HomeMy WebLinkAboutContract 29370-A3 CITY SECRETARY
AMENDMENT No.3 CONTRACT MO. °
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and Kiml.ey-Horn and
Associates, Inc. , (ENGINEER) made and entered into City Secretary
Contract No. 29370 , (the CONTRACT) which was authorized by M&C C-
19873 on the 2nd day of December, 2003 in the amount of $391, 900 . 00;
and
WHEREAS; the CONTRACT was subsequently revised by: Amendment
No. 1 in the amount of $380,345.00 which was authorized by M&C C-
24129 on December 2 , 2003 and Amendment No. 2 in the amount of
$42,030. 00 which was administratively authorized on June 20, 2013;
and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Water and Sanitary Sewer Main Relocation on Vickery Boulevard.
WHEREAS, it has become necessary to execute Amendment No. 3 to
the CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated October 18, 2013,
a copy of which is attached hereto and incorporated herein. The cost
to City for the additional design services to be performed by
Engineer totals $34,470 .00.
2 .
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid
by the City for all work and services shall be an amount of
848,745. 00. OFFICIAL RECORD
q' D. ' .. '2616' Page -1- 11 r j EC i URY
OMT HI, 'rx
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED: ENGINEER
City of Fort Worth Kimley-Horn and Associates, Inc.
Fernando Costa Glenn Gary, P.E.
Assistant City Manager Senior Vice-President
DATE: �,m DATE:
APPRO RECD NDED:
f
S. Frank Crumb, P.E.
Director, Water Department
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
Date: N/A
Douglas W. Black
Assistant City Attorney
ATTEST:
Mary J. r
City Secretary
OFFICIAL RECORD
CITYSECRETARY
Page -2- F"T. INORTH, �
Kimley-Horn
and Associates, Inc.
October 18, 2013
Suite 950
801 cherry Street,Unit 11
Fort Worth,Texas
Mr. Robert Sauceda, P.E. 76102
City of Fort Worth
Water Department
1000 Throckmorton St.
Fort Worth,TX 76102
Re: Vickery Boulevard Water and Sanitary Sewer Improvements
Additional Services—Amendment No. 3
KHA No. 061018023
Dear Robert:
Kimley-Horn and Associates, Inc. (Kimley-Horn or ENGINEER) is pleased to
provide the City of Fort Worth(CITY) with Amendment No. 3 for the Vickery
Boulevard Water and Sanitary Sewer Improvements contract. This amendment
is divided into two parts.
Part I consists of the design and coordination of a 36-inch, 30-inch, 24-inch and
12-inch water lines along 81h Ave and Oleander St in the Medical District
(Medical District— Part 9). Part 2 consists of additional design coordination and
CCA services associated with miscellaneous water and sanitary sewer
improvements due to the Chisholm Trail Parkway project.
Part.1 —Medical District—8th Ave
Item I (Design Management) -$2,400
The ENGINEER will complete Project Management and Design Management
services as outlined in Amendment No. 2 for up to an additional three (3)
months:
Item 2 (Water and Sanitary Sewer Final Design)-$28,535
The ENGINEER will complete final design and coordination of the following
water relocations in accordance with the scope of services in the original
contract:
• 36-Inch Water Line along Oleander St from 9ffi Ave to 8"'Ave for 560 LF
■
TEL 817 335 6511
FAX 817 335 5010
Mr.Robert soucexa,pE..October |8,z»o^Page z
and Associates, Inc.
• 30'inch Water Line along 8"Ave from Oleander Stk/ Myrtle St for
)'65ULF
• 24-inch Water Line along 0 h Ave from Myrtle St to Jessamine St for
],600DF
• |2-inub Water Line along 8h Ave from Allen Ave to Mitchell Ave
• 8-inch VVutcr Line along Oleander St from 9 m Ave k` 8 m Ave for 560 LF
Part 2—Chisholm Trail Parkway (CTP)
Item % (Design Coordination, and oCCA)- $3,535
The ENGINEER with BB[} Engineering, LI.C, ElqGQNEER`smubconau|tunt, will
coordinate and design for the following relocations associated with Chisholm
Trail Parkway, in accordance with the scope o{services in the original contract:
• Fire hydrant relocation ut northeast comer of Vickery Blvd and
Montgomery St
• Design of approximately 200LFo[ |2-inoh water line and traffic control
along Vickery Blvd from Montgomery S( tmKimuzey 3t
VVc recommend that the City increase the budget hy $34,470 for these additional
services. From the additional services listed above, the recommended breakdown
for water and sewer services is as Ch||ovwx:
Water Sewer Total
Description
PART I —Medical District
Item I —Design Management $2,400 $0 $2,400
Item 2—Water and Sanitary $28,535 $0 $28,535
Sewer Final Design
Item I — Design Coordination
Total $34,470 so $34,470
The following table summarizes the Fee per Work Phase breakdown:
Kknley-Horn Mr.Robert s«ucoma,,E..October 18,zo|3,Page a
and A88OC|@(8G, Inc.
Work Phase Water Sewer Total
Total $34,470 $0.00 $34,470
The following table summarizes our recommended budget revisions and shows
the revised contract amount:
Description Original Amend No Amend No. Amend Revised
Contract 1 '2 No. 3 Contract
Pre-Engineering $16,100 $2,400 $18,500
Preliminary Construction $104,500 $54,800 $17,930 $177,230
Plans
Final Construction Plans $137,650 $126,450 $17,150 $34,470 $315,720
Pre-Construction Services $1,500 $10,500 $550 - $12,550
Construction Phase $14,350 $12,200 $4,000 - $30,550
Services
Total Project $391,900 $380,345 $42,030 $34,470 $848,745
With these Additional Services, our revised contract amount will he $848,745.
This will revise our total contract MBE and SBE participation of$178,750 from
22.0Y6to21.M.
The following table summarizes the water and sewer design fees:
Revised
Contract
Contract/Amendment Water Fee Sewer Fee Survey Fee Total Fee Amount
Original Contract $297,844 $0 $94,056 $391,900 N/A
Amendment No. 1 $305,425 $0 $74,920 $380,345 $772,245
Amendment No. 3 $34,470 $0 $34,470 $848,745
TOTAL $679,769 so $168,976 $848,745 $848,745
Kimley-Horn Mr.Robert Sauceda,P.L.,October 18,2013,Page 4
and Associates, Inc.
We appreciate the opportunity to be of continued service to the City. Please
contact us if we need to provide any further information.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
Glenn A. Gary, P.E.
Sr. Vice President
GAG/SR-M:srm
Attachments:
K:\FrW-Utilities\061018023\-MedicaI District\PPPWmendmentg2Draft2lAmend2.Vickery-[,tr dm
0 10 0 C> W) 0 O Y4 1
iC
0 cc 0 a 0
40V w N N w 64 0 M w E
E
I
ui
0
CO ui
0.
0 61W
O La
w uj
S z
V
In
ui
E
ull o
ca .1
z
rCL
0.
E
co
W =
w 0
>
Nt
(D <
C M cli C\l 0
co q co
> CL
0 v V d b -q 'o'D 0
0
C
Jc o o ea m N 0 1,01
A
S
. I -
00 >
42 0
(L
0 N C LLJ
r
9
> 0
is 0
uj 0 a -E
'
E
0 % w wr � . = 8 .2
LD E! E m u M,
CL
E V LD E
0 tL 0, 0- r c CL
& U-iz to 0 0
N