Loading...
HomeMy WebLinkAboutContract 55295-A4CSC No. 55295-A4 AMENDMENT No . 4 TO CITY SECRETARY CONTRACT No. 55295 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 55295, (the CONTRACT) which was authorized M&C 21-0058 on the 12th day of January, 2021, in the amount of $1,242,804.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No.1 in the amount of $297,400.00 authorized by M&C 22-0130 on February 22nd, 2022, Amendment No.2 in the amount of $98,800.00 administratively authorized on November 7th, 2023, and Amendment No.3 in the amount of $64,140.00 authorized by M&C 24-0996 on November 12th, 2024; and WHEREAS, the CONTRACT involves engineering services for the following project: Westside III Ground Storage Tank and West IV and V Pump Station (Markum Ranch Pump Station and Ground Storage Tank), CPN 103010; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $61,200.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1, 764, 344. 00. OFFICIAL RECORD CITY SECRETARY 3. FT. WORTH, TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas WS III GST & WS IV/V PS Prof Services Agreement Amendment Template CPN 103010 Revision Date: 12/08/2023 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Jesica McEachern Assistant City Manager DATE: 09/12/2025 iT9For ., ,oea po 7 V�0 �o PVo 0°=4 ATTEST: °°o*°°.o' ado nEaA546p Jannette Goodall City Secretary APPROVAL RECOMMENDED: ckr ' • , Ftard &r Christopher Harder &p 3, 2025 08:46:08 CDT) Christopher Harder, P. E. Director, Water Department Contract Compliance Manager: ENGINEER Kimley-Horn and Associates, Inc. P.E. Chris Igo, P.E Associate DATE: 09/02/2025 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Fatrw,o C,o-ot. yam 09/02/2025 Farida Goderya, P.E. Sr. Project Manager APPRO W FORM AND LEGALITY: Douglas Black (Sep 5, 202517:14:30 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 2 of 2 M&C No.#: M&C Date: Form 1295: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX N/A N/A N/A WS III CST & WS IV/V PS CPN 103010 Kimley>»Horn August 5, 2025 Ms. Farida S. Goderya, PhD, P.E. Senior Project Manager City of Fort Worth Water Department 200 Texas Street Fort Worth, TX 76102 Re: City of Fort Worth — WS415 Pump Station and WS3 Ground Storage Tank — Amend. No. 4 Supplemental Construction Phase Services KHA No. 061018386 City Project No. 103010 Dear Farida: This letter is in reference to a contract between Kimley-Horn and Associates, Inc. (ENGINEER) and the City of Fort Worth (CITY) dated 01-12-2021 referred to herein as the "CONTRACT". Due to delays in the Contractor's schedule, additional site visits, weekly status update meetings, coordination with the Contractor, and site observation as performed by Engineer will be required to be performed for an additional eight months (January 2025 thru August 2025). The hourly scope for regular on -site observation is based on 240 additional calendar days and being on site for an average of 4 hours a week. ENGINEER will provide the services outlined as follows: TASK 8. CONSTRUCTION PHASE SERVICES (ADDITIONAL SCOPE) 8.1 Construction Support • The scope of services shall be in accordance with the Original Contract with the following additional services: o On -Site Observation: ■ Make up to four (4) site visits at intervals as directed by CITY in order to observe the progress of the work. o Progress Meetings: ■ Attend up to thirty (30) weekly status update calls. o Pump Station Startup Coordination: ■ Coordination with the Contractor, Contractor's subcontractors, equipment vendors, and City staff to provide input, recommendations, and review additional RFIs associated with startup. 8.2 Supplemental Construction Phase Services 8 additional months (January 1, 2025 thru August 31, 2025) of site observation and coordination as provided for Task 8.2 in Amendment No. 1 of this contract as originally executed on 03-17-2022. Kimley»>Horn Page 2 We recommend that the City increase the budget by $61,200 for these additional services. The following tables summarize our recommended budget revisions, water and sanitary sewer design fees, and revised contract amount: The proposed budget modifications reflect the additional funds needed for the additional services. The details of the budget modifications can be found in the table below: Description I Original I Amend. Amend. Amend. Amend. Revised I Budget No.1 No.2 No.3 No.4 Budget Water I $1,242,804I $297,400 $98,800 $64,140 $61,200 $1,764,344I Sewer I $0I $0 $0 $0 $0 $0 Total I $1,242804 I $297,400 $98,800 $64,140 $61,200 $1,764,344 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Chris P. Igo, P.E. Associate CPI/jck \\kimley-horn\CN_FTW\FTW_UtiliSes\061018386-Markum-Ranch-PS&GST\PPP\POST_NTP\Amend4\MarkumRanch PS_Arn 4.doc 8/5/2025 EXHIBIT B-1 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Supplemental Construction Phase Services Amendment No. 4 - WS4/5 Pump Station and WS3 Ground Storage Tank (Markum Ranch Pump Station) City Project No. 103010 Task No. Task Description Project Director Project Manager Labor Project Engineer (hours) Professional Senior Tech Support Admin. Total Labor Cost Travel / Subconsultant Reproduction I M/WBE Non-SBE Markup Fees/ Permitting Total Expense Cost Task Sub Total 8.0 Construction Phase Services 01 551 551 731 123 0 $60,200 $0 $0 $0 $1,000 $1,000 $61,200 8.1 8.2 Construction Support Site Visits C4hr/mofor 8/mo) Weekly Calls (30) Startup Coordination Supplemental Construction Phase Svcs 8 Addtl Mo (January 2025 - Au_qust 2025) Site Observation f 46hr/mo for 8lmo) City and Contrac(or Coordination 32 15 8 32 15 15 8 8 30 20 15 8 100 $0 $1,000 $1,000 $1,000 $0 $0 $0 $16,400 $0 $16,400 $12,700 $0 $12,700 $6,800 $0 $6,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,600 $0 $20,600 $3,700 $0 $3,700 Subtotal 0 55 55 73 123 0 $ 60,200 0 0 0 $ 1,000 1 $ 1,000 $ 61,200 Project Summary Total Hours 306 Total Labor $60,200 Total Expense $1,000 SBE Sub $0 SSE Participation 0.0% Non-SBE Sub $0 Total Sub Markup $0 Total Direct Expenses $1,000 Grand Total $61,200.001 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 Page 1 of 1