HomeMy WebLinkAboutContract 62925-CO1CSC No. 62925-COI FORT�WORTH. City of Fort Worth Change Order Request Project Name olden Triangle Boulevard City Sec # 1 62925 Client Project #(s)! 101013 Project Golden Triangle realignment, paving, striping, sidewalks, traffic signals, drainage, and waterline from Misty Redwood Trail to 1-35W Description) Contractor McMahon Contracting and Construction, L.L.0 Change Order #1 1 Datel 7/8/2025 City Project Mgc1 Bereket Birhane City Inspector Ben Weaveding Dept. TPW Contract Time Totals (CD) Original Contract Amount $10,824,277.43 $10,824,277.43 575 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $10,824,277.43 $10„824,277.43 575 kAmount of Proposed Chance Order QQ 00 $Q 00 38 Revised Contract Amount $10,824,Y-43 $10,824,277.43 613 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding (if necessary) $0.00 $0.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT I 0.00% .1 MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $13,530,346.79 JUSTIFICATION (REASONS) FOR CHANGE ORD - A HyundaFGenesis Car Dealership constructed two driveway connections to Golden Triangle Boulevard that were not reflected in the bid plans prior to letting. The proposed driveway plans were revised to tie into Golden Triangle Boulevard. The unit prices have been verified to be consistent with the original contract. -After coordination with the Water Department, the plans were revised to raise the storm drain instead of lowering the 24" waterline in front of Golden Heights. This change provided the necessary clearance and led to a reduction in watedine quantities. The unit prices have been verified to be consistent with the original contract. -A pile of misc debris south of Golden Heights needs to be removed from City ROW. (see attached ledger for details). See the attachment for a breakdown of labor, materials, and equipment. -Additional temporary asphalt is needed for a storm drain cutting across Golden Triangle at STA 41+00.00 (see attached). The unit price has been verified to be consistent with the original contract. -Phase 1 traffic control was revised to provide sufficient taper length for traffic coming from I-35W. This requires TCP barriers, concrete hand pours, and mobilization for temp asphalt and striping. See the attachment for a breakdown of labor, materials, and equipment. -An abandoned gas pipe at STA 35+50 conflicted with the proposed storm drain and needed to be removed. See the attachment for a breakdown of labor, materials, and equipment. - A light pole at STA 27+50 is damaged and needs to be replaced. Per Bean Electric, a different pole and arm than those in the contract need to be used to match the existing foundation. See the attachments for a quote from the subcontractor and a breakdown of labor, materials, and equipment. -The total net cost of $55,347.41 is being offset by an equal reduction in the Construction Allowance bid item; therefore, the net contract amount increase is $0.00. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. ny Name me) Sam Reynolds I Contract S)lnature Date rW McMahon ContractingSam Reynolds 8/4/25 Project and Contract Compliance Maner 08/12/25 )L-(Aug12,202506251TCDT) 08/12/25 Senior Capital Project Officer 08/12/25 - 08/25/25 Wad,a,k(Aug 26,202510:02:17 COT)- .l. 08/26/25 1-4�4,,..r. I 08/26/25 f 1 08/27/25 1 1. 09/06/25 Council Actid M&C Number I � I M&C Date Approved ATTEST: 4poR>°aQ P�oFe0000000a�oada a�8 9,0 Jannette Goodall, City Secretary ° o =° col 0 344 .......goa OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth ..IV Change Order Additions Project Name Golden Triangle Boulevard City Sec # 62925 ClientProject# 101013 1 Contracts MN6hon Contractinq and Construction, LLC PMI Bereket Birhane I Inspector] Ben Weaveding Change Order Submittal # O Date 1 7/8/2025 ADDITIONS ITEM DESCRIPTION DEPT 0 Unit Unit Cost Total 102 0241.0401 Remove Concrete Drive TPW 4,707. W0000 SF $1.2 $6,024.96 117 0241.3013 Remove 18" Storm Line TPW 103.00000000 LF $33.1 1 $3,415.48 119 0241.3015 Remove 24' Storm Line TPW 64.00000000 LF $33.15 $2,121.60 120 0241.4401 RemoveHeadwall/SET TPW 4.00000000 EA $745.3, $2,981.56 202 3123.0101 Unclassified Excavation by Plan TPW 445.00000000 CY $24.7! $11,013.75 203 3124.0101 Embankment by Flan TPW 72.00000000 CY $7.6 $548.64 210 3213.0401 6' Concrete Driveway TPW 4,159.00000000 SF $12.9 $53,900.64 213 3213.0506 Barrier Free Ramp, Type P-1 TPW 4.00000000 EA $3,093.8 $12\375.52 224 3292.0100 Block Sod Placemen4 TPW 780.00000000 SY $7.8:" $6,123.00 520 3305.0111 Valve Box Adjustment (Water) TPW 1.00000000 EA $551.55 $551.55 907 Remove Misc Water debris TPW 2.00000000 EA $4,048.52 $8,097.04 908 2" Asphalt Pavement TY C TPW 406.00000000 SY $70.0 $28,440.30 909 AsKaftAdditional MOB TPW 1.00000000 EA $9,092.1 $9,092.17 910 Striping Additional MOB TPW 1.00000000 EA $1,636.6 $1,636.65 911 Barrier- Water or Low Profile TPW 4.00000000 MO $3,232.s $12,930.28 912 Replace Damaged Illumination pole TPW 1.00000000 EA $11,562.4 $11,562.48 913 Additional Hand Pours TPW 1.00000000 LS $22,226. 9' $22,226.19 914 Remove Existing Gas Line TPW 100.00000000 LS $22.7E $2,276.00 TPW $195,317.81 Sub Total Additions $195,317.81 Change Order Additions Page 2 of 4 FoR I Woe rrr City of Fort Worth `- Change Order Deletions Project Name i Golden Triangle Boulevard CitySec # 1 62925 Client Project # 1 101013 1 Contractor]McMahon Contracting and Construction, LLC I PMI Bereket Birhane I Inspectorl Ben Weaveding Change Order Submittal # O1 Date 1 7/8/2025 1 DELETIONS ITEM DESCRIPTION DEPT 0 Unit UnftCost ' Total 209 3213.0105 11" Conc. Pvmt TPW 1 .O b0006d SY $114.06 $1 140.00 214 3213.0301 4" Conc. Sidewalk TPW 1,392.00000006 SF $6.8d $d,507.36 223 3291.0100 Topsoil TPW 8.00000000 CY $67.7 $541.76 225 3292.0400 Seeding, Hydromulch TPW 565.00000000 SY $2.0� $111130.00 701 2605.3118 FumishAnstall Conduit -Schedule 80 PVC 21nch Open TPW 25.00000000 LF $29.19 5729.75 704 3441.1405 No. 2 Insulated Elec Condr TPW 25.00000000 LF 5.84q 13 0241.1019 Remove 24" Water Line TPW 28.00000000 LF $219.55 .M.00 $6,987.40 407 3341.0309 36" RCP, Gass III TPW 149.00000000 LF $226.1d $33,693.37 504E 3311.0651 24" DIP Water TPW 28.00000000 LF $1,013.15 $28,368.20 505A 3311.0001 Ductile Iron Fittings w/Restraint TPW 1.80000000 TON $9,361.80 $16,851.38 507 3312.0108 Connection to Existing 24" Water Main TPW 2.00000000 EA $14,317.17 $28,634.34 509 3304.0002 Cathodic Protection TPW 1.00000000 LS $11,675.Od $11,675.00 523 3305.0117 Concrete Collar for Valve / Test Station TPW 1.00000000 EA $524.9ill$524.96 527 3305.0109 Trench Safe( TPW 28.00000000 LF $1.49 $40.88 906 9999.XXXX Construction Allowance TPW 55,347.41000000 EA $1.0Q $55,347.41 TPW $195,317.81 I I I 1 Sub Total Deletions $195,317.81 Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service 7Amount for this CO Total $0.00 Previous Change Orders CO# DATE I AMOUNT Total I $0.00 1 MCMAHON CONTRACTING L.P. PCO#1 - RFI-001 Response/ Revised FROM: Sam Reynolds DATE: 7/3/2025 McMahon Contracting L.P. 3019 Roy Orr Blvd. PROJECT: Ft Worth- Golden Triangle Grand Prairie, TX 75050 Phone: 972-263-6907 Fax: 972-264-0008 TO: Bereket Birhane, P.E. 817-392-7862 Bereket.Birhane @,,fortworthtexas.aov We hereby propose the following changes and/or additions to the original contract. ITEM DESCRIPTION UNIT OF ORIGINAL ADD/DEDUCT REVISED UNIT PRICE NET COST CHANGE Working MEASURE QUANTITY QUANTITY QUANTITY Days New-37 Remove Misc Water EA 0 2.00 2.00 $4,048.52 $81097.03 1.00 227 2" Asphalt Pavement TY C SY 1100 406.00 1506.00 $70.05 $281440.30 2.00 NEW Asphalt Additional MOB EA 5 1.00 6.00 $91092.17 $91092.17 NEW Striping Additional MOB EA 0 1.00 1.00 $1,636.65 $11636.65 NEW Barrier- Water or Low Profile MO 0 4.00 4.00 $31232.57 $121930.30 1.00 NEW Replace Damaged Illumination pole EA 0 1.00 1.00 $111562.48 $111562.48 1.00 NEW Additional Hand Pours LS 0 1.00 1.00 $221226.19 $221226.19 8.00 NEW Remove Existing Gas Line LS 0 100.00 100.00 $22.76 $21276.00 1.00 Additional working days required: 38 (includes production and delay days) TOTAL: $96,261.13 14.00 ***Notes- 1. Pricing based off RFI-001 response. This creates additional TC and hand pours 2. Barrier is priced for a 4 month duration. If conflicts extend the need, there will be additional cost ($3250/ Month) 3. Quantities for existing items are based off revised quantity table provided by Phillip Graham 4. Additional working days based off bid productions. McMahon is also requesting 15 Additional days due to TCP delay and soil testing delay. McMahon Contracting Rep: Customer: Ft Worth- Golden Triangle DETAILED COST BREAKDOWN Remove Water Materials LABOR DESCRIPTION Dirt Foreman Operator Skilled Laborer I I I (LABOR COST (LABOR MARKUP 155% LABOR BURDEN TOTAL LABOR COST EQUIPMENT DESCRIPTION Track Hoe (Skid Steer Foreman Truck (EQUIPMENT �9�ST 115% E"QUIPN{EICfT MARKUP TOTAL EQUIPMENT COST MATERIALS DESCRIPTION (Dump Fees I I I MATERIAL COST (MATERIAL MARKUP TOTAL MATERIAL COST SUBCONTRACTORS D�$�e PTION 6u{sidle TTrucking I I I I I I I ISUBCONTRACTOR COST (SUBCONTRACTOR MARKUP TOTAL SUBCONTRACTOR COST rneT enureeecv TOTAL LABOR COST TOTAL EQUIPMENT COST TOTAL MATERIAL COST TOTAL SUBCONTRACTOR COST 1% BOND TOTAL COST EMAHON CONTRACTIN6 L.P. HR Hr QTY UNIT REQUIRED RATE 1.00 Hr 10.00 $ 47.50 2.00 Hr 10.00 $ 24.75 1.00 Hr 10.00 $ 21.50 Hr Hr Hr Hr Hr Hr #REF! HR HR QTY UNIT REQUIRED RATE 1.00 HR 10.00 $ 174.16 1.00 HR 10.00 $ 95.18 1.00 HR 10.00 $ 47.17 HR HR #REF! UNIT EXTENDED QTY UNIT COST COST 3.00 MO 250.00 $ 750.00 I LBS $ - I LS $ - I $ 750.00 I #REF! $ 112.501 $ 862.50 UNIT EXTENDED QTY UNIT COST COST 10.00 Hrs $ 125.00 $ 1,250.00 I $ I $ I $ I $ I $ I $ I $ I $ 1,250.00 I 20% $ 250.00 1 $ 1,500.00 $ 2, 014.50 $ 3,639.87 $ 862.50 $1, 500.00 $ 80.17 $ 8,097.03 Total Cost: $8,097.03 Unit Cost: $4,048.52 2 EA EXTENDED COST $ 475.00 $ 495.00 $ 215.00 $ - $ - $ - I $ - I $ - I $ - I $ 1,185.00 I $ 177.75 1 $ 651.75 1 $ 2,014.50 EXTENDED COST $ 1,741.60 1 $ 951.80 I $ 471.70 $ - $ - I $ 3,165.10 I $ 474.77 I $ 3,639.87 Ft Worth- Golden Triangle DETAILED COST BREAKDOWN RFI-001 Asphalt sub additional mob LABOR DESCRIPTION Asphalt Forman Asphalt Laborer Asphalt Operator Mechanic I I I (LABOR COST ILABOR MARKUP 155% LABOR BURDEN TOTAL LABOR COST EQUIPMENT DESCRIPTION (EQUIPMENT �T 115% "QUIP E MARKUP TOTAL EQUIPMENT COST MATERIALS (DESCRIPTION I I I (MATERIAL COST (MATERIAL MARKUP TOTAL MATERIAL COST SUBCONTRACTORS IDESj(;RIPTION ]Haul Trucks I I I I I I I ISUBCONTRACTOR COST ISUBCONTRACTOR MARKUP TOTAL SUBCONTRACTOR COST COSTSUMMAR TOTAL LABOR COST TOTAL EQUIPMENT COST TOTAL MATERIAL COST TOTAL SUBCONTRACTOR COST 1% BOND TOTAL COST EMAHON CONTRACTING C.P. HR Hr EXTENDED QTY UNIT REQUIRED RATE COST 1.00 Hr 5.00 $ 46.50 $ 232.50 2.00 Hr 4.00 $ 24.00 $ 192.00 3.00 Hr 5.00 $ 33.00 $ 495.00 1.00 Hr 2.00 $ 35.00 $ 70.00 Hr $ - Hr $ I Hr $ I Hr $ I Hr $ I $ 989.50 I 1 #REF! $ 148.431 $ 544.23 1 $ 1,682.15 HR HR EXTENDED QTY UNIT REQUIRED RATE COST HR $ HR $ I HR $ HR $ HR $ I $ I #REF! $ 1 UNIT EXTENDED( QTY UNIT COST COST LDS $ - I LBS $ I LS $ I $ I #REF! $ - UNIT EXTENDED QTY UNIT COST COST 4.00 LDS $ 1,525.00 $ 6,100.00 $ I $ I $ I $ I $ I $ I $ I $ 6,100.00 I 20% $ 1,220.00' $ 7,320.00 $ 1,682.15 $ 7,320.00 $ 90.02 $ 9,092.17 Total Cost: $ 9,092.17 Unit Cost: $ 9,092.17 1 LS EMAHON CONTRACTIN6 L.P. Ft Worth- Golden Triangle DETAILED COST BREAKDOWN RFI-001 Additional Striping Mob LABOR HR Hr EXTENDED DESCRIPTION QTY UNIT REQUIRED RATE COST IStripe Foreman 1.00 Hr 3.50 $ 42.00 $ 147.00 IStripe Laborer 2.00 Hr 3.00 $ 22.75 $ 136.50 Hr $ - I Hr $ - I Hr $ - I I Hr $ - I I Hr $ - I I Hr $ - I Hr $ - I (LABOR COST $ 283.50 I (LABOR MARKUP 1 #REF! $ 42.53 1 155% LABOR BURDEN $ 155.93 1 TOTAL LABOR COST $ 481.95 EQUIPMENT HR HR EXTENDED DESCRIPTION QTY UNIT REQUIRED RATE COST Paint Truck 1.00 HR 3.00 $ 165.00 $ 495.001 IF550W/Trialer 1.00 HR 3.00 $ 165.00 $ 495.001 HR $ - I HR $ - I HR $ - I (EQUIPMENT $ 990.00 1 115% "QUIP E MARKUP ERT #REF! $ 148.501 TOTAL EQUIPMENT COST $ 1,138.60 MATERIALS UNIT EXTENDED DESCRIPTION QTY UNIT COST COST I MO $ - I I LBS $ I I LS $ I IMATERIAL COST $ I (MATERIAL MARKUP #REF! $ - 1 TOTAL MATERIAL COST $ - SUBCONTRACTORS UNIT EXTENDED DESCRIPTION QTY UNIT COST COST I LS $ I I $ I I $ I I $ I I $ I I $ I I $ I I $ I ISUBCONTRACTOR COST $ I (SUBCONTRACTOR MARKUP 20% $ I TOTAL SUBCONTRACTOR COST $ - COSTSUMMARY TOTAL LABOR COST $ 481.95 TOTAL EQUIPMENT COST $1,138.50 TOTAL MATERIAL COST $ TOTAL SUBCONTRACTOR COST $ 1%BOND $ 16.20 TOTAL COST $1,636.65 Total Cost: $1,636.65 Unit Cost: $1,636.65 1 LS Ft Worth- Golden Triangle DETAILED COST BREAKDOWN Gas Line Removal LABOR DESCRIPTION (Foreman Excavation (Excavation Operator (Excavation Laborer 1 Laborer Skilled Water Truck Driver ILABOR COST ILABOR MARKUP 155% LABOR BURDEN TOTAL LABOR COST EQUIPMENT DESCRIPTION Track Hoe (Foreman Truck ( ( (EQUIPMENT �9�ST 115% E1QUIPW{E�C , MARKUP TOTAL EQUIPMENT COST MATERIALS IDESCRIPTION (Dump Fees I I IMATERIAL COST IMATERIAL MARKUP TOTAL MATERIAL COST SUBCONTRACTORS ESEIPTION (Trucking I I I I I I I ISUBCONTRACTOR COST ISUBCONTRACTOR MARKUP TOTAL SUBCONTRACTOR COST COSTSUMMAR TOTAL LABOR C ST TOTAL EQUIPMENT COST TOTAL MATERIAL COST TOTAL SUBCONTRACTOR COST 1% BOND TOTAL COST EMAHON CONTRACTING C.P. HR QTY UNITREQUIREE 1.00 Hr 3.00 $ 1.00 Hr 3.00 $ Hr $ Hr $ Hr $ Hr Hr Hr Hr HR QTY UNIT REQUIRE[ 1.00 HR 3.00 $ 1.00 HR 3.00 $ HR HR HR Hr EXTENDED RATE COST 47.50 $ 142.50 26.00 $ 78.00 20.00 $ - 21.50 $ 24.75 $ - $ 220.50 #REF! $ 33.08 $ 121.28 $ 374.85 HR EXTENDED RATE COST 174.16 $ 522.48 47.17 $ 141.51 $ 663.99 #REF! $ 99.60 $ 763.59 UNIT EXTENDED QTY UNIT COST COST 2.00 EA 250.00 $ 500.00 LBS $ - LS $ - $ 500.00 #REF! $ 75.00 $ 575.00 UNIT EXTENDED QTY UNIT COST COST 2.00 LID $ 225.00 $ 450.00 $ 450.00 20% $ 90.00 $ 540.00 $ 374.85 $ 763.59 $ 575.00 $ 540.00 $ 22.53 $ 2,275.97 Total Cost: $ 2,275.97 Unit Cost: $ 22.76 100 LF EMAHON CONTRACTING C.P. Ft Worth- Golden Triangle DETAILED COST BREAKDOWN Damaged Illumination Pole LABOR HR Hr EXTENDED DESCRIPTION QTY UNIT REQUIRED RATE COST Foreman Excavation Hr $ 47.50 $ Excavation Operator Hr $ 26.00 $ Excavation Laborer Hr $ 20.00 $ ILaborerSkilled Hr $ 21.50 $ Water Truck Driver Hr $ 24.75 $ I Hr $ I Hr $ I Hr $ Hr $ (LABOR COST $ I ILABOR MARKUP I #REF! $ 1 155% LABOR BURDEN $ I TOTAL LABOR COST $ - EQUIPMENT HR HR EXTENDED DESCRIPTION QTY UNIT REQUIRED RATE COST Skid Steer Track Loader HR $ 95.18 $ (Foreman Truck HR $ 47.17 $ I Water Truck HR $ 51.25 $ HR $ HR $ (EQUIPMENT �9�ST $ 115/o 1QUIP E MARKUP #REF! $ TOTAL EQUIPMENT COST $ MATERIALS UNIT EXTENDED DESCRIPTION QTY UNIT COST COST I Barner Rental-120 LF Water barrier/ Low Profile MO 1400.00 $ - I I LBS $ I I LS $ I IMATERIAL COST $ I (MATERIAL MARKUP #REF! $ - I TOTAL MATERIAL COST $ - SUBCONTRACTORS IQQESC IPTTI Bean-Weplace�llum Pole I I I I I I I ISUBCONTRACTOR COST ISUBCONTRACTOR MARKUP TOTAL SUBCONTRACTOR COST GOAL LABNOST $ UNIT EXTENDED QTY UNIT COST COST 1.00 EA $ 9,540.00 $ 9,540.00 I $ I $ I $ I $ I $ I $ I $ I $ 9,540.00 I 20% $ 1,908.00 I $11,448.00 TOTAL EQUIPMENT COST $ TOTAL MATERIAL COST $ TOTAL SUBCONTRACTOR COS' $11,448.00 1% BOND $ 114.48 TOTAL COST $11,562.48 Total Cost: $11,562.48 Unit Cost: $11,562.48 1 EA EMAHON CONTRACTING L.P. Ft Worth- Golden Triangle DETAILED COST BREAKDOWN RFI-001 Barrier- for Revised TCP LABOR HR Hr EXTENDED DESCRIPTION QTY UNIT REQUIRED RATE COST Foreman Excavation 1.00 Hr 10.00 $ 47.50 $ 475.00 �Excavation Operator 1.00 Hr 10.00 $ 26.00 $ 260.00 Excavation Laborer 1.00 Hr 10.00 $ 20.00 $ 200.00 �Laborer Skilled 1.00 Hr 10.00 $ 21.50 $ 215.00 Water Truck Driver 1.00 Hr 20.00 $ 24.75 $ 495.00 I Hr $ - I Hr $ I Hr $ I Hr $ - ILABOR COST $ 1,645.00 1LABOR MARKUP 1 #REF! $ 246.75 155% LABOR BURDEN $ 904.75 TOTAL LABOR COST $ 2,796.50 EQUIPMENT HR HR EXTENDED DESCRIPTION QTY UNIT REQUIRED RATE COST Skid Steer Track Loader 1.00 HR 10.00 $ 95.18 $ 951.80 Foreman Truck 1.00 HR 10.00 $ 47.17 $ 471.70 Water Truck 1.00 HR 20.00 $ 51.25 $ 1,025.00 1.00 HR $ - 1 1.00 HR $ - I EQUIPMENT �gSST $ 2,448.50 115% EQUIP O MARKUP #REF! $ 367.28 TOTAL EQUIPMENT COST $ 2,815.78 MATERIALS UNIT EXTENDED e c I N Q� COST BST a ner�ental-120 LF Water barrier/ Low Profile 4.00 MO 10400.00 $ 5,600.00 1 LBS $ - 1 LS $ - IMATERIAL COST $ 5,600.00 IMATERIALMARKUP #REF! $ 840.00 TOTAL MATERIAL COST $ 6,440.00 SUBCONTRACTORS UNIT EXTENDED QQ e 9 QTM C C (T ucfor DTeli�ery 5.00 HRS $ P5 00 $ 625.00 I $ - I $ - I $ - I $ - I $ - I $ - I $ - ISUBCONTRACTOR COST $ 625.00 (SUBCONTRACTOR MARKUP 20% $ 125.00 TOTAL SUBCONTRACTOR COST $ 750.00 COSTSUMMARY TOTAL LABOR COST $ 2,796.50 TOTAL EQUIPMENT COST $ 2,815.78 TOTAL MATERIAL COST $ 6,440.00 TOTAL SUBCONTRACTOR COST $ 750.00 1% BOND $ 128.02 TOTAL COST $ 12,930.30 Total Cost: $ 12,930.30 Unit Cost: $ 3,232.57 4 MO 4 EA4A"ON CONTRACTING C.P. Ft Worth- Golden Triangle DETAILED COST BREAKDOWN RFI-001 Additional Hand Pours LABOR DESCRIPTION Foreman Paving Leadman Paving Skidsteer/Backhoe Operator Concrete Finisher Straight Edge Laborer - Skilled Laborer - Common Foreman- Setup Concrete Form Setter Laborer -Skilled Skidsteer/Backhoe Operator LABOR COST LABOR MARKUP 55% LABOR BURDEN TOTAL LABOR COST EQUIPMENT DESCRIPTION Skid Steer Track Loader Foreman Truck EQUIPMENT COST 15% EQUIPMENT MARKUP TOTAL EQUIPMENT COST MATERIALS DESCRIPTION Form Lumber/ Misc Dowels/ Baskets MATERIAL COST MATERIAL MARKUP TOTAL MATERIAL COST SUBCONTRACTORS DESCRIPTION Saw/ SEAL SUBCONTRACTOR COST SUBCONTRACTOR MARKUP TOTAL SUBCONTRACTOR COST COST SUMMARY TOTAL LABOR COST TOTAL EQUIPMENT COST TOTAL MATERIAL COST TOTAL SUBCONTRACTOR COST 1 % BOND TOTAL COST HR Hr EXTENDED QTY UNIT REQUIRED RATE COST 1.00 Hr 10.00 $ 48.75 $ 487.50 1.00 Hr 10.00 $ 26.00 $ 260.00 2.00 Hr 10.00 $ 22.75 $ 455.00 5.00 Hr 10.00 $ 23.75 $ 1,187.50 4.00 Hr 10.00 $ 24.75 $ 990.00 3.00 Hr 10.00 $ 21.50 $ 645.00 2.00 Hr 10.00 $ 19.00 $ 380.00 1.00 Hr 20.00 $ 19.00 $ 380.00 5.00 Hr 20.00 $ 21.75 $ 2,175.00 2.00 Hr 20.00 $ 21.50 $ 860.00 1.00 Hr 20.00 $ 22.75 $ 455.00 $ 8,275.00 #REF! $ 1,241.25 $ 4,551.25 $ 14,067.50 HR HR EXTENDED QTY UNIT REQUIRED RATE COST 1.00 HR 20.00 $ 95.18 $ 1,903.60 3.00 HR 10.00 $ 47.17 $ 1,415.10 1.00 HR $ 112.70 $ - 1.00 HR $ 90.92 $ - 1.00 HR $ 47.17 $ - $ 3,318.70 #REF! $ 497.81 $ 3,816.51 QTY UNIT 1.00 LS 285.00 LF LS QTY UNIT 1.00 LS $ 14,067.50 $ 3,816.51 $ 1,722.13 $ 2,400.00 $ 220.06 $ 22,226.19 Total Cost: $ 22,226.19 Unit Cost: $ 22,226.19 UNIT EXTENDED COST COST 500.00 $ 500.00 3.50 $ 997.50 $ 1,497.50 #REF! $ 224.63 $ 1,722.13 UNIT EXTENDED COST COST $ 2,000.00 $ 2,000.00 $ 2,000.00 20% $ 400.00 $ 2,400.00 1 LS EMAHON CONTRACTING L.P. Golden Triangle PCO-1 Ledger Item 137- Remove Misc Water- Debris piles to be removed containingwater materials, barricades, rubble and wood. .i Item 227- 2"AsphaltTY C- Additional temp asphalt required for cut across on storm lines A & B As shown on markup New Item -Add Asnhalt MOB- Revisions require an additional MOB in ph1 to complete New Item- Add Strine Mob- Revisions add additional removal mob for striper New Item- Barrier- Revised TCP sheets show additional barrier needed. Approx 120LF New Item- Additional Hand Pours- Due to the traffic control phasing, 3 additional hand pours will be needed to complete the Tie -In @ 64+00 both EB and WB. This includes additional setup, traffic control, forms, and delay. New Item- Gas Pine Removal- Gas pipe shown on plans was not in the expected location and entered the storm trench at 35+50(see below picture) We removed 100 LF of pipe. • ..ads. - New Item- Replace Damaged Pole- Existing pole shown on Sheet 123 of contract plans @ station 27+50 is damaged and needs replaced. To match the existing and replace the arm, a different pole and arm is needed than those in the plans per Bean Electric. Additional Mob Charges- See Below From Work Orders Asphalt MOB We prol)ose lojkrIUS11 all labor, titatertals, ana equipment to construct, as (tit inaepenitent cwturacror, inejettesping work Golden Triangle Blvd paving City of Fort Worth ITEM # ITEM DESCRIPTION QUANTITY � UM UNIT PRICE I TOTAL PRICE 206 2" Asphalt Pvmt Type D 615.001 $Y 207 8.5" Asphalt Base Type B 602.00f SY 227 2" Asphalt Pvmt Type C (Temporary Asphalt) 1,100.00 1 Sy INCL 14TIONS & Z= USIONS: *13id does not include the following, sales tax, bond cost, ACC dues,, testing, utility a0alments, curb or pavement edge backfill, temporary striping or Ift barricades, tratric control (including lane closure labor or equiputient), engineering or layout, patching or repair to installed or existing flicifilles, or any item not specifically called out in this bid. * Prices based upon 4DIngwwkkk2 move -ins for perinartent paving and 3 inove-inafor itunpararypaving. Additional move -his will be. charged (ii? the rate of$7.11W.00ewh. ' Sobgradc to be compacted, fine graded to final elevations, acceptable by Peachtree Construction, prior to our mobilization, Stripe Mob 308 24" PREFORMED CONTRAST THERMO 400 LF $ 309 THERMO TURN ARROW 11 EA $ c. 310 THERMO WORD (ONLY) 9 EA $ 311 4" SQ REFL TY I IC RPM 72 EA $ 312 4" SQ REFL TY 11 AA RPM 19 EA $ 313 4" SQ REFL TY It CR RPM 180 EA $ 314 F&I SPD LMT SN & POST ASSY 3 EA $ 316 F&I KP RT SN & POST ASSY 3 EA $ 316 F&I SM RD SN R4.7C & POST ASSY 3 EA 317 F&I LEFT TRN ONLY SN & POST ASSY 3 EA $ 318 F&I SM RD SN TO EXIST POST ASSY 2 EA $ 319 F&I PRIVATE DR SN & POST ASSY 2 EA $ 320 REMIREINSTALL SM RD SN & POST ASY 2 EA $ DAILY MOB 6 EA $ NO TRAFFIC CO,` NOTE: REMOVAL OF EXISIIN',` ","'kVEMENT MARKINGS BY FLAIL MILL ONLY NO OTHER METHODS INCLUDED NOTE: ALL PAVEMENT MARKINGS PRICED AS EXTRUDED THERMOPLASTIC AND RAISEI PAVEMENT MARKERS UNLESS NOTED OTHERWISE. NOTE: ALL SIGNS PRICED AS TXDOT TRI SLIP BASE POST ASSY, NO COATING I N C L, SIGNS POST OR HARDWARE INCL NOTE: DAILY MOB OF 113507 PER DAY PLUS WORK COMPLETED 64.60 $ 26,800.00 _VP 71& .4 ELECTRICAL A subsidlarf # LuaMM TAAIt ORTA17ait TEEHRO MMU Bean Electrical, LLC PO Box 40016 Fort Worth, TX 76140 Request for Change RFC Number: 1 Date: 03/19/2025 Regarding: Remove and Salvage damaged pole and furnish and install 1- D40with 9TArm. To: Job Site: GOLDEN TRIANGLE BLVD Requested By: Phone: Recipients: jPhone: Requested Change: Remove and Salvage Existing Street Light Pole Furnish/Install Rdwy Illum D40 Pole Furnish/Install Rdwy Illum 9TArm Please respond by: 03/21/2025 E-mail: JE-mail: UM Quantity Unit Price EA 1.0000000 1555.000000 EA I 1.0000000 EA I 1.0000000 RFC Total 4290.000000 3695.000000 Change to Contract 1 $ 1555.00 $ 4290.00 $ 3695.00 Bean Electrical, LLC. TECL17979 Regulated by The Texas Department of Licensingand Regulations,P.O. Box 12157, Austin, Texas 78711, 1800 803 9202,512 463 6599, website www.Iicense.state.tx.us/ComMaints $ 9540.00 J. lip I II LOT 2, BLOCK INSTALL BARRICADE II II SYNERGY WEST s NST. N0. D217091127 O.P.R. T.C.T. �'LMELM2� HARMON ROAD TO BE CLOSED FROM z1 TT SEXIST. GOLDEN TRIANGLE INTERSECTION a P N ' ( TO SOUTH SYNERGY WEST DRIVE -� (COMPLETE SYNERGY WEST DRIVE _----------------------- ------ — O CONSTRUCTION PRIOR TO ROAD REROUTE TRAFFIC TO ONE -LANE O CLOSURE) EACH DIRECTION ON EXIST. SOUTH + - 12GAS LINE I LANES OF GOLDEN TRIANGLE PROP. ' NTRAC TOR TO VERIFY -- - -- - -- - - - I LO _ — __ __ _ _ =ELEVATION 8 CLEARANCE __ r—_ —I- -- - - -- - _ C RIOR TO ANY CONSTRUCTION _ __—__ __— - _, _ _ T ss � � r - TRAFFIC CONTROL oy LEGEND CONSTRUCTION THIS PHASE 2F. CONSTRUCTION PREVIOUS PHASE ® TEMPORARY ASPHALT CONCRETE TRAFFIC FLOW ARROW �(� — — — CHANNELIZING DEVICE 01 20' C/C XO Nor BARRICADE Q • SEE NOTES FOR LOTS I, 2 8 3, BLOCK I, R 8 S MILLER ADDITION ON SHEET 173. RSEST iOT I LOT 3, BLOCK I SYNERGY WEST INST. N0. W23214948 O.P.R.T.C.T. TT OF ALLIANCE, INC. INST. N0. D-068949 O.P.R.T.C.T. DRIVE TO BE CLOSED DURING \ {-- - PHASE 'I' CONSTRUCTION. \'' L---------- I PRIORITIZE PAVING OF SOUTH Y SYNERGY WEST DRIVE AFTER }-- STORM DRAIN CONSTRUCTION TO --- - INSTALL BARRICADES 1=_ ALLOWS ACCESS = e rfi T ; 00 -- -- '__—Ste'—�'_ -- 7. ---- -- Temp Pave Metlla for Fulum TCP plena REVISIONS 11 RER9E mR91aIGem PNAg � A ,RANro �pDAGE mn4n2mA N NC —z 3 c JI., , _L Q Fq LOT P a] i A4 PHI(IP LGRRHAM Fl DDITION - � 1 ............................... 1160 NOTE; COxTRAc7oR SWIALLW O 50 100 150 INSTALL BARRICADES 8 TEMPORARILY CLOSE DRIVE FOR STORM DRAIN INSTALLATION. PROVIDE TEMPORARY ASPHALT PATCH ON STORM DRAIN L TRENCH --------�+� W II Additnal C.—I. Removal and lamp ____—_4 r forexis8n9 ==_ == a ROUTE WEST BOUND TRAFFIC ACROSS END ROAD EXIST. ASPHALT MEDIAN TO EXIST. WORK SIGN SOUTH LANES OF GOLDEN TRIANGLE I LOT 3 TxDOT TRAFFIC SIGNAL �II R 8 S MILLER kla LY ADDTION POLES INST. N0. 0067160 % O.P .T T. L- RETAINING WALLS AND STRIlC1URE3 UNUSS GINEURSE NOIEA NOTE —ACTOR SHALL RELOCATE EKSTING iENCE3 AS NOTED TO ONE FEET O: PROP— R GHT - WAY. I / 1NE CONTRACTOR SHALL CM7ACT THE Gg10WING AT OF 48 NWRS PRIOR TO IXCAVADNG AT EACH LOCAR01t k, AT&T 1-9W-876-8T1 9 PONT "TH WA I-T. FlE1D OPERATIONS (817) N2-B2Y8 Z] I FORT WORTH T1R(W (917) 392-S. N 1 �� l 1 I ONCOR GIXA.9�k ElEC1) ClY9- 7�PI5_9214 'i "TMHCd�PL ]J 809-6212 EM. J3W �$ Omm MERGE ROAD WORK I(()t� yERTICAL CONTROL LEFT SIGN AHEAD SIGN CONmOL POINT R CONTROL PONT R CONTROL POINT p V I I x' CUT IN CONC. x' CUT IN CONC. 'x' CUT IN TOP N: 702-5.68 S.SM.N. APRON CURB INLET 2329556.47 N: 7023591.12 N: 7024826.68 z __ - _ ............ _ UJIM. 799.11 E 2329543.94 E 2329679.87 W 9742 ELEM. 796 k7 K 2656 C GY/Y PRO/ECT /f01013 INPSCO 10. 11-K O IM a —_ll i Llll C' - CITY OF FORT WORTH, TEXAS .. .,. TRANSPORTATION AND PUBLIC WORKS TRANSPORTATION DNG &CAPITAL /XVISI WwWIER & ASSOCIATES, , INC. ENGINEERS SURVEYORS LAND PLANNERS ( 2201L W.]a UNM BLVD., SUE 20DE 7811119T01L IDIS 7006 W 5151 NEVIKATMIS DR., SUITE 115 AW. TOM 7502I .a I Tar Fm IYNNOm NA F-27/5 4n.Neduotiolrmn (MR-7I00 'V GOLDEN TRIANGLE BOULEVARD I FROM MISTY REDWOOD TO INTERSTATE HIGHWY 35W z TRAFFIC CONTROL PLAN PHASE 1 A I STA 48+00 TO END a0 oESANE]k PIA SCAIE DALE: "'.025 SHEET 0 0 50 100 150 oRaN: PKc T'-So' 175 OF 268 F- _� tEEL.EVATION OP. 12' GAS LINE NTRACTOR TO VERIFY LOT 2. BLOCK I B CLEARANCE SYNERGY WEST INST. MER DPWEST 27 IOR TO ANY CONSTRUCTION O.P.R.T.C.T. �— T�INSTALL BARRICADE�1 li HARMON ROAD TO BE CLOSED BETWEEN V G TEMP. ASPHALT EXISTING INTERSECTION WITH GOLDEN TRIANGLE -- MEDIAN CROSSING Q —" AND NORTH DRIVE TO SAGINAW BUSINESS PARK REROUTE TRAFFIC TO ONE LANE PROVIDE ACCESS OVER Q TEMP. ASPHALT EACH WAY E EXIST. AND - CURB DURING + CONCRETE CONSTRUCTED NORTH TWO LANES PHASES 2A 8 2B LO - -EXISTING SOUTH LANES OF -- r = r —-i =� -�- -- _ --- GOLDEN TRIANGLE BOULEVARD —"- CLOSED AND REMOVED TRAFFIC CONTROL C� i LEGEND CONSTRUCTION THIS PHASE ✓�(� CONSTRUCTION PREVIOUS PHASE ® TEMPORARY ASPHALT CONCRETE Y TRAFFIC FLOW ARROW �(9 -� -� CHANNELIZING DEVICE 0 20' C/C x BARRICADE O -) �--,1 1 I Rl� - ---- E RE PHASE 2C j///� DURIV TO EN NG PHASES 21A 8P2B R 6N s SEE NOTES FOR LOTS I. 2 8 3. BLOCK I. CK LOT 3. BLOI \� R B S MILLER ADDITION ON SHEET 173. SYNERGY WEST INST. NO. D223214948 O .P.R.T.C.T. \ \ TT OF ALLIANCE. INC. \ PROVIDE CURB LEAVE OUT MT. N0. D222060449 \� OR ACCESS OVER CURB -------- -- DURING PHASES 2B 8 2C TEMP. ASPHALT ------------------ ----- MEDIAN CROSSING CHANNELIZED LANE DROP _ _ -ROUTE EAST BOUND JL TRAFFIC ACROSS EXIST. 'ASPHALT r MEDIAN PHASE 2B J— �— �s �.�1 I DRIVE TO REMAIN OPEN DRIVE TO REMAIN OPEN DURING PHASES 2A 8 2C DURING PHASES 28 8 2C �I R 9 S MILLER FAMILY ADOmON INST. N0. O2ROOBT I80 O.PIr TLCIT. LJI .mms. LOT ......... ..... O 5U 100 ISO ( ROAD WORK j AHEAD SIGN RIGHT SIGN — �tJ9dr / REVISIONS P MWs: cgrswwmw RE4x uwrs A TRATTD comma osM/PNA >E TEMP MEDIAN CROSSINGS PHASE 2 - TEMPORARY HATCH PHASE 3 - PERMANENT HATCH o0 N k 3 a F FHltli L GRRHN.1 Fl §...1.....94 _.._....;.... Y )�190.: i SOLG 8 NOTE CONTHALTTM FIWSALL OOBIING Tf6FS. RETAINING WALLS AND STRUCNRES UNLESS OTHEI MSE NOTEA ( NOTE CONTRACTOR SHALL RELMATE ENSUING EENCES AS NOTED TO ME STET OF PROPOSE➢ —T OF WAY. THE CONTRACTOR SHALL CM7ACT THE FgI.OWTNG AT U— 48 NODRS PRIOR TO EXCAVATING AT EACH LOCATM fs, ET T-60o-S)8-BT, 9 FORT M'gi1H WAIEA RPi. FlE1D OPEAATONS (BI)) 3B2-8PB8 P- FORT WORTH re�w (en) 3oz-moo � M-.R ENERGY M 215-4386 g1COR GAS ! C IC T617) PIS-8214 1fW ENERGY 1-600-23 P133 SSC TELEPHONE (Bn) 538 12 O CXARIFR COYI. -TIES SOB- G- FXE 3163 d) ALL ER FACLITES 1-BOO-qG-lE56 HORIZONTAL & VERTICAL CONTROL C7 L CONTR% POINT i1 CONTROL POINT /2 CONTROL PONT i3 X' CUT IN CONIC X- CUT IN CONIC. ')C CUT N TOP Faa N: 702-5.68 S.SM.H. APRON CURB INLET E 23296S6.47 N1 1023591.12 N: 702,1811,61 z ELEM. 799.11 E 2329543.94 E 2329679.87 W 797.42 ELEM. 796 k7 K 2656 COY PRCUlCT 1101013 IHPSCO NO. 21-K O ...,..., ... C S ..,. T 5 TRANSPORTATION AND PUBLIC WOORRK -... --- — - — V — / 1 — — TRANSPORTATION PROGRAMIvDNG &CAPITAL Jj]j( J�+�,(j}/PIVISION a — I BMWIER & ASSOCIATES, INC. _ o ` 1 ENGINEERS SURVEYORS LAND PLANNERS pa 2201 E U10R BLVD., SUITE 200E AA MI1, 7DLlS 7M LA7 INSTALL 2�P� END ROAD iem III. RW*Aon m'6 wm 11 - 07�-7701 BARRICADE, // / WORK SIGN ry GOLDEN TRIANGLE BOULEVARD "yl" 1 LOT 3 END ROAD i� l FROM MISTY REDWOOD 1l0 /; 11 , /l TO INTERSTATE HIGHWY 35W WORK SIGN W TxDOT TRAFFIC CONTROL PLAN PHASE 2 A / TRAFFIC SIGNAL / STA 48+00 TO END OPALEP5/14/POPS NT I1770 0 SO I00 I60 PKC -5O'Iq p i1 ii � / l -- REVISIONS T / E1ao..ox IME I111 A � SYfERLOT GYLS T D6/1{/AA I " ROP. 12' GAS LNE WT. NOR D217094127 — CONTRACTOR TO VERIFY p ELEVATION 8 CLEARANCE ---- I I(p / RNM TO ANY CONSTRUCTIONa TO I T 6� E�Iffi�A� NE �N II iI 1101 it �\ INSTALL BARRICADE �P•��. Q d I, HARMON ROAD CLOSED BETWEEN NORTH Q SAGINAW BUSINESS PARK AND INTERSECTION + WITH PROP. GOLDEN TRIANGLE BOULEVARD REMAINDER EXIST. PAVEMENT GOLDEN� _ -_ -_-_- __ _ _ — - -- - k TRIANGLE BOULEVARD REMOVED Q a 51+ 7+00 �53+00 ' .54+CO-55+00-_ 56+00 - LLJ �i TRAFFIC CONTROL // ` I LEGEND C —J ROUTE TRAFF! ONE -LANE EACH E" CONSTRUCTION THIS PHASE WAY ON PROP. SOUTH 8 EAST LANES Sl / / OF GOLDEN` TRIANGLE BOULEVARD \ LOT 2 PG CONSTRUCTION PREVIOUS PHASE / yam/ *+9j pyy� ® TEMPORARY ASPHALT CONCRETE Y / / / j / / R 8 S MILC71 F, MIL> ADDITION § `' 94719 / / MC:2ST. I D, 7I60 - YM1N5Eo.% --►TRAFFIC FLOW ARROW �/ / O.p.R. .C. hMl "•........ a CHANNELIZING DEVICE 0 20' C/C �%CO // // oi1 I 41T BARRICADE Q /// (//•PNI 5 ICIIT��Fy�7��,yN TFi� O 50 100 150 NOR CG . U.0 s A 1 JT L E765 Na FENOE6 J RETNMNG WALLS AND STfiICNRES UNLESS OTIERWSE NOT]L ' J j //�/� 5) ) / xolE CGNIRAGIdi 91A11 RF10LAlE FIOsnNG iFNLE4 AS NoIEO TO QIE FEET y ♦ SEE NOTES FOR LOTS I, 2 8 3. BLOCK I, j�/' l i or weY. R 8 S MILLER ADDITION ON SHEET 173. / ,� IXCAV�ANTNG AT SAWOCCOTIO 4TA T 1XE ('GLOWING AT LEAST 18 NOUR6 PRIOR TO y FORT 1"T�1 wAWI -T. NE O-ATIONS (617) 3Yz-6RP8 LOT 3. BLOCK I TT OF ALLIANCE. INC. SYNERGY WEST INST. N0. D223214990 I / / /� '•� m_ GAS ! C C 611) 213-6214 INSTALL BARRICADE INST. ND. D223219998 O.P.R.T.C.r. INSTALL BARRICADE I I / �� /iSSC aN1c (ni)) > O.P.R.T.O.T.---------------- ®--------C----- , TI LEFT SIGN ul Dn�iERcaMM.�mA NIAL IXr. 3363 C T O I _ _ _-____ __ ROUTE WEST BOUND TRAFFIC ON ----------------#iL_ , t�/ MERGE ROAD WORK j-I`1011L Cp + GOLDEN TRIANGLE BOULEVARD ACROSS e- ---------- - -- -- _ J ' Jl" / AHEAD SIGN X° WT IN CONIC %' WT M M TOP - �UNIxG. YGNI (I TAM I / YUfll /J MEDIAN AT OPENING, MAINTAIN ACCESS �e _ - - - a- _ __ N: 702 6.68 S.SM.H. APRON CURB INLET 1 _ _ TO NORTH 8 SOUTH DRIVES -` -n/' ---� -- - , 7024926.68 '- ° �� -- -- - ELEV: 79991147 E 23298N3,94 E: 23296]9.87 -�— T-1.--�� -- - -- - zz Q _ _ LYIY PROJECT /f010f3 KIMPSCO N0. 11-K w 58 59+00,,---�60+00 __61 +00 �---�-- + _---- t� rpk00 ..64+00 Y Y 65+00 66+Op / 67+OC 6B+0p 69+C CITY OF FORT WORTH, TEXAS ..,. A TRANSPORTATION AND PUBLIC WORKSMIvD TRANSPORTATION PROGRANG ..,. & cAPITAi DIVISION W WNAN WIER & AtbJI iAu mk�j INC. ] ENGINEERS SURVEYORS LAND PLANNERS 2201 L INOR BLVD., SUITE 200E N3INOTON, TOAS 76D06 I7a cQ 5151 IDDDLATIENS DR, SUITE 115 PLMO. TW 75024 a C END ROAD / \ /v / To F RW *d. NA F-2776 W.E."- W- ---- (BL7I-W-7100 WORK SIGN ) GOLDEN TRIANGLE BOULEVARD LOT 3 FROM MISTY REDWOOD �l l TO)P7 �iST� I�ifi�1�3Y33�Y --� R e S MLLER FAMILY ADDITION /I tie rl/ INST. N0. DT.C.T. I60 / TRAFFIC CONTROL PLAN PHASE 3 W O.P.R.T.C.T. TRDOT L / Tq �q L� /' STA 48+00 POL�G SIGNAL 0 5001 150 DESNRFR PLa 5r„n DALE: U14/2025 SHEET V O1 : PNC I 1°-s0' I I179 OF 268 I p I; 1-1 U 11 i II I ) l � _ _ REVISIONS �I III I.• DEnsDDX DALE w I II I LOT 2. BLOCK 1 j SYNERR GY WEST �� �•"•�' ^��� DD/14/ --_- I ^ WT. N0. T,C,T, O.P.R.T.C.T. / RIX'. 12' GAS LINE M.- 21 T 4 JI-IL JJJII______IIIII u J„ O INSTALL PERMANENT PAVEMENT MARKINGS ON ISd _ ROAD WORK GOLDEN TRIANGLE BOULEVARD FROM HARMON + AHEAD SIGN ROAD TO 1-35W OPENI — - - - -- -- / In >C -- TO HARMON ROAD -- --- - - - C — DURING PHASE 4 Q - CONSTRUCTION — �_ �_ /-52++00- —53+00 �_ 54+00 _ _55+00- �I.. 56+00 1�00 C) _ TRAFFIC CONTROL ! A9 / /w/ - ` II C.i LEGEND CONSTRUCTION THIS PHASE �/� J� / END ROAD V/ //�� WORK SIGN /jam 'or ">Flh / y% ........1..................... 4*#9�............ .fir CONSTRUCTION PREVIOUS PHASE V� 11 / LOT ' / as �..._..._. __/^�[_7.......�.... - / / / ^�ir.�sa�mm»»»mm»»+ PHIUP L GRWM1 TEMPORARY ASPHALT CONCRETE / / / / R e S MI61 MIST1 0, F MIL7✓1DDITION --'TRAFFIC FLOW ARROW // O.p.R. c.` - a CHANNELIZING DEVICE ® 20' C/C �%CO // /// oTl . sots �5 �r BARRICADE 1� �\� N Tl'R[ 1CIT7�yy O $b 100 150 NOl[ RI-INI G STRU,EUNUEa FENCE6. RETAINING WALLS MID SIRUCNRES UNLF35 OTINiMSE NOIEA � CONTRACTDR SHALL RELOCATE FMSIING iFNLE4 AS NOTED TO RIE FEET y / OF PROPOSED F-F OF WAY. * SEE NOTES FOR LOTS I, 2 8 3. BLOCK 1. R B S MILLER ADDITION ON SHEET IT3. % / `� / TIE CONIRACTgt SNALL CONTACT 1NE FOLLOWING AT LEAST 48 HOUIS PPoOk TO 4 EXCAWATNG AT EACII LOCATOR / �• FORT WpiTi WA1EA OE.1 FlF1D OPFAATONS (817) %2-exDa OT 3.. BLOCXST TT OF ALLIANCE. NC. , ., . / idtT WTRIII T19W (D17) 392-D10D P- ... / ATMOS ENERGY ((m 216-�.186 NBT. N0. 02 WEST INST. N0. D222068499 I ROAD WORK COR • EIEC C B1 215-8214 Lk�J O.P.R.T. C.T. O.P.R. T.C.T. iwEL�EPHONE ( ) ]]8-8819 0 r _� w ,., w w I SIGN / ALL DTx 7j- P� ® I I / LXARIER COMI. DW-o2it FXf. JSDb LANE ENDS I AHEAD SI A\im{fJ_+', JFxF`ETTEp6g / l a1 fi O �—JF __________________ _____INSTALL __ _ MERGE RIGHT # / V (7AL �E i CO Q--- __-________________________ e H vnvv vv v vvv vv vvLvvvvv vvvvvv v. - / EUNINUL YGNI /I I:LN IN I I ` YUNI EJ ___ vvv + -- _ ------------BARRICADE c� X' CUT N CONC. X' CUT IN CONC., '%' CUT IN TOP N: 7024468.66 S.SM.H. APRON CURB INLET ig E 2329SM47 N: 7023501.12 N; 7024829.68 E 2329613.94 E: 2329679.87 , l 2 E2V. 798 S—... ... ._. - _ C/lY PRQ/EG'T 1101013 AEIPSGY) NO. 21-K « fi 58+00=59+00+= J60400 61+00� J--62+ 63+00 64+00 _ 65+00� ~ 68+00.. /..69+0( LLJJ TRANSPORTATION AND PUBLIC CITY OF FORT NVORTFL TEXAS y z / TRANSPORTATION RkNUANO & CAPITAi- oIVISION VIWIER & ASSOCIATES, S I INC U ENDI ROAD / EN0INEERS SURVEYORS LAND PLANNERS INSTALL PERMANENT PAVEMENT MARKINGS ON Wa a2m L IAWR Bw., sane 2aoe AaLxcmx, IOrs 7sao6 W 6 Q I GOLDEN TRIANGLE BOULEVARD FROM HARMON WORK SIGN �l 5151 HFIDOU121BS OR., SIZE 115 PUWO, TM75024 a 3 ROAD TO 1-35W Tm Fm IDEW95m xA F-2776 m.MNAmddm m (817)-67-77M �il / l LOT 3 GOLDEN TRIANGLE BOULEVARD I �l l �l / FROM MISTY REDWOOD "s FANL :�/ / r� TO11?TF�4,ST�iI�]ftYssw A a R B S MILLER Y ADDFIION a NST. N0. DZROO6TI60 TRAFFIC CONTROL PLAN PHASE 4 o.P,.a.Tl.c,T. PROP. TxDOT I TRAFFIC SIGNAL / STA 48+00 Tq FI; Q LJ POLES 0 50 100 ISO 0 6pFFR PLO SCALE DATE 5/14/2025 SH1.A - // /0, ORAwN: P. I 1'-50' I I1S7EEP OF 268 6 S��rn VAN a NET. W. D21511TY9e / CAUTIONS 111 O.P.R.T.C.T. GAS LNES 2421 FREELAND ROB DR. D = II°01'50' / s7q 40-03.93 l E R = 1,036.00 OFF 62.36'LT L = 199.45 // T/C = 796.51 T = 100.03 :d. CAUTIN I s CH = N5.04'43'E pROp,O12'I GAS LNE 199.14 CONTRACTOR TO VERIFY I $e ELEVATION 8 CLEARANCE PRIOR TO ANY CONSTRUCTION 1 D• C . '. 'a '' (TYPE'.. BFR -( •,M-21 ;: n,• PI(TYPE 1 1 STA 39+74.27 1 STA I 339.+963.L0T5 TC 33.26' LT OJ,= 795.69 r SII T/C,= 796.45 x' m E STA 39+65.23, 7r MEDIAN PER AL OFF 8.68' LT I 116 7/C = 796.91 STA 39+65.20 BFR � = D OFF 6.00' LT TYPE --_ T/C = 797.06 WD .y ••• STA 39+60.41 OFF 32.00' RT; 1•. I OFF 32.00' RT 3 7/C = 796.31 N 7023686.83 SEE SHEET 104 FOR E 2329619.56 DRIVE APPROACH PLAN 1 CONS N N u U) m ~ 816 70 VC LT. m r K, 58 On 0 o 16 0�1p m nsI + + +� j 800 away o_w - ----------� �- . /C L . T/r RR r ai p1i�O6H� 790 L° TC- OF CURB REIi ��tNr mr a J xU� W �7 aw 70yz RT. 780 54 ¢ > V F1M TOO Ol N D�1 � 39+00 40+00 l I l'CAww-!!- 9EF S1EEr 1OO µ , 3FF 48.00' LI T/P = 795.65 STA 40+67.4( OFF 32.00' L7 7/C = 795.33 fA 40+29.36 PTi4� -<�M-2 ) 7023695.60 STA 4( 2329621.1 6 OFF 6. T/C - Temp AsphaM v 41+ Cw-A fOr Cut-ACross 1,542M of TYPE (M-2 1 STA 4 r7� a _ OFF a \1 T I, BLOC I �-L N SENIOR V LAS 2401 6oL0LT1 NO. D21701 78 S �D15, "O.�P.R.7.C.T. HE RoaO I, RTA 41+70.00 JV OETY TRIA J F W �� 48.67' LT. \OFF �GN RETAINING WALL 70ST \ + 00 GOLDEN TRIANGLEL 1,04. 33.00' LT. ST. 10' REC. CURB INLET 6,�,DROP = 795.15 PROP, R, \OFF 790. 15E 'z STA 42+52.7C OFF 1.00' LT T/C = 795.95 ' STA 41+88.28� OFF 6.00' RT 15 T/C = 795.90 _ OFF 8.0' 7096.L2T0 _ld.E END MEDIAN CAP REVISIONS g=.salmnl wa d wrNx Clmzn Na z - rsx® .1an11 ..An PnuF.E ON.Pmle 0 20 40 60 GRAPHIC SCALE IN FEET -RELOCATE CAUTION II PP BY EXISTING UTILTTES ARE INDICATED ON THE PLANS FROM OTHERS AVAILABLE NFORMATION. IT SHALL BE THE RESPONSBILRY OF N THE CONTRACTOR TO VERIFY THE LOCATION OF ALL UTILITIES, iC . i O TO NOTIFY ALL UTILITY COMPANIES OF THE CONTRACTORS OPERATIONS, TO PROTECT ALL UTILITIES FROM DAMAGE, Uo TO REPAIR ALL UTILITIES DAMAGED DUE TO THE CONTRACTORS TUTILITIESOPERATIONS, _ + AND TO NOTIFY THE ENGINEER PROMPTLY OF ALL CONFLICTS OF THE WORK WITH EASTNG UTILITIES. SEEDING PLAN LEGEND 3 Q f'- © BUFFALO GRASS SOD a PER SECTION 32 92 I3 (n NON-NATIVE SEED PER SECTION 32 92 _ 14 LLJ J 14DICATES AREA WHERE THE .sf?E ••.T.?;tS, BOX CULVERT TOP WILL BE =/ WITHIN PAVEMENT SUBGRADE _ ,* l e 0 .....:?!. �""v � c6uwn ® DEPTH LIMITS. LIME -!ei57e STABILIZED SUBGRADE TO BE O ,,`+STA -.I- 9 'x-1^^,°m' ` zSTA 42+21.35 >'-'`- \ -1 s: •'"'_" MIXED TO THE SIDE, PLACED, "OFF 32.00' RT - i'�"`p2 2e41AB ���OFF �STTA Q AND COMPACTED OVER BOX yY T/C = 795.18 ;'..Y ras/z° CULVERT. O T/C= 795.52 _���-N6T L-s1 25T- E+GOLDEN TRWNGLE BLVD N 5U8 �13(GGDEyg7. 43+07.85 CONSTRUCT& N TE.� CONST. 10' REC. CURB INLET LIAM 0' SEE SHEET I✓)5 Rc0•W. OFF = 795. 8 5. TOP = 795.17 'OL •(RAC AJI` d\ _T/C-T795.68 "ate' WMNIi G ft- AAND"SMCWRRES UMUMS OnRRY15E Wa N 1IL = 790.65 EXIST. R.O.W. B' WATER LiNE`ll w Ly YATER EA GOLDEN TPoAN6LE SOU.EVARD TRFCWMY ELECTRIC LOT I NST. N0. D220067160 NOTE: CMMA- SHALL RELOCATE E>as11NC FENCES M NOTE➢ M OE NRT A 16156, PG. LOT I. COOPERATIVE EASEMENT I O.P.R.T.C.T. PnaP� �, R wAY. D.R.T.C.T. TES 4BIE, AOORON MST. N0. D213284460 12740111114AON SAD O FIB'T. NO. D213284460 R A S NUER FATLY ADOTION THE CONIRMTOR 91A11 CONTACT 111E FOUAYND AT 1£AST M HNR9 PINT W S O.P.R.T.C.T. O.P.R.T.C.T. SCALEr NBT. NO. D22006T160 E%CAVARNB AT FACH WC,AiMXk T E T. I O.P.R.T.C.T. FICRZ. l'=PO p VERT. I'=5 ATIT me11PL-nm OPFRARONs (817) 3P2-890e FORT WORTH T4aw (m7) »x-meo ATYD6 ENERGY (e17) zis-+]6e M M YN M M M ONCOR CAs k CINC m 216-6214 1p M M f0 N lIW ENERGY 1-BDo- ?f SBC IElEPHIX1E N LL) Y) M IO Y) OIARiFR COZY. 81 eN-82]2 EXT. J]N O n n ~ ^ 810 ALL mxw F-eoo-do-TEsa w 1 fRiLON'I'AL & YNI,71�`T�II(` CO77N��TT7'' 1((([���{rI BO V . LT. CONTROL PONT 0 CONTROL YUNI l PONT 03 8 t• K1 66 p N X' CUT IN CONC. )r CUT IN CONC. -X' CUT IN TOP Faa N +9 O N: 7024466.88 S.S.M.H. APRON CURB IN= 'E: 232BBB8.47 N: 7D23591.12 N: 7024829.68 1 ElEY: N9.11 E 2329543.94 E: 23Mn.57 �►A� REV: N7.42 ETEV: ]98.23 a+C�-,.' C+N r_ N.G. S LEFT R.O. 7. K 26M A N - Q LYYY PROJECT 0101015 A143C0 NO. 21-K N.G. • 1 . �j < Q 7 _� n . BOG PROPOSED a-zi .__. TOP OF LLNB LEFT j Mee ^• n____-. J'- 6U._. /C LT-0 ).6111 -0//.6 14ETAINING WAL. FDRIZONTAL PVER"TCAL CONAOL TABLE / OFFSET TO POINTBTATION BACK OF WALL TMELEV I-ELEV mh 1 41+70 48.67 LT. 796.20 795.53 - 1 2 42+00 48.67 LT. 797.00 795.46 01� �JN O N 1 3 4 42+10 42+15 48.67 LT. 48 67 LT 797.75 798.00 795.47 ]95.48 O +� O m 1� O m 5 42+25 4067 LT 798.35 ]95.51 f+0 ! N p + t` 6 7 42+50 42+75 4867 LT. 48.67 LT. 798.50 799.10 ]95.85 795.80 - > - _ J W > J F W 1 8 42+90 48.67 LT. 799.55 ]95.89 R W 1 9 1 10 43+00 43+25 48.67 LT. 46.67 LT 799.25 796n5 795.ss 7W.10 _ 80 V'I RT. KI 66 a w 11 43+50 4667 LT 797.25 796.25 OM1 lO M =1 M r t` t• f• t` 41+00 42+00 NA . O RIGHT RD.W. 790 780 Y) Y) 43+00 43+50 CITY OF FORT WORTH, TEXAS p TRANSPORTATION AND PUBLIC WORKS pQ: TRANSPORTATION PROGRAMMING & CAPITAL Y DIVISION W � UK WIER & ASSOCIATESF INC. ENGINEERS SURVEYORS LAND PLANNERS 2201 E U A &'A, 95E TINE MAMK MVIS 7MM 5151 NDBpNR O RL S.n.RSE 115 RNA 7Dki 75024 IWj Tm Fh RYIYMdo. No. F-2N6 eClme�ary SIYHO-711B (J GOLDEN TRIANGLE BOULEVARD FROM MISTY REDWOOD TP'W�p&1%�SW A STA 39+00 TO STA 43+50 0 FNYNN: OW I 1*-w I 10.7 OF 288 C7 101013-CNCO-Golden Triangle Boulevard Change Order #1 Final Audit Report 2025-08-12 Created: 2025-08-12 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAAkohRaVUrH8Zrl-mTXVvwMxEbYsg3Lgmm "101013-CNCO-Golden Triangle Boulevard Change Order #1" H istory Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2025-08-12 - 1:14:21 AM GMT- IP address: 204.10.90.100 Document emailed to Ann Estes (ann.estes@fortworthtexas.gov) for filling 2025-08-12 - 1:04:12 PM GMT '4 Document emailed to Bereket Birhane (bereket.birhane@fortworthtexas.gov) for signature 2025-08-12 - 1:04:12 PM GMT E4 Document emailed to Ben Weaverling (Ben.Weaverling@fortworthtexas.gov) for signature 2025-08-12 - 1:04:13 PM GMT Document shared with SamR@McMahoncontracting.com by Andrea Munoz (Andrea. Munoz@fortworthtexas.gov) 2025-08-12 - 1:05:22 PM GMT- IP address: 204.10.90.100 Email viewed by Ann Estes (ann.estes@fortworthtexas.gov) 2025-08-12 - 1:20:43 PM GMT- IP address: 104.47.64.254 Form filled by Ann Estes (ann.estes@fortworthtexas.gov) Form filling Date: 2025-08-12 - 1:21:04 PM GMT - Time Source: server- IP address: 204.10.90.100 Email viewed by Bereket Birhane (bereket. birhane@fortworthtexas.gov) 2025-08-12 - 2:22:09 PM GMT- IP address: 104.47.65.254 A0 Document e-signed by Bereket Birhane (bereket.birhane@fortworthtexas.gov) Signature Date: 2025-08-12 - 2:25:17 PM GMT - Time Source: server- IP address: 204.10.90.100 FORTWORTIt, Poe 'Y Adobe Acrobat Sign it Email viewed by Ben Weaverling (Ben.Weaverling@fortworthtexas.gov) 2025-08-12 - 3:44:29 PM GMT- IP address: 107.116.185.138 Document e-signed by Ben Weaverling (Ben.Weaverling@fortworthtexas.gov) Signature Date: 2025-08-12 - 3:47:27 PM GMT - Time Source: server- IP address: 107.116.185.138 L-4 Document emailed to Raul Lopez Roura (Raul.LopezRoura@fortworthtexas.gov) for signature 2025-08-12 - 3:47:31 PM GMT Email viewed by Raul Lopez Roura (Raul.LopezRoura@fortworthtexas.gov) 2025-08-12 - 7: 38:32 PM GMT- IP address: 104.47.64.254 Document e-signed by Raul Lopez Roura (Raul.LopezRoura@fortworthtexas.gov) Signature Date: 2025-08-12 - 7:52:17 PM GMT - Time Source: server- IP address: 208.184.124.181 U-7-+ Document emailed to Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) for signature 2025-08-12 - 7:52:22 PM GMT uo Document declined by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) Decline reason: There no initials from the contractor. Please route to him then back to me,Lissette 2025-08-12 - 8:24:43 PM GMT- IP address: 208.184.124.181 FoRTAP"ered � Acrobat Sign 101013-CNCO-Golden Triangle Boulevard Change Order #1 Final Audit Report 2025-08-25 Created: 2025-08-14 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAAJJKwioiTi4nwZFrDYc-tiAOm3sFPgbtl "101013-CNCO-Golden Triangle Boulevard Change Order #1" H istory Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2025-08-14 - 2:06:08 PM GMT- IP address: 204.10.90.100 Document emailed to samr@mcmahoncontracting.com for filling 2025-08-14 - 2:12:10 PM GMT Document shared with Ann Estes (ann.estes@fortworthtexas.gov) by Andrea Munoz (Andrea. Munoz@fortworthtexas.gov) 2025-08-14 - 2:13:07 PM GMT- IP address: 204.10.90.100 Document shared with Bereket Birhane(bereket.birhane@fortworthtexas.gov) by Andrea Munoz (Andrea. Munoz@fortworthtexas.gov) 2025-08-14 - 2:13:07 PM GMT- IP address: 204.10.90.100 Document shared with Ben Weaverling (Ben.Weaverling@fortworthtexas.gov) by Andrea Munoz (Andrea. Munoz@fortworthtexas.gov) 2025-08-14 - 2:13:07 PM GMT- IP address: 204.10.90.100 Email viewed by samr@mcmahoncontracting.com 2025-08-14 - 2:17:06 PM GMT- IP address: 52.3.199.226 Email viewed by samr@mcmahoncontracting.com 2025-08-20 - 7:59:58 PM GMT- IP address: 52.3.199.226 i Email viewed by samr@mcmahoncontracting.com 2025-08-22 - 8:00:06 PM GMT- IP address: 52.3.199.226 .. Signer samr@mcmahoncontracting.com entered name at signing as Samuel Reynolds 2025-08-22 - 8:36:51 PM GMT- IP address: 71.78.122.98 FORTWORTIL Pared by Adobe Acrobat Sign Form filled by Samuel Reynolds (samr@mcmahoncontracting.com) Form filling Date: 2025-08-22 - 8:36:53 PM GMT - Time Source: server- IP address: 71.78.122.98 Document emailed to Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) for signature 2025-08-22 - 8:36:57 PM GMT Email viewed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) 2025-08-25 - 6:27:14 PM GMT- IP address: 104.47.65.254 Document e-signed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) Signature Date: 2025-08-25 - 6:28:40 PM GMT - Time Source: server- IP address: 208.184.124.181 Document signing automatically delegated to Lissette Acevedo (lissette.acevedo@fortworthtexas.gov) by Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) 2025-08-25 - 6:28:43 PM GMT Document emailed to Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) for signature 2025-08-25 - 6:28:44 PM GMT Document emailed to Lissette Acevedo(lissette.acevedo@fortworthtexas.gov) for signature 2025-08-25 - 6:28:44 PM GMT Email viewed by Lissette Acevedo(lissette.acevedo@fortworthtexas.gov) 2025-08-25 - 8:45:44 PM GMT- IP address: 104.47.64.254 LO Document declined by Lissette Acevedo (lissette.acevedo@fortworthtexas.gov) Decline reason: Please send to Patricia for approval, Lissette 2025-08-25 - 8:47:40 PM GMT- IP address: 204.10.90.100 101013-CNCO-Golden Triangle Boulevard Change Order #1 Interim Agreement Report 2025-09-03 Created: 2025-08-26 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Out for Signature Transaction ID: CBJCHBCAABAApQsRYWg9yMoO_yekc5A6pv1 mOxnlFjYO Agreement History Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will be generated when the agreement is complete. "101013-CNCO-Golden Triangle Boulevard Change Order #1" H istory Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2025-08-26 - 2:32:08 AM GMT- IP address: 204.10.90.100 Document emailed to Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) for signature 2025-08-26 - 1:29:05 PM GMT Signer Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) entered name at signing as Patricia L. Wadsack 2025-08-26 - 3:02:15 PM GMT- IP address: 208.184.124.181 Document e-signed by Patricia L. Wadsack (patricia.wadsack@fortworthtexas.gov) Signature Date: 2025-08-26 - 3:02:17 PM GMT - Time Source: server- IP address: 208.184.124.181 4 Document emailed to Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) for signature 2025-08-26 - 3:02:21 PM GMT Email viewed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) 2025-08-26 - 3:03:17 PM GMT- IP address: 107.77.198.174 Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) Signature Date: 2025-08-26 - 3:05:09 PM GMT - Time Source: server- IP address: 107.77.198.174 4 Document emailed to Lorita Lyles (Lorita. Lyles@fortworthtexas.gov) for approval 2025-08-26 - 3:05:13 PM GMT FoRTWORT11. Powe ed by Adobe Acrobat Sign Email viewed by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) 2025-08-26 - 3:05:48 PM GMT- IP address: 208.184.124.181 Document approved by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) Approval Date: 2025-08-26 - 3:11:21 PM GMT - Time Source: server- IP address: 208.184.124.181 L�4 Document emailed to Douglas Black (Douglas.Black@fortworthtexas.gov) for signature 2025-08-26 - 3:11:25 PM GMT Document e-signed by Douglas Black (Douglas.Black@fortworthtexas.gov) Signature Date: 2025-08-27 - 4:08:37 PM GMT - Time Source: server- IP address: 204.10.90.100 =� Document emailed to Jesica McEachernaesica.mceachern@fortworthtexas.gov) for signature 2025-08-27 - 4:08:41 PM GMT FoRTWORTIC Powered by Adobe Acrobat Sign FORT WORTH,,., Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Golden Triangle Boulevard Change Order #1 M&C: N/A CPN: 101013 CSO: 62925 DOC#: N/A Date: 7/8/2025 To: Name Department Initials Date Out 1. Ann Estes TPW - Reviewer 08/12/25 2. Bereket Birhane TPW - Signature a 08/12/25 3. Sam Reynolds McMahon - Sign sx 08/22/25 4. Ben Weaverling TPW - Signature -41�- 08/12/25 5. Raul Lopez TPW - Signature 08/12/25 6. Lissette Acevedo TPW — Signature rA 08/25/25 7. Patricia Wadsack TPW — Signature PLW 08/26/25 8. Lauren Prieur TPW — Signature gxF, 08/26/25 9. Doug Black Legal — Signature 7w= 08/27/25 10. Jesica McEachern CMO — Signature CM 09/06/25 11. Jannette Goodall CSO - Signature *,7,—_-,- 09/10/25 12. TPW Contracts CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No ROUTING TO CSO: ®YES ❑No Action Required: ❑ Attach Signature, Initial and Notary Tabs ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File Return To: Please notify TPWContracts(a fortworthtexas.g_ov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you!