Loading...
HomeMy WebLinkAboutContract 64079Docusign Envelope ID: 841 F5E52-3067-4ECA-93A0-9CD4F736FC4D CSC No. 64079 Fort Worth and Western Railroad REIMBURSEMENT AGREEMENT PRELIMINARY ENGINEERING SERVICES THIS REIMBURSEMENT AGREEMENT (the "Agreement"), effective as of the latest date written by a signatory (the "Effective Date"), is made by and between Fort Worth & Western Railroad Company (hereinafter "Railroad"), and City of Fort Worth (hereinafter "Agency"). RECITALS Whereas, Agency desires to initiate the project more particularly described on Exhibit A attached hereto (the "Project"); and Whereas, The Project will affect Railroad's track and right of way at or near the Project area more particular1y described on Exhibit A; and Whereas, Railroad agrees to collaborate with Agency on the conceptualization and development of the Project in accordance with the terms and conditions of this Agreement. NOW THEREFORE, the parties hereto agree as follows: AGREEMENT 1.Railroad, or its representatives (hereinafter "Railroad Group"), at Agency's sole cost and expense, agrees to perform ( or shall cause a third-party consultant [hereinafter "Third Party"] to perform on Railroad Group's behalf) the preliminary engineering services work described on Exhibit B attached hereto (the "PE Work"). Agency acknowledges and agrees that: (a)Railroad Group's review of any Project designs, plans and/or specifications, as part of the PE Work, is limited exclusively to potential impacts on existing and future Railroad facilities and operations; (b) Railroad Group makes no representations or warranties as to the validity, accuracy, legal compliance or completeness of the PE Work; and (c) Agency's reliance on the PE Work is at Agency's own risk. 2.The estimated cost of the PE Work is Fifteen Thousand Dollars & 00/100 ($15,000.00) (the "Estimate"). Notwithstanding the Estimate, Agency agrees to reimburse Railroad Group for one hundred percent (100%) of all actual costs and expenses incurred tor the PE Work, including costs and expenses in excess of the Estimate ("the "Excess Cost"), if any, unless such Excess Costs are due to the cause of Railroad Group. Excess Costs which cause the Agency's total expenditure for PE Work to exceed the Estimate will require additional Agency authorization before payment can be made. During the performance of the PE Work, Railroad Group will provide progressive billing to Agency based on actual costs in connection with the PE Work. Within sixty (60) days after completion of the PE Work, Railroad Group will submit a final billing to Agency for any balance owed for the PE Work. Agency shall pay Railroad Group within thirty (30) days after Agency's receipt of any progressive and final bills submitted tor the PE Work. Bills will be submitted to Agency using the contact information provided on Exhibit C. Agency's obligation hereunder to reimburse Railroad Group for the PE Work shall apply regardless if Agency declines to proceed with the Project or Railroad elects not to approve the Project. Reimbursement Agreement Preliminary Engineering Services E.Beny Sidewalk Project, MP 2.5 EveITTian Subdivision Document No. 20250909-02 Page 1 of 7 Docusign Envelope ID: 841 F5E52-3067-4ECA-93A0-9CD4F736FC4D 3.Agency acknowledges and agrees that Railroad may withhold its approval for the Project for any reason in its sole discretion, including without limitation, impacts to Railroad's safety, facilities, or operations. If Railroad approves the Project, Railroad will continue to work with Agency to develop final plans and specifications and prepare material and force cost estimates for any Project-related work to be performed by Railroad. 4.If the Project is approved by Railroad, Railroad shall prepare and forward to Agency a Construction and Maintenance Agreement (the "C&M Agreement") which shall provide the terms and conditions for the construction and ongoing maintenance of the Project. Unless otherwise expressly set forth in the C&M Agreement, the construction and maintenance of the Project shall be at no cost to Railroad. No construction work on the Project affecting Railroad's property or operations shall commence until the C&M Agreement is finalized and executed by Agency and Railroad. 5.Neither party shall assign this Agreement without the prior written consent of the other party, which consent shall not be unreasonably withheld, conditioned, or delayed. 6.No amendment or variation of the terms of this Agreement shall be valid unless made in writing and signed by the parties. 7.This Agreement sets forth the entire agreement between the parties regarding the Project and PE Work. To the extent that any terms or provisions of this Agreement regarding the PE Work are inconsistent with the terms or provisions set forth in any existing agreement related to the Project, such terms and provisions shall be deemed superseded by this Agreement to the extent of such inconsistency. IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of the Effective Date. BY: CITY OF FORT WORTH Jesica McEachern Assistant City Manager 09/22/2025 Date:. _____________ _ Reimbursement Agreement Preliminary Engineering Services E. Berry Sidewalk Project, MP 2.5 Everman Subdivision Document No. 20250909-02 BY: FORT WORTH AND WESTERN RAILROAD Kevin Erasmus President and CEO Date: 9/25/2025 Page 2 of 7 Docusign Envelope ID: 841 F5E52-3067-4ECA-93A0-9CD4F736FC4D APPROVAL RECOMMENDED: Lauren Prieur (Sep 16, 2025 17:49:24 CDT) Lauren L. Prieur, P.E Transportation and Public Work Director Date: 09/16/25 --------------- Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. David J. Kastendick, PE Senior Project Manager APPROVED AS TO FORM AND LEGALITY: Douglas Black (Sep 19, 2025 17:44:17 CDT) Douglas W. Black Senior Assistant City Attorney Date: 09/19/2025 --------------- Reimbursement Agreement Preliminary Engineering Services E.Berry Sidewalk Project, MP 2.5 Everman Subdivision Document No. 20250909-02 Page 3 of 7 Docusign Envelope ID: 841 F5E52-3067-4ECA-93A0-9CD4F736FC4D ATTEST: ��u�.�� � .�-� Jannette Goodall City Secretary 09/23/2025 Date: 44p4�Unb a poRp�a� �,� �°°o ��a�YOddd v°�`o �o�.�o Pv8 0=4 P�a* o o *� � ��a� nEXASo-4p Form 1295 No.: N/A M&C No: N/A M&C Date: N/A Reimbursement Agreement Page 4 of 7 Preliminary Engineering Services OFFICIALRECORD E. Berry Sidewalk Project, MP 2.5 Everman Subdivision CITYSECRETARY Document No. 20250909-02 FT. WORTH, rx Docusign Envelope ID: 841F5E52-3067-4ECA-93A0-9CD4F736FC4D Exhibit A Project Description and Location Project Description Plan review and project coordination for proposed railroad sidewalk crossings at E. Berry St. Location Everman Subdivision MM 2.5, DOT # 797677S �.1 . 1 , �IST E 9ERRY Sf ( 1.'1 � � ,$ 11 Fx UPRP POw 60' � / Ey JvaR Aaw 60 rnow E inncKs `�c..i�'7� �' �g ' raou C�cks � i..\T��AL Z ` . L�✓�n�`vV'� � �` ;�,.�,v,n-�� 1 E.fN'- 1 � �ELECT�1., � _ 1 _ � �.�Vwv � 3' 0.5�'HPLI 1RkV9TI�N AE1bvE arup REPIACE IXSRIUC CPOSSIN ` °���� � ���Eo PM'E15 AS N�EO fOR MI� REWIR'c0 SU9511RFKf IMGROVE11EN5 (SEE NOIE i) I� 9P (IW �-� I� �� � IXIST UPRA f�� �5' (ttP}-..%t � � + �u � �.-__._�__._. ._.-.iS__.-.�._.____�.._._.._ �. � {....:. _:.i-.--+.�_. � i � a",�.7as� l.-�-%-'-"�'-'- � tt+oo �I}� tslm / S 1,1�; z' nsHUT ,:+�- k.0 wncLS (ruScn Elc�snNc ��«m CONL PANf15 (YAOH EIfI5114V V 1 1R�VJ.III�N [qp5511N PU�FL IME) CFOSSING ANE1 T'Pc� 4� 1-��P�YEMEh7 {lYf`;� NO RNL PFOPo B�GIr� tW L PFOPO )' �SPF+pLT 1RV+Sf110 t� � a+OFlLE SiA Iaf50 �70FlLE SiA 1p+X7 p�vEUExi (T'P) .$ . L'PPF 4l➢I SfA li}]}.19 - 1 . . E BFRF1 $T STA 109+]fi.tl '1 — r,1vv�/�__� l 1 . ':Al�f.�1 L, G�5 1 .� IX 11PIiR ROM' E0� ✓VV�.ti� 1 4 f% UPqR AOM 40� f1iW � iRICXS iROM � 1WCN5 �mEs. s�`;�„t"��' � � �, M¢ �oc.no a ai ununes ane .oraoai h wwrou�rrcw 1a �Enirr uu ian� �',,MT^,'J� 1' 1 ' { u �nunQ aaim m mxmunn. uo wrorc� eu r�mr.c �nuna �xau , ouucc oumrc cousmurnaH_ �1 1. }, �LL �ISfInG C�C651K >a+E15 70 BE Iu5PEC7E0 70 OEIEAUIxE �ELSE mpA �0 aIST E 9ERRv S� (� �, ufr�a�[WVLL FkISiInG CA055MG PUQS i0 BE REVSEO ��Ea SUBSUAF�E � I � � u NR MVE Ca11ttC�F. �. . �� 1. �i.. ]� 46FA i0 fKDI�)-4! w0 RC012)-tt itlP R�INGD tlMS51nG OEwu4 oH uu[ oF TUFFlC IN EKX qRC110N MLL NE� 1D BE YUxf�MED WRIxG u IHfFNMILf Oli CbSfRUCIION T ILL 114ES 011LY lEIi�MIiY IXDSIRES WLL BE —� � LLIMD O�PoNC TWPNG(� �R1C [OMROL PLW WLL BE AEWRfD BY CVn�MCICA PPlqt TD fOYN COuuY[Ild). A(IST f OQiFv ST GF I � � I I . ' —� ' ' �I ' I ' — , w � �ra� Itt I 6a0 I . ! f i.�.c_ II _ti �I_ ��� !�0 FI[k� b.�M — l� T� } -�--� - —�— 1 a ¢ , .; ��- �; �' -� Z u�srr.�� 4� «�w �." �. ,X, °�w°ar"�'°�+�iao � f � - - - - - -..'�. _ . . ...._ - o�ucm �_ .ar�. . �—� - N �CITY OF FD(iT WORTH, iEXAB W TKAN3PORTATION 8 WBLIC WORK9 F N — E BERRY s7 & E SE�11NnRY DR r e�0 SIDEWAUCBADARAMPINPILL � E BERRY ST RAIL PLAN m qTA10.T5TO5TA11•25 w � TR NSYSTEMS �`���. " : m �w �c. r�v �om � Z --- °' �am , sc�� I o.m u¢r V , ... rao' i�nvxax o-��o� �[ �f � EXIS7INC'IRRM-7b BESlRt�aTR�1lYR� -TWhA . EY4�:41E.AVO.RfFIICtIl IFS eso -- --�--� -;�em[o_Is¢ Mo�.z) . � —� I Fyu. .;Fx � 3�1 � L- 100 .Iy� vl� . o.ae s�7cEo 1v� I r , E S+�T TOv�.. �_ _ � ' '�I.� ' � ' ' e�p �a �� F � � a�: 02 � ..., + �� . , r bzo ----- � owa . . . --, �.ao ' -- u+oo � � --- ,swo Reimbursement Agreement Preliminary Engineering Services E. Berry Sidewalk Project, MP 2.5 Everman Subdivision Document No. 20250909-02 vn = o.m 8! � � = �� px u+oo O�iO �• i.r� m. K c �� GEGElJO O iW�OSf➢ WKRFfE (1A551NG vwF1 � v�asm mncx� vo�w.x � aW�fSED COMtAEiE dINF�'�v RqPOSm �SPHaLT TP�15f11Cu � 7R�ELIM�N �Y i � ;'�ran 4 wcntl.0 _�_ ��ewl lw �F�- nrY ..:�o�e�9i]0 i��� �.�� .�«a.> consr ucr�a+rar��s �.� o�r�nu�ve+ve �'�: ea Page 5 of 7 Docusign Envelope ID: 841 F5E52-3067-4ECA-93A0-9CD4F736FC4D EXHIBIT 6 Scope of Project Services Scope of services includes, but is not limited to the following • Field diagnostic(s) and inspections • Plan, specification and construction review • Project design comments and recommendations • Project conceptual design outline • Project agreement preparation • Legal review of proposed agreement • Preparation of Project estimate for force account or other work performed by the Railroad • Meetings and travel Reimbursement Agreement Page 6 of 7 Preliminary Engineering Services E. Berry Sidewalk Project, MP 2.5 Everman Subdivision Document No. 20250909-02 Docusign Envelope ID: 841 F5E52-3067-4ECA-93A0-9CD4F736FC4D EXHIBIT C Billing Contact Information Name David J. Kastendick Title Senior Project Manager Address 100 Fort Worth Trail, Fort Worth, TX. 76102 Work Phone 817-392-5448 Cell Phone 817-213-0723 Email David.Kastendick@fortworthtexas.gov Reimbursement Agreement Page 7 of 7 Preliminary Engineering Services E. Berry Sidewalk Project, MP 2.5 Everman Subdivision Document No. 20250909-02 Docusign Envelope ID: 841 F5E52-3067-4ECA-93A0-9CD4F736FC4D ��RT �"i�DRTH« Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: FWWR PE Agreement Sidewalk E Berry St M&C: N/A CPN: 104219 Date: ,. „ , ,,.,,,. � To: I Name � CSO: Department Initials FWWR �-� DOC#: Date Out 9/25/2025 2. David Kastendick-Signature TPW D� 09/12/25 3. Chad Allen-Review TPW S� 09/16/25 4. Lissette Acevedo-Review TPW 09/16/25 5. Patricia Wadsack-Review TPW p(��/' 09/16/25 6. Lauren Prieur-Signature TPW � 09/16/25 7. Doug Black-Signature Legal � 09/19/25 8. Jesica McEachern-Signature CMO � 09/22/25 9. Jannette Goodall CSO ,.�� 09/23/25 10. TPW Contracts TpW CC: TPW BSPAP Recon Team, TPW Records Room, Alexiz Ramirez DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documcnts rcccivcd from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will rcvicw and take the ncxt stcps. NOTE: FWWR to sign after execution by City per their request. NEEDS TO BE NOTARIZED: ❑YES �No RUSH: ❑YES �No SAME DAY: ❑YES �No ROUTING TO CSO: �YES ❑No Action Required: ❑ As Requested ❑ For Your Information � Signature/Routing and or Recording ❑ Comment ❑ File NEXT DAY: ❑YES �No ❑ Attach Signature, Initial and Notary Tabs Return To: Please notify TPWContracts(a�fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you! F�RT�ORTH� City Secretary's Office Contract Routing & Transmittal Slip COntraCtOr'S Name: Fort Worth & Western Railroad Company SUb� eCt Of tile 1�gPeelllellt: Plan review and project coordination for proposed railroad sidewalk crossings at E. Berry St. M&C Approved by the Council? * Yes ❑ No ❑■ If so, the M&C must be attached to the cont�act. Is this an Amendment to an Existing contract? Yes ❑ No 8 If so, provide the original cont�act numbeY and the amendment nu�nber. Is the Contract "Permanent"? *Yes 0 No ❑ If unsure, see back page, fo� pe�manent contract listing. Is this entire contract Confidential? *Yes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: Expiration Date: If �different fr�om the approval date. If applicable. Is a 1295 Form required? * Yes ❑ No 0 *If so, please ensu�e it is attached to the app�oving M&C o� attached to the contract. Proj ect Number: If applicable. 104219 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO nrocessin� in the followin og rder: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the information is required and if the information is not provided, the contract will be returned to the department.