Loading...
HomeMy WebLinkAboutContract 40255-CO2 FORT WORTH City of Fort Worth CITY SECRETARY Change Order Reques'qONTRACT NO.U 'C—D- 2 Project Namel Water and Sanitary Sewer Main Replacement Contract 2003,STM-A JCity Sec No. 40255 Project No.(s P253-603170032283&P258-703170032283 DOE No. 4056 City Proj.No. 00322 Project Description Water wer on Chapin Road from Williams Road to Benbrook Highway and M*wood Road from Edgehil Road Contractorl Rodgers Construction,Co. Change Order# ® Date: 1 4/27/2011 City Project Mgr.1 Rakesh Chaubey City Inspector I Joe Rogers Phone Number.1 817-392-6051 Phone Number 817-223-2247 Dept. WATER SEWER Totals Contract Time Calendar d Original Contract Amount 120 Extras to Date ,' 20 Credits to Dater Pending Change Orders(in M&C Process) : Z Contract Cost to Date : -JAmount of Proposed Change C, 05 05 Revised Contract Amount h `n Original Funds Available for Change Orders $13,000.00 $7,000.00 Remaining Funds Available for this CO Additional Funding(ff may) - CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT � � 7 MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25N 0 The change order will provide for the following: Cr, • Increased pay item quantities of 6 and 8-inch water pipe, 8-inch gate valve and box,pipe fittings, water service taps and lines that are needed to complete the project. o e The deletion of pay item quantities that are no longer needed on the project. CD Ll- UN CD Staff concurs with the contractor's request for �ial calendar days on this change order. IFoRP a, *� .,Attested by Marty Hendrl , City Sec P �•o &C-A- lt is understood and agreed that the acceptance of this Charge constitutes an accord and satisfaction and represents payment in hill(bah time and money)for all coals arising out or,or incidartal I%the above Charge Order. Rodgers Construction,Co. Blake Rogers y / �E P-46EP-5 z9�ii Ivy TS / M&C Number M&C Date Approved 1� FORT WORTH City of Fort Worth Change Order Additions Project Name I Water and S—mitary Sewer Main Replacernent Contract 2003,STM-A City Sec No. 40255 Project No.(s) P253-603170032283 8 P258-703170032283 DOE No. 4056 City Proj.No. 00322 Project Water and Sanitary Sewer on Chapin Road from Williams Road to Benbrook Highway and lQrkwood Road from Description Edgehill Road to Hilldale Road Contractor Rodgers Construction,Co. Chane Order# ® Date: 4/27/2011 City Project Mgr. Rakesh Chaubey City Inspector r Joe Rogers ADDITIONS nit JUnit Cost I o 4 Pipe pressure 81n Install Water 190.00 LF 14.87 $2,825.30 6 Pipe pressure bin Install Water 8.00 LF 17.54 $140.32 2 Valve 81n gate valve w/box Water 2.00 EA 1,053.76 $2,107.52 16 Pipe Install Water 0.65 TN $2,623.40 $1,705.21 17 Water Service 1 in Tap Water 8.00 LF $242.45. $1,939.60 18 lWater Service 1 i Copper Water 73.00 EA $13.29 $970.17 22 Water Servloe 2 in Copper Water 10.00 LF $21.91 $219.10 23 Meter Box Class A Water 7.00 EA $146.49 $1,025.43 24 Meter Box Class B Water 2.00 EA $264.99 $529.98 29 Fire Hydrant barrel&stem extension-Install Water 2.00' VF $254.00 $508.00 31 JPavernent 2in HMAC on bin flex base temporary-Install Water 122.00 LF $13.01 $1,587.22 32 Pavement 21n HMAC on 2/27 concrete base-Install Water 30.00 LF $21.75 $652.50 39 Grass Sod Install Water 125.25 SY $11.90 $1,490.48 1 YNFfbr T Water Meter Vault-Install Water —179— Fl TTTM $1,913.00 17 Driveway bin Install Sewer 99.00 SF $35.48 $3,512.52 A 11 M $3,512.52 Page 2 of 4 Sub Total $21,126.35 FORT WORTH City of Fort Worth 1W 000- Change Order Deletions Project Name Water and Sanitary Sewer Main Replacement Contract 2003,STM-A City Sec No. 40255 Project No.(s) P253-603170032283&P258-703170032283 DOE No. 4056 City Proj.No. 1 00322 Project Water and Sanitary Sewer on Chapin Road from(Williams Road to Bentxook Highway and IGrkwood Road from Edgehill Description Road to Hilklale Road Contractor Rodgers Construction,Co. Chane Order# F4 Date 4/27/2011 City Project Mgr. Rakesh Chaubey City Inspector Fjoe Rogers DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 1 Pipe Pressure 12 In PVC-install Water 5.00 LF $24.11 $120.5 2 Pipe Pressure 12 In DIP-Install Water 40.00 LF $51.15 $2,046.D 5 Pipe Pressure 8 In DIP-Install Water 86.00 LF $40.36 $3,470.91 7 Pipe Pressure 6 In DIP-Install Water 27.00 LF $35.47 $957.61 19 Water Service 11/2 in Tap to main Water 5.00 EA $368.58 $1,842.91 20 Water Service 11/2 In Copper Water 20.00 LF $16.69 $333.81 25 Meter 2-&Meter Box&Mtr Box Class B(City furnished,Contr installed) Water 2.00 EA $1,317.91 $2,635.8; 34 Pavement Concrete on 2127 Concrete base(STR-31)-Install Water 0.50 LF $65.04 $32.5; 35 Pavement Valley Gutter-instal Water 9.00 SY $121.67 $1,095.0: 37 Driveway 6 in-install Water 108.00 SF $12.59 $1,359.7, 38 1 Curb&Gutter-install Water 187.50 LF $19.89 $3,729.3f 43 Fill material Ballast stone-install Water 5.00 CY $19.00 $95.0( 44 Pipe 6 In drain non-perforated)-Install Water 50.00 LF $9.33 $466.5( 49 Pavement 2 In HMAC temporary asphalt Water 585.00 LF $13.01 $7,610.& 3 1 Pipe Swr 10 in SDR26-install Sewer 67.00 LF $33.93 $2,273.31 4 Pipe Swr 4 In SDR26-install Sewer 186.00 LF $15.32 $2,849.52 5 Swr Service 4 in 2 way dean out-install Sewer 9.00 EA $284.19 $2,557.71 7 Manhole remove Sewer 5.00 EA $199.61 $998.05 9 Manhole std 4 ft dia added depth-install Sewer 3.00 VF $92.97 $278.91 10 1 Manhole vacuum test Sewer 7.00 EA $126.94 $888.58 12 Collar-Manhole Sewer 3.00 EA $319.85 $959.55 13 Pavement 2In HMAC on 2/27 concrete base-install Sewer 70.00 LF $25.50 $1,785.00 15 Walk 4 ft-Install Sewer 144.001 SF $5.53 $796.32 16 Curb&Gutter-instal Sewer 100.00 LF $17.59 $1,759.00 18 Trench 5 ft depth-install Sewer 849.00 LF $0.88 $747.12 19 Dehole 5 to 10 ft deo-study Sewer 3.00 EA $76.09 $228.27 21 Inspection postconatrucdcm clearving&TV Sewer 1,230.00 LF $1.92 $2,361.60 24 Manhole interior protective -install Sewer 10.00 VF $175.90 $1,759.00 WATER $25,796.72 SEWER $20,241. Deletions Sub Total $46,038. Page 3 of 4 MIWBE Breakdown for this Change Order Total IN;_WUN , t. . Previous Change Orders Total Page 4 of 4 O W) Lt) N th O �A t") N W) v V- O G N O N CD w N L o r-_I O � m m W n N C th cf r V- V- 0 0 fA to V! EN t9 to �A CO) m � r- COD CO) O Y M O COD CND W O a I a0 N r- -, O> O CD q N CD ch th la N N v N �'' N to O 44 H! to 6s y to U) t M0°) as NMa °oti � ti N V- v- m w t- O o w a Q vcrN etwso o B �= c Q A N O N N N N 2 vI N N F � �� �� C OC L ° v U Q Q °N 404040 U! iA iN d0 to fA d Ad W ~ ° cL O m ° w 0 c Ovi W L N O so (D � c O U tgVN ° W ,* V- m0 v a 3cyio � ° m L c C Z O U L r CL L w O O N Q. m O CD O U O �p C Q > ui r Q o ° o m Q uai c c o o a co a c v Q o Z o b `' m o Q LL. c z U m Z •m i iZm Q U o mcM w v o .c c CL w .5 c 3 a X � ° it iam000 ¢ O UQ cwQ