Loading...
HomeMy WebLinkAboutContract 40169-CO3 F_OR"T WORTH City of Fort Wor_.. _____ Change Order Request (R Project Namel Medical District Water Distribution System Improvements, Part 4 cityAPRolp 40169 Project No.(s) P265-60910024787 and P275-709170024787 DOE No. 6288 Ci Pro. No. 00247 r% 1110M, Project Description Installation of a 30/42 inch water main from South Holly Water Treatment Plant to the a ica istric an inch sewer main from I1-130/15th Street intersection southerly 1,580 ft. Contractorl Oscar Renda Contracting, Inc. Change Order# 0 Date: 4/11/2012 City Project Mgr.1 Liam Conlon City Inspector I Raymond Brice Phone Number:1 817-392-6824 Phone Number: 817-392-8452 Dept. Water Sewer Totals Contract Time (Calendar days) Original Contract Amount $4,433,920.00 $1,006,385.00 $6,40,=.00 540 Extras to Date $155,000.00 $226,988.10 Credits to Date $5,977.30 x,977, Pending Change Orders(in M&C Process) Contract Cost to Date $4,582 NZ70 $1.233.,373.1-0 M16,3116AJ 540 Amount of Proposed Change Order SZO.124= 035 Revised Contract Amount $+, ,942 7U 1,443,497,32: 575 Original Funds Available for Change Orders $133,000.00 $31,000.00 $1134,000; Remaining Funds Available for this CO Additional Funding(if necessary) $210124. CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 10; MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) 3 Change Order No. 3 will provide compensation for the following: • Additional effort expended to install a project sewer main 30 feet deep (instead of 10 feet) in order to connect to an existing sewer main that was encountered at a different elevation th#'n depicted on existing City records. • The removal and replacement of a segment of an existing 30-inch sewer main that was encountered in direct conflict with a project 36 inch water main on 15th Street. • The replacement of a segment of the existing 18-inch sewer main located on Peter Smith Road in order to eliminate a swag on the main M Ksitive sewage flow. e"t -• Increased pay item quantity of 30 se +t�__��11 $lecessary to complete the project. Sta th, cont_ractgr's reque (�$3 a it ona l ndar days on this change Pr" IAL REC RD r' o ,Id Z 7/ �do SECR RY cv It is t an 4 r tqgonstitutes an accord and satisfaction t,'„X in full(both time and money) a1I costs arising ou or incid jbov Lange Order. CL C\J car Renda Construction, Inc. Dan Frettin er i 00 '--f f L )Z 14117111. 1 M&C Number C-25552 M&C Date Approved FORT WORTH City of Fort Worth 1W ow— Change Order Additions Project Name Medical District Water Distribution System Improvements, Part 4 City Sec No. 40169 Project No.(s) P265-60910024787 and P275-709170024787 DOE No. 6288 City Pro.No. 00247 Project Installation of a 30/42 inch water main from South Holly Water Treatment Plant to the Medical District and 30 inch sewer main from Description IH30/15th Street intersection southerly 1,580 ft. Contractor Oscar Renda Contracting,Inc. Change Order# 0 Date:1 4/11/2012 City Project Mgr. Liam Conlon City Inspector Ra mond Brice ADDITIONS Uldt U1*cad TOW Pipe-Sewer -inc y Open u Sewer 449.00 LF $200.00 $89,800.00 55 Sewer Line H Extension Additional Cost Sewer 1.00 LS $79,085.22 $79,085.22 56 30"Sewer Remove and Replace w/bypass pumping on 15th St. Sewer 1.00 LS $25,685.00 $25,685.00 57 18"Sanitary Sewer Pipe w/Cement Stabilized Backfill Sewer 213.00 LF $296.00 $63,048.00 Water Sewer $257.618 22 Additions Sub Total $257,618.22 Page 2 of 4 FORT WORTH City of Fort Worth W 0011, Change Order Deletions Project Name Medical District Water Distribution System Improvements, Part 4 City Sec No. 40169 Project No.(s) P265-60910024787 and P275-709170024787 DOE No. 6288 City Pro. No. 00247 Project Description Installation of a 30/42 inch water main from South Holly Water Treatment Plant to the Medical District and 30 inch sewer main from IH30/15th Street intersection southerly 1,580 ft. Contractor Oscar Renda Contracting, Inc. Change Order#0 Date 4/11/2012 City Project Mgr. Liam Conlon City Inspector Raymond Brice DELETIONS TM, DESCRFTtf* DEPT Qty Unit Urdt Coat TOW 4 Pipe-Sewer-12 Inch(Vitrified Clay) Sewer 50.00 LF $390.00 $19,500.00 5 Pipe-Sewer-18 Inch SDR-26(AII Depth) Sewer 5.00 LF $180.00 $900.00 6 Pipe-Sewer-10 Inch SDR-26(All Depth) Sewer 30.00 LF $70.00 $2,100.00 10 Pipe-Sewer-6 Inch SDR-26(AII Depth) Sewer 8.00 LF $57.00 $456.00 12 Concrete-Encasement(Concrete Stabilized) Sewer 34.00 LF $25.00 $850.00 13 Manhole-Std 4-foot Diam.-0-6 foot Sewer 1.00 EA $1,500.00 $1,500.00 14 Manhole-Std 4-foot Diam.-0-6 foot Added Depth Sewer 12.00 VF $100.00 $1,200.00 16 Manhole-Drop-Std 4-foot Diam.Added Depth Sewer 5.00 VF $100.00 $500.00 26 Collar-Manhole(Per Item D-27) Sewer 8.00 EA $200.00 $1,600.00 28 Manhole-Vacuum Test(Sanitary Sewer) Sewer 6.00 EA $200.00 $1,200.00 33 Curb and Gutter-Replacement Sewer 30.00 LF $30.00 $900.00 35 Driveway(Sidewalk,or Parking lot) Sewer 2966.00 SF $3.00 $8,898.00 38 Concrete-Type B for Miscellaneous Sewer 10.00 CY $40.00 $400.00 39 Concrete-Type E for Miscellaneous Sewer 10.00 CY $45.00 $450.00 43 Pipe-Pressure-Abandon(Existing) Sewer 1020.00 LF $2.00 $2,040.00 49 Structure(Retaining Wall near Line) Sewer 1.00 LS $5,000.00 $5,000.00 Water Sewer $47,494.00 94.00 Page 3 of 4 Deletions Sub Total $47,4 MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders c0'# DATE AMOUNT Total $0.00 M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FoRT WoRm COUNCIL ACTION: Approved on 4/10/2012 DATE: 4/10/2012 REFERENCE NO.: **C-25552 LOG NAME: 60MEDP4CO3-RENDA CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Change Order No. 3 to City Secretary Contract No. 40169 with Oscar Renda Contracting, Inc., in the Amount of$210,124.22 for a Total Contract Amount of$6,026,440.02 for Medical District Water Distribution System Improvements, Part 4 from South Holly Water Treatment Plant to the Medical District (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council authorize execution of Change Order No. 3 to City Secretary Contract No. 40169 with Oscar Renda Contracting, Inc., in the amount of$210,124.22 for Medical District Water Distribution System Improvements, Part 4 from South Holly Water Treatment Plant to the Medical District, thereby increasing the contract amount to $6,026,440.02. DISCUSSION: On April 6, 2010, (M&C C-24164) the City Council authorized a contract in the amount of $5,440,305.00 with Oscar Renda Contracting, Inc., for Medical District Water Distribution System Improvements, Part 4 from South Holly Water Treatment Plant to the Medical District. The contract was subsequently revised by two change orders with a net total of$376,010.80 that are further described as follows: Change Order No. 1 (M&C C-24735), February 15, 2011, in the amount of $381,988.10. Change Order No. 2 with a credit of $5,977.30 administratively approved by the City Manager on February 22, 2012. This Mayor and Council Communication will authorize the execution of Change Order No. 3 to provide compensation for the following: Additional effort expended to install a project sewer main 30 feet deep (instead of 10 feet) in order to connect to an existing sewer main that was encountered at a different elevation than depicted on existing City records. The removal and replacement of a segment of an existing 30 inch sewer main that was encountered in direct conflict with a project 36 inch water main on 15th Street. The replacement of a segment of the existing 18 inch sewer main located on Peter Smith Road in order to eliminate a swag and provide positive sewage flow. Increased pay item quantity of 30 inch sewer pipe that was necessary to complete the project. M/WBE - Oscar Renda Contracting, Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional 19 percent M/WBE participation on the Change Order No. 3. This project is located in COUNCIL DISTRICT 9. http://apps.cfwnet.org/council_packet/mc_review.asp?ID=16655&councildate=4/10/2012 4/11/2012 M&C Review Page 2 of 2 FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P265 541200 609140024787 $210.124.22 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: S. Frank Crumb (8207) Additional Information Contact: Liam Conlon (6824) ATTACHMENTS 60MEDP4CO3-RENDA MAP 1.pdf 60MEDP4CO3-RENDA MAP 2.12df http://apps.cfwnet.org/council_packet/mc_review.asp?ID=16655&councildate=4/10/2012 4/11/2012