HomeMy WebLinkAboutContract 40526-CO1 ® MOTOROLA CHANGE ORDER
CITY SECRETARY
CONTRACT NO. S
Change Order No. 01
Date: December 2,2010
Project Name: Fort Worth Phase I P25-TX-091171 A
Customer Name: City of Fort Worth
Customer Project Mgr: Alan Girton
The purpose of this Change Order is to:
Update the contract documents with changes determined during the Design Review.This is a no-
cost change order that includes clarifications and corrections to verbiage in the System Design
and Statement of Work sections of the original contract documents.The updated System
Description and Statement of Work are attached with this document.
Contract if City of Fort Worth: Contract Date: 6128/10
Contract 40526
Motorola Contract:
10-15074/RH/CB
In accordance with the terms and conditions of the contract identified above between
The City of Fort Worth and Motorola, Inc.,the following changes are approved:
Contract Price Adjustments
Original Contract Value: $1,649,850.04
Previous Change Omer amounts for Chan Omer
numbers through WA
This Change Osier: $0
New Contract Value: $1,649,850.04
Completion Date Adjustments
Original Completion Date: 7/8/2011
Current Completion Date prior to this Change Order: 7/8/2011
New Completion Date: 702011
cbw
taN w amermadSmW
_vw The only material equipment adjustment relates to a minor length and type of coaxial cable..
There are no other equipment changes to the originally priced equipment Clarifications and
corrections to the previous System Description and Statement of Work verbiage about
equipment,which are incorporated in the updated documents, include:
1. Only two(not flour)antennas are being provided at the Burnett Plaza site
2. No equipment is to be provided for the Aledo radio site
In both cases above,the final version of the verbiage had not been updated property during final
Order, these corrections YAI be
9MGM111111111111M or 3.0 Poe 1 of 2 Fort Worth PttadbJf25-gX--,: 3 5 IN
CITY SECRETARY 091171A
Fr.WORTH, TX
® MOTOROLA CHANGE ORDER
ChwqM In swviose: or
There are no service changes with this change order. Clarifications and corrections to the
Statement of Work that relate to services include:
1. Only two antennas are being provided at the Burnett Plaza site
2. No equipment is to be provided for the Aledo radio site
3. Clarified the number of electrical circuits needed for Burnett Plaza and Eagle
Mountain sites
4. Clarified the T1 requirements for the project,to be supplied by the City of Fort Worth
dui w � i�'ht/A
There are no schedule changes
Prid :..die don orN+�.• .
There are no pricing changes
There are no customer responsibility changes,although some responsibilities were clarified in the
updated Statement of Work
l y #smote f Chan",# -
There is no change in payment schedule
,o4b�ati�Q
Unless amended above, all other terms and conditions of the Contract shall remain in full force. OJV o as
are any inconsistencies between the provisions of this Change Order and the provisions of theoW c42°o 0�0�
the provisions of the Change Osier will prevail.
pro° o�
IN WITNESS WHEREOF the parties have ecuted this Change Order as of the last date sigrlo o��
o�cd�
Reviewed by: Date: ;I-" 7~� °°°0042°00°°°
0 o a Proj t Manager by. 44�` ►�,5ao
Reviewed by: Date: IC� A'—t�t"
City of Fort Worth Project Manager Marty HendrixsOCiry Secreta6 C-ayp-
-,a,
MOTOROLA,INC. CITY Of FORT API 15I to
WoRTH
By: By:
Printed Name: Printed Name: Karen 6. Mentgemery
Title: S'tK'c /Yj, Title: Assistant City Manager
Date: /z� -7 Zz--a,(./ Date:
1
APPROVED V ED AS TO AND LZGAL--i .
OFMIK ver 3.0 Page 2 of 2 Aasi2taf6'6 P&WWyTX-
CITY SECRETARY 091171A
FT.WORTH,TX