Loading...
HomeMy WebLinkAboutContract 38754-A2 Amendment No. 2 STATE OF TEXAS § CITY SECRETARY NO. 3`�+54r-AZ- COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Dunaway Associates, LP (Engineer) made and entered into City Secretary Contract No. 38754 (the Contract) which was authorized by the City Council by M&C C-23532 on the 19th of May, 2009; and WHEREAS, the Contract involves engineering services for the following project: Pavement Reconstruction and Water and Sanitary Sewer Replacement on Dowdell Street (Baylor Street to Martin Luther King Jr. Freeway), Hanger Avenue (Burchill Road to Vaughn Boulevard), Hanger Avenue (South Collard Street to East Dead End), and Strong Avenue (Vaughn Boulevard to Campbell Avenue) 2008 CIP Contract 513, Project No. 01266 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly-authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 14, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $28,794.20. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $227,660.20. OFFICIAL R e;;CRO CITY 5L: 4TAkY > TP ® H,�TX Contract Amendment No. 2 Page 1 of 2 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Executed on this the day of OCAUb�,r , 2011, in Fort Worth, Tarrant County, Texas. ATTEST: ��o °��1<, °° 0 Marty Hendrix ��� °p0V° pn°�T� City Secretary as *,& 00000 APPROVAL RECOMMENDED: APPROVED: Douglas W. Wiersig, P.L. Fernando Costa Director Assistant City Manager Transportation and Public Works Dunaway Associates, LP C-7ASJ n ENGINEER Contract Authorizatioa ` --M - By: � ' Date K NAME: Toby K. Ford, P.E. TITLE: Vice President 550 Bailey Ave. Ste 400 Fort Worth, TX 76107 APP VE AS TO FORM AND LEGALITY: Douglas Black Assistant City Attorney OFFICIAL RECORDI CITY ts:. T1f�Y i FT. WORTH, TX Contract Amendment No. 2 Page 2of2 ~D UNAWAY DA No. 2009014-01 September 14, 2011 Mr. Richard Argomaniz, P.E. Project Manager City of Fort Worth Transportation and Public Works Department Fort Worth, Texas 76102 Reference: Amendment No. 2 ver2 2008 Capital Improvements Program Neighborhood Streets Design Services for Dowdell Street (Baylor Street to Martin Luther King Freeway), Hanger Avenue (Burchill Road to Vaughn Boulevard and South Collards Street to E Dead End), Strong Avenue (Vaughn Boulevard to Campbell Street). (Contract 5B—Project No. 01266) Dear Mr. Argomaniz: Dunaway Associates, L.P. is pleased to present this Amendment No. 2 for additional services that are beyond our original scope of services. 1) Per email correspondence from the City on 3/15/2011 the current project scope should be amended to include the following: Hanger Ave-East(from Collard St to the East Dead End) i. Coordination with TRC consultants for inclusion of utility plans(8"water line& 12" sanitary sewer line) and specifications in the DALP set of construction documents. Dowdell Street(from US 287 Frontage Rd to Baylor Street) i. 750 LF of 8"water line replacement. ii. 775 LF of 8"sanitary sewer line(L-4189) replacement. iii. TXDOT Permits - Both of these utility improvements will occur within the US 287 frontage road pavement and will require permitting approval by TXDOT. As a result of the utility improvements the paving improvements will also be extended within the US 287 Frontage Rd and will require approval and permitting by TXDOT. 2) These tasks will also require additional reproduction costs. Amendment No. 2-rev 2 September 14, 2011 Page 2 ASSUMPTIONS 1) A sanitary sewer pipe sizing analysis is not included in this scope of service. A summary of the proposed budget for this contract amendment is as follows(See Exhibit "A-1"for a detailed man-hour estimate of these tasks): Basic Fee Fee 1 Additional Desi n Services 1 $ 28 220.00 2 Additional Reproduction Services $ 574.00 TOTAL PROPOSED AMENDMENT 28 794.00 A summary of the total project is as follows: Contract Description Fee Original Contract Paving and Utility Reconstruction-3 Streets $187,781.55 Amendment No. 1 Additional Water Line Design $11,085.00 Amendment No.2 Additional Water&Sanitary Sewer Design $28,794.00 TOTAL PROJECT $227,880.00 i MWWBE Participation 1 There are no MWBE sub-consultant services included as a part of this amendment. City MN BE Goal—20% MWWBE Goal Provided: Original Contract— 23% ($42,386/$187,781) Amendment No. 1—23% ($2,585/$11,085) Amendment No.2— 0% ($0/$28,794) Revised MWWBE%(Original contract+Amendments)—20%($44,971 /$227,660) • i Please review the enclosed Information and do not hesitate to call me if you have any questions or require additional Information regarding this amendment. f Sincerely, DUNAWAY ASSOCIATES, L.P. Kervin Campbell, P.E. Project Manager Public Sector Services 2009014_Amendment#2 RArgomaniz kmc 9-14-2011.docx T-q v ^ N n 1.4 V). Q V} V1 V? � N N V! V► V 00 U rll0 0 � N m v o t b o oo ti N N m coo w v> UD Ln oo ao ao k o a UD g o Y N M M CD CL N w cc O .0 UD 3 C_ L7 m N co � C 1 � Q E V N m a) Q Q M W Q � 0 c v to = m c = o c � _ c N _ J Q L Y � 3 o cn 0 c Z N O Y_ c w •C C C M Y J N 40 7 w C1 c y CQ C a+ e-1 t0 Q d U _ J 0� O co co Y u w w _ O L O O 'D C LL LL O Q 3 J J o �' Q a c Ln Y_ .` Q ^ ^ E s a a c o o a c p D m O~ o Q u o o v In a Ea N In U 2 w m c a Ln w N M -o, Ln j Y E W e 1 -C 'a c: i Q v Q m AMMENDMENT 2 CONTRACT 58 o�T COUNCIL D/STRICT 5 AW 'Rik AV Na MAPSCO 78 Z DOWDELL STREET (BAYLOR ST TO MLK FWY) ,� A DUNAWA 550 k4sy Avwm•Sups 400•Fart Worth,Tom mas 76107 L-2030 EX SS PROPOSED SS Tat 817.335.1121•Fax 81 7—W.7437 _6° WL_ EX WL 8� 7 (D(F.F-1114) PROPOSED WL 2w U 200 SCALE: 1--2W to v I I I I I BAYLOR 1L_ — ss r SIS EX EX i U) �\ y II �\ I OD -00 J 3 I � �\ i a J W i 25 II -Q 0- J I w I En w � o HARDEMAN i M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FORTWOTI.I COUNCIL ACTION: Approved on 5/19/2009 -Ord. No. 18622-05-2009 DATE: 5/19/2009 REFERENCE C-23532 LOG NAME: 202008CONTRACT56 NO.. CODE: C TYPE: NOW PUBLIC NO CONSENT HEARING: SUBJECT: Authorize an Engineering Agreement in the Amount of$187,781.00 with Dunaway Associates, LP, for Pavement Reconstruction and Water and Sanitary Sewer Main Replacement on Dowdell Street, Hanger Avenue and Strong Avenue and Adopt Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$65,701.00 from the Water and Sewer Operating Fund to the Water Capital Projects Fund in the amount of$50,416.00 and the Sewer Capital Projects Fund in the amount of$15,285.00; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of$50,416.00 and the Sewer Capital Projects Fund in the amount of$15,285.00 from available funds; and 3. Authorize the City Manager to execute an Engineering Agreement with Dunaway Associates, LP, in the amount of$187,781.00 for pavement reconstruction and water and sewer main replacement on Dowdell Street, Hanger Avenue and Strong Avenue. DISCUSSION: The 2008 Capital Improvement Program (CIP) includes funds for pavement reconstruction on the following streets: Dowdell Street Baylor Street to Martin Luther King Jr Freeway Hanger Avenue Burchill Road to Vaughn Boulevard Hanger Avenue South Collard Street to East Dead End Strong Avenue Vaughn Boulevard to Campbell Avenue In addition, the Water Department has determined that the existing water mains on the identified streets are severely deteriorated and should be replaced with this project. Dunaway Associates, LP, proposes to perform the necessary design work for a lump sum fee of $187,781.00. City staff considers this fee to be fair and reasonable for the scope of services proposed. In addition to the Engineering Agreement $67,302.00 ($12,775.00 water; $7,300.00 sewer; and $47,227.00 street) is needed for project management and design review. M/WBE — Dunaway Associates, LP, is in compliance with the City's M/WBE Ordinance by committing to 22 percent M/WBE participation. The City's goal on this project is 20 percent. This project is located in COUNCIL DISTRICT 5, Mapsco, 78P, 78Q, 78T, 78U and 78Z. file:HC:\Documents and Settings\ArgomaR\My Documents\2008 CIP\2008 CIP 5B\M&C Revie... 10/14/2011 M&C Review Page 2 of 2 FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance funds will be available in the current capital budgets, as appropriated, of the Water Capital Projects Fund, the Sewer Capital Projects Fund and the Street Improvements 2008 Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 1&2) 1) PE45 538040 0609020 $50.416.00 P253 476045 6051701266ZZ $50.416.00 1) PE45 538040 0709020 $15.285.00 1&2) $15.285.00 P258 476045 7051701266ZZ 3) P253 531200 605170126631 $9,959.00 2) P253 531350 605170126610 $2,100.00 3) P253 531200 605170126632 $19.918.00 2) P253 531350 605170126620 $2,100.00 3) P253 531200 605170126633 $3,320.00 2) P253 531350 605170126630 $7,875.00 3) P253 531200 605170126651 $4,444.00 2) P253 531200 605170126631 $9,959.00 3) P258 531200 705170126631 $2,218.0 0 2) P253 531200 605170126632 $19.918.00 3) P258 531200 705170126632 $4,435.00 2) P253 531200 605170126633 $3,320.00 3) P258 531200 705170126633 $739.00 2) P253 531200 605170126651 $4,444.00 3) Q204 531200 205400126631 $35.884.00 2) P253 531350 605170126660 $350.00 3) Q204 531200 205400126632 $71.770.00 2) P253 533010 605170126681 $350.00 3) Q204 531200 205400126633 $11.962.00 2) P258 531350 705170126610 $1,200.00 3) C204 531200 205400126651 $22,539.00 2) P258 531350 705170126620 $1,200.00 3) P258 531200 705170126651 $593.00 2) P258 531350 705170126630 $4,500.00 2) P258 531200 705170126631 $2,218.00 2) P258 531200 705170126632 $4,435.00 2) P258 531200 705170126633 $739.00 2) P258 531200 705170126651 $593.00 2) P258 531350 705170126660 $200.00 2) P258 533010 705170126681 $200.00 Submitted for City Manager's Office by: Fernando Costa (8476) Originating Department Head: William Verkest (7801) Additional Information Contact: Richard Argomaniz (8653) ATTACHMENTS 202008CONTRACT5B AOC.doc 202008CONTRACT5B.pdf file:HC:\Documents and Settings\ArgomaR\My Documents\2008 CIP\2008 CIP 5B\M&C Revie... 10/14/2011