HomeMy WebLinkAboutContract 60923-CO2Contract Time
(CD)
210
110
320
196
516
Date
Date
Date
Date
Date
N/A
ATTEST:
____________________________________________
Jannette Goodall, City Secretary
City of Fort Worth
Contractor
60923
Client Project #(s)104935
Date 8/18/2025
City Project Mgr.
Change Order Request
2
Project Name
Remaining Funds Available for this CO
Pending Change Orders (in M&C Process)
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
$262,672.00$262,672.00
Contract Cost to Date
$0.00
Amount of Proposed Change Order
$5,838,045.70
Revised Contract Amount $5,838,045.70
$0.00
City Sec #2024 Asphalt Resurfacing Contract 1
TPWDept.Totals
Project Description Street pavement rehabilitation on approximately 21.9 lane miles and replacing damaged curb and gutter, driveways, and non-compliant ADA ramps.
Change Order #Peachtree Construction, Ltd.
Marwan Hafez Kevin JacksonCity Inspector
$5,253,445.70
Original Funds Available for Change Orders
$5,838,045.70
Extras to Date $584,600.00
$5,253,445.70
Credits to Date
11.13%
$6,566,807.13
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
N/A
Additional Funding (if necessary)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
DateAssistant City Attorney
This Change Order# 2 adds an additional 196 calendar days to the contract time due to construction conflicts and the additional scope to the project.
1- Developer Project Conflict on Peppertree Lane (additional 184 days)
Work on Peppertree Lane (Panay Way to Little Fox Drive) was delayed because a separate developer project had to complete sewer line construction before the City’s paving
work could begin. This overlap in construction activities prevented our contractor from moving forward as originally scheduled. The developer started construction on November
18, 2024, and completed it on August 3, 2025. The additional days for this conflict are defined as follows: 143 days (2/1/2025 - 6/23/2025) for Developer to complete the sewer
line construction; 32 days (6/24/2025 - 7/25/2025) for our contractor to complete pulverization, Cem-lime material delivery, and asphalt pavement overlay; 9 days (7/26/2025 -
8/3/2025) for developer to complete curb and gutter placement and concrete collars.
2- Additional 2.02 Lane Miles (additional 12 days)
While the project was underway, adjoining street segments were evaluated and found to be in poor condition. To provide consistent pavement quality and reduce the need for
future repairs, the additional work has been completed using available contract quantities and does not significantly change the overall project scope. All works associated with
these additional segments were completed on 8/15/2025, adding 12 days (8/4/2025 - 8/15/2025) to this change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Council Action (if required)
M&C Number
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager
$5,838,045.70
$584,600.00
Original Contract Amount
M&C Date Approved
Contractor's Company Name
Peachtree Construction, Ltd.
Contractor (Name)
J. Barry Clark
Contract Signature
Senior Capital Project Officer
Director, Contracting Department (Dept)
DateProgram Manager
DateAssistant Director (Dept)
Assistant City Manager
QtyDEPTITEM DESCRIPTION
$0.00
TotalUnit CostUnit
City of Fort Worth
Change Order Additions
Project Name 2024 Asphalt Resurfacing Contract 1 City Sec # 60923
Client Project # 104935
2 8/18/2025
Marwan Hafez InspectorContractor
Change Order Submittal #
Peachtree Construction, Ltd.PM Kevin Jackson
Sub Total Additions
Date
TPW
ADDITIONS
$0.00
$0.00
Change Order Additions Page 2 of 4
$0.00
$0.00
Sub Total Deletions
Date
TPW
Client Project # 104935
2 8/18/2025Change Order Submittal #
Contractor
City of Fort Worth
Change Order Deletions
Project Name 2024 Asphalt Resurfacing Contract 1 City Sec # 60923
DELETIONS
Unit CostUnit
$0.00
TotalQtyDEPTITEMDESCRIPTION
Peachtree Construction, Ltd. PM Marwan Hafez Inspector Kevin Jackson
Change Order Deletions Page 3 of 4
$584,600.00Total
M/SBE for this Change Order
Previous Change Orders
$0.00Total
Type of Service Amount for this COM/SBE Sub
N/A $0.00
1 11/13/2024
CO #DATE AMOUNT
$584,600.00
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE:2024 Asphalt Resurfacing Contract 1 – CO2
M&C: 24-0979 CPN: 104935 CSO: 60923 DOC#: CO#2
Date: 8/18/2025
To: Name Department Initials Date Out
1 Sophia Flores (BSP) TPW
2 J Barry Clark/Peachtree Construc.Vendor
3 Kevin Jackson (Inspector)TPW
4 Marwan Hafez (PM) TPW
5 Zelalem Arega (PGM) TPW
6 Mary Hanna (SCPO) TPW
7 Patricia Wadsack (AD) TPW
8 Lauren Prieur (Director) TPW
9 Doug Black (ACA) Legal
10 Jesica McEachern (ACM) CMO
11 Jannette Goodall (CS) CSO
12 TPW Contracts TPW
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts
ALSO List: - Bus Sppt: Sophia Flores; Prg Mgr: Zelalem Arega; Sr CPO: Mary Hanna
DOCUMENTS FOR CITY MANAGER’S SIGNATURE:All documents received from any and all City
Departments requesting City Manager’s signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, will review and
take the next steps.
NEEDS TO BE NOTARIZED: YES No
RUSH:YES No SAME DAY:YES No NEXT DAY:YES No
ROUTING TO CSO: YES No
Action Required: Attach Signature, Initial and Notary Tabs
As Requested
For Your Information
Signature/Routing and or Recording
Comment
File
Return To: Please notify TPWContracts@fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext.
8363 with questions. Thank you!