HomeMy WebLinkAboutContract 64065CSC No. 64065
CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR GENERAL PROFESSIONAL SERVICES
This agreement ("Agreement") is between the City of Fort Worth, a Texas home-rule
municipality ("City"), and ECS Southwest, LLP, authorized to do business in Texas
("Consultant"), for a project generally described as: Amon Carter Stair Replacement
("Project") -Project No. 106370.
Article I
Scope of Services
(1)Consultant hereby agrees to perform professional services as set forth in this
Agreement and the Scope of Services, attached hereto as Attachment "A"
("Services"). These Services shall be performed in connection with the Project.
(2)Additional services, if any, will be memorialized by an amendment to this Agreement.
(3)All reports, whether partial or complete, prepared under this Agreement, including
any original drawings or documents, whether furnished by City, its officers, agents,
employees, consultants, or contractors, or prepared by Consultant, shall be or
become the property of City, and shall be furnished to the City, prior to or at the time
such services are completed, or upon termination or expiration of Agreement.
Article II
Compensation
Consultant shall be compensated an amount up to $1,798.50 ("Contract Amount")
in accordance with the Proposal shown in Attachment "A". Payment shall be considered
full compensation for all labor (including all benefits, overhead and markups),
materials, supplies, and equipment necessary to complete the Services.
Consultant shall provide monthly invoices to City. Payments for services rendered shall be
made in accordance with the Texas Prompt Payment Act (Texas Government Code Ch.
2251 ).
Acceptance by Consultant of said payment shall release City from all claims or liabilities
under this Agreement for anything related to, performed, or furnished in connection with the
Services for which payment is made, including any act or omission of City in connection with
such Services.
Article Ill
Term
Time is of the essence. The term of this Agreement shall commence on the Effective Date and
shall continue until the expiration of the funds or completion of the subject matter pursuant to
City of Fort Worth, Texas
Standard Agreement for Professional Services
Revision Date: March 8, 2024
Page 1 of 8
WRMC Amon Carter Stairs
106370
the schedule, whichever occurs first, unless terminated in accordance with the terms of this
Agreement. Unless specifically otherwise amended, the original term shall not exceed five
years from the original effective date.
Article IV
Independent Contractor
Consultant shall operate hereunder as an independent contractor and not as an officer, agent,
servant, or employee of City. Consultant shall have exclusive control of and the exclusive right
to control the details of the work to be performed hereunder and of all persons performing
same, and shall be solely responsible for the acts and omissions of its ofFicers, agents,
employees, contractors and subcontractors. The doctrine of respondeat superior shall not
apply as between City and Consultant, its officers, agents, employees, contractors, and
subcontractors, and nothing herein shall be construed as creating a partnership or joint venture
between City and Consultant.
Article V
Professional Competence
Work performed by Consultant shall comply in all aspects with all applicable local, state and
federal laws and with all applicable, standards, codes, rules and/or regulations promulgated
by local, state and national boards, bureaus and agencies. Approval to proceed by City of
Consultant's work or work product shall not constitute or be deemed to be a release of the
responsibility and liability of Consultant or its officers, agents, employees, contractors and
subcontractors for the accuracy and competency of its performance of the Services.
Article VI
Indemnification
CONSULTANT, AT NO COST TO THE CITY, AGREES TO INDEMNIFYAND HOLD CITY,
ITS OFFICERS, AGENTS, SERVANTS AND EMPLOYEES, HARMLESS AGAINST ANY
AND ALL CLAIMS, LAWSUITS, ACTIONS, COSTS AND EXPENSES OF ANY KIND,
INCLUDING, BUT NOT LIMITED TO, THOSE FOR PROPERTY DAMAGE OR LOSS
(INCLUDING ALLEGED DAMAGE OR LOSS TO CONSULTANT'S BUSINESS AND ANY
RESULTING LOST PROFITS) AND/OR PERSONAL INJURY, INCLUDING DEATH, THAT
MAY RELATE TO, ARISE OUT OF OR BE OCCASIONED BY CONSULTANT'S BREACH
OF (i) ANY OF THE TERMS OR PROVISIONS OF THIS AGREEMENT OR (ii) ANY
NEGLIGENT ACT OR OMISSION OR INTENTIONAL MISCONDUCT OF CONSULTANT,
ITS OFFICERS, AGENTS, ASSOCIATES, EMPLOYEES, CONTRACTORS (OTHER
THAN THE CITI� OR SUBCONTRACTORS RELATED TO THE PERFORMANCE OR
NON-PERFORMANCE OF THIS AGREEMENT. THIS SECTION SHALL SURVIVE ANY
TERMINATION OR EXPIRATION OF THIS AGREEMENT.
City of Fort Worth, Texas WRMC Amon Carter Stairs
Standard Agreement for Professional Services 106370
Revision Date: March 8, 2024
Page 2 of 8
Article VII
Insurance
Consultant shall not commence work under this Agreement until it has obtained all insurance
required under Attachment F and City has approved such insurance.
Article VIII
Force Majeure
City and Consultant shall exercise their best efforts to meet their respective duties and
obligations as set forth in this Agreement, but shall not be held liable for any delay or
omission in performance due to force majeure or other causes beyond their reasonable
control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural
disasters, epidemics/pandemics, wars, riots, material or labor restrictions by any
governmental authority and/or any other similar causes.
Article IX
Transfer or Assignment
Consultant, its lawful successors and assigns, shall not assign, sublet or transfer any interest
in this Agreement without prior written consent of City.
Article X
Termination of Contract
(1) City may terminate this Agreement for convenience by providing written notice to
Consultant at least 30-days prior to the date of termination, unless Consultant agrees
in writing to an earlier termination date.
(2) Either City or Consultant may terminate this Agreement for cause if either party fails
to substantially perform, through no fault of the other and the nonperforming party
does not commence correction of such nonperformance within 5 days after receipt of
written notice or thereafter fails to diligently pursue the correction to completion.
(3) If City chooses to terminate this Agreement, upon receipt of notice of termination by
Consultant, Consultant shall discontinue Services on the date such termination is
effective. City shall compensate Consultant for such services rendered based upon
Article II of this Agreement and in accordance with Exhibit "B".
Article XI
Right to Audit
(1) Consultant agrees that City shall, until the expiration of three (3) years after final
payment under Agreement, have access to and the right to examine any directly
pertinent books, documents, papers and records of Consultant involving transactions
relating to Agreement. Consultant agrees that City shall have access during normal
City of Fort Worth, Texas WRMC Amon Carter Stairs
Standard Agreement for Professional Services 106370
Revision Date: March 8, 2024
Page 3 of 8
working hours to all necessary facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section.
City shall give Consultant reasonable advance notice of intended audits.
(2) Consultant further agrees to include in all its subcontracts hereunder, a provision to
the effect that the subcontractor agrees that City shall, until the expiration of three (3)
years after final payment under the subcontract, have access to and the right to
examine any directly pertinent books, documents, papers and records of such
subcontractor(s), involving transactions to the subcontract, and further, that City shall
have access during normal working hours to all subcontractor facilities, and shall be
provided adequate and appropriate work space in order to conduct audits in
compliance with the provisions of this article. City shall give Consultant and any
subcontractor reasonable advance notice of intended audit.
(3) Consultant and subcontractor(s) agree to photocopy such documents as may be
requested by City. City agrees to reimburse Consultant for the cost of copies at the rate
published in the Texas Administrative Code in efFect as of the time copying is performed.
Article XII
RESERVED
Article XIII
Observe and Comply
Consultant shall at all times observe and comply with all federal, state, and local laws and
regulations and with all City ordinances and regulations which in any way affect Agreement
and the work hereunder, and shall observe and comply with all orders, laws ordinances and
regulations which may exist or may be enacted later by governing bodies having jurisdiction
or authority for such enactment. No plea of misunderstanding or ignorance thereof shall
be considered. Consultant agrees to defend, indemnify and hold harmless City and all of
its officers, agents and employees from and against all claims or liability arising out of the
violation of any such order, law, ordinance, or regulation, whether it be by itself or its
employees or its subcontractor(s).
Ciry of Fort Worth, Texas WRMC Amon Carter Stairs
Standard Agreement for Professional Services 106370
Revision Date: Maroh 8, 2024
Page 4 of 8
Article XIV
Immigration Nationality Act
Consultant shall verify the identity and employment eligibility of its employees and
employees of all subcontractor(s) who perform work under Agreement, including completing
the Employment Eligibility Verification Form (I-9). Upon request by City, Consultant shall
provide City with copies of all I-9 forms and supporting eligibility documentation for each
employee who performs work under Agreement. Consultant shall adhere to all Federal and
State laws as well as establish appropriate procedures and controls so that no services will
be performed by any Consultant employee who is not legally eligible to perform such
services. CONSULTANT SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM
ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS
PARAGRAPH BY CONSULTANT, CONSULTANT'S EMPLOYEES,
SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Consultant,
shall have the right to immediately terminate Agreement for violations of this provision by
Consultant.
Article XV
Venue and Jurisdiction
If any action, whether real or asserted, at law or in equity, arises on the basis of any provision
of Agreement, venue for such action shall lie in state courts located in Tarrant County, Texas
or the United States District Court for the Northern District of Texas — Fort Worth Division.
Agreement shall be construed in accordance with the laws of the State of Texas.
Article XVI
Contract Construction/No Waiver
The parties acknowledge that each Party and, if it so chooses, its counsel, have reviewed
and revised Agreement and that the normal rule of contract construction, to the effect that
any ambiguities are to be resolved against the drafting party, must not be employed in the
interpretation of Agreement or any amendments or exhibits hereto.
The failure of City or Consultant to insist upon the performance of any term or provision of
this Agreement or to exercise any right granted herein shall not constitute a waiver of City's
or Consultant's respective right to insist upon appropriate performance or to assert any such
right on any future occasion.
Article XVII
Severability
The provisions of Agreement are severable, and if any word, phrase, clause, sentence,
paragraph, section or other part of Agreement or the application thereof to any person or
circumstance shall ever be held by any court of competent jurisdiction to be invalid or
City of Fort Worth, Texas WRMC Amon Carter Stairs
Standard Agreement for Professional Services 106370
Revision Date: March 8, 2024
Page 5 of 8
unconstitutional for any reason, the remainder of Agreement and the application of such
word, phrase, clause, sentence, paragraph, section, or other part of Agreement to other
persons or circumstances shall not be affected thereby and Agreement shall be construed
as if such invalid or unconstitutional portion had never been contained therein.
Article XVIII
Notices
Notices regarding Articles IX or X are to be provided to the other Party by hand-delivery or
via U.S. Postal Service certified mail return receipt requested, postage prepaid, to the
address of the other Party shown below:
City of Fort Worth
Attn: Nikita N. Watts, Senior Capital Projects Officer
Property Management
100 Fort Worth Trail
Fort Worth, Texas 76102
Consultant:
ECS Southwest, LLP
Attn: Alberto Frias, Jr
2621 White Settlement Road
Fort Worth, Texas 76107
All other notices may be provided as described above or via electronic means.
Article XIX
Prohibition On Contracts With Companies Boycotting Israel
Consultant, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of
the Texas Government Code, if Consultant has 10 or more full time-employees and the
contract value is $100,000 or more, the City is prohibited from entering into a contract with
a company for goods or services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of
the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed
to those terms in Section 808.001 of the Texas Government Code. By signing this
contract, Consultant certifies that Consultant's signature provides written verification
to the City that if Chapter 2271, Texas Government Code applies, Consultant: (1) does
not boycott Israel; and (2) will not boycott Israel during the term of the contract.
City of Fort Worth, Texas WRMC Amon Carter Stairs
Standard Agreement for Professional Services 106370
Revision Date: March 8, 2024
Page 6 of 8
Article XX
Prohibition on Boycotting Energy Companies
Consultant acknowledges that in accordance with Chapter 2276 of the Texas Government
Code, the City is prohibited from entering into a contract for goods or services that has a
value of $100,000 or more, which will be paid wholly or partly from public funds of the City,
with a company (with 10 or more full-time employees) unless the contract contains a written
verification from the company that it: (1) does not boycott energy companies; and (2) will not
boycott energy companies during the term of the contract. The terms "boycott energy
company" and "company" have the meaning ascribed to those terms by Chapter 2276 of the
Texas Government Code. To the extent that Chapter 2276 of the Government Code is
applicable to this Agreement, by signing this Agreement, Consultant certifies that
Consultant's signature provides written verification to the City that Consultant: (1)
does not boycott energy companies; and (2) will not boycott energy companies
during the term of this Agreement.
Article XXI
Prohibition on Discrimination Against Firearm and Ammunition Industries
Consultant acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code, the City is prohibited from entering into a contract for goods or services
that has a value of $100,000 or more which will be paid wholly or partly from public funds of
the City, with a company (with 10 or more full-time employees) unless the contract contains
a written verification from the company that it: (1) does not have a practice, policy, guidance,
or directive that discriminates against a firearm entity or firearm trade association; and (2)
will not discriminate during the term of the contract against a firearm entity or firearm trade
association. The terms "discriminate," "firearm entity" and "firearm trade association" have
the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code. To
the extent that Chapter 2274 of the Government Code is applicable to this Agreement,
by signing this Agreement, Consultant certifies that Consultant's signature provides
written verification to the City that Consultant: (1) does not have a practice, policy,
guidance, or directive that discriminates against a firearm entity or firearm trade
association; and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
Article XXII
Headings
The headings contained herein are for the convenience in reference and are not intended to
define or limit the scope of any provision of Agreement.
City of Fort Worth, Texas WRMC Amon Carter Stairs
Standard Agreement for Professional Services 106370
Revision Date: March 8, 2024
Page 7 of 8
Article XXIII
Attachments, Schedules and Counterparts
This Agreement may be executed in one or more counterparts and each counterpart shall,
for all purposes, be deemed an original, but all such counterparts shall together constitute
but one and the same instrument.
The following attachments and schedules are hereby made a part of Agreement:
Attachment A -Scope of Services/Compensation
Duly executed by each party's designated representative to be effective on the date subscribed
by the City's designated Assistant City Manager.
BY:
CITY OF FORT WORTH
v'�tJ� Vajerie Washington (Sep 30, 2025 20:01:12 CDT)
Valerie Washington
Assistant City Manager
Date: 09/30/2025
Jannette Goodall
City Secretary
BY:
CONSULTANT
ECS Southwest, LLP
T""' '{,
Timothy Tarbutton (Sep 25, 202513:42:33 CDT)
Tim Tarbutton
Subsidiary Regional Manager
Date: 09/25/2025
A��ROVf.L RECOMMENDED:V yr1~t71t1,Jc.oz.__
Marilyn Marvin
Director Property Management
APPROVED AS TO FORM AND LEGALITY
By: Ste en Hines ( ep 30, 202515:09:10 CDT)
Stephen M. Hines
Sr. Assistant City Attorney
M&C No.: NA;...._ ___ _
M&C Date: NA '--------
Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all performance and reporting
�:�uire�
City of Fort Worth, Texas
Standard Agreement for Professional Services
Revision Date: March 8, 2024
Page 8 of 8
Name: Nikita N. Watts
Title: Sr. Capital Project Officer
WRMC Amon Carter Stairs
106370
�
_ _ :� - -
�i -� f-=
-_ �.. _��
���
ECS Southwest, LLP
Estimated Fee Proposal for Construction Materials Testing and
Observation Services
Amon Carter Stair Replacement
Amon Carter Square & Will Rogers Rd
Fort Worth, Texas 76107
ECS Proposal No. 63:4229
September 16, 2025
'�""��
_ "`�-
�
�
�
ECS SOUTHWEST, LLP
Geotechnical • Construction Materials • Environmental • Facilities
September 16, 2025
Ms. Nikita Watts
City of Fort Worth
100 Fort Worth Trail
Fort Worth, Texas 76102
Reference: Estimated Fee Proposal for Construction Materials Testing and Observation Services
Amon Carter Stair Replacement
Amon Carter Square & Will Rogers Rd
Fort Worth, Texas 76107
ECS Proposal No. 63:4229
Dear Ms. Watts:
ECS Southwest, LLP (ECS) appreciates the opportunity to submit this proposal to provide Construction
Materials Testing and Observation Services for the above-referenced project. This proposal contains our
project understanding, proposed scope of services, fee estimate with applicable schedule of unit rates,
and authorization requirements.
Our considerable experience with similar projects will help us provide efficient, cost-effective construction
observation, testing, and engineering consulting services.
We look forward to the opportunity to work with you on this project and to serve as your consultant in
the future. If you have any questions, or if we can be of any additional service, please contact us at (682)
350-2250.
Respectfully submitted,
ECS Southwest, LLP
-- �
Alberto Frias Jr
CMT Group Supervisor
Alberto Frias Jr
CMT Group Supervisor
�� ��
Tim Tarbutton
Subsidiary Regional Manager
2621 WHITE SETTLEMENT ROAD, FORT WORTH, TX 76107 • T: (682) 350-2250 • F: (817) 847-8616
ECS Florida, LLC • ECS Mid-Atlantic, LLC • ECS Midwest, LLC • ECS Pacific, Inc. • ECS Southeast, LLC • ECS Southwest, LLP
ECS New York Engineering, PLLC —An Associate of ECS Group of Companies • www.ecslimited.com
"ONE FIRM. ONE MISSION:'
ECS Southwest, LLP
PROJECT UNDERSTANDING
Our understanding of the project is that it will include repair to the East stairs of the existing Will Rogers
Memorial Facility, we assume two trips for the reinforcing steel observation and two sets of five cylinders
as provided in the email scope of work.
SCOPE OF SERVICES
The scope of services for this project includes the testing and observation associated with the planned
development. The scope of services for this project is outlined in more detail in Appendix I of this proposal.
CONSTRUCTION DOCUMENTS
Construction documents or formal documentation was not available to ECS at the time of this proposal
preparation. The estimated fee is based on email/phone call. The estimated fees for this project are
outlined in Appendix III.
UNDERSTANDING CONSTRUCTION MATERIALS TESTING AND SPECIAL INSPECTIONS
Construction Materials Testing (CMT) and Special Inspections (SI) are performed to help provide the
project's contractors, designers, owners, and local code officials some indication of the level of compliance
obtained by the installing contractors with the project specifications. These services are provided at
periodic intervals, which typically are defined by the project specifications and on some occasions by the
applicable building code. Test locations for most materials, i.e. soils, concrete, and fireproofing, are
generally based upon random selection, as such not all materials incorporated into a construction project
are tested or observed.
The greater the testing frequency, the greater the confidence level that the test results are representative
of other untested areas; however, no amount of testing can assure 100% compliance. Testing and
observation services provided by ECS do not relieve the installing contractors from their obligation to
install all materials in accordance with the applicable project plans and specifications. ECS makes a
reasonable effort to test in accordance with the applicable project requirements and to identify areas of
materials that may not comply with the project specifications. However, due to the periodic and random
nature of our testing, we cannot guarantee that all materials have been installed in accordance with the
specifications. The responsibility to correct or remediate non-complying conditions, even non-complying
conditions discovered after testing or during subsequent phases of construction remains solely with the
installing contractors.
FEES FOR SERVICES
ECS proposes to conduct our scope of services on a unit rate basis in accordance with the fee schedule
included in Appendix II. We have utilized this fee schedule along with the plans and specification to derive
the estimated fees which are shown in Appendix III. Services provided for this project will be billed in
accordance with the unit rate fee schedule provided in Appendix II of this proposal. Our professional
judgment was used to determine the estimated fees; however, there are many factors that are not in ECS'
control once the project starts, such as the contractor's working hours and intensity, which could affect
over-time the estimated fees for our services. We will endeavor to work and invoice the client within the
confines of our estimated fees; however, the estimated fees are not represented as a lump sum price or
a not-to-exceed value.
ECS Proposal No. 63:4229
Page � 3
ECS Southwest, LLP
Any and all deviations from the assumed quantities and timeframes detailed in the attached estimate are
not included and will be considered as an addition to our proposed scope of service. We have assumed
that the general contractor will provide the normal and customary concrete cylinder curing boxes and/or
curing sheds as applicable and therefore costs associated with on-site concrete cylinder curing facilities
have not been included in the estimated fees. Please note that we have not included site visits for the
specific task of retesting or re-observing failed tests/non-compliant work. Time for Project Engineers to
attend meetings (other than those included in our estimate fee herein) have not been included in the
estimated fee. Actual fees may be greater or less than the estimate based upon actual quantities that will
be calculated using the enclosed schedule of unit rates.
Should supplemental services be deemed necessary at a later date, they would be invoiced at the rate
noted on the fee schedule in effect at that time, unless otherwise agreed upon in advance. All unit rates
will remain in effect for the duration of the project.
ECS field services will be rendered portal-to-portal from our office in Fort Worth, TX. Our unit rates are
based on a normal 8 hour work day, Monday through Friday. Overtime beyond 8 hours per day, 40 hours
per week, outside the hours of 7:00 AM to 5:00 PM Monday through Friday and all ECS recognized
Holidays will be invoiced at a rate of 1.5 times the normal hourly rate. [REFERENCE APPENDIX II]
BILLING AND CONTRACT CONDITIONS
Invoices will be issued on a monthly basis and will provide a breakdown of billing units. Upon request, ECS
Southwest, LLP will provide a separate invoice for services provided outside of the proposed scope of
work. Invoices are normally processed on or around the 10th of each month and represent costs incurred
during the previous month. These invoices will typically display a monthly cumulative summary of project
costs to date. This monthly summary will serve as a means of monitoring expenses as they relate to job
progress. We request that payment be rendered within 30 days of receipt of the invoice. ECS reserves the
right to assess a finance charge of 1.5% per month on the outstanding balance over 30 days. ECS also
reserves the right to withhold final certifications until outstanding balances have been paid in full.
COMMUNICATIONS AND SCHEDULING
Our automated Field Reporting and Electronic Distribution (FRED) system can provide an efficient
reporting of field and laboratory activities as discussed later.
Our service will be provided on an on-call basis. The appropriate contractor or owner representative
should contact our Dispatch at _635cheduling@ECSLimited.com or by calling our office at (682) 350-
2250.
Scheduling or cancellation should occur prior to 3:00 p.m. on the day before services are required. After
that time, we will make every effort to schedule or cancel, but we cannot guarantee results. Services
cancelled without advance notice will be assessed a minimum 4-hour charge upon arrival at the site.
ECS requests that all materials proposed for compaction or fill placement be submitted to our laboratory
for testing a minimum of one week in advance of their placement on the project.
ECS reports are distributed by e-mail. Please list those to whom the reports should be sent and provide
their e-mail on the attached Proposal Acceptance Form [Appendix IV].
ECS Proposal No. 63:4229
Page � 4
ECS Southwest, LLP
Technician rates for services provided during evening/night shifts (if applicable) will be charged at 1.50
times the appropriate hourly rate. A minimum of 3-hours is billed for each work shift schedule between
6:OOpm and 6:OOam.
ECS ADVANTAGES
In addition to the standard services many local testing agencies provide, ECS has distinguished itself on
multiple disciplines to allow us to "Set the Standard of Service" for you, our clients. Most notably:
• Resources. Our size allows us to maintain consistent staffing levels to meet your project's needs.
We currently have 85+ offices and testing facilities, and 2,500+ employees.
• Experience. In 2023, ECS celebrated its 35th anniversary.
• Technology. Electronic Paperless reporting. All recorded data is stored digitally for ease or
reproduction.
• Efficiency. Our paperless reporting allows us to save costs which we pass directly to our clients.
ECS Proposal No. 63:4229
Page � 5
ECS Southwest, LLP
FULLY DIGITIZED CMT REPORTING AND DISTRIBUTION
Since 2001, ECS field technicians have been utilizing our proprietary Field Report and Electronic
Distribution (FRED) system. This completely digital method of construction material testing information
allows for a quick, efficient and accurate reporting process.
O
� �c� )}� --� ►%
field technicians write repprts reports are
on-site using a hand-held transmitted to
electronic de�ice the office
WHAT THIS MEANS FOR OUR CLIENTS
projeci manager / tlient receives report
principa! engineer review via emaii, witi�in
and apprave reports hours of completion
With FRED, finalized reports are typically delivered in one to two business days from when the work was
performed. The reports are written on-site, resulting in more precise data and observations. With the
information gathered, everyday construction problems in the field can be resolved quickly by the project
engineer, saving the client time and money.
Our paperless reporting system can be efficiently forwarded to all parties involved.
AUTHORIZATION
If the scope of work as outlined in this proposal and the attached Terms and Conditions of Service are
acceptable to you, please sign the attached Proposal Acceptance Form as our client and return one copy
of the Proposal Acceptance Form to ECS. Please note that the attached Terms and Conditions of Service
are incorporated herein by reference and are an integral part of this agreement between us.
By signing the Proposal Acceptance Form or by referencing this proposal in other documents intended to
authorize ECS to proceed with the scope of services described, you are also accepting the Terms and
Conditions of Service and making this proposal the agreement between ECS and our Client.
Fully completing and signing the attached Proposal Acceptance Form as our client will provide formal
authorization for ECS to enter the site and perform the above work, as well as provide proper invoicing
instructions and distribution lists for reports and correspondence. Please provide any specific instructions
or details not covered in this proposal on the attached Proposal Acceptance Form. Please note we have
provided a place for you to enter invoicing instructions and report distribution.
Attachments
Appendix I— Scope of Services
Appendix II — Fee Schedule
Appendix III — Estimated Fees
Appendix IV — Proposal Acceptance Form
ECS Southwest, LLP Terms and Conditions of Service
ECS Proposal No. 63:4229
Page � 6
ECS Southwest, LLP
APPENDIX I- SCOPE OF SERVICES
e
1. Test and report concrete for compliance with the provisions of ACI, local building codes,
generally accepted construction practices, and specific project requirements.
2. Observe placement of reinforcing steel and accessories to document conditions and
installation for general compliance with the project drawings and specifications.
3. Observe placement of concrete and document procedures with regard to forming, vibration,
and curing.
4. Sample concrete at the frequency stated in the project specifications and perform the
following tests and functions:
a. Confirm mix design
b. Slump
c. Unit Weight
d. Air Content
e. Temperature
f. Batch-to-placement time
g. Cast test cylinders
5. Sampling, testing, and curing of specimens in the field shall be performed in accordance with
applicable ASTM guidelines and project requirements. Additional tests shall be performed as
needed in the event deficiencies are encountered. Compliance with extreme weather
procedures will also be documented.
6. Curing and testing of concrete cylinders in the laboratory shall be performed in accordance
with applicable ASTM guidelines and project requirements. Four-inch by eight-inch cylinders
size is proposed.
7. Provide documentation of events in the field and notify the appropriate persons upon
recognition of deficiencies.
B. Reinf ; Steel
1. Observe reinforcing steel (rebar, welded wire) placement for cast in place and site cast
concrete components as well as masonry components to document conditions and
installation for general compliance with the project drawings and specifications.
2. Provide documentation of events in the field and notify the appropriate persons upon
recognition of deficiencies.
ECS Proposal No. 63:4229
Page � 7
ECS Southwest, LLP
APPENDIX II - FEE SCHEDULE
Engineering Technician (Concrete)
Senior Field Technician
Structural Steel Inspector, CWI
Compressive Strength, Concrete Cylinders
Concrete Cylinder Pickup
Trip Charge
1.
2.
3.
4.
5.
6.
_._. ���----
1. Project Management (10% of total Project Cost)
S
$
$
$
$
$
58.00/hour
66.00/hour
95.00/hour
23.00/each
184.00/pickup
53.00/tri p
$
180.50/I u m p
sum
ECS Proposal No. 63:4229
Page � 8
ECS Southwest, LLP
APPENDIX III - ESTIMATED FEES
CONSTRUCTION MATERIALS TESTING
FIELD/LABORATORY SERVICES Quantity Rate Units Fee
Engineering Technician (Concrete) 8 hours $58.00 / hour $ 464.00
Senior Field Technician 8 hours $66.00 / hour $ 528.00
Structural Steel Inspector, CWI 0 hours � $95.00 / hour $ 0.00
Compressive Strength, Concrete Cylinders 10 $23.00 / each $ 230.00
Concrete Cylinder Pickup 1 pickup $184.00 / pickup $ 184.00
Trip Charge 4 trips $53.00 / trip $ 212.00
Field/Laboratory Services Subtotal: $ 1,618.00
ENGINEERING/MANAGEMENT Quantity Rate Units Fee
Project Management (10% of total Project Cost) 1 $180.50 / lump sum $ 180.50
Engineering/Management Subtotal: $ 180.50
ESTIMATED TOTAL FEES: $ 1,798.50
ECS Proposal No. 63:4229
Page � 9
ECS Southwest, LLP
APPENDIX I\' - P
ECS Southwest, LLP
Project Name: Amon Carter Stair Replacement
ECS Proposal: 63:4229
Location: Fort Worth, Texas 76107
PTANCE FORM
Please complete and return this Proposal Acceptance Form to ECS as shown at the bottom of this form. By signing
and returning this form, you are providing us with authorization to proceed, providing us permission to enter the
site, and making this proposal the agreement between us. Your signature also indicates that you have read this
document and the terms and conditions of service in its entirety and agree to pay for these services as above set
forth. Should any changes to the proposal be necessary, the change shall be mutually accepted with an ECS
countersignature.
CLIENTAND BILLING INFORMATION
Client Company/Entity
Name:
Address:
Address:
City, State, Zip:
Contact Person:
Telephone No.:
Email Address:
Invoiced Addressee
Report Addressee
If you require copies to others or invoice approval different than above, please check ✓ box for invoice
and/or reports and provide their contact names, company, e-mail addresses and phone numbers below.
v �
u 0
� a
� � Contact Name
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
Special Instructions:
Client Signature: X
Company
Print Client Name:
Please return signed authorization to Alberto Frias Jr at afrias@ecslimited.com.
Email Address Phone Number
Date:
ECS Proposal No. 63:4229
Page � 10