Loading...
HomeMy WebLinkAboutContract 61792-FP3FORT WORTH. ./- City Secretary Contract No. 61792 Date Received 09.09.2025 -FP3 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Tradition Winding Meadows Drive North City Project No.: 105116 Improvement Type(s): ❑ Paving ❑x Drainage ❑ Street Lights ❑x Bridge Original Contract Price: $1,370,174.02 Amount of Approved Change Order(s):-$34,123.17 Revised Contract Amount: $1,336,050.85 Total Cost of Work Complete: $1,336,050.85 7anrer McKibben 09/09/2025 Contractor Date Project Manager Title LH Lacy Company Company Name Troy 6avdnev 09/09/2025 Project Inspector Date Motadage Moham deep, !'. U. 09/09/2025 Project Manager Date Jz� 09/09/2025 CFA Manager Date lu� 09/09/2025 TPW Director Date (, 09/10/2025 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: Tradition Winding Meadows Drive North City Project No.: 105116 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 190 WD Days Charged: 215 WD Work Start Date: 9/9/2024 Work Complete Date: 8/14/2025 Completed number of Soil Lab Test: 600 Completed number of Water Test: 17 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name TRADITION, WINDING MEADOWS DRIVE NORTH Contract Limits Project Type STORM DRAINAGE City Project Numbers 105116 DOE Number 5116 Estimate Number 1 Payment Number 1 City Secretary Contract Number Contract Date Project Manager NA Contractor L.H. LACY COMPANY P.O. BOX 541297 Inspectors For Period Ending 8/14/2025 WD Contract Time 5WD Days Charged to Date 215 Contract is 100.00 Complete DALLAS, TX 75354 T. GARDNER / J. ROGERS Friday, August 29, 2025 Page 1 of 5 City Project Numbers 105116 DOE Number 5116 Contract Name TRADITION, WINDING MEADOWS DRIVE NORTH Estimate Number 1 Contract Limits Payment Number I Project Type STORM DRAINAGE For Period Ending 8/14/2025 Project Funding UNIT HE STORM DRAINAGE IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 36 REMOVE 2 EA $496.56 $993.12 2 $993.12 37 REMOVE 40 LF $21.40 $856.00 40 $856.00 28 REMOVE 105 LF $16.95 $1,779.75 105 $1,779.75 39 LARGE STONE RPIRAP, DRY 855 SY $159.18 $136,098.90 855 $136,098.90 40 MEDIUM RPIRAP, DRY (CO#4) 350 SY $142.13 $49,745.50 350 $49,745.50 41 TRENCH SAFETY (CO#2), (CO#4) 2670 LF $1.09 $2,910.30 2670 $2,910.30 42 CONCRETR COLLAR 1 EA $709.75 $709.75 1 $709.75 43 21" RCP, CLASS III 363 LF $83.56 $30,332.28 363 $30,332.28 44 24" RCP, CLASS III (CO#4) 370 LF $93.75 $34,687.50 370 $34,687.50 45 27" RCP, CLASS III (CO#4) 0 LF $118.34 $0.00 0 $0.00 46 30" RCP, CLASS III (CO#4) 168 LF $129.32 $21,725.76 168 $21,725.76 47 36" RCP, CLASS III 423 LF $162.45 $68,716.35 423 $68,716.35 48 42" RCP, CLASS III 199 LF $211.55 $42,098.45 199 $42,098.45 49 6X3 BOX CULVERT 61 LF $494.75 $30,179.75 61 $30,179.75 50 T STORM JUNCTION BOX (CO#4) 4 EA $5,969.25 $23,877.00 4 $23,877.00 51 5' STORM JUNCTION BOX 1 EA $8,015.85 $8,015.85 1 $8,015.85 52 24" SET, 1 PIPE (CO#4) 3 EA $2,501.40 $7,504.20 3 $7,504.20 53 27" SET, 1 PIPE (CO#4) 0 EA $2,728.80 $0.00 0 $0.00 54 30" SET, 1 PIPE 1 EA $2,956.20 $2,956.20 1 $2,956.20 55 36" SET, 1 PIPE 4 EA $3,411.00 $13,644.00 4 $13,644.00 56 42" SET, 1 PIPE 2 EA $3,922.65 $7,845.30 2 $7,845.30 57 10' RECESSED INLET 7 EA $7,390.50 $51,733.50 7 $51,733.50 58 T DROP INLET 1 EA $7,049.40 $7,049.40 1 $7,049.40 59 BOTOM OF 10' CURB INLET 3 EA $2,842.50 $8,527.50 3 $8,527.50 60 3' DROP INLET 1 EA $5,912.40 $5,912.40 1 $5,912.40 61 PARALLEL WING WALL, 4-8'X3' BOXES 1 EA $57,987.00 $57,987.00 1 $57,987.00 62 FLARED WING WALL, 4-8'X3' BOXES 1 EA $36,384.00 $36,384.00 1 $36,384.00 63 FLARED WING WALL 1- 8'X3' BOXES 1 EA $16,486.50 $16,486.50 1 $16,486.50 64 FLARED WING WALL1- 8'X3' BOXES & 1-6'X3' 1 EA $20,863.95 $20,863.95 1 $20,863.95 BOX 65 8X3 BOX CULVERT 1086 LF $595.24 $646,430.64 1086 $646,430.64 Friday, August 29, 2025 Page 2 of 5 City Project Numbers 105116 DOE Number 5116 Contract Name TRADITION, WINDING MEADOWS DRIVE NORTH Estimate Number 1 Contract Limits Payment Number I Project Type STORM DRAINAGE For Period Ending 8/14/2025 Project Funding Sub -Total of Previous Unit $1,336,050.85 $1,336,050.85 Friday, August 29, 2025 Page 3 of 5 City Project Numbers 105116 Contract Name TRADITION, WINDING MEADOWS DRIVE NORTH Contract Limits Project Type STORM DRAINAGE Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 3 Change Order Numbcr 4 DOE Number 5116 Estimate Number 1 Payment Number I For Period Ending 8/14/2025 $1,370,174.02 $1,183.74 ($35,306.91) Total Contract Price $1,336,050.85 Total Cost of Work Completed $1,336,050.85 Less % Retained $0.00 Net Earned $1,336,050.85 Earned This Period $1,336,050.85 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $1,336,050.85 Friday, August 29, 2025 Page 4 of 5 City Project Numbers 105116 DOE Number 5116 Contract Name TRADITION, WINDING MEADOWS DRIVE NORTH Estimate Number 1 Contract Limits Payment Number I Project Type STORM DRAINAGE For Period Ending 8/14/2025 Project Funding Project Manager NA City Secretary Contract Number Inspectors T. GARDNER / J. ROGERS Contract Date Contractor L.H. LACY COMPANY Contract Time 50 WD P.O. BOX 541297 Days Charged to Date 215 WD DALLAS, TX 75354 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $1,336,050.85 Less % Retained $0.00 Net Earned $1,336,050.85 Earned This Period $1,336,050.85 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,336,050.85 Friday, August 29, 2025 Page 5 of 5 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Tradition - VNndina Meadows Drive North CHANGE CONTRACT: (A) Water/Sewer/Storm Drain. (13) Pavina. (C) Street Liahts ORDER No: CFA# 24-0077 CITY PARTICIPATION: NO CITY PROJECT # 105116 'REVIEWED CITY SECRETARY CONTRACT # 61792 4 FID # 30114-0200431-105116-E07685 X # X-27955 FILE# I«209 By Mosadage Mohammdeen at 1:18 pm, Jul 11, 2025 INSPECTOR: John Rogers Phone No: 682-210-8044 PROJECT MANAGER: Mo Mohammdeen Phone No: 682-402-7050 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREETLIGHTS CONTRACT Developer DAYS Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Cost City Cost ORIGINAL CONTRACT $681.667.02 $0.00 $329,865.55 $0.00 $1.370,174.02 $0.00 $1.838.787.60 $0.00 $208.815.94 $0.00 190 EXTRAS TO DATE $38.771.24 $0.00 $14,426.27 $0.00 $1,183.74 $0.00 $15.040.00 $0.00 $0.00 $0.00 ZREDITS TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ZONTRACT TO DATE $720.428.26 $0.00 $344,291.82 $0.00 $1,371,357.76 $0.00 $1.863.827.60 $0.00 $208.816.94 $0.00 190 4MOUNT OF PROP. CHANGE ORDER $0.00 $0.00 $0.00 $0.00 ($35.306.911 $0.00 ($420.009.00) $0.00 $0.00 $0.00 0 REVISED CONTRACT AMOUNT $720.428.26 $0.00 $344,291.82 $0.00 $1,336,050.85 $0.00 $1,433.818.60 $0.00 $208.815.94 $000 190 TOTAL REVISED CONTRACT AMOUNT PER UNIT $720A28.26 $344.291.82 $1.336.050.85 $1 A33.818.60 $208.815.94 REVISED COST SHARE Dev. Cost: $4,043,405.47 City Cost: $0.00 1 1 TOTAL REVISED CONTRACT $4,043,405A7 You are directed to make the following changes in the contract documents UNIT III: STORM DRAIN IMPROVEMENTS CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION CFW Unil Price UNIT PRICE Developer Cost City Cost TOTAL 40 3137.0104 �j2 ]) SY Medium R' /�p dry Ile' $142.13 ($3,126.86) $0.00 ($3,126.86) 41 3305.0109 (ieAj LF Trench ty $1,09 ($202.74) $0.00 ($202.74)I` ( 45 3341.0208 (91) LF 27' RCP, Class III $$98.34 ($ 0 768.94) $0.00 (110,768 94) ` 46 3341.0302 (31) LF 30" RCP, Class III $129.32 q$4,008.92) $0.00 ($4.008.92) 50 3349.0001 (1) EA 4' Storm Junction Box $5,969.25 ($5,969.25) $0.00 ($5,969.25) 52 3349.4105 {1� EA 24" SET, 1 p)pe $2,501.40 �$2.501.40) $0.00 ($2,501.40) 53 3349.4106 (1) EA 27" SET, 1 pipe $2,728.80 ($2,728.80) $0.00 ($2,728.80) RAIN IMPROVEMENT9 ($35.306.91) I I ! I IT IV, PAV EMENT I I CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION CFW Unh Price UNIT PRICE Developer Cost City Cost TOTAL 3 0241.1100 (1900) SY Remove a Pvmt I481bs.IS.Y. $5.00 ($9,500.00) $0.00 $9,500.00) 4 3211.0400 (90) TON I Hydrated Lime $320,00 ($28,800.00) $0.00 ($28,800.00) 5 3211.0502 l((3765 SY 8" Ume Treatment $4.60 �$17.319.00) $0.00 C$17,319.00) 6 3212,0302 (2720) SY 2" Asphalt Pvmt Type D $18.00 ($48,960.00) $0.00 ($48,960.00) 7 3212.0502 (2720) SY ! 4.5" Asphalt Base Type B $37.00 ($100.640.00) $0.00 ($100,640.00) 8 3213.0105 (930) SY 10" Concrete Pavement $86.00 ($79,980.00) $0.00 ($79,980.00) 10 3213.0301 2,!40) LF 10' Conc Sidewalk $65,00 $15.600.00) $0.00 $15,600.00) 11 (8) Free Ramp, P-1 BarriLane $3,500.00 �28,000.00) 0.00 000.00) '"-($330 12 3217.1002 E I L�y� d Arrow $165.00 �$330.00) 0 00) 20 9999.0017 � ) LF Existing Asphalt 8 Connect to Existing Paven i $20,00 ($880.00) $0.00 ($880.00) 24 9999.0021 (18,000) CY rut i Unclassified Fill for Sam Reynolds Road $5.00 ($90.000.00) $0.00 ($90,000.00) TOTAL UN�T IV. PAVING IMeROVEMENTS ($420.009.00) TOTAL CHANGE ORDER: ($455,315.91) Revised: 12-17-2018 Page 1 Asterisk (*) indicates New Pay Rem REASONS FOR CHANGE ORDER 1. Removal of Interim condition Sam Reynolds Road Construction RECOMMENDED: APPROVED: GMcivill HT HWY 114 Development LP BY: . By: Name: Matt Baacke Name: Dusty Dellinger Title: -Project Engineer Title: Construction Manager APPROVAL RECOMMENDED: APPROVED: CFW- Water Department CFW -Assistant City Manager By: By: Name: Name: Title: Title: RECOMMENDED: CFW- *Contract Compliance Manager ATTEST By: REVIEWED Name:, By Mosadage Mohammdeen at 1:18 pm, Jul 11, 2025 IS. Goodall . J,-retary Title:` M&C Number: M&C Date Approved: APPROVED: APPROVED: LH Lacy Company, Ltd. Mario Sinacola & Sons Excavating, Inc. Bv: 2 auni+r.Daa-- By — Name: Benjamin Drake Name: Harlan Jones Title: —VICE rB deD1_ Title: Vic- Pmside_.nt APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attomey By: Name: Title: * Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. J❑ There are NO City Funds associated with this Contract ❑ There are City Funds associated with this Contract Revised: 12-17- 2018 Page 2 FORTWORTH. M" TRANSPORTATION AND PUBLIC WORKS August 28, 2025 LH Lacy Company, Ltd. 1880 Crown Dr. #1200 Dallas,TX 75234 RE: Acceptance Letter Project Name: Tradition Winding Meadows Drive North Project Type: Drainage City Project No.: 105116 To Whom It May Concern: On August 21, 2025 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on August 28, 2025. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on August 28, 2025, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-2443. Sincerely, Mosadage MohawwXeen,T�e. Mosadage Mohammdeen, Project Manager Cc: John Rogers, Inspector Troy Gardner, Inspection Supervisor Emanuel Nieto, Senior Inspector Andrew Goodman, Program Manager GM Civil, Consultant LH Lacy Company, Ltd, Contractor Hines, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFIDAVIT STATE OF Texas COUNTY OF Dallas Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Bobby Gordon, President Of L.H. Lacy Company, Ltd, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; City Project #105116 - Winding Meadows Drive, North BY Bobby rdon, President Subscribed and sworn before me on this date 3 of September, 2025. Notary Public Dallas County, State of Texas 2\ems �� DARLENE CONEY Notary ID #10317301 My Commission Expires March 9, 2028 _ e . .1 i. I. 1 i , .W . CONSENT OF SURETY TO FINAL PAYMENT AIADocumetit G707 Bond No. 5316989 TO OWNER (Anrne and addrem) City of Fort Worth & HT Hwy 114 Development, LP. 2700 Commerce St., Suite 1600 Dallas, TX 75226 PROJECT: (A'amc and arkhaw Winding Meadows Drive North - Utility Improvements OWNER ARCHITECT CONTRACTOR SURETY OTHER ARCHITECT'S PROJECT NO.: CONTRACT FOR: Construction CONTRACT DATED: In accordance mth the provisions of the Contract between the Owner and the Contractor as indicated sixwe, the (hurry( name and addhsscfVurr(jI Great American Insurance Company 301 East Fourth Street Cincinnati, OH 45202 , SURETY, on bond of (Inpcn narnr and addrrss of CoMraaur ) L.H. Lacy Company, Ltd. 1880 Crown Dr., Suite 1200 Dallas, TX 75234 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (Mm,ilname and ac lmz ofOwwm.T) City of Fort Worth & HT Hwy 114 Development, LP. 2700 Commerce St., Suite 1600 Dallas, TX 75226 as set forth in said Surety's bond. IN' WITNESS WHEREOF, the Surety has hereunto set its hand on this date: August 26, 2025 (hurl in wv ithy( [be womb f4k ww1 hr thr numcrk dare and var.; Attz.;1 L , OWNFR, Great American Insurance Company ('4M-yy) L� By. �. (SY,quahfrr ofurriboryzcd rrprrarnrurierJ David T. Miclette (Ainlyd name and dfkr Attorney -in -Fact G707-1994 GREAT AMERICAN INSURANCE COMPANY® Administrative Office: 301 E 4TH STREET 0 CINCINNATI, OHIO 45202 • 513-369-5000 • FAX 513-723-2740 The number of persons authorized by this power of attorney is not more than THIRTEEN No.O 22621 POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the GREAT AMERICAN INSURANCE COMPANY, a corporation organized and existing under and by virtue of the laws of the State of Ohio, does hereby nominate, constitute and appoint the person or persons named below, each individually if more than one is named, its true and lawful attorney -in -fact, for it and in its name, place and stead to execute on behalf of the said Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof; provided that the liability of the said Company on any such bond, undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below. Name Address Limit of Power STACEY BOSLEY NIKOLE JEANNETTE AARON HAWLEY ALL ASHLEY BRITT DAVID T. MICLETTE ALL OF HOUSTON, TEXAS $100,000,000 LUCAS LOMAX NANCY RIOS WILL DUKE STACY OWENS RITA G. GULIZO BARRY K MCCORD ROBERT C. DAVIS KATHLEEN CUCKLER This Power of Attorney revokes all previous powers issued on behalf of the attomey(s)-in-fact named above. IN WITNESS WHEREOF the GREAT AMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 17TH day of APRIL 1 2025 Attest r� GREAT AMERICAN INSURANCE COMPANY Assistant Secretary Divisional Senior Vice President STATE OF OHIO, COUNTY OF HAMILTON - ss: JOHN K. WEBSTER (877-377-2405) On this 17TH day of APRIL , 2025 , before me personally appeared JOHN K. WEBSTER, to me known, being duly sworn, deposes and says that he resides in Cincinnati, Ohio, that he is a Divisional Senior Vice President of the Bond Division of Great American Insurance Company, the Company described in and which executed the above instrument; that he knows the seal of the said Company; that the seal affixed to the said instrument is such corporate seal; that it was so affixed by authority of his office under the By -Laws of said Company, and that he signed his name thereto by like authority. SUSAN A KOHORST Notary Public gState of Ohio My Comm. Expires May 18, 2030 This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great American Insurance Company by unanimous written consent dated June 9, 2008. RESOLVED: That the Divisional President, the several Divisional Senior Vice Presidents, Divisional Vice Presidents and Divisonal Assistant ice Presidents, or any one of them, be and hereby is authorized, from time to time, to appoint one or more Attorneys -in -Fact to execute on behalf of the Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof,- to prescribe their respective duties and the respective limits of their authority; and to revoke any such appointment at any time. RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond., undertaking, contract of suretyship, or other written obligation in the nature thereof, such signature and seal when so used being hereby adopted by the Company as the original signature ofsuch officer and the original seal of the Company, to be valid and binding upon the Company with the same force and effect as though manually affixed CERTIFICATION I, STEPHEN C. BERAHA, Assistant Secretary of Great American Insurance Company, do hereby certify that the foregoing Power of Attorney and the Resolutions of the Board of Directors of June 9, 2008 have not been revoked and are now in full force and effect. Signed and sealed this 26th day of August 2025;' _. Assistant Secrttaiy - _ `, S1029AJ (04/25)