Project Name I 2024 Bridge Rehabilitation Contract 1 City Sec # I 61681
Client Project #(s) I 105238
Project Bridge Rehabilitation at 14 Locations
Description
Contractor) Gibson and Associates, Inc. Change Order #I 2 I ate I 8/26/2025
City Project Mgr. I Tariqul Islam City Inspector I Henry Tristan
Dept. Ti Contract Time
Totals (CD)
Original Contract Amount $702,890.50 $702,890.50 210
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $702,890.50 $702,890.50 210
Amount of Proposed Change Order $0.00 20
Revised Contract Amount $702,890.50 $702,890.50 230
Original Funds Available for Change Order $105,434.00 $105,434.00
Remaining Funds Available for this CO I $105,434.00 $105,434.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST +25%) $878,613.13
JUSTIFICATION (REASONS) FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Furnish all labor and materials as specified in Change Order #2. This change order
includes the addition of two bridge repair locations: the Park Hill Drive Bridge over Forest Drive and the Riverside Drive Bridge over the Trinity River. The
Park Hill Drive Bridge sustained damage from a recent traffic incident and requires steel fence repairs. In addition, due to the deteriorated condition of the
steel and concrete railings, painting is needed to restore and preserve the structure. The Riverside Drive Bridge was also damaged in a traffic incident and
requires repairs to the steel railing. To address these repairs, this change order includes new bid items for steel rail repair, steel fence repair, and painting of
steel and concrete railings. The net change order amount will be $0, as the cost of the additional work will be offset by deleting unused quantities from the
original contract.
Time: Staff supports the contractor's request for an additional 20 calendar days to complete the expanded scope of work.
Cost: The City has reviewed the contractor's proposed unit prices and compared them with recent TxDOT average bid prices for similar steel fence repairs
and painting of steel and concrete railings at the Park Hill Drive Bridge. The steel rail required for the Riverside Drive Bridge will be custom-made, as it is
currently not available in the market, and TxDOT has no comparable bid prices. However, the contractor has submitted a detailed cost breakdown for the
steel railing repair. Based on this analysis, staff has determined that the proposed pricing is fair and reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Nam Contractor (Name) Contract Signatur Date
09/02/25
Gibson and Associates, Inc. Trey Meador Try eado??` r(Sep2,20251726:13 CDT)
Inspecto
Date
09/02/25
Project and Contract Compliance Manager
1AU_
Date
09/03/25
Progr
Date
Senior Capital Project Officer
Date
74kaAfaft
09/03/25
k-*--
09/04/25
Assistant Director (Dept)
Date
Director, Con t)
Date
J .8.202513.3a.18—)
09/08/25
Po
09/08/25
Assistant Cit
Date
Assistant Citya M
Date
DEW-_..,
09/09/25
09/12/25
ouncil Action (if required)
M&CNumber I N/A I M&C Date Approved IN/A
ony
ATTEST: g FORT QQQ
ao°=° k� o
°� p,�,o ° °s°o
ao_
Jannette Goodall, City Secretary � �*
QQQn�EXpgo'Oo
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
*'--- Change Order Additions
Project Name 1 2024 Bridge Rehabilitation Contract 1 City Sec p 1 61681
Client Project q 1 105238 1
Contractor I Gibson and Associates, Inc. I PM I Tariqul Islam I Inspector I Henry Tristan I
Change Order Submittal a F-2 I Date 1 8/26/2025
ADDITIONS
ITEM
DESCRIPTION
DEPT
City
Unit
Unit Cost
Total 1
New- 31
Steel Rail Repair - Riverside Dr Bridge
TPW
18.00000000
LF
$1,300.00
$23,400.001
New - 32
Steel Fence Repair- Park Hill Or Bridge
TPW
1.00000000
LS
$16,500.00
$16,500.001
New - 33
Clean and Paint Concrete Rail - Park Hill Or Bridge
TPW
1.00000000
LS
$24,000.00
$24,000.00 1
New - 34
Clean and Paint Metal Rail - Park Hill Dr Bridge
TPW
1.00000006
LS
$46,000.00
$46,000.00 I
New - 35
Traffic Control
TPW
1.00000000
LS
$6,000.00
$6,000.001
TPAt $115,900.001
1
1
1
Sub Total Additions $115,900.001
Change Order Additions Page 2 of 4
Foe_ T�H City of Fort Worth
Change Order Deletions
Project Name 2024 Bridge Rehabilitation Contract 1 City Sec # 1 61681
Client Project# 105238 1
Contractor) Gibson and Associates, Inc. I PMI Taricul Islam I Inspectorl Henry Tristan I
Change Order Submittal # 2 Date 1 8/26/2025
DELETIONS
ITEM DESCRIPTION DEPT
16 RAISING EXISTING STRUCTURES TPW
19 SHORT RADIUS TPW
Qty Unit Unit Cost Total
5.00000000 EA $17,000.00 $85,000.00�
15.45000000 LF $2,000.00 $30,900.00�
TPJJ $115,900.00�
Sub Total Deletions $115,900.00
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Not Applicable
Not Applicable
Previous Chanee Orders
Not Applicable
Total $0.00
Co # DATE AMOUNT
1 6/2/2025 $0.00
Total I $0.00 I
FORT WORTH.
Routing and Transmittal Slip
Transportation and Public Works
Department
DOCUMENT TITLE: 2024 Bridqe Rehabilitation Contract 1, CO 2
M&C
CPN 105??R
DATE:
To: 1. Crystal Greene (Business
Support)
2. Gibson & Associates, Inc.— Trey
Meador
3. Henry Tristan (Inspector)
4. Oscar Aguillon (Sr. Inspector)
5.Tariqul Islam (PM)
6 Zelalem Arega (PGM)
7 Mary Hanna (SCPO)
8. Patricia Wadsack (AD)
g Lauren Prieur (Director)
10. Doug Black (ACA)
11.Jesica McEachern (ACM)
Cso # 61681 DOC#
INITIALS DATE OUT
09/03/25
TM 09/02/25
tfeiif y T-k&air 09/02/25
OA
OA
09/03/25
Tl
rI
09/03/25
Z41
09/03/25
ze�ae
�L
09/04/25
09/08/25
09/08/25
09/09/25
Douglas Black
C�A
09/12/25
12. Jannette Goodall (CS) Ja�fnetteGoodall 09/12/25
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: U Yes ❑✓ No
RUSH: ❑Yes ❑✓ Nc ❑ Yes ❑✓ No NEXT DAY: ❑ Yes ❑✓ No
ROUTING TO CSO: ❑✓ Yes [—]No
Action Required:
❑ As Requested ❑ Attach Signature, Initial and Notary Ta
■ Signature/Routing and or Recording
❑ Comment
❑ File
Return to: Please call
at ext. for pick up when completed. Thank you.