AMENDMENT No.4
TO CITY SECRETARY CONTRACT No. 56416
WHEREAS, the City of Fort Worth (CITY) and Shield Engineering Group
PLLC., (ENGINEER) made and entered into City Secretary Contract No.
56416, (the CONTRACT) which was authorized by M&C 21-0508 on the 22nd
day of June, 2021 in the amount of$ 456,150.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $94,690.00 which was administratively authorized
on June 27th, 2022; Amendment Number 2 in the amount of $644,000.00
which was authorized by M&C #24-0245 on March 26th, 2024; Amendment
Number 3 in the amount of $0.00 which was administratively authorized on
June 4th, 2025; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Trinity River Vision- Central City Flood Control Drainage Projects,
CPN (103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666,
103667); and
WHEREAS, it has become necessary to execute Amendment No. 4 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $99,050.00. (See Attached Funding Breakdown Sheet, Page
-4-)
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: June 13, 2025
Page 1 of 4
2.
Trinity River Vision-Central City Flood Control Drainage Projects
103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666, 103667
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for
all work and services shall be an amount of $1,293,890.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Jesica McEachern
Assistant City Manager
DATE: 10/01/2025
ATTEST:
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED: x��
Lauren Prieur (Sep 25, 202514:08:29 CDT)
Lauren Prieur
Director, TPW Department
Contract Compliance Manager:
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: June 13, 2025
Page 2 of 4
CONSULTANT
Shield Engineering Group, PLLC
1-,i{--� Jean-Marie Alexander (Sep 22, 2025 16:15:29 CDT)
Jean Marie Alexander coo
DATE: 09/22/2025
Trinity River Vision-Central City Flood Control Drainage Projects
103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666, 103667
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
�ic�� 7�'r.'�i��ed
Thanaa Maksimos
Program Manager
APPROVED AS TO FORM AND LEGALITY:
������
Douglas Black (Sep 26, 2025 15:15:58 CDT)
Douglas W. Black
Sr. Assistant City Attorney
M&C No.#: N/A
M&C Date: N/A
City of Fort Worth, Texas Trinity River Vision-Central City Flood Control Drainage Projects
Prof Services Agreement Amendment Template 103260, 103261, 103262, 103263, 103269, 103664, 103665, 103666, 103667
Revision Date: June 13, 2025
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 56416
Amendment No. 4
Project CF1- CF2 -
Fund Dept ID Account Bond Amount
ID Activity
Reference
52002 0200431 5330500 103664 002880 9999 $40,110.00
52002 0200431 5330500 103665 002880 9999 $40,110.00
52002 0200431 5330500 103666 002880 9999 $18,830.00
Total: $99,050.00
City of Fort Worth, Texas Trinity River Vision-Central City Flood Control Drainage Projects
Prof Services Agreement Amendment Template 103260, 103261, 103262, 103263, 103269, 103664, 103665, 103666, 103667
Revision Date: June 13, 2025
Page 9 of 4
ATTACHMENT B
COMPENSATION
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 1 of 4
B-1
Design Services for
Trinity River Vision-Central City Flood Control Drainage Projects
City Project No. 103260,103261,103262,103263,103264,103664,103665,103667
Time and Materials with Rate Schedule Project
I. Compensation
A. The ENGINEER shall be compensated for personnel time, non-labor expenses,
and subcontract expenses in performing services enumerated in Attachment A as
follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Category Rate .
Labor Category Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category 2025 Rate
($/hour)
Principal/Director 305
Program Manager 285
Project Manager 255
Senior Professional Engineer 235
Professional Engineer 215
EIT II 170
EIT I 150
Designer 160
CAD Drafter 135
Support/ Admin 100
Senior RPLS 255
RPLS 220
GIS Analyst 155
Survey Technician 120
Party Chief 120
Survey Crew Member 80
ii. Non-Labor Expenses. Non-labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non-labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
ATTACHMENT B
COMPENSATION
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 2 of 4
B-2
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department, Capital Delivery Division, monthly
progress reports and schedules in the format required by the City.
ATTACHMENT B
COMPENSATION
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 3 of 4
B-3
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount %
Prime Consultant
Shield Engineering
Group, PLLC
Project Manager $99,050.00 100
Proposed Sub-Consultants
TOTAL $_________ 100%
Project Number & Name Total Fee Sub Fee
$___99,050.00_________ $___________
-1
ENGINEER INVOICE
(Supplement to Attachment B)
City of Fort Worth, Texas
Attachment B
Revised Date: 8/18/2025
Page 4 of 4
B-4
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
�
�
�^y
L
'�^
V/
� � M
vU�
.; � �
C "M
� o
N N �
v � �
•� N N
�� O
� � �
�
ia
C
y � �
N V O
O Oa
L L �
a a U
C
0
u
�
N
W
.Q
�
N
a�
�
E
3
Z
N
�
�
U
m
L
O
W
u
'o
>
c
3
0
�
a
v
Q
R
3
N
�
m
�
N
N
O
u
�.
�d
R .p
> �
R N
N «
ai �
� �O
aa
o c
1.1 L
N,
'd 3
u �
o a
c o
� YO
T �
C y
W �
L
� U
O
�
�
L
>r
C >
rn i
� lL
'O O
m �
Lp� �
V J
a`, �
a -
z "'
� � �
� L �
� O
tp > O
� � W
N O I�
� � m
N
H
N
'6 N
'O C
Q O
_ � L
2
R V N
,� _ K
aEiOF�i
V
�
F
L
�
lL
m
0
O
m
�
a
H
N
N
�
�
Q
.�
�
U
a
�
0
� �
m �
� m
� �
� ¢
m �
� �
a �
� c
� �
� �
� 7t « E
� �d°o
� � 7 LL F
Z �'o a..
= N c� m m R
0 0 0
Q N N� N N y
u u �
� a a E '� '> 'o
a a �, �
� � � �o a� a� >
U viviavivi5
e3�
0
0
�
�
C
d
,a^
v/
d
�
�
�� �
O G%
� (i
� L
rn y
°' a
�
�
>
�
�I
0
0
�
�
a�
C)
�O
>
C
N
L
H
Ne�
a�
�
�
��
N U
m d
o 'o
� a`
m �
� s
m �
o F
�
N �
N 0
O C
� U
� a
N 0
m o
O LL
� U
N �
m
o �
� �
U
'�
0
>
`m
>
�
�
H
..
�
a
E
a
rn
R
c
R
�
�+
C)
N
.,, Z O
°' � a`
d
y � r
RY� =Z
N �p
N � � � �
� m m � �
o�u> � �
W p� p y
T
O= �ip -
m Y � 'e. V
N
J F R
U
t
�
O
�
r
0
LL
O
?.�'
U
O
rn
�
L
W
a
E � ry
o � �
�=
r � �
���
� `o � m
m
F � iq �
' a �
r J —
� m d �
_ � �
w � � �
� �
U Q H �
F�RT`��RTHd
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Shield Contract Amendment No.4
M&C: CPN: 103260,103261,103262, CSO: 56416 DOC#:
103263,103264,103664,
103665,103666,103667
Date:
To: Name Department Initials Date Out
Jean-Marie Alexander Consultant � � �
1• jeanmarie.alexander@shield-engineering.com �M� �9 22 25
2. Thanaa H. Maksimos TPW — Program Manager TM 09/19/25
3, Lissette Acevedo TPW — Sr. CPO � 09/23/25
4. Patricia Wadsack TPW — Assistant Director p(��/' 09/25/25
5. Lauren Prieur TPW - Director �t� 09/25/25
(, Doug Black Legal - Assistant City Attorney �,� 09/26/25
'7. Jesica McEachern CMO — Assistant Ciry Manager � 10�01�25
g, Jannette Goodall CSO — City Secretary ►� 10�02�25
�a ,��b ��
9, Allison Tidwell CSO — City Secretary �w 10/06/25
10. Katherine Cenicola CSO — City Secretary Ke 10�02/2025
11. Tpw_SW_Contract TPW Stormwater
CC: Program Manager — Thanaa Maksimos, Sr. CPO — Lissette Acevedo, TPW BSPAP Recon
Team — Cindy Sengathith
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the nert steps.
NEEDS TO BE NOTARIZED: ❑YES �No
RUSH: ❑YES �No SAME DAY: ❑YES �No NEXT DAY: ❑YES �No
ROUTING TO CSO: �YES ❑No
Action Repuired:
❑ As Requested
❑ For Your Information
� Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tpw sw contracts(cr�,fortworthtexas.�ov Ca11817-229-3283 with questions. Thank you!