HomeMy WebLinkAboutContract 36324-A5 AMENDMENT No, 5
Y SECRUAW
TO CITY SECRETARY CONTRACT CONTRACT
NO lalill MW
NMEREAS, the City of Fort Worth (CITY) and Kimley-Horn
and Associates,, Inc. ,, (ENGINEER) made and entered into City,
Secretary Contract No. 363241 the CONTRACT), which was
authorized by M&C C-22555 on the 4 th day of December,, 2007 in
the amount of $251,355. 010; and
WHEIREAK, the CONTRACT was subsequently revised by.
Amendment Number 1 'in the amount of $138, 730 , 00, which was
authorized by M&C C-250128, on July 19, 2011, Amendment No. 2 in
the amount of' $49, 6010. 00 which was administratively authorized
on August 23, 20!12, Amendment No 3 in the amount of'
$27, 0010 . 00 which was administratively authorized: on December
61 2012 and Amendment No. 4 In the amount of $48,r3OO . 00 which
was administratively authorized on July 24, 20131 -, and
HEREAK, the CONTRACT' involves engineering services for
the following project,*
Water and Sanitary Sewer Relocations for State Highway
121T, Part 3 ; and
If
NMEREAS, it has, become necessary to execute Amendment
No. 5 to the CONTRACT to "include an increased scope of work and
revised f ele.
NOWTHEREFORE, CITY and ENGINEER,, acting herein by and
through their duly authorized representatives,, enter, into, the
following agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT 'i' s amended to include the
additional engineering services specified 'in a proposal dated
December 3,, 2013,, a, copy of which 'is attached hereto and
incorporated herein. The cost to City for the additional
design services, to be performed by Engineer totals $41,, 700. 00 .,
2 .
Article, II of the CONTRACT is amended to provide for an
increase in the fee to be paid, to Engineer for all work and
services performed under the Contract, as amended, so that the mil-total fee paid by the City for all work an ' be
an amount, of $,5,56,, 685 . 00 'OFFICIAL RECORD
'sh
0
D
CITY'SECRETrARY
Page
L
F'Ta
AN 01 8 2014
MA
3M
All the' ` provisions of the Contract, which are not
expressly amended herein, shiLll remain in full force and
effect.
EXECUTED and EFFECTIVE as of the date last written by a
,signatory, below.
APPROVED: ENGINEER
City of Fort, Worth, Kimley-Horn and Associates Inc. ,
Fernando Costa Gfen,n Ga,ry,, P.E.
Assistant City Manager Senior Vice-President
DATE: DATE: R01
APP REC — WED.
S. Frank Crumb, P
Director, Water Department
APPROVED AS TO FORM AND LEGALITY: M&C,so N/A
Date l-0 N/A
tv�A au lu
Michelle M. Krd4-1
Assistant City Attorney
0 X000% 0
ATTEST
-77
0%
0
K '
000010000
S
C30-ty Secr ary
OFFICIAL RECORD
LFF1
CIA Oft
Co
EC
E
R
ly
"I
CITY SECRIETAW
T
to W
OR :
it 3
THY IUJ
TX
Page -2-
Ki m ley-Hom
and Amciates, Inc,
December 32013
SU46 950
801 Cherry Street,0011,
Mr. Liam Conlon Fort Wofth,Texas
76102
Project Manager
City of Fort Worth Water Department
100O Throckmorton Street
Fort Worthl,TX 7'6102
Re: Water and San 1tary Sewer Relocations for S14-12 IT(Southwest Parkway),,
Part 3
Additional Services -Amendment No. 5
KRA No. 06 10 J 8049
City Project No. 008,99
Dear,Liam,
Th*is is an amendment to a contract between Kimley-Hom and Associates, Inc,
and the City of Foal Worth("flie City")dated 12-19-2007 referred to'herein as
the"'Contract".
Per contract Ainendinent No.4, Kirnley-Horn has desiW,ied a,sanitary wNeer line
through the Villages of Sunset Pointe Subdivision, as well roadway
reconstruction sheets,for Big Spruce Lane. Kin-iley-Horn has also prepared plan,
profile and gfading sheets for a screen wall to be located baween the City ROW
and NTTA ROW.
"I'his amendment will provide for Consoualon Phase Services'.Part 15 contract
termination services.,as well as pavement design services as indicated below:
Item t(Construction Phase Services)
Kiniley-Horn w,ill provide construction phase services. as defit',ted in the Contract
Exhibit"A-1"' Part D—Construction Phase Services including:
9 Attend one (1)preeonstruction conference prior to construction
* Perform one(1)site visit pier,i-notitti,up to five(5)
* Review shop drawings and sample submissions as defined in the
Contract
* Revise drawings and provide record drawings-to the City
* Attend one(1)final site inspection
Additionally, Kiniley-Florn will attend one(1) meeting with the Villages of
Sunset Pointe HOA and one(1)1)ublic meet ing,prior to construction.
H
TEL 817 335 651 1
FAX 817 33;5 5070
ktc Liarn Conlon,Deeviiher 3,21013,Page 2
Kimley-Horn
and Associates, loc.
Item 2(Part 1,5—Contract Termination)
Kin fley-Horn provided the followirig,services,due to the ccinstruction contract
w ith SJ. Louis Constructon. being terminated for convenience by the City-&
Coordination, With S.J. Louis and City staff regarding accounting for and
delivery of materials of land,
Review of CMR's that were submitted by S. Louis.
Attending meetings with City staff regarding submitted CMR.'s and
close-out procedures.
Item 3 (Roadway and Pavement Design)
Kimley-Horn will provide, Pavement Design for the proposed Big Spruce Lane
recons-truction. These services will be perfonned by a sub-consultant and
administered by Kirrilley-Hom.
Kirnley-Horn will modify the previous roadway design to include the follo)Nring
updates,as directed by the Transportation and Public Works Department:
Roadway Jointing Plaus
Sidewalk Replacement
Driveway Replacenlent
Intersection Updates and Replacement
Storm Drain, Updates and Replacement
Scope of Services
The scope of services for this amendment is divided into tl e!following tasks-,
Item I (Construction P'liase Services),- $11,100 Kimley-Horn
(Water$01; Sewer$11,100),
* Task I—Meeting with the V1,11ages of Sunset Pohite HOA,
Preconstruction Meeting,Site set-vations and Final Walkthrough.
* Task 2—Shop Drawing and Substitution Review.
* Task 3—Construction Phase Services related to the Summer Creek
Project,
Item 2(Part 15—Cont-ract Terinination):$12,000 Kimley-Horn
(Water$0- Sewer$12,000)
# 'J.'ash-A I —Six(6)Meetings WI M City Staff.
* Task 2—Reviewing CM.R Submittals.
M J,1A am Card ou,DecQrnbu 3,2013,Page 3
n ,a Associates,, Inc.
d
Item 3(Pavement Desigit 4. $13,364 Kiniley-horn
$ 4,760 Pavement Sub
S 476 4 0% Sub Fee
S18,600 Total
(Water$0, Newer 818,600)
* Task 1–Design proposed pavement cross-section for 13%Spruce-L".ane.
* Task 2–Design,Roadway hni)roveinents for Big Spruce,Lane.
We recon-imend that the pity increase the budget by$41,700 for the.s.e
additional services, Frorn the additional serviQes listed above,,the
recorritnended breakdown for water and sewer services is as follaws:
Descrtiption Water Sewer Total
I-e;rvt 1, 1
Item I –Construction Phase $0 $11)100 $11,100
Senlices
Item 2–Part 15 Contract $0 $125,000 $12,000
–Tenninatioll
Iferil 3 –Pavement Design $10 $1800-1 $180,0
Totai SO $41,5700 $413,
The following table summarizes the fee per Work Phase:
Total
or Phase Water Fee Sewer Fee Fee
31 $0 $,0 $0
1"I
32 $0 $0 $U
33 $0 $411,700 $411700
51, $0 $0 $0
Total SO $417700 t$41,700
Nt Liam COM01111 December 3)2013,,Page 4
Kimley-Horn
and Associates, Inc..
The folto,"ring table suiurnarizes our recommended budget revisions by Item
(please see attached Fee Breakdown for an hourly breakdown of each item):
Description Iter" I Item 2 Item 3 Total,
Pre-Engineering $0
Conceptual Engineering $- $0
Preliminary constructioll $0
Plans
Final Construction Plans 18)60-0 – $18.00
Pre-Construct on Services
Construction Phase
Ser es $ I'lJO0 127000 S- $2_1J00
vic
Total $119.100 $12 Mfi OO $419700
The following table sununarizes our recommended budget revisions and shows
the revised contract aniount:
Description 0 rigl n a I Amend Amend Amend Amend Amend Revised
F e e No. I N .2 No 3 No.4 No.5 Contract
Pre-Engine erl"na $359,00 $354010 $5 200 $4800 $81,300
Conceptual Engineering $62980 $85900 $ $ $- $71.11880
Prefitninary Construction $4%665 $32713,0 $ $ $ - $815795
Plans
Final Construction Plans $85M 0 $46MO $441400 $ $433,200 $ 18 600 $2375510
Pre-Construction, Services $3fiO0 $510001 5;100 $13)'700
Constru+t on Phase
Servic,es $14,A0 $11 po $ $22P200 $- $23)100 1 $707500
I A 3 111 1 ol 011 IN N I I I I I 1 011 i9iii ii AMA ......
Total Project $251,355 $138,730 $49s O $27,000 $48,300 S411700-'.1 5556,685
Mr Liam Conlon,Ncember 3,2013,Page 5
PW WA Thley--Horri
an Associates, Ifte.
The following tables siimtnarize our revisio'jis to the M/WBE percentages
This Amendment
Sub-Consu.Uant Fee
HVJ Associates,Bic.. $4176,0
1"otal
M/WBE Pementage 11*4%
"'llotal Contract
Description Pei-Amend No.4 Revised
Contract Amount $514:985 $556>685
Total Contract M E S891080 $93,840
'YotA- 1 Contract 17.2% 1.6.8%
M/WBE,Percentage
The following table,surnmarizes our revisions to the water and sanitary sewer
design fees.-
Descrii ption Original Amelid. Amend. Amend. Amend. Amend. Total
No. 1 No.2 No.3 No 4 No.5
Water $1331377 $1 1-081695 $36> 00 $0 -7—$0 $0 S278,372,
Sewer $1171978 $30ffl5 $13,3 00 $271,000 $148,300 $41,7001 $278,313
We appreciate the oppoi-tunity to be of continued service to the City. Please
contact Lis, if we need to provide any ffirther informatioll,
Very tt-Lily yours,
KIMLEY-1-10,RN AND ASSOCIATES, INC.
"Fe-vis Registered Engineering 1"Irm F-928
Gel e n,n A. G a r yv,.P.E.P
Sr. Vice President
GAG/ek,
J
Attacbments
�T'f'Al FPO I'Vat aTroi"tTTXV1-1J i i I fli v s'kG6 101:80°9TMArnend u c -5"Mi A-SH 121 PL15 Amend 5-1-mdoc
Generel Project Information Fee Information
Task Budget Summary Task 700 Task 888
Igo
li.......... a"I 01,01 ME, Expenses All I
Roadway Design $ 51500
SJL Term ination 121,00
Ji
SubconsWtant Summary
IVIT'ask Name Multiplier
tabor. 35,300
�Expenses..-: $i 6140O
$ 4111700m
Project Budget-Summary
General r jec Information �'r, % /�� ,r r/ bask 1 rmabo
i"'r�. I u"ce'�j`1i/ /j/,r/ /
r �'M a r `
Jt"ry i
bask Description and Budgkiinhg
IL
s
r,
r;
o�
I 11
I
�1
I II
I � �
r
i
/ r .r.
16 /r/
// ..
LAM
General Proj rri,,,� ,,�!, .,�/i, , 'r z /! ,;�„ ,, rii r/,,, r�,< r, ,� iJ r,/J r/r /„/,/ T/ff1 f
/ /, /,r /
,, r /i r � f „ r r
,. i ,. ..,.".%„i” i. /„/,// r//„„%/////,rer� �r d ,ti,,,v/,Ir//,/r,'Sri r� � r�� �/,r�; a,�//�////i ilon
.,, "r ,
91411/111M/
r/
//„ �/
r/
/ „i ,r i.r✓,/,��.r// //r/r�.........._., ,r ,/r/
,/,r/://rr,✓/i/„r rir r,,,,r/r r r/.r rr/r,i r i i/i i/
r/r r
.,.
a r
r,
r
/ ,
a,
/
r, r,
/
i
wi
w�ul�plll
ill
I I
III
i
II
IM
/
N I pl
M
i
�h
Jill
ylzrzo M,
MUNAWNA
i
General Project Informiation �//gip/r rioi;,�� r///%��r / �//if�////�i,,,%/r/�/ i,//ii Rio,, Information
11 ,
R
t
r r
/ r
/ r
Budgeting
MIC
llffimu
/ ! �rra,
/ r r/ /
r,
r r
/
i
r„
/
„
r
/
/
•
I
I
�I
:
r
r I r
,r
r,
/; � / r,r it„ ,, „/ / ./ /, „/ r ,• ,,, // �,......
OR