Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 63927
Received Date: 09/10/2025 Received Time: 9:22 a.m. Developer and Project Information Cover Sheet: Developer Company Name: Housing Authority of the City of Fort Worth, Texas dba Fort Worth Housing Solutions Address, State, Zip Code: 1407 Texas Street Fort Worth, Texas 76102 Phone & Email: 817-333-3401 1 mmlemons@fwhs.org Authorized Signatory, Title: Mary -Margaret Lemons, President Project Name: Cavile Place Phase IV - Hughes House III Brief Description: Water Sewer, Paving, Storm Drain & Street Lights Project Location: 4912 & 5012 E. Rosedale St. Plat Case Number: FS-22-031, Plat Name: Cavile Addition, J A Cavile Addition FS23-229 Council District: 5 Phased or Concurrent Phased Provisions: CFA Number: 25-0071 City Project Number: 105847 1 IPRC24-0213 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 1 of 16 Standard Community Facilities Agreement Rev. 9/21 City Contract Number: 63927 STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and Housing Authority of the City of Fort Worth, Texas dba Fort Worth Housing Solutions ("Developer"), acting by and through its duly authorized representative. City and Developer are referred to herein individually as a "party" and collectively as the "parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Cavile Place Phase IV - Hughes House III ("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement ("Community Facilities" or "Improvements"); and WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land, pay fees or construction costs, or meet other obligations that are not a part of this Agreement; and WHEREAS, the City is not participating in the cost of the Improvements or Project; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated into this Agreement by reference, as if it was fully set out herein. Developer agrees to comply with all City of Fort Worth, Texas Page 2 of 16 Standard Community Facilities Agreement OFFICIAL RECORD Rev. 9/21 CITY SECRETARY FT. WORTH, TX provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exists between the terms and conditions of this Agreement and the CFA Ordinance, the CFA Ordinance shall control. 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been approved by the City ("Engineering Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: E Exhibit A: Water E Exhibit B: Sewer E Exhibit C: Paving E Exhibit D: Storm Drain E Exhibit E: Street Lights ❑ Exhibit F: Traffic Signal & Striping The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, B, C, D, E, F, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 5. Financial Guarantee City of Fort Worth, Texas Page 3 of 16 Standard Community Facilities Agreement Rev. 9/21 Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement, becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors, or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and City of Fort Worth, Texas Page 4 of 16 Standard Community Facilities Agreement Rev. 9/21 (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to construct the Improvements in the City. (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an obligee, in the amount of one hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider, which shall be made a part of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed, and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. 10. Utilities City of Fort Worth, Texas Page 5 of 16 Standard Community Facilities Agreement Rev. 9/21 Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. 11. Easements and Rights -of -Way Developer agrees to provide, at its expense, all necessary rights -of -way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. 12. Liability and Indemnification (a) TO THE EXTENT PERMITTED BY APPLICABLE LAW, DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) TO THE EXTENT PERMITTED BY APPLICABLE LAW, THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ONACCOUNT OFANYINJURIES OR DAMAGES SUSTAINED BY ANY PERSONS, INCLUDING DEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERLY SAFEGUARD THE WORK, OR ON ACCOUNT OF ANY ACT, INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB- CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY City of Fort Worth, Texas Page 6 of 16 Standard Community Facilities Agreement Rev. 9/21 WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE, AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors, along with an assignment of all warranties given by the contractors, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third -party beneficiary of such contracts. 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre -approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtain proof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand - delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: DEVELOPER: City of Fort Worth, Texas Page 7 of 16 Standard Community Facilities Agreement Rev. 9/21 Development Services Contract Management Office City of Fort Worth 100 Fort Worth Trail Fort Worth, Texas 76102 With copies to: City Attorney's Office City of Fort Worth 100 Fort Worth Trail Fort Worth, Texas 76102 and City Manager's Office City of Fort Worth 100 Fort Worth Trail Fort Worth, Texas 76102 Fort Worth Housing Solutions 1407 Texas Street Fort Worth, Texas 76102 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of three (3) years after final payment under the contract, have access to and the right to examine any directly pertinent books, documents, papers and records of such contractor, involving transactions to the contract, and further, that City shall have access during normal working hours to all of the contractor's facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to City of Fort Worth, Texas Page 8 of 16 Standard Community Facilities Agreement Rev. 9/21 all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co -employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 20. Non -Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any fixture occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the City of Fort Worth, Texas Page 9 of 16 Standard Community Facilities Agreement Rev. 9/21 remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose, their attorneys, have had the opportunity to review and comment on this document; therefore any rule of contract construction or interpretation that would normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code. To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement. 26. Prohibition on Boycotting Energy Companies Developer acknowledges that in accordance with Chapter 2276 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2, and redesignated from Chapter 2274 of the Texas Government Code by Acts 2023, 88th Leg., R.S., Ch. 768 (H.B. 4595), Sec. 24.001(22), the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meanings ascribed to those terms by Chapter 2276 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2 and redesignated from Chapter 2274 of the Texas Government Code as described above. To the extent that Chapter 2276 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 27. Prohibition on Discrimination Against Firearm and Ammunition Industries Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract City of Fort Worth, Texas Page 10 of 16 Standard Community Facilities Agreement Rev. 9/21 contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. 28. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 29. Amendment No amendment, modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 30. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 31. No Third -Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise, to any other person or entity. 32. Compliance with Laws, Ordinances, Rules and Regulations City of Fort Worth, Texas Page 11 of 16 Standard Community Facilities Agreement Rev. 9/21 Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 33. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 34. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. 35. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder, and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth, Texas Page 12 of 16 Standard Community Facilities Agreement Rev. 9/21 36. Cost Summary Sheet Project Name: Cavile Place Phase IV - Hughes House III CFA No.: 25-0071 Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total City Project No.: 105847 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total Total Construction Cost (excluding the fees) Estimated Construction Fees: C. Construction Inspection Service Fee D. Administrative Material Testing Service Fee E. Water Testing Lab Fee Total Estimated Construction Fees: Financial Guarantee Statement of Appropriated Fundinq Developer's Cost $ 146,990.73 $ 57,342.00 $ 204,332.73 $ 329,330.05 $ 14,650.80 $ 325,684.80 $ 669,665.65 $ 873,998.38 $67,500.00 $2,315.04 $337.50 $ 70,152.54 IPRC No.: 24-0213 Amount $ 873,998.38 X City of Fort Worth, Texas Page 13 of 16 Standard Community Facilities Agreement Rev. 9/21 IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH DEVELOPER Housing Authority of the City of Fort Worth, CJv Texas dba Fort Worth Housing Solutions Jesica Mc/Evachern RN" Assistant pity Manager Mary-N argare emons (Sep 3, 202515:26:13 CDT) 09/06/2025 Mary -Margaret Lemons Date: President Recommended by: Date: 09/03/2025 Dwayne Hollars Sr. Contract Compliance Specialist Development Services Approved as to Form & Legality: Jessika Williams Contract Compliance Manager: Assistant City Attorney By signing, I acknowledge that I am the person M&C No. N/A responsible for the monitoring and Date: 09/03/2025 administration of this contract, including ensuring all performance and reporting Form 1295: N/A requirements. ATTEST: a°°^n'a954` Kandice Merrick Jannette S. Goodall Contract Manager City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 14 of 16 Standard Community Facilities Agreement Rev. 9/21 The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment ❑x Attachment 1 - Changes to Standard Community Facilities Agreement ❑ Attachment 2 — Phased CFA Provisions ❑ Attachment 3 — Concurrent CFA Provisions X❑ Location Map © Exhibit A: Water Improvements X❑ Exhibit B: Sewer Improvements © Exhibit C: Paving Improvements ® Exhibit D: Storm Drain Improvements ® Exhibit E: Street Lights Improvements ❑ Exhibit F: Traffic Signal and Striping Improvements ® Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Page 15 of 16 Standard Community Facilities Agreement Rev. 9/21 ATTACHMENT "I" Changes to Standard Community Facilities Agreement City Project No. 105847 None City of Fort Worth, Texas Page 16 of 16 Standard Community Facilities Agreement Rev. 9/21 a co FoRTWORTH THE CITY OF FORT WORTH CFA VICINITY EXHIBIT PUBLIC WATER, SEWER, PAVING, DRAINAGE, & STREET LIGHT IMPROVEMENTS TO SERVE CAVILE PLACE - PHASE IV - HUGHES HOUSE III IPRC NO. 24-0213 , CPN: 105847 more W DALLAS 7 rk c/) z a- �—� VINSON 10 � W = l� N H0 SITE LOCATION AMI� 1 J rl/-XlylrJnir« I_ z 0 Z COVIAN W GRAPHIC SCALE IN FEET 0 500 1000 2000 CAVILE PLACE - PHASE IV HUGHES HOUSE III FORT WORTH, TARRANT COUNTY, TEXAS JUNE 2025 IPRC24-0213 CPN#105847 Fif 0 Y Q WINDDMERE LL z W W J_ z W 0 l W Q GRA DE KING !U SELENE CRAIGI HIETT I TE 0.7 Kosea le ® MACA Park RTH KI,TMAN P CALUM T WAINWRI HT DI inn EISENHO E VICINITY MAP MAPSCO No.: 79J & 79K MCCO MACK BARON SALAZAR ORnT WORTH HOUSING Kimley>>> Horn DEVELOPMENT, INC. SOLUTIONS 801 Cherry St. Unit 11, Suite 1300 720 OLIVE STREET 1407 TEXAS AVE Fort Worth, Texas 76102 SUIT 2500 FORT WORTH, TX 76102 Phone: (817) 339 - 2294 ST. LOUIS, MO. 63101 State of Texas Registration No. F-928 EX. 6" WATERLINE TO BE I _\ PROP. 12" WATER LINE ROSEDALE STREET REMOVED &REPLACED CONNECT TO EX. 12" WATERLINE (K-0623) (L-2935)(X-20851) \ CONNECT TO EX. FIRE HYDRANT REMOVE AND RELOCATE EX. FIRE HYDRANT E PROP. 2" DOMESTIC SERVICE 63 PROP. 4" FIRE SERVICE Iull��fW%���iiiu� - � G �/� � E _ I PROP. 2" IRRIGATION SERVICE —� F \\\ \ 6" EX.WATERLINE TOI- BE , m ©\ L \ REMOVED & REPLACED (L-2935)(X-20851) PROP. 2"DOMESTIC SERVICE w v I I I w F E PROP. 4" FIRE SERVICE _ _ PROP. 2" DOMESTIC SERVICE E H PROP. 4" FIRE SERVICE r IL - �I � F L, CONNECT TO EX. 6" 7 8" WATERLINE I — n 1 �- - (L-2935)(X-20851)(X-27160) a / I x -I PROP. 2"IRRIGATmIO_N SERVICE AVENUE-G N 3 �Z d L w- IP ' m x - REMOVE AND RELOCATE EX. FIRE HYDRANT x H %x F- N3 II f— w CAVILE PLACE - PHASE IV - HUGHES HOUSE III FORT WORTH, TARRANT COUNTY, TEXAS JUNE 2025 IPRC24-0213 CPN#105847 NORTH GRAPHIC SCALE IN FEET 0 50 100 200 I I I I LEGEND EXHIBIT A WATER IMPROVEMENTS DEVELOPER: OWNER: MCCORMACK BARON FORT WORTH HOUSING SOLUTIONS SALAZAR 1407 TEXAS STREET DEVELOPMENT, INC. FORT WORTH, TX 76102 720 OLIVE STREET SUITE 2500 ST. LOUIS, MO. 63101 PROP. WATER LINE EX. WATER LINE FIRE HYDRANT Kimley»>Horn 801 Cherry St. Unit 11, Suite 1300 Fort Worth, Texas 76102 Phone: (817) 339 - 2294 State of Texas Registration No. F-928 LEGEND PROPERTY LINE ss PROP. SEWER LINE ss — EX. SEWER LINE 0 SANITARY SEWER MANHOLE CONNECT TO EX. 8" SEWER MAIN (X-02390) PROP. 6" SEWER SERVICE ss N \=T e � e eee ® o I o i CAVILE PLACE — PHASE IV — HUGHES HOUSE III FORT WORTH, TARRANT COUNTY, TEXAS JUNE 2025 IPRC24-0213 CPN#105847 GRAPHIC SCALE IN FEET 0 50 100 200 I I I CONNECT TO EX. 8" SEWER MAIN (X-02390) ROSEDALE STREET PROP. 6" SEWER SERVICE Ss SS 55 -- Ss ss Ss SS LU LU � 1 0 Q o 0 0 0 O F o o w o 0 o C EXHIBIT B SEWER IMPROVEMENTS DEVELOPER: OWNER: KI„ Horn MCCORMACK BARON FORT WORTH HOUSING SOLUTIONS Iley>>> SALAZAR 1407 TEXAS STREET 801 Cherry St. Unit 11, Suite 1300 DEVELOPMENT, INC. FORT WORTH, TX 76102 Fort Worth, Texas 76102 720 OLIVE STREET Phone: (817) 339 - 2294 SUITE 2500 ST. LOUIS, MO. 63101 State of Texas Registration No. F-928 J E REMOVE CONCRETE PAVEMENT ROSEDALE STREET XG7 (REMOVE CONCRETE PAVEMENTS �A �- ( REMOVE ASPHALT PAVEMENT ll I/I U J� - i I , LEGEND PROPERTY LINE REMOVE ASPHALT PAVEMENT REMOVE CONCRETE 0 REMOVE CONCRETE PANEL PAVEMENT CAVILE PLACE - PHASE IV - HUGHES HOUSE III FORT WORTH, TARRANT COUNTY, TEXAS JUNE 2025 IPRC24-0213 CPN#105847 REMOVE CONCRETE PAVEMENT( J NORTH REMOVE & REPLACE CONCRETE 1 SIDEWALK rl REMOVE CONCRETE k SIDEWALK �-- — `o REMOVE ASPHALT PAVEMENT 1 F~ e j _ - w o i o i � d I I REMOVE CONCRETE SIDEWALK AVENUE G REMOVE CONCRETE PAVEMENT] GRAPHIC SCALE IN FEET 0 50 100 200 EXHIBIT C PAVING IMPROVEMENTS (1 OF 2) DEVELOPER: OWNER: MCCORMACK BARON FORT WORTH HOUSING SOLUTIONS SALAZAR 1407 TEXAS STREET DEVELOPMENT, INC. FORT WORTH, TX 76102 720 OLIVE STREET SUITE 2500 ST.LOUIS, MO. 63101 Kimley»>Horn 801 Cherry St. Unit 11, Suite 1300 Fort Worth, Texas 76102 Phone: (817) 339 - 2294 State of Texas Registration No. F-928 PROP. 11" CONC. PAVEMENT PER _ TXDOT CRCP ROSEDALE STREET E G a N uJ N I l rt-- 1:7 f'U117 � I 0 IPROP.5'CONCRETE SIDEWALK Io 00 PROP TYPE R-1 RAMP I I AEI F L�5I PROP. 11" CONC. PAVEMENT PER TXDOT CRCP PROP. 5' CONCRETE SIDEWALK � 0 PROP TYPE R-1 RAMP J o I o � o o o i PROP.5'CONCRETE SIDEWALK , L o Aa s L 71 PROP TYPE R-1 RAMP —AVENUE G I PROP.5'CONCRETE ti PROP.5'CONCRETEI SIDEWALK SIDEWALK — — Tt — — — I CAVILE PLACE - PHASE IV - HUGHES HOUSE III FORT WORTH, TARRANT COUNTY, TEXAS JUNE 2025 IPRC24-0213 CPN#105847 EXHIBIT C PAVING IMPROVEMENTS (2 OF 2) GRAPHIC SCALE IN FEET 0 50 100 200 l 1 1 LEGEND PROPERTY LINE PROPOSED CONCRETE SIDEWALK I� PROPOSED CONCRETE PAVEMENT PROPOSED 11" CONCRETE PAVEMENT PER TXDOT CRCP DEVELOPER: OWNER: KlmIey»)Horn MCCORMACK BARON FORT WORTH HOUSING SOLUTIONS SALAZAR 1407 TEXAS STREET Suite 1300 1 1, 801 Cherry St. Unit DEVELOPMENT, INC. FORT WORTH, TX 76102 Fort Worth, Texas 1 720 OLIVE STREET SUITE 2500 Phone: (817) 339 - 2294 ST.LOUIS, MO. 63101 State of Texas Registration No. F-928 J LEGEND PROPERTY LINE PROP. STORM DRAIN LINE EX. STORM DRAIN LINE C JUNCTION BOX LU w i r W IQ H IW CAVILE PLACE - PHASE IV - HUGHES HOUSE III FORT WORTH, TARRANT COUNTY, TEXAS JUNE 2025 IPRC24-0213 CPN#105847 ROSEDALE STREET CONNECT TO EX. 54'-_ STORM LINE (K-0623) � L PROP. 24"IISTOIRM LINE PROP. 4' JUNCTION BOX 0 0 0 o I EXHIBIT D STORM IMPROVEMENTS DEVELOPER: OWNER: MCCORMACK BARON FORT WORTH HOUSING SOLUTIONS SALAZAR 1407TEXAS STREET DEVELOPMENT, INC. FORT WORTH, TX 76102 720 OLIVE STREET SUITE 2500 ST.LOUIS, MO. 63101 GRAPHIC SCALE IN FEET 0 50 100 200 i I Kimley»>Horn 801 Cherry St. Unit 11, Suite 1300 Fort Worth, Texas 76102 Phone: (817) 339 - 2294 State of Texas Registration No. F-928 1 PROP. PEDESTAL SERVICE EXISTING POLE TO BE REMOVED EXISTING STREET EXISTING ARM & FIXTURE TO LIGHT TO REMAIN BE RELOCATED ROSEDALE STREET EXISTING STREET PROP. PEDESTRIAN LIGHT TO REMAIN EXISTING STREET LIGHT LIGHT TO REMAIN T PROP.GROUNDBOXI rl PROP. PEDESTRIAN PROP. RESIDENTIAL STREET LIGHT o o LIGHT Uj C w INSTALL RELOCATED ARM & L4� o� �o FIXTURE � 0 O PROP. GROUNDBOX PROP. PEDESTRIAN LIGHT w o a C PROP. PEDESTAL SERVICE PROP. PEDESTRIAN _ o LIGHT �I 1 CJ o o PROP. RESIDENTIAL STREET 0 o LIGHT PROP. GROUNDBOX o o INSTALL RELOCATED ARM & LIF I I V I I I FIXTURE EC AVENUE G PROP. PEDESTRIAN EXISTING POLE TO BE PROP. RESIDENTIAL LIGHT REMOVED STREET[ EXISTING ARM & FIXTURE TO PROP. GROUNDBOX I BE RELOCATED NORTH GRAPHIC SCALE IN FEET 0 50 100 200 I I I LEGEND PROPERTY LINE PROPOSED CONDUIT ❑� PROPOSED GROUND BOX PROPOSED 10' -14' WASHINGTON STANDARD LIGHT POLE & FIXTURE PROPOSED ROADWAY ILLUMINATION TY 11 POLE © PROPOSED PEDESTAL SERVICE EXISTING STREET LIGHT EXHIBIT E STREET LIGHT IMPROVEMENTS DEVELOPER: OWNER: CAVILE PLACE — PHASE IV — MCCORMACK BARON FORT WORTH HOUSING SOLUTIONS HUGHES HOUSE III SALAZAR 1407 TEXAS STREET DEVELOPMENT, INC. FORT WORTH, TX 76102 FORT WORTH, TARRANT COUNTY, TEXAS 720 OLIVE STREET JUNE 2025 SUITE 2500 IPRC24-0213 CPN#105847 ST.LOUIS, MO.63101 Kimley»>Horn 801 Cherry St. Unit 11, Suite 1300 Fort Worth, Texas 76102 Phone: (817) 339 - 2294 State of Texas Registration No. F-928 00 42 43 DAP -BID PROPOSAL 1 OF 38 UNIT PRICE BID Bidlist Iteml No. I I 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 23 1 24 I 25 I CAVILE PLACE - PHASE IV - HUGHES HOUSE III CITY PROJECT NO. 105847 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description 0241.0100 Remove Sidewalk 0241.1000 Remove Conc Pvmt 0241.1100 Remove Asphalt Pvmt 0241.1300 Remove Conc Curb&Gutter 3110.0102 6"-12" Tree Removal 3123.0101 Unclassified Excavation by Plan 3124.0101 Embankment by Plan 3211.0112 6" Flexible Base, Type A, GR-1 3211.0400 Hydrate Lime for Subqrade 3211.0501 6" Lime Treatment 3212.0302 2" Asphalt Pvmt Type D 3212.0401 HMAC Transition 3213.0101 6" Conc Pvmt 3213.0301 4" Conc Sidewalk 3213.0401 6" Concrete Driveway 3213.0501 Barrier Free Ramp, Type R-1 3216.0101 6" Conc Curb and Gutter 3217.0501 24" SLID Pvmt Marking HAE (W) 3291.0100 Topsoil 3292.0100 Block Sod Placement 3293.0103 Plant 3" Tree 3441.4108 Remove Sign Panel and Post 3441.4110 Remove and Reinstall Sign Panel and Post 3471.0001 Traffic Control 9999.0008 11" Concrete Pavement Per Txdot CRCP Bidder's Application Bidder's Proposal Specification Section No. Unit of Bid Unit Price Bid Value Measure Quantity UNIT I: PAVING IMPROVED �NTS 0241 13 SF 3080 0241 15 SY 1070 0241 15 SY 910 0241 15 LF 700 31 1000 EA 2 31 2316 CY 10 31 2400 CY 20 321123 SY 100 321129 TON 17 321129 SY 1760 32 12 16 SY 15 32 12 16 TN 75 32 13 13 SY 1100 32 13 20 SF 4800 32 13 20 SF 960 32 13 20 EA 2 321613 LF 290 32 17 23 LF 65 3291 19 CY 50 32 92 13 SY 780 32 93 43 EA 79 3441 30 EA 7 3441 30 EA 1 3471 13 MO 1 00 00 00 SY 445 TOTAL UNIT I: PAVING IMPROVEMENTS 1 $2.75 $8,470.001 $6.00 $6,420.001 $6.00 $5,460.001 $3.00 $2,100.001 $500.00 $1,000.001 $50.00 $500.001 $64.00 $1,280.001 $35.00 $3,500.001 $325.00 $5,525.001 $16.26 $28,617.601 $325.00 $4,875.001 $315.00 $23,625.001 $71.14 $78,254.001 $8.53 $40,944.001 $7.03 $6,748.801 $1,350.00 $2,700.001 $31.25 $9,062.501 $40.00 $2,600.001 $10.00 $500.001 $29.00 $22,620.001 $250.00 $19,750.001 $25.00 $175.001 $25.00 $25.001 $8,000.00 $8,000.001 $104.67 $46.578.151 $329,330.051 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECT 00 42 43_Bid Proposal_DAP.xIs 00 42 43 DAP -BID PROPOSAL 2 OF 38 UNIT PRICE BID CAVILE PLACE - PHASE IV - HUGHES HOUSE III CITY PROJECT NO. 105847 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Bidder's Application Bidder's Proposal BtdlNtoltem Description Specification Section No. Uit of I Bid U ni[Price I Bid Value Measure Quantity UNIT II: DRAINAGE IMPROVE'VIENT$ 1 13125.0101 SWPPP 2!1 acre 312500 LS 1 $1,500.00 $1,500.001 2 13301.0012 Post -CCTV Inspection of Storm Drain 3301 32 LF 40 $3.00 $120.00 3 3305.0109 Trench Safety 330510 LF 40 _ $1.32 $52.80 4 3341.0205 24" RCP, Class III 3341 10 LF 40 $122.70 $4,908.00 5 3349.0001 4' Storm Junction Box 33 49 10 EA 1 $8,070.00 $8.070.00 Td�AL UNIT It: DRAINA E IMPRO EMENTS $14,650.801 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECT 00 42 43_Bid Proposal_DAP.xIs 00 42 43 DAP -BID PROPOSAL 3 OF 38 UNIT PRICE BID Bidlist Iteml No. Description CAVILE PLACE - PHASE IV - HUGHES HOUSE III CITY PROJECT NO. 105847 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Bidder's Application Bidder's Proposal Specification Section No. Unit of Bid Unit Price Bid Value Measure Quamity UNIT III: STREET LIGHT IMPRO CEMENTS 1 2605.3015 2" CONDT PVC SCH 80 (T) 26 05 33 LF 2910 $12.61 $36,695.10 2 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 EA 35 $294.57 $10,309.95 3 3441.1408 NO 6 Insulated Elec Condr 3441 10 LF 7475 $9.81 $73,329.75 4 3441.1502 Ground Box Type B, w/Apron 3441 10 EA 10 $1,200.00 $12,000.00 5 3441.1646 Furnish/Install Type 33B Arm 3441 20 EA 2 $1,700.00 $3,400.00 6 3441.1772 FurnishHnstall 240-460 Volt Single Phase Transocket Metered Pedestal 3441 20 EA 2 $8,500.00 $17,000.00 7 3441.3037 Furnish/Install 10'- 14' Washington Standard Light Pole & Fixture LED 3441 20 EA 24 $4,062.50 $97,500.00 8 3441.3302 Rdwy Illum Foundation TY 3,5,6, and 8 3441 20 EA 2 $2,475.00 $4,950.00 9 3441.3303 Rdwy Illum Foundation TY 7 3441 20 EA 24 $2,800.00 $67,200.00 10 3441.3351 Furnish/Install Rdway Illum TY 11 Pole 3441 20 EA 2 $900.00 $1,800.00 11 9999.0006 Remove and Salvage Exisiting Light Pole, Arm, Lum, & Demo Foundation 2' BFG 00 00 00 EA 3 $500.00 $1.500.00 TOTAL UNIT III: STREET LIWT IMPROVEMENTS $325,684.801 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECT 00 42 43_Bid Proposal_DAP.xIs 00 42 43 DAP -BID PROPOSAL 4 OF 38 CAVILE PLACE - PHASE IV - HUGHES HOUSE III CITY PROJECT NO. 105847 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value No. Measure Quantity UNIT IV: WATER IMPROVEMENTS 1 0241.1012 Remove 6" Water Line 0241 14 LF 380 $24.34 $9,249.20 2 3305.0109 Trench Safety 330510 LF 380 $1.68 $638.40 3 3311.0001 Ductile Iron Water Fittings w/ Restraint 3311 11 TON 3 $8,960.00 $26,880.00 4 3311.0061 4" PVC Water Pipe 3311 12 LF 70 $49.60 $3,472.00 S ggl1 nAA1 17" \AIofc Pi— cm 11 1n QQ 11 17 I F 4An G17d 7d Gd7 911 gn 7 3312.3002 6" Gate Valve 33 12 20 EA 3 $773.33 $2,319.99 8 3312.3005 12" Gate Valve 33 12 20 EA 3 $12.120.00 $36.360.00 11 3312.0002 Water Samplinq Station 33 12 50 EA 14 $45.71 $639.94 TOTAL UNIT IV: WATER IMPROVEMENTS $146,990.731 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECT 00 42 43_Bid Proposal_DAP.xIs 00 42 43 DAP -BID PROPOSAL 5 OF 38 CAVILE PLACE - PHASE IV - HUGHES HOUSE III CITY PROJECT NO. 105847 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal BtdlNtolteml Description No. Iil U-it of I Bid U Price I Bid Value Measure Quantity EMENTSSection UNIT V: SANITARY SEWER IMPROVnit 1 3301.0002 Post -CCTV Inspection 3301 31 LF 55 $3.00 $165.00 2 ####.#### Final MH-CCTV Inspection 3301 31 EA 4 $45.00 $180.00 3 3301.0101 Manhole Vacuum Testing 3301 30 EA 4 $300.00 $1,200.00 4 3305.0112 Concrete Collar 33 05 17 EA 4 $480.00 $1,920.00 5 3331.3201 6" Sewer Service 3331 50 EA 2 $3,726.00 $7,452.00 6 3339.0001 Epoxy Manhole Liner 33 39 60 VF 9 $455.00 $4,095.00 7 3339.1001 4' Manhole 33 39 10, 33 39 20 EA 4 $8,920.00 $35,680.00 8 3339.1003 4' Extra Depth Manhole 33 39 10. 33 39 20 VF 7 $950.00 $6,650.00 TOTAL UNIT V: SANITARY SEWER IMPROVEMENTS $57,342.001 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECT 00 42 43_Bid Proposal_DAP.xIs 00 42 43 DAP -BID PROPOSAL 6 OF 38 UNIT PRICE BID Bidlist Iteml No. CAVILE PLACE - PHASE IV - HUGHES HOUSE III CITY PROJECT NO. 105847 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Application Project Item Information Description Specification Section No. Unit of Bid Measure Quantity Bid Summary UNIT I: PAVING IMPROVEMENTS UNIT II: DRAINAGE IMPROVEMENTS UNIT III: STREET LIGHT IMPROVEMENTS This Bid is submitted by the entity named below: Spring Valley Construction Company 10950 Alder Cir Dallas, TX 75238 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to ran as provided in the General Conditions. Total Construction Bid Sean Stackenalt TITLE: Sr PM DATE: 8127/25 END OF SECTION Bidder's Proposal Unit Price I Bid Value $329,330.05 $14,650.80 $325,684.80 $146,990.73 $57,342.00 $873,998.38 160 working days after the date when the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECT 00 42 43_Bid Proposal_DAP.xis