Loading...
HomeMy WebLinkAboutContract 57280-CO3Contract Time (CD) 730 200 930 192 1,122 Date Date Date Date Date 6/24/2025 ATTEST: ____________________________________________ Jannette Goodall, City Secretary Original Contract Amount M&C Date Approved Contractor's Company Name Circle C Construction Company Contractor (Name) Keegan Jonkers Contract Signature Senior Capital Project Officer Director, Contracting Department (Dept) DateProgram Manager DateAssistant Director (Dept) Assistant City Manager $16,380,492.60 $1,717,240.00 $0.00 $345,525.69 22.77% $18,329,065.75 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 25-0607 Additional Funding (if necessary)$1,464,673.35 JUSTIFICATION (REASONS) FOR CHANGE ORDER $518,663.17 $600,484.49 DateAssistant City Attorney Change Order No. 3 provides for the following: M&C 25-0607 on June 25, 2025. Prices for new items were compared to those of TxDOT as well as bid prices for similar items, and staff has determined that they are reasonable. Staff concurs with the contractor's request for192 additional calendar days on the change order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Council Action (if required) M&C Number Inspector/Inspection Supervisor Date Project and Contract Compliance Manager $14,663,252.60 Original Funds Available for Change Orders $8,414,831.87 $5,090,862.69 $600,484.49 $120,710.00 $4,023,655.20 $466,723.00Extras to Date $219,450.00 $7,520,168.70 Credits to Date $345,525.69 $4,496,021.39 $93,583.00 $3,119,428.70 $1,031,067.00 City Sec #Westcliff Drainage Improvements Ph1 and Contract 91 Pt2 TPWDept.TotalsSewerWater Project Description TPW and Water Department partnership project constructing storm drain, water pipe, and sanitary sewer improvements in the westcliff neighborhood. Change Order # Circle C Construction Company Berton Guidry, PE Brian McGill City Inspector Remaining Funds Available for this CO Pending Change Orders (in M&C Process) MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $590,293.00$376,000.00 Contract Cost to Date $4,490,378.20 $156,550.00 Go to ADD & DEL Tabs to Enter CO Backup $7,739,618.70 Revised Contract Amount $4,150,495.70 $18,001,715.95 $0.00 $1,621,223.35 $156,550.00 $675,213.17 City of Fort Worth Contractor 57280 Client Project #(s)C01669 & C01957 Date 9/9/2025 City Project Mgr. Change Order Request 3 Project Name 3 Gallon Soft Leaf Yucca (CO 3) $3,000.00 $2,317.50 $1,250.00 $1,200.00 $145,099.88 SF EA LF EA LF $1,800.00 $1,200.00 $25.00 $2,000.00 $1,500.00 $35.00 EA $15.00 13.00000000 EA 4.00000000 EA $300.00 $65.00 4.00000000 EA $52.00 40.00000000 $15,000.00 $95,000.00 108 109 110 111 140.00000000 LF LF Block Sod Placement (CO 3) 10.00000000 500.00000000 Sewer Sewer Sewer 112 Install New 4-Inch Concrete Sidewalk (50/50, 100% Water) Updated (CO 3) Remove Existing 6-Inch Concrete Driveway (50/50, 100% Water) Updated (CO 3) $350.00 $1,000.00 $15,600.00 Sewer Sewer 105 106 107 SF SF 115 Remove Existing 6-Inch Concrete Driveway (50/50, 100% Water) Updated (CO 3) Install New 6-Inch Concrete Driveway (50/50, 100% Water) Updated (CO 3) Block Sod Placement (50/50, 100%) Updated (CO 3) Remove Fire Hydrant Assumbly (CO 3) Remove 6" Pipe (CO 3) Remove 6" Valve (CO 3) Install 6" Plug (CO 3)112 110 Temporary Fencing (CO 3) 6" CIPP for Church (CO 3) Turn Arrow w/ Word (CO 3)Water 4" Private Service Bore (CO 3) Remove 4-Inch Concrete Sidewalk (50/50, 100% Water) Updated (CO 3)Sewer Sewer 4.00000000 SY $2,317.50 $16,222.50 $3,000.00 $83,531.25 $3,000.00 $12,000.00 $5.00 $35.00 $6.50 $31.25 $1,250.00 $5,000.00 $30,595.00 $58,140.00 $6,000.00 $80,000.00 $3,900.00 $18,750.00 $7.50 $22.00 $14.55 $504.56 $31.79 Water Water Water LF LF EA SF SF SF 1.00000000 1.00000000 1.00000000 EA 211.00000000 612.00000000 1,200.00000000 600.00000000 600.00000000 2,673.00000000 2,673.00000000 2,673.00000000 162.00000000 1.00000000 TN SY EA EA EA LF EA EA LF LF LF LF LF LF EA SF SF SF EA SY 114 Valve Box Modifications Updated (CO 3) 113 Removal of 12" Valve (CO 3) 96 Service Reinstatement for Pipe Enlargement (CO 3) 98 4' Diameter Sanitary Sewer Manhole (CO 3) 97 Sanitary Sewer Service Relocation on Private Property (Including Property Restoration) (CO 3) 95 8" Sanitary Sewer By Pipe Enlargement Method (CO 3) CONTRACT 91 UNIT 2: SEWER IMPROVEMENTS (WATER) 115 Water Water Water Water Water Water Sewer Water Water Sewer Water 103 Remove Existing Concrete Curb and Gutter (50/50, 100% Water) (CO 3) 105 108 QtyDEPTITEMDESCRIPTION 463.50000000 463.50000000 2.00000000 4.00000000 100.00000000 1,576.00000000 657.49900000103 100 96 97 6" SLD Pvmt Marking HAS (W) 50%Water- 50%TPW (CO 3) Remove Ex Concrete Curb and Gutter (50/50, 100% Water, Refer to Pavement Layout Sheet) (CO 3) Install New Concrete Curb and Gutter (match existing) (50/50, 100% Water) (CO 3) Install 2" Water Service (CO 3) 3-Inch Surface Course Asphalt, Type "D" (50/50, 100% Water) (CO 3) 8-Inch Chem-Lime Stabilization @ 32 Lbs/SY (50/50, 100% Water) (CO 3) 11-Inch Pavement Pulverization (50/50, 100% Water) (CO 3) Install New 6-Inch Concrete Driveway (50/50, 100% Water) (CO 3) Remove Existing 6-Inch Concrete Driveway (50/50, 100% Water) (CO 3) Removal of 8" Valve (CO 3) 6" SLD Pvmt Marking HAS (Y) 50%Water- 50%TPW (CO 3) Install Private Plumbing for Church Service Location Reroute (CO 3) Salvage 2" Meter (CO 3) 2" Water Service Reconnect (CO 3) 2" Copper Service Line (CO 3) Pvmt Marking Bike Lane (CO 3) TotalUnit CostUnit Water Water Water Sewer $12,328.11 $339,803.31 $12,000.00 $7,500.00 $6,000.00 $2,000.00 $12,500.00 $29,550.00 $3,468.75 $10,175.00 $145,099.88 $109,489.52 Water Water Water Sewer 117 118 119 120 90 91 104 116 101 102 121 122 98 99 92 93 94 95 Sewer City of Fort Worth Change Order Additions Project Name Westcliff Drainage Improvements Ph1 and Contract 91 Pt2 City Sec # 57280 EA 30 3 Gallon Turks Cap (CO 3)TPW 34.00000000 31 3 Gallon Nandina Domestica (CO 3)TPW 5.00000000 77 Install New 5' inlet (CO 3)TPW 2.00000000 29 45 Gallon Possumhaw Holly (CO 3)TPW 3.00000000 TPW Client Project # C01669 & C01957 3 //2025 Berton Guidry, PE InspectorContractor Change Order Submittal # Circle C Construction Company PM Brian McGill Sub Total Additions Date TPW Water LF $96.25 $75.00 EA $75.00 ADDITIONS 38 Specialty Fence for 3601 Encanto (CO 3)TPW 77.00000000 2.00000000 EA $1,500.00 EA $7,500.00 EA $1,250.00 CONTRACT 91 UNIT 1: WATER IMPROVEMENTS (WATER) Irrigation fixes to 3700 Wyndale Ct (CO 3) 3 Gallon Tngerine Crossvine (CO 3) 12" Plant Bedding Mix (CO 3) Topsoil (CO 3) Seeding Shade Friendly Mix (CO 3) 36 37 32 33 34 35 $2,923,034.53 $375.00 $901,251.07 $908,590.32 $7,411.25 $4,710.00 $30,000.00 $4,100.00 462.50000000 462.50000000 9,972.50000000 217.00000000 10,689.00000000 4.00000000 60.00000000 4.00000000 Water Water Water Water Water Water Water $3,000.00 $125.00 $1,500.00 $78,000.00 $1,500.00 $500.00 $125.00 $18.75 $18.75 $2,500.00 $17,374.50 $83,531.25 $2,430.00 $1,500.00 $2,500.00 $6.50 $31.25 $1,500.00 $35.00 $1,000.00 Sewer 4.00000000 EA $450.00 $3,900.00Sewer75.00000000 LF $6,500.00Sewer $26,000.00 LS EA 99 Concrete Collar (CO 3) $5.00 $6,000.00 101 Preconstruction CCTV Inspection of Sanitary Sewer Pipe (CO 3)Sewer 1,200.00000000 LF 100 Remove Sanitary Sewer Manhole (CO 3)Sewer 3.00000000 EA $1,000.00 102 Postconstruction CCTV Inspection of Sanitary Sewer Pipe (CO 3)Sewer 1,200.00000000 LF $5.00 Irrigation (CO 3) 76 Remove Existing 5' inlet (CO 3) 75 Block Sod Updated (CO 3) 463.50000000 EA $5.00 $6,000.00 $16,222.50 $5.00 $2,312.50 462.50000000 LF $2,500.00 $31.25 $95.00 $10.00 $375.00 $11,562.50 Install New 6-Inch Concrete Driveway (50/50, 100% Water) updated (CO 3) 4" 2-Way Cleanout (CO 3) Sanitary Sewer Service (CO 3) 8-Inch Chem-Lime Stabilization @ 32 Lbs/SY (50/50, 100% Water) (CO 3) 104 Install New Concrete Curb and Gutter (match existing) (50/50, 100% Water) (CO 3)Sewer 463.50000000 EA Sewer Sewer LF 2,673.00000000 8.00000000 8.00000000 1,000.00000000 107 11-Inch Pavement Pulverization (50/50, 100% Water) (CO 3) 109 3-Inch Surface Course Asphalt, Type "D" (50/50, 100% Water) (CO 3) 106 Install New 6-Inch Concrete Driveway (50/50, 100% Water) (CO 3) Sewer Sewer Sewer Sewer 113 114 TPW 838.00000000 $3,494.68 $4,500.00 $12,570.00 Remove Existing 6-Inch Concrete Driveway (50/50, 100% Water) (CO 3)Sewer 462.50000000 LF Hydro Seeding Regular (CO 3) Pipe Bursting Point Repair (CO 3) 4" Sanitary Sewer Service Relocation on Private Property (CO 3) Sewer SY 499.24000000 200.00000000 Sewer Pvmt Marking Bike Lane (CO 3) WESTCLIFF UNIT 5: LANDSCAPING (TPW) 6' Wrought Iron Fence Updated (CO 3) Landscaping Allowance (CO 3) 3" Caliper Texas Red Bud (CO 3) 45 Gallon Wichita Junipers (CO 3) TPW TPW TPW TPW TPW TPW Sewer $1,113,193.14 $30,000.00 $4,100.00 $75.00 $125.00 $85.00 $10.00 LS $2,475.00 $14,375.00 $6,715.00 1.00000000 1.00000000 33.00000000 115.00000000 79.00000000 471.00000000 CY CY SY SY $15.00 $7.00 $10.00 $95.00 $2,000.00 $13,300.00 $2,550.00 SY LF LF LF EA LF LS EA EA EA EA EA 111 WESTCLIFF UNIT 3: DRAINAGE IMPROVEMENTS (TPW) $1,500.00 $145.00 9,972.50000000 SY $14.55 $339,803.31 $17,374.50$6.50 10,689.00000000 $31.79 $109,489.52 $95.00 217.00000000 TN $504.56 78 79 80 81 82 83 84 85 86 19 20 87 88 43 44 45 46 47 48 6" SLD Pvmt Marking HAS (Y) 50%Water- 50%TPW (CO 3) 6" SLD Pvmt Marking HAS (W) 50%Water- 50%TPW (CO 3) 49 50 51 16 17 18 Cleaning of Existing Storm Drain above our Connection Disposal (CO 3) 5' Inlets (CO 3) WESTCLIFF UNIT 4: PAVING IMPROVEMENTS (TPW) Pavement Pulverization (11" pulverize, 3" cut) (100% Trail Lake, Manderly) (CO 3) Cement (26 lbs/sy)(100% Manderly) (32LBS/SY) (CO 3) 3" Asphalt Pavement Type D (100% Trail Lake, Manderly) (CO 3) Curb and Gutter Removal Updated (CO 3) Concrete Paving Repair, Residential (CO 3) Curb and Gutter Updated (CO 3) Hydro Seeding Regular (CO 3) Hydroseeding wildflower (CO 3) 21" RCP Plugs for EOL Laterals on Suffolk (CO 3) Connection Junction Box, Vacuum Cleaning (CO 3) Connection Junction Box, Vacuum Disposal (CO 3) Cleaning of Existing Storm Drain upstream of connection at Granbury Rd (CO 3) Cleaning of Existing Junction Boxes upstream of connection at Granbury Rd (CO 3) Upper Junction Box Vacuum Disposal (CO 3) Traffic Control for Junction Box and Upper Line Cleaning (CO 3) 3" Chinkapin Oak (CO 3) 3" Caliper Red Cedar (CO 3) 3 Gallon Cast Iron Plant (CO 3) 3 Gallon Gulf Muhly Grass (CO 3) 3 Gallon Salvia Greggi (CO 3) 25 26 27 28 3 Gallon Coral Honeysuckle (CO 3) 3 Gallon American Beautyberry (CO 3) 3 Gallon Inland Seaoats (CO 3) 21 22 23 24 5,000.00000000 1.00000000 2.00000000 20.00000000 5.00000000 50.00000000 50.00000000 4.00000000 1.00000000 24.00000000 4.00000000 3,067.00000000 8.00000000 3,034.00000000 4,874.00000000 25.00000000 4,874.00000000 1,576.00000000 657.50000000 3.00000000 200.00000000 1.00000000 1.00000000 6.00000000 2.00000000 2.00000000 13.00000000 20.00000000 91.00000000 27.00000000 18.00000000 58.00000000 13.00000000 SY LS EA HR EA HR HR EA MO EA EA SY TN SY LF CY EA EA EA EA EA $8.00 $2,500.00 $1,000.00 $725.00 $2,500.00 $725.00 $725.00 $2,500.00 $4,500.00 $2,500.00 $4,500.00 $14.55 $504.56 $31.79 $8.00 $150.00 $43.75 $18.75 $18.75 $1,500.00 $240.00 $25,000.00 $2,000.00 $1,500.00 $2,000.00 $2,000.00 $75.00 $75.00 $75.00 $75.00 $75.00 $75.00 $75.00 $40,000.00 $2,500.00 $2,000.00 $14,500.00 $12,500.00 $36,250.00 $36,250.00 $10,000.00 $4,500.00 $60,000.00 $18,000.00 $44,624.85 $4,036.48 $96,450.86 $38,992.00 $3,750.00 $213,237.50 $29,550.00 $12,328.13 $4,500.00 $48,000.00 $25,000.00 $2,000.00 $9,000.00 $4,000.00 $4,000.00 $975.00 $1,500.00 $6,825.00 $2,025.00 $1,350.00 $4,350.00 $975.00 TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW TPW Change Order Additions Page 1 of 1 SY $10.00TPW225.00000000 TPW SY 37 3217.0002 4" SLD Pvmt Marking HAS (Y)TPW 270.00000000 LF $15.00 1 0171.0101 Construction Staking TPW WESTCLIFF UNIT 5: LANDSCAPING (TPW) 2 $4,050.00 27 3292.0100 Block Sod Placement (50% Anita, Suffolk) 3,034.00000000 CY $11.50TPW3,067.00000000 SY $21.10 $64,017.40 26 3292.0100 Block Sod Placement (100% Trail Lake, Manderly)TPW 613.00000000 SY $10.00 $6,130.00 15 3212.0303 3" Asphalt Pvmt Type D (100% Tr Lake, Manderly) 13 3211.0600 Cement (26 lbs/sy) (100% Manderly)TPW 8.00000000 $2,680.00 11 0241.1700 Pvmt Pulverization (11" pulv, 3" cut) (100% Tr Lake, Manderly) WESTCLIFF UNIT 4: PAVING IMPROVEMENTS 0241.1700 11-Inch Pavement Pulverization (50/50, 100% Water)Sewer 9,972.50000000 SY 2,673.00000000 SF 54 3212.0303 3-Inch Surface Course Asphalt, Type" D" (50/50, 100% Water) $35,270.50 10,689.00000000 SY $11.50 $114,683.75 56 3211.33 8-Inch Chem-Lime Stabilization @ 32Lbs/SY (50/50, 100% Water)Sewer 217.00000000 TN $21.10 $225,537.9059 12 3331.3105 4" San Sewer Service Relocation on Private Property (w/ Property Rest.)Sewer 211.00000000 EA $5.00 $13,365.0046 48 3213.0401 Install New 6-Inch Concrete Driveway Sewer 2,673.00000000 SF $25.00 $66,825.00 0241.0401 Remove Existing 6-Inch Concrete Driveway $1,301,811.18 $226,037.90 $563,064.63 SY $11.50 Water 600.00000000 $325.00 $225,537.90 Water 217.00000000 TN Water $70,525.00 Water 10,689.00000000 SY Sub Total Deletions Date TPW Water EA SY Client Project # C01669 & C01957 3 //2025Change Order Submittal # Contractor City of Fort Worth Change Order Deletions Project Name Westcliff Drainage Improvements Ph1 and Contract 91 Pt2 City Sec # 57280 DELETIONS Unit CostUnit 3201.0112 5' Wide Asphalt Pavement Repair, Residential 0241.0401 Remove Existing 6-Inch Concrete Driveway 3213.0401 Install New 6-Inch Concrete Driveway 0241.0100 Remove 4-Inch Concrete Sidewalk (50/50, 100% Water)30 36 51 11 TotalQtyDEPTITEMDESCRIPTION CONTRACT 91 UNIT 1: WATER IMPROVEMENTS (WATER) 31 3213.0301 Install New 4-Inch Concrete Sidewalk (50/50, 100% Water) 3211.33 8-Inch Chem-Lime Stabilization @ 32Lbs/SY (50/50, 100% Water) 34 0241.1700 11-Inch Pavement Pulverization (50/50, 100% Water) 39 3212.0303 3-Inch Surface Course Asphalt, Type" D" (50/50, 100% Water) 20 26 28 CONTRACT 91 UNIT 2: SANITARY SEWER IMPROVEMENTS (WATER) Water Water Water Water 3292.0100 Block Sod Placement (50/50, 100% Water) 3331.3101 4" Sanitary Sewer Service Sewer Water Sewer Sewer TPW LF SF SF SF CY TN LS 600.00000000 471.00000000 14,572.02000000 50.00000000 2,673.00000000 2,673.00000000 9.00000000 162.00000000 1.00000000 54.00000000 79.00000000 1.00000000 $7.50 $22.00 $5.00 $21.10 $52.00 $325.00 $250.00 $10.00 $10,972.00 $2,250.00 $800.00 $40.00 $18,000.00 $100.00 $1,200.00 $10,800.00 $70,525.00 $335.00 $2,750.00 $20,047.50 $58,806.00 $3,000.00 $55.00 SF $22.00 $13,200.00 $167,578.23 $1,620.00 LS $4,710.00 $250.00 $4,000.00 $2,000.00 EA 3292.0400 Seeding, Native Trail Mix $1,200.00 $2,400.00 4 3293.0101 Nellie R. Stevens Holly (45 gal) TPW 6.00000000 EA 3 3293.0100 Texas Redbud (3" cal) TPW 4.00000000 EA $1,000.00 $10.00 5 3293.0102 Chinkapin Oak (3" cal) TPW 2.00000000 EA $1,000.00 TPW 2.00000000 EA $1,000.00 $6,000.00 $1,040.00 6 3293.0103 Red Cedar (3" cal) $45.00 $2,430.00 8 3293.0105 Sideoats Grama (3 gal) TPW 149.00000000 EA 7 3293.0104 Cast Iron Plant (3 gal) TPW 26.00000000 EA $40.00 9 3293.0106 Artic Fire Dogwood (3 gal) TPW $5,960.00 $1,080.00 10 3293.0107 Oakleaf Hydrangea (3 gal) $55.00 $4,345.00 12 3293.0109 Plant Bedding Mix (12") TPW 115.00000000 CY 11 3293.0108 Coral Honeysuckle (3 gal) TPW 27.00000000 EA $40.00 13 3291.0100 Topsoil (6") TPW $11,500.00 $47,125.00 TPW 20.00000000 EA $40.00 14 3290.0100 Irrigation 15 3231.0133 6' Wrought Iron Fence TPW 325.00000000 LF $145.00 TPW $18,000.00 Sewer $512,708.65 Circle C Construction Company PM Berton Guidry, PE Inspector Brian McGill Change Order Deletions Page 1 of 1 $0.00Total M/SBE for this Change Order Previous Change Orders $0.00Total Type of Service Amount for this COM/SBE Sub CO #DATE AMOUNT City of Fort Worth, Mayor and DATE: 06/24/25 M&C FILE NUMBER: M&C 25-0607 LOG NAME: 20SWM WESTCLIFF PHASE 1 AND CONTRACT 91 PT 2 CHANGE ORDER 3 SUBJECT (CD 3 and CD 9) Authorize Execution of Change Order No. 3, to a Construction Contract with William J. Schultz, Inc. dba Circle C Construction Company in the Amount of $1,621,223.35 forthe Westcliff Drainage Improvements, Phase 1, and Sanitary Sewer Rehabilitation Contract 91, Project Part 2, Adopt Appropriation Ordinances, and Amend Stormwater and Water Capital Improvement Program Contributions to their Respective Fiscal Years 2025-2029 Capital Improvements Programs RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Change Order No. 3 to City Secretary Contract No. 57280 a construction contract with William J. Schultz, Inc. dba Circle C Construction Company, in the amount of $1,621,223.35 for the Construction of the Westcliff Drainage Improvements, Phase 1, and Sanitary Sewer Rehabilitation Contract 91, (City Project No. C01957) Part 2, for a revised contract amount of $18,001,715.95; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $946,260.00, from available PayGo residuals in the Water and Sewer Capital Projects Fund, for the purpose of funding the Sanitary Sewer Rehabilitation Contract 91 project (City Project No. C01957) Part 2 and to affect a portion of Water's Contribution to the Fiscal Years 2025-2029 Capital Improvement Program; 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Stormwater Rev Bonds 2020 Fund, in the amount of $350,000.00, from available Proceeds Drainage Rev Ref 2020 residuals, for the purpose of funding the Westcliff Drainage Improvements project by (City Project No. C01669); and 4. Amend the Stormwater Capital Improvement Program Contribution to the Fiscal Year 2025-2029 Capital Improvements Program. DISCUSSION: On February 22, 2022, by Mayor and Council Communication (M&C 22-0120), the City Council authorized a contract with William J. Schultz, Inc. dba Circle C Construction Company in the amount of $14,663,252.60 for the construction of Westcliff Drainage Improvements, Phase 1, and Sanitary Sewer Rehabilitation Contract 91, Part 2. The project provides for the installation or replacement of storm drain pipes, deteriorated sanitary sewer mains, and deteriorated water mains. The storm pipe improvements are the final phase of the overall four-phase Westcliff Drainage Improvements project to mitigate home and property flooding in the Westcliff neighborhood. The sanitary sewer component of this project is part of the Water DepartmenYs Sanitary Sewer OverFlow Initiative Program. As part of this project, all identified street segments will be reconstructed with asphalt after storm drain, water line, and sanitary sewer installation is completed. The contract was subsequently revised to add needed construction items by Change Order No. 1, in the net amount of $59,500.00, administratively authorized February 9, 2023. The contract was further revised to add needed construction items and a survey for easement negotiations by Change Order No. 2, authorized on May 14, 2024, by Mayor and Council Communication (M&C 24-0393), in the amount of $1,657,740.00 and an additional 190 calendar days was added to the schedule. Change Order No. 3 will provide modifications due to unforeseen conditions and design changes resulting from requests by the Water Department. The unforeseen conditions included unidentified sewer services on a sewer line planned to be abandoned and an existing storm drain pipe filled with debris. The scope affected by design changes includes water improvements for Westcliff Elementary, a shift from open cut to bore for private services, a change in pavement striping specifications, adjustments to landscaping, and adjustments to account for increases due to inflation. Staff recommends that the contract time be extended by an additional 192 calendar days due to the changes in scope discussed above, for a total contract time of 1,122 days. Contract item additions have been evaluated by City staff as necessary, and the unit prices were determined to be fair and reasonable when compared to City standard prices and recently bid projects. The following table summarizes previous contract actions and change orders: M&C Amount Original Contract � $14,663,252.60 Texas Council Communication Justification Original Contract Number Date M&C 22-0120 02/22/2022 Change Order 1 Change Order 2 Change Order 3 Revised Contract Amount The construction cost for Change Order No. 3. will be shared between the Transportation and Public Works Department Stormwater Division and the Water Department. The Stormwater construction cost will increase by $674,964.56, and the Water Department costs will increase by $946,260.00 (Water: $402,095.00; Sewer: $544,165.00). It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY), instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions of this M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2025-2029 Capital Improvement Program, as follows: Capital Fund FY2025 CIP Budget Chanc,�e Revised Project Name Authori FY2025 Name Appropriations llncrease/Decreasei gudaet W&S Capital C01957 — SS Projects — Rehab Contract $0.00 This M&C $946,260.00 $946,260.00 Fund 56002 91 $59,500.00 $1,657,740.00 $1,621,223.35 Add needed Administrative 02/09/2023 construction items Add needed construction items and survey for M&C 24-0393 05/14/2024 easement negotiations Design and construction changes and To Be additions to This M&C Determined address unforeseen conditions $18,001,715.95 Appropriations for the Westcliff Phase 1 Improvements and Contract 91 Part 2 are as depicted below: Existina Additional Fund Appropriations (This Project Total Appropriations M&C1 6002 Water & ewer Capital und (C01957) 0100 -General apital Projects �01957) 9601 — Water apital (C01957) 59607 — Sewer Capital Legacy (C01957) 52007 — $12,508,101.0 $1,050,034.0 $4,000.0 $498,439.0 $946,260.00 $13,454,361. $0.00 $1,050,034. $0.00 $4,000. $0.00 $498,439. Stormwater Rev Bonds 2020 (C01669) 52002 — Stormwater Capital Projects Fund (C01669) 30100 — General Capital Projects Fund (C01669) 59601 - Water Capital (C01669) 59651 Stormwater Cap Proj — Bonds (C01669) 59652 Stormwtr Cap Proj Legacy (C01669) 59653 — Stormwater Cap Proj 2007 (C01669) Proiects Total $7,386,000.0 $1,755,185.31 $500,000.0 $121,041.91 $6,029,823 $23,287 $586.4 $29, $350,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,296,260.00 $7,736,000.00 $1,755,185.31 $500,000.00 $121,041.91 $6,029,823.67 $23,287.92 $586.43 $31,172,759.24 Business Equity - William J. Schultz, Inc. dba Circle C Construction Company agrees to maintain its initial M/WBE commitment of 22.00% that it made on the original contract and extend and maintain that same M/WBE commitment of 22.00% to all prior change orders up to and inclusive of this Change Order No. 3. Therefore William J. Schultz, Inc. dba Circle C Construction Company remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous MMBE Commitment form executed by an authorized representative of its company. Funding is budgeted in the W&S Capital Projects and Stormwater Rev Bonds 2020 Funds for the TPW Department for the purpose of funding the SS Rehab Contract 91 and the Westcliff Drainage projects. This project is located in COUNCIL DISTRICTS 3 and 9. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified All-Funds project within the W&S Capital Projects Fund and Unspecified All-Funds project within the Stormwater Rev Bonds 2020 Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the W&S Capital Projects Fund for the SS Rehab Contract 91 project and in the Stormwater Rev Bonds 2020 Fund for the Westcliff Drainage project. Prior to any expenditure being incurred, the Transportation & Public Works and Water Departments have the responsibility of verifying the availability of funds. Submitted for City Manager's Office bk Jesica McEachern 5804 Originating Business Unit Head: Lauren Prieur 6035 Additional Information Contact: Thanaa Maksimos 2485 Expedited Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: M&C: 25-06 CPN: C 01669 CSO: DOC#: Date: To: Name Department Initials Date Out 1. Berton Guidry - Signature TPW 2.Keegan Jonkers k.jonkers@circlecconstruction.com Contractor 3. Brian McGill TPW 4. Tony Sholola Water 4. Thanaa Maksimos Review TPW 5. Lissette Acevedo - Review TPW 6. Patricia Wadsack TPW 7. Lauren Prieur TPW 8. Doug Black - Signature Legal 9. Jesica McEachern - Signature CMO 10.- Review CSO 11. Jannette Goodall - Signature CSO 12. Allison Tidwell - Review CSO 13. TPW_SW_Contracts TPW_SW ATURE: All documents received from any and all APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: YES No Return to: tpw_sw_contracts@fortworthtexas.gov Call 817-229-3283 with questions. Thank you!