AMENDMENT NO. 1 TO CITY s
CONMCT NO. a zs
COMMUNITY FACILITIES AGREEMENT
STATE OF TEXAS §
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and Keller Independent School District
(Developer) entered into Community Facility Agreement, City Secretary Contract No.
39257, wherein Developer is to make certain improvements to Old Denton Road within
the City; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the CFA
to include City participation of $473,362.11 (City Participation) for the costs shown in the
Revised Summary of Costs table attached hereto.
NOW THEREFORE, City and Developer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the CFA:
Cost Summary Table is amended to be and read:
(Remainder of Page Intentionally Left Blank)
AMENDMENT NO.1
CFW&Keller ISD OFFICIAL RECORD;
Old Denton Road
Contract No.39257 CITY SECRETARY
Page 1 of 4 h FT. WORTH, TX
REVISED SUMMARY OF COSTS
Items Developer's City's Cost Total Cost
Revised Cost
A. Water and Sewer Construction
1.Water $54,682.50 $0.00 $54,682.50
2.Sewer $7,470.00 $0.00 $7,470.00
Water/Sewer Construction Sub-Total $62,152.50 $0.00 $62,152.50
B.TPW Construction
1.Street(Paving) $184,479.13 $217,846.94 $402,326.07
2. Storm Drainage $0.00 $118.154.16 $118.154.16
3. Street Lights
$39,401.03 $18,673.17 $58,074.20
TPW Construction Sub-Total $223,880.16 $354, 674.27 $578,554.43
Total Construction Cost(excluding $286,032.66 $354, 674.27 $640,706.93
Fees):
Construction Fees:
C.Water Inspection Fee(2%) $1,243.05 $0.00 $1,243.05
D.Water Material Testing Fee(2%) $1,243.05 $0.00 $1,243.05
Sub-Total for Water/Sewer
Construction Fees $2,486.10 $0.00 $2,486.10
E.TPW Inspection Fee(4%) $8,955.21 $14,186.97 $23,142.18
F.TPW Material Testing Fee(2%) $4,477.60 $7,093.49 $11,571.09
Sub-Total for TPW Construction Fees $13,432.81 $21,280.46 $34,713.27
Total Construction Fees: $15,918.91 $21,280.46 $37,199.37
Other costs:
G. Engineering $0.00 $44,560.91 $44,560.91
H. Surveying $0.00 $7,093.49 $7,093.49
I.Construction Manager Fee for $28,880.54 $45,752.98 $74,633.52
Section B—TPW Construction 12.9%
J. Contingency $0.00 1 $0.00 $0.00
TOTALS $330,832.11 $473,362.11 $804,194.22
AMENDMENT NO.1
CFW&Keller ISD
Old Denton Road
Contract No 39257
Page 2 of 4
Section M is amended as follows:
M.v.
Developer agrees that all payment applications shall be made by the contractor
directly to developer and developer agrees to pay 100% of all payment
applications through completion of the project. Developer agrees to request a
one-time reimbursement for the City's share of the Project at completion of
construction.
M.vi.
City agrees, upon receiving all required documentation from the Developer, and
accepting the improvements, to make a one-time reimbursement to the
Developer based on actual construction amounts.
All other provisions of the CFA, which are not expressly amended herein, shall remain
in full force and effect.
EXECUTED on this the <S-f— day of��il/!� C/ , 201.#"in
Fort Worth, Tarrant County, Texas.
ATTEST: CITY OF FORT WORTH:
(&fJ• �4o�un��� Fernando Costa
City Secretary OF Fd 44 Assistant City Manager
000000
#0`0 000 oo° ��
c a o 0 APPROVAL RECOMMENDED:
(}
1� O 00
a4�4� Dougf
is W. Wiersig, P , Director
Transportation and Putlic Works
AMENDMENT NO.1
CFW&Keller ISD
Old Denton Road OFFICIAL RECORD
Contract No.39257
Page 3 of 4 ! CITY SECRETARY
FT. WORTH, TX
Wendy Chi-Babulal, EMBA, P.E.,
Water Development Engineering Manger
APPROVED AS TO FORM
AND LE�LITY:
Dju�4aW. Black
Assistant City Attorney DEVELOPER
Keller IndependenYSchool District
YVt G c 2 dos 14/e„dy Wk's
ZG it
� By:
Kevin St e n
Board resident � ;�✓��
AMENDMENT NO.1
CFW&Keller ISD ; OFFICIAL RECORD
Old Denton Road
Contract No.39257 CITY SECRETARY
Page 4 of 4
FT. WORTH, TX
G�D
a:4"zl' 35W
SITS' I ' I
WINE
GOLDEN
KR
f �
LOCATION MAP
N.T.S.
TE GM ANN AND MKAW CITY FORT WORTH, TEXAS
PUBLIC UC MPROVEMENTS TO SERVE EXHOT
f f o o v.o*'R. at r 07061102 OLD DENTON ROAD MIDDLE SCHOOL ADDITION
A /NC. fart w•rrn, x•• LOCATION MAP
Pa•.•:la n n
lssa-as•r.,:taf7laaa-aafs
DEC 2009 MA�.rr�aYRno ....u0-••n••.••.
o
O
C> w
LO o J
Q
z o U
z° X °<
,r o � ° U w
LLII I
I � °z :2 a w w
CD < 3 Lim O
C� ,
LE 0
d
UJ O �
�• ° o F
® 0D4
Li
�'
� Z
00 N
`.
O °•w+
x.�
G q O
.A •
•=A O
o3q�
0
t�
as I V
-
�< I I
I
II
hi
Qm
IFTF
PC lu�
2a �QL
0
0
0
a
U
W
O
o
n 2 m r-
U�J z Q
Lj
w LLJ
�> o o J
C, a
O Of 0- x
oa H
__j o
T LTI,
cwn w = b
O Q 3 On
LLJ Fa- ' m m
za 0 � o �
;a a o (ro g
aN w
0
0
a cn
� I o Y
cn. Z
a �a a d
0
QV {� • � e•Ke
0 ~♦e
o ee
•=A 4
(A) I 'tee
lo
o„
to
o II y
=3 - - - - - --
wpm
wi a
mllmrllrrrnl� � „"g U
I-
asa
Fj \
Bg O
n U
W
O
PROPOSED 6" HMAC I I I I I
7RANS177ON (KISD) ""� `Tx P��°" I MAYYARmD-I;ER ADDT ON
PROPOSED � :4 ° I N t N PoOq.RD W r4O
ErC.CL.14
4" SIDEWALK
(KISD)
PROPOSED HIGH 1 1
(KISD)VOLUME DRIVE APPROACH
�_I I
PROPOSED 4" SIDEWALK I I 1
(KISD) I I uwi J
I
PROPOSED 27' WIDE 11.50"
CONCRETE PAVEMENT (KISD)
PROPOSED HIGH VOLUME I PR�p0 RP�SE
DRIVE APPROACH (KISD) I I ��¶-P� ( I O
PROPOSED 11.50" 1 �� \0 v"0� l
CONCRETE PAVEMENT
(KISD)
LL
#iUi3H -
i 095..
D
CA,N sA FARMS I '
CAB. P.RT.4T.
I —
I
300 0 150 300 1 1
I
GRAPHIC SCALE
SCALE—00' TEAM NAU AND PERKINS CITY of FORT WORTH, TEXAS
PAVIING IMPROVEMENTS TO SERVE ewaeiT
N A
11001
DEC A 2009 1!E /NC. r r wo M
OLD DENTON ROAD MIDDLE SCHOOL ADDITION
rn.e o e ,s r r..r
re...:(81 Y)asa-s»a.f..:(ar7)asa-aa/a
B
P4000"w AY Fq KISD IMPROVEMENTS
PROPOSED 11.50" - - -
CONCRETE o
(CITY) — - -z — o r
PROPOSED 27' WIDE 11.50" C 8�4A 4 PRT._. -
CONCRETE PA 1/EMENT - -
(CITY)
PROPOSED 4" SIDEWALK
(CITY) - - - -
PROPOSED 6" HMAC
TRANSITION (CITY) � T
111
PEDESTRIAN - -
BRIDGE
I
i
-ORNE
PROPOSED 4" SIDEWALK
(CITY)
VARDEN STREET
PROPOSED 4" SIDEWALK
(CITY)
rvc
Z
300 0 150 300
GRAPHIC SCALE
AND CITY OF FORT WORTH, TEXAS
'
PAYING IA MVEk"TS TO SERVE E*=T
1100 w.o o" Street OLD DENTON ROAD MIDDLE SCHOOL ADDITION
/NC. Fore Wore, Tox•• ?oeo• p-1
DEC 2009 ,.,rny,.,r.n,�,�no F....:r,�,;,��t.:������:���„„-•,�, CITY IMPROVEMENTS v
2-10' RECESSED CURB O
INLETS END 21" RCP — — _—
k RU 21" RCP SD — E
I
" CRAWFORD FARMS
END 21 RCP CAB. A. SLD. 10959, P.R.T.C.T.
1-21" PLUG '
1-2421" REDUCER
1-24 x21" 45' WYE
CONNECT TO EXIST 24" RCP-- y
FAIS #T-
24" RCP SD — — — — — —
1-30 x24" REDUCER
30" RCP SD
I�
CONNECT TO EXIST. 24" RCP -
1-42 x36" REDUCER -
1-42" CAST-IN-PLACE 1
SAFETY END TREATMENT
BEGIN 42" RCP
Ell I
I ` i
S � � -
I
I
I
Nom 1 200 0 100 200
ALL STORM DRAIN IMPROVEMENTS
SHOWN ARE CITY FUNDED.
GRAPHIC SCALE
300� TES WW NAU AND PERK/INS CITY of FORT WORTH, TEXAS
1
STORK DRAIN IMPROVEMENTS TO SERVE EXHNNT
1100 M o 0 o n Street OLD DENTON ROAD MIDDLE SCHOOL ADDITION
Fort wort, fiioo 71100 D'1�
DEC 2009 frrra�r.rw�eF-M F"""("'....l:;''-::1:0.00:) "" CITY IMPROVEMENTS DL
— — —
I
X4llAA1 wu�wµ
ADDITION I I I n<n roo-DEOM Mc
� I uvwwD 9 PA— I w�mKT. T. sa
C/A 4 114 rAT.CL CA4 A 8b 10lS�PATGT. pAT.CT.
- �II
�I I
PROPOSED STREET
LIGHTS (KISD) I I
4 TOTAL
PROPOSED I � `
STREET LIGHTS
(KISD) _
♦ CA,Sa f10 FARMS
A
CIA 9b ICED.PAT.CT.
DFWe
I —
flV ■ I��/ - �-
�1
i
300 0 150 300
GRAPHIC SCALE
r3300• MAU AND PMKRO CITY of FORT WORTH, TEXAS
STREET LIGHT UMVENENTS TO SERVE EXFWT
f f o o Y.o o n s t r o o t OLD DENTON ROAD MIME $Ch1001 ADDITION
Rerf worts. Toros >sfof
DEC 2009 Fr•WOM•� ""' "":'::."::'-&a l:0.00:""' "" KISD IMPROVEMENTS V
R07 1 - - - -
I
II I I _BI�NER I
Q 4 PAOIGUM I GM�IID.r P"ADDrnnam I „'q`D om°DECKS,
I
I I � iii J I
j ¶,P RPO FA I
PROPOSED -
STREET LIGHTS - L kl
(Cl TY) — — — — — -- — — o r-- 1w
MAW=FARMS
PROPOSED STREET 4�wm PALCL
LIGHTS (CITY)
(TYPICAL) F
2 TOTAL
i� 111
X11
it
300 0 150 300
GRAPHIC SCALE
'.' �AWD MKS CITY of FORT WORTH, TEXAS
STREET LIGHT IMPROVEMENTS TO SERVE E*WT
1100 U.e e w a r.e e r OLD DENTON ROAD MIDDLE SCHOOL ADDITON
A inic. rerr were, r.,r.. s�1o>f CITY IMPROVEMENTS CA
DEC 20DO Now.in/-..l1.....m
M&C Review Pagel of 3
�J Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA FoRT� WORT1_I
COUNCIL ACTION: Approved on 712612011 - Ordinance Nos. 19793-07-2011 & 19794-07-2011
DATE: 7/26/2011 REFERENCE NO.: **C-25057 LOG NAME: 20OLD DENTON
ROAD/ KELLER ISD
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of Amendment No. 1 to Community Facilities Agreement City
Contract No. 39257 with Keller Independent School District and Authorize City
Participation in the Amount of$473,362.11 for the Design and Construction of Old
Denton Road Near the New Timberview Middle School, Located at 10300 Old Denton
Road and Adopt Appropriation Ordinances (COUNCIL DISTRICT 4)
v,Y<k.LS'd!dYw 4"'RYW• 5i.""' r:.+��d. .,kv. "w' W., 1'N -r& - h;.rw%sEt�#.'4!514 Nk
t .
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached appropriation ordinance increasing the estimated receipts and appropriations of
the Special Assessments Fund in the amount of$384,149.80;
2. Authorize the transfer of$384,149.80 from the Special Assessments Fund to the New
Development Fund;
3. Adopt the attached appropriation ordinance increasing the estimated receipts and appropriations of
the New Development Fund in the amount of$384,149.80;
4. Authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 39257, a
Community Facilities Agreement with Keller Independent School District, the Developer, to allow the
City of Fort Worth participate in the amount of$473,362.11 for the design and construction of
approximately 520 linear feet of Old Denton Road and an additional 2,500 linear feet of sidewalk to
provide connectivity to Timberview Middle School; and
5. Upon approval by the Keller ISD Board, authorize payment to Keller ISD in the amount of
$473,362.11 for the design and construction of roadway, sidewalk, storm drainage and street light
improvements on Old Denton Road.
DISCUSSION:
On October 6, 2009, the Keller Independent School District executed a Community Facilities
Agreement, City Contract No. 39257 for community facilities to serve its new Timberview Middle
School located on Old Denton Road. Old Denton Road is identified as a future four-lane divided
major arterial in the 2009 City of Fort Worth Master Thoroughfare Plan and the Keller ISD was
required to improve at its own expense 750 linear feet of the eastern half of the road, along the
frontage of the new middle school. City staff is recommending participation in the project to extend
said road improvements an additional 520 linear feet to the south to Crawford Farms Drive.
Additionally, staff is recommending City participation to extend the sidewalk from Crawford Farms
Drive to Amador Drive to provide pedestrian connectivity to the school. The Cost Summary of the
Community Facilities Agreement has been revised using actual construction cost to reflect the
additional work and City participation and is shown in the Revised Summary of Costs table below.
Based on construction costs, funding in the amount of$473,362.11 is requested for the City's portion
of the construction cost, construction inspection, materials testing, engineering, surveying and
construction manager fee. Developer Future Improvement Funds will be utilized for a portion of this
cost in the amount of$384,149.80 and an additional amount of$89,212.31 will come from the 2004
Capital Improvements New Development funds. Upon Council's approval City staff will execute
Amendment No. 1 to the Community Facilities Agreement to include City participation.
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=15525&councildate=7/26/2011 07/27/201 ,
M&C Review Page 2 of 3
REVISED SUMMARY OF COSTS
Items Revised Cost City's Cost Total Cost
A. Water and Sewer Construction
1. Water $54,682.50 $0.00 $54,682.50
2. Sewer $7,470.00 $0.00 $7,470.00
Water/Sewer Construction Sub- $62,152.50 $0.00 $62,152.50
Total
B. TPW Construction
1. Street (Paving) $184,479.13 $217,846.94 $402,326.07
2. Storm Drainage $0.00 $118.154.16 $118.154.16
3. Street Lights $39,401.03 $18,673.17 $58,074.20
TPW Construction Sub-Total $223,880.16 $354, 674.27 $578,554.43
Total Construction Cost $286,032.66 $354, 674.27 $640,706.93
(excluding Fees):
Construction Fees:
C. Water Inspection Fee (two
ercent $1,243.05 $0.00 $1,243.05
D. Water Material Testing Fee (two
ercent $1,243.05 $0.00 $1,243.05
Sub-Total for Water/Sewer
Construction Fees $2,486.10 $0.00 $2,486.10
E. TPW Inspection Fee (four
ercent $8,955.21 $14,186.97 $23,142.18
F. TPW Material Testing Fee (two
ercent) $4,477.60 $7,093.49 $11,571.09
Sub-Total for TPW Construction
Fees $13,432.81 $21,280.46 $34,713.27
Total Construction Fees: $15,918.91 $21,280.46 $37,199.37
Other costs:
G. Engineering $0.00 $44,560.91 $44,560.91
H. Surveying $0.00 $7,093.49 $7,093.49
I. Construction Manager Fee for
Section B —TPW Construction $28,880.54 $45,752.98 $74,633.52
12.9 percent)
J. Contingency $0.001 $0.001 $0.00
TOTALS $330,832.111 $473,362.111 $804,194.22
This project is located in COUNCIL DISTRICT 4, Mapsco 21Q and 21U.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above
recommendations and adoption of the attached appropriation ordinances, funds will be available in
the current capital budget, as appropriated, of the New Development Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
GS94 488100 020941369010 $384,149.80 GS94 538040 020941369010 $384,149.80
11 5) C202 541200 202760139380 $473,362.11
GS94 538040 020941369010 $384,1.49,80
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=15525&councildate=7/26/2011 07/27/2011
M&C Review Page 3 of 3
2&3 $384,149.80
C202 472094 202760139380
3) C202 541200 202760139380 $384,149.80
Submitted for City Manager's Office by: Fernando Costa (6122)
Originating Department Head: Douglas Wiersig (7801)
Additional Information Contact: Jana Knight (2025)
-- David Jodray (8702)
ATTACHMENTS
20OLD DENTON ROAD- KELLER ISD Recl.doc
200LD DENTON ROAD- KELLER ISD Rec3.doc
20OIdDentonKISD 01393 Exhibit.pdf
ittp://apps.cfwnet.org/council_packet/mc_review.asp?ID=15525&councildate=7/26/2011 07/27/2011