HomeMy WebLinkAboutContract 40243-A5 z AMENDMENT NO. 5 TO AGREEMENT FOR ARCHITECTURAL DESIGN SERVICES RENOVATE and EXPAND the GENERAL TERMINAL BUILDING at MEACHAM INTERNATIONAL AIRPORT STATE OF TEXAS § i1 t /n1 § CITY SECRETARY CONTRACT NO. —f�O� 43 n COUNTY OF TARRANT § WHEREAS, The City of Fort Worth and Hahnfeld Hoffer Stanford (Architect) made and entered into City Secretary Contract No. 40243 (The Contract)which was authorized by the City Council by M&C C-24215, the 11th day of May, 2010; and Amendment Nos. 1, 2, 3 & 4 were administratively executed in the amount of$22,350.00 for additional topographic surveys, cost estimates and underground utilities survey; and WHEREAS, further amendment is necessary for Phase II additional design services to increase the scope of work for design development, construction documents and construction administration services; and NOW THEREFORE, City and Architect, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article 1.1, SECTION I—SERVICES OF THE ARCHITECT, a paragraph is added to read as follows: "Provide additional design services for Phase II services increasing the Architect's proposed scope of work to include design development, construction documents and construction administration services. The cost of this additional service is $985,732.50 plus up to $63,680.00 in reimbursable expenses. The scope of services is in the Agreement as Attachment "A" and is described on page 4 (of 4) in Exhibit A in Attachment "A" and is already made a part of this Agreement. Attached is page 4(of 4) of Exhibit A in Attachment"A." 2. Paragraph 1 of SECTION V-COMPENSATION TO ARCHITECT, is amended as follows: "The total compensation for all of the assignments to be performed by Architect as described in CHARACTER AND EXTENT of ARCHITECT'S SERVICES hereof shall be a fixed fee of $1,242,757.50 plus up to$76,880.00 in reimbursable expenses." 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED this the day of j V`SL 2011, in Fort Worth, Tarrant County, Texas. Hahnfeld Hoffer Stanford APPROVED: By: By: —y�.�r C.�t.—► Michael J. ff ,AIA Fernando Costa Principal Assistant City Manager APPROVAL�ECOMMENDED: RECO ED: /1 I -"\ Douglas W Wiersig, PE, Direcjor, Martha"Marty" Hfpdrix Transportation & Public Works Dept. City Secretary APPRO ED F RM LEGALITY: M&C C-24980 June 14 2 0or Yc� Contract Authorization ,a o° A BY pa►°° Douglas W. Black Date I 0 -4 Assistant City Attorney OFFICIAL RECORD ° d�0ji CITY SECRETARY o° �, ��� c 0 uo° ICY FT WORTH,TX 09053-00 Meacham Terminal Bldg Renovation AE Fees - Phase 2 (DD, CD's, Bidding, & CA) $ 12 Million Dollar Construction Cost Option 1/25/2010 Basic Services Fees Architectural -HHS 4.88% $ 585,000.00 MEP-Campos Engineerinng (MM/BE) 1.32% $ 158,000.00 Structural- MYD (MNVBE) 0.33% $ 39,900.00 Total Basic Services Fees(%Based on$12 million) 6.52% $ 782,900.00 Additional Services Fees Civil-TNP 0.53% $ 63,362.50 Landscape- Leonard Technical Services (M/ BE) 0.12% $ 14,745.00 Cost Consultant.-Creative.Cost Consultants 0.08% $ 9,800.00 Geothermal Design-Campos Engineering (MM/BE) 0.24% $ 28,600.00 Code Consultant- Pruitt Consulting 0.02% $ 1,900.00 Network-AppliedTech Group(M/WBE) 0.14% $ 17,200.00 Total Additional Services Fees(%Based on$12 million) 1.13% $ 135,607.50 LEED Services Fees Civil-TNP $ 3,600.00 Architectural- HHS $ 19,800.00 MEP-Campos $ 35,100.00 Cost- CCA $ 1,890.00 Landscape- LTS $ 6,835.00 Total LEED AddT Fees&Costs $ 67,225.00 Total Phase 2 Fees (w/LEED) 8.21% $ 985,732.50 Total Phase 2 HUB Fees(goal 2r1o) 26.22% $ 258,445 00 Other Reimbursable Fees&Costs not included in Fees above Printing Costs $ 25,000 LEED Review Costs (if certifying project) $ 2,430 LEED Commisioning Agent-Fundamental $ 35,000 Testing & Balancing(If no LEED Commisioning) TBD Materials Testing During Construction By Owner TAS Submittal (Estimated) $ 1,250 Total Reimbursable Fees&Costs $ 63,680 Hahnfeld Hoffer Stanford 5:19 PM Page 4 of 4