Loading...
HomeMy WebLinkAboutContract 40526-CO1 ® MOTOROLA CHANGE ORDER CITY SECRETARY CONTRACT NO. S Change Order No. 01 Date: December 2,2010 Project Name: Fort Worth Phase I P25-TX-091171 A Customer Name: City of Fort Worth Customer Project Mgr: Alan Girton The purpose of this Change Order is to: Update the contract documents with changes determined during the Design Review.This is a no- cost change order that includes clarifications and corrections to verbiage in the System Design and Statement of Work sections of the original contract documents.The updated System Description and Statement of Work are attached with this document. Contract if City of Fort Worth: Contract Date: 6128/10 Contract 40526 Motorola Contract: 10-15074/RH/CB In accordance with the terms and conditions of the contract identified above between The City of Fort Worth and Motorola, Inc.,the following changes are approved: Contract Price Adjustments Original Contract Value: $1,649,850.04 Previous Change Omer amounts for Chan Omer numbers through WA This Change Osier: $0 New Contract Value: $1,649,850.04 Completion Date Adjustments Original Completion Date: 7/8/2011 Current Completion Date prior to this Change Order: 7/8/2011 New Completion Date: 702011 cbw taN w amermadSmW _vw The only material equipment adjustment relates to a minor length and type of coaxial cable.. There are no other equipment changes to the originally priced equipment Clarifications and corrections to the previous System Description and Statement of Work verbiage about equipment,which are incorporated in the updated documents, include: 1. Only two(not flour)antennas are being provided at the Burnett Plaza site 2. No equipment is to be provided for the Aledo radio site In both cases above,the final version of the verbiage had not been updated property during final Order, these corrections YAI be 9MGM111111111111M or 3.0 Poe 1 of 2 Fort Worth PttadbJf25-gX--,: 3 5 IN CITY SECRETARY 091171A Fr.WORTH, TX ® MOTOROLA CHANGE ORDER ChwqM In swviose: or There are no service changes with this change order. Clarifications and corrections to the Statement of Work that relate to services include: 1. Only two antennas are being provided at the Burnett Plaza site 2. No equipment is to be provided for the Aledo radio site 3. Clarified the number of electrical circuits needed for Burnett Plaza and Eagle Mountain sites 4. Clarified the T1 requirements for the project,to be supplied by the City of Fort Worth dui w � i�'ht/A There are no schedule changes Prid :..die don orN+�.• . There are no pricing changes There are no customer responsibility changes,although some responsibilities were clarified in the updated Statement of Work l y #smote f Chan",# - There is no change in payment schedule ,o4b�ati�Q Unless amended above, all other terms and conditions of the Contract shall remain in full force. OJV o as are any inconsistencies between the provisions of this Change Order and the provisions of theoW c42°o 0�0� the provisions of the Change Osier will prevail. pro° o� IN WITNESS WHEREOF the parties have ecuted this Change Order as of the last date sigrlo o�� o�cd� Reviewed by: Date: ;I-" 7~� °°°0042°00°°° 0 o a Proj t Manager by. 44�` ►�,5ao Reviewed by: Date: IC� A'—t�t" City of Fort Worth Project Manager Marty HendrixsOCiry Secreta6 C-ayp- -,a, MOTOROLA,INC. CITY Of FORT API 15I to WoRTH By: By: Printed Name: Printed Name: Karen 6. Mentgemery Title: S'tK'c /Yj, Title: Assistant City Manager Date: /z� -7 Zz--a,(./ Date: 1 APPROVED V ED AS TO AND LZGAL--i . OFMIK ver 3.0 Page 2 of 2 Aasi2taf6'6 P&WWyTX- CITY SECRETARY 091171A FT.WORTH,TX