of backfill 10) Disinfection 11) Testing 12) Clean-up 2. Abandonment of Water Line by Cut and installation of Abandonment Plug a. Measurement 1) Measurement for this Item shall be per each cut and abandonment plug installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Water Abandonment Plug" installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction of backfill 8) Clean-up 3. Water Valve Removal a. Measurement 1) Measurement for this Item will be per each water valve to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Water Valve" for: a) Various sizes c. The price bid shall include: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 024114-5 UTILITY REMOVAL/ABANDONMENT Page 5 of 17 1) Removal and disposal of valve 2) CLSM 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 4. W ter Valve Removal and Salvage a. Measurement 1) Measurement for this Item will be per each water valve to be removed and salvaged. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Water Valve" for: a) Various sizes c. The price bid shall include: 1) Removal and Salvage of valve 2) CLSM 3) Delivery to City 4) Pavement removal 5) Excavation 6) Hauling 7) Disposal of excess materials 8) Furnishing, placement and compaction of backfill 9) Clean-up 5. W ter Valve Abandonment a. Measurement 1) Measurement for this Item will be per each water valve to be abandoned. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Abandon Water Valve" for: a) Various Sizes c. The price bid shall include: 1) Abandonment of valve 2) CLSM 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 6. Fire Hydrant Removal and Salvage a. Measurement 1) Measurement for this Item will be per each fire hydrant to be removed. CITY OF FORT WORTH W TER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 024114-6 UTILITY REMOVAL/ABANDONMENT Page 6 of 17 b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Fire Hydrant". c. The price bid shall include: 1) Removal and salvage of fire hydrant 2) Delivery to City 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 7. W ter Meter Removal and Salvage a. Measurement 1) Measurement for this Item will be per each water meter to be removed and salvaged. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Water Meter" for: a) Various sizes 2) If a "Water Meter Service Relocate" is performed in accordance with Section 33 12 10, removal and salvage or disposal of the existing (2-inch or smaller) water meter shall be subsidiary to the cost of the "Water Meter Service Relocate", no other compensation will be allowed. c. The price bid shall include: 1) Removal and salvage of water meter 2) Delivery to City 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 8. W ter Sampling Station Removal and Salvage a. Measurement 1) Measurement for this Item will be per each water sampling station to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Water Sampling Station". c. The price bid shall include: 1) Removal and salvage of water sampling station 2) Delivery to City CITY OF FORT WORTH W TER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 024114-7 UTILITY REMOVAL/ABANDONMENT Page 7 of 17 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 9. Concrete Water Vault Removal a. Measurement 1) Measurement for this Item will be per each concrete water vault to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Concrete Water Vault". c. The price bid shall include: 1) Removal and disposal of concrete water vault 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Removal, salvage and delivery of any valves to City, if applicable 4) Removal, salvage and delivery of any water meters to City, if applicable 5) Pavement removal 6) Excavation 7) Hauling 8) Disposal of excess materials 9) Furnishing, placement and compaction of backfill 10) Clean-up C. Sanitary Sewer Lines and Appurtenances 1. Abandonment of Sanitary Sewer Line by Cut and installation of Abandonment Plug a. Measurement 1) Measurement for this Item shall be per each cut and abandonment plug installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Sewer Abandonment Plug" for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction of backfill 8) Clean-up 2. Sanitary Sewer Manhole Removal a. Measurement CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 024114-8 UTILITY REMOVAL/ABANDONMENT Page 8 of 17 1) Measurement for this Item will be per each sanitary sewer manhole to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Sewer Manhole" for: a) Various diameters c. The price bid shall include: 1) Removal and disposal of manhole 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Cutting and plugging of existing sewer lines 4) Pavement removal 5) Excavation 6) Hauling 7) Disposal of excess materials 8) Furnishing, placement and compaction of backfill 9) Clean-up 3. Sanitary Sewer Junction Structure Removal a. Measurement 1) Measurement for this Item will be per each sanitary sewer junction structure being removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the lump sum bid per each "Remove Sewer Junction Box" location. c. The price bid shall include: 1) Removal and disposal of junction box 2) Removal, salvage and delivery of frame and cover to City. 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up D. Storm Sewer Lines and Appurtenances 1. Abandonment of Storm Sewer Line by Cut and installation of Abandonment Plug a. Measurement 1) Measurement for this Item shall be per each cut and abandonment plug to be installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Storm Abandonment Plug" installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing abandonment plug CITY OF FORT WORTH W TER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 024114-9 UTILITY REMOVAL/ABANDONMENT Page 9 of 17 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction of backfill 8) Clean-up 2. Storm Sewer Manhole Removal a. Measurement 1) Measurement for this Item will be per each storm sewer manhole to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Manhole Riser" for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of manhole 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 3. Storm Sewer Junction Box Removal a. Measurement 1) Measurement for this Item will be per each storm sewer junction structure to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Storm Junction Box" for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of junction box 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 4. Storm Sewer Junction Structure Removal a. Measurement CITY OF FORT WORTH W TER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 0241 14 - 10 UTILITY REMOVAL/ABANDONMENT Page 10 of 17 1) Measurement for this Item will be per each storm sewer junction structure being removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the lump sum bid per each "Remove Storm Junction Structure" location. c. The price bid shall include: 1) Removal and disposal of junction structure 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 5. Storm Sewer Inlet Removal a. Measurement 1) Measurement for this Item will be per each storm sewer inlet to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Storm Inlet" for: a) Various types b) Various sizes c. The price bid shall include: 1) Removal and disposal of inlet 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 6. Storm Sewer Junction Box Removal a. Measurement 1) Measurement for this Item shall be per linear foot of existing storm sewer box to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per linear foot of "Remove Storm Junction Box" for all sizes. c. The price bid shall include: 1) Removal and disposal of Storm Sewer Box 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 0241 14 - 11 UTILITY REMOVAL/ABANDONMENT Page 11 of 17 6) Furnishing, placement and compaction of backfill 7) Clean-up 7. Headwall/SET Removal a. Measurement 1) Measurement for this Item will be per each headwall or safety end treatment (SET) to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Headwall/SET". c. The price bid shall include: 1) Removal and disposal of Headwall/SET 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 8. Trench Drain Removal a. Measurement 1) Measurement for this Item shall be per linear foot of storm sewer trench drain to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per linear foot of "Remove Trench Drain" for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of storm sewer line 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Contact Inspector and the Water Department Field Operation Storage Yard for coordination of salvage material return. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 0241 14 - 12 UTILITY REMOVAL/ABANDONMENT Page 12 of 17 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Protect and salvage all materials such that no damage occurs during delivery to the City. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 MATERIALS 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 REMOVAL, SALVAGE, AND ABANDONMENT A. General 1. Manhole Abandonment a. All manholes that are to be taken out of service are to be removed unless specifically requested and/or approved by City. b. Excavate and backfill in accordance with Section 33 05 10. c. Remove and salvage manhole frame and cover as coordinated with City. d. Deliver salvaged material to the City. e. Cut and plug sewer lines to be abandoned. £ Backfill manhole void in accordance with City Standard Details. B. Water Lines and Appurtenances 1. Water Line Pressure Plugs a. Ductile Iron Water Lines CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 0241 14-13 UTILITY REMOVAL/ABANDONMENT Page 13 of 17 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 2) Plug with an MJ Plug with mechanical restraint and blocking in accordance with Section 33 11 11. 3) Perform Cut and Plug in accordance with Section 33 12 25. b. PVC C900 and C905 Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 2) Plug with an MJ Plug with mechanical restraint and blocking in accordance with Section 33 11 11. 3) Perform Cut and Plug in accordance with Section 33 12 25. c. Concrete Pressure Pipe, Bar Wrapped, Steel Cylinder Type Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10 2) Plug using: a) A fabricated plug restrained by welding or by a Snap Ring in accordance with Section 33 11 13; or b) A blind flange in accordance with Section 33 11 13 3) Perform Cut and Plug in accordance with Section 33 12 25. d. Buried Steel Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 2) Plug using: a) A fabricated plug restrained by welding in accordance with Section 33 11 14; or b) A blind flange in accordance with Section 33 11 14 3) Perform Cut and Plug in accordance with Section 33 12 25. 2. Water Line Abandonment Plug a. Excavate and backfill in accordance with Section 33 05 10. b. Plug with CLSM in accordance with Section 03 34 13. 3. W ter Line Abandonment by Grouting a. Excavate and backfill in accordance with Section 33 05 10. b. Dewater from existing line to be grouted. c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 or CLSM in accordance with 03 34 13. d. Dispose of any excess material. 4. W ter Line Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Cut existing line from the utility system prior to removal. c. Cut any services prior to removal. d. Remove existing pipe line and properly dispose as approved by City. 5. W ter Valve Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and dispose of valve bonnet, wedge and stem. c. Fill valve body with CLSM in accordance with Section 03 34 13. 6. W ter Valve Removal and Salvage a. Excavate and backfill in accordance with Section 33 05 10. b. Remove valve bonnet, wedge and stem. CITY OF FORT WORTH W TER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 0241 14 - 14 UTILITY REMOVAL/ABANDONMENT Page 14 of 17 c. Deliver salvaged material to the Water Department Field Operation Storage Yard. d. Protect salvaged materials from damage. e. Fill valve body with CLSM in accordance with Section 03 34 13. 7. Water Valve Abandonment a. Excavate and backfill in accordance with Section 33 05 10. b. Remove the top 2 feet of the valve stack and any valve extensions. c. Fill the remaining valve stack with CLSM in accordance with Section 03 34 13. 8. Fire Hydrant Removal and Salvage a. Excavate and backfill in accordance with Section 33 05 10. b. Remove Fire Hydrant. c. Place abandonment plug on fire hydrant lead line. d. Deliver salvaged fire hydrant to the Water Department Field Operation Storage Yard. e. Protect salvaged materials from damage. 9. Water Meter Removal and Salvage a. Remove and salvage water meter. b. Return salvaged meter to Project Representative. c. City will provide replacement meter for installation. d. Meter Box and Lid 1) Remove and salvage cast iron meter box lid. 2) Remove and dispose of any non -cast iron meter box lid. 3) Return salvaged material to the Water Department Field Operation Storage Yard. 4) Remove and dispose of meter box. 10. Water Sample Station Removal and Salvage a. Remove and salvage existing water sample station. b. Deliver salvaged material to the Water Department Field Operation Storage Yard. 11. Concrete Water Vault Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and salvage vault lid. c. Remove and salvage valves. d. Remove and salvage meters. e. Deliver salvaged material to the Water Department Field Operation Storage Yard. f. Remove and dispose of any piping or other appurtenances. g. Demolish and remove entire concrete vault. h. Dispose of all excess materials. 12. Cathodic Test Station Abandonment a. Excavate and backfill in accordance with Section 33 05 10 b. Remove the top 2 feet of the cathodic test station stack and contents. c. Fill any remaining voids with CLSM in accordance with Section 03 34 13. C. Sanitary Sewer Lines and Appurtenances CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 0241 14 - 15 UTILITY REMOVAL/ABANDONMENT Page 15 of 17 1. Sanitary Sewer Line Abandonment Plug a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and dispose of any sewage. c. Plug with CLSM in accordance with Section 03 34 13. 2. Sanitary Sewer Line Abandonment by Grouting a. Excavate and backfill in accordance with Section 33 05 10. b. Dewater and dispose of any sewage from the existing line to be grouted. c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 or CLSM in accordance with 03 34 13. d. Dispose of any excess material. 3. Sanitary Sewer Line Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Cut existing line from the utility system prior to removal. c. Cut any services prior to removal. d. Remove existing pipe line and properly dispose as approved by City. 4. Sanitary Sewer Manholes Removal a. All sanitary sewer manholes that are to be taken out of service are to be removed unless specifically requested and/or approved by City. b. Excavate and backfill in accordance with Section 33 05 10. c. Remove and salvage manhole frame and cover. d. Deliver salvaged material to the Water Department Field Operation Storage. e. Demolish and remove entire concrete manhole. f. Cut and plug sewer lines to be abandoned. 5. Sanitary Sewer Junction Structure Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and salvage manhole frame and cover. c. Deliver salvaged material to the Water Department Field Operation Storage. d. Demolish and remove entire concrete manhole. e. Cut and plug sewer lines to be abandoned. D. Storm Sewer Lines and Appurtenances 1. Storm Sewer Abandonment Plug a. Excavate and backfill in accordance with Section 33 05 10. b. Dewater line. c. Plug with CLSM in accordance with Section 03 34 13. 2. Storm Sewer Line Abandonment by Grouting a. Excavate and backfill in accordance with Section 33 05 10. b. Dewater the existing line to be grouted. c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 or CLSM in accordance with 03 34 13. d. Dispose of any excess material. 3. Storm Sewer Line Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove existing pipe line and properly dispose as approved by City. 4. Storm Sewer Manhole Removal CITY OF FORT WORTH W TER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 0241 14 - 16 UTILITY REMOVAL/ABANDONMENT Page 16 of 17 a. All storm sewer manholes that are to be taken out of service are to be removed unless specifically requested and/or approved by City. b. Excavate and backfill in accordance with Section 33 05 10. c. Demolish and remove entire concrete manhole. d. Cut and plug storm sewer lines to be abandoned. 5. Storm Sewer Junction Box and/or Junction Structure Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Demolish and remove entire concrete structure. c. Cut and plug storm sewer lines to be abandoned. 6. Storm Sewer Inlet Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Demolish and remove entire concrete inlet. c. Cut and plug storm sewer lines to be abandoned. 7. Storm Sewer Box Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Cut existing line from the utility system prior to removal. c. Cut any services prior to removal. d. Remove existing pipe line and properly dispose as approved by City. 8. Headwall/SET Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Demolish and remove entire concrete inlet. c. Cut and plug storm sewer lines to be abandoned. 9. Storm Sewer Trench Drain Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove existing pipe line and dispose as approved by City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH W TER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 0241 14 - 17 UTILITY REMOVAL/ABANDONMENT Page 17 of 17 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.2.C.3.c. — Include Frame and Cover in Payment description 12/20/12 D. Johnson Throughout — added abandonment of storm and sewer manholes when requested and/or approved by City CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 REVISED 12/20/2012 City Project No. 103358-1 FORTWORTH. City of Fort Worth Division 33 - Utilities 05/10/2023 0 000 11110*11111 Rill TEMPORARY WATER SERVICES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 330430-1 TEMPORARY WATER SERVICES Pagel of4 1. Temporary Water Service needed to maintain service during water main replacement project B. Deviations from this City of Fort Worth Standard Specification 1. Installation of temporary water service for lines larger than 3-inches. C. Products Installed But Not Furnished Under This Section 1. Fire Hydrant Meters D. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 — General Requirements 3. Specification 32 12 16 — Asphalt Paving 4. Specification 33 05 10 — Utility Trench Excavation, Embedment and Backfill 5. Specification 33 04 40 — Cleaning and Acceptance Testing of Water Mains 6. Specification 33 12 10 — Water Services 1-inch to 2-inch 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Measurement a. Measurement for Temporary Water Services will be measured by: 1) Lump sum or 2) Per linear foot of Temporary Water Main for Miscellaneous Projects only 2. Payment a. The work performed and materials furnished in accordance with this Item and measured under "Measurement" will be paid for at the unit price bid for "Temporary Water Service" of the type specified. 3. The price bid shall include: a. Temporary water service line b. Connections c. Fittings d. Valves e. Corporation stops f. Temporary asphalt for crossings g. Traffic Control h. Disinfection i. Removal of temporary services CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACT 2019 — WSM-N PART 1 Revised July 1, 2011 City Project No. 103358-1 330430-2 TEMPORARY WATER SERVICES Page 2 of 4 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. NSF International a. 61, Drinking Water System Components —Health Effects 3. ASTM International (ASTM): a. D3035, Standard Specification for Polyethylene (PE) Plastic Pipe (DR -PR) Based on Controlled Outside Diameter 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Provide advance notice for service interruption and meet requirements of Division 1. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2-PRODUCTS N <I]l."L►`iWa D111'7�IS.y : I �117 :711111�.y A. Fire Hydrant Meters 2.2 EQUIPMENT, PRODUCT TYPE, AND MATERIALS A. Description 1. Regulatory Requirements a. All Temporary Water Service components in contact with potable water shall conform to the requirements of NSF 61. B. Materials 1. Service Couplings, Fittings, and Corporation Stops a. Conform to Section 33 12 10. 2. Service lines a. Polyethylene tubing b. Conform to ASTM D3035 and SDR 11 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACT 2019 — WSM-N PART 1 Revised July 1, 2011 City Project No. 103358-1 330430-4 TEMPORARY WATER SERVICES Page 3 of 4 Temporary Water Service Main a. Galvanized steel pipe b. Conform to Schedule 40. 4. Driveway Approach a. Asphalt 1) Type B Asphalt in accordance with Section 32 12 16 C. Design Criteria Service lines a. 3/4-inch minimum pipe size b. Minimum flow rate of 5 GPM at a dynamic pressure of 35 psi 2. Temporary Water Service Main a. 2-inch minimum pipe size b. 10-inch water line to be connected to new water line and/or nearby hydrant as indicated in the drawings near the Bob Bolen Public Safety Complex. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Install Temporary Water Services in accordance with provisions herein and in accordance with City Standard Details or as shown on the Drawings. 2. Perform disinfection test of temporary water service main and water services in accordance with Section 33 04 40. B. Temporary Water Service Installation Connect to existing water supply a. Fire hydrant 1) Connect to fire hydrant with hydrant meter and 2-inch gate valve. b. If a fire hydrant is not available, tap existing water main. 1) Connect to water main with 2-inch service tap and a corporation stop in accordance with Section 33 12 10. 2) Connect temporary water main with resilient seat gate valve as shown on the Drawings. 3) Record water usage with a hydrant meter. 4) Do not tap existing water main, unless approved by the City. 2. Water service a. Connect 3/4-inch water service to 2-inch temporary water service main. b. Remove existing meters, tag with address and provide to City Inspector. c. Connect 3/4-inch temporary water service to existing private service. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACT 2019 — WSM-N PART 1 Revised July 1, 2011 City Project No. 103358-1 330430-4 TEMPORARY WATER SERVICES Page 4 of 4 d. Connect temporary water service lines larger than 3-inches as shown on the Drawings. e. Cover domestic meter box with protective guard or barricade. C. Intersection and Driveway Approach Crossing for Temporary Water Service 1. Crossing for Temporary Water Service Main a. Cover temporary service line with sufficient asphalt to protect service line and to provide a driveable crossing. b. If required to bury temporary service line due to high volume traffic, or other reasons required by the City, excavate, embed and backfill in accordance with Section 33 05 10. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Field Tests and Inspections 1. Check each water service installation for leaks with full flow through the curb stop at the time the main is tested in accordance with Section 33 04 40. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED[ 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2019 — WSM-N PART 1 City Project No. 103358-1 33 12 10- 1 WATER SERVICES 1-INCH TO 2-INCH Page 1 of 17 SECTION 33 12 10 WATER SERVICES 1-INCH TO 2-INCH PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Lead-free 1-inch to 2-inch water service lines from the water main to the right-of- way, fittings and water meter boxes complete in place, as shown on the Drawings, directed by the Engineer, and specified herein for: a. New Water Service b. New Water Service (Bored) c. Water Meter Service Relocate d. Private Water Service B. Deviations from this City of Fort Worth Standard Specification 1. All lead service lines encountered by the Contractor either discovered during construction or as indicated on the drawings shall be removed from the water main to the meter. 2. The Contractor shall notify the Project Manager and Inspector of any lead service lines encountered that are not indicated on the drawings. 3. All lead service lines shall be disposed of at a certified metal recycling center as specified in the deviations of the Utility Removal/Abandonment Specification (02 41 14). 4. Lead Service Line removal shall be considered subsidiary to the installation of the new water service and/or service reconnection. No additional payment will be made. C. Products Installed but not Furnished Under this Section 1. Water meters for various sizes D. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 33 04 40 — Cleaning and Acceptance Testing of Water Mains 4. Section 33 05 10 —Utility Trench Excavation, Embedment and Backfill 5. Section 33 12 25 — Connection to Existing Water Mains 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. New Water Service a. Measurement 1) Measurement for this Item shall be per each new "Water Service" complete in place from the tap of the main to the installation of the meter box and associated appurtenances where the service line is installed by open cut construction. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10-2 WATER SERVICES 1-INCH TO 2-INCH Page 2 of 17 b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per each "Water Service" installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing New Service Line as specified by the Drawings 2) Submitting product data 3) Tapping saddle 4) Corporation stop 5) Curb stop 6) Fittings 7) Service line installed by open cut 8) Connection to meter 9) Meter Box and Lid 10) Pavement removal 11) Excavation 12) Hauling 13) Disposal of excess material 14) Surface Restoration associated with Meter Box installation and connection, excluding grass (seeding, sodding or hydro -mulch paid separately) 15) Clean-up 16) Disinfection 17) Testing 2. New Bored Water Service a. Measurement 1) Measurement for this Item shall be per each new Water Service complete in place from the tap of the main to the installation of the meter box and associated appurtenances where the service line is installed by trenchless method. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per each "Bored Water Service" installed for: a) Various sizes c. The price bid shall include: 1) Submitting product data 2) Tapping saddle 3) Corporation stop 4) Curb stop 5) Fittings 6) Service line installed by trenchless method 7) Connection to meter 8) Meter Box and Lid 9) Pavement removal 10) Excavation 11) Hauling 12) Disposal of excess material 13) Surface restoration associated with Meter Box installation and connection, excluding grass (seeding, sodding or hydro -mulch paid separately) CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 3 WATER SERVICES 1-INCH TO 2-INCH Page 3 of 17 14) Clean-up 15) Disinfection 16) Testing 3. Water Meter Service Reconnect a. Measurement 1) Measurement for this Item shall be per each Water Meter Service Reconnect complete in place from public service line connection to private service line connection. b. Payment 1) The work performed in conjunction with relocation of the meter, associated private service line, fittings and meter box 5 feet or less in any direction from centerline of existing meter location and the materials furnished in accordance with this Item will be paid for at the unit price bid per each "Water Meter Service, Reconnection" installed for: a) Various size of services c. The price bid shall include: 1) Private service line 2) Fittings 3) Private connection to water meter 4) Connection to existing private service line 5) Cut and crimp of existing service 6) Removal and Disposal or Salvage of existing 2-inch or smaller water meter, as directed by City 7) Pavement removal 8) Excavation 9) Hauling 10) Disposal of excess material 11) Surface restoration for area disturbed for installation of meter box, excluding grass (seeding, sodding or hydro -mulch paid separately) 12) Clean-up 13) Cleaning 14) Disinfection 15) Testing 4. Private Water Service Relocation a. Measurement 1) Measurement for this Item shall be per linear foot of Private Service relocation complete in place from the meter box to a connection to the existing service line on private property. b. Payment 1) The work performed in conjunction with Private Service Line installation where the meter and meter boxes are moved more than 5 feet in any direction from centerline of existing meter location and materials furnished in accordance with the Item and measured as provided under "Measurement" will be paid for at the unit price bid per linear foot of "Private Water Service" performed for: a) Various service sizes c. The price bid shall include: 1) Obtaining appropriate permit 2) Obtaining Right of Entry CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 4 WATER SERVICES 1-INCH TO 2-INCH Page 4 of 17 3) Submitting product data 4) Private service line 5) Fittings 6) Backflow preventer, check valve, and isolation valve relocation, if applicable 7) Connection to existing private service line 8) Pavement removal and replacement 9) Excavation 10) Hauling 11) Disposal of excess material 12) Surface restoration, excluding grass (seeding, sodding or hydro -mulch paid separately) 13) Clean-up 14) Cleaning 15) Disinfection 16) Testing 1.3 REFERENCES A. Definitions 1. New Service a. Installation of new 1-inch to 2-inch Water Service Line by open cut construction from the water main to the right-of-way, including corporation stop, curb stop, fittings and water meter boxes complete in place, as shown on the Drawings. 2. New Service (Bored) a. Installation of new 1-inch to 2-inch Water Service Line by trenchless construction method from the water main to the right-of-way, including corporation stop, curb stop, fittings and water meter boxes complete in place, as shown on the Drawings. 3. Meter Service Reconnection a. Relocation and reconnection of the private service line from an existing meter to be abandoned and a new meter installed that lies within 5 feet of the existing meter. 4. Private Service Relocation a. Relocation and reconnection of private service line behind the water meter where the existing meter to be abandoned and the new meter installed is greater than 5 feet of the existing meter. A licensed plumber is required to relocate the private service. 5. Lead-free a. Lead-free pipes and plumbing fittings and fixtures shall contain less than 0.25 percent lead in accordance with the reduction of Lead in Drinking Water Act (P.L. 111-380). B. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. ASTM International (ASTM): a. A48, Standard Specification for Gray Iron Castings. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 5 WATER SERVICES 1-INCH TO 2-INCH Page 5 of 17 b. A536, Standard Specification for Ductile Iron Castings. c. B88, Standard Specification for Seamless Copper Water Tube. d. B98, Standard Specification for Copper -Silicon Alloy Rod, Bar and Shapes. e. C131, Standard Specification for Resistance to Degradation of Small -Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. f. C150, Standard Specification for Portland Cement. g. C330, Standard Specification for Lightweight Aggregates for Structural Concrete. h. C857 (RL), Standard Practice for Minimum Structural Design Loading for Underground Precast Concrete Utility Structures i. D883, Standard Terminology Relating to Plastics. j. D1693, Standard Test Method for Environmental Stress -Cracking of Ethylene Plastics 3. American Water Works Association (AWWA): a. C700, Cold -Water Meters - Displacement Type, Bronze Main Case. b. C800, Underground Service Line Valves and Fittings. 4. NSF International (NSF): a. 61, Drinking Water System Components - Health Effects. 5. Reduction of Lead in Drinking Water Act a. Public Law 111-380 (P.L. 111-380) 6. General Services Administration (GSA): a. RR-F-621E, Frames, Covers, Gratings, Steps, Sump and Catch Basin, Manhole 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Provide advance notice for service interruptions and meet requirements of Division 0 and Division 1. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 0133 00. B. All submittals shall be approved by the City prior to delivery. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS A. Product Data, if applicable: 1. Tapping Saddle 2. Corporation stop 3. Curb Stop 4. Service Line 5. Meter Box 6. Meter Box Lid B. Certificates and Test Reports 1. Prior to shipment of any Water Service components, the manufacturer shall submit the following: a. A Certificate of Adequacy of Design stating that the components to be furnished comply with all regulatory requirements identified in this Section including: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 6 WATER SERVICES 1-INCH TO 2-INCH Page 6 of 17 1) The Reduction of Lead in Drinking Water Act (P.L. 111-380) 2) AWWA C800 3) NSF 61 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Qualifications 1. Manufacturers a. Water Services shall meet or exceed the latest revisions of AWWA C800, NSF 61, the Reduction of Lead in Drinking Water Act and shall meet or exceed the requirements of this Specification. 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Protect all parts such that no damage or deterioration will occur during a prolonged delay from the time of shipment until installation is completed and the units and equipment are ready for operation. 2. Protect all equipment and parts against any damage during a prolonged period at the site. 3. Prevent plastic and similar brittle items from being directly exposed to sunlight or extremes in temperature. 4. Secure and maintain a location to store the material in accordance with Section 01 6600. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED PRODUCTS A. Water meters for various sizes 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Manufacturers 1. Only the manufacturers as listed on the City's Standard Products List will be considered as shown in Section 0160 00. a. The manufacturer must comply with this Specification and related Sections. 2. Any product that is not listed on the Standard Products List is considered a substitution and shall be submitted in accordance with Section 0125 00. 3. The Water Services and appurtenances shall be new and the product of a manufacturer regularly engaged in the manufacturing of Water Services and appurtenances having similar service and size. B. Description CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 7 WATER SERVICES 1-INCH TO 2-INCH Page 7 of 17 Regulatory Requirements a. All materials shall conform to the Reduction of Lead in Drinking Water Act (P.L. 111-380). This Act defines "Lead-free" for pipes and other appurtenances to be less than 0.25 percent lead. b. Water Services shall meet or exceed the latest revisions of AWWA C800 and shall meet or exceed the requirements of this Specification. c. All Water Services components in contact with potable water shall conform to the requirements of NSF 61. C. Materials/Design Criteria 1. Service Lines a. Provide Type K Copper Tubing per ASTM B88. b. Furnish in the annealed conditions, unless otherwise specified in the Contract Documents. 2. Service Couplings a. Fitting Ends 1) Flared Copper Tubing with thread dimensions per AWWA C800 2) Provide coupling nuts with a machined bearing skirt of a length equal to the tubing outer diameter (O.D.). b. Provide with hexagonal wrench grip compatible with the coupling size. c. Provide lead-free service couplings in accordance with the Reduction of Lead in Drinking Water Act. 3. Corporation stops a. Provide brass castings per AWWA C800 for: 1) Bodies 2) Plugs 3) D washers 4) Bottom nuts b. Machining and Finishing of Surfaces 1) Provide 1 1/4 inch per foot or 0.1458 inch per inch f 0.007 inch per inch taper of the seating surfaces for the key and body. 2) Reduce large end of the tapered surface of the key in diameter by chamfer or turning for a distance that will bring the largest end of the seating surface of the key into the largest diameter of the seating surface of the body. 3) Relieve taper seat in the body on the small end. 4) Extend small end of the key there -through to prevent the wearing of a shoulder and facilitate proper seating of key. 5) Design key, key nut and washer such that if the key nut is tightened to failure point, the stem end of the key shall not fracture. 6) Design nut and stem to withstand a turning force on the nut of at least 3 times the necessary effort to properly seat the key without failure in any manner. 7) Port through corporation stop shall be full size to eliminate turbulence in the flow way. 8) Design stop for rotation about the axis of the flow passageway inside the following minimum circles in order to properly clear the tapping machine: a) Two 7/8-inch for 1-inch corporation stops b) Four 15/16-inch for 1 '/2 -inch and 2-inch corporation stops c. Provide lead-free corporation stops in accordance with the Reduction of Lead in Drinking Water Act. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 8 WATER SERVICES 1-INCH TO 2-INCH Page 8 of 17 4. Curb Stops a. Provide brass castings per AWWA C800. b. Valve plugs shall be: 1) Cylinder type 2) Plug type, or 3) Ball type c. Incorporate full flow porting. d. Provide for full 360 degree plug rotation clockwise or counter -clockwise. e. Overall Length 1) 3-5/16 inch + 1/8 inch for 1-inch diameter 2) 4-1 /32 inch + 9.32 for 1-inch diameter f. Cylindrical Plug Type 1) Provide O-ring seal at top and bottom. a) O-ring at top only is acceptable if bottom of curb stop body is closed. 2) Seals shall be Buna N. 3) 1 O-ring seal shall surround the outlet port of the curb stop and act to effectively seal in the closed position. 4) The port in the plug shall provide a straight through, full size flow way, so shaped as to eliminate turbulence. 5) All waterways shall be smooth and free of burrs or rough areas. 6) Design the curb stop to provide ease and accuracy of operation and positive shut-off of water. g. Tapered Plug Type 1) Provide O-ring seal at top and bottom. 2) The tapered plug and cylindrical recess in the valve body shall be machined to match within approved manufacturing tolerances. 3) Inlet and outlet ports shall be sealed by O-rings or combination Teflon U- shaped seal rings backed with O-rings. 4) The port in the plug shall provide a straight through, full size flow way, so shaped as to eliminate turbulence. 5) All waterways shall be smooth and free of burrs or rough areas. 6) Design the curb stop to provide ease and accuracy of operation and positive shut-off of water. h. Ball Plug Type 1) Provide double O-ring seals on the stem. 2) The ball shall seal against rubber rings mounted in the valve body at the inlet and outlet ports. 3) The ball shall be bronze with a smooth Teflon coating. 4) The port in the plug shall provide a straight through, full size flow way, so shaped as to eliminate turbulence. 5) All waterways shall be smooth and free of burrs or rough areas. i. Provide lead-free curb stops in accordance with the Reduction of Lead in Drinking Water Act. 5. Straight Adapters a. Brass castings and threads per AWWA C800 b. Provide lead-free straight adapters in accordance with the Reduction of Lead in Drinking Water Act. 6. Three Part Copper Unions a. Brass castings and threads per AWWA C800 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 9 WATER SERVICES 1-INCH TO 2-INCH Page 9 of 17 b. Provide lead-free Three Part Copper Unions in accordance with the Reduction of Lead in Drinking Water Act. 7. Straight Meter Couplings a. Brass castings per AWWA C800 b. Threads per AWWA C700 c. Tailpiece with outside iron pipe thread d. Chamfer corners on threaded end of meter nut. e. Machine inside and outside of tailpiece. f. Provide lead-free Straight Meter Couplings in accordance with the Reduction of Lead in Drinking Water Act. 8. Branch Connections a. Brass castings per AWWA C800 b. Inlet and outlet connections per AWWA C800 c. Provide lead-free branch connections in accordance with the Reduction of Lead in Drinking Water Act. 9. Service Saddles a. Castings 1) Brass or Nylon coated ductile iron castings per AWWA C800 2) Free of porosity with sharp edges removed 3) Saddle a) Form to fit firmly against side of maximum diameter of water main with approximately 180 degrees wrap around. 4) Outlet a) Design outlet boss for no thread distortion by bending moments. b) Tapped for taper threaded corporation stop conforming to AWWA C800. b. Straps 1) Conform to ASTM B98. 2) Form flat to fit uniformly against the wall of the water main. 3) Shall be double straps 4) Rod diameter not less than 5/8 inch flattened to 1 inch on one side. 5) Straps shall be threaded 5/8 inch (11-NC-2A) for a distance such that'/2 inch remains after clamp is fully tightened on the pipe. 6) Chamfer strap ends to protect the starting threads. 7) The threads shall be full and free from shear. 8) 4-inch and larger pipe shall be in accordance with Section 33 12 25. c. Nuts 1) Bronze material a) Same material as straps 2) Dimensions equal to or larger than heavy hexagon nuts 3) Tapped 5/8 inch (I I-NC-2B) d. Gaskets 1) Neoprene rubber material 2) Cemented to saddle and positioned to facilitate installation 10. Brass Flanged Angle Valve a. For 1 '/2-inch and 2-inch services b. Brass castings per AWWA C800 c. Valve Body with integral outlet flange and inlet wrenching flat d. Fit together key and body by turning key and reaming body CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 10 WATER SERVICES 1-INCH TO 2-INCH Page 10 of 17 1) Key with 0-ring seal seat at the upper end 2) Lap key and body seat are to conform to corporation stop requirements of this Specification. 3) The outlet flange shall contain an 0-ring seat or a uniform flat drop -in flange gasket surface. 4) Drop -in flange gasket surface shall contain gasket retaining grooves milled circular about the axis of the flange. 5) The size of the outlet flange and the diameter and spacing of the bolt holes shall conform to AWWA C700. 6) The flange on 2-inch angle valves shall be double drilled to permit connection to 1 '/2 -inch meters. 7) The inlet port of the valve shall be tapered to conform to AWWA C800 taper pipe thread. 8) The key cap shall include a wrenching tee marked with a raised or recessed arrow to show whether the valve is open or closed. 9) Valve Assembly (main body, key, key cap) a) Brass material per AWWA C800 b) 0-ring seal on the top of the key between the key and body seat c) Key cap shall complete the assembly by attaching to the key by means of a strong bronze pin with phosphor bronze spring washer(s) depressed between the key cap and the top of the valve main body. d) Provide with padlock wings for locking the valve in the closed position. e) There shall be a uniform application of cold water valve grease between the body and the key. f) The valve shall be capable of being easily opened and stopping lugs. g) The waterway through the valve shall be smooth and rounded for minimum pressure loss, and shall be free of burrs or fins. h) The valve shall be strong, well designed, neat in appearance, water- tight and entirely adequate for the intended purpose. i) Provide with either a high quality rubber drop -in gasket or an 0-ring seal depending on the manufacturer's flange seal surface design choice. e. Provide lead-free brass flanged angle valves in accordance with the Reduction of Lead in Drinking Water Act. 11. Meter Boxes shall: a. Be constructed of: 1) Polymer, black polyethylene material as defined in ASTM D883. a) Minimum wall thickness of 3/8-inch throughout with no blowing agents or foaming plastics b) Body shall be black throughout, blended at the time of manufacture, and shall have a molded recycled emblem with a minimum of 35 percent Post Industrial/ Pre Consumer Recycled Content- verified with a Leed Product Documentation. c) Have a tensile strength greater than 1700 pounds per square inch (psi). d) Smooth edges and corners and be free from sharp edges so the unit can be handled safely without gloves. e) Exterior free from seams or parting lines. f) Have crush resistant ribbing along the outside of the box. g) Have a flange around the lid opening to help prevent settling and aide in adjustment to grade. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 11 WATER SERVICES 1-INCH TO 2-INCH Page 11 of 17 h) Not to be installed in roadway — designed to withstand loading in non - deliberate and incidental traffic only. 2) Concrete a) Frame of No. 6 gauge wire welded closed b) Type I or Type II Portland cement, in accordance with ASTM C 150, portioned with lightweight aggregate, in accordance with ASTM C330 (1) Percentage of wear not to exceed 40 per ASTM C131 (2) Minimum 28 day compressive strength of 3,000 psi b. Be able to withstand a minimum 15,000 pounds vertical load c. Withstand a minimum 400 pounds sidewall load. d. Have pipe holes measuring a minimum of 2-1/2" x 3-1/4". e. 1-inch Standard Meter Box (Class A) 1) For use with services utilizing 5/8-inch x 3/4-inch, 3/4-inch or 1-inch meter Single or Dual service meter. 2) Polymer a) Size: working of not less than 10 inches x 16 inches, 12 inches high 3) Concrete a) Size: working area not less than 10-inches x 16-inches, 12 inches high f. 2-inch Standard Meter Box (Class C) 1) For use with services utilizing 1-1/2-inch or 2-inch Single service meter. 2) Polymer a) Size: working area not less than 14-inches x 28-inches, 12 inches high 3) Concrete a) Size: working area not less than 15-inches x 26-1/2-inches, 12 inches high g. Bullhead Standard Meter Box (Class B) 1) For use with services utilizing two 5/8-inch x 3/4-inch or 3/4-inch or 1-inch Single service meter. 2) Polymer a) Size: working area not less than 15-inches x 18-inches, 12 inches high 3) Concrete a) Size: working area not less than 15-inches x 18-inches, 12 inches high 12. Meter Box Lid a. Meter Box Lids Shall: 1) Be solid throughout with reinforcing ribs. 2) Have City of Fort Worth `Molly' logo molded into the lid. 3) Bear the Manufacturer's IS (name or logo) and Country of Origin. 4) Be designed both with and without AMI receptacles 5) Have a molded tread -plate 6) Seat securely and evenly inside the meter box and shall not overlap the top edge of the meter box. 7) Have a molded pick bar for use by meter reading tool. 8) Have Automated Meter Infrastructure (AMI) snap locking slide mounts for number of meters/endpoints associated with meter box 9) Have an opening to accept the AMI end -point. Opening shall accommodate an endpoint with a 1-7/8 inches diameter. 10) Have recessed AMI end point area, to alleviate a trip hazard, centered over AMI slide mount. Recess area should be 4-1/2 inches in diameter and 3/8" deep. 11) Have built-in anti -flotation devices. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 12 WATER SERVICES 1-INCH TO 2-INCH Page 12 of 17 b. Cast Iron or Ductile Iron 1) Lids for Concrete Meter Boxes shall be constructed out of a cast iron and meet RRF-621 specification. 2) Shall withstand a minimum vertical load of 15,000 pounds 3) Coat castings with a bituminous emulsified asphalt unless otherwise specified in the Contract Documents, ground smooth, and cleaned with shot blasting, to get a uniform quality free from strength defects and distortions. 4) Dimensions shall be within industry standards of fl/16 inch per foot. 5) Shall have a plug inserted in to the AMI receptacle to avoid water entering through opening until the AMI receptacle is used 6) Be a minimum of 1-3/4 inches thick at reinforcing ribs. 7) Casting weights may vary f5 percent from drawing weight per industry standards. c. Plastic(Composite) 1) The lid shall: a) Constructed of Engineered Plastic as defined in ASTM D883 (1) Have a molded recycled emblem with a minimum of 50 percent Post Consumer Recycled and 50 percent Post Industrial/ Pre Consumer Recycled Content- verified with a Leed Product Documentation. (2) Be designed to fit a concrete box/cast iron box in retrofit installations. (3) Have a tensile strength greater than 1700 psi. (4) Have a `knock -out" plug to accept the AMI end- point. Knock -out diameter shall be 1-7/8 inch diameter. A removable plug may be substituted for the knock -out plug. (5) Be constructed out of a composite material blend for maximum durability and corrosion resistance. (6) Be black throughout with no blowing agents or foaming plastics (7) Smooth edges and corners and be free from sharp edges so the unit can be handled safely without gloves. (8) Exterior free from seams or parting lines. (9) Have a molded tread -pattern- tread dimensions shall be. 188-inch x .938-inch x .150-inch deep. (10) Have "City of Fort Worth" molded into the lid. (11) Have "Water Meter" molded into the lid- Font shall be standard Fadal CNC font with 1-inch characters x .150-inch deep. (12) Have a molded pick hole pocket- dimensions shall be 3-inch x 9/16-inch x Thru Hole with 3/16-inch 304 stainless steel rod. (13) Have 2 pieces of %2-inch rebar located in lid pockets for locatability as shown in Drawings. (14) Have location capability using metal detector. b) Domestic Manufacture Only -Made in USA molded on Lid. c) Not to be installed in roadway or parking area d) Be designed to withstand H-10 loading for non -deliberate and incidental traffic only as . e) Have ultraviolet protection. 2) 1-inch Standard Plastic Meter Box Lid (Class A) CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 13 WATER SERVICES 1-INCH TO 2-INCH Page 13 of 17 a) For use with services utilizing 5/8-inch x 3/4-inch, 3/4-inch or 1-inch meter Single or Dual service meter. b) Size: 11-7/8-inch x 17-7/8-inch, 1-1/2 inches high c) For use with Class A Standard Meter Box. d) Polymer lid shall seat evenly inside meter box and shall not overlap the top edge of the meter box. 3) 2-inch Standard Plastic Meter Box Lid (Class C) a) For use with services utilizing 1-1/2-inch or 2-inch Single service meter. b) Size 27-inches x 15-1/4-inches, 1-7/8 inches high c) For use with Class C Standard Meter Box. d) Polymer lid shall seat evenly inside meter box and shall not overlap the top edge of the meter box. 4) Bullhead Standard Plastic Meter Box Lid (Class B) a) For use with services utilizing two 5/8-inch x 3/4-inch or 3/4-inch or f - inch Single service meter: b) Size: 16-5/8-inch x 14-5/8-inch, 1-3/4 inches high c) For use with Class B Standard Meter Box. d) Polymer lid shall seat evenly inside meter box and shall not overlap the top edge of the meter box. 13. Horizontal Check Valve a. Equip 1 %2-inch and 2-inch Water Services with a horizontal check valve, with pipe plug, only if specified in the Drawings. b. If an existing backflow preventer is present, the Contractor is to leave it, and is not required to provide an additional horizontal check valve. c. Provide lead-free horizontal check valves in accordance with the Reduction of Lead in Drinking Water Act. 14. Service Marker a. 3 inch wide, 5 mil blue vinyl tape 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL A. Tests and Inspections 1. At the City's option, the manufacturer shall be required to provide certification records showing conformance of materials, design and testing to these Specifications. 2. The test procedures shall conform to AWWA C800. a. In the event that a chosen valve fails the City's hydrostatic test, the cost of the test shall be at the expense of the supplier. b. Proof testing of the remainder of the valves shall be at the cost and responsibility of the supplier. c. These tests will be the basis of acceptance or rejection of the remainder of the shipment by the City. 3. The City reserves the right to select products at random for testing. The failure of materials to conform to the applicable Specification may result in the rejection of the entire shipment. B. Marking CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 14 WATER SERVICES 1-INCH TO 2-INCH Page 14 of 17 1. Service saddle castings shall be clearly marked by letters and numerals cast thereon showing: a. Manufacturer's name b. Type C. Size of Pipe PART 3 - EXECUTION 3.1 INSTALLERS A. A licensed plumber is required for installations on the outlet side of the service meter. 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Install Water Services and appurtenances in accordance with AWWA C800. 2. Install Water Service Lines 5 feet north or east of center of lot frontage on lots 75 feet or wider, or where shown on Drawings. 3. Install Water Service Lines on lot center line on lots less than 75 feet wide, unless otherwise shown on the Drawings. 4. Install services at a minimum depth of 36 inches below final grade/proposed top of curb, unless otherwise specified in the Contract Documents. 5. Perform leak tests in accordance with Section 33 04 40. 6. Replace existing 3/4-inch Service Lines with 1-inch new Service Line, tap, and corporation. 7. Install replaced or relocated services with the service main tap and service line being in line with the service meter, unless otherwise directed by the City. 8. Excavate, embed and backfill trenches in accordance with Section 33 05 10. B. Handling 1. Haul and distribute Service Lines fittings at the project site and handle with care to avoid damage. a. Inspect each segment of Service Line and reject or repair any damaged pipe prior to lowering into the trench. b. Do not handle the pipe in such a way that will damage the pipe. 2. At the close of each operating day: a. Keep the pipe clean and free of debris, dirt, animals and trash — during and after the laying operation. b. Effectively seal the open end of the pipe using a gasketed night cap. C. Service Line Installation 1. Service Taps a. Only ductile iron pipe may be directly tapped. b. Install service taps and/or tap assemblies of the specified size as indicated on the Drawings, or as specified by the Engineer. c. Perform taps on a water system that is either uncharged or under pressure. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 15 WATER SERVICES 1-INCH TO 2-INCH Page 15 of 17 d. Taps consist of: 1) For Concrete Pressure Pipe or Steel Pipe a) Standard internal pipe threaded holes in the pipe walls (1) Made during pipe fabrication (2) Provide tapered threaded outlet with cc threads for up to 2-inch. (3) Provide flange outlet with flange to thread insulator adaptor kits for 4-inch and larger taps. 2) Other pipe materials a) Bronze service clamp with a sealed, threaded port through which the pipe wall is drilled to complete a service port e. Tap Assemblies 1) Consist of corporation stop with iron to copper connection attached to: a) Copper tubing terminating as shown on the City's Standard Detail b) May be required adjacent to gate valves c) Install as shown on the Drawings, or as directed by the Engineer. d) When required, shall be included in the unit price bid for installing gate valve. 2) Chlorination and testing purposes a) No separate payment will be made for taps required for testing and chlorination. 2. Installation of Water Services a. Install tap and Service Line in accordance with City Details. b. Install meter box in accordance with City Details. 1) Adjustment of the Service Line to proper meter placement height shall be considered as part of the Meter Box installation. 3. Trenching a. Provide a trench width sufficiently wide to allow for 2 inches of granular embedment on either side of the Service Line. 4. Bored Services a. Services shall be bored utilizing a pilot hole having a diameter'/2 inch to 3/4 inches larger than the Service Line. 5. Arrangement a. Arrange corporation stops, branches, curb stops, meter spuds, meter boxes and other associate appurtenances as shown in the City Detail, and to the approval of the Engineer. 6. Service Marker a. When Meter Box is not installed immediately subsequent to service installation: 1) Mark Curb Stop with a strip of blue vinyl tape fastened to the end of the service and extending through the backfill approximately 6 inches above ground at the Meter Box location. b. Installation of service taps only: 1) Attach service marker tape to the corporation stop or plug and extend upward and normal to the main through the backfill at the adjacent trench edge to at least 6 inches above ground to flag the tap location. 7. Corporation stops a. Fully open corporation stop prior to backfill. D. Removal of Existing Water Meters CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 33 12 10 - 16 WATER SERVICES 1-INCH TO 2-INCH Page 16 of 17 1. Remove, tag and collect existing Water Service meter for pickup by the City for reconditioning or replacement. 2. After installation of the Water Service in the proposed location and receipt of a meter from the City inspector, install the meter. 3. Reset the meter box as necessary to be flush with existing ground or as otherwise directed by the City. 4. All such work on the outlet side of the service meter shall be performed by a licensed plumber. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Field Tests and Inspections 1. Check each Water Service installation for leaks and full flow through the curb stop at the time the main is tested in accordance with Section 33 04 40. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 DATE NAME 12/20/2012 D.Johnson 2/13/2013 F. Griffin 4/26/2013 F. Griffin 6/19/2013 D. Johnson 11/21/2016 W. Norwood 11/21/2016 W. Norwood 2/14/17 2/14/17 W. Norwood 33 12 10 - 17 WATER SERVICES 1-INCH TO 2-INCH Page 17 of 17 END OF SECTION Revision Log SUMMARY OF CHANGE Added Blue Text for clarification 1.2 A. — Revision to items included in price bid Specification modified to be in accordance with the Reduction of Lead in Drinking Water Act — All materials shall be lead free in accordance with this Act. 1.2.A.3 — Water Meter Service Relocate was renamed Water Meter Service Reconnect 1.6.B. — added certification submittals for compliance with regulatory requirements Added the phrase `, including grass' to lines; Part 1, 1.2.A.1.c.14, Partl, 1.2.A.2.c.13, Part 1, 1.2.A.2.c.13, Part 1,1.2.A.3.c.11, Partl, 1.2.A.4.c.II Added the phrase `and replacement' to line Part 1,1.2.A.4.c.7 Revised lines with `including grass' replacing with `excluding grass (seeding, sodding or hydromulching paid separately)' Included in Part 1, 1.2, A, 1, c, 14; Part 1, 1.2, A, 2, c, 13; Part 1, 1.2, A, 3, c, 11; Part 1, 1.2, A, 4, 2, 11 1.2.A.4.c — Addition of private water service appurtenances relocation to being included in the linear foot price of private water services Require meter box suitable for AMI meter. 2.2,C, 11 & 2.2,C,12 Require service saddle with double straps. 2.2,C,9,b 2.2, C, 9.a.3 Remove table "Fit Contour of pipe..." W. Norwood 3.4, C, l.d.(2) Remove nylon sleeve inserts, require cc threads. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENTS CONTRACTS 2019 — WSM-N, PART 1 Revised February 14, 2017 City Project No. 103358-1 FORTWORTH. City of Fort Worth Division 34 - Transportation 05/10/2023 SP34 71 13.01 TRAFFIC CONTROL Page 1 of 4 SPECIAL PROVISION TO STANDARD SPECIFICATION 34 7113 TRAFFIC CONTROL For this Project, the Standard Specification 34 71 13 for Traffic Control (dated 11/22/2013) is amended with respect to the clauses cited below. No other clauses or requirements of this Standard Specification are waived or changed. Delete section 1.1. from Standard Specification 34 71 13 and replace with: 1.1 SUMMARY B. Installation of Traffic Control Devices and preparation of Traffic Control Plans, including moving, replacing, maintaining, cleaning and removing upon completion of the work, all temporary or permanent street closure barricades, signs, cones, lights or other devices required to handle traffic in conformance with the current edition of the Texas Manual of Uniform Traffic Control Devices and as indicated on the Drawings or directed by the Engineer or designated City representative. C. Deviations from this City of Fort Worth Standard Specification 1. As outlined in this Special Provision to Standard Specification 34 7113. D. Related Specifications Sections include, but are not limited to: 1. Division 0 —Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements Delete paragraph 1.2. from Standard Specification 34 71 13 and replace with: 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement andPayment 1. Installation of Traffic Control Devices a. Measurement 1) Traffic Control Devices for the project will be measured per month throughout the project duration regardless of the number of set-ups, locations or streets under construction. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured, as provided under "Measurement," shall be paid for at the unit price bid for "Traffic Control" under each Unit ofWork (Water, Sewer, Paving, etc). No additional compensation is made for materials, equipment or labor required for this Item. CITY OF FORT WORTH WATER AND SANITARY SEWER December 13, 2019 REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 SP 34 71 13.01 TRAFFIC CONTROL Page 2 of 4 SPECIAL PROVISION TO STANDARD SPECIFICATION 34 7113 TRAFFIC CONTROL 2) No more than one month may be charged during the same 30 day period of a contract. Projects with multiple crews performing concurrent Units of Work (Water, Sewer, Paving, etc) will be paid for 1 (one) month total, under the contractor's selected unit. The selected unit must have had active work during that period. 3) The months for each Unit of Work will be approximated for bidding and can be adjusted during construction as thework progresses according to the Contractor's schedule. The Contractor's schedule shall reflect the project being complete within the project duration set by the contract. c. The work performed under this Item shall include, but not be limited to: 1) Traffic Control implementation 2) Installation 3) Maintenance 4) Adjustments 5) Replacements 6) Removal 7) Police assistance during peak hours d. Traffic Control Plan Changes: 1) Contractor driven changes to the sequencing, resources, or location of traffic control activities do not warrant additional cost for traffic control. 2) City requested changes to the scope or sequencing can be submitted as a change order with supporting documentation for review by the 3) During periods of inactivity the contractor must provide supporting documentation that additional traffic control was required based on current site conditions and was present at the site. 2. Portable Changeable Message Board Signs a. Measurement 1) Portable Changeable Message Board Signs for the project shall be measured per week regardless of the number of set-ups, locations or streets under construction. b. Payment 1) The work performed and materials furnished in accordance to this Item and measured as provided under "Measurement" shall bepaid for at the unit price bid per week for "Portable Message Sign". c. The price bid and work performed under this Item shall include, but not be limited to: 1) Delivery of Portable Message Sign to Site 2) Message updating 3) Sign movement throughout construction 4) Return of the Portable Message Sign post -construction 3. Preparation of Traffic Control Plans or details if not provided on the Drawings and applicable City Standard Traffic Control Detail is available at: CITY OF FORT WORTH WATER AND SANITARY SEWER December 13, 2019 REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 SP 34 71 13.01 TRAFFIC CONTROL Page 3 of 4 SPECIAL PROVISION TO STANDARD SPECIFICATION 34 7113 TRAFFIC CONTROL http://fortworthtexas.gov/uploadedFiles/Transportation and Public Wor ks/Permits/TrafficControlPlans.pdf a. Measurement 1) Traffic Control Plans for the project shall be measured throughout the contract time period and furnished by the Contractor. b. Payment 1) The work performed and materials furnished in accordance withthis Item shall be subsidiary to the unit price bid for "Traffic Control". c. The work performed under this item shall include, but not be limited to: 1) Preparing the Traffic Control Plans 2) Adherence to City and Texas Manual on Uniform Traffic Control Devices (TMUTCD) 3) Obtaining the signature and seal of a licensed Texas Professional Engineer for all Traffic Control Plans submitted to the City. 4) Incorporation of City comments Delete paragraph 1.5.13, D, E and G from Standard Specification 34 71 13 and replace with: 1.5 SUBMITTALS B. Obtain a Street Use Permit from the Street Management Section of the Traffic Engineering Division, 311 W. 1 Oth Street. The Traffic Control Plan (TCP) for the Project shall be as detailed on the Traffic Control Plan sheets of the Drawing set if provided. A copy of the Traffic Control Plan shall be submitted with the Street Use Permit and upon approval uploaded to the City's BIM360 project page as a submittal. D. Contractor shall prepare Traffic Control Plans if required by the Drawings or Specifications. The Contractor will be responsible for having a licensed Texas Professional Engineer sign and seal the Traffic Control Plan sheets. Contractor, at his or her expense, shall prepare and submit for approval Traffic Control Plans where Contractor wishes to deviate from the approved set of Traffic Control plans if provided in the construction documents. E. Lane closures (including moving operations) that require a lane to be closed to through traffic for 24 hours or longer shall require a site -specific traffic control plan. G. Design Engineer will furnish standard details for traffic control. These are guidance and are not sufficient for a site specific traffic control plan for lane closures over 24 hours. Delete paragraph 1.5.G from Standard Specification 34 71 13. Delete paragraph 3.3.K from Standard Specification 34 71 13 and replace with: CITY OF FORT WORTH WATER AND SANITARY SEWER December 13, 2019 REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 SP 34 71 13.01 TRAFFIC CONTROL Page 4 of 4 SPECIAL PROVISION TO STANDARD SPECIFICATION 34 7113 TRAFFIC CONTROL 3.3 INSTALLATION K. Contractor shall make arrangements, at his or her expense, for police assistance to direct traffic iftraffic signalturn-ons, streetlightpole installation, orother construction will be done during peak traffic times (AM: 7 am —9 am, PM: 4 pm - 6 pm). CITY OF FORT WORTH WATER AND SANITARY SEWER December 13, 2019 REPLACEMENTS CONTRACTS 2019 - WSM-N, PART 1 City Project No. 103358-1 FORTWORTH. City of Fort Worth Appendix 05/10/2023 FORTWORTH. City of Fort Worth Laboratory Test Results for 2019 WSM-N, Part 1 Coring Project 05/10/2023 FORTWORTH. Project: CPN# 103358 Date Tested: 8/29/2022 — 9/2/2022 Requested by: Pratima Poudyal City of Fort Worth Capital Delivery Division/Soil Lab 920 Woodward Street Fort Worth, Texas 76107 Laboratory Test Results for 2019 WSM-N Coring Project 9/2/2022 Phone: 817-392-7920 This report presents the results of a street coring project for CPN #103358. Mr. Stephen Overton and Mr. Daniel Wright performed the cores, and Mr. Zelalem Arega reviewed and approved the results. W. Hammond Street � (College Avnue to East Dead End) HOLE # 1 LOCATION: 920 W. Hammond Street (E/4) 2.00" HMAC 7.00" Base material (Dark brown sandy clay with rock) 7.00" Yellowish brown sandy clay with limestone pieces (LL- 38, PL-19, PI- 19) HOLE # 2 LOCATION: 810 W. Hammond Street (W/4) 4.00" HMAC 4.25" Concrete (Broken) 7.75" Brown sandy clay with rock (LL- 52, PL- 21, PI- 31) HOLE # 3 LOCATION: 100' West of Hemphill Street (E/4) 4.25" HMAC 6.75" Base material (Brown sandy clay with rock) 5.00" Brown sandy clay with rock HOLE # 4 LOCATION: 552 W. Hammond Street (W/4) 5.50" HMAC 5.00" Base material (Brown clayey sand with limestone pieces) 5.50" Brown sandy clay with organics (LL- 63, PL- 24, PI- 39) Page 1 of 5 FORTWORTH. City of Fort Worth Capital Delivery Division/Soil Lab 920 Woodward Street Fort Worth, Texas 76107 HOLE # 5 LOCATION: 512 W. Hammond Street (E/4) 9.00" HMAC 7.00" Dark brown clay (LL- 71, PL- 27, PI- 44) HOLE # 6 LOCATION: 404 W. Hammond Street (W/4) 7.50" HMAC 6.00" Base material (Brown clayey sand with rock) 3.50" Brown sandy clay with rock (LL- 53, PL-19, PI- 34) W. Boyce Avenue (Hemphill Street to East Dead End) HOLE # 1 LOCATION: 316 W. Boyce Avenue (W/4) 2.25" HMAC 6.00" Base material (Brown clayey sand with rock) 7.75" Light brown clayey sand with rock HOLE # 2 LOCATION: 517 W. Boyce Avenue (E/4) 2.50" HMAC 7.50" Base material (Brown clayey sand with gravel) 6.00" Dark greyish brown clay (LL- 76, PL- 25, PI- 51) HOLE # 3 LOCATION: 544 W. Boyce Avenue (W/4) 2.25" HMAC 7.75" Base material (Brown clayey sand with gravel) 6.00" Dark greyish brown clay W. Spurgeon Avenue (Hemphill Street to East Dead End) HOLE # 1 LOCATION: 125' East of Hemphill Street (W/4) 6.75" HMAC 9.25" Brown sandy clay with rock and organics (LL- 65, PL- 23, PI- 42) Phone: 817-392-7920 Page 2 of 5 FORTWORTH. City of Fort Worth Capital Delivery Division/Soil Lab 920 Woodward Street Fort Worth, Texas 76107 HOLE # 2 LOCATION: 517 W. Spurgeon Avenue (E/4) 3.25" HMAC 5.00" Dark brown clay with rock 7.75" Brown sandy clay with rock and organics HOLE # 3 LOCATION: 312 W. Spurgeon Avenue (W/4) 3.00" HMAC 3.75" Concrete (Broken) 5.00" Base material (Brown clayey sand with rock) 4.25" Brown clay (LL- 70, PL- 23, PI- 47) Fuller Avenue Street to Cole HOLE # 1 LOCATION: 908 Fuller Avenue (E/4) 5.00" HMAC 7.00" Base material (Brown sandy clay with limestone) 4.00" Brown clay (LL- 70, PL- 21, PI- 49) HOLE # 2 LOCATION: 929 Fuller Avenue (W/4) 3.00" HMAC 7.00" Base material (Brown sandy clay with limestone) 6.00" Brown clay HOLE # 3 LOCATION: 1012 Fuller Avenue (E/4) 5.00" HMAC 6.00" Base material (Brown sandy clay with limestone) 5.00" Dark brown clay (LL- 66, PL- 23, PI- 43) HOLE # 4 LOCATION: 100' West of Cole Street (W/4) 4.00" HMAC 6.00" Base material (Brown sandy clay with limestone) 6.00" Brown/ Dark brown sandy clay with organics and rock Phone: 817-392-7920 Page 3 of 5 FORTWORTH. City of Fort Worth Capital Delivery Division/Soil Lab 920 Woodward Street Fort Worth, Texas 76107 W. Felix Street (Hemphill Street to 110' East of May Street) HOLE # 1 LOCATION: 400 W. Felix Street (W/4) 1.50" HMAC 6.25" Concrete (4612 PSI) 5.25" Sand 3.00" Brown sandy clay with limestone (LL- 36, PL-16, PI- 20) HOLE # 2 LOCATION: 528 W. Felix Street (W/4) 2.00" HMAC 4.50" Concrete 4.50" Light brown clayey sand with limestone 5.00" Dark brown clayey sand with limestone May Street (W. Felix Street to W. Hammond Street) HOLE # 1 LOCATION: 200' North of Felix Street (N/4) 6.00" Concrete (5810 PSI) 10.00" Greyish brown sandy clay with rock (LL- 60, PL- 22, PI- 38) HOLE # 2 LOCATION: 200' North of W. Spurgeon Avenue (S/4) 5.25" Concrete (Rebar, not testable) 10.75" Greyish brown sandy clay with rock HOLE # 3 LOCATION: 200' North of W. Boyce Street (N/4) 7.00" Concrete (4387 PSI) 9.00" Greyish brown sandy clay with rock Waggoman Street (I-35W Frontage Road to East Dead End) Phone: 817-392-7920 Page 4 of 5 FORTWORTH. City of Fort Worth Capital Delivery Division/Soil Lab 920 Woodward Street Fort Worth, Texas 76107 HOLE # 1 LOCATION: 200' East of I-35W Frontage Road (E/4) 3.00" HMAC 8.00" Base material (Brown sand with limestone) 5.00" Brown sandy clay (LL- 67, PL- 22, PI- 45) HOLE # 2 LOCATION: 100' East of Evans Street (W/4) 8.00" HMAC 8.00" Brown sandy clay with rock (LL- 53, PL-19, PI- 34) HOLE # 3 LOCATION: 550' East of Evans Street (E/4) 4.50" HMAC 4.00" Base material (Brown sand with rock) 7.50" Brown sandy clay (LL- 58, PL- 23, PI- 35) Phone: 817-392-7920 Page 5 of 5 FORTWORTH. City of Fort Worth Summary of Test Hole Information and Coordinates 05/10/2023 Yellow Rose Mapping LLC 2011 Woodland Hills Ln. Weatherford, Texas76087 Summary of Test Hole Information and Coordinates YELLOW ROSE (817) 703-6578 McPDiMI LLC Project Name: COFW Water and Wastewater General Location: Hemphill Street and W Spurgeon Street Field Manager: A.W. Replacement, WSM-N, No. 103358 Technicians: A.J. Client Name: Garver Vacuum Excavation Truck/Trailer: YR Proj. Number: GARV2305_137 City/Town: Fort Worth County: Tarrant State: Texas Designating Truck: T-12 Test Hole If UtilitySize, Utility Material Utility Type Depth to Top or Cross General Surface Type ID'd By: Date Test Hole Utility Survey Northing Easting (X) Ground Top of Utility Owner I Test Hole Specific Notes O.D. (Refer to (Refer to Utility (Feet) Sectional Utility and Thickness 1:5/8"Iron Excavated Observed Point If (Y) Elevation (Z) Elevation (Inches) Legend) Legend) View Direction (Inches) (Refer Rod/Cap (Yes or No) to Legend) 2: Nail/Disk 3:'X'in Conc. A 1 24 RCCP W 5.53 A-7 Nail/Disk 5/1/2023 Yes 90000 6932769.92 2328254.51 718.38 712.85 City of Fort Worth 2 4 STL G 3.20 A-4 Nail/Disk 5/1/2023 Yes 90001 6932771.47 2328389.79 715.44 712.24 Atmos 3 4 PE G 3.72 C-8 X in Cone 5/1/2023 Yes 90002 6932611.76 2328978.93 713.32 709.60 Atmos 4 24 RCCP W 4.07 A-6 Nail/Disk 5/1/2023 Yes 90003 6932505.44 2329110.36 715.72 711.65 City of Fort Worth 5 21 RCP STM 2.80 A-4 Nail/Disk 5/1/2023 Yes 90004 6932089.53 2333427.42 638.65 635.85 City of Fort Worth Notes: F- Utility Materials 1 Utility Types Surface Types STL - Steel PVC- Polyvinyl Chloride CSC - Concrete/Steel Cylinder E- Electric T- Telephone TS- Traffic Signal A - Asphalt PE - Polyethylene DBC - Direct Buried Cable CMP - Corrugated Metal Pipe G - Gas FOC - Fiber Optic Cable FM - Force Main B - Brick AC - Transite RCP - Reinforced Concrete Pipe RCCP - Reinforced Concrete Cylinder Pipe W - Water SAN - Sanitary Sewer - C - Concrete cl - Cast Iron VC - Vitrified Clay - PL - Product Line STM - Storm Sewer - NG - Natural Ground DI - Ductile Iron FG - Fiberglass - FL - Fuel Line CTV - Cable Television - - Prepared By: T. Habenicht Date: 5/10/2023 Checked by: C. Ewing Date: 5/10/2023 Sheet: 1 of 1 VT-5 i FORTWORTH. City of Fort Worth Instructions to Bidders About the Business Equity Goal 10/19/2021 FORTWORTH. City of Fort Worth Business Equity Division INSTRUCTIONS TO BIDDERS ABOUT THE BUSiRESS EQUITY G L Bid number: 103381-1 Business Equity Goal: % It is the policy of the City of Fort Worth to ensure the full and equitable utilization of Business Equity Firms when appropriate, in the procurement of all goods and services. When a Business Equity Goal is established for a bid, it means that the City of Fort Worth believes that there are Business Equity Firms available that can provide goods or services requested by the bid. The Business Equity Goal for Bid number 103381-1 is %. This means that the City believes that there are available Business Equity Firms that can provide goods or services required by this bid and therefore, % of the Bidder's awarded amount must be spent with a Business Equity Firm. All requirements and regulations stated in the City's current Business Equity Ordinance #25165-10-2021 apply to this bid. Definitions are at the end of this document. Because a Business Equity Goal has been established for this bid, in order for your bid to be considered, a Bidder must satisfv one (1) of the conditions below. A. Commit to Meet or Exceed the Business Equity Goal Hire Business Equity Firm(s) to provide goods or services and spend at least the goal amount with the Business Equity Firm(s). Step 1: Obtain a listing of Business Equity Firms by completing the "Request for Listing of Certified Firms Form" located at the City of Fort Worth's Business Equity Division website. Step 2: Request bids from Business Equity Firms to provide goods or services at least 10 calendar days before bid opening. Step 3: Submit the following two (2) forms: a. Utilization Plan b. Letter(s) of Intent B. Prove a Good Faith Effort Show attempt to hire Business Equity Firms to meet or exceed the goal, but was unsuccessful. This can occur in two (2) ways: 1) Bidder proposes a smaller Goal Step 1: Obtain a listing of Business Equity Firms by completing the "Request for Listing of Certified Firms Form" located at the City of Fort Worth's Business Equity Division website. Step 2: Request bids from Business Equity Firms to provide goods or services at least 10 calendar days before bid opening. Step 3: Submit the following three (3) forms: a. Utilization Plan b. Letter(s) of Intent c. Good Faith Effort 2) Bidder proposes a 0% Goal Step 1: Obtain a listing of Business Equity Firms by completing the "Request for Listing of Certified Firms Form" located at the City of Fort Worth's Business Equity Division website. Step 2: Request bids from Business Equity Firms to provide goods or services at least 10 calendar days before bid opening. Step 3: If unsuccessful, submit Good Faith Effort Form. Please see Ordinance &20-370 (q) page for requirements of an acceptable Good Faith Effort. C. Prove that the Bidder Can Perform the Service and Provide all Materials on the Project as the Prime Contractor Bidder must show that the Bidder is providing all of the goods and services through their own company and that there are no goods or services provided by a third party or an affiliate. Bidder will not purchase any supplies or inventory from a third party. Step 1: Must submit Prime Contract Waiver Form D. Create a Joint Venture with a Business Equity Firm At least one or both of the firms must be a Business Equity Firm Step 1: Must submit Joint Venture Form DEADLINE TO SUBMIT REQUIRED DOCUMENTS AND FORMS Bidders must submit sealed bids to be opened at the date, time, and place stated in the solicitation for the public opening of bids. Faxed copies will not be accepted. FREQUENTLY ASKED QUESTIONS 1. If I am Business Equity Firm, can I count my performance of the bid? Answer. A Business Equity Prime Contractor can count its self -performance towards meeting the Business Equity Goal for the assigned North American Industry Classification System (NAICS) commodity codes on its Minority Business Enterprise (MBE) or Women Business Enterprise (WBE) certification. 2. What if I am a Business Equity Firm, but I am unable to self perform all work or provide all of the goods under the bid, can I count my performance under the Bid? Answer. If the Business Equity Prime cannot self -perform all of the work, it will be accountable for subcontracting with certified firms to meet the overall goal. Business Equity Firms that qualify under the "Significant Business Presence" definition may count in the Program upon approval of DVIN-BE. 3. This bid does not have a set amount that the City will purchase from the Awarded Bidder, how do I complete the form? Answers: a. For a low bid procurement, the lowest bidder shall submit a Utilization Plan no later than 2:00 PM on the third business day after bids are opened detailing all Subcontractors the Contractor intends to utilize in its performance of a Contract. Contractors that are Business Equity Firms may count their self -performed services towards meeting a Business Equity Goal. b. For a Best Value procurement, all bidders who wish to be considered for evaluation scoring shall submit a Utilization Plan by 2:00 PM on the third business day after the bids are opened detailing all Subcontractors the Contractor intends to utilize in its performance of a Contract. Contractors that are Business Equity Firms may count their self -performed services towards meeting a Business Equity Goal. c. Non-compliance. If the lowest bidder for a low bid procurement or any bidder for a Best Value procurement does not timely submit its Utilization Plan with the required documents, that bidder will be deemed Non -Responsive. For a low bid procurement, the City will notify the next lowest bidder who shall then submit a Utilization Plan with required documents no later than 2:00 PM on the third business day after the bidder receives notification. This process will be followed until a bidder submitting the required documents is selected. DEFINITIONS Business Equity Firm means an Independent Firm that is a Certified minority- and/or women -owned business enterprise (M/WBE) with a Significant Business Presence in the City's Marketplace. Business Equity Goal means a calculation prepared by the DVIN-BE that includes all the following factors: the detailed cost estimate of the work to be performed, or goods purchased; the 6-county Marketplace; the availability of Business Equity Firms and non -Business Equity Firms in the Marketplace determined ona Contract -by -Contract basis; and the subcontracting/supplier opportunities of each project. Certified means those firms identified by the North American Industry Classification System (NAICS) that have been determined to be a bona fide MBE or WBE by the North Central Texas Regional Certification Agency (NCTRCA), the Dallas/Fort Worth Minority Supplier Development Council (DFW /MSDC), Women's Business Council -SW (WBCS), Texas Department of Transportation (TxDOT) or another certifying agency that the DVIN-BE may deem appropriate and accepted by the City of Fort Worth. DVIN-BE means the City's Department of Diversity and Inclusion — Business Equity Division Good Faith Efforts means the actions undertaken by a Contractor and approved by DVIN-BE as described inthe Business Equity Ordinance U0-370 (g). Joint Venture means a business entity formed by two or more independent Persons for the purpose of pursuing a common objective, such as a prime contract. The resulting business entity has additional resources and capacity, enhancing its ability to compete for larger awards. A joint venture is generally characterized by shared ownership, shared returns and risks, and shared governance. In a joint venture, the prime managing partner holds 51 % or more interest in the business. Partner(s) hold less than 51 % interest but in most cases, not less than 20%. Marketplace means the geographic area as defined by the City's most current Disparity Study (i.e., Tarrant, Dallas, Denton, Johnson, Parker and Wise counties). Responsive means that a Person is compliant with the requirements of the Business Equity Ordinance. Significant Business Presence means a Person (1) which has its principal place of business located inside the Marketplace; (2) which has its principal place of business located outside the Marketplace but has been verified to be in existence for a minimum of 24 months and from which at least 20% of the business's workforce is based in the Marketplace; or (3) which has cumulative business receipts greater than $1,000,000 for work done in the Marketplace since January 1, 2013. Utilization Plan means the list of Business Equity Firms that a Contractor commits will be utilized to meet the Business Equity Goal for a specific project, the scopes of the work and the dollar values or the percentages of the work to be performed. VIOLATIONS AND SANCTIONS 1. Failure to comply with the City's Business Equity Ordinance will result in the bid being considered "Non -Responsive." 2. Failure to submit the required Business Equity forms and documentation will result in the bid being considered non -responsive and a "written warning" letter that may impact the Offeror's evaluation scoring on future City bid opportunities for up to 12 months, refer to Ordinance F420-373 on VIOLATIONS AND SANCTIONS for continued offenses or failures to comply. If you have any questions, contact Department of Diversity & Inclusion, Business Equity Division Email: DVIN_BE@fortworthtexas.gov I Phone: 817-392-2674 FORTWORTH. City of Fort Worth Business Equity Utilization Form 03/24/2022 City of Fort Worth FORT WORTH Business Equity Utilization Form Disadvantaged Business Enterprise Utilization Form (Applicable if Federally -Funded) PRIME/OFFEROR/OWNER COMPANY NAME: PROJECT NAME: Water and Sanitary Sewer Replacements Contracts 2019 - WSM-N, Part 1 PROJECT NUMBER: BID DATE: City's Business Equity Goal: 103358-1 ❑ (Check if addressing DBE Goal) Check all applicable boxes to describe ❑ Not Certified MBE Prime/Offeror/Owner's Classification: Certifying Agency: ❑NCTRCA [:]D/FW MSDC �TX DOT Ethnicity: ❑African American Hispanic Caucasian 11WBE ❑DBE WBCS Other: ATTACHMENT 1A Page 1 of 4 Offeror's Business Equity (or DBE) % Commitment: HUB ❑VOSB Section 3 11 Asian ❑ Native American Gender: ❑Male Dernale11 Non -Binary Definitions: Business Equity Firm: Certified MBE Minority Business Enterprise or WBE Women Business Enterprise DBE: Disadvantaged Business Enterprise HUB: Historically Under Utilized Business VOSB: Veteran Owned Small Business Section 3: Certified Housing Urban Development Vendors ALL BUSINESS EQUITY FIRMS MUST BE CERTIFIED BEFORE CONTRACT AWARD Failure to complete this form, in its entirety, and received by the Purchasing Division no later than 2:00 p.m. on the third City business day after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. Exception: CFA, ICA, and CDBG proiects, documents will be submitted to the Citv Proiect Manaqer if up blicly bid or to the Developer if privately bid. The undersigned Prime/Offeror agrees to enter into a formal agreement with the Business Equity firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth (Exception: Developer proiects). The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non -responsive to bid specifications. Business Equity firms listed toward meeting the project goal must be located in the City's marketplace at the time of bid or the business has a Significant Business Presence in the Marketplace. The marketplace is the Citv of Fort Worth including portions of Denton, Parker, Wise, and all of Tarrant, Dallas, and Johnson counties. Certified means those Business Equity Firms, located within the Marketplace, that have been determined to be a bona -fide minority or women business enterprise by the North Central Texas Regional Certification Agency (NCTRCA), Dallas/Fort Worth Minority Supplier Development Council (D/FW MSDC) and Women's Business Council -Southwest (WBCS). If hauling services are utilized, the Prime/Offeror will be given credit as long as the Business Equity firm listed owns and operates at least one fully licensed and operational truck to be used on the contract. The Business Equity firms may lease trucks from another Business Equity firm, including Business Equity owner -operated, and receive full Business Equity credit. The Business Equity firm may lease trucks from non -Business Equity firms, including owner -operated, but will only receive credit for the fees and commissions earned by the Business Equity as outlined in the lease agreement. Federally -funded Projects (ONLY), Counting DBE Participation: If materials or supplies are obtained from a DBE manufacturer, count 100 percent of the cost of the materials or supplies towards the goal. If the materials or supplies are purchased from a DBE reqular dealer, count 60 percent of the cost of the materials and supplies toward the DBE goal. When materials or supplies are purchased from a DBE neither a manufacturer nor a reqular dealer, count the entire amount of fees or commissions charged for assistance in the procurement of the materials and supplies or fees or transportation charges for the delivery of the materials or supplies delivered to the job site. In all cases, the Prime/Offeror is responsible to identify the amounts to be used toward the committed DBE goal. Note: For DBE Goals, 60% of the services count towards the goal. Effective 01/01/2021 Updated 03/24/2022 FORT WORTH ATTACHMENT 1A Business Equity Utilization Form Page 2 of Please note that only certified Business Equity firms will be counted to meet the Business Equity goal. Prime/Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Business Equity firms and non -Business Equity firms. Prime/Offerors must identify by tier level all subcontractors/suppliers. Tier: means the level of subcontracting below the Prime/Offeror i.e. a direct payment from the Prime/Offeror to a subcontractor is considered 1 st tier, a payment by a subcontractor to its supplier is considered 2nd tier. Business Equity firms are to be listed before non -Business Equity firms. The Prime/Offeror is responsible to provide proof of payment of all tiered sub-contractors/suppliers identified as a Business Equity firm and counting those dollars towards meeting the contract committed goal. Certified Business Equity Prime/Offeror Contractors counting their self -performance towards meeting the contract goal, must be certified within those NAICS commodity codes with a certifying agency acceptable by the City of Fort Worth. Certified Business Equity Prime/Offeror counting self -performing services towards the goal, the service(s) to be performed should be listed first on the Utilization form. Check this box Flif certified Prime Contractor services will be counting towards the Business Equity contracting goal. Please list services first below. Please list certified Business Equity firm names as listed on their certification, includinq DBA names. NAMES AND ADDRESSES OF CONTRACTORS/SUPPLIERS Business Name: Address: Phone: Email: TYPE OF SERVICES/SUPPLIES Specify Tier PROVIDED (NAICS Required) Name 1st Tier Type of Service/Supplies: NAICS Code: Contact Person: $ AMOUNT: Business Name: Type of Service/Supplies: Address: Phone: NAICS Code: Email: Contact Person: $ AMOUNT: Business Name: Type of Service/Supplies: Address: Phone: NAICS Code: Email: Contact Person: $ AMOUNT: Certification Agency Certified By: EID/FW MSDC FINCTRCA EITXDOT E]WBCS Other: Certified By: EIDFW MSDC FINCTRCA EITXDOT F_]WBCS Other: Certified By: EIDFW MSDC FINCTRCA EITXDOT F_]WBCS Other: Gender and Ethnicity: ❑ Male ❑ Female ❑ Non -Binary African American ❑ Hispanic Asian Caucasian Native American ❑ Male ❑ Female ❑ Non -Binary African American Hispanic ❑ Asian ❑ Caucasian ❑ Native American ❑ Male ❑ Female ❑ Non -Binary ❑ African American ❑ Asian ❑ Caucasian ❑ Hispanic ❑ Native American Effective 01 /01 /2021 Updated 03/24/2022 FORT WORTH Business Equity Utilization Form Please include multiple copies of this page if needed to list all contractors and suppliers. NAMES AND ADDRESSES OF CONTRACTORS/SUPPLIERS Business Name: Address: Phone: Email: Contact Person: Business Name: Address: Phone: Email: Contact Person: Business Name: Address: Phone: Email: Contact Person: Business Name: Address: Phone: Email: Contact Person: ATTACHMENT 1A Page 3 of 4 TYPE OF SERVICES/SUPPLIES Specify Tier PROVIDED NAICS Re uired Certification Agency Gender and Ethnicity: � q ) Name 1st Tier Type of Service/Supplies: Certified By: ❑Male ❑Female ❑Non -Binary ❑D/FW MSDC ❑African American ❑ Hispanic ❑NCTRCA NAICS Code: ❑Asian ❑TXDOT ❑WBCS ::]Other:❑Caucasian El Native $ AMOUNT: American Type of Service/Supplies: Certified By: ❑ Male ❑Female ❑Non -Binary ❑DFW MSDC ❑African American ❑Hispanic ❑NCTRCA NAICS Code: ❑TXDOT ❑WBCS ❑Asian ❑Other: ❑ Caucasian ❑ Native $ AMOUNT: American Type of Service/Supplies: Certified By: ❑ Male ❑Female ❑Non -Binary ❑DFW MSDC ❑ ❑NCTRCA African American ❑Hispanic NAICS Code: ❑TXDOT ❑WBCS ❑Asian ❑ Other: ❑ Caucasian ❑ Native $ AMOUNT: American Type of Service/Supplies: Certified By: ❑Male ❑Female El Non -Binary ❑DFW MSDC ❑NCTRCA ❑African American ❑Hispanic NAICS Code: ❑TXDOT ❑WBCS ❑Asian ❑Other: ❑Caucasian ❑Native $ AMOUNT: American Effective 01/01/2021 Updated 03/24/2022 FORT WORTH Business Equity Utilization Form Total Dollar Amount of Certified Prime/Offeror Services towards contract goal $ Total Dollar Amount of Business Equity (or DBE if applicable) Subcontractors/Suppliers $ Total Dollar Amount of Non -Business Equity Subcontractors/Suppliers $ TOTAL DOLLAR AMOUNT OF CERTIFIED PRIME/ALL SUBCONTRACTORS/SUPPLIERS $ ATTACHMENT 1A Page 4 of 4 The Prime/Offeror will not make additions, deletions, or substitutions to this certified list without the prior approval of the Business Equity Division through the submittal of a Request for Approval of Change/Addition online. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The Prime/Offeror shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed Business Equity goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Prime/Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including non -Business Equity firms. The Prime/Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The Prime/Offeror agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that will substantiate the actual work performed by the Business Equity firms on this contract, by an authorized officer or employee of the City. A Prime/Offerer who intentionally and/or knowingly misrepresents material facts shall be Debarred for a period of time of not less than three (3) years. Authorized Signature Title Company Name Address City/State/Zip Code Printed Signature Contact Name and Title (if different) Phone Number Email Address Date Department of Diversity and Inclusion - Business Equity Division Email: DVIN_BEOffice@fortworthtexas.gov Ph: 817-392-2674 Effective 01/01/2021 Updated 03/24/2022 FORTWORTH. City of Fort Worth Prime Contractor Waiver Form 03/13/2022 FORT WORTH City of Fort Worth Business Equity (M/WBE) Specifications Prime Contractor Waiver Form OFFEROR COMPANY NAME: PROJECT NAME: Water and Sanitary Sewer Replacements Contracts 2019 - WSM-N, Part 1 City's MBE Project Goal: I Offeror's MBE Project Commitment: % I % ATTACHMENT 113 Page 1 of 1 Check applicable block to describe Prime M/WBE NON-MWBE BID DATE PROJECT NUMBER 103358-1 If both answers to this form are YES, do not complete ATTACHMENT 1C (Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1 C. This form is only applicable if both answers are yes. Failure to complete this form in its entirety and be received by the Purchasing Division no later than 2:00 p.m., on the second City business day after bid opening, exclusive of the bid opening date, will result in the bid being considered non -responsive to bid specifications. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this NO project, this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? YES L—I If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including certified M/WBE(s) on this contract, the payment thereof and any proposed changes to the original M/WBE(s) arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the M/WBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract and may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. Authorized Signature Title Company Name Address City/State/Zip Printed Signature Contact Name (if different) Phone Number Fax Number Email Address Date Business Equity Division Rev. 3/13/2022 Email: DVIN_BEOffice@fortworthtexas.gov Phone: (817)392-2674 FORTWORTH. City of Fort Worth Good Faith Effort Form 03/15/2022 FORT WORTH. City of Fort Worth ATTACHMENT 1C Business Equity Division Page 1 of 4 Good Faith Effort Form PRIME/OFFEROR COMPANY NAME: PROJECT NAME: Water and Sanitary Sewer Replacements Contracts 2019 - WSM-N, Part 1 Check applicable box to describe Prime/Offeror's Certification I❑ Business Equity Non -Business : irm ❑ Equity Firm BID DATE Business Equity Goal: Offeror's Business Equity Goal Commitment: PROJECT NUMBER Rio Rio 103358-1 I If the Offeror did not meet or exceed the Business Equity Goal for this project, the Prime/Offeror must complete I !I this form. 11 If the Prime/Offeror's method of compliance with the Business Equity Goal is based upon demonstration of a "Good Faith Effort", the Prime/Offeror will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 10 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Prime/Offeror. Failure to complete this form, in its entirety with supporting documentation, and received by the Purchasing Division no later than 2:00 p.m. on the third City business day after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. Exception: CFA, ICA, and CDBG projects, documents will be submitted to the City Project Manager if publicly bid or to the Developer if privately bid. 1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a Business Equity firm or non -Business Equity firm. (DO NOT LIST NAMES OF FIRMS). On all projects, the Prime/Offeror must list each subcontracting and or supplier opportunity regardless of tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Effective 03/15/2022 ATTACHMENT 1C Page 2 of 4 2.) Obtain a current (not more than two (2) months old from the bid open date) list of Business Equity subcontractors and/or suppliers from the City's Business Equity Division. ❑ Yes ❑ No Date of Listing 3.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? ❑ Yes (If yes, attach list to include name of Business Equity firm, person contacted, phone number and date and time of contact.) ❑ No 4.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by fax, exclusive of the day the bids are opened? ❑ Yes (If yes, attach list to include name of Business Equity firm, fax number and date and time of contact. In addition, if the fax is returned as undeliverable, then that "undeliverable confirmation" received must be printed directly from the facsimile for proper documentation. Failure to submit confirmation and/or "undeliverable confirmation" documentation may render the NO GFE non -responsive.) 5.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened? ❑ Yes (If yes, attach email confirmation to include name of Business Equity firm, date and time. In addition, if an email is returned as undeliverable, then that "undeliverable message" receipt must be printed directly from the FINO email system for proper documentation. Failure to submit confirmation and/or "undeliverable message" documentation may render the GFE non -responsive.) NOTE: The three methods identified above are acceptable for soliciting bids, and each selected method must be applied to the applicable contract. The Prime/Offeror must document that either at least two attempts were made using two of the three methods or that at least one successful contact was made using one of the three methods in order to deemed responsive to the Good Faith Effort requirement. NOTE: The Prime/Offeror must contact the entire Business Equity list specific to each subcontracting and supplier opportunity to be in compliance with questions 3 thru 5. 6.) Did you provide plans and specifications to potential Business Equity firms? ❑ Yes ❑ No 7.) Did you provide the information regarding the location of plans and specifications in order to assist the Business Equity firms? ❑ Yes ❑ No Effective 03/15/2022 ATTACHMENT 1C Page 3 of 4 8.) Did you prepare a quotation for the Business Equity firms to bid on goods/services specific to their skill set? ❑ Yes (If yes, attach all copies of quotations.) ❑ No 9.) Was the contact information on any of the listings not valid? ❑ Yes (If yes, attach the information that was not valid in order for the Business Equity Division to address the corrections needed.) ❑ No 10.) Submit documentation if Business Equity firms quotes were rejected. The documentation submitted should be in the firms forms of an affidavit, include a detailed explanation of why the Business Equity firms was rejected and any supporting documentation the Prime/Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Prime/Offeror will provide for confidential in -camera access to an inspection of any relevant documentation by City personnel. (Please use additional sheets, if necessary, and attach.) Company Name Telephone ADDITIONAL INFORMATION: Contact Person Scope of Work Reason for Rejection Please provide additional information you feel will further explain your good and honest efforts to obtain Business Equity firm participation on this project. The Prime/Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Prime/Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. A Prime/Offeror who intentionally and/or knowingly misrepresents material facts shall be Debarred for a period of time of not less than three (3) years. Effective 03/15/2022 ATTACHMENT 1C Page 4 of 4 The undersigned certifies that the information provided and the Business Equity firms listed was/were contacted in good faith. It is understood that any Business Equity firms listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City's Business Equity Division. Authorized Signature Title Company Name Address City/State/Zip Business Equity Division Email: DVIN_BEOffice@fortworthtexas.gov Phone: (817) 392-2674 Printed Signature Contact Name and Title (if different) Phone Number Email Address Date Effective 03/15/2022 FORTWORTH. City of Fort Worth M/WBE Joint Venture Eligibility Form 02/13/2019 FORT WORTH. CITY OF FORT WORTH M/WBE Joint Venture Eligibility Form All questions must be answered; use "N/A" if not applicable. Name of City project: Water and Sanitary Sewer Replacements Contracts 2019 - WSM-N, Part 1 A joint venture form must be completed on each project UP/Bid/Purchasing Number: 103358-1 1. Joint venture information: Joint Venture Name: Joint Venture Address: (If applicable) Telephone: Cellular: Facsimile: I E-mail address: Identify the firms that comprise the joint venture: Joint Venture Page 1 of 3 Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the joint venture M/WBE firm Non-M/WBE firm name: name: Business Address: Business Address: City, State, Zip: City, State, Zip: Telephone Facsimile E-mail Telephone Facsimile Cellular Cellular Certification Status: E-mail address Name of Certifying Agency: P"r 1i 2. Scope of work performed by the Joint Venture: Describe the scope of work of the M/WBE: Describe the scope of work of the non-M/WBE: Rev. 2/13/19 Joint Venture Page 2 of 3 3. What is the percentage of M/WBE participation on this joint venture that you wish to be counted toward meeting the project goal? 4. Attach a copy of the joint venture agreement. 5. List components of Ownership Of joint venture: (Do not complete if this information is described in joint venture agreement) Profit and loss sharing: Capital contributions, including equipment: Other applicable ownership interests: 6. Identify by name, race, sex and firm those individuals (with titles) who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable): Management decisions: a. Estimating b. Marketing and Sales c. Hiring and Firing of management personnel d. Purchasing of major equipment and/or supplies Supervision of field operations The City's Business Equity Division will review your joint venture submission and will have final approval of the M/WBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City's Business Equity Division immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's Business Equity Ordinance 25165-10-2021 . Rev. 2/13/19 Joint Venture Paqe 3 of 3 AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall agree to provide to the joint venture the stated scope of work, decision -making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits, interviews with owners and examination of the books, records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or willful misrepresentation of facts. Name of MBE firm Name of non -MBE firm Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Title Title Date Date Notarization State of County of On this day of , 20 , before me appeared and to me personally known and who, being duly sworn, did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public Signature Commission Expires Office of Business Diversity Email: mwbeoffice@fortworthtexas.gov Phone: (817) 392-2674 (seal) Rev. 2/13/19 FORTWORTH. City of Fort Worth Horizontal Wage Rate Table 09/30/2013 2013 PREVAILING WAGE RATES (Heavy and Highway Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate Asphalt Distributor Operator $ 15.32 Asphalt Paving Machine Operator $ 13.99 Asphalt Raker $ 12.69 Broom or Sweeper Operator $ 11.74 Concrete Finisher, Paving and Structures $ 14.12 Concrete Pavement Finishing Machine Operator $ 16.05 Concrete Saw Operator $ 14.48 Crane Operator, Hydraulic 80 tons or less $ 18.12 Crane Operator, Lattice Boom 80 Tons or Less $ 17.27 Crane Operator, Lattice Boom Over 80 Tons $ 20.52 Crawler Tractor Operator $ 14.07 Electrician $ 19.80 Excavator Operator, 50,000 pounds or less $ 17.19 Excavator Operator, Over 50,000 pounds $ 16.99 Flagger $ 10.06 Form Builder/Setter, Structures $ 13.84 Form Setter, Paving & Curb $ 13.16 Foundation Drill Operator, Crawler Mounted $ 17.99 Foundation Drill Operator, Truck Mounted $ 21.07 Front End Loader Operator, 3 CY or Less $ 13.69 Front End Loader Operator, Over 3 CY $ 14.72 Laborer, Common $ 10.72 Laborer, Utility $ 12.32 Loader/Backhoe Operator $ 15.18 Mechanic $ 17.68 Milling Machine Operator $ 14.32 Motor Grader Operator, Fine Grade $ 17.19 Motor Grader Operator, Rough $ 16.02 Off Road Hauler $ 12.25 Pavement Marking Machine Operator $ 13.63 Pipelayer $ 13.24 Reclaimer/Pulverizer Operator $ 11.01 Reinforcing Steel Worker $ 16.18 Roller Operator, Asphalt $ 13.08 Roller Operator, Other $ 11.51 Scraper Operator $ 12.96 Servicer $ 14.58 Small Slipform Machine Operator $ 15.96 Spreader Box Operator $ 14.73 Truck Driver Lowboy -Float $ 16.24 Truck Driver Transit -Mix $ 14.14 Truck Driver, Single Axle $ 12.31 Truck Driver, Single or Tandem Axle Dump Truck $ 12.62 Truck Driver, Tandem Axle Tractor with Semi Trailer $ 12.86 Welder $ 14.84 Work Zone Barricade Servicer $ 11.68 The Davis -Bacon Act prevailing wage rates shown for Heavy and Highway construction projects were determined by the United States Department of Labor and current as of September 2013. The titles and descriptions for the classifications listed are detailed in the AGC of Texas' Standard Job Classifications and Descriptions for Highway, Heavy, Utilities, and Industrial Construction in Texas. Page 1 of 1 FORTWORTH. City of Fort Worth Davis -Bacon Heavy Construction Wage Rate Table 07/01 /2014 "General Decision Number: TX20230026 02/03/2023 Superseded General Decision Number: TX20220026 State: Texas Construction Type: Heavy Counties: Johnson, Parker and Tarrant Counties in Texas. Heavy Construction Projects (Including Water and Sewer Lines) Note: Contracts subject to the Davis -Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis -Bacon Act itself, but do not apply to contracts subject only to the Davis -Bacon Related Acts, including those set forth at 29 CFR 5. 1 (a)(2)-(60). �If the contract is entered pinto on or after January 30, 12022, or the contract is renewed or extended (e.g., an loption is exercised) on or lafter January 30, 2022: �If the contract was awarded on for between January 1, 2015 and January 29, 2022, and the contract is not renewed or �. lextended on or after January 130, 2022: 1 Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $16.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2023. 1 �. Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $12.15 per hour (or the applicable wage rate listed) on this wage determination, if it is higher) for all hours spent performing on that contract in 2023. 1 The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request. Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/06/2023 1 02/03/2023 * PLUM0146-002 05/01/2022 Rates Fringes PLUMBER/PIPEFITTER...............$ 36.73 10.35 ---------------------------------------------------------------- * SUTX1990-041 06/01/1990 Rates Fringes CARPENTER ........................ $ 10.40 * * $3.64 Concrete Finisher ................$ 9.81 ** ELECTRICIAN ......................$ 13.26 ** Form Setter ......................$ 7.86 ** Laborers: Common ......................$ 7.25 ** Utility .....................$ 8.09 ** PAINTER ..........................$ 10.89 ** Pipelayer ........................ $ 8.43 * * Power equipment operators: Backhoe.....................$ 11.89 ** 3.30 Bulldozer ...................$ 10.76 ** Crane .......................$ 13.16 ** 3.30 Front End Loader ............ $ 10.54 ** Mechanic ....................$ 10.93 ** Scraper .....................$ 10.00 ** Reinforcing Steel Setter ......... $ 10.64 ** TRUCK DRIVER .....................$ 7.34 ** WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information. Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis -Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health -related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health -related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/govemment-contracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non -union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISIO" FORTWORTH. City of Fort Worth Davis -Bacon Highway Construction Wage Rate Table 07/01 /2014 "General Decision Number: TX20230025 01/06/2023 Superseded General Decision Number: TX20220025 State: Texas Construction Type: Highway Counties: Archer, Callahan, Clay, Collin, Dallas, Delta, Denton, Ellis, Grayson, Hunt, Johnson, Jones, Kaufman, Parker, Rockwall, Tarrant and Wise Counties in Texas. HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction; bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction; and other major bridges). Note: Contracts subject to the Davis -Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis -Bacon Act itself, but do not apply to contracts subject only to the Davis -Bacon Related Acts, including those set forth at 29 CFR 5. 1 (a)(2)-(60). �If the contract is entered into on or after January 30, 12022, or the contract is renewed or extended (e.g., an loption is exercised) on or lafter January 30, 2022: �If the contract was awarded on for between January 1, 2015 and January 29, 2022, and the contract is not renewed or �. lextended on or after January 130, 2022: 1 Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $16.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2023. 1 Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $12.15 per hour (or the applicable wage rate listed) on this wage determination, if it is higher) for all hours spent performing on that contract in 2023. 1 The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request. Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/06/2023 SUTX2011-007 08/03/2011 Rates Fringes CONCRETE FINISHER (Paving and Structures) ......................$ 14.12 ** ELECTRICIAN ......................$ 19.80 FORM BUILDER/FORM SETTER Paving & Curb ...............$ 13.16 ** Structures ..................$ 13.84 ** LABORER Asphalt Raker ...............$ 12.69 ** Flagger.....................$ 10.06 ** Laborer, Common .............$ 10.72 ** Laborer, Utility ............ $ 12.32 ** Pipelayer...................$ 13.24 ** Work Zone Barricade Servicer....................$ 11.68 ** POWER EQUIPMENT OPERATOR: Asphalt Distributor ......... $ 15.32 ** Asphalt Paving Machine ...... $ 13.99 ** Broom or Sweeper ............ $ 11.74 ** Concrete Pavement Finishing Machine ........... $ 16.05 ** Concrete Saw ................$ 14.48 ** Crane Operator, Lattice Boom 80 Tons or Less ........ $ 17.27 Crane Operator, Lattice Boom over 80 Tons ........... $ 20.52 Crane, Hydraulic 80 Tons or Less .....................$ 18.12 Crawler Tractor .............$ 14.07 ** Excavator, 50,000 pounds or less .....................$ 17.19 Excavator, over 50,000 pounds ...................... $ 16.99 Foundation Drill, Truck Mounted ..................... $ 21.07 Foundation Drill, Crawler Mounted ..................... $ 17.99 Front End Loader 3 CY or Less ........................$ 13.69 ** Front End Loader, over 3 CY.$ 14.72 ** Loader/Backhoe..............$ 15.18 ** Mechanic .................... $ 17.68 Milling Machine .............$ 14.32 ** Motor Grader, Fine Grade .... $ 17.19 Motor Grader, Rough ......... $ 16.02 ** Pavement Marking Machine .... $ 13.63 ** Reclaimer/Pulverizer........ $ 11.01 ** Roller, Asphalt .............$ 13.08 ** Roller, Other ............... $ 11.51 Scraper .....................$ 12.96 ** Small Slipform Machine ...... $ 15.96 ** Spreader Box ................$ 14.73 ** Servicer .........................$ 14.58 ** Steel Worker (Reinforcing) ....... $ 16.18 ** TRUCK DRIVER Lowboy -Float ................ $ 16.24 Off Road Hauler .............$ 12.25 ** Single Axle .................$ 12.31 ** Single or Tandem Axle Dump Truck .......................$ 12.62 ** Tandem Axle Tractor with Semi Trailer ................$ 12.86 ** Transit -Mix .................$ 14.14 ** WELDER ...........................$ 14.84 ** WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information. Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis -Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health -related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health -related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/govemment-contracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number. 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non -union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISIO" FORTWORTH. City of Fort Worth Water Department Standard Product List 03/07/2023 FORT WORTH® Note: All water or CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST than 1S inch diameter shall be approved for use by the Water basis. Special bedding may be required for some Updated: 03/07/2023 l Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) 07/23/97 33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra -Seal P-201 ASTM 132240/13412/13792 04/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 04/26/00 33 05 13 Profile Gasket for 4' Diam. MH. Press -Seal Gasket Corp. 250-4G Gasket ASTM C-443/C-361 SS MH 1126199 33 05 13 HOPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring Traffic and Non -traffic area 5/13/05 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System er - MTanriors & Bases/Fiberglass 33-39-13 (1/8/13 1/26/99 33 39 13 Fiberglass Manhole Fluid Containment, Inc. Flowti[e ASTM 3153 Non -traffic area 08/30/06 33 39 13 Fiberglass Manhole L.F. Manufacturing Non -traffic area 1 j Water & Sewer - Manholes & Bases/Frames & Covers/Rectammlar 33-05-13 (Rev 2/3/16) 1 * 33 05 13 IManholc Framrs and Covers Western lron Works, Bass & Hays Foundry 1001 24"x40" WD lWat1& Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) * 33 05 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 30024 24" Dia. * 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. A 24 AM 24" Dia. I 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" Dia. 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry R- 165-LM (Hinged) ASTM A48 & AASHTO M306 24" Dia. 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry R-1743-LM (Hinged) ASTM A48 & AASFTO M306 30" dia. 33 05 13 Manhole Frames and Covers Sigma Corporation MH-144N 33 05 13 Manhole Frames and Covers Sigma Corporation MH-143N 33 05 13 Manhole Frames and Covers Pont-A-Mousson GTS-STD 24" dia. 33 05 13 Manhole Frames and Covers Neenah Casting 24" dia. 10/31/06 33 05 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. 7/25/03 3305 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-RBFS 30" Dia. 01/31/06 3305 13 30" Dia. MH Ring and Cover East Jordan Iron Works V1432-2 and V1483 Designs AASFITO M306.04 30" Dia. I 11/02/10 3305 13 30" Dia. MH Ring and Cover Sigma Corporation MH1651FWN & MH16502 30" Dia 07/19/1 t 3305 13 30" Dia. MH Ring and Cover Star Pipe Products NIH32FTWSS-DC 30" Dia 08/10/11 3305 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring 30" Dia 30" ERGO XL Assembly 10/14/13 3305 13 30" Dia. MH Ring and Cover, (Hinged & Lockable) East Jordan Iron Works with Cam Lock/MPIC/T-Gasket ASSFITO MI 05 & ASTM A536 30" Dia 06/01/17 3405 13 30" Dia. MH Ring and Cover (Hinged & Lockable) CI SIP Industries 2280 (32") ASTM A 48 30" Dia. CAP-ONE-30-FTW, Composite, w/ Lack 0111111 33 OS 13 30" Dia. MH Ring and Cover Composite Access Producs, L.P. w/o Hmg 30" Dia. 10/07/21 3405 13 30" Dia. MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and Cover 30" Dia. �* Water & Sewer 33 05 13 - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/1 Manhole Frames and Covers Pont-A-Mousson Pamtight 24" Dia. * 33 05 13 Manhole Frames and Covers Neenah Casting 24" Dia. * 33 05 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 24" Dia. * 33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. I 03/08/00 33 05 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48 24" Dia. I 04/20/01 3305 13 Manhole Frames and Covers (SIP)Scrampore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia. er - Manholes & Bases/Precast Concrete Tev I * 33 39 10 Manhole, Precast Concrete * 33 39 10 Manhole, Precast Concrete 09/23/96 33 39 10 Manhole, Precast Concrete 05/08/18 33 39 10 Manhole, Precast Concrete 10/27/06 33 39 10 Manhole, Precast Concrete 06/09/10 33 39 10 Manhole, Precast (Reinforced Polymer)Co tcrete 09/06/19 33 3920 Manhole, Precast Concrete 10/07/21 32 39 20 Manhole, Precast Concrete 10/07/21 33 3920 Manhole, Precast (Reinforced Polymer) Concrete 03/07/23 1 33 3920 IManhole. Precast Concrete Hydro Conduit Corp SPL Item 449 ASTM C 478 48" Wall Concrete Pipe Co. Inc. ASTM C-443 48" Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" Oldcastle Precast Inc. 48" I.D. Manhole w/ 24" Cone ASTM C 478 48" Diam w 24" Ring US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" Armoreck 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Predl Systems 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic At ASTM TM C-923; AmeriTex Pipe and Products. LLC 48" & 60" I.D. Manhole w/32" Cone ASTM CSC I 04/28/07 1 IManholc, Precast (Reinforced Polymer) Concrete I Amitech USA I Water & Sewer - Manholes & Bases/Rehab Svstems/Cementitious EI-14 Manhole Rehab Systems Quadex 04/23/01 EI-14 Manhole Rehab Systems Standard Cement Materials, Inc. E1-14 Manhole Rehab Systems AP/M Permaform I 4120101 E I-14 Manhole Rehab System Strong Company 5/12/03 EI-14 Manhole Rehab System (Liner) Triplex Lining System 08/30/06 General Concrete Repair FlexKrete Technologies Meyer Polycre a Pipe Relim" MSP Strong Seal MS2A Rehab System MH repair product to stop infiltration ASTM D5813 Vinyl Polyester Repair Product Mise. Use * From Original Standard Products List CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approv pec No./ IManufacturer Model1. National Spec Water &Sewer - an o es Bases/Rehab Svstems/NonCementitiousI mmmmw` 05/ 00/96 E1-14 Manhole Rehab Systems Spravroq, Spray Wall Polyurethane Coating ASTM D639/D790 I 12/14/01 Coating for Corrosion protection(Exterior) ERTECH Series 20230 and 2100 (Asphatic Emulsion) Structures Only I01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1BB, Sl, S2 Acid Resistance Test Sewer Applications I8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications » v�33 nu�pP���.u�g �Pi ayolloull- x `Structures 03/19/18 I 39 20� Coating for Corrosion orotection(Exterim) Sherwin Williams Grade (Asohatic Emulsion) Only I 33 05 13 Manhole Insert ME Knutson Enterprises Made to Order - Plastic ASTM D 1248 For 24" dia. I * 33 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia. I I * 3305 13 Manhole Insert Noflow-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia. I I 09/23/96 3305 13 Manhole Insert Southwestern Packing & Seals, Inc. Lifesaver - Stainless Steel For 24" dia. I I 09/23/96 3305 13 Manhole Insert Southwestern Packing & Seals, Inc. TetherLok - Stainless Steel For 24" dia I I 7111 ati arer & Sewer - Pine Casino Spacers 33-05-24 (07/01/13) I 04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI IO2/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI I04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers I09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48" I09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Casin Spacers Up to 48" I 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Powerchock Up to 48" 03/19/18 Casing Spacers BWM SS-12 Casing Spacer(Stainleas Steel) 03/19/18 Casing Spacers BWM FB-12 Casing Spacer (Coated Carbon Steel) for Nonyressme Pipe and Grouted Casing 03/29/22 33 05 13 Casing Spacers CCI Pipeline Systems CSC12, CSS12 PEW I Water & Sewer - Pines/Ductile Iron 33-11-10(1/8/13) I * 33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AW WA C150, C151 3" thou 24" OS/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Fastite Pipe (Bell Spigot) AW WA C150, C151 4" thin 30" 08/24/18 33 11 10 Ductile Icon Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AW WA C150, C151 4" thin 30" * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AW WA C150, C151 * 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AW WA C150, C151 I Water & Sewer - Utility Line Marker (08/24/2018) I INEK I ewer - Coatinss/EDoxv 33-39-60 (01/08/13) I 02/25/02 Epoxy Lining System Sauereisen, Inc SewerGard 21 ORS LA County 9210-1.33 I 12/14/01 Epoxy Lining System Ertech Technical Coatings Ertcch 2030 and 2100 Series I I 04/14/05 Interim Ductile Iron Pipe Coating Induron Protecto 401 ASTM B-117 Ductile Iron Pipe Only I I01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1BB, Sl, S2 Acid Resistance Test Sewer Applications I I8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications I I INNE Sewer - Coatings/Polvurethane I I Sewer - Combination Air Valves I I 05/25/18 I 33-31-70 Air Release Valve A.R.I. USA, Inc. D121LTP02(Compwite Body) 2" I I Sewer - PiDes/Concrete I I E I-04 Conc, Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 I E I-04 Conc. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76 I I E I-04 Conc. Pipe, Reinforced Hanson Concrete Products SPL item 495 hirinhele, 998 Pipe ASTM C 76 I IE I-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76 I I Sewer - Pine Enlargment Svstem (Method)33-31-23 (01/18/13). I PIM Corporation Polyethylene PIM Corp., Piscata Way, N.J. Approved Previously �Plmswim McConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously I TRS Systems Treachless Replacement System Polyethylene Calgary, Canada Approved Previously I I Sewer- PiDe/Fibere as)x s Wnforced/33-31-13(1/8/13) I Hobas Pipe USA, Inc. Hobas Pipe (Non -Pressure) ASTM D3262/D3754 I 7/21 /97 33 31 13 Cent. Cast Fiberglass (FRP) I 03/22/10 33 31 13 Fiberglass It,. (FRP) Ameron Bondstrand RPMP Pipe AST-.3262-3154 I 04/09/21 33 31 13 Glass -Fiber Reinforced Polviner Pipe FRP Thompson Pie Group Thompson Pipe Flowtite ASTM D3262/D3754 03/07/23 3331 13 Fiberglass Pioe (FRP) Future Pine Industries Fiberstron¢ FRP ASTM D3212. ASTM D3681. ASTM D4161. AW WA M45 Sewer - PiDe/Polvmer Pine 4/14/OS Polvmer Modified Concrete Pioe Amnech USA Mover Polvcrete Pipe ASTM C33, A276, F477 8" tp 1112", Class V I06/09/10 El-9 Reinforced Polymer Concrete Pipe US Composite Pipe Reinforced Polymer Concrete Pioe ASTM C-76 I I I - PiDes/HDPE 33-31-23(1/8/13) * From Original Standard Products List CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a proiect specific basis. Special bedding maybe required for some I ' Polyethylene pipe Phillips Driswpipe, Inc. Opticore Ductile Polyethylene Pipe ASTM D 1248 8" I �11gh-dcnsitv I High -density polyethylene pipe PIexco Inc. ASTM D 1248 8" I I High -density polyethylene pipe Polly Pipe, Inc. ASTMD 1248 8" I High -density polyethylene pipe CSR Hydro CondmUPipehne Systems McConnell Pipe Enlargement ASTM D 1248 I I Sewer - PiDes/PVC (Pressure Sewer) 33-11-12 (4/1/13) I 12/02/11 33-11-1� DR -Id PVC Pressure Pipe Apelife Jennie —PVC Pressure Pipe AWWA C900 4"thin 12" 10/22/14 33-11-12 DR-14 PVC Pressure Pipe I Royal Building Products Royal Seal PVC Pressure Pipe AW WA C900 4" thin 12" I 33-31-20 PVC Sewer Pipe I 12/23/97* 33-31-20 PVC Sewer Pipe I 33-31-20 PVC Sewer Pipe I 01/18/18 33-31-20 PVC Sewer Pipe I 11/11/98 33-31-20 PVC Sewer Ape I * 33-31-20 PVC Sewer Pipe I 09/11/12 33-31-20 PVC Sewer 05/06/05 33-31-20 PVC Sohd Wall Pipe , 04/27/06 33-31-20 PVC Sewer Fittings I 33-31-20 PVC Sewer Fittings I 3/19/2018 33 3120 PVC Sewer Pipe I 3/19/2018 33 3120 PVC Sewer Pre I 3/29/2019 33 3120 Gasketed Fittings (PVC) I 10/21/2020 33 3120 PVC Sewer Pipe I 10/22/2020 33 3120 PVC Sewer Pipe I 10/21/2020 I 33 3120 PVC Sewer Pipe P 33-31-12 1 * Cured in Place Pipe I 05/03/99 Cured in Place Ape 05/29/96 Cured in Place Pipe I Sewer - Pipes/Rehab/Fold & Form Fold and Form Pipe I 11/03/98 Fold and Form Ape Fold and Form Pipe I 12/04/00 Fold and Form Pipe I 06/09/03 I Fold and Form Pipe 1-M Manufacturing Co., Inc. (JM Eagle) Diamond Plastics Corporation Lamson Vylon Pipe Vinyltech PVC Pipe Diamond Plastics Corporation J-M Manufacturing Co, Inc. (JM Eagle) P,qq life Jet Stream Diamond Plastics Corporation Harco Plastic Trends, Inc.(Westlake) Pipelife Jet Stream Pipelife Jet Stream GPK Products, Inc. NAPCO(Westlake) Sanderson Pipe Corp. NAPCO(Westlake) Insimfrrm Texark, Inc National Envirotech Group Remolds Inc/Inliner Technolgy (Inliner USA) Cullum Pipe Systems, Inc. Insimfirm Technologies, Inc. American Pipe & Plastics, Inc. Ultralmer Miller Pipeline Corp. Sewer - PiDes/ODen Prot -de Large Diameter i 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Lamson Vylon Pipe I 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Extrusion Technologies, Inc. E100-2 PVC Sewer Pipe, Ribbed Up -or ETI Company I 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Double Wall Advanced Drainage Systems (ADS) I 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Triple Wall Advanced Drainage Systems (ADS) I05/16/11 I Steel Reinforced Polyethylene Pipe ConTech Construction Products SDR-26 SDR-26 Gravity Sewer "S" Gravity Sewer Pipe SDR 26/35 PS 115/46 SDR-26 and SDR-35 SDR 26/35 PS 115/46 SDR-26 and SDR-35 Gasket Fittings Gasketed PVC Sewer Main Finings SDR 35 SDR 26 SDR 26 SDR 26 SDR 26 SDR 26/35 PS 115/46 National Liner, (SPL) Item #27 Inliner Technology Insim "NuPIPe" Ultralmer PVC Alloy Pipeliner EX Method Carlon Vylon H.C. Closed Profile Pipe, Ultra -Rib Open Profile Sewer Pipe SaniTite HP Double Wall (Corrugated) SamTne HP Triple Wall Pipe Durmaxx ASTM D 3034 ASTM D 3034 ASTM F 789 ASTM D3034 ASTM F 679 ASTM F 679 ASTM F-679 ASTM F-679 ASTM D-3034, D-1784, etc ASTM D 3034 ASTM F679 ASTM D3034 ASTM D3034/F-679 ASTM D3034 ASTM D3034 ASTM F-679 ASTM F 1216 ASTM F-1216/D-5813 ASTM F 1216 ASTM F-1504 ASTM F-1504, 1871, 1867 ASTM F-1504, F-1947 ASTM F 679 ASTM F 679 ASTM F 2736 ASTM F 2764 ASTM F 2562 4" - 15" 4" thin 15" 4" thin 15" 4" thin 15" 18" to 27" 18" - 28" 18" 18" to 48" 4" - 11" I 18"- 24" I 4"- 15" I 4"- 15" I 4" - 15" I 4"- 15" I 18"- 36" I I I I I I I I Demo. Purpose Only I I Up to 18" diameter I 18" to 48" 18" to 48" 24"-30" 30" to 60" 24" to 72" * From Original Standard Products List CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approval Spec I on 1W Manufacturer Model1. National Spec Water - Aoour�enancesgig -10 (07/Ol/13) 'EM Pr Ol/18/18 33-12-10 Double Strap Saddle Romac 202NS Nylon Coated AWWA C800 1"-2"SVC, up to 24 "Pipe 08/28/02 Double Strap Saddle Smith Blair 4317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Stra Service Saddle Mueller Company DR2S Double SS Stra DI Saddle W AWWA C800 1"-2" SVC, u to 24" Pipe 03/07/23 33-12-10 Double Soup Service Saddle Powerseal 3450AS, Incl. Corp. Stop, Dbl Soup, Stainless NSF ANSI 372 1"-2" SVC, up to 24" Pipe 10/27/87 Curb Stops -Ball Meter Valves McDonald 6100M,6100MT & 610MT 3/4" and 1" 10/27/87 Curb Stops -Ball Meter Valves McDonald 4603B, 4604B, 610UM, 6100TM and 6101M 1 h" and 2" FB600-7NL, FB1600-7-NL, FV23-777-W-NL, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. L22-77NL AWWA C800 2" FB600-6-NL, FB1600-6-NL, FV23-666-W- 1111018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, L22-66NL AWWA C800 1-1/2" FB600-4-NL, FB1600-4-NL, Bt 1-444-WR- 1111018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, B22444-WR-NL, L28-44NL AWWA C800 I" 13-25000N, B-24277N-3, B-20200N-3, H- AWWA C800, ANSF 61, 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, , H-1552N, H142276N ANSI/NSF 372 _ B-25000N, B-20200N-3, B-24277N-3,H- AWWA C800, ANSF 61, 1111.1. 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, H-14276N, H-15525N ANSI/NSF 372 1-112" 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15530N ANSI/NSF 372 I" 01/26/00 Coated Tapping Saddle with Double SS Straps 1CM Industries, Inc. 4406 Double Band SS Saddle 1"-2" Taps on up to 12" 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel) 1CM Industries, Inc. 412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel) 1CM Industries, Inc. 415 Tapping Sleeve AWWA C-223 Concrete Pipe Only 05/10/11 Tapping Sleeve (Stainless Steel) Powerseal 3490AS (Flange) & 3490MJ 4"-8" and 16" 02/29/12 33-12-25 Tapping Sleeve (Coated Steel) Romac FTS 420 AWWA C-223 U p to 42" w/24" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST Stainless Steel AWWA C-223 Up to 24" w/12" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp 4" to 30" Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW37C-12-lEPAF FTW Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW39C-12-1EPAF FTW 08/30/06 Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW65C-14-lEPAF FTW Class "A" Concrete Meter Box Bass & Hays CMB37-B12 1118 LID-9 Concrete Meter Box Bass & Hays CMB-18-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CMB65-B65 1527 LID-9 and Gaskets 33-11 r Water - Combination Air Release 33-31-70 (01/08/13) 1 E I -I I Au Release Valve GA Industnes, Inc. Empve Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 1" &W21' * EI-11 [ourbiration ombmation Au Release Valve Multiplex Manufacturing Co. Crispin Air and Vacuum Valves, Model No. 1/2", 1" & 2" EI-11 ombination At Release Valve Valve and Primer Corp. APCO #143C, #145C and #147C 1", 2" & 3" Water 4WRarrel Fire Hvdrant 10/Ol/87 E-1-12 Dry Barrel Fire Hydrant American -Darting Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 03/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-502 09/30/87 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AWWA C-502 01/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-502 08/24/88 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502 E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-502 0.1.7 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502 Shop Drawings No. 6461 ]0/14/87 E-1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Centurion AW WA C-502 01/15/88 E1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Super Centurion 200 AWWA C-502 10/09/87 E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-502 09/16/87 E-1-12 Dry Barrel Fire Hydrant American Flow Control (AFC) Waterous Pacer WB67 AWWA C-502 08/12/16 33-12-40 Dry Barrel Fire Hydrant EI (East Jordan Iron Works) WaterMaster 5CD250 I 02/05/93 E101-5 Detector Check Meter Ames Company Model 1000 Detector Check Valve AWWA C550 4" - 10" 08/05/04 Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6" * From Original Standard Products List CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approval 1' I. 6kg""on Manufacturer Model No.ISpec Size Water - Pines/PVC (Pressure Waterl 33-31-70 (01/08/13) J& I& —M ` I 01/18/18 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR14 ASTM D1784 4"-12" I 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR14 AWWA C900 4"-12" I I 3/19/2018 3311 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AWWA C900 16"-24" I I 5/25/2018 3311 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AWWA C900 4"-12" I 5/25/2018 3311 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AWWA C900 16"-24" AWWA C900-16 UL 1285 12/6/2018 3311 12 PVC Pressure Pipe J-M Manufacnrring Co., Inc d/b/a JM Eagle DR 14 ANSI/NSF 61 4"-28" FM 1612 12/6/2018 3311 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 18 ° 16"-24" 9/6/2019 3311 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR18 AWWA C900 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR14 AWWA C900 4"-12" 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 AWWA C900 4"- 12" I Water - PinesNalves & Fittin¢s/Ductile Iron Fittines 33-11-11 (01/08/13) I 07/23/92 EI-07 Ductile Iron Fittings Star Pipe Products, Inc. Mechanical Joint Finings AW WA C153 & C110 I * EI-07 Ductile Iron Fittings Griffin Pipe Products, Co. Mechanical Joint Fittiq @ AWWA C 110 I * E1-07 Ductile Iron Fittings McWane/Tyler Pipe/ Union Unlmes Division Mechanical Joint Finings, SSB lass 350 AWWA C 153, C 110, C III I 08/11/98 E1-07 Ductile Iron Fittings Sigma, Co. Mechanical Joint Finings, SSB Class 351 AWWA C 153, C 110, C 112 I 02/26/14 E1-07 MJ Fittings Accucast Class 350 C-153 MJ Finings AWWA C153 4"-12" I 05/14/98 E1-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1400 AW WA C111/C153 4" to 36" I 05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1500 Circle -Lock AW WA C111/C153 4" to 24" I 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, Inc. One Bolt Restrained Joint Fitting AWWA C111/C116/C153 4" to 12" I I 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 1100 (for DI Pipe) AWWA C111/C116/C153 4" to I" I I 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, hic. Megalug Series 2000 (for PVC Pipe) AWWA C111/C116/C153 4" to 24" I I 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLC4 - SLC10 AW WA C111/C153 4" to 10" I I 03/06/19 33-11-11 Mechanical Joint Retainer GlandaFVC) Sigma, Co. Sigma One-Lok SLCS4 - SLCS12 AW WA C111/C153 4" to 12" I I 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCE AW WA C111/C153 12" to 24" I I 08/10/98 E1-07 MJ Fiffir IP) Sigma, Co. Sigma One-Lok SLDE AW WA C153 4" - 24" I I 10/12/10 E1-24 Interim Restrained Joint System S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" I I 08/16/06 E1-07 Mechanical Joint Fittings SIP Industries(Serampore) Mechanical Joint Fittings AW WA C153 4" to 24" I I 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargrip Series 4000 ASTM A536 AW WA CI I I I I 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stmgrip Series 3000 ASTM A536 AW WA CI I I I EZ Grip Joint Restraint (EZD) Black For DIP 03/19/18 33-1141 Mechanical Joint Retainer Glands SIP Industries(Serampore) ASTM A536 AW WA CI I I 3"-48" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) DRl4 PVC Pipe ASTM A536 AW WA CI I I 4"-12" 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Sersmpore) �` vaP V11i. nn, oa„ �,.1.�`VJ nGLL �V1 �J°✓ ASTM A536 AW WA CI11 16"-24" I Water - Pioes/Valves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15). I Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing # 94-20247 16" I 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515 30" and 36" I I 08/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SD 94-20255) AWWA C515 20" and 24" I I 05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247) AWWA C515 16" I I 10/24/00 E1-26 Resilient Wedge Gate Valve American Plow Control Series 2500 (Ductile Iron) AWWA C515 4" to 12" I I 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515 42" and 48" I I 05/23/91 E1-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seeded GV AWWA C509 4" to 12" I I01/24/02 E1-26 Resilient Wedge Gate Valve American AVK Company 20" and smaller I I * E1-26 Resilient Seated Gate Valve Kennedy 4" - 12" I I E1-26 Resilient Seated Gate Valve M&H 4" - 12" I I * E1-26 Resilient Seated Gate Valve Mueller Co. 4" - 12" I I 11/08/99 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AWWA C515 16" I I 01/23/03 Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18"-24" (SD 6709) AWWA C515 24" and smaller I 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36', C-515 AW WA C515 30" and 36" I 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AW WA C515 42" and 48" I 01/28/88 EI-26 Resilient Wedge Gate Valve Clow Valve Co. AWWA C509 4" - 12" I 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AW WA C515 16" I 11/08/99 EI-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AW WA C515 24" and smaller I 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AWWA C515 30" and 36" (Note 3) 11/30/12 Resilient Wedgy Gate Valve Clow Valve Co. Clow Valve Model 2638 AWWA C515 24" to 48" (Note 3) 05/08/91 E1-26 Resilient Seated Gate Valve Stockham Valves & Fittings AWWA C 509, ANSI 420 - stem, 4" - 12" I EI-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co. Meirosea1250, regwreinerts SPL #74 3" to 16" 11/26/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works) EJ F1owMa uer Gat. Valve & Box.s 08/24/18 I Matco Gate Valve Matco-Norca 225 MR AWWA/ANSI C115/An21.15 4" to 16" I * From Original Standard Products List FORT WORTH® Note: All water or CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST than 1S inch diameter shall be approved for use by the Water basis. for some Updated: 03/07/2023 I * E1-30 Rubber Seated Butterfly Valve Henry Pratt Co. AW WA C-504 24" I * E1-30 Rubber Seated ButterFly Valve Mueller Co. AW WA C-504 24"and smaller 1/11/99 E1-30 Rubber Seated Butterfly Valve Dezurik Valves Co. AW WA C-504 24" and larger 06/12/03 E1-30 Valmatm American Butterfly Valve Valmanc Valve and Manufacturing Corp. Valmatic American Butterfly Valve. AW WA C-504 Up to 84" diameter 04/06/07 E1-30 Rubber Seated ButterFly Valve M&H Valve M&H Style 4500 & 1450 AW WA C-504 24" to 48" 03/19/18 33 12 21 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) AW WA C504 Butterfly Valve AW WA C-504 30"-54" Water�ne Encasement 33-11-10 (01/08/13) 05/12/OS EI-13 Polyethylene Encasment Flessol Packaging Fulton Enterprises AW WA C105 8 mil LLD 05/12/05 EI-13 Polyethylene Encasment Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AW WA C105 8 mil LLD 05/12/05 E1-13 Polyethylene Encasment AEP Industries Bullstrong by Cowtown Bolt & Gasket AW WA C105 8 mil LLD 09/06/19 33-11-11 Polyethylene Encasment Northtown Products Inc. PE Encasement for DIP AW WA C105 8 mil LLD Water - SamDUnt= Station 03/07/23 33 12 50 Iwatcr Sam lin Station I Eclipse Number 88, 12-inch Depth of Bur As shown in spec. 33 12 50 ot/21/20 Water - Automatic Flusher Automated Flushing System Mueller Hydrogaud HG2-A-IN-2-PVC-018-LPLG(Permanent) 04/09/21 Automated Flushing System Kupf le Foundry Company Eclipse #9800wc 04/09/21 Automated Flushing System Kupf le Foundry Company Eclipse 99700 (Portable) * From Original Standard Products List