HomeMy WebLinkAboutContract 38570-A1 CRY SECWTAKY AMENDMENT No. 1 CONTRACT NO' 3 8 5-7 0 -A TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 38570, (the CONTRACT) which was authorized by M&C C-23485 on the 14th day of May, 2009 in the amount of $ 173, 000; and WHEREAS, the CONTRACT involves engineering services for the following study: WILDCAT BRANCH OPEN CHANNEL STUDY (SWS-017) ; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated February 18, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $46, 990 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $219, 990 . 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . [OFFICIAL RECORD I CITY SECRETARY FT. (NORTH, TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth HALFF ASSOCIATES, INC. 7��4 it �J. e aj--it�- Fernando Costa J. Russell Killen, P.E. , CFM Assistant City Manager Vice President DATE: 41--Z to /.Z DATE: APPROV RECOMMENDED: Cass Dougla . Weirsig, Ph D, P.E. Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: fV1 Date: Douglas W. Black Assistant City Attorney ATTEST: p `opo°°opo U 00 oA0 ox0 Mary J. K °v r (��� o }C d ° °°° A City Secre ary �a °°OOOO°° I rOFFICIAL RECORD SECRETARN WORTH, TX ... HALFF' February 18, 2012 Ranjan Muttiah, Ph.D., P.E., CFM T/PW Stormwater Management City of Fort Worth 1000 Throckmorton Street Fort Worth,Texas 76102 Re: Wildcat Branch Open Channel Study(SWS-017)Amendment No. 1 Dear Mr. Muttiah, Per our contract dated May 14, 2009, Halff Associates, Inc has been retained to provide professional engineering services for the City of Fort Worth. As stated in the agreement, Halff is responsible for the development of existing conditions hydrologic and hydraulic models as well as the evaluation of several flood reduction alternatives and the submission of a request for a Letter of Map Revision (LOMR)to the Federal Emergency Management Agency (FEMA). Examination of recent aerial imagery and on-site inspection has revealed a significant amount of fill placement on the Mt.Tabor property which will likely reduce the amount storage volume available in the watershed. This could result in higher peak discharges downstream of Village Creek Drive. Per our discussions with the City of Fort Worth T/PW Stormwater Management and the owners of the Mt.Tabor property located immediately west of Village Creek Drive, it has become necessary to provide additional professional services for the Wildcat Branch Open Channel Study. These services include the following: • Project Management including meetings and coordination • Additional topographic survey and finished floor elevations • Revisions to existing hydrologic and hydraulic models • Evaluation of additional flood mitigation alternatives • Associated Quality Assurance/Quality Control Each of these items has been specifically detailed in Attachment'A' of this proposal. The Compensation and Payment information as well as Fee Summary and Level of Effort information has been provided in Attachment 'B' and its respective exhibits. In addition, a revised project schedule has been included as Attachment 'D'. Attachment 'E' shows the area of fill placement where the survey will be taken and the hydraulic model will be modified. In order to meet our current M/WBE participation requirements, ANA Consultants, LLC will be contracted to perform all topographic survey and finished floor elevation surveys. Finally, a Professional Services Agreement has been included for Amendment No. 1. MALFF ASSOCIATES,INC. d()f)(>'()G5 1 Y I K 9') .L.yAn'I: I HI 1:847 142i 'A W W I14 ;7M (:4- 'A)R 'x 1('S'< <.. Ax 817; V 11/84 ONE HA L F F• Ranjan Muttiah,Ph.D.,P.E.,CFM mil NNE City of Fort Worth February 2012 Page 2 of 2 If you have questions or comments regarding this amendment, please feel free to contact either Russell Killen or me at(817)847-7422 or email me at tbarrPhalff.com. Sincerely, HALFF ASSOCIATES, INC. Texas Firm Registration No. F-312 Terry M. Barr, P.E., CFM Project Manager Cc: File Enclosures Professional Services Agreement for Amendment No. 1 Attachment'A'—Scope of Services Attachment'B'—Compensation and Payment Exhibits B-1, B-3, B-3A, B-4—Fee Summary and Level of Effort Attachment V—Revised Project Schedule Attachment'E'—Project Revision Map Signed Letter of Intent from ANA Consultants, LLC ATTACHMENT "A" WILDCAT BRANCH OPEN CHANNEL STUDY—AMENDMENT NO. 1 STUDY NO. SWS-017 ADDITIONAL SERVICES FOR OPEN CHANNEL STUDY In accordance with the terms and conditions of the agreement between the City of Fort Worth (CITY) and Halff Associates, Inc. (ENGINEER), executed on May 14th, 2009, this document will provide additional information regarding the scope of services to be performed as part of Amendment No. 1 of the Wildcat Branch Open Channel Study (SWS-017). Based on discussion with the City of Fort Worth Stormwater Management and the owners of the Mt. Tabor property, located near the intersection of Village Creek Dr. and Berry St., additional analysis of the drainage patterns in the area have been deemed appropriate. A significant amount of fill was placed on the property resulting in the loss of valley storage along Wildcat Branch, which needs to be evaluated to gauge its impacts downstream. In addition to analysis of the fill placement, the CITY is interested in working with the property owner to ensure that the property is developed in a manner that both improves the economic situation in the area and conforms to the objectives of the Fort Worth Parks and Community Services Department. These goals should also include reducing flood hazards in the watershed. As such, several tasks are listed below. These tasks are in addition to those enumerated in Attachment 'A' and Exhibit 'A-1' of the Original Contract. The additional tasks are as follows: I. Task 1: Project Management A. The ENGINEER shall attend one (1) public meeting to present what possible mitigation alternatives are being explored. B. The ENGINEER shall attend up to three (3) additional meetings to discuss the Mt. Tabor property with the CITY and/or the owner of the property. ll. Task 2: Data Search, Collection, Field Reconnaissance, Stream Condition Assessment, and Surveys A. The ENGINEER shall provide topographic survey of Tract 9 and 9A of the Assabranner, GJ Survey, comprising approximately 34 acres. B. The ENGINEER shall survey up to forty (40) finished floor elevations. C. The ENGINEER shall make necessary adjustments to the terrain information using the topographic survey and regenerate the TIN. D. The ENGINEER shall conduct a site visit to obtain photographic documentation of the fill placement and the general condition of the site. Ill. Task 3: Development of Hydrologic Models A. ENGINEER shall adjust the drainage subbasin boundaries to reflect the physical changes to the terrain. ENGINEER shall also make necessary adjustments to the loss parameters including NRCS Curve Numbers and Impervious Cover percentages. ATTACHMENT C-1 Page 1 of 2 B. The ENGINEER shall provide updated Modified-Puts routing to reflect the loss of storage on the Mt. Tabor site. C. The ENGINEER shall provide updated model runs for the 2-, 5-, 10-, 25-, 50-, 100-, and 500-year rainfall event. Updated tables reflecting the revised discharges shall be generated as well. IV. Task 4: Development of Hydraulic Models and Floodplain Maps A. The ENGINEER shall update the hydraulic model by extracting new cross sections adjacent to the Mt. Tabor site. Roughness values will be adjusted to reflect the changes in vegetative cover and other factors. B. The Engineer shall provide updated model runs for the 2-, 5-, 10-, 25-, 50-, 100-, and 500-year rainfall event. Updated tables reflecting the revised discharges shall be generated as well. C. The ENGINEER shall provide an updated Floodway run and associated results tables. V. Task 5: Watershed Flood Hazard Assessment NONE VI. Task 6: Proposed Flood Mitigation Alternative Analysis A. The ENGINEER shall consider several alternatives for the master plan of improvements. The improvements shall consist of detention and channel improvement options as follows: 1. Two (2) channel improvement options to be evaluated downstream of Village Creek Drive. The improvements will consider the potential dual-use of the land adjacent to the channel as a linear park. 2. Three (3) detention options to be considered in the vicinity of the Mt. Tabor property. These may consist of either in-line or off-line detention ponds. 3. The effectiveness of the previously modeled flood improvement alternatives will also be evaluated. VII. Task 7: Quality Assurance and Quality Control Procedures NONE VIII. Task 8: Letter of Map Revision Application and Support NONE ATTACHMENT 'C-1 Page 2 of 2 ATTACHMENT "B" WILDCAT BRANCH OPEN CHANNEL STUDY — AMENDMENT NO. 1 STUDY NO. SWS-017 COMPENSATION AND PAYMENT SCHEDULE I. Compensation A. The Engineer shall be compensated a total lump sum fee of $46,990. Payment of the total lump sum fee shall be considered full compensation for the services described in Attachment "A" for all labor materials, supplies and equipment necessary to complete the project. B. The Engineer shall be paid in accordance with "Exhibit B-1", Supplement to Attachment B. Each invoice from the Engineer shall be verified as to its accuracy and compliance with the terms of this contract by an officer of the Engineer. C. Additional Tasks that may be assigned, not currently included in the Scope, may be billed and paid on an hourly basis for actual hours worked and expenses incurred, at an hourly billing rate as provided in Exhibit "13-2". No additional Tasks will be performed without prior written authorization from the City. D. Professional Services Fee summary is provided in Exhibit "13-3". E. Total project fees including MWBE participation is provided in Exhibit "13-3A". II. Schedule The intent of the schedule is to complete the effort described in Attachment "A" — Additional Scope of Services and deliver a final report within 210 calendar days after the "Notice to Proceed" letter is issued. A. A preliminary (75%) report reflecting the revised Data Collection (Task 2), Hydrologic Modeling (Task 3), Hydraulic Modeling and Floodplain Mapping (Task 4), Flood Hazard Assessment, and Preliminary Alternative Analysis (Task 6) will be submitted within 150 calendar days after approval of the contract amendment. B. A final draft (90%) report, which will include the preliminary report and the completed Flood Reduction Alternative Analysis (Task 6), will be submitted within 30 calendar days after the submittal of the preliminary report. C. A final report will be submitted 30 calendar days after the submittal of the draft final report. ATTACHMENT B Page 1 of 1 EXHIBIT "13-1" (SUPPLEMENT TO ATTACHMENT B) WILDCAT BRANCH OPEN CHANNEL STUDY —AMENDMENT NO. 1 STUDY NO. SWS-017 METHOD OF PAYMENT PROGRESS REPORT REQUIREMENTS I. Method of Payment Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice from the ENGINEER outlining the estimated current percent complete of the total project. The budget does not include revisions to the scope of work after the NTP. If revisions are requested by the City, a revision of scope and budget will be required. Partial payment shall be made to the Engineer monthly; the aggregate of such monthly partial fee payments shall not exceed the following: Until delivery of the preliminary (75%) report, a sum not to exceed 60 percent of the total lump sum fee of the amendment. Until delivery of the final draft (90%) report, a sum not to exceed 90 percent of the total lump sum fee of the amendment. Upon delivery of the final (100%) report and LOMR as defined in Attachment C-1 of the original contract, the balance of fees, less previous payments, shall be payable after delivery of the FINAL report and electronic files. II. Progress Reports A. The Engineer shall submit to the designated representative of the Director of the Department of Transportation/Public Works monthly progress reports covering all phases of the analysis in the format required by the City. B. Periodic reports concerning MWBE participation shall be submitted as required by the MWBE Office. EXHIBIT B-1 Page 1 of 1 EXHIBIT "B-3" (SUPPLEMENT TO ATTACHMENT B) WILDCAT BRANCH OPEN CHANNEL STUDY —AMENDMENT NO. 1 STUDY NO. SWS-017 PROFESSIONAL SERVICES FEE SUMMARY TASK FEE Task 1: Project Management $3,775 Task 2: Data Search, Collection, Field $1,795 Reconnaissance, Stream Condition Assessment, Task 2: Field Surveys of Hydraulic Structures $3,850 Task 2: Finished Floor Elevations $4,400 Task 3: Development of Detailed Hydrologic Models $6,660 Task 4: Development of Hydraulic Models and $8,790 Floodplain Maps Task 5: Watershed Flood Hazard Assessment $0 Task 6: Proposed Flood Mitigation Alternative $14,610 Analysis) Task 7: Quality Assurance and Quality Control $3,110 Procedures Task 8: Letter of Map Revision Application and $0 Support SERVICE TOTAL $46,990 EXHIBIT B-3 Page 1 of 1 EXHIBIT "B-3A" (SUPPLEMENT TO ATTACHMENT B) WILDCAT BRANCH OPEN CHANNEL STUDY —AMENDMENT NO. 1 STUDY NO. SWS-017 SUMMARY OF TOTAL PROJECT FEES Consulting Firm Prime Responsibility Amount Percent PRIME ENGINEER: Halff Associates Engineering & Project Management $39,490 84.0% SUB ENGINEER: ANA Consultants Field Survey $7,500 16.0% 'Total •r Professional S- - $46,990 11' . Project Description Scope of Services Total Fee M/WBE Fee Percent ANA Consultants (See Below) $46,990 $7,500 16.0% SUB ENGINEER. shall participate in performing portions of the following Tasks as outlined in Attachment "A": Task 2.a. Field Surveys Task 2.b. Finished Floor Elevations Non-MWBE Participation None 0% EXHIBIT B-3A Page 1 of 1 unuga i , 0 00 1111014"S"i poddnS OAjJVljSJUjtU > J/fj u.r��upi 0 I ,y Jo u�bua 147 V4 LD wu �f �ff ......... , I lv4o4qnS oal ee M...... I I titer 0 8 8 8 8 r""'l'lY ! �l, I �i 9m a^" b a 01, psjo)gnS 6a.1 w �a a #wv �- �aa w- 0 wpm °+ 0rb Zo w�p1N poddn a#ny emjsa ujuAp$ IN�aNmarl 1 umDpulN Buamr u}fiu3 I I SJID maavurlr V r „V I VD m+xqua Q '40 'aS "y q" tvb q# 4*4 C v'4 Y V"4 R'wl N 'a'A FM"a C,N'','j "9 r'•.d wfe °y L v Y%x f:X�"o'I uN muarulB#al's au� aim I Nrra90.'fr#YMaPJd aim li m BBFdurajNY PO Wd aw ri r Offie ul ledNouPd i I f. L f; T w nmm # � � W � � *a• nr ` rw"pj �¢n. aUF ap r av aC N � i t�aa��N4utaN��tv�� �li � � Wu�INrt�aaa�a �� l If n c � 9 �wm® �NuN�W I jueonsuojqns poddnS to ue4uN 5uNcoauf6u �I sai ofurrr t I a �ulu� I 1 ull.au UOIJ3 ME Aoau BU3 usa I �I ul NudN3uNJ rya it i I ua esv xa 1 cv j rl a> f C C tg� 5 i7L 4 �i Ni' 1 �r CIO Ca 1 G C7! C\11?` V i CO f to }y i RS � �4f n Gy ti N by In CG 'f�t�.y ^tQp� 'Qp� {n C17 0) 0 0 c LL n 0 C>, cn cn to 0 w ? L' 21 _ E cv tv cTv .cv- cv cv cv c� tv car N N ev Cv r 04 N cv � cv cli x�} eii ev cal e» of c c» o ..n w m c+ o 66 6 rot er er :s�t cr Cl) cv cv t c� c )eev n It c v °° 0)0 0 o 0 o o c o c c ° .2 es u r ev c� CL Ull ro ar co (v sa crS nx ax ca xu es ca va cC� ca cra In � U") CM v u Co +s o °m o r a iv � 1 a� >. c °�dqr `" 'r � �� J� p,,; '/r��°", '�` g tom•^ ���� � � � ��` I �� �� r � u u W"' ,� a ,• f f �� bn � y� w i✓� � , �� � �u u, w'a °� o➢ 9af I ���� �, �' t, re� r� P � J��amfyv� Ii it dN 9 ��p i ,N rvl � �IU' �'�' I � !' ° 4 iii U w✓ � i tl ��a?�.�rnw i Gp�� �� l^�N;� Ni . � ° " ✓r•!�' 1Pv�UU��iO�"q''�IIIti � frtll � ��� �, ,. �� �,,+��ot ���°� r .o ixio� N v I b � p s is .fir, ' U N � i '�� �✓/,�d8�` w �Vld9 z l y , rr rr rw jmkro � f yi lJl �l P a pp Po 0 ONE EM HALFF February 17, 2012 AVO 26921 Mr. Mark Assaad, P.E. ANA Consultants, LLC 1331 Airport Freeway, Suite 410 Euless, TX 76040 Re: YWidcat Branch Open Channel Study(SINS-017)—Amendment No. 1 Mark: Halff Associates, Inc. intends to contract with ANA Consultants, LLC, for MWBE SERVICES on the subject City of Fort Worth project. Halff Associates, Inc. intends to contract up to $7,500 to your firm for Finished Floor Elevation and Field Surveys during the course of the project. Please acknowledge this commitment by signing below and returning an original to me. Sincerely, HALFF ASSOCIATES, INC. Terry M. Barr, P.E., CFM Project Manager Mark Assa ice P resident Da ANA Consultants, LL HALFF ASSOCIATES.INC 4000 FOSSE CREEK 6 LVD TEL(817)8 47-1422 WW W HALF F COM FORT WORTH,TX 7607 FAX(817)232-9784