HomeMy WebLinkAboutContract 38678-A4 CITY SECRETARY CONTRACT NO. AMENDMENT No. 4 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Transystems Corporation Consultants, (ENGINEER) made and entered into City Secretary Contract No. 38678, (the CONTRACT) which was authorized by M&C C-23535 on the 19th day of May, 2009 in the amount of $ 111, 700 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $6, 260 . 00 which was administratively authorized on January 11, 2010, Amendment Number 2 in the amount of $4, 160 . 00 which was administratively authorized on June 22, 2010, Amendment Number 3 in the amount of $28, 666 . 00 which was administratively authorized on September 27, 2011; and WHEREAS, the CONTRACT involves engineering services for the following project: Pavement Reconstruction and Water and Sanitary Sewer Main Replacement on Hawthorne Avenue, 12th Street and Lisbon Street 2008 CIP Contract 9C, Project No. 01238; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated April 5th, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $10,803. 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and servic 11 be an amount of $161 ,589. 00. OFFICIAL RECORD 3 . CITY SECRETARY FT. WORTN, TX � f,- i2 P IN Page -1 - All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER TranSystems Corporation Consultants Vernando LNOsta- �(� ��, Raul Pena I I , P.E. Assistant City Manager Principal DATE: DATE: AP VAL RECOMMENDED: Douglas - Weirsig, P. Director, Transportation & Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: Date : Douglas W. Black Assistant City Attorney ATTEST: .CY O� oDOOOOOO '+I # °oO' 0 X %- Z-X U Y Mary J. r d� a City Secretar 0 L� O�O000000 A y A.'11114'0' OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -2- TranSystems ,w�tf?�� Bank of America Building 500 West 7th Street Suite 1100 Fort Worth,TX 76102 Tel 817 339 8950 Fax 817 336 2247 www.transystems.com AMENDMENT NO. 4 SUMMARY OF DESIGN FEE April 5, 2012 Mr. Patrick Buckley, P.E. City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102-6311 RE: Amendment No.4 2008 CIP Contract 9C City Project No. 01238 City Secretary Contract No. 38678 DOE#6146 Water Project No. P253 531200 6091701238 Sewer Project No. P258 531200 7091701238 Street Project No. C204 531200 2094001238 Dear Mr. Buckley, Per your request,this amendment revises the previously approved Capital Improvement Project—Contract 9C, City Secretary Contract No. 38678 design plans and contract documents. This contract has been amended by the following amendments: Amendment No. 1 $ 6,260.00 Administrative Approval 1/11/2010 Amendment No. 2 $ 4,160.00 Administrative Approval 6/22/2010 Amendment No. 3 $28,666.00 Administrative Approval 9/27/2011 Specifically,Amendment No.4 includes preparation for pre-construction public meeting,verifying project control and construction phase services as needed. This work is to be included with and will augment the designs associated with the original contract. The specific work to be included is as follows: • 1P Street, Hawthorne Avenue and Lisbon Street — o Prepare and attend pre-construction public meeting • Verify, mark and reset project control(Gorrondona and Associates) • Construction phase assistance(as needed) WPageVst��ills 2of2 April 5,2012 Fee for Additional Services: Prepare and attend pre-construction public meeting =$ 1,485.00 Verify, mark and reset project control =$ 1,500.00 Construction phase assistance =$ 7,718.00 Mileage = 100.00 Total Contract Amendment No.4 Value: $ 10.803.00 Contract value revisions are as follows: Original Contract Fee: $111,700.00 Amendment No. 1: $ 6,260.00 Amendment No.2: $ 4,160.00 Amendment No. 3: $ 28,666.00 Amendment No.4: $ 10,803.00 TOTAL CONTRACT $161,589.00 Thank you for your consideration. Please contact me should you require any additional information. Sincerely, TranSyste ns Corporation Consultants Raul Pena III, P.E. Principal CADocuments and Settings lCGGARTNERIDesktoplLetter amendment 4_2012-04-05.doc W x 6 Z gc� t v c 6 Z O O 0 O f6 tC> O 00 O O aci O 00 O ao E F- V L n r r O S 69 69 6g E N w T f6 •� O 00 ci O O O L O -4- U) h ,^ m — r v/ U o 69 69 69 69 69 O U O C 04 �t et a LO U 64 � N U'3 o Eo- � o > O 6 co A N O O _C it N O C� M co M O c W 69 ca V � O O CD a m O 0 CD r 1 d4 N = a a .c C a- O N O c U +r V � v rn � a) v CD` C W O a g o O O a Z U 0 - •E 1 L • O O C O o aa) c ' m h ESN d w • d • • N N. �c m , Q C 0 N C X _ f6 c o 0 J y N l0 . aa) a 'o v° `.3 3 m e = p E O X C (`p 0 (C0 O �_ C J J Q a a CL Q d a to a: �� 0 0 cn Q oo ►- ►- F► a, u L a, c 0 u O c O u `o w Y c v E v c v E Q w m 3 0 0 0 0 o � oor-I r� r� r� a--1 a--1 N -1 r-I r-I 0 Y V l0 L Y C 0 0 0 0 0 0 O U 0 0 0 0 0 0 O O O lD 0) cn O 1.0 N 00 00 00 (0 r� cn .-I N O u1 r\ N O O - r- r-I r-I N Ln l0 l0 O r CD co M in L? L? in in L? O Z 0! O O .5 O O C000 � O r I r-I U c O 00 c w = CO a in in N 0 0 0 00 m o 0 0 0 0 CV 0 00 00 0 0000 0 0 0 0 V -D cn 1.0 r� Ln r� cn O rte.{ N M a-i N u O � C7 C Ln to to in to O V O O O 1 L O O O V 0J O O Ol O O O 00 Ol cn 00 •� "v0 00 00 cr a � c w m 00 '� o E > 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m z E o o Li Lo m y l07 o 0J N l0 r\ l0 O N o m L.0 m o w V1 M N Ol N m O 00 +�+ 3 h C C fo I. 0J u r- E in in v� �n to in m v v o E N u Q U r0 Y O V ~ � O O O O z z z Z o c c c c c E E E E m -0 -0 -0 -0 0 c c c c c Y O Q Q Q Q