Loading...
HomeMy WebLinkAboutContract 38352-A1 AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. 34VQ J - A] COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (CITY) and Half Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 38352, (the CONTRACT) which was authorized by the City on the 20th day of March 2009; and WHEREAS, the Contract involves engineering services for the following project: Lake Shore Drive Alternative Alignment Feasibility Study; Project No. 01295 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated September 16, 2009, a copy of which are attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $14,800.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $38,900.00. -_ --, Page -1- 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the fit day of , 2009, in Fort Worth, Tarrant County, Texas. ATTEST: Marty HendriP Contract AuthorizatiOP City Secretary APPROVAL RECOMMENDED: APPROVED: William k'.TVerke,X, .E. Fernando Costa Director, Department of Assistant City Manager Transportation and Public works Halff Associates, Inc. ENGINE By: Nam Jerry F. Roberts, P.E. vice President 4000 Fossil Creek Boulevard Fort Worth, Texas 76137 APPROVED AS TO FORM AND ,LEGALITY: 4 Assistant City torney ,a MEN HALFF September 16, 2009 AVO 26771 Mr. Michael R. Weiss, P.E. City of Fort Worth Transportation and Public Works Department 1000 Throckmorton Street Fort Worth,Texas 76102 Re: Lake Shore Drive Alignment Study Project No. 01295 Engineering Amendment No. 1 Dear Mr.Weiss: Please find attached three (3) originals of revised Engineering Amendment No. 1 for the above-referenced project. Our proposal was revised, as requested, to include one (1) additional public meeting for a total of two (2) public meetings. If our proposal is acceptable,please sign and return one copy to our office for our records. Please call me at (817) 847-1422 if you have any questions or comments. Sincerely, HALFF ASSOCIATES,INC. z r I Benjamin L. McGahey,P.E. Attachments HALFF ASSOCIATES,INC. 4000 FOSSIL CREEK BLVD. 1 EL (817)847-1422 WW W.HALFF.COM FORT WORTH,TX 76137-2720 FAX (817)232-9784 ATTACHMENT "A" LAKE SHORE DRIVE ALTERNATIVE ALIGNMENT STUDY STUDY NO. 01295 SCOPE OF WORK Preface The City of Fort Worth Lake Shore Drive Alternative Alignment Study shall be amended as requested by the City to extend north to Quail Road and south across the B.B. Mosites tract, as recorded in Vol. 6215, Pg. 517, and Vol. 6112, Pg. 784 of the D.R.T.C.T., to merge with the existing MTP location. Additional Services a. Alignment Study The ENGINEER will evaluate the north and southern portions of the 2004 MTP and the revised MTP alignment. The ENGINEER will evaluate the right-of-way requirements, constructability, permitting, and public opinion of each alignment and provide a recommendation to the city. b. Schematic Design Revised conceptual schematics will be prepared for both the 2004 MTP alignment and the revised MTP alignment for use in the Public Meeting. c. Right-of-Way Determination The Engineer will provide preliminary estimates of necessary right-of-way area, relocations, and demolition based on each alignment. The estimates will be based on the existing Tarrant Appraisal District Maps. d. Estimates of Probable Construction Costs Estimates will not be prepared for the alignments north of E. Berry Street nor south of Wilbarger Street. e. Report It is not necessary for the original report to be revised. f. Public Meeting The ENGINEER will assist the City in conducting two (2) additional public meetings with residents and other stakeholders to present the schematic designs. The ENGINEER will prepare visual materials for presentation at the meeting. ATTACHMENT"A" Page 1 of 2 Project Schedule a. Public meeting will be conducted in late October on a date determined by the City. b. The Master Thoroughfare Plan revision will be presented again to the Planning Commission tentatively on November 25 th ATTACHMENT"A" Page 2 of 2 ATTACHMENT "B" LAKE SHORE DRIVE ALTERNATIVE ALIGNMENT STUDY STUDY NO. 01295 ADDITIONAL COMPENSATION I. Additional Compensation The Engineer shall be compensated an additional total lump sum fee of $14,800.00. Payment of the total lump sum fee shall be considered full compensation for the additional services described in Attachment "A" for all labor materials, supplies and equipment necessary to complete the project. ATTACHMENT"B" Page 1 of 1