Loading...
HomeMy WebLinkAboutContract 64078Docusign Envelope ID: 91 D2C9E7-F215-4043-8C45-9C358731 D753 CSC No. 64078 Fort Worth and Western Railroad REIMBURSEMENT AGREEMENT PRELIMINARY ENGINEERING SERVICES THIS REIMBURSEMENT AGREEMENT (the "Agreement"), effective as of the latest date written by a signatory (the "Effective Date"), is made by and between Fort Worth & Western Railroad Company (hereinafter "Railroad"), and City of Fort Worth (hereinafter "Agency"). RECITALS Whereas, Agency desires to initiate the project more particularly described on Exhibit A attached hereto (the "Project"); and Whereas, The Project will affect Railroad's track and right of way at or near the Project area more particularly described on Exhibit A; and Whereas, Railroad agrees to collaborate with Agency on the conceptualization and development of the Project in accordance with the terms and conditions of this Agreement. NOW THEREFORE, the parties hereto agree as follows: AGREEMENT 1.Railroad, or its representatives (hereinafter "Railroad Group"), at Agency's sole cost and expense, agrees to perform (or shall cause a third-party consultant [hereinafter "Third Party"] to perform on Railroad Group's behalf) the preliminary engineering services work described on Exhibit B attached hereto (the "PE Work''). Agency acknowledges and agrees that: (a)Railroad Group's review of any Project designs, plans and/or specifications, as part of the PE Work, is limited exclusively to potential impacts on existing and future Railroad facilities and operations; (b) Railroad Group makes no representations or warranties as to the validity, accuracy, legal compliance or completeness of the PE Work; and (c) Agency's reliance on the PE Work is at Agency's own risk. 2.The estimated cost of the PE Work is Fifteen Thousand Dollars & 00/100 ($15,000.00) (the "Estimate"). Notwithstanding the Estimate, Agency agrees to reimburse Railroad Group for one hundred percent (100%) of all actual costs and expenses incurred for the PE Work, including costs and expenses in excess of the Estimate ("the "Excess Cost"), if any, unless such Excess Costs are due to the cause of Railroad Group. Excess Costs which cause the Agency's total expenditure for PE Work to exceed the Estimate will require additional Agency authorization before payment can be made. During the performance of the PE Work, Railroad Group will provide progressive billing to Agency based on actual costs in connection with the PE Work. Within sixty (60) days after completion of the PE Work, Railroad Group will submit a final billing to Agency for any balance owed for the PE Work. Agency shall pay Railroad Group within thirty (30) days after Agency's receipt of any progressive and final bills submitted for the PE Work. Bills will be submitted to Agency using the contact information provided on Exhibit C. Agency's obligation hereunder to reimburse Railroad Group for the PE Work shall apply regardless if Agency declines to proceed with the Project or Railroad elects not to approve the Project. Reimbursement Agreement Preliminary Engineering Services E.Seminary Sidewalk Project, MP 3.88 Everman Subdivision Document No. 20250909-03 Page 1 of 7 Docusign Envelope ID: 91 D2C9E7-F215-4043-8C45-9C358731 D753 3.Agency acknowledges and agrees that Railroad may withhold its approval for the Project for any reason in its sole discretion, including without limitation, impacts to Railroad's safety, facilities, or operations. If Railroad approves the Project, Railroad will continue to work with Agency to develop final plans and specifications and prepare material and force cost estimates for any Project-related work to be performed by Railroad. 4.If the Project is approved by Railroad, Railroad shall prepare and forward to Agency a Construction and Maintenance Agreement (the "C&M Agreement") which shall provide the terms and conditions for the construction and ongoing maintenance of the Project. Unless otherwise expressly set forth in the C&M Agreement, the construction and maintenance of the Project shall be at no cost to Railroad. No construction work on the Project affecting Railroad's property or operations shall commence until the C&M Agreement is finalized and executed by Agency and Railroad. 5.Neither party shall assign this Agreement without the prior written consent of the other party, which consent shall not be unreasonably withheld, conditioned, or delayed. 6.No amendment or variation of the terms of this Agreement shall be valid unless made in writing and signed by the parties. 7.This Agreement sets forth the entire agreement between the parties regarding the Project and PE Work. To the extent that any terms or provisions of this Agreement regarding the PE Work are inconsistent with the terms or provisions set forth in any existing agreement related to the Project, such terms and provisions shall be deemed superseded by this Agreement to the extent of such inconsistency. IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of the Effective Date. BY: CITY OF FORT WORTH Jesica McEachern Assistant City Manager Date: 09/23/2025 -------------- Reimbursement Agreement Preliminary Engineering Services E.Seminary Sidewalk Project, MP 3.88 Everman Subdivision Document No. 20250909-03 BY: FORT WORTH AND WESTERN RAILROAD Kevin Erasmus President and CEO 9/25/2025 Date: _____________ _ Page 2 of 7 Docusign Envelope ID: 91 D2C9E7-F215-4043-8C45-9C358731 D753 APPROVAL RECOMMENDED: Lauren Prieur (Sep 22, 2025 09:49:42 CDT) Lauren L. Prieur, P.E Transportation and Public Work Director 09/22/25 Date: ______________ _ Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. David J. Kastendick, PE Senior Project Manager APPROVED AS TO FORM AND LEGALITY: Douglas Black (Sep 23, 2025 13:26:49 CDT) Douglas W. Black Senior Assistant City Attorney 09/23/2025 Date: ______________ _ Reimbursement Agreement Preliminary Engineering Services E.Seminary Sidewalk Project, MP 3.88 Everman Subdivision Document No. 20250909-03 Page 3 of 7 Docusign Envelope ID: 91 D2C9E7-F215-4043-8C45-9C358731 D753 ATTEST: Jannette Goodall City Secretary 09/24/2025 Date: ---------------- Reimbursement Agreement Preliminary Engineering Services E.Seminary Sidewalk Project, MP 3.88 Everman Subdivision Document No. 20250909-03 Form 1295 No.:_N_I_A _______ _ M&C No:____,;Na.a.;/.a...A.;...._ ________ _ M&C Date: N/A-------------- Page 4 of 7 Docusign Envelope ID: 91 D2C9E7-F215-4043-8C45-9C358731 D753 Exhibit A Project Description and Location Project Description Plan review and project coordination for proposed railroad sidewalk crossings at E. Seminary Dr. Location Everman Subdivision MM 3.88, DOT # 797680A aisr e seMiwa� oA €:� i � �i i + ; � �.. I , �u :�. � ' ' i �� 2 .•.T en� � J - j L�nn:ti�l-- I �N ! --- — '��s f �g. II [% JPAR ROlY 60' / I I IX�iPRR fROu �. 1RACN5 �„�„� �/ f�'M Q �_ " "x_ � � . � V '%�Jl'��•�� ZP0. NFM AS ItEE7E9 I I.:`-.�_�^., �- �Eu hE evp uEpUCE EYISIII�f, [w(m91�:G, � � - . . Fn ELS AS NEEaEb FIXx �hY REuulaE6 ' SL35lIkFA�E INVHGVf1AEN1` ��£ NQIE ]} � ., E%IST V%7A � f;C1YC hWELS (N4TCM f%ISII ���P rb �PAR � L�i05511tiaRkfLTPEI � � f�� 1 . .. .. . . ... . . . . . . .- ��.�.::. . . .... .HO411'1Q1Y. . F—_— _—_ t —_—_r_—_—j—_—_y _—_rt_—_—_y_ _._{-.....¢ ^:�.�.:__ _ _ _+_—_—_�_— —�—_—_�_ _—_+_—_—"t. + M1HI.Bi 111+00 � Ziw�! G.E_� �• � 2 � ]5+00 7�+ao �`�EGIN 1LVL �'IiuPOSm � "0�+: P/LE]S 1w�TCH E%ISIINc MtOFlLf STA N+]5 yp' (�rp` �� CR�i I� °�E� T�'PEj EH� WYL PROPOSm PR�FlLE yTA 2N� rs 1 �HA�, .. . . . . . . �I I T�iAN�IiICM -- ii[ IIPFR I f PAVEIAfM (T'PJ SR�i �' � i uAPR Mlpl Sf� = 27+�I.qa Ex WIGi RON 60' SEuli'uR1' PA ST .�OS+�8.97 _ ��W E Tu�CkS _____ __ I t10�E5. f �� LLL M�M�E�3 PRION�10 mOnj1F�1K,'n isM�P�RT a� C� ��I116�FW�L�OUIE � - _���_, �AAIACE OJAIXG CGu51RUCilOH. � �� i 1. A„ IXl�x LG��51� CHnssa�Pin[i55Pn B!]�Tp��rs�lnre 5� qPRpR jp � + ' I EKIST E SF]AINMY OR ` INPVOVf].iEM1S AQE LLMPLLIE. A � �I �. !i[Fpi Tp m�{�}-32 �� �C']�2)-2Y f� aVNLbO 46�SSIMC DEI4LS' �#y= ,-� LEGENG O n�pp5� [p�pa[� �q�551HL PONEL O PR]aq�y C'�NAEiE SIDErir1H 0 VRaP�EU CO�iE CRNEM'ax PAOPCiEl` hS�HALT 1RxN51110� �PR�qLI�I���+Y i.e e.:�me.i �. n�o�am n.d.e�y I�r �M �..r� vnN�lk[]CIIovNOI�SraINisM[P t�ro uEm] iva AO�mM'p � YN �it� OME InNE CF 1PAfFC IN EMH pREC110X N1LL MEEA l6 HE WIM�dE� NRING .Yii�q,vMuu,s� sr iei-T}T Y�IVIEN+VCE W CWSfP�LAOM AT 4L TMES. OHLY IEU�R�ftY Cl95WtES MLL 9E �� �� �� � � � � � 8J6 �TMEq �wM� 'MT� �'� �� F � uL'I�£� OUPIruG TwFNc � ikafn^, COxIROL PUX x1LL BE REOUNEfl 9r ' " � � ' ' ' ' . ' � �e��� y �klRkTp4 PPIpR N w� v ��uuEVCln�) . .. . �'EMIS� E 5£YI�VP/ pR � r -- 4 at L � � � � HOPo20HTAL6YERTICALCONTROt u . . . . _� . �u m . '� � � - — ry ' . . — ' W.mo�.t 11ic�. Il � �?� � � � ;69;a��, � � � V ti a � E: ��,�.:o � h IWL.PA�POSEP . '^ . . 9 . . . . . . . EIEY e�..Je }a eeo n aaff1LE-sTA P0+75 . � � . . . " G d . . °a H d . . . . � d . . . . . ae° ,�. . . . �" � . .. . . . . . . FNP fUIL PRq'�i . . i d . . . � c+ aF�vnn r�n . . . a�aKi[� sr. a<+�o � � lExI5TPJ2 8 ' —� 65'J Ny� � ShJ L= 4�L - $ PAOPOSE� TfiA Jrl IXIST 1aA�� . . � ^ `a a" g � . ��.n . n n F� 690 �o+�o .i+oo .�.� . r . p n . g �.w . �:m . �.w . ew v7+w )stIX� � u '. � . � CITY 6F FORT WOi2TH, TE%AS u � - - �' - - TAANSPOR7A'1'IaN S PUBLIC WORyG9 � ry U � � � : � 69fRAYS78E56MINARVDR } . �m, . �0 SI�EWALK&A�ARAMPINFILL a � � : � d � � t StMINAItY �H 3iAIL FLAN ¢ L= ix5'� STAZOF5�T6$Tp,�F$5 LL YFL,- 0.13. . . . . � Q .. Q �..W n � TR HSYS'�1�5�;�W „�09 ; !.m . d:w . $�m . u[c sea� � 2 � 4E5dFA 11. 7Jli IXiE: SIEEf L 7.+ov ww�: .i, r-�o� t�n�nme c-�rr.aa+ Reimbursement Agreement Preliminary Engineering Services Page 5 of 7 E. Seminary Sidewalk Project, MP 3.88 Everman Subdivision Document No. 20250909-03 Docusign Envelope ID: 91 D2C9E7-F215-4043-8C45-9C358731 D753 EXHIBIT B Scope of Project Services Scope of services includes, but is not limited to the following • Field diagnostic(s) and inspections • Plan, specification and construction review • Project design comments and recommendations • Project conceptual design outline • Project agreement preparation • Legal review of proposed agreement • Preparation of Project estimate for force account or other work performed by the Railroad • Meetings and travel Reimbursement Agreement Page 6 of 7 Preliminary Engineering Services E. Seminary Sidewalk Project, MP 3.88 Everman Subdivision Document No. 20250909-03 Docusign Envelope ID: 91 D2C9E7-F215-4043-8C45-9C358731 D753 EXHIBIT C Billing Contact Information Name David J. Kastendick Title Senior Project Manager Address 100 Fort Worth Trail, Fort Worth, TX. 76102 Work Phone 817-392-5448 Cell Phone 817-213-0723 Email David.Kastendick@fortworthtexas.gov Reimbursement Agreement Preliminary Engineering Services Page 7 of 7 E. Seminary Sidewalk Project, MP 3.88 Everman Subdivision Document No. 20250909-03 Docusign Envelope ID: 91 D2C9E7-F215-4043-8C45-9C358731 D753 Fo�T�WaRTH�, Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: FWWR PE Agreement SidewalkE Seminary Dr M&C: N/A CPN: 104219 CSO: Date: „ „ , ,,,,,,, � DOC#: To: Name Department Initials Date Out 1• Kevin Erasmus-Si nature FWWR �� 9/25/2025 2. Da�id Kastendick-Signature TPW D� 09/12/25 3. Chad Allen-Review TPW S� 09/16/25 4. Lissette Acevedo-Review TPW 09/18/25 5. Patricia Wadsack-Review TPW p(.,�/' 09/19/25 6. Lauren Prieur-Signature TPW x� 09/22/25 7. Doug Black-Signature Legal � 09/23/25 8. Jesica McEachern-Signature CMO � 09/23/25 9. Jannette Goodall CSO � 09/24/25 10. TPW Contracts TPW CC: TPW BSPAP Recon Team, TPW Records Room, Alexiz Ramirez DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRiATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NOTE: FWWR to sign after execution by City per their request. NEEDS TO BE NOTARIZED: ❑YES �No RUSH: ❑YES �No SAME DAY: ❑YES �No NEXT DAY: ❑YES �No ROUTING TO CSO: �YES ❑No Action Repuired: ❑ As Requested ❑ For Your Information � Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: Please notify TPWContracts(a�fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you! F�RT ��RTH�} City Secretary's Office Contract Routing & Transmittal Slip ContraCtor's Name: Fort Worth & Western Railroad Company SUb�eCt Of tile AgPeeffie11t: Plan review and project coordination for proposed railroad sidewalk crossings at E. Seminary Dr. M&C Approved by the Council? * Yes ❑ No 8 If so, the M&C must be attached to the contract. Is this an Amendment to an Existing contract? Yes ❑ No 8 If so, provide the original contract number and the amendment number. Is the Contract "Permanent"? *Yes 8 No ❑ If unsure, see back page for permanent contract listing. Is this entire contract Confidential? XYes ❑ No 8 If only specific information is Confidential, please list what information is Confidential and the page it is located. Effective Date: If�different from lhe approval dale. Expiration Date: If applicable. Is a 1295 Form required? * Yes ❑ No 8 *If so, please ensure it is attached to the approving M&C or attached to the contract. Proj ect Number: If applicable. 104219 *Did you include a Text field on the contract to add the City Secretary Contract (CSC) number? Yes 8 No ❑ Contracts need to be routed for CSO processin� in the following order: 1. Katherine Cenicola (Approver) 2. Jannette S. Goodall (Signer) 3. Allison Tidwell (Form Filler) *Indicates the infor7nation is required and if the information is nol provided, the contract will be returned to the department.