Loading...
HomeMy WebLinkAboutContract 39489-A3 CITY SECRETARY 3q �q A-5 CONTRACT NO. Amendment No. 3 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. 39489 (M&C C- zs'�M ) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Jacobs Engineering Group Inc. (Consultant) made and entered into City Secretary Contract No. 39489 (the Contract) which was authorized by M&C C-23816 on the 29th day of September, 2009; and subsequently revised by previous amendments; and WHEREAS, the Contract involves professional services for the following project: Citywide Stormwater System GIS Project WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the revised scope of services specified in Attachment A, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Consultant total $3,265,000 (see Exhibit B-2 for a detailed breakdown). 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Consultant for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$9,458,056. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. PROFESIONAL SERVICES CONTRACT(REV 4/14/05) I Page 1 of 2 i OFFICIAL RECORD CITY SECRETARY i FT. WORTH, TX IN WITNESS THEREOF, the parties hereto have made and executed this Agreement in multiple originals the day and year first above written, in Fort Worth, Tarrant County, Texas. CITY OF FORT WORTH: CONSULTANT: Fernando Costa Brad Davis, P.E. Assistant City Manager Operations Manager, South Central Region RECOMMENDED: max. ( L J. &J, Douglas Wiersig, P.E. Director,gept. of Transportation/Public Works APPROVED AS TO FORM AND LITY: 1 C Assistant City Attorney A ST: rr Y e`0 d AyCity Secretary ��a ° OO°°O� qp ° d k� 1 Zd • 1"L Date Z�30 0 Contract Authorization ,( ( � . Il Date PROFESIONAL SERVICES CONTRACT(REV 4;14/05) Page 2 of 2 OFFICIAL RECORD; CITY SECRETARY j FT. WORTH, TX Attachment A Amendment No. 3 City of Fort Worth Stormwater Management System Data Collection, Inventory and Mapping Year 4 Scope of Work SECTION I - PROJECT DEFINITION The goal of Year One was to develop the stormwater management system asset inventory and database for the top five priority mapsheds in the City and implement procedures for expanding and maintaining the database throughout Years Two, Three, and Four. Year One services was a pilot study to allow the City and the consultant team the opportunity to judge levels of effort required to produce the stormwater mapping and inventory deliverables that the City needs as expressed in initial scoping meetings and Version 1.0 of the Quality Management Plan. Year Two of the project was developed using the procedures and workflows defined and approved in Year One. Approximately 37 square miles of mapsheds were developed for the schematic development task in Year One but the majority of those mapsheds were not surveyed, rectified, assessed nor integrated into the City's existing system. By the end of Year Two, schematic development was completed for all 222 prioritized mapsheds, and field survey was completed for approximately 60 mapsheds. By the end of Year Three, field survey was completed for 76 more mapsheds (program total of 136 mapsheds), and rectification work had been completed for 102 mapsheds, with final QC for those rectified mapsheds ongoing. The scope defined below encompasses the effort anticipated to continue to add to the GIS inventory through program Year 4, building upon the data from Years 1, 2, and 3. The Year 4 scope of work includes: • Survey and data capture • Validate and rectify schematic • Limited condition assessment of specific assets • Reporting • Project management • Strategic planning of various items for future years of the program and coordination with other related activities such as condition assessment and asset management • A contingency account (use as approved by city staff) to allow for unforeseen items or final production work needed The overall project progress and goals will be reviewed quarterly, and the goals and scope may be adjusted at the direction of City staff in working with the consultant team. Based upon the understood contract budget for the entire program through Year 4, it is anticipated that all mapsheds will be fully surveyed. The Year 4 scope also anticipates that a "modified rectification"approach, which reduces the amount of data to be input from plans, will be used to complete the rectification on the remaining 120 mapsheds. The process and level of effort for rectifying these remaining mapsheds has not been fully tested and determined at this time, which is one of the reasons for the contingency account. The city staff will be kept apprised of the modified rectification progress at least on a quarterly basis, as described previously. The anticipated schedule for the completion of this work is as follows: • Surveying complete: November 2012 (12 months duration) • Rectification complete: February 2013 (15 months duration) • QC comment responses complete and city acceptance: April 2013 (18 months duration) • Transition to maintenance and final acceptance of database: October 2013 (occurs in six-month period from April 2013 to October 2013) Rectification work will overlap surveying work such that only a portion of the rectification work will need to be completed after the surveying work is completed. SECTION II — BASIC SCOPE OF SERVICES Task 1600 - Field Survev The location of each stormwater management system asset, as identified and defined in the QMP for field verification, will be located by conventional survey methods using QMP survey procedures. Version 1.0 of the Field Survey Manual was developed in Year One of the project, which specifies the measurements, notes, photographs and occasional sketches that are to be collected for each asset. If the crews are unable to collect survey data within an area, the City will be notified and the City will assist in resolving the issues that prevent the survey (e.g., high traffic areas). 1. Using the equipment, software and procedures as well as the QC processes defined in the QMP, survey each stormwater management system asset by priority watershed a. Load export of the field verified schematic and supporting data on survey units b. Following procedures defined in the Survey Field Manual — i. Capture location of asset ii. Take measurements and populate attributes iii. Take field notes 1. Field observation of condition iv. Take digital photographs c. Report issues to the City for assistance in completing survey 2. Upload survey data from survey units 3. Verify that survey attributes meet the standards defined in the QMP a. Tools, queries and scripts 4. Deliver sub-centimeter survey accuracy data and measurements in ASCII format, field notes, sketches and photographs in GIS format for City acceptance of the survey data The anticipated number of mapsheds to be fully surveyed under the defined budget, and added to the mapsheds already completed in Years 1, 2, and 3, is 86 mapsheds. This is based upon unit costs per surveyed feature being experienced for the Year 3 work. This would complete the survey work for all 222 mapsheds. Task 1700 - Validate and Rectify Schematic (Modified Rectification) It is the goal of the program to complete rectification to the schematic level for all of the mapsheds that receive full field survey. A"modified rectification"approach will be used which will be a reduced level of effort from the full rectification approach used for the first 102 mapsheds. The modified approach will primarily involve a reduction in the amount of data extracted from the plans and the associated attribution, which is anticipated to significantly reduce the level of effort for rectification and rectification QC that has been experienced to date for the program. This change will be documented for the project through a QMP modification. The survey data will be integrated into the geodatabase and the location of the schematic assets will be adjusted to the surveyed coordinates, as identified and defined in the QMP. 1. Using the modified rectification procedures and QA/QC processes defined in the QMP, adjust the asset locations in the field verified schematic to the survey locations a. Utilize the geometric network and connectivity rules 2. Calculate intelligent unique ID, defined in QMP, for new features 3. Verify that the features meet the standards defined in the QMP and perform final QA a. Utilize tools developed in Year 3 to check for and correct attribute and topology errors b. Compare survey data to digital terrain provided by the City to determine accuracy of survey data and resurvey points as needed 4. Populate survey attribute fields with actual values while maintaining plan values 5. Verify that attributes meet the standards defined in the QMP a. Compare plan values to actual values; perform QMP defined data review, including populating and flagging of missing data using inference tools to provide a near-model-ready database. b. Test in InfoWorks/InfoNet model 6. Hyperlink images and survey related data to appropriate asset 7. Deliver geodatabase of the storm water management system which incorporates the initial schematic, field reconnaissance improvements, survey data and hyperlinked images in GIS This task also includes scope for the ESRI ArcGIS Desktop and ArcSDE 10.0 testing and upgrade. The consultant team will test the database for upgrade to V10 of the software to ensure compatibility for the system users and consistency with the use of V10 elsewhere in the program. Once testing is complete, the production database will be upgraded from ArcSDE 9.3 to V10. Task 1800 - Condition Assessment Assets will be flagged that appear to need further investigation to determine actual condition. Drainage complaints, maintenance history and historical knowledge will also be evaluated to determine which assets will be assessed. 1. Using the methodology defined in the QMP, determine the storm water management system assets to be assessed 2. Using the equipment, software and procedures as well as the QC processes defined in the QMP, assess the condition of the specified assets by priority mapsheds a. Following procedures defined in the Condition Assessment Field Manual — i. Conduct visual inspection ii. Conduct CCTV inspection iii. Conduct pole mounted camera inspection (not currently used) iv. Confined space entry v. Take field notes vi. Take digital photographs 3. Verify that the assessment data meets the standards defined in the QMP a. Tools, queries and scripts 4. Use findings to calculate condition assessment ratings 5. Update geodatabase with calculated rating information 6. Deliver video, photos, and condition assessment report of findings in GIS or a format compatible with the City Asset Management software for City acceptance It is the goal of this contract and budget to perform limited and strategic condition assessment. It is anticipated that there will be needs for much more condition assessment information than the current budget allows. Therefore, condition assessment work in this task will be limited to the agreed-upon task budget established, and locations of condition assessment work will be reviewed and confirmed with city staff before the work is started. This will allow the information collected to be in the most strategic locations in each mapshed. This task will also include effort to link the condition assessment information into the GIS, digitize the new features found, revise geometry and adjust the schematic based upon findings. Task 1900— Reporting Quarterly reporting will be performed to allow the City to judge actual budget requirements necessary to map the City's mapsheds. This budget tracking and reporting will also allow the City to modify the mapping protocol if it appears that the initial protocol cannot be performed within the constraints of the City's budget. Following the production of each report, meetings with the City will be scheduled to review project status. Task 2000 — Project Management/Oversight Services Due to the size, scope and nature of this project, project management services will include tracking of effort and expenses, review of project progress, scheduling of staff and subconsultants'staff, quality review and oversight, budget review, communication with City staff, invoicing, goal review and realignment, and updates to the contract scope and/or fee, if necessary. Administrative fees on subconsultants'contracts are included within this task. The level of effort for this task is based upon the level of effort experienced in Year 3 for an eighteen-month period, and then a reduced level of project management time for the last six months of the program. Task 2200 — StrateQic Services The overall goal of this task is to assess and develop strategies for the storm water inventory program as it integrates with other storm water programs and as it ends the data production phase and moves into the maintenance mode. The current need is for direction and budgeting related to the following areas and questions: • Condition assessment— How will a full assessment of the storm water assets be accomplished, by when, and how much will it cost? • Land, easements, maintenance agreements — How can conditional areas such as 404 mitigation areas, streams, private maintenance areas, or special easements be captured in the GIS database for reference by operations and engineering staff? • Channels — the focus of the inventory program has been on inlets, outlets, pipes, and manholes. How can channel attributes be added as well; how long would it take, and how much would it cost? Which attributes are needed or useful? • Best Management Practice (BMP) implementation — How can the GIS be used to capture and track BMP requirements and implementation? • Database transition to maintenance — How will the data entry procedures change once the inventory is over and the database is under maintenance by city staff? • Work Order/Asset management— What changes need to be made in the GIS database to allow data transfer and coordination with the new work order/asset management program being developed? The following scope is intended to provide solutions to the questions above. 1. Condition assessment— Pipe condition assessments were reduced to the minimum necessary to create the Schematic for the Mapping Project. In order to support capital replacement program and the proposed asset management system (WOAMS), a structured program is needed to assess conditions of the underground storm drain system beginning with a proposed baseline CCTV of new lines as a condition of acceptance by the CFW. Strategy should consider establishing priorities for accomplishing this work based on likely need for replacement, known blockages, other likely maintenance issues, and budget. Different types of assessments should be considered based on the issues, e.g., spot observations as well as detailed condition assessments. After preliminary research by Jacobs, a group will be pulled together for brainstorming as a means of developing a strategy/decision document. Specific work tasks are: a. Establish goals and schedule (workplan) for development of the strategy document. Conduct an initial assessment of baseline data needed and develop unit costs for data gathering processes. Develop methods for ranking priorities based upon defect scoring standards or other means. Utilize statistics or trends as needed to help focus the priorities. b. Develop rules and procedures to serve as a manual for the program. Develop a technical memorandum as documentation. c. Develop a request for qualifications (RFQ) document for city use to procure condition assessment contractors. d. Develop a construction standards document for inclusion in the city's standard specifications which would include items such as post- construction CCTV inspection of storm water pipes. 2. Land/conservation layer-- The CFW staff needs to inventory known 404 mitigation areas, Waters of the US and areas that are potentially conservation areas (where information is available) so that it is clear which areas are to be preserved in a "natural state"and which require routine maintenance. In most cases, these areas are designated only by signage which may or may not reflect original plans or current realities. In some cases, higher maintenance areas may need to be defined and easements put into place. Some of this information will be on development plats — HOAs, etc. — where information could be looked up. This situation is currently happening in the Heritage development. Understanding 20-year-old aerial photos and contours might also be used to determine if a channel is along an old stream bed and thus may be classified as "waters of the U.S." In many cases, engineered channels may appear to be natural because of the lack of maintenance over many years. In summary, a simple work program will be developed to define how to map these conditions based on readily available information, as a guide for future planning and operations/maintenance. 3. Easements and private maintenance agreements -- The current database only includes easement boundary information that the GIS project has digitized from plats. A long term strategy is needed, however, for an appropriate review of other records including information in real property, additional files found in the vault, and when necessary, digging through files at the Courthouse. This will require a balance of identifying where the amount of work seems worth the cost. As a beginning point for determining the"dimensions"of this problem, Jacobs will query the current GIS schematic to determine percents and locations of existing easement information (and ROW's where in streets) with respect to (1) underground pipes and (2) open channels. This will help determine the magnitude of work that may be needed in future years of the program. A summary document of the findings and recommendations will be developed. 4. Channels—The CFW inventoried channels 5 to 10 years ago, with respect to cross-section as well as general condition (internal as well as the TranSystems inventory). At the beginning of the storm water inventory project, channel attributes were reviewed and refined in the Manual. The current need is for general planning as well as operations/maintenance information for all channels subject to regular maintenance, including standard cross-section, armoring, bottom treatment (armoring or pavement, pilot or standard bottom), general vegetation conditions, etc. Previous work in this area will be reviewed, followed by a recommendation for a multi-year program for collecting the needed inventory information for these stormwater features. 5. BMPs—these water quality features are expected to grow in number and complexity in the long term. A strategy will be developed to review and refine previous arrangements by using the database as a tracking tool. For completeness, special features such as dams, levees, other open water features, stormwater trash collectors, etc., will be included. 6. Database transition —this is a short term need related to wrapping up the data creation program and fashioning the database for full maintenance operations by city staff. In coordination with this task, the City will need to define the business processes that best fit the storm water mapping needs. Jacobs will develop the strategy document and implement the final changes to the database and associated tools to allow this maintenance phase to begin. 7. Asset management—Jacobs will coordinate with city staff and the asset management consultant to modify the database as needed to allow for communication and data transfer between the stormwater GIS and asset management functions. In summary, the areas above will have strategies developed, which will in some cases include a multi-year approach of data collection and analysis (Years 5-9 of program). This will begin with organized workshop sessions for each of these topics (or in combination) leading to decision documents that can be used for planning and budgeting. Jacobs will assist with the interviews, workshops, and planning documents as part of the Year 4 scope of work. Schedule for each task will be developed prior to the start of each task and be driven by the city's planning and budget cycle needs. Budget for all of Task 2200 is limited to an allowance of $265,000. Attachment B-1 City of Fort Worth Storm Water Management System Data Collection, Inventory and Mapping - Year Four Basis of Compensation Task Amendment 3 0100 - Update QMP $0.00 0200 - Geodatabase Requirements (COMPLETED) --- 0300 - Geodatabase Design Scema (COMPLETED) --- 0400 - Data Compilation $0.00 0500 - Data Conversion (NOT USED) --- 0600 - Data Scanning (NOT USED) --- 0700 - Georeferencing $0.00 0800 - Schematic Development $0.00 0900 - Maintenance $0.00 0903 - GIS Database Maintenance $0.00 1000 - Easement Data Compilation $0.00 1100 - Easement Data Scanning (NOT USED) --- 1200 - Georeferencing for Easement Development $0.00 1300 - Easement Development $0.00 1400 - Field Reconnaissance $0.00 1500 - Evaluation of Easement Layer (NOT USED) --- 1600 - Field Survey $945,000.00 1700 -Validate and Rectify Schematic $1,103,000.00 1800 - Condition Assessment $118,000.00 1900 - Reporting $4,000.00 2000 - Project Management $360,000.00 2100 - Inlet Marker Program Support (COMPLETED) --- 2200 - Strategic Services $265,000.00 Contingency $470,000.00 Subtotal Fee-Amendment#3 $3,265,000.00 Non-M/WBE Subconsultants $521,500.00 M/WBE Subconsultants $946,850.00 Amendment#3 M/WBE Percentage 29.0% Program-to-date Summary Subtotal contract $11,149,055 Non-M/WBE Subconsultants $2,236,270 M/WBE Subconsultants $3,478,090 M/WBE Percentage 31.2% Q 0 N pp Q pp pO v Y ate+ O O O O O O L INO ap+ M O a lOG 1D O^ N ~ ypj N Vf All� N Vf N yC V1 O 0 N Ln X N M 00 O W O O M W o 0 0 H .-i O 06 (0 00 y+ N VT V} Ln H Ln O O An M W l0D H l0 w lG N L V? ~ 0J CL x W y� M 0) ym O O O O O O O O O 1f1 A 75 m 00 N N.N O O 0 00 O O O E :33¢ 00 w w w w O O 0 0 N o W VT N.V). VT VT VT VT H Vf 7 H M co Ln m 0 N 1O ri °O a a W m O �.m m N 00 VM 0p V 1011 W 00 .a-1 N Vm1 n C Vl N N N N VT to H F N n n � N O O O O O a g m 3 C y Z H c, s 3 L G w Ln M N i Q F tNp ICT 000 N O O O O w 01 m Q V1 d' ur. M a o t co ._ a+ o CC t0 x C r :) i M W C Y 0 C F C M � o O O C 8 d v+ y C a '^ m J W C Y1 N N N C 00 �.q M O O O O O M E V1 C y � N N W N W M Go c N J r�i1 N m 0 0 0 0 0 0 00 00 O O n o0 M 0m M Y 4 m m V N lD m t0 .--I .-1 m V Lmn N N ry r-I rl Ln m C H A G ul C d N •-� O O O O OQ O l00 O O 00 `"� O 0m rl 0 co c 0 N C 0 Q F h T � C 10 O O O O p z y O T Q C d Y Y Y Y o 7 CO C 1- 1- c c c o C v m W Y E E t t L L N 00 00 b0 Qm 61 N N O! N w b0 v d N Q O F a n w > c y M c C .5 c > > > > c u C v d d o 4 a m m 0 O O O �i o v o cc°0 c v Ca o 10 10 C C m N C C C V U U U V !' m c �- G pdp C W W E E > o o " T, a ° a a ° y -0 v c a w c o d Z o v 3 o+ a o 0 0 0 o C L 2 [ E 0 _0 W W Q LL N ,� �p d O a a a a V f0 U m �- Q c ,° t a v > y a` v v o ? r z $ 8 8 8 $ 8 _0 N p.� N N N N O Q H D C x v w a Exhibit B-3A (Supplement to Attachment B) City of Fort Worth Storm Water Management System Data Collection, Inventory and Mapping - Year Four Summary of Total Project Fees Consulting Firm Prime Responsibility Amount Percent Jacobs Engineering Group Inc. Survey, Rectify, Condition Assessment, PM $1,796,650.00 55.0% NTB Associates, Inc. GIS and Survey QC $521,500.00 16.0% DFW Infrastructure, Inc. CCTV Condition Assessment $48,000.00 1.5% Franzi Davis, GISP GIS QC $100,000.00 3.1% Surveying and Mapping, Inc. Field Survey $218,250.00 6.7% ANA Consultants, LLC Field Survey $126,250.00 3.9% Gorrondona &Associates, Inc. Field Survey $236,100.00 7.2% Fulton Surveying, Inc. Field Survey $218,250.00 6.7% Total for Professional Services $3,265,000.00 100.0% Task Description Scope of Services Total Fee MWBE Fee Percent 1 Field Survey See Attachment A $945,000.00 $798,850.00 84.5% 2 Rectify Schematic See Attachment A $1,103,000.00 $100,000.00 9.1% 3 Condition Assessment See Attachment A $118,000.00 $48,000.00 40.7% 4 Reporting See Attachment A $4,000.00 $0.00 0.0% 5 Project Management See Attachment A $360,000.00 $0.00 0.0% 6 Strategic Services See Attachment A $265,000.00 $0.00 0.0% 7 Contingency $470,000.00 $0.00 0.0% $3,265,000.00 $946,850.00 29.0% Surveying and Mapping, Inc. shall participate in performing portions of Task 1 - Field Survey ANA Consultants, LLC shall participate in performing portions of Task 1 - Field Survey Gorrondona &Associates, Inc. shall participate in performing portions of Task 1 - Field Survey Fulton Surveing, Inc. shall participate in performing portions of Task 1 - Field Survey Franzi Davis, GISP shall participate in performing the QC review of Task 2 -- Rectify Schematic DFW Infrastructure, Inc. shall participate in performing portions of Task 3 -- Condition Assessment Non-MWBE Participation Total Fee Percent NTB Associates, Inc. $521,500.00 16.0% City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 11/15/2011 - Ordinance No. 19983-11-2011 DATE: Tuesday, November 15, 2011 REFERENCE NO.: C-25300 LOG NAME: 20SWMGISPROJECT-YR4 SUBJECT: Adopt Supplemental Appropriation Ordinance Increasing Appropriations in the Stormwater Utility Fund in the Amount of$1,105,000.00 and Decreasing the Unaudited, Unreserved, Undesignated Stormwater Utility Fund Balance by the Same Amount and Authorize Execution of Amendment No. 3 to City Secretary Contract No. 39489 with Jacobs Engineering Group, Inc., for Citywide Stormwater System GIS Project in the Amount of$3,265,000.00 for the Transportation and Public Works Department Bringing the Total Contract Amount to $11,149,055.00 (ALL COUNCIL DISTRICTS) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached supplemental appropriation ordinance increasing estimated receipts and appropriations in the Stormwater Utility Fund in the Amount of$1,105,000.00 and decreasing the unaudited, unreserved, undesignated Stormwater Utility Fund Balance by the same amount; and 2. Authorize execution of Amendment No. 3 to City Secretary Contract No. 39489 with Jacobs Engineering Group, Inc., for Citywide Stormwater System GIS Project in the Amount of$3,265,000.00 for the Transportation and Public Works Department, Stormwater Management Division. DISCUSSION: This Mayor and Council Communication (M&C) requests approval of Amendment No. 3 for the final phase of a planned multi-phase project to locate, assess, and map the approximately 35,000 inlets and 1000 miles of pipe in the City's drainage system. The overall project scope of work includes the development of a Geographic Information System (GIS) map of the system and associated easements from: engineering plans, detailed field surveys, and video tapes of selected pipes. The GIS map will efficiently provide vital data on the location, condition, material type, and age of these stormwater facilities. Such data is crucial for the accurate assessment of drainage problems, the planning and design of effective capital projects, and the efficient operations of field maintenance crews for both preventive maintenance and emergency response. In the previous phases of this initiative all engineering plans have been mapped and roughly 45 percent of inlets and manholes have been surveyed. The scope of this Amendment will focus on completing the survey and tying this information back to the engineering plans. In addition, the condition assessment of selected pipes will be completed and a program will be outlined for ongoing condition assessment to be executed as priortities and resources dictate. In August 2007, a Request for Proposal (RFP) was issued and a total of six proposals were received. The top three consultants were interviewed. Carter and Burgess, Inc., was selected as the most qualified and an Agreement was executed with them in the amount of $1,690,999 00 (M&C C-23072) Carter and Burgess, Inc , was subsequently acquired by Jacobs Engineering Group, Inc. (Jacobs), so a new contract Logname: 20SWMGISPROJECT-YR4 pqn, I � ) was executed with Jacobs for Phase 2 services in the amount of$3,590,056.00 (M&C C-23816). Subsequent amendments to that Agreement were $480,000.00 for database maintenance (M&C C-24410) and $2,123,000.00 for Phase 3 services (M&C C-24446). Amendment No. 3 in the amount of $3,265,000.00 will bring the total contract cost to $11,149,055.00. Jacobs Engineering Group, Inc., proposes to perform the scope of work for this Amendment on a time and materials basis for a not-to- exceed fee of$3,265,000.00. City staff considers this fee to be fair and reasonable for the scope of services proposed. Currently available is $2,160,000.00 in the Fiscal Year 2012 Adopted Stormwater Utility operating budget and the attached Ordinance will appropriate the remaining $1,105,000.00 making a total of$3,265,000.00 available for this Amendment. Jacobs Engineering Group, Inc., is in compliance with the City's MWWBE Ordinance by committing to 29 percent MWWBE participation. The City's MWBE goal is 29 percent. This project is located in ALL COUNCIL DISTRICTS. FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached supplemental appropriation ordinance, funds will be available in the current operating budget, as appropriated, of the Stormwater Utility Fund. Upon approval, the unaudited, unreserved, undesignated fund balance of the Stormwater Utility Fund will exceed the minimum reserve as outlined in the Financial Management Policy Statements. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers 1) PE69 531200 0209204 $1.105,000.00 2) PE69 531200 0209204 $3,265,000.00 CERTIFICATIONS: Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Elizabeth Young (6785) ATTACHMENTS 1. 20SWMGISPROJECT-YR4 A02.doc (Public) 2. compliance memo yr4v2.pdf (CFW Internal) 3. PE69-5ZZZZZ-02092ZZ Current.doc (CFW Internal) 4. PE69-5ZZZZZ-02092ZZ.doc (CFW Internal) Logname: 20SWMGISPROJECT-YR4 Page 2 of 2