Loading...
HomeMy WebLinkAboutContract 45207 COMMUNITY FACILITIES AGREEMENT THE STATE,OF TEXAS § City Secretary 'A COUNTY OF TARRANT § Contract No. rilo, WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project") within the City of Fort Worth, Texas,(",City"); and WHER]EAS, the Developer and the City desire to enter into this Community Facilities in connection with the Improvements. Agreement("CFA"or"'Agreement") Developer and Project Information,., Developer Company Name-, M &C Development, Ltd. Address, State,,Zip Code: 3825 Camp Bowie Blvd. I Fort Worth,TX 76107 Phone, E-Mail: (817)665-2321,randy.lockhart@att.net Authorized Signatory/Title-, Haydn Cutler, General Partner Project Name and Brief Description: Water, Sewer, Paving, Drainage & Street Light Improvements to serve Marine Creek Ranch, Section 7 Project Location: North of Crystal Lake Dr. & East of Center Hill Rd. P'lat Case,No.: FP- 13-032 Plat Name: Marine Creek Ranch, Section 7 Council District: 7 City Project No: 02166 CFA: 2013-079 DOE: 7 101 To he completed by staff.- Received by,. 'Date: rD o kii OFFICIAL RECORD Cilry sECRETARY RECEIVED DEC 17 FT.WORTH,TX ny 'r'141 W,THEREFORE,For and in consideration of the covenants and conditions contained herein.the City and the Developer do hereby agree as follows: General Requi'rem ents A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees, to comply, with all provisions oaf said Policy in the performance of its duties and obligations hereunder and to cause all contractor's hired by Developer to comply with the Policy in connection with the work performed by said contractors,. B. Developer shall provide tinancial security 'in conformance with paragraph 6, Section 11, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said, process requires the contractor to submit an Affidavit of Bills, paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub-contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans,, specifications, and cost estimates provided for the Pro*ect and the exhibits attached hereto. T he following checked exhibits are made a part hereof: E. The Developer shall award all contracts for the construction of the Improvements 'in accordance with Section If, paragraph 7 of the Policy and the contracts shall be administered in contormance with paragraph 8, Section 11,,of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: 0 - It I To employ a construction contractor who is appirolvelci by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's,requirements for being insured, licensed and bonded to do work in public streets and/or pre qualified to perform rater waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and perfon-trance bond in 2 the names of the City and the Developer for one hundred percent (100%) of the contract price of'the Improvements, and a maintenance bond in the name of the City for one hundred percent(1001%) ofthe contract price of the Improvements for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. I -orm the, construction work contemplated III To require the contractor(s) it hires to per,f 11 A 4, herein to provide insurance equal to, or in excess of the amounts required by the City's standard specifications and contract documents for develo,pler-awarded Infrastructure construction contracts. The City shall be named as additional I It insured on all insurance required by said documents and same will be evidenced on the ACC RD Certificate of Insurance supplied by the contractor's 'insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of"Intent to commence construction so that City 'inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City *inspection forces, and not to 'Install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v,. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction gill commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G., Developer agrees to provide, at its expense, all, engineering drawings and documents necessary to construct the improvements, required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. 1. City shall not be responsible for any costs, that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community 3 facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City .7 harmless for any inadequacies "in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required tor the construction of the, current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmles,s, and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted, brought for or on account of any *injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors,subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act,, intentional or otherwise, neglect or misconduct of said DEVELOPER, is contractors, sub-contractors, officers, agents or employees, whether or not such injoufies, death or dam es are caused, in whole, or in Part, by the alIgged negl* nCe o f the ON OL or Worth,�ils officers, servants, Lge or employees. M. Developer will further require its contractors to indemnift, defend and hold harmless the City, its officers, agents and empilo:yees from and against any and all claims,, suits, or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any "injuries or damages to persons or property, 'Including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated hereitt, whether or not such # - - death damag sed " injuries, or es are cay --,, in whole or in part,, by the al n 'z' ence of the City oLFort Worth, its o icers, servants, or etqployees. Further, Developer will require its contractors to 'indemnify,and hold harmless the City for any losses, damages,costs or expenses, suffered by the City or caused as a result of sand contractor's failure to complete the work and construct the improv in n al a good and workmanlike manner,, free from defects, in conformance with the '1 i Policy,and n accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the infrastructure and tmprovements, Developer will, assign to the City a non-exclusive right to enforce the 4 contracts entered into by the Developer with its contractor along with an assignment of all warranties given by -the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions, granting to the City the right to enforce, such contracts, as an express intended third party beneficiary of such contracts. 0. Inspection and material testing fees are required as follows". t. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%:) for a total of 4%of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash plaving, and storm drain 'inspection fees equal to four percent(4%) and material testing fees equal to two percent 1(2%) for a total of 6% of the developer's share of the total, construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total,cost of street signs. P. COMPLETION WITHIN 2 YEARS I If applicable,the City's obligation to participate(exclusive of front foot charges) in the cost of the Improvements shall terminate if the Improvements, are not completed within two (2) years; provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one year. If the Improvements are not completed within such extension pie i r old, there will be no further obligation of the City to participate. City participation in a CF'A shall be subject to the availability of City funds and approval by the Fort Worth City Council. 0 ii. Nothing contained herein is intended to limit the! Developer 's obligations under the Pollicy, this Agreement, its rinancial guarantee, its agreement with its contractor or other related agreements. iii. In he City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvet-nents if at the end of two (,2) years from the date of this Agreement the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of 5 the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years, if the Developer breaches this Agreement, becomes insolvent or falls, to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) 6 Cost Summary Sheet Project Name: Marine Creek Ranch, Sectton7 ................. CFA No..- 2013-079! DOE N . Items Developer's,Cost ,A. Water an Sewer Construction 1. Water Construction $ 343164220 2,Sewer Construction $ 172$694-40 Water and Sewer Construction Total' $ 516,336.60 B. TPW Construction 1,Street $ 960,747.00 2,Storm Drain $ 256,120.010 3.Street Lights Installed by Developer $ 86,164.89 TPIN Construction Cost'Total $ 1,303,031.89 Tota!Construction Cost(excluding the,fees): 1,819s368.49 Construction Pines: C. Water/S�ewer Inspection Fee(2,%) $ 10,32673 D. Water/Sewer,Material Tesfing�F'e,e(21%) $ 101,326.73 -Total for Water Construction Fees $ 20,653,46 E. TPW Inspection Fee(4%,), $ 48,674.68, F. TPW Material Testing(2%) $ 24,337'.34 G, Street Light Inspsection Cost $ 3,446.60 H. Street Signs Installation Cost $ 2,4501.0101 Sub-Total for TPW Construction Fees $ 78)908.62 Total Construction Fees: $ 99,562.08 Choice Financial Guarantee 92tioins,choose one Amount (ck,one) and=I�0% $ 1 m819,3 .491 Completion, reement=100%/Holds Plat $ 1,81%368,49 lCash Escrow Water/Sanitay.Sewer=1251% $ 645,420.75 Cash Escrow Paviin Storm Drain= 125% :F$ 1,628,789x86 Letter of Credit= 125%w expiration period $ 2,1274,,210 ZI ................... IN TESTIMONY WHEREOF, the City of Fort Worth has caused this, instrumen'tto be executed 4 - in quadruplicate in its name and on its, behalf by 'Its Assistant City Manager, attested by its City Secretary, with the co lorate seal of the City affixed, and said? 0-4- rp eloper has exec7ult " hi's L/ instrument 11nuadruplicate, at Fort Worth,,Texas this day of 20 CITY OF FORT WORTH-Recomitzended Water Department Transnortation & Public Works Department _��V RE. Wendy Chi- abulal. MB , EA, P.E. Douglas iersig, Develop m t Engineering Manager Director ,Approved as to Form &Lega .- Approved by Clity Maniagerl's,Office I"" 00� 00 Douglas W. Black Fernando Costa Assistant City Attorney Assistant City Manager M&C No. Date-, ATTEST: 00 0, 8 '01 '01 0I 4F Aary J, Ka 000,0,0000 City Secret o ATTEST.- DEVELOPER,: M &C nt, Ltd. ........................ ....... P yw V. ............. 01000" 110, Signature Signature Name: Fay Cutler (Print),Name: 6 kxlel T itle: General Partner Title- OFFICIAL RECORD, ' CITY SECRETARY' FTs WORT H9 TX i NO OWN PIM Arl �1 hill w FAD OWN SECTION 00 42 43 PROPOSAL FORM Marine Creek Ranch Section.7 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Me&wre Bid Quantity Unit Price Bid Value UNIT 1:WATER ........ 1-01 330,5.01019, T,r,e-nc,h Safety, 10 LF 70b8: $1,401,60 1-02 ��"�'�.�t��1 ute I �Pa w/Retra,int I31 T­ 8 ,,60. 0- 3 8"PVC Watepe 33 11 12 LF 3.952 X29.179 1 1 $79,0,4-O,O-0 1,173­6,11,11101"!PVC Water Pipe 33 11 12 LF' 947 $30,00 $28,41000 -05 , ' " , "' 1 12WiaPipb S -- , -, -- -- ""', LF $46.5 1 0 9 i 1-06......33111.01461 12"PVC Water Pipe 3311 12 LF 2019 $X00 $72,684.00, ---- I---"Ill-1-11,11-11- -1-11----,........... 1-07 113312,0001,Fire Hydrant 3�3 12 40 1111 1111........ EA 7 $2,850�00 $19,950.00 1-0181 331,2,0017 Connection to Existing 4"-121"Water Main 33 12 25 EA 2 ...... ...... $800.00 1'60 1111.11-09 133,12.2003 1"Water ter Service 33,1,.x..1.0.110 EA 74 $1 860.00 ....................... . ......'"11 ­111................... ... .... ....... $63,6�40.0-10 3312.2203 2" Service ......... .......... ,9010.00.... ......... ........................ ........ $3,800.00 1111 1111 1 3312�3002 6"'Gate Valve 33,1220 EA 7 $83000 $5,810.00 1-12 '3312,20 EA 16 20 00 $19,200.00 1-13 3312.30014 2""G2 20 EA 2 $1,72O.00 $3,440-00 1-14 33123005 1 Gate Valve 33 1220 EA 8 $2,140.00 $17,120.00 1-15 9999.0 0 4"Sch,40 PVC Irrigation Sleeve LF 420 $M00 $4,,200.00 1-16 91999,0001 Testing LF 7008 $0_,20 $1,401.601 UNIT I TOTAL: $343,642.20 2-01 3305�.0109 Trench Safety 33 05 10 LF 3168 $1.00 $3,168.00 1111 .................. ... ..... ....... 2-02 3,331.3101 4"Sewer Service 3331 50 EA 74 $605�00 $44,770.00 2-03 3331.4115 8"Sewer Pipe 3311 10,33 31 1 , LF 2971 3331�20 $26.00 $77,246.00 .......... ''Ill., I.- - I - ,, I . r� -I I . 2-04 3331.4116 8"Sewer Pipe,CSS Backfill 33 11 10,3331 12, LF 197 333120 $36.00 $7,092-00 2-05, 3339.0001 Epoxy Man,holle Liner 13339,60 VF 10 $1901.00 $1,9�00.00 1111................ . .......... .. . .............1111 2-06 3339.10011 4'M�anhole(Up to 6'depth) 33 39 101,33 319,20 EA 13 $2,200.00 $28,600�00 f 2-07 3339.1�003 4"Extra Depth Man!hole 33 39 10,33 39 20 VF 3,o $100,00 $3,0001.00 1111.2-08 9999.01002 Connect,to exisfing EA $5,00.00, $5010.00 2-09 9999.0003 Clay Dam EA 4 $250.00 $1,000.00 2-10 9999.0004 Vacuum Test Manholes EA 13 $100.00 $,1,300,00 2-11 _19999,0005 Post TV Inspection LF 3168 $1.30 $4,118A0 UNIT 11 TOTAL: $172,694.40 UNIT Ill,:PAVING, 3-101 0241,1100 Remove Asphalt Pvmt 02�41,15 SY 747 $9.00 $6,723.00 3-02 31 ry'61 64"Me'd her'- 'S't...o....ne,kiprap,'d,ry '3"1 37,00, SY 41 $2.00 $8Z00 3-03 3211.0400 Hydrated Lime(30 LB/SY) 3211 29 TN 403 $150-00 $60,4501.00 _ 1111 3-04 3211.0501: 6"'Lime Treatment 32 11129 SY 13250 $175 $23,187.50 1111,��5 3211.0502 8""Lime Treatment 321129 SY 13660 $1,50 $20,490.00 16 3213.0101 6"Conc Pvmt 321313 SY 12371 $2&00 $346„391.001 .......... .. 3 07 3213.9'193 8”Conc Pv,m,t 32 13.. Sy 12950 $33.25, $430,587.60 .......... J�... .......................... ......... 3-08 13 0301 4"Conc ewalk 321,320, SF 7232 $4.251 $30,73&00 3-019 3213.0501 Barrier Free Ramp,Type R-1 321320, EA 18 $17,100,.00 1111.. 1111 SF 5172 $4.25, $21,981�00 3-10 99^99.00102 4"Temporary Asphalt Sidewalk J- 3-11 9999.0003 Pavement Header LF 37 $�6,00 $22�2,00 1111 3-12 9999.0004 Type Ill I Barricade EA 1 $1,500m $1' ..................... -1,11 I'll-1 �,I-I'll-........ -1111111111 1 ­­" I 3-13 9999.00015 Remove Existing Barricade EA 1 $175.00 $175.00,1111. 3-14 EA J,9999.0006 Connect to existing Pavement Header 3 $�375,0 0 $1,125.00 UNIT Ill TqTAL:L__$960,747.01? ,. UNIT IV*STREET LIGHTS ,1 3441,3302 1OOW NIBS Lumin ray 24 $306 u�u EA $�',344 4-62 3441.33 11 kdwy III urn FoundatiM rt TY 4 344120 EA 24 $1,06600 $25,608M 4- 9999M07 ch 0 PVC Conduit(T 260533.,,.... ..... r,,.. $4.910, $1�..- -1.1 ..cta� . 34 41 2g LF 1,0557 $0,47.......... V/�y/��'^�+r� N'�M,P"Y.M'1 .. 4- 9999.0010 Furnishlinstall d-25 Street.Light Piole&Light 34 41., .. g�i a�tur e� EA Fl 24 $1,292,gO $31,0108,00 UNIT IV TOTAL: $86,164.89 UNIT V:STORM DRAIN 5-01 024 1,44x1 l'em�a�re 1-lew�°rM11�SE�T 4 ....,.. ,. 41 14 EA 1 - 1,dCgng $1, gD.tig .. 137.0104 Medium Stone Riprap,.dr 31.3�"g� Y 11 g4 45,00 4 630.00............$g3 330;.0 1 0g Trench Safety 330510 LF 2307 $0.50 $1,1 98.50 ,M 5.0112 Concrete C her 33 g$1 ` LA 2 $2501,00 $500.00. ­ 5-05 3341, 201 211"RCP,Class 111 3341 10 Ll= 42 $43,00 $20,400.00 5-06 3341. 205 24""RCP,Class 111 33'41' 1� LF ag 2,5g $29,347,501 5-g7..,, 3341,0208 2. RCP"Class .. ...... $ .... ... �"' N 33 41 10 LF 1,37' $ 9.010� ,g,�3». g' ..., �.08 334 .. ,_. . .,., _ .._.. ... ., „ Class . ,... ,. $73 $142,483.00 ..... ...,.... 1.,...,,.. 11 33.,. .- �g,. 41 1 LF 5-0g 3341.0309 36"RCP, 111 3341 10 LF 39 $8'6»00 $33"745,00 8-10 3341,0402,42"°R CI P,CIass 1111 ;3 41 10 LF 208 11;x'.00 $33,378.00 5-11 13349.0001 4 Storm.Junction _ ., .., " �"4�at�V"r�67Io .. 33 49 N VuN E,�""1 3,200-00 ,��^�y�y yy�+,+,y./�y 51-12 3340,00 ,..,, ., 02 5 Storm Junction Box 33 49 10 EA 2 3,500.00 $7"000.00 13 3340.1004 27""Flared lleadvMe1I,1 pipe ""33'49 40 E"'"A 2,300.00 $4,600.00 6-14 3349.5001 10"Cur Inlet 33 4'g 20 EA 2 2,800.00 $5,600,00 .,- ....... .,,...,.. .. ....... ,...m. 6­- .15 3349.5002 1 Curb Inlet 33'4g 20 EA 11 3 ,. I X700.00! $40,"00.00 -16 ..... 334. .. ..._ ... . _.. ...,. .,..... ... ., _. ..... 700.... $7,400.00 Ura,p ll1 et _..3 4g 2g w ., -17 9999.0011 Concrete Flume LF 1031 8.00 $8,248.00 5-18 19999.0013 4"Wde Swale LF 268 17.00 $4,560.00 UNIT V T TAL: 256,120.00 SUMMARY UNIT I TOTAL. $343,042.20 UNIT 11 TOTAL: $172,894.40 UN,IT I1.1 TOTAL: $960"747.00 U N IT IV TOTAL, $86,1164.89 LI N IT V TOTAL: $2561,120.00 TOTAL BID 1,819,368.49 END OF SECTION w P oLOCATZCW 01 NO Vlkr 0"'L CATION MA MAP= Na- CREEK R"CH BL OCK Lo LOTS X 57-66o, 7 - and 9OX BL OCK Qp LOTS 1-7 T,, L07S 1-26 BLOCK Q, LOTS — BEING' ACRES OFLAND LOCATE LOCATEO IN THE JOSEPH BOMAN SURVEY, ABSTRACT NO. 79 AND THE 0WMM/Dm;vElDpzR#o ALEXANDER F. ALBRIGHT SURVEY, ABSTR4CT NO. 1849: CITY O FORT WORTH, TARR4NT CO N7Y E HAY,CO REALTY, LTD. 3825 CAMP BOWIE BLVD. 74 BUILDABLE L07S, I FORT'I TEL* (817)WORM, 665,,,2321 CONTACT: RAMY LOCKHAW S E FP-013-032 CA SE NAME: I E CREEK RANCH PHA SEC TION 7 DA M '10.02.13 MARINH CRZHI-c M M� r tCL PROJEC 2 I?AJVC,.jff c'os i nnis-i-associates A W4 B Y A. MCGINLEY ivA lay r I lbpo rogiAntim, r CHECKED BY.- A., CASCO PLAT INFORMATION 2'0 0 #o s t o b ro fm 817-469-167t SHEET : F w --------------- MATCHLINE EXHIBIT �A SHEET HA=RMTY, V VOL 14192, P: 644 DRTCT Ji3URE PHASE PROP r 12" WL aD 4111 fj N , s Cw 0 40, �r RU �P b ► N V a. 40 ot HILL goAD a 1 MURE PHASE HAYM RM7r, LM PROP. 1 WL VOL 14192,PG. 644 TC �. .. .... 'XIS TINE LEGEND WA TER LINE WAI TER LINE 200 0 100 2W 410 FIRE HYDRANT GA 7E VA S R ES' nch = 200 ft. NOM AU WMER UMES ARE 8"UNU"SS O WSE DA : 10-02-13 MARINE PROJECT 2652-01-01 m rr s ie-i nd i ass fates WATER 200 east obrom DRA WN B Y.- A. MCGINLE Y 01V "a raostmfion number.f—2759 CHECKED B Y: A. CA CO f of orling ton, texos 76010 -- EXHIBIT A 817'- 469-1671. SHEET N . 2 OF 10 SHEET F fo.x: 11'17274-S757 wwV.MMak4xa9.C 0 rte A,A 1 EXIS TINE 12 WA TER LINE 1_ 2190 CITY Of FW*WIN avimrARY SOM Ma I f1 opwrcr CAULD w AM0 ACM ary or Fwr DPRYCT UAYCOA"Mo LID Vo-ton ft6" FUnM PHA. PROP. " WL FURW ASE LID f4fu f oRmr MATCH LINE IT ►'"A" SHEET 1 r W e�► LINE' 200 0 100 FIRE HYDRANT GA 7E VALE SER VICE ' M AU WA7M LINES MW 80 UNMSS OnfERME NOW inch = 200' f t.. DA 7E 10.02.13 r,M,JON% MA RIIVZ PROJECT 2652 I?AArC.,U y se- *n' I -rasa fates DRA WN BY: A. MCGINLEY ' S-ECT701V A artooeating surveyiN iarxftic rchit"txa pia ar lm nmbw. f Mg WATER 00 cost abr0m CH`�CK"�, 8Y. A. r, SCO gar i�f arIPn torn, tit xa3 76Oil0 EXHIBIT 817 469-1671' SHEET NO.- F 10 SHEET f ai x; 617 -274--67571 w w w mini taxaasc0Mi HA YW REAL" ; "L VOL 1419Z PG; $44 M1" w.. FUTURE PHASE � " " CAVEt S to 40 to i 0 lAll 84! to i n w 4r .s "AM Y to RCLAD �WMW� M 8. CENO f'TURE PHAW 1, i HA=R.IX V WL 14192,M 644 TCT op EXISTING �. SAM 7A SEWER LINE SANITARY SEWER MANHOLE TH CONCRETE COLLAR 8" SANITARY SEWER SANITARY SEWER SERVICE 1 inch = 200 f . DAB . 2. 3 MA,R-TX-E C REC T 2652-01-01 pA.N1""V T-T DRA WN 8 Y.- A MCGINLEY S-E(7, 21"77 U-`N clyff angtmeting surveying farKluape ateNlecture pt,* tbpe r 't*n0on rturnbar f-27511 WASTEWATER . CAB wDa3t abwramrw CHECKED "A. � to 1) arIIn91on, texas 76010 EXHIBIT A- 617-469-1671 .SHEET N F 10, tax; 817-..274-8757 wwVww,mmatIx00-00 r TC UNE E IT "B" SHEET HAS REALTY, LID WL 14192,.P 44 DIRTU �. F7?JR PHASE ILI TYPE », RAW TYPE '-I 44 RAW I A N� N CIO CAV1, D ia E) Ilk R. ,rlp TYPE R-I Atl RAMS" YPE R-t /+ w AA4dfi""} gyp" .P 'Cw '7 w d 14192. Pa 5 TYPE R TYPE R-I RAW RAMP TYPE R-I RAMP 60** ROW 29* B—B PAVEMENT 6" C "NC inch 200 f t.. 5 * ROW DA T". MAREVEI C.R-E-EKI { CHECKED '00I PROJECT 2652-01-01 -RAIV mycos�ki�e��,�-mc'innis�-+,,associates DRA KV BY.- A. MCGINLE Y SHICT101v thpe rv4,*atm' num6w f—2759 Y. A. CASCO I$ o�,V1agion, texas 76010 EXHIBIT 1 469.1671 SHEET NO: 5 of 10 SHEET 1, OF 21 lox: 8 17-27*-8757 wwv.m m ataxaa.oaa� EXIS77NG f " r EEN MN A SUVE t ? ic a x, EAR"~FA*—SAQW A W 3 Y Cr n`r WRTH I ELS*NTARY W4 0 8'14 4 SW I N "IC7 AO XOS4 W h W �p IN`�1�!�C COO F 0✓ 00 h5, N so NOW RMTr,LTD KL 109Z M 044 FVIVRE PHASE FUWRE PHASE RA)W MAN,0+ VOL 1409,Z M 644 ORMT TCH BIT "....." SHEET I 37' PA VEMEN T,� 8,11' C 'C.)l 200' 0 100 200 60" ROW 291* --B PAVEMENT, 6" CONC.; nch 2010 F 5 W DA TE: 10.02.13 w � r MA,R11VH CREEK PROJECT 2652-01-01 Co.",HA-Y w A. �"� � � " oh4l enp �� ur, r landscape r�ch1locture pl�V B EXHIBIT 817-469-167$ SHEET 6 OF TO SHEET 2 OF 2 fa x, I t 7' 274-8757' MATCHLIM EXHIBIT "B-1" STET 2 5* ' HAS REALTY, LTD Z PO,INLET . R 15" CURB INLETS ,4 X4" r SD RCP .. 5 W50 CAVE DOVE WMH1 in �4 x NO `s ISLA cry,ar Lq � ka .., 1.5" CURB INLET Al R CP EST 1C� EXISTING 15 5"ACC�'P � "� CURB CURS INLET S-,%- OSDUH I L 1 CURB '' jqoAD HEADWALL sr coo W PHASE' 1'5" CUR&.. .._ � HA WO REALTY, LTD 24 . .� X04 42* RCS'' INLETS �' 14192,� ��� 15„ RCP RCP �...� EXISTING CURB 48 Pop RCP INLETS LEG EXIS + ENu JUNCTION BOX. STORM SEWER LINE 2001 a 10 200 0 STORM MANHOLE CURB INLET 1 inch 200 ft. DA 7E: 10.020 13 MA,R-TIVH CRH-EW,7.Lr--,'p.- PROXCT 2652-01-01 «� � � C� x 7 cNil onoo wring survey"land archo odurre planting tbpe r4stroi(on numtor: {..279 2�� Boat abr� STORM DRAINAGE B-1 CHECKED A. C.ASC If t: c►lpnglon, texts 76010 EXHIBIT SHEET 'S] 7 OF 10 SHEET I OF 21 sox 617--274-8757 w V w.m m a l 0 x a I-C 0 m M~CIRM OT W BLOCK 'kSLW1 ? i ICT EXISTING y fi 21W3 AMIS j AWE ' CCO 02000SOP4 ,/f�'� �d p EI 77N " i.n.n 1 ' 1 � � " 48 RCP 24 RCP- EXISTING 5 CURB "4� 42" RCP ry 42 INLET" '02 RCP rcr 5" 5" CURB"`. INLET""lz INLET r RCS' HAYM RMIYo LTD WL 141n Pa 6 DRrcr FUTURE ASE HEADWALL RCP FUTURE PHASE' HAY RMrY,V MATCHUNE EXHIBIT "B-1" SHEET 1 STORM SEWER LINE 200 0 10' 0 200 400 0 S TORM MANHOLE . inch 200 f t. GARB INLET DA M 10-02-13 MA RIN-E CR-E-E-K" " PROJECT 7f= 2652-01-01 m os ie--�,mci nni.4..associates DRAWN BY.- A. MCGINLEY tbpo r*troUm tiurmbw f 2 STORM DRAINAGE si t a b r+a «����'" ,� � �� tit t1� rl1nglmw t+�x*3 76010� � 81, .49_11 SHEET NO: 8 OF 10 SHEET' 2 OF 2 fox: 817-274—87 57 r��rw.�or�v�aa�a�.c��► MATCHUNE EXHIBIT & C-1 SHEET 2 HA= REA 7% L VM 14192,PG. 6 ., ,,.. FV TaErC T PHASE iL � . M r I M x. Ay; CAVE RUN .•a+raw+M.u: ry� y� M^.�' � ,� Ch DRIVE ix µ� Qd m to to tn ria f ET _. C» an W) HILL ROAD J-1 H REALlY, LTD VOL 1419Z Po., 6 0 EXISTING S TREE T DUCT LIGH T (T ' 200 400 STREET NAME SIGNS 200 0 1 X STREET LIGHTS inch 200 f t. DA M. 10.02.13 , "52-01- 1 MAll?'11ME CAR.E-ElV' yc sloe w in is-+,ass sates URA Y.- A. MCGINLEY civil engineering survoylog la cape arr-Meo e piannhV tbpe r ,at numb f-2759 CHECKED B Y.- A. CASCO STREET GTS SIGNS 0 0 a io 3 t a b r a l EXHIBIT i """1 817-469-1671 fox; 1317-274-8757 ~CNM EXISTING STREET IC LIGHT TY . Lon,ft=I M M" � ° Orr of awr �« � '� , C 2d054 AM"S CITY Of MRT MWIM CCf 021MAIM OFWYCt w 41 . AYW WALM LTD M,140192,ft 644 ORITCT FUTURE PHASE FUTI)RE PHASE NAYW RM TY,L 7 VOL 04192,,,Pa Tor MATCHIINE E B C & Cl—l" SHEET I S TREE T NAME SIGNS 100 200 400 STREET LIGHTS inch 200 ft. DAM, . 2. -E CREEK PROJEC T 2652— — MARIN coskie,� Innis,,,assocsa e DRA WN BY: A. MCGINLEY SEE G � nu � f-2759�,,�r STREET LIGHTS SIGNS 200 oat o r a CHECKED � � � a� a►h rIInt*A, kaxa3 76414 E C— 9 81 '-*69-1671 SHEET JVO 10 OF 10 SHEET 2 OF 2 fax: 317mm-274-875 www.mmotaxaa.a n