RE: Amendment No. 2
Eastland Creek Open Channel Study
City Project No. SWS-019
Dear Mr. Eubanks:
As we discussed at our meetings on January 21, 2011 and February 24,
2011, this amendment revises the previously approved Eastland Creek
Open Channel Study, City Secretary Contract No. 38800, City Project No.
SWS-019. Specifically, this amendment includes the following two tasks:
Task 1: Comparing peak flow rates resulting from the storm drain and
overland flow paths, and
Task 2: Additional field survey, 2D and HEC-RAS split flow modeling along
Jennifer Court to more accurately map the floodplain.
Task 1: Stone Drain versus Overland Flow Path Analysis
The existing storm drain system in the upper three sub-basins only captures
the 5-year discharge, and during the 100-year event much of the flow travels
overland. A sensitivity analysis will evaluate the importance of Tc
calculations on peak discharges and subsequent floodplain mapping. A
combined method was suggested to allow the runoff captured by the storm
drain system to be based on the storm drain Tc, but allow the excess runoff
to be based on overland paths. Sub-basins with two flow paths will be input
into the HEC-HMS model for each sub-basin with a significant storm drain
system. The results represent an average 30% reduction in the peak
discharge values for use in the floodplain mapping.
The specific work to be included in this amendment to analyze the Tc for the
storm drain versus overland flow paths in the hydrologic model is as follows:
• Convert design rainfall to incremental amounts
• Copy sub-basins in HMS and input flow path Tc and loss rates
• Finalize HMS mm_gnd summarize results in a memo.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
NM ENiwwwrh>♦.Ms. 210 E.300 Sh" Phone:(817)333-M
sub 300 Fu:(817)333.2818
Fad WoM,TX 781024002 www.hNm.com
8
Mr. Steven Eubanks, P.E., CFM
May 31, 2011
Page 2 of 3
Task 2: 2D Modeling and HEC-RAS Split Flow along Jennifer Court
In the initial floodplain mapping from HEC-GeoRAS in the Jennifer Court
area, the assumption of a constant WSEL across the entire cross section
will place 3 rows of houses in the 1%-chance floodplain. However, once the
overflow between the 1e1 row of houses reaches Jennifer Court, it speeds up
and flows down to Eastland Street, and does not inundate the 2"d or 3rd row
of houses. Modeling this situation correctly in the LOMR will require a HEC-
RAS split flow reach, guided by a 2D hydraulic model of the area.
The specific work to be included in this amendment to develop the 2D
modeling and a HEC-RAS split flow reach a"Jennifer Court is as follows:
• Import RAS Geo File/boundary conditions/flow analysis
• Define 2D area polygon, meshing &2D model run
• Incorporate surrey points to 2D model/Manually define 2D elements
for 2D mesh
• Left bank 2D split flow modeling
• Incorporate survey points to RAS model
• Model lateral weir in RAS
• Results analysis/2D vs RAS comparison
• Update Hydraulic Report/QAQC
Schedule
HDR estimates that it will take an additional 1 week for Task 1 to finalize the
Tc analysis and 3 weeks for Task 2 to add the 2D and HEC-RAS split flow
modeling. The remainder of the project schedule will remain the same.
Deliverables
Deliverables will remain the same as outlined in the contract.
Man EM 000doe.hM. 210 E.r Shed Phow:(SM 333-2800
Suits 3W Fa:017)>334818
Fat Worth,Tx 76102-4W wrw Affine.oan
J
Mr. Steven Eubanks, P.E., CFM
May 31, 2011
Page 3 of 3
Fee Estimate
HDR is proposing to complete the additional services outlined above for a
lump sum fee of$37,510. Invoices will be sent monthly and will be based
on a percent complete of the lump sum fee.
HDR's fees for the aforementioned services are itemized below:
Task 1 - Professional Services $ 5,680.00
Task 2- Professional Services $ 15,780.00
Task 2-Sub-Contracted Services(ANA) $ 11,200.00
Task 1 and 2 Expenses $ 4,850.00
Total Contract Amendment No. 2 Value: _ $ 37.510.00
Contract value revisions are as foik)ws:
Professional Services $ 225,352.00
Amendment request No. 1: $ 7,560.00
Amendment request No. 2: $ 37.510.00
TOTAL CONTRACT AMOUNT $ 270,422.00
If you have any questions or there is additional documentation needed for
this work, please contact Mr. Curtis Beitel, P.E. at(817)333-2817.
Sincerely
Dennis Schulze, P.E.
Vice President
HDR Engineering, Inc.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
MM Es6Mccdme.Inc. 210 E.309 SMM Pla :(817)333-M
Suit 300 Fa:(017)3332616
Fad Woflh,TX 7610240M www.hdrinc.0"
AMENDMENT NO. 2
STATE OF TEXAS S CITY SECRETARY CONTRACT NO.38800
(No M&C Needed)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and HDR Engineering,
Inc. , (Engineer) made and entered into City Secretary Contract No.
38800, (M&C # C-23582) which was executed by the City Manager on
the 7th day of July, 2009, and Amendment No. 1 which was executed
administratively by the City Manager on the 20th day of April,
2011;
WHEREAS, the Contract involves engineering services for the
following project:
Eastland Creek Open Channel Study - Study No. SWS-019;
WHEREAS, it has become necessary to execute Amendment No. 2
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1 .
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated May 31, 2011, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $37,510. 00.
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $270,422 .00.
City of Fort Worth,Texas
Amendment to Engineering Agreement
PMO Official Release Date 10.01 2010
Page 1 of 2
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the 6 day of June, 2011, in Fort Worth, Tarrant
County, Texas.
ATTES a� ��silo �a4
'n7y,, p 0000°OOp00"
11�rtj Hendrix G.. a d
6i ty Secretary 000 0Yx 0
%'��'00000000 oo 400 Ay
APPROVAL RECOMMENDED: aa���x � APPROVED:
C-74f Q"�'
Douglas W' rsig, P.E. , Dir ctor, Fernando Costa
Transportation and Public Works Assistant City Manager
HDR Engineering, Inc.
NEER
By.
Name: Dennis Schulze, P.E.
Vice President
210 East 3rd Street, Suite 300 - ---
Fort Worth, Texas 76102 OFFICIAL RECORD
CITY SECRETARY
APPROVED AS TO FORM AND LEGALITY: FT. WORTH, TX
Q) 5 --
is City Attorney
City of Fort Worlh,Texas
AmerWrnerrl W E.Wkw ring Agreement
PMO oAcisl Release Otle:6,18.2010 ;
Pape 2 of 2 h� .. ` + [j'
i[t
fy
MEN
°
Rf
N N
ow
3 pM pM
3� h.Y I N�
IVOR
�,t N 03�st,ia'f41A � d f m m N O l
Mg. bt S
BMW
1 m m
1
sp ,_ Sol
N a ��� Z .0 F y ♦ ° O h �N
.5kk3 S
6
e W T �ilk
U i O
atti-
A
�r 2
N 2 g
Cl
O(ryryQQ''
^o
N
x n 2 KH
ism
� � A �'a� w o ����SPi ■ a u v s .. o c ;' F��� �5
�� T polo �
f z ? UlW O
S W
2 ��+', K����,, sic W y� f' L
os l�
IL
fir`