HomeMy WebLinkAboutContract 62014-CO29/15/2025 Contract Time (Calender days) 630 630 112 742 Date Date Date Date M&C Number M&C Date Approved $0.00$0.00 N/A N/A Assistant City Manager Construction Supervisor (TPW Dept) City of Fort Worth Additional Funding (if necessary) $480,706.25 Contractor's Company Name $222,081.00 $114,700.00 Revised Contract Amount Contractor Signature Council Action (If Required) Senior Assistant City Attorney Date Justin Roberts Director (Water Dept)Date Venus Construction Contract Cost to Date Date $0.00 Project Manager MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Inspector $384,852.00$48,071.00 Totals $10,103,000.75 Eric Tinner $114,700.00 $384,852.00 Paving $480,706.25 $10,103,000.75 $10,103,000.75 Sewer $3,277,134.00 $3,277,134.00 Water and Sanitary Sewer Replacement Contract 2020, WSM-M City Sec No.: 2 Date: 103413DOE No. Change Order Request Change Order # Project Description: 62014 Project No.(s): Water and Sanitary Sewer Repalcement City Proj. No.: Contractor: Project Name: 103413 N/A City Inspector: Phone Number: Preeti KC 817-647-2566 Venus Construction City Project Mgr. Remaining Funds Available for this CO Pending Change Orders (in M&C Process) 817-392-5467 Phone Number: Water Extras to Date Dept. $480,706.25 $0.00 $6,345,160.50 $48,071.00 $6,345,160.50Original Contract Amount $6,345,160.50 $3,277,134.00 Amount of Proposed Change Order Original Funds Available for Change Orders $222,081.00 Credits to Date Contractor Name CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT $12,628,750.94 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 2 includes additional concrete flatwork on Rondo Dr. to address replace broken curb and gutter and revise elevations to ensure positive drainage flow. It also includes removing and replacing driveway sections and valley gutters as needed to further enhance proper drainage. Staff concurs with the contractor's request for an 112 additional calendar days for the change order for the time it took Atmos to relocate the lines and to address drainage issues on the street. Eric Tinner 9/16/25 09/16/2025 City Project Mgr. 8" Concrete Driveway Paving 359.42 $96,980.79 $32,344.90 $32,344.90 $32,290.99 $2,332.54 $22,248.89 $1,383.77 $6,325.79 $2,332.54 $22,248.89 $1,437.68 $6,325.79 Total ADDITIONS $1,437.68 $6,325.79 $2,332.5465 Remove existing curb and gutter 65 8" Concrete Driveway Sewer 62014 City Proj. No.: $68.20 $3.85 $17.60 LF SF SF 326.23 359.42 Paving Paving 6" Concrete Curb and Gutter Remove existing concrete driveway 6 3 4 Additions Sub Total Date: Water Sewer Paving $7.15 SF $17.60 Eric Tinner Project No.(s): Project Description Water and Sanitary Sewer Repalcement Contractor Venus Construction 2Change Order: 103413 City Sec No.: Preeti KC City Inspector City of Fort Worth Change Order Additions Project Name Water and Sanitary Sewer Replacement Contract 2020, WSM-M 9/15/2025 103413 DOE No.N/A LF 69 8" Concrete Driveway Sewer 359.42 2 Remove existing curb and gutter Paving 326.23 67 Remove existing concrete driveway Sewer 359.42 LF $7.15 66 6" Concrete Curb and Gutter Sewer 326.23 SF $4.00 LF $68.20 SF $17.60 326.23 63 Remove existing concrete driveway Water 359.42 DESCRIPTION Water Remove existing curb and gutter 61 Water $7.15 Unit 359.42 $4.00 LF $68.20 SF LF DEPTITEM Qty 326.23 $22,248.8962 6" Concrete Curb and Gutter Water 326.23 Unit Cost Page 2 of 4 $32,344.90 $32,344.90 $32,290.99 $96,980.79 City Sec No.: 62014 City Proj. No.: 103413 Total $32,344.90 $32,344.90 $32,290.99 Paving Deletions Sub Total Water Sewer $100,000.00 98 Water Construction Allowance Water 0.21563265 LS $150,000.00 86 Sanitary Sewer Construction Allowance Sewer 0.323449 Venus Construction Change Order:2 Qty LS UnitDESCRIPTIONDEPT Unit Cost DELETIONS City Project Mgr.Preeti KC City Inspector: Project No.(s): Project Description Contractor ITEM 9/15/2025 Eric Tinner Water and Sanitary Sewer Repalcement 103413 DOE No.N/A Date City of Fort Worth Change Order Deletions Project Name Water and Sanitary Sewer Replacement Contract 2020, WSM-M Paving Construction Allowance19 0.5381831 $60,000.00LS Page 3 of 4 Type of Service Amount for this COMWBE Sub CO #DATE AMOUNT M/WBE Breakdown for this Change Order Previous Change Orders $0.00Total $0.00Total Page 4 of 4 /2025 Water & Sanitary Sewer Replacement Contract 2020, WSM-M CSC: 62014 CPN: 103413 Change Order Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. _____________________________________ Signature ______________________________________ Name of Employee ______________________________________ Title ATTEST: ______________________________________ Jannette Goodall City Secretary Preeti KC Sr. Professional Engineer