Loading...
HomeMy WebLinkAboutContract 60443-FP4-FP4City Secretary 60443 Contract No. _____ _ fORTWORTH® Date Received 10/2/2025 10/8/2025 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Westpoint Blvd and N Indigo Dr City Project No.: 104118 Improvement Type(s): Water� Sewer� Original Contract Price: $4,283,345.00 Amount of Approved Change Order(s): -$2,164,607 .80 Revised Contract Amount: $2,118,737.20 Total Cost of Work Complete: $2,118,737.20 � 09/25/2025 Colton Tollett (SeQ 25, 2025 07:20:22 CDT) Contractor Date VP Title DT Utility Contractors Company Name Adr-ia11 Ar-a11da 09/25/2025 &Jdi!ll !ti!oda (See 25 2025 07:53:27 CDT} Project Inspector Date rr 711aAg''11_ 09/25/2025 Project Manager Date 10/02/2025 CFA Manager Date �-?n.:.-_10/03/2025 Lauren Prieur (Oct 3, 202511:10:41 CDT) TPW Director Date 10/06/2025 Asst. City Manager Date Page 1 of 2 Notice of Project Completion Project Name: Westpoint Blvd and N Indigo Dr City Project No.: 104118 City's Attachments Final Pay Estimate 0 Change Order(s): 0 Yes ❑ N/A Pipe Report: 0 Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid � Consent of Surety � Statement of Contract Time Contract Time: 180 CD Days Charged: 242 WD Work Start Date: 1/11/2024 Work Complete Date: 2/25/2025 Completed number of Soil Lab Test: 1083 Completed number of Water Test: 31 Page 2 of 2 FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name MORNINGSTAR - WESTPOINT BLVD, AND NORTH INDIGO SKY DRIV Contract Limits Project Type WATER & SEWER City Project Numbers 104118 DOE Number 4118 Estimate Number 1 Payment Number 1 For Period Ending 2/25/2025 WD City Secretary Contract Number Contract Date Project Manager NA Contractor D T UTILITY CONTRACTORS, INC. 2614 CAUSBIE RD WEATHERFORD � TX 76087 Inspectors D. WATSON / T. STRANG Contract 15me 32�VD Days Charged to Date �4� Contract is 100.00 Complete Monday, March 24, 2025 Page 1 of 7 City Project Numbers 104118 DOE Number 4118 Contract Name MORNINGSTAR - WESTPOINT BLVD, AND NORTH INDIGO SKY DRI Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER & SEWER For Period Ending 2/25/2025 Project Funding UNTI' I: WATER IMPROVEMENTS Item Description of Items No. 1 6" PVC WATER PIPE 2 8" PVC WATER PIPE 3 8" PVC WATER PIPE, W/CSS 4 8" DIP WATER 5 12" DR -14 PVC WATER PIPE 6 12" DR -14 PVC WATER PII'E, W/ CSS 7 12" DR -14 PVC WATER PIPE, W/CONCRETE CASING 8 12" DR -14 PVC WATER PIPE, W/24" STEEL CASING 9 12" DIP WATER (RESTRAINT JOINTS) 10 12" DIP WATER (RESTRAINT JOINTS), 24" STEEL CASING 11 12" DIP WATER (RESTRAINT JOINTS), W/ CSS 12 16" DR -14 PVC WATER PIPE 13 16" DIP WATER (RESTRAINT JOINTS) 14 16" DR -14 PVC WATER PIPE, W/30" STEEL CASING 14 4:-12" PRESSURE PLUGS 15 TRENCH SAFTEY 16 6" GATE VALVE 17 8" GATE VALVE 18 12" GATE VALVE 19 12" GATE VALVE AND BOX (PRESSURE PLANE ) 20 16" GATE VALUE W/ VAULT 21 CONNECT TOEXISTING 4"-12" WATER MAIN 22 FIRE HYDRANT 23 6" BLOW OFF VALVE (DTAIL D105) 24 ADNSTING EXISTING 12" VALVE BOX W/ CONCRETE COLLAR (SHEET 9) 25 ADJUST EX. VALVE BOX ADNSTMENT TO FINISHED GRADE (SHT 9) Estimated Unit Unit Cost Estimated Completed Completed Quanity Total Quanity Total 180 LF $43.00 $7,740.00 180 $7,740.00 974 LF $65.00 $63,310.00 974 $63,310.00 20 LF $115.00 $2,300.00 20 $2,300.00 12 LF $65.00 $780.00 12 $780.00 2500 LF $95.00 $237,500.00 2500 $237,500.00 40 LF $125.00 $5,000.00 40 $5,000.00 38 LF $125.00 $4,750.00 38 $4,750.00 155 LF $310.00 $48,050.00 155 $48,050.00 446 LF 147 LF 120 LF 905 LF 30 LF 20 LF 10 EA 5587 LF 9 EA 6 EA 16 EA 1 EA 2 EA 7 EA 7 EA 1 EA I EA $110.00 $49,060.00 $340.00 $49,980.00 $125.00 $15,000.00 $165.00 $149,325.00 $165.00 $4,950.00 $375.00 $7,500.00 $500.00 $5,000.00 $1.00 $5,587.00 $1,250.00 $11,250.00 $2,100.00 $12,600.00 $4,250.00 $68,000.00 $4,250.00 $4,250.00 $25,000.00 $50,000.00 $1,500.00 $10,500.00 $5,600.00 $39,200.00 $25,000.00 $25,000.00 $500.00 $500.00 446 $49,060.00 147 $49,980.00 120 $15,000.00 905 $149,325.00 30 $4,950.00 20 $7,500.00 10 $5,000.00 5587 $5,587.00 9 $11,250.00 6 $12,600.00 16 $68,000.00 1 $4,250.00 2 $50,000.00 7 $10,500.00 7 $39,200.00 1 $25,000.00 1 $500.00 2 EA $500.00 $1,000.00 2 $1,000.00 Monday, March 24, 2025 Page 2 of 7 City Project Numbers 104118 DOE Number 4118 Contract Name MORNINGSTAR - WESTPOINT BLVD, AND NORTH INDIGO SKY DRI Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER & SEWER For Period Ending 2/25/2025 Project Funding 26 MANHOLE ADJUSTMENT, VALVE VAULT (SHEET9) 27 MISCELL. STRUCTURE ADNSTMENT, AIR RELEASE (SHEET 9) 28 REMOVE & REPLACE 7.5" PAVEMENT/LIME STABILIZATION PRESSURE (SHEETS 29 REMOVE & REPLACE 6.0" PAVEMENT/LIME STABILIZATION PRESSURE (SHEETS . 30 REMOVE & REPLACE BARRIER FREE RAMP- TYPE P-1 (MODIFIED) (SHEETS 12&13) 31 REMOVE & REPLACE EXISTING CONCRTE DRIVEWAY (4° THICK) (SHEET 12) 32 REMOVE & REPLACE EXISTING RESIDENTIAL SIDEWALK (4°THICK) (SHEETS 12& 13) 33 CUT, BACKFILL GROUT, PLUG AND ABANDON IN PLACE 12" WATER LINE (SHEETS 13 34 DUCTICLE IRON WATER FITTINGS W/ RESTRAINT 35 MEDIUM STONE, RIPRAP, DRY 36 4"-12" PRESSURE PLUGS 37 1" IRRIGATION SERVICE (MEDIANS OR POS) 38 2" IRRIGATION SERVICE (MEDIANS OR POS) 39 8" DR -14 PVC WATER PIPE (ITEMS 1-39 TO 1- 57, SHTS. 16A TO 16C) 40 12" DR -14 PVC WATER PIPE 41 12" WATER PIPE W/ CONCRETE CASING 42 12" DIP WATER PIPE 43 12" DIP WATER PIPE W/ 24" STEEL CASING 44 12" DIP WATER PIPE W/ 24" STEEL CSING ON CONC 45 TRENCH SAFTEY 46 8" GATE VALVE 47 12" GATE VALUE 48 4"12" PRESSURE PLUGS 49 CONNECT TO EXISTING 4"-12" WATER MAIN 50 2" IRRIGATION SERVICE (MEDIANS OR POS) 51 4" - COMBINATION TURBINE METTER VAILT INSTALLATION WITH BYPASS PER D-ll 9 52 MEDIUM STONE, RIPRAP, DRY 1 EA $1,500.00 $1,500.00 1 EA $2,500.00 $2,500.00 296 SF $26.00 $7,696.00 260 SF $24.00 $6,240.00 2 EA $4,200.00 $8,400.00 245 SF $26.00 $6,370.00 2570 SF $26.00 $66,820.00 50 LF $95.00 $4,750.00 16 TN $12,000.00 $192,000.00 500 SY $125.00 $62,500.00 11 EA $500.00 $5,500.00 4 EA $1,250.00 $5,000.00 6 EA $3,400.00 $20,400.00 10 LF $65.00 $650.00 2155 LF $95.00 $204,725.00 5 LF $125.00 $625.00 25 LF $125.00 $3,125.00 6 LF $310.00 $1,860.00 35 LF $I50.00 $5,250.00 2170 LF $1.00 $2,170.00 1 EA $2,100.00 $2,100.00 4 EA $4,250.00 $17,000.00 2 EA $500.00 $1,000.00 1 EA $1,500.00 $1,500.00 2 EA $3,400.00 $6,800.00 1 SY $65,000.00 $65,000.00 334 SY $125.00 $41,750.00 1 $1,500.00 1 $2,500.00 296 $7,696.00 260 $6,240.00 2 $8,400.00 245 $6,370.00 2570 $66,820.00 50 $4,750.00 16 $192,000.00 500 $62,500.00 11 $5,500.00 4 $5,000.00 6 $20,400.00 10 $650.00 2155 $204,725.00 5 $625.00 25 $3,125.00 6 $1,860.00 35 $5,250.00 2170 $2,170.00 1 $2,100.00 4 $17,000.00 2 $1,000.00 1 $1,500.00 2 $6,800.00 1 $65,000.00 334 $41,750.00 Monday, March 24, 2025 Page 3 of 7 City Project Numbers 104118 DOE Number 4ll 8 Contract Name MORNINGSTAR - WESTPOINT BLVD, AND NORTH INDIGO SKY DRI Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER & SEWER For Period Ending 2/25/2025 Project Funding 53 REMOVE & REPLACE 7.5" PAVEMENT/LIME 19 SY $261.00 $4,959.00 19 $4,959.00 STABILIZATION PRESSURE PLUGS 54 REMOVE & REPLACE EXISTING RESIDENTIAL 860 SF $26.00 $22,360.00 860 $22,360.00 SIDEWALK (4" THICK) 55 REMOVE & REPLACE EXISTING R-1 ADA 1 EA $4,200.00 $4,200.00 1 $4,200.00 RAMP 56 REMOVE EXISTING 167 L.F. OF A EXISTING 8" 1 LS $9,500.00 $9,500.00 1 $9,500.00 WATERLINE REMOVE AND SALVAGE 57 SLAVAGEANDREINSTALLEXISTING 1 EA $15,000.00 $15,000.00 1 $15,000.00 WASHINGTON STYLE STREET LIGHT WITH TYPE 7 Sub-Total of Previous Unit �1,677,3Rz.00 $1,677,3Rz.00 UNTI' II: SANITARY SEWER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 6" SEWER PIPE SDR-26 (SHEET 22) 84 LF $50.00 $4,200.00 84 $4,200.00 2 8" SEWER PIPE SDR-26 594 LF $65.00 $38,610.00 594 $38,610.00 3 8" SEWER PIPE SDR-26 W/ CSS 40 LF $125.00 $5,000.00 40 $5,000.00 4 8" SEWER PIPE SDR-26 W/ C ONCRETE 42 LF $125.00 $5,250.00 42 $5,250.00 ENCASEMENT 5 8" DIP SEWER, W/ EPDXY COATING 4 LF $110.00 $440.00 4 $440.00 6 8" DIP SEWER W/20 STEEL CASING, W/EPDXY 189 LF $225.00 $42,525.00 189 $42,525.00 CAOTING 7 10" SEWER PIPE SDR-26 30 LF $74.00 $2,220.00 30 $2,220.00 8 12" SEWER PIPE SDR-26 (CO#2) 366 LF $85.00 $31,110.00 366 $31,110.00 9 12" SEWER PIPE SDR-26 W/ CSS 50 LF $145.00 $7,250.00 50 $7,250.00 10 12" DIP SEWER W/ EPDXY COATING 283 LF $185.00 $52,355.00 283 $52,355.00 11 12" DIP W/24" STEEL CASING, W/EPDXY 268 LF $375.00 $100,500.00 268 $100,500.00 COATING (CO#2) 12 12" DIP, W/CSS 50 LF $235.00 $11,750.00 50 $11,750.00 13 18" DR-14 SEWER 20 LF $118.00 $2,360.00 20 $2,360.00 14 24° HDPE DR-17 DIPS PIPE (CO#2) 0 LF $350.00 $0.00 0 $0.00 15 IMPORTED EMBEDMENTBACKFILL, CSS 0 CY $25.00 $0.00 0 $0.00 (CO#2) 16 IMPORTED EMBEDMENT/BACKFILL, CLSM 0 CY $35.00 $0.00 0 $0.00 (D201B01) (CO#2) 16A CONCRETE ENCASEMENT FOR UTILITY PIPES 0 CY $75.00 $0.00 0 $0.00 (CO#2) Monday, March 24, 2025 Page 4 of 7 City Project Numbers 104118 DOE Number 4118 Contract Name MORNINGSTAR - WESTPOINT BLVD, AND NORTH INDIGO SKY DRI Estimate Number 1 Contract Limits Payment Number 1 Project Type SANITARY SEWER For Period Ending 2/25/2025 Project Funding 17 24" DIP SEWER PIPE, W/EPDXY COATING 0 LF $400.00 $0.00 0 (CO#2) 18 24" HDPE DR-17 DIPS PIPE WITH EPDXY 0 LF $573.00 $0.00 0 COATING (CO#2) 18A 42" CASING BY OPEN CUT (CO#2) 0 LF $425.00 $0.00 0 19 TRENCH SAFETY (CO#2) 0 LF $1.50 $0.00 0 20 WAGNER NO. 2050-200 ORDER CONTROL (SEE 0 EA $18,000.00 $0.00 0 SHEET 33A) (CO#2) 21 WAGNER NO. 2050-200 ORDER CONTROL (SEE 0 EA $31,250.00 $0.00 0 SHEET 33A) (CO#2) 22 POST-CCTV INSPECTION (CO#2) 0 LF $4.20 $0.00 0 23 MANHOLE (0-6' DEPTH) (CO#2) 11 EA $6,400.00 $70,400.00 11 24 4' MANHOLE (0-6 DEPTH) 2 EA $7,200.00 $14,400.00 2 25 4' EXTRA DEPTH MANHOLE 152 VF $200.00 $30,400.00 152 26 4' MANHOLE (0-6' DEPTH) (CO#2) 0 EA $7,500.00 $0.00 0 27 5' DROP MANHOLE (CO#2) 0 EA $8,600.00 $0.00 0 28 5' EXTRA DEPTH MANHOLE (CO#2) 0 VF $300.00 $0.00 0 29 EPDXY MANHOLE COATING (24" MANHOLES 0 VF $310.00 $0.00 0 ONLY) (CO#2) 29A EPDXY MANHOLE COATING 32 VF $310.00 $9,920.00 32 30 MANHOLE VACUUM TESTING (CO#2) 0 EA $150.00 $0.00 0 31 4"-12" PRESSURE PLUG 8 EA $500.00 $4,000.00 8 32 18"PRESSUREPLUG 1 EA $1,500.00 $1,500.00 1 33 CONNECT TO EXISTING SANITARY SEWER 1 EA $2,415.20 $2,415.20 1 MAIN 34 TRENCH WATER STOPS (CO#2) 5 EA $950.00 $4,750.00 5 35 MEDIUM STONE, RIPRAP, DRY (CO#2) 0 SY $125.00 $0.00 0 Sub-Total of Previous Unit �441,355.zo $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $70,400.00 $14,400.00 $30,400.00 $0.00 $0.00 $0.00 $0.00 $9,920.00 $0.00 $4,000.00 $1,500.00 $2,415.20 $4,750.00 $0.00 $441,355.20 Monday, March 24, 2025 Page 5 of 7 City Project Numbers 104118 DOE Number 4118 Contract Name MORNINGSTAR - WESTPOINT BLVD, AND NORTH INDIGO SKY DRI Estimate Number 1 Contract Limits Payment Number 1 Project Type SANITARY SEWER For Period Ending 2/25/2025 Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 2 $4,283,345.00 ($2,164,607. 80) Total Contract Price $2,118,737.20 Total Cost of Work Completed $2,118,737.20 Less % Retained $0.00 Net Earned $2,118,737.20 Earned This Period $2,118,737.20 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $2,118,737.20 Monday, March 24, 2025 Page 6 of 7 City Project Numbers 104118 DOE Number 4118 Contract Name MORNINGSTAR - WESTPOINT BLVD, AND NORTH INDIGO SKY DRI Estimate Number 1 Contract Limits Payment Number 1 Project Type SANITARY SEWER For Period Ending 2/25/2025 Project Funding Project Manager NA Inspectors D. WATSON / T. STRANG Contractor D T UTILITY CONTRACTORS, INC. 2614 CAUSBIE RD WEATHERFORD, TX 76087 City Secretary Contract Number Contract Date Contract Time 325 WD Days Charged to Date 242 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed Less % Retained Net Earned Earned This Period $2,118,737.20 Retainage This Period $0.00 Less Liquidated Damages � Days @ $0.00 / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $2,118,737.20 $0.00 $2,118,737.20 $0.00 $0.00 $0.00 $0.00 $0.00 $2,118,737.20 Monday, March 24, 2025 Page 7 of 7 2I19I2024 DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: MORNINGSTAR- WESTPOINT BLVD. and NORTH INDIGO SKY DRIVE CHANGE CONTRACT: SANITARY SEWER ORDER No: CFA # 23-0126 CITY PARTICIPATION: NO CITY PROJECT # 104118 DOE # N/A CHANGE ORDER WATER PROJECT # 301140200431-104118-E07685 No: 2 SEWER PROJECT # 301140200431-104118-E07685 FILE # X-276o9 INSPECTOR: ADRIAN ARANDA Phone No: 817-329-6655 /+drian.,4randa�fortworthtexas.aov PROJECT MANAGER: GEORGE MARQUEZ, P.E. Phone No: 817-392-6826 Georae.Marauez�FortWorthTexas.00v CONTRACT UNIT WATER SEWER PAVING DRAINAGE STREETLIGHTS CONTRACT ev oper Deve oper Deve oper Deve oper DAYS Cost City Cost Developer Cost City Cost Cost City Cost Cost City Cost Cost City Cost ORIGINAL CONTRACT $2,605,963.00 180 EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE $0.00 $0.00 $2,605,963.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 AMOUNT OF PROP. CHANGE ORDER ($2,164,607.80) REVISED CONTRACT AMOUNT $0.00 $0.00 $441,355.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 180 TOTAL REVISED CONTRACT AMOUNT PER UNT $0.00 $441,355.20 $0.00 $0.00 $0,00 REVISED COST SHARE Dev. Cost: $441,355.20 City Cost: $0.00 TOTAL REVISED CONTRACT 5441,355.20 REVIEWED By Victor V Tornero Jr. at 1:35 pm, Mar O5, 2025 Page 1 REASONS FOR CHANGE ORDER: This portions of the Sanitary Sewer was broken out into a new project: Morningstar Westpoint- 24" Sanitary Sewer Line, CPN: 105124, IPRC : 23-0151, FID Na: 30114-0200431-105124E0768! Project approved by Directory Andrew Goodman, November 1st, 2023. This Change Order reflects said item removed on this project The new adds are based on changes in the field due to a conflict of existing gas pipelines in the field. RECOMMENDED: APPROVED: APPROVED: WELCH ENGINEERING, INC. F.G. ALEDO DEVELOPMENT, LLC. BY: J�oG�s� � �s�iii BY: ✓lin+ -��' 6T 0.T. Ui1LITY CONTRACTORS, WC. BY: � �i�ill Name: Timothy J. Welch, P.E. Name: Kim Gill Name: Colton Tollett Title: President Title: President Title: Vice President FoRTWoRTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Wespoint Blvd and N Indigo Sky Dr CITY PROJECT NUMBER: 104118 WATER PIPE LAID SIZE TYPE OF PIPE LF Open-Trench 6" PVC 180 LF Open-Trench 8" PVC 994 LF Open-Trench 8" DIP 12 LF Open-Trench 12" DR-14 PVC 2,733 LF Open-Trench 12" DIP 713 LF Open-Trench 16" DR-14 PVC 925 LF Open-Trench 16" DIP 30 LF FIRE HYDRANTS: 9 PIPE ABANDONED DENSITIES: NEW SERVICES: SIZE 1" VALVES (16" OR LARGER) TYPE OF PIPE Taken-Pass DOM LF N/A f►.i■w�l SEWER PIPE LAID SIZE TYPE OF PIPE LF Open-Trench 6" SDR-26 PVC 84 LF Open-Trench 8" SDR-26 PVC 676 LF Open-Trench 8" DIP 193 LF Open-Trench 10" SDR-26 PVC 30 LF Open-Trench 12" SDR-26 PVC 50 LF Open-Trench 12" DIP 463 LF Open-Trench 24" DIP 249 LF Open-Trench 24" DR-17 3,819 LF PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: 6" Taken-Pass SDR-26 PVC 84 LF TRANSPORTATION AND PUBLIC WORKS The Cit� of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 �������T�� TRANSPORTATION AND PUBLIC WORKS February 27, 2025 DT Utility Contractors 2614 Causbie Rd Weatherford TX 76087 RE: Acceptance Letter Project Name: Westpoint Blvd and N Indigo Dr Project Type: Water, Sewer, Drainage City Project No.: 104118 To Whom It May Concern: On February 27, 2025 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on February 27, 2025, which is the date of the final inspection and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-6826. Sincerely, ��� ��� George Marquez P.E , Project Manager Cc: Adrian Aranda , Inspector Donald Watson , Inspection Supervisor Aaron Ybarra , Senior Inspector Andrew Goodman , Program Manager Welch Engineering INC, Consultant DT Utility, Contractor FG Aledo Development LLC, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Signature: Signature: Email: Kandice.Merrick@fortworthtexas.gov Email: allison.tidwell@fortworthtexas.gov Rev. 08/20/19 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Colton Tollett, Vice President Of D.T.Utility Contractors, Inc., known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Morningstar Westpoint Blvd CPN 104118 Tarrant County, Texas. BY Colton Tollett, Vice President of D.T. Utility Contractors, Inc. Subscribed and sworn before me on this date 9th of September, 2025. � F Notary Public State of Texas rOj�y pUBGc LISA D SIMONS NOTARY PUBLIC * '� ' STATE OF TE)W.S `�,,�aF��.�py MY COMM. IXP. 07/OB/29 NOTARY ID 2008712 GONSENT OF SURETY TO FINAL PAYMENT -11.-1 17r�c�tr�rte�tl G?U? Boncf Na. 57A2SUOOQ2448 '3'{ ) ( )1X'\ I:h: i,Aynrir ru�el rr.lrin�t.) FG Aledo Development, LLC 3Q45 Lackland Blvd Fort Worth, TX 7�116 PEz( )11:CT. !:A'.-»Ur rrnd.�rl�lren.) � ��t��l:,t :\NCHI�I E(:�C c:r�n-rEt�c.r��x ti���t�:���' � s't'l � i�.►2 AFtCHITF,Cl"ti Pi2011�.(; [' N(.).: � x X �C (;U�''�'RnC"1' FC.�[t; Pa�ing, Drainage, Sewer, Water and 5treet Light Irn�ro�ements CONTEtAC7' DA't't•:i�: September 6, 2023 Marningstar - Westpoint Blvd. and North Indigo Sky Drive Paving, Dra�nage, Sewer, Water and 5treet Light Improvements City Praject No.: 1Q41'18 In cic �ur�l.in�r »iih tltc ��tta�isie�ns c�ithe Ci�ntr:�ri hciwcci3 the Ouncr ��aul tiic Cun€ra�:inr t�y inclir:ilrcl ahu+r. rhr il��.;r�1 rriu+ic• ruer! redilrr" ��f ti�����•ty�l American Alternati�e Insurance Corporation 555 College Road East - P.O. Box 5241 Princeton, NJ 08543 � i Ar.}. •� 1�tr r�r� e- rrnrl ue 1�6r.c� „1'Lin+hircicu'1 D.T. Utillity Contractor5, Inc. 2614 Causbi� Road WeatherFord, TX 76087 si!xr:��'. CC)�'CR�(:TOF, h��rch� a��]�E-c��es nl ihi• tit�al E��t� inei�t tt� [hc Caiiih:iciirr. �in�l a�ree�� €iia[ iinal ��a��rncn[ [<< tlle Ccm[rac;ur shall nc�l relie��e [h� 5ueeft� t�f :u n' c 1t i[. c �hli�;k�f i� m; [ � 1 (lif.a•r7 rr�urtr rurrl «eldre•.:<r�J U�rm•rr FG Aiedo Develapment, LLC 3045 Lackland Blvd Fort Worth, TX 75116 34 tii'l �III�I�l IYk ti1Ul� .lL['CI\'.5 ti7Ull(�. c��wvE:rt, I\ �X'['t'\I:Sti 11'E ll:i�fi�)I�. thr Sw'�tc }l�t,, heretirn�s ,ct ii> h:tticl ���� ��us d.3��: March 3, 2�25 �hi.rrf u1 +1'�71u{g tlh• midNi� fnlluu ed %iY lbr rttrrnc•r ii- drrir rr�ir7 st•rrr- i American A�ternati�e Insura Cor oration � �,,,,�•��; /l ,.. t� _. _`� . � --_— - . �' � . ;{ �.. ! l��,;vr�rler�Y�nJiriNiv�rizrrlrrprr�.rrufr+lir<y � � '--'%�!� /L ;, , Atu.til: , ���,.���. Debra Robinson, 1NiEness Russ Frenzel� Attorney-i�, Fact _ i!'rr+nval ieruur�rud �eNrt �.�..�.� CALITiQi�: Y�u s#�otald sign an originai AIA dc��€�r�-s�r�t €h�t has this caufion printPti~i7 r��. Ars � � origir�al assura� tf��t chang�s will not be obscured as may occur when doc�rnents are=r�rn,rc�,�c�d, See Instruciion 5�►eet for Limited License for Reprotlt�Ction of this dacument. �AIA AOCUMENT G707 • CC)�'.i�:.�`I' UI� �E HI.II' fU Fl:�,�l. p:�1:�11i.v'I • I�,r�-� I�.I�f7"ICI.� •.4L1 .�,� I �J�S�� • 7F [f�_ .aa4FRIC_�V 3�S'I'1Ti'Tf: ( lI� .�ft�,t I I'll�.c:'f�. I -+� \E:IC � � (1Hh :1�'I:ti! E�. ?.'�F'. IX':��I I- i � t�c,'l'(i.�. ni. �fx��r�-,,9� . WARNIHG: Unlicensed phalocopying v€atates U.S. wpy- right kaws antl w'sll su6jeeE the violatnr to legal proseculion. G7Q7---1994 . _ .i � _ �� '�- : � C�R71Fi�D COPY KN6W ALL MEN LiY THESE PR�SENTS That the AMERIGAN ALTERNATIV� INSEJRANCE GORPORATION. a corporation organiaed and exisGng by vErtue of the laws oF lhe Sl�ale of �elaware ("Corporalion"} with offices at 555 College Road East. Princeton. N.J 06543. has made. constituted and appointed. and by 4hese presents. rtoes make corstitute and appo3nl�. Russ Frenzel; Brady K. Coz; William O. Baldwin; Brent Baldwin; Michaei 8. Hili; Keith Rogers; Sam Freireith; Brock Anglin; Cindy Alford; Yamillec Ramos; Neira Hernandez; and Kristi Qale �?s true and Eativful Attorneys-in-Fact. at ?rieiczbn, ir. the State of N�r� Jersey, eaclz or them alone to have fuil �ower to act v.�thouF ihe other or others. to make. execute and dal�var pn :ts �ehalf. as Surety or Co-surety. hancls and undertakings given fcr any and all pur�,oses, also to exe�ute and deliver on ics behalf as aforesaid renewals. extensians. agraenlents, waivers, consents orst�pulatians relat�ng lo such Gonds or underiakings piov�ded, however. Inat no single bpnd or undertaking sn made, executed and delivered shall o�lcgate said Company far any portion af the penal Sum thereof in exces5 af the Sum pf One Hundred Milliqn Oollars [5100,fl00.0001 Such "�onds and undertak[ngs for said purposes, when duly executed hy said Ariomey{sj-irnFacl, shall be bindfng upon said Company as fully and to lhzsame extznt as if s�gned hy Yh2 Pras�tlent oE said Company under 3is corporale seal attestad by its Secretary il�is appocntmeni is made under and by authonty of a cerlafn Resolution adop[ed at a mee[mg of ihe Board of Duectors at said Company duly held on tt�e 27t3� day of Augusk. 1975. a copy of vlh�ch appears 6elow P�WER OF ATTORNEY EN WIiNESS W1-EEREOF, the Afv1ERICAN AL7ERNA7IVE 1NSURANCE CORPORATION has caused its corporate seal to be hereunto aiftxed, and these presents to be signed by rts duly au[honzed o�cers this 24`" day ot Sapiem6er, 202i, ,�c'!'i5 �ny%;"'�., c �4��;` � i;:�ORPnRqrFf c�% ' .SCAL:�� ;,�t� ts23,-,�„e`�,.. �„ ai' �_ ""'%��� � ���;,,�,<<�. BY- Attesi: � ,�„��.( r:.-.. Michael G. Kerner President �" .. Ignacio Ri+rera Dep�ty Generai Courtsel & Secr�tary STATE Of NEW JERSEY, COl1NTY OF SOhAERSET The foregofng instrument was acknowledged hefore me by means aT online notar�zation this 24'' day of Sep[ember, 2Q21, hy Michae{ G. Kemer a�d Ignacio Rivera, who are personaliy known to me. .�a;a`��"� .''•lV'- _ k�� � �,,,��a,�� . ���� VtM . . 1 �"� �� r,,.,.�,�"'� �rnnrrnrsv�c� rrn�r��ir+e'r'c (�-1E������,',,�..D�� JdG r San�i:ippajTdetary Pu ti� f} 5 te of P��w j�rsey � My Commission Expir�s Fehntary S. 2426 +.».�;��s�.�a.i�� vir►�i u� hhcu�idcrtii��;ncd.I,��;icu� Ititicr;s_ hr�cf,vccrliil�; t I hai thc E�n.Icr��Lc�c•�I i` S��crclan ul \mr.nc�in -lhcrn;il��c In,u�uncc ('arp,��rut�on. ;� c��i�,c�ruh��n uE lhc St:�tc nl I)��ia�t��re_ 2 Ih.n ihe ongin,�l �����er ul��,�tuinu4� nl� n�hieh Ih� li�re�tnnr is a co�,y' 14as �iuly czecirt�d u�� bch.ill'uf�5aid �c�r�urai�on �azt thc d�a af' its �ate. i�ncl f��s not since t�ccn rrvnl.r�L a�ricniic�i ��i muililiccf. th.il ilic undcrsi�nct! Ir.is ci�mparccl tlic fuiztining cu�4 ii�crcnt't� rtk� suiil uri�i��ul puncrufz�Lwrziev_ �rnci [h.0 t11L sanie is a Irue arid cc�rrcct c:ap� nf,.uJ urS!��nal pn«rrafuttnrnr� and uflhr snc�rlc lhrrrul'. .s I lu.i� tltc urfgiE}nl rcaul�ilinn nl'�viiirh Ihc li�llu�� in_ i., �i cu��t �c:�s duh ;uiu��lcil aL wul ii•cnrdc�i m �It� minutcs i�f: �I iogul�Y mc�ling ol'tt�e [3i�8rJ uf i 3„r, l� �rti ��I :;.i�d C'�,rpur;�ti�7ai cluly h�IJ un ��ugusl •I. I'l�)ti. an� hc2s nui sin�c bccn rcvoitt�l. anzcn�l�d nr mu�li�icil. IZI 5�11.V3:U, ihnt each ul'Ihe lio-llir++ni�; c�t'lic�rs i�f Ihi+Car��nr<iliim. neuncl�. thc 1'residcnt, lhe 1=xcculive Vice President,113e tienior Viee Presidenls. aincl ti3c Virc ['residrnis, he, an�l Ihc�� hcrchF ur�. authu�'iznl. I'rnm umr ur lime in lhcir c3iscretian. lo appanzt such ageEii ar a��criis ar attornc�- or attor>>c� s-in-fact as cfccmc�l h� Ihcm ncccssa�y ur cla,irnblc li�r lhc ��ur��u,c ul'cc�nyin�+ on ihi; Corpur:tliou', husincss, ancl to cmpowcr such agcnt ur u� enis ur auurnry or utlornc} s-in-fisct to csccu�c und �I�livcr, iiti iliis C'uiporatiuii's nanu und un ils 6cIia1L �ind undcr its acaE or uiiienvisc, surcly bunt4ti. surct� imJcr�aicin�s ��r nuret� �u��u�acts m;icic h� this l'ur�,i7r.slfan as,urctti' lhcrcnn RGtif7LVLiU. thal ihc <ignalurr nt ejny ;iuthurirecE ntlicrr ul'ih� i'�u��uruion .iI7lI SI3C ('urpuruiun's tie:jl mac be al]ixeci by Cacsimilc Lo sny ro��er oi �uEornee und rt•,wir,ui�in nFany {�m�rr nl'��uurnr} ur renilic.xc n��either �iven fix ihe e�rci�linn oi'any surct�� hnnd. sureir undenakfng. or suret�� ccintrsct_ su�•h si�nauuc and scal. �ti hcn sn tiscd hcin� hcrrl�y aidoptrcl hy Ihc Cairpuration �cs ihc t�ngin,il si�nature of 5uch oll�iccr ac�c� thc original scal al the Cnr�or:itiun. Io hc valid �ind hi:�dine u�un t1�e C'��r�+nritmn �ritii the s.:me lixce an�l eticci ax ihc�u�h manuall� al7i�ec� 1=UR'I I IIiR RI:SC)I..VI:[). th.st any pric�r �Fppoinlmcnls hy Iltc CorF�or. tiun c�l MGns arc. in all respccls, hereh� ratified. cantirmcd snd a�pro� cd, PURTI i�R K[.5( )i.VGU. that lhc 5ccec�ary or am� nssist.utl Sccrc[�jry ul tlii� Cor{}c�r,�Uoci is licreh�� �wthorizcd tuecruty und drin�cr lo any persan tc� tivhosn su�h crrtitiraunn an�l cEclrvery nr.i1' itie deemcJ necessar} und desirahle ui the upiniu�i ufsueh Secre�anr or r\;sf;tant Secretan_ a we cop� ofthe forego4n, nsulut�uri � A I h�• u�zdcrsisne�l I��i, cc,m�,ariJ thr ii�ir,oin� ca��,ir5 e�I .,aiJ uri�i:r�ii icsulifucros,Gti su r��orded. ;snd iEzeti �u� thr �ume irur �ni; c{irrect ccs�,ies ol'said un�isie�i resoiutu��5; <is ,u rccnnlcd eand af the whnle lhcrcul L1 itne" lhr hancf ui ti�c• ��ndersiznel ai�� ihe;c.d i�Cnai.i Cnr�,ur,niun Ihi, 3rd Ja� ul� __MafC�l 'U25 .�`y�;��6t kVSJ,pq�,'�•.,. ;`��.t�F" ••`f �''. __�;.�aRaoRqrE':'c; ; ��. SEAL ; � _ ", f; . 1923 .;,� - , ��""f� ���f i �t ""�" `` \\ll{f21(':1\ \I.l l?fi\.-�1 I\'f: 1\ti!'E2:\\('l�. C ORPOft;1"f !{)\ 4, [ :.... ., .�..�......«..w,. � ���.�,s�l:•i. :a�'sc7:r.C':1' :��If}" I-rciii�� [�n�.r,: I)tF�uic Cirnrr:il C a�sn>�I ti tic�r�lan T�s-�ao�-�