Loading...
HomeMy WebLinkAboutContract 38894-A1 CITY SECRETARY CONTRACT NO. -3 AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Stream Water Group, Inc. (Engineer) made and entered into City Secretary Contract No. 38894 (the Contract) which was authorized by the City Council by M&C C-23647 on the 29th day of July, 2009 in the amount of$215,053.00, and; WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services: Street reconstruction,water and sanitary sewer replacement on 16th St NW(Clinton Ave to Circle Park Blvd),22nd St NW(Prairie Ave to McKinley Ave),Belmont Ave(NW 19th St to NW 20th St),Odd St(Belmont Ave to Grand Ave),Gould Ave(NW 14th St to NW 16th St),and Highland Ave(NW 18th St to Odd St).2008 CIP Project,Council District 2,Contract 2A;Project No.01320, DOE No.6178 WHEREAS, it has become necessary to execute Amendment No.1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated March 14, 2012 of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $7,990.00. 2. Article 1I of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$223,043.00 3. All other provisions of the contract, which are not=O�FFICIAL ein, shall Ong remain in full force and effect. EXECUTED on this the_ day of 2012, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: Z� �Z' (j , �j� cmtl� Doug W. Wiersig, P.E.N Fernando Costa Director, Transportation dnU Assistant City Manager Public Works Department Stream Water Group, Inc. ENGINEER ATTEST: AI&J kAYW,tity cretary BY' #00000000 y� lA Name: Shamsul Arefin, P.E. T *' �Preside nt LAG 0 6737 Brentwood Stair Rd; Suite 230 �Fort Worth, TX 76112 ° � a� A °0000°° p a�>1 aTLS APPRPVf,D AS TO FORM AND LEGALITY: Assistant City Attorney OFFICIAL RECORD CITY SECRETARY FT WORTHY TX March 14,2012 Mr.Gopal Sahu,P.E. Project Manager Transportation&Public Works Department 1000 Throckmorton St,Fort Worth,TX 76102 Phone:(817)392-7949 RE: Contract Amendment No. 1 Engineering Design Services: 2008 CIP Project,Council District 2,Contract 2A Project No.01320,DOE No.6178 Dear Mr.Sahu: The following is a summary of additional work requested for Amendment No. 1 to the above referenced project,per recent design meetings with City of Fort Worth officials. Amendment No. 1: • Update pavement design sheets and cross section sheet to include side walk improvements 1. Updated 15 plan and profile sheets to include new sidewalk and replacement of existing sidewalk per public meeting and City request 2. Revised 26 sheets to update cross-section for Sidewalk addition Amendment No. 1 Amount(see Exhibit B-313): Street Improvements(T&PW Department): $7,990.00 Total Amendment No.I (C204-531200-2024001320,Work Phase: 30) $7,990.00 The current status of the contract between Stream Water Group,Inc and City of Fort Worth for the above referenced project is as follows: Original Contract Amount= $215,053.00 Amendment No. 1 Amount= $ 7,990.00 Total Contract Amount including Amendment No. 1 = $223,043.00 Please process Amendment No. 1,to the 2008 CIP Project,Council District 2,Contract 2A; Project No.01320, DOE No.6178 in the amount of$7,990.00. If you require any additional information or have any questions regarding this matter,please give me a call at 800-446- 8076 ext 106.We appreciate the opportunity to provide engineering design services for the City of Fort Worth. Sincerely, Stream Water Group,Inc. Shamsul Arefin,P.E. President Copy: File EXHIBIT B-313 (SUPPLEMENT TO ATTACHMENT B) Contract Amendment No. 1 Engineering Design Services: 2008 CIP Project, Council District 2, Contract 2A Project No. 01320, DOE No. 6178 Hourly Rate $150 $135 $135 $105 $90 $45 Pricipal Project Staff Direct Cost Task Description QA/QC Manager Proj Eng Engineer CAD Clerical Total Fee 1 Design Sheets Update i 15 Plan and Profile Sheets(for sidewalk)Update 1 4 15 $ 100 $ 2,125 ii Update Spec and Conduct Site Visit 4 9 $ 50 $ 1,805 iii Cross Sections Sheet(26 sheets)Update for Sidewalk 12 26 $ 100 $ 4,060 Total Design Update: C204-531200-2024001320 work phase 30 = $ 7,990 C) I V