HomeMy WebLinkAboutOrdinance 27958-09-2025Ordinance No.27958-09-2025
AN ORDINANCE ADJUSTING ESTIMATED RECEIPTS AND APPROPRIATIONS
IN THE DRAINAGE REV BONDS SERIES 2023 FUND, BY INCREASING
ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE PHARR STREET
STORM DRAIN PROJECT (CITY PROJECT NO. 105550) IN THE AMOUNT OF
$510,000.00 AND DECREASING ESTIMATED RECEIPTS AND
APPROPRIATIONS IN THE STORMDRAIN PIPE REHAB PROGRAMMABLE
PROJECT (CITY PROJECT NO. P00114) BY THE SAME AMOUNT, FOR THE
PURPOSE OF CONVERTING TO A STATIC PROJECT; PROVIDING FOR A
SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF
PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT
HEREWITH; AND PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS:
SECTION 1.
That the budget of the City of Fort Worth for Fiscal Year 2024-2025, as enacted by Ordinance
27107-09-2024, as amended, is hereby further amended to make the following adjustments to
estimated receipts and appropriations in the Drainage Rev Bonds Series 2023 Fund, by increasing
estimated receipts and appropriations in the Pharr Street Storm Drain project (City Project No.
105550) in the amount of $510,000.00 and decreasing estimated receipts and appropriations in the
Stormdrain Pipe Rehab programmable project (City Project No. P00114) by the same amount, for
the purpose of converting to a static project.
SECTION 2.
That should any portion, section or part of a section of this ordinance be declared invalid, inoperative
or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall
in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said
remaining provisions shall be and remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance 27107-09-2024 and all other ordinances and
appropriations amending the same except in those instances where the provisions of this ordinance
are in direct conflict with such other ordinances and appropriations, in which instance said conflicting
provisions of said prior ordinances and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance shall take effect upon adoption.
APPROVED AS TO FORM AND LEGALITY:CITY SECRETARY
____________________________________ _____________________________
Jannette S. Goodall
Assistant City Attorney City Secretary
ADOPTED AND EFFECTIVE: September 16, 2025
Mayor & Council Map � CPN #105550
Pharr Street Storm Drain Project
Includes Water, Sanitation Sewer and Paving Repairs � CD #11
- '.: r. , _
Proposed Replacement
• • Storm Drain System
• • Water System
Sanitary Sewer System
Council Districts
9 - Elizabeth M. Beck
11- Jeanette Martinez
O
��
Q
�G
�
� S�
�PG
�Q � �`
.. °. • "`�•-��
9 - Elizabeth
M. Beck
_�..
�
� -�
�
�'
. �
� \
�Q
�
v
�
�
� �
�
�
0
�tc 4` 1
�l
� F� �� ���
'0 �-' y"
7 �
Q �
F", 'j
s � ^�
_ �
FORTWORTHo
�
N
�
� �
�� � �y � � � � 2
� ,
S � :�.. — �
11- Jeanette `�,, � • o
Martinez � . ' z
������ .
• Qa,�
}•' � �'i• '
��"a� � • i
� � �• �`' � °i �t ;� -
��� � � � -� � ,
• •o .� `. J .
�� • • "� �� : ��.
� , • �;g �. :
� •� • d s��
� �� :.j ��i� ►�$��
� � r}� ir
y• j J� . r. ry�J ` ���! ���+;.
• • � +�h*�►A��� � '��:
� • �� ��t d� � �� '�
�+ ��,� � �..
�
'' � � �
. �
,� � , � ��
,, �
,► ; � z
..:_.,. �
. � `'� ., . � "- v
" ` �,� �
,• �, "�, 4 � C�
r � � � ' � � ��� i ��� , f
� � , i^� � �!
��' � � �
ll,, �. �r
• .. �� +� ' �
h �� �O �
U' � �
� �', _ .� ��•�� • - .. .
G � �� �.��. , . � ,•
� ,�a� � � ,- � � ,;
: "�
: � � �
^�� : �� � . .. `�.' yJ� / .!" ;:,•
• � .�_�.' . � .
�
_ � �
I'311��
i i� :
; ��
_ '�` r
�' � V' 1
�
K
�
IXifPS �E
35
�,
��
��
.�
� - _ _ � �I,
A ��'' _ --.� � �
.�„ ����� �
._ �� .. ,
Data Source: CFW GIS, NearMap � Map generated August 2024
160 32� TPWBusinessSupportServices
Copyright OO 2024 City of Fort Worth. Unauthorized reproduction is a violation of
applicable laws 7his data is to be use forgraphical representation only The accuracy
Fe et is not to be taken/used as data produced for engineering purposes or by a registered
N professional landsurveyoc The Cityof Fort Worth assumes no responsibilityfor the
accuracy of said data.
City of Fort Worth,
Mayor and
DATE: 09/16/25
Texas
Council Communication
M&C FILE NUMBER: M&C 25-0865
LOG NAME: 20SWM PHARR ST STORM DRAIN AND W/WW REPLACE-WESTWOOD DESIGN
SUBJECT
(CD 11) Authorize Execution of an Engineering Agreement with Wesfinrood Professional Services, Inc. in the Amount of $298,270.00 for Design of
the Pharr Street Storm Drain Project, Adopt Appropriation Ordinances to Effect a Portion of Water's Contribution to Fiscal Years 2025-2029
Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of an engineering agreement with Wesfinrood Professional Services, Inc. in the amount of $298,270.00 for design of the
Pharr Street Storm Drain project (City Project No. 105550);
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund
in the amount of $283,665.00, transferred from available PayGo funds in the Water and Sewer Fund, for the purpose of funding the Pharr
Street Storm Drain project (City Project No. 105550) to effect a portion of Water's Contribution to Fiscal Years 2025-2029 Capital
Improvement Program; and
3. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Drainage Rev Bonds Series 2023 Fund,
by increasing estimated receipts and appropriations in the Pharr Street Storm Drain project (City Project No. 105550) in the amount of
$510,000.00 and decreasing estimated receipts and appropriations in the Stormdrain Pipe Rehab programmable project (City Project No.
P00114) by the same amount, for the purpose of converting to a static project; and
4. Amend the Fiscal Years 2025-2029 Capital Improvement Program.
DISCUSSION:
This Mayor and Council Communication (M&C) is to authorize execution of a contract with Wesfinrood Professional Services, Inc., which will
provide engineering and design services to replace the deteriorated stormwater, water, and sanitary sewer systems under Pharr and Gilvin
Streets. The roadway will be paved after the proposed improvements are completed.
In March 2024, the City repaired a sinkhole on Pharr Street and, upon doing so, discovered the need to replace the entire stormwater system
under Pharr and Gilvin Streets. The Transportation and Public Works Department, Stormwater Division will collaborate with the Water Department
to complete the replacements of the stormwater and water/sewer infrastructure.
In May 2021, the Transportation and Public Works Department (TPV�, Stormwater Management Division (SWMD), published a Request for
Qualifications (RFQ) for various engineering consulting services. Forty-five consultants responded to the RFQ for the project development and
design service area with Statements of Qualifications (SOQ). An evaluation team of three City staff subject matter experts from the SWMD of TPW
scored the SOQs based on company experience, prior projects, workload, and team experience. The City's Business Equity team also evaluated
the SOQ's. A pool of twenty-one consultants was selected based upon these scores to be matched with specific projects. Based on this scoring,
Westwood Professional Services, Inc. was selected as the most qualified consultant to perform development and design services for this project.
Westwood Professional Services, Inc., proposes to complete design and engineering services for a fee in the amount of $298,270.00; TPW
Stormwater will fund $158,905.00, and the Water Department will fund $139,365.00. The services provided will include data collection and design
for the replacement of water, sanitary sewer, and stormwater pipes, and the replacement of pavement on Pharr and Gilvin Streets in the affected
areas. Staff considers the fee to be fair and reasonable for the proposed scope of services. In addition; $214,300.00 (Stormwater: $70,000.00;
Water: $47,400.00; Sanitary Sewer: $96,900.00) is necessary for project management, permits, utility coordination, public meetings, and material
testing. This project will have no impact on the Transportation & Public Works Department or the Water DepartmenYs operating budgets when
completed. The sanitary sewer component of this project is part of the Sanitary Sewer Overflow Initiative Program of the Water Department.
It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY), instead of within the annual budget ordinance,
as projects commence, additional funding needs are identified, and to comply with bond covenants.
The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2025-2029 Capital
Improvement Program, as follows:
Capital Fund FY2025 CIP Budget Revised
Name Project Name Appropriations Authority Adjustment FY2025
Budget
002 - w&s
ects —
Pharr Street
Storm Drain - $0.00 This M&C $283,665.00 $28
CPN (105550)
Funding is budgeted in the Transfer to Water/Sewer account of the Water and Sewer operating budget for the purpose of funding the Pharr Street
Storm Drain project.
FY2025 — Water PAYGO Appropriations per City Ordinance 27107-09-2024
FY2025
Amended
PayGo (includes YTD PayGo FY2025
FY2025 Original any council Approved
Adopted PayGo actions for/Moved to Remaining
This M&C PayGo Balance
subsequent to Capital Projects
budget
adoption)
$92,597,771.00 $145,458,196.00 ($78,904,493.00) ($283,665.00) $66,270,038.00
Note: There may be other pending actions or recently approved actions that are not reflected in the table due to timing.
Fund Existing Additional project Total
Appropriations Appropriations
Drainage Rev Bonds
Series 2023 — Fund $510,000.00 $0.00 $510,000.00
52008
W&S Capital Projects $0.00 $283,665.00 $283,665.00
- Fund 56002
Project Total $782,000.00 $283,665.00 $1,065,665.00
Funding is budgeted in the Drainage Rev Bonds Series 2023 Fund for the TPW Department for the purpose of funding the Pharr Street Storm
Drain project, as appropriated.
Recommendation 3 will adjust appropriations befinreen Stormdrain Pipe Rehab programmable project (City Project No. P00114) and convert the
Pharr Street Storm Drain project (City Project No. 105550) into a static capital project. This action is needed as future funding for this project is
anticipated from other funding sources and the scope of this project differs from that of the current programmable project.
The project is located in COUNCIL DISTRICT 11.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Water & Sewer Fund and in the Pharr Street Storm Drain project within
the Drainage Rev Bonds Series 2023 Fund, and upon approval of the above recommendations and adoption of the attached appropriation
ordinances, funds will be available in the W&S Capital Projects and the Drainage Rev Bonds Series 2023 Funds for the Pharr Street Storm Drain
project to support the above recommendations and execution of the engineering agreement. Prior to any expenditure being incurred, the
Transportation & Public Works and Water Departments have the responsibility of verifying the availability of funds.
Submitted for City Manager's Office bk Jesica McEachern 5804
Originating Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Thanaa Maksimos 2485
John Kasavich 8480